Small and Ethnic Communities and Vulnerable Communities’ Development Framework Bangladesh Weather and Climate Services Regional Project SFG1623

Transcript of Bangladesh Weather and Climate Services Regional...

Page 1: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic Communities and Vulnerable

Communities’ Development Framework

Bangladesh Weather and Climate

Services Regional Project

SFG1623

Page 2: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

1 | P a g e Bangladesh Regional Weather and Climate Services

Abbreviations

BMD Bangladesh Meteorological Department

BWCSRP Bangladesh Weather and Climate Services Regional project

CBO Community-Based Organization

CCS Consultation and Communication Strategy

CHT Chittagong Hill Tracts

CIF Climate Investment Fund

DDC District Development Committee

DP Displaced Persons

EWS Early Warning System

FGD Focused Group Discussion

GOB Government of Bangladesh

GRC Grievance Redress Committee

INGO International non-government organizations

IP Indigenous People

KII Key Informants Interview

IPP Indigenous Peoples Plan

NGO Non-Government Organization

NMS National Meteorological service

OP Operation Policy

PMU Program Management Unit

PCMU Project Coordination and Monitoring Unit

RSMC Regional Specialized Meteorological Center

SEVCDF Small, Ethnic and other Vulnerable Communities Development Framework

SIA Social Impact Assessment

SPCR Special Program for Climate Resilience

TOR Terms of Reference

VCDP Vulnerable Community Development Plan

WB World Bank

Page 3: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

2 | P a g e Bangladesh Regional Weather and Climate Services

Table of Contents Abbreviations ................................................................................................................................................ 1

1 Background: ........................................................................................................................................... 3

2 Objectives of SEVCDF: ............................................................................................................................ 4

3 Defining the tribal peoples ..................................................................................................................... 4

4 Project Impacts: ..................................................................................................................................... 5

5 Mitigation Measures: ............................................................................................................................. 5

6 Entitlement Matrix: ................................................................................................................................ 6

7 Baseline Conditions: ............................................................................................................................... 9

8 Consultation with the ethnic community: ............................................................................................. 9

9 Capacity Building .................................................................................................................................. 10

10 Grievance Redress Mechanisms ........................................................................................................ 10

11 Monitoring and Reporting ................................................................................................................. 11

12 Specific Measures .............................................................................................................................. 11

Annex-1: Social Safeguard Screening for the Ethnic Communities ........................................................ 13

List of Tables

Table 01: Location of tribal people in Bangladesh ........................................................................................ 5

Table 02: Specific measures for SEVCDP ..................................................................................................... 11

Page 4: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

3 | P a g e Bangladesh Regional Weather and Climate Services

1 Background: Bangladesh Weather and Climate Services Regional Project intends to introduce a complete

package of weather forecast to improve accuracy and lead time for weather forecasts and multi-

hazard early warning, increased sharing of data and information for extreme regional events,

increase in number of end users satisfied by hydro-meteorological services and farmers

satisfaction with agro-meteorological services. The main objective of the proposed project is to

strengthen the capacity of Bangladesh Government in delivering weather and climate

information in priority sectors and to prepare for and respond to climate variability and hydro-

meteorological disasters. Proper implementation and right communication with stakeholders will

reduce the damages due to climate change and will play a major role through increasing GDP of

the country. This document is a framework for small and ethnic communities and other

vulnerable peoples development plan. More details are explained with the SMF of this project.

With a population of some 160 million and a land area of approximately 144000 square

kilometers, Bangladesh is densely populated. It is the third largest Muslim majority country of the

world. Over 85% of the population is Bengali Muslims; the remaining 15% are Hindu, with a very

small numbers are Christians and Buddhists. Ethnic and vulnerable communities comprise

about less than 1% (3 million) 12 of the population of Bangladesh living mainly in the Chittagong

Hill Tracts (CHT) and in rural communities in Mymensingh, Sylhet, Dinajpur and Rajshahi. There

are 45 recognized distinct different ethnic groups living in 28 districts of Bangladesh. Of the 45

tribes 13 are living in 3 CHT districts: Khagrachari, Rangamati and Banderban. The 13

indigenous groups in CHT possess separate identities, specific racial backgrounds, different

languages, and distinct heritage and culture. The largest groups are the Chakmas, Marmas, and

Tripuras. They differ in their social organization, marriage customs, birth and death rites, food

and other social customs from the people of the rest of the country. The other 32 ethnic

communities are scattered in 25 districts although there is good concentration of Garos in

greater Mymensingh and Gazipur and of Santals in greater Rajshahi district. There is lack of

information on their socioeconomic indicators. Ethnic communities largely speak Tibeto-Burman

languages.

