BARAUNI REFINERY

21
Barauni Refinery-in harmony with nature BARAUNI REFINERY BARAUNI REFINERY 2 2 nd nd National Conference National Conference on on ERDMP Accreditation ERDMP Accreditation 27 Sept 2012 27 Sept 2012

description

BARAUNI REFINERY. 2 nd National Conference on ERDMP Accreditation. 27 Sept 2012. Supply Chain of Barauni Refinery. Depots Terminals Bulk Consumers. 6 MMTPA. Nigeria Malaysia. Nepal & Other areas. 30%. 36%. 34%. Haldia. Mktg Terminal Bihar & UP. Barauni. Paradeep. BKPL - PowerPoint PPT Presentation

Transcript of BARAUNI REFINERY

Page 1: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

BARAUNI REFINERY BARAUNI REFINERY

22ndnd National Conference National Conference on on

ERDMP AccreditationERDMP Accreditation

27 Sept 201227 Sept 2012

Page 2: BARAUNI REFINERY

Supply Chain of Barauni RefinerySupply Chain of Barauni Refinery

NigeriaMalaysia

Middle EastSouth African Countries

Haldia

ParadeepBarauni

Mktg TerminalBihar & UP

DepotsTerminalsBulk Consumers

BKPL (Barauni Kanpur PiPELINE)Patna, Mughalsarai,Allahabad, Kanpur,Lucknow

Nepal & Other areas

30%

34%

36%

6 MMTPA

Page 3: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

AVU

I /

II /

III

Fuel GasLPG

CRU Motor Sprit

Naphtha

KeroseneH2

PLANT

DHDT

COKER – A /B

FCCU

HSD (High Speed Diesel)

LRU

LSHS

Petroleum Coke

ARU/SRU SULPHUR

LPG MERICHEM

GASOLINE MERICHEM

BLOCK FLOW DIAGRAM OF BARAUNI REFINERY

MSQ

Page 4: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

OFF-SITE DISASTER MOCK DRILL

FOR ERDMP ACCREDITATION

BARAUNI REFINERY

Page 5: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Introduction• Development and implementation of ERDMP is the key

to develop a state of readiness

• The third party accreditation of ERDMP is mandatory as per PNGRB Regulations 2010.

• Collaboration with Disaster Management Institute (DMI), Bhopal for review and accreditation of ERDMP.

• Conduction of a disaster mock drill is a mandatory step for obtaining 3rd party accreditation of ERDMP.

• Accordingly, a full scale Off-Mock Disaster Mock Drill carried out at Barauni Refinery on 12th Sept 2012.

• Shri Rakesh Dubey, Director DMI, Bhopal critically supervised the whole drill process as external observer.

Page 6: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Objective of Disaster Mock drill

• Observe and evaluate the effectiveness of ERDMP.

• Check preparedness of district administration to respond and manage large scale disasters.

• Create awareness and coordination among government functionaries, refinery personnel and communities.

• Develop and strengthen disaster management preparedness, response and recovery plans.

• Minimize damage to public, environment, property and machinery.

Page 7: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Scenario of Disaster Mock drill

• Level-3 scenario of catastrophic failure of LPG Tanker at LPG loading area.

• Failure leads to boiling liquid expanding vapour explosion (BLEVE).

• Mosadpur & Devna villages falls in the affected off-site areas because of this the disaster.

Page 8: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Page 9: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Appreciation Programme

• Conducted for district administration authorities.

• To create awareness about the scenario of the mock drill.

• Strengthen the communication and co-ordination between district authority and refinery.

• DM, Begusari along with 50 other officials from district administration and Barauni Refinery attended the prograame

Page 10: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Appreciation Programme

Page 11: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Sequence of EventsTime Event

1140 hrs Fire call was received at fire control room from LPG loading area.

1143 hrs Major fire siren was blown

1154 hrs Onsite Disaster was declared by blowing the disaster siren

1205 hrs Off Site Disaster Plan was activated immediately after it became clear that it the major fire might turn into BLEVE

1210 hrs District administration team arrived at disaster site

1224 hrs Emergency was controlled and all clear siren was blown

Page 12: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

De-briefing Session• A debriefing session was held to review the disaster

mock drill.

• Areas of concern were discussed aiming at various scope of improvement.

• DM, Begusrai chaired the debriefing session in presence of Mr. SK Jha, ED, Barauni Refinery, Dr Rakesh Dubey, Dir, DMI, Bhopal, Mr RK Chugh, GM (TS) and Mr S K Das, GM (T).

• About 78 officials from district administration and Barauni Refinery attended the meeting.

Page 13: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Highlights of the Mock Drill• The drill lasted for about 44 minutes

• Barauni Refinery executed the disaster management plan effectively.

• All the off-site emergency coordinators from district administration participated actively in the exercise.

• The district administration effectively discharged its role in managing and controlling the offsite disaster.

• The habitants of affected villages, vehicle drivers and other people commuting on the nearby roads were found to be aware of the emergency situation.

Page 14: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Highlights of the Mock Drill• The active participation of Civil defense volunteers in

the mock drill was praiseworthy.

• Three causalities (one burn, another fallen from height and third with gas exposure) were reported onsite and two causalities were reported offsite.

• The whole exercise was closely observed by 10 observers from Barauni Refinery and 4 observers from district administration.

• The mock drill culminated without any mishap and inconvenience to the public.

• The exercise was successful and was deeply appreciated by Mr Rakesh Dubey, Director, DMI, Bhopal.

Page 15: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Mock Drill in Pictures

Director DMI, Bhopal with ED, Barauni Refinery and BR Management during Opening Meeting

Location of Disaster Mock drill: LPG TT Loading Shed

Page 16: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Mock Drill in Pictures

Arrival of Fire Team at LPG TT Area and Fire Fighting in Progress

Removal of Causality from the Site

Page 17: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Mock Drill in Pictures

Civil defense officers and Ambulance in nearby village

Arrival of District Administration

Page 18: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Mock Drill in Pictures

District Police Controlling the traffic

Director, DMI Bhopal assessing the Offsite Situation

Page 19: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Mock Drill in News

Page 20: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

Mock Drill in News

Page 21: BARAUNI REFINERY

Barauni Refinery-in harmony with nature

THANK YOU