    PROPOSED4000 MW ULTRA MEGA POWER PROJECT

    AT

    KAKWARA, BANKA DISTRICT, BIHAR

    FOR

    APPOINTMENT OF TECHNICAL CONSULTANT

    FOR

    SITE FEASIBILITY STUDY, ACQUISITION OF LAND,CONDUCTING VARIOUS TECHNICAL STUDIES AND

    OBTAINING CLEARANCES

    BIDDER

    DESEIN PRIVATE LIMITEDCons!"#n$ En$#n%%&s, D%s%#n Hos%, G&%'"%& K'#!'s( ) II, N%* D%!(# ) ++0 04P(on% No- . /+++4+/+400, 1/1+231, F'5 No- . /+++1/1+2/2, 1/1+/6

    E7'#! . #n8o9:%s%#n-;o7

    , W%< s#"% . ***-:%s%#n-;o7

    DATE . +2THJULY, 10+6 TIME . +6.00 (&s =IST> ONWARD

    PRESENTATION

    mailto:[email protected]:[email protected]
  • 7/23/2019 Banka UMPP

    2/30

    2

    CAPACITY

    DESEIN IS INDIA?S LEADING ENGINEERING POWER

    PLANT CONSULTANCY WITH TRACK RECORD OF 60 YEARS-

    DESEIN PROVIDES TOTAL ENGINEERING, PROCUREMENT,

    CONSTRUCTION @ COMMISSIONING SUPERVISION FOR

    UNIT SIE UTO 00 MW FOR BOTH SUPERCRITICAL @

    SUBCRITICAL-

    POWER PLANT DESIGN IS DRIVEN BY IT?S EPERTISE @

    EPERIENCE OF THE THERMAL CYCLE- DESEIN

    CONCEPTUALIES THE COMPLETE LIFE CYCLE OF THE

    PROJECT PROJECT FEASIBILITY, DETAILED ENGINEERING,

    OPERATION @ MAINTENANCE AND RENOVATION @MODERNIATION-

    DESEIN HAS WORKED ON DIFFERENT FUELS SUCH AS

    COAL, GAS, LIGNITE, WASHERY REJECTS AND

    RENEWABLES-

  • 7/23/2019 Banka UMPP

    3/30

    3

    CAPACITY

    Con":

    A SINGLE WINDOW SERVICE PROVIDER TO POWERUTILITIES

    DRAWING MANAGEMENT SYSTEM PROVIDING ARCHIVAL,

    STORAGE @ MANAGEMENT OF DRAWINGS

    LATEST COMMUNICATION FACILITIES FOR

    CORRESPONDENCE, TRANSFER OF TECHNICAL DATA

    AND DRAWINGS ETC.

    ISO /00+.100 CERTIFIED COMPANY SINCE 1004,

    CERTIFICATE NO- +0/1 DATE 0-+1-10+2,

    CIN. U34//DL+/30PTC006434

    ACCREDITED WITH. QCINABET VIDE MoEF, O-M- No- J

    ++0+2331004IA II =I> DATED 20-0/-10++ FOR CAT-A, UNDER S-No- +6 OF LIST A?

  • 7/23/2019 Banka UMPP

    4/30

    4

    STRENGTHS

    ETENSIVE DOMESTIC AND INTERNATIONAL EPERIENCE

    ENGINEERING,PROCUREMENT @ CONSTRUCTION CAPABILITIES

    TURNKEY ASSIGNMENTS FOR CONSORTIUM

    LARGE MULTIDISCIPLINARY INFRASTRUCTURE PROJECTS

    GLOBAL STRATEGIC ALLIANCES

    STRONG TEAM SKILLS IN ALL DISCIPLINES INCLUDING

    ENVIRONMENT

    REGISTERED WITH VARIOUS NATIONAL AND INTERNATIONAL

    AGENCIES

    MODERN ENGINEERING OFFICE WITH LATEST FACILITIES

  • 7/23/2019 Banka UMPP

    5/30

    5

    WORK ENVIRONMENT

    EQUIPPED WITH STATEOFTHEART MAIN SOFTWARE TOOLS SUCH AS.

