M06 Gas dehydration Fuel Gas
and HCDP
PIP MEC STR MISC TOTAL DRY
203 t 560 t 450 t 60 t 1273 t
M08 H2S Removal System
PIP MEC STR MISC TOTAL DRY
54 t 401 t 469 t 39 t 963 t
M10 Oil Processing and Produced
Water Treat.
PIP MEC STR MISC TOTAL DRY
204 t 339 t 726 t 127 t 1396 t
M12 Power Generation
PIP MEC STR MISC TOTAL DRY
19 t 97 t 530 t 526 t 1172 t
M14 Chemical Unit and Products
Storage
PIP MEC STR MISC TOTAL DRY
27 t 297 t 393 t 10 t 727 t
M16 Laydown Area
PIP MEC STR MISC TOTAL DRY
1 t - 179 t 20 t 200 t
M17 Automation and Electrical
PIP MEC STR MISC TOTAL DRY
1 t - 909 t 588 t 1498 t
M15 Utilities
PIP MEC STR MISC TOTAL DRY
96 t 148 t 436 t 68 t 748 t
M13 Power Generation
PIP MEC STR MISC TOTAL DRY
19 t 97 t 671 t 621 t 1408 t
M11 Water Injection and Sulphate
Removal Unit
PIP MEC STR MISC TOTAL DRY
278 t 652 t 633 t 52 t 1615 t
M09 A/B Pig Launchers / Receivers
PIP MEC STR MISC TOTAL DRY
M09A
572 t - 506 t 180 t 1258 t
M09B
670 t - 272 t 36 t 978 t
M07 Gas Injection
PIP MEC STR MISC TOTAL DRY
194 t 429 t 369 t 58 t 1050 t
M05 Main Gas Compression and
VRU System
PIP MEC STR MISC TOTAL DRY
306 t 610 t 589 t 89 t 1594 t
M03 Exportation Gas Compression
PIP MEC STR MISC TOTAL DRY
395 t 658 t 468 t 75 t 1596 t
M02 CO2 Compression
PIP MEC STR MISC TOTAL DRY
379 t 592 t 559 t 68 t 1598 t
M01 Flare System
PIP MEC STR MISC TOTAL DRY
272 t 132 t 396 t 59 t 859 t
M04 CO2 Removal
PIP MEC STR MISC TOTAL DRY
10 t 707 t 193 t 16 t 926 t
Projeto P-76
ILHA 01 ILHA 02 ILHA 03 ILHA 04
M19 A-G Riser Pipe
Rack
M18 A-G Central Pipe
Rack
M20 Flare Tower
Capacidades – Principais sistemas
Total Líquido Processado 28.600 m³/d
Total Processamento de Óleo 24.000 m³/d
Água Produzida 24.000 m³/d
Sistema de Proc. e Trat. de Gás 7.000.000 m³/d
Pressão Máx. de Injeção de Gás 55.000 kPa abs
Pressão Gas Lift 24.500 kPa abs
Máxima de Gas Lift 4.000.000 m³/d
Pressão de Exportação de Gás 24.500 kPa abs
Água de Injeção 31.800 m³/d
Pressão Água de Injeção 24.500 kPa abs
Composições típicas do óleo
°API 27 - 29 (Óleo leve)
Conc. CO2 (% molar) 8 – 26
Conc. H2S 0 – 170 ppmvol (gás)
Temp. de chegada do óleo 20 – 85°C
Descrição Geral
Produção de Óleo 150.000 bbl/d de óleo
Produção de Gás 7 MM m³ /d de gás
Líquido estocado 1.400.000 bld
Número de poços 20 (6 WAG / 11 satélites / 1
manifold com 3 poços)
Tipo do navio VLCC convertido
Dimensões Gerais 332 m x 58 m x 50 de altura
(excl. a lança do flare)
Acomodações (POB) 110 pessoas
Localização Cessão Onerosa do Pré-sal
na Bacia de Santos
CLLI / Equipamentos Estratégicos
Equipamentos fornecidos pela PNBV - CLLI
M12 / M13 Turbogenerators
M05 Main Gas Motocompressors
M03 Exportation Gas Motocompressors
M02 CO2 Turbocompressors
M07 Injection Gas Motocompressors
M04 CO2 Removal Unit
Equip. Estratégicos (E1) – 330 dias após Notice to proceed
M05 VRU (Vapor Recovery Unit)
M01 / M20 Flare and Closed Flare System
M06 Gas Dehydration Unit
M11 Sulphate Removal Unit
M00 Vacuum Deaerator Column & Vacuum System
M11 Main Injection Water Pumps
M10 Oil Dehydrator
M10 Production Separators
Geral Plate Heat Exchangers
Geral Shell &Tube Heat Exchangers
M00 Sea Water Lift Pumps
Geral Pressure Vessels I (Scrubbers)
M07 Well Service Pump
Geral Modules Primary Structure (80%)
M00 Flotation and Hydrocyclone Unit
M08 H2S Removal Unit
Equip. Estratégicos (E2) – 360 dias após Notice to proceed
M17 Electric Panels (Switchgears)
M17 Power Transformers
Geral CSS
Geral Inconel Piping
Geral Centrifugal Pumps
Geral/M09/M11/M19
Choke Valves
Geral / M10 Fiscal Metering Unit
M14 Chemical Injection Unit
Geral Gate Valves 10.000 psi
M01/M15 Positive Displacement Pumps
Geral Pressure Vessels II
Geral SDV 10.000 psi
Sequência 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 30 31 34 35 36 37 38 39
Módulo M17 M19G M15 M18G M16 M19 E/F M19D M13 M13
(Aut. Room) M18F LAB M14 M11
M11 (SRU)
Desaer. M19 B/C M09A M09
Aft/Fwd Skid M18E M12 M07 M18D
Plataf. M10
M10 M05 M18C M08 M06 M19A M03 M18B M04 M01 M18A M02 Flare tower
Sequência de Içamento
Notas: Última atualização em 21/01/2014 | Pesos retirados do FEED Documento não oficial somente para referência | Vent posts não incluídos na sequência de içamento