The ethnic peoples everywhere are generally poorer than the mainstream peoples.Most tribal

peoples in CHT live in settlements in remote hills and valleys that are very difficult to access,

they still use lands for living and livelihood under the traditional/customary tenure not recognized

in the country’s land administration system. The areas they inhabit, especially in CHT, are

generally characterized by poor basic infrastructures like roads, schools, water supply and

sanitation, health care facilities, little knowledge about climate products and its benefits.

In Rangamati and Khagrachari, substantial parts of which have long been submergedby the

Kaptai Hydroelectric Project, many of the ethnic people lives on hilltops that dot the vast

expanse of waters. For them small country boats are the only means of transportation to go

anywhere and send their children to schools, some of which are quite far away from home.

These tribal groups do not have any idea about the meteorological services. It is important to

engage them with the project preparation and its implementation.

Page 5: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

4 | P a g e Bangladesh Regional Weather and Climate Services

2 Objectives of SEVCDF: The SEVCDF is based on the World Bank’s Operational Policy 4.10 and is applicable to all sites

with the presence of small ethnic community populations. The main objectives of SEVCDF are

to:

Ensure the project activities and interventions uphold the social and cultural norms and

practices of the small ethnic community or other vulnerable communities.

Ensure that the project engages with the small ethnic communities in a free, prior and

informed consultation through processes that are appropriate to the local institutional

context, ensuring that their participation is meaningful in the entire process of

preparation, implementation and monitoring of the sub projects and related activities

Ascertain that the project does not inadvertently lead to or induce disempowerment, or

increase disparities between the small ethnic community/other vulnerable and

‘mainstream’ communities

Avoid, minimize and/or mitigate any kind of adverse impacts on small ethnic community

households, including on their livelihoods;

Establish appropriate strategies for information sharing, communication, training and

decision-making with the different small ethnic communities (women and men) at all

stages of the project

Ensure that the project benefits and investments are equally accessible to the small

ethnic groups and other vulnerable communities inhabiting the project area

Most of the small ethnic community peoples are small in number and arefully mainstreamed into

the local social, cultural and economic institutions due to their livelihood requirements. However,

given that there is a small presence of the small ethnic community peoples, the SEVCDF will

be incorporated within the overall project design. The need for a SEVCDF will be established at

the project preparation on the basis of screening using the following criteria:

Presence of small ethnic community and other vulnerable communities in the target

project cities.

Adverse impacts on customary rights of use and access to land and natural resources,

including common area and grazing lands

Negative impacts on socio-economic or cultural identity of small ethnic community or

other sub-groups.

Impacts that may undermine indigenous knowledge and customary institutions

Focused consultations with small ethnic community and other vulnerable communities

on interventions

3 Defining the tribal peoples

No single definition can capture the diversity of the tribal peoples, as they arefound in varied and

Page 6: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

5 | P a g e Bangladesh Regional Weather and Climate Services

changing contexts. As such, Project will use the World Bank and other development partner

guidelines to identify tribal people in particular geographic areas by examining the following

characteristics.

Self-identification as members of a distinct indigenous cultural group and recognition of

this identity by others;

Collective attachment to geographically distinct habitats or ancestral territories in the

project area and to the natural resources in these habitats and territories;

Customary cultural, economic, social, or political institutions that are separate from those

of the dominant society and culture; and

A tribal language, often different from the official language of the country or region.

A group that has lost collective attachment to geographically distinct habitats or ancestral

territories in the project area because of forced severance also remains eligible for

coverage under World Bank’s safeguard policy. Table 06 shows the distribution of 45

indigenous communities living in 28 districts of the country. From the consultation

meetings and other

Table 01: Location of tribal people in Bangladesh

SI.No Location Tribal Community

SI.No Location Tribal Community

1. Mymensingh, Tangail, Netrokona, Jamalpur and Sherpur district

Koch, Barman, Dalu, Hodi, Banai, Rajbangshi, Garo, Hajong

5. Sumangonj, Mouvlibazar, Sylhet, Hobigonj district

Monipuri, Khasia, Garo, Hajong, Patro, Khasia, Santal, Oraon

2. Gazipur Barman, Garo, Koch

6. Jessore, Satkhira, Khulna

Bagdi, Rajbangshi, Santal

3. Patuakhali, Barguna, Cox Bazar district

Rakhain 7. Rajshahi, Dinajpur, Rangpur, Gaibandha, Noagaon, Bagura, Sirajgonj, Chapainawabgonj, Natore district

Munda, Malo, Mahali, Khondo, Bedia, Bhumij, Kole, Bhil, Karmakar, Mahato, Muriyar, Musohor, Pahan, Paharia, Rai, Sing, Turi, Santal, Oraon

4. Bandarban, Rangamati and Khagrachari district

Chakma, Marma, Tripura, Bawm, Pangkhu, Lusai, Tanchangya, Khiang, Mru, Asam, Gurkha, Chak, Khumi

8.