    DOC IMAGE? SOFTWARE FOR DOCUMENT MANAGEMENT

    LOTUS NOTES FOR MESSAGING MAILING

    INTEGRATION OF WORK THROUGH LOCAL AREA NETWORK

    EACH DISCIPLINE EQUIPPED WITH REQUISITE SOFTWARE TOOLS

    PDS PDMS

    AUTOPLANT

    SOLIDWORKS 10+0

    REVIT STRUCTURALS

    CIVIL ) 2D CAESAR ) II

    GT PRO GT MASTER

    ISC ) ST2

    AERMOD

    PRIMAVERA

    STAAD ) PRO

    SECTION WIARD

    CAD RC

    MAP GUIDE

    NISA

    AUTO CAD 10+6

    MICRO STATION

    MS O88#;%

    STAAD PRO ) V#

    STEAM PRO STEAM MASTER

    LIBSYS

    SB SLOPE 2

  • 7/23/2019 Banka UMPP

    6/30

    6

    T&n% Con"&';"#n$ En$#n%%n$, P&o;&%7%n" @

    Cons"&;"#on

    I:%n"#8#n$ N%* Oo&"n#"#%s

    B#::#n$ Fo& P'"% P&o%;"s

    H'n:!#n$ A!! As%;"s o8 P'"%Po*%& P&o%;"s, In;!:#n$A&o'!s F&o7 V'osS"'""o& Bo:#%s

    P&o;&%7%n" So&"

    P&o%;" Mon#"on$

    F#n'n;#'! S"&;"n$

    INDEPENDENT POWER PROJECTS

    CONSTRUCTION OF POWER PLANTS

    NEW POWER PROJECTS

    F%'s#

  • 7/23/2019 Banka UMPP

    7/307

    ROLE IN POWER SECTOR

    ENVIRONMENTAL IMPACT ASSESSMENT STUDIES FOR

    MORE THAN 0 PROJECTS ) 0,23/ MW

    COMPLETE ENGINEERING FOR MORE THAN 26,114 MW

    UP TO 00 MW UNIT CAPACITY

    FEASIBILITY REPORTDETAILED PROJECT REPORT

    FOR MORE THAN 10/ PROJECTS ) +,++,/4+ MW

    EPC CONTRACTING FOR6 MAJOR PROJECTS =160 MW"o 0 MW>

    OPERATION @ MAINTENANCE FOR 10 POWER

    PROJECTS

  • 7/23/2019 Banka UMPP

    8/308

    EMPANELLMENT

  • 7/23/2019 Banka UMPP

    9/309

    ACCREDITATION =QCINABET>

  • 7/23/2019 Banka UMPP

    10/30

    SUPERCRITICAL PROJECTS =10060 ONWARDS>

    10

    S.No. Client

    Assignments

    / Projects Major Study Components/ Features

    ToR/NoC

    Obtained

    C

    Obtained

    !. PFC "td. #$$$ M%Sasan &MPP'Mad(yaPrades()

    Feasibility Report* Project Report'+an,able)* -A Studies*Topograp(ical Surey* Arearainage Study* Socio0conomic

    Surey and 1eo0Tec(nical-nestigation

    !2.$3.$3 45.!!.$3

    4 PFC "td. #$$$ M%Tilaiya &MPP'6(ar,(and)

    Feasibility Report* Project Report'+an,able)* -A and S-A Studies*Topograp(ical Surey* Area

    rainage Study and 1eo0Tec(nical-nestigation.

    4$.$5.$7 $7.$#.$8

    5. PFCConsul0ting "td.

    !98$ '5:33$)M% Tal;andiSabo TPP'Punjab)

    Feasibility Report* Project Report'+an,able)* -A and S-A Studies*Topograp(ical Surey* Arearainage Study and 1eo0Tec(nical

    -nestigation.

    !#.!4.$7 !!.$7.$8

    PROJECTS HANDLED COMPLETED

  • 7/23/2019 Banka UMPP

    11/30

    SUPERCRITICAL PROJECTS Con":

    11

    S.No. ClientAssignments

    / Projects

    Major Study Components/ FeaturesToR

    Obtained

    C

    Obtained#. PFC

    Consul0ting "td.

    #$$$ M%Odis(a&MPP

    'Odis(a )

    Feasibility Report* Project Report'+an,able)* -A and S-A Studies*Topograp(ical Surey* Area rainageStudy and 1eo0Tec(nical-nestigation.

    4$.$2.$9 TEAM MEMBERS =TM> TO BE DEPLOYED

  • 7/23/2019 Banka UMPP

    13/30

    COMPOSITION OF TEAM

    13

    S.No. Name

    Designati

    on

    Qualifcatio

    n

    Area o

    Specialization

    Position/Experienc

    e=. Mr.

    Mu>es"5.S"arma

    Manager P:D!Ecolog& (Enironment#

    EnironmentManagement

    +M / 7rs.

    13. Mr. N. Ali Sr.Manager

    . +ec".!Ciil#

    Ciil relate)actiities

    +M / 12rs.

    11.Mr.C.Mis"ra

    Sr.Engineer.

    .E.!Mec".#

    DP' ( Po8er+ari?

    +M / =rs.

    1. Mr. D.Dasgupta

    Consultant

    . E.!Metallurg

    Enironmental

    Enginnering

    +M / 63rs.

    12.Mr. S. C.

    0ainConsultant

    AM@E!C"em.#

  • 7/23/2019 Banka UMPP

    14/3014

    SITE LOCATION MAP

  • 7/23/2019 Banka UMPP

    15/3015

    SCOPE OF WORK

    PROPONENT

    BIDDER

    ACQUISITION OF LAND ANDTECHNICAL STUDIES =PLANT,

    TOWNSHIP, ASH DISPOSAL AND

    VARIOUS CORRIDORS>

    STATUTORY CLEARANCES=AS APPLICABLE>

    SITE MOBILISATION, PFR @ FORM+, ToR FROM MoEF@CC BASELINE DATA GENERATION TOPOGRAPHICAL SURVEY AREA DRAINAGE STUDY GEOTECHNICAL INVESTIGATION, SOCIOECONOMIC STUDY PROJECT INFORMATION REPORT EIA STUDIES DETAILED PROJECT REPORT, LAND ACQUISITION COMPREHENSIVE SIA, R@R PLAN AND

    CSR PLAN

    GTS BENCH MARK

    AIRPORTS AUTHORITY OF INDIA

    MINISTRY OF DEFENCE

    ARCHAEOLOGICAL SURVEY OF INDIA

    MINERALOGICAL MAP

    SATELLITE IMAGERY

    NHAISH FOR APPROACH ROAD

    GRAM SABHA

    CHANGE IN LANDUSE

    PUBLIC HEARING

    ENVIRONMENTAL CLEARANCE

    FOREST CLEARANCE S"'$% I

    TOOLS @ TECHNIQUES

  • 7/23/2019 Banka UMPP

    16/30

    TOOLS @ TECHNIQUES

    DETAIL STUDIES WITHIN SCOPE OF WORK WILLBE CARRIED OUT AS PER TECHNICALSPECIFICATIONS-

    BASED ON DATAINFORMATION COLLECTED, ASITE SELECTION MATRI WILL BE PREPARED-

    RANKING OF ALL POTENTIAL SITES WILL

    FOLLOW SUIT FOR THE PURPOSE OFEVALUATION-

    MAJOR SETTLEMENTS, HOUSEHOLD NUMBERS,LAND USE CATEGORIES AS PER REVENUE DATAAND EISTING INDUSTRIES WILL BE INCLUDED

    IN ASSESSMENT-

    A PREFEASIBILITY REPORT CONTAINING SITESELECTION, BRIEF PROJECT DETAILS ANDENVIRONMENTAL CONCERNS-

    16

  • 7/23/2019 Banka UMPP

    17/3017

    ASSIGNMENT EECUTION SEQUENCE

    OBTAINING SITE DETAILS AND ALTERNATE SITES IDENTIFIED

    OBTAINING REPORTS DOCUMENTS AVAILABLE WITH CLIENT

    DETAILING WORK PLAN AND INCLUDING BROAD

    DEPLOYMENT SCHEDULE

    RECONNAISSANCE SURVEY OF SITE, SURROUNDING

    AREAS, ALTERNATE SITES, WATER AND OTHER CORRIDORS

    IN TERMS OF TECHNICAL, ENVIRONMENTAL AND SOCIAL

    ASPECTS-

    THE STUDY AREA WILL COVER BOTH CORE AND BUFFER

    ONES AROUND THE PROJECT SITE=S>-

    TASK +00 KICK OFF MEETING WITH PFCCL.

  • 7/23/2019 Banka UMPP

    18/3018

    ASSIGNMENT EECUTION SEQUENCE

    COLLECTION OF SECONDARY DATA ON LAND USE

    PATTERN, SETTLEMENTS, ROADRAIL CONNECTIVITY,

    METEOROLOGY, GEOLOGY, CENSUS DATA ETC-

    PRELIMINARY DISCUSSION WITH LOCAL OFFICIALSAND PEOPLE ON THE PROPOSED PROJECT AND ITS

    IMPLICATION AT THE LOCAL AND DISTRICT LEVELS-

    PREPARATION OF PREFEASIBILITY REPORT AND

    FORM+ AND SUBMISSION TO MOEF@CC FOR

    OBTAINING TOR-

    TASK +00 KICK OFF MEETING WITH PFCCL. Con":

  • 7/23/2019 Banka UMPP

    19/3019

    TASK 100 BASELINE STUDY

    SITE SURVEY AND PREPARATION OF LAYOUT FOR POWER

    PLANT AND VARIOUS CORRIDORS. ENVIRONMENTAL MONITORING =METEOROLOGY, AIR,

    SURFACE @ GROUND WATER, NOISE, SOIL ETC-> SOCIO ) ECONOMIC SURVEY LAND USE PATTERN, DETAILS OF LAND OWNERSHIP ETC-

    TOPOGRAPHICAL SURVEY AREA DRAINAGE STUDY GEO TECHNICAL SURVEY, SOIL INVESTIGATION ETC- ECOLOGICAL AND OTHER RELEVANT STUDIES-

    THE ABOVE STUDIES WILL BE CARRIED OUT AT THE POWER

    PLANT SITE AND ITS VARIOUS CORRIDORS-

    A SECOND TEAM WILL CARRY OUT STUDY OF THE COALBLOCK=S> LAND AS PER DETAILS PROVIDED BY THE CLIENT-

    MEANWHILE SATELLITE IMAGERY OF PROJECT SITE ANDCOAL BLOCK SITE WILL BE PROCURED-

    ASSIGNMENT EECUTION SEQUENCE

  • 7/23/2019 Banka UMPP

    20/3020

    TASK 200 LAND ACQUISITION PLAN =PROJECT SITE>

    PREPARATION AND SUBMISSION OF LAND ACQUISITIONAPPLICATION FOR.

    POWER PLANT AND CORRIDORS FOR WATER AND ASH

    PIPELINE, SERVICEAPPROACH ROADS ETC-

    SUBMISSION TO DISTRICT ADMINISTRATION FOR

    NOTIFICATION OF SECTION++ UNDERRIGHT TO FAIR

    COMPENSATION AND TRANSPARENCY IN LAND

    ACQUISITION, REHABILITATION AND RESETTLEMENT

    ACT, 10+2-

    ASSIGNMENT EECUTION SEQUENCE

  • 7/23/2019 Banka UMPP

    21/3021

    TASK 400 COAL BLOCK=S> LAND IDENTIFICATION

    PROCUREMENT OF DOCUMENT OF THE TOTAL CAPTIVE

    COAL BLOCK=S> LAND

    TO IDENTIFY COAL BLOCK=S> LAND HAVING SUFFICIENT

    COAL TO LAST AT LEAST 6 YEARS FROM THE COD OF +ST

    UNIT AT NORMATIVE CAPACITY, AND

    TO PROCURE ITS DECLARATION FROM THE CENTRAL

    GOVERNMENT UNDER SECTION/ OF THE CBA

    =ACQUISITION @ DEVELOPMENT> ACT +/63

    ASSIGNMENT EECUTION SEQUENCE

    O Q

  • 7/23/2019 Banka UMPP

    22/3022

    TASK 600 RAIL CORRIDOR STUDY =COAL TRANSPORT>

    FEASIBILITY STUDY FOR TRANSPORTATION OF COALBY RAIL FROM THE CAPTIVE COAL BLOCK=S>, WILL

    BE UNDERTAKEN-

    AFTER SELECTION OF RAIL CORRIDOR, TO SUBMITAPPLICATION FOR LAND ACQUISITION TO DISTRICT

    ADMINISTRATION FOR NOTIFICATION UNDER

    SECTION++ UNDER LAND ACQUISITION,

    REHABILITATION AND RESETTLEMENT ACT, 10+2

    ASSIGNMENT EECUTION SEQUENCE

    ASSIGNMENT EECUTION SEQUENCE

  • 7/23/2019 Banka UMPP

    23/3023

    TASK 00 FOREST CLEARANCE

    FOR ANY FOREST LAND IN THE AREA, STUDY WILL BECARRIED OUT IN CONSULTATION WITH THE CONCERNED

    DFO AND OTHER FOREST OFFICIALS, AS REQUIRED

    UNDER THE FOREST CONSERVATION ACT,+/0-

    FOREST DIVERSION PROPOSAL WILL BE PREPARED FOR

    ONLINE SUBMISSION TO THE FOREST DEPARTMENT-

    ASSIGNMENT EECUTION SEQUENCE

    ASSIGNMENT EECUTION SEQUENCE

  • 7/23/2019 Banka UMPP

    24/3024

    TASK 300 DRAFT RAPID EIAEMP REPORT

    PREPARATION OF PROJECT INFORMATION REPORT ONCOMPLETION OF SURVEY WORK-

    AFTER ONE SEASON BASELINE STUDY AND ASSESSMENT

    OF POTENTIAL ENVIRONMENTAL AND SOCIAL IMPACTSOF THE PROPOSED UMPP RAPID EIA AND EMP REPORT

    WILL BE SUBMITTED TO THE SPCB FOR PUBLIC HEARING-

    THE STUDY WILL COVER POWER PLANT LAND, ASH AND

    WATER PIPELINE CORRIDORS AND FUEL TRANSPORTATION

    CORRIDORS-

    A COMPREHENSIVE SIA, R@R PLAN AND CSR PLAN WILL

    ALSO BE PREPARED AND SUBMITTED-

    ASSIGNMENT EECUTION SEQUENCE

    ASSIGNMENT EECUTION SEQUENCE

  • 7/23/2019 Banka UMPP

    25/3025

    TASK 00 PUBLIC HEARING

    ASSISTANCE WILL BE PROVIDED TO THE CLIENT INCONDUCTING PUBLIC HEARING

    BASED ON OBSERVATIONSUGGESTION IN THE PUBLIC

    HEARING THE DRAFT EIA REPORT WILL BE FINALISED

    FOR SUBMISSION TO MOEF @ CC

    TASK /00 COMPREHENSIVE EIA, SIA ETC-

    AFTER FIELD MONITORING FOR THREE SEASONS A

    COMPREHENSIVE EIA REPORT WILL BE PREPARED

    ALONG WITH A CUMULATIVE IMPACT ASSESSMENT

    REPORT, IF REQUIRED-

    ASSIGNMENT EECUTION SEQUENCE

    ASSIGNMENT EECUTION SEQUENCE

  • 7/23/2019 Banka UMPP

    26/30

    26

    TASK +000 DETAILED PROJECT REPORT

    THE POWER ENGINEERS OF THE STUDY TEAM WILL

    WORK OUT VARIOUS OPTIONS IN CONSULTATION WITH

    THE CLIENT AND FINALISE THE PROJECT COMPONENTS-

    DETAILED PROJECT REPORT =DPR> WILL THEN BE

    PREPARED AND SUBMITTED TO THE CLIENT-

    THE DPR WILL PROVIDE TARIFF CALCULATION, LOAN

    EQUITY RATIO, IRR, IDC ETC- TO ESTABLISH THE

    VIABILITY OF THE PROJECT-

    ASSIGNMENT EECUTION SEQUENCE

    TASK ++00 ENVIRONMENTAL CLEARANCE AFTER OBTAINING OTHER STATUTORY CLEARANCES THE

    EIA EMP REPORT WILL BE SUBMITTED TO MOEF @ CC-

    PRESENTATION BEFORE THE EAC WILL BE MADE FOR

    OBTAINING ENVIRONMENTAL CLEARANCE-

    ASSIGNMENT EECUTION SEQUENCE

  • 7/23/2019 Banka UMPP

    27/30

    27

    TASK +100 PROJECT @ COAL BLOCK=S> LAND ALLOCATION

    OBTAINING AWARD OF THE POWER PLANT, CORRIDORS,

    APPROACH ROADS ETC- IN FAVOUR OF THE SPV UNDER

    SECTION+/ AND SECTION12 OF L-A AND R@R ACT, 10+2,

    OR UNDER ANY OTHER RELEVANT ACT-

    PROCURING DECLARATIONS OF THE GOVT- UNDER SECTION

    / OF CBA =ACQUISITION @ DEVELOPMENT> ACT +/63, FOR

    THE CAPTIVE COAL BLOCK=S> LAND TO OPERATE THE POWER

    STATION FOR AT LEAST FIVE YEARS FROM THE COD OF +ST

    UNIT AT NORMATIVE AVAILABILITY-

    ASSIGNMENT EECUTION SEQUENCE

    EECUTION PLAN

  • 7/23/2019 Banka UMPP

    28/30

    28

    EECUTION PLAN

    AFTER THE KICKOFF MEETING WORK PLAN WILL BE

    FINALISED-

    ARRANGEMENTS WILL BE MADE FOR

    RECONNAISSANCE SURVEY AS WELL AS OPENING

    OF SITE OFFICE AT KAKWARA OR BANKA INCONSULTATION WITH PFCCL-

    PLANNING AND MANAGEMENT OF OPERATIONS WILL

    BE CARRIED OUT FROM THE HEAD OFFICE IN DELHI-

    FOR THE TASKS IDENTIFIED SEPARATE TEAMS WILL

    BE DEPLOYED WITH TIME FRAMES TO COMPLETE

    THEM-

    EECUTION PLAN

  • 7/23/2019 Banka UMPP

    29/30

    29

    EECUTION PLAN

    MONITORING AND SURVEY DATA GENERATED AND

    SECONDARY DATA COLLECTED WILL BE COLLATED

    AND ANALYSED IN DELHI-

    DOCUMENTATION AND GENERATION OF VARIOUS

    DRAWINGS, MAPS, REPORTS WILL TAKE PLACE INDELHI-

    ALL THROUGH THE STUDY, THE TEAM LEADER

    MEMBERS WILL HAVE REGULAR INTERACTION WITH

    THE PFCCL TO ENSURE THAT THE STUDY

    PROGRESSES AS PER THE PLAN FOR TIMELY

    COMPLETION-