4 Project Impacts: Project will not affect any tribal people. As there is no major construction work due to the project

nature, all the equipments will be set up in the Upazila office premises. Tribal people will be benefited

from the project. Tribal people may receive training to run the new automated weather forecast

equipments.

5 Mitigation Measures: Though it is highly unlikely that the project will adversely affect any small ethnic and vulnerable

communities, the following mitigation measures will be taken from the project in case of such effects:

Page 7: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

6 | P a g e Bangladesh Regional Weather and Climate Services

1. Resettlement and rehabilitation planning and preparation activities will be undertaken well

before displacement occurs, so that the communities can effectively participate in decision

making.

2. A preference for relocation in areas closed by the existing localities, to employment

opportunities and to infrastructure and services of weather information dissemination will be

followed.

3. Adequate compensation and assistance will be ensured through consultation with the

communities.

4. Livelihood restoration program for the vulnerable communities will be undertaken

5. Payment of full compensation prior displacement will be ensured

6. Formation of local compensation committee that includes representative of small ethnic and

vulnerable community groups and other vulnerable groups working with them

7. Assistance in restoration of livelihood for example; training program, loan facilities, credit etc.

6 Entitlement Matrix:

Type of Loss Application Entitled Person Compensation

Arable land Less than 20 percent of land holding

1 lost, the remaining

land economically viable

Title holder -Land for land or Cash compensation for lost land at replacement cost.

More than 20 percent of land holding lost OR where less than 20% holding lost but the remaining land becomes economically unviable

Title holder -Land for land or compensation in cash. Compensation by receiving a new parcel of land of equivalent size and crop productivity and free of taxes, registration and transfer cost; at location acceptable to PAP; and with long-term security of tenure of better or equivalent nature to that affected. -Compensation for preparation of replacement land -Transition allowance for three months -Transfer/shifting allowance -PAPs will be entitled to income rehabilitation assistance

Tenant/lease holder -Cash compensation equivalent to the replacement value of gross harvest for one year on top of the remaining period of tenancy agreement.

Agricultural labor -Cash compensation equivalent to 6 months salary and assistance in getting alternative employment.

Squatters Any squatters/encroachers affected by taking of agricultural land will not be entitled to compensation for land. Affected squatters will be provided with relocation assistance with an additional grant of BDT 10000/hh.

Residential / Less than 20% of land holding Title holder -Land for land at project sponsored resettlement

1 Land holding refers to the land plot directly impacted by the project and does not include any other land holdings

that a PAP may own at other locations.

Page 8: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

7 | P a g e Bangladesh Regional Weather and Climate Services

commercial land

lost and remaining land viable for present use

sites or Compensation in cash at market value. Any squatters/encroachers affected by taking of residential land will not be entitled to compensation for land. Residential squatters will receive a 4 decimal of land from the project. For squatters see entitlements for affected structures.

More than 20% holding affected OR where less than 20% holding affected but the remaining area becomes smaller than minimally accepted under the zoning laws and unviable for continued use

Title holder -Land for land or cash compensation. Replacement land of minimum plot of acceptable size under the zoning laws or a plot of equivalent size, whichever is larger, in an area with adequate physical and social infrastructure. In the case of loss of commercial land the replacement land of sufficient size for business continuation in market are or at location comparable to previous site. -Replacement land to be free from taxes, registration and transfer costs. -Transition Allowance for three months -Transfer/shifting allowance. Any squatters/encroachers affected by taking of residential land will not be entitled to compensation for land. Residential squatters will receive a 4 decimal of land from the project. For squatters see entitlements for affected structures.

Tenant/Leaseholders -Cash compensation equivalent to the six months of rent or for the remaining period of tenancy/lease agreement, whichever is greater.

Structures Structures partially

affected but the remaining

structure viable for

continued use.

Owner with valid

title to land

Squatters

Tenants

Encroachers

Cash compensation for the structures -Assistance in restoration of the remaining structure (Repair Allowance, minimum20%ofcompensation)

-Cash compensation for the affected structures. - Transfer/shifting allowance. -Transition allowance for six months.

-Cash compensation equivalent to 6 months' rental allowance -Transfer/shifting allowance -Assistance in alternate rental accommodation.

- Early notice on the demolition - Technical advice in demolition, relocation

and repairing of affected structure - Payment for repairing only those damages

to structure resulting from demolition, if required

- Transfer/shifting allowances, if required - Transitional allowance

Page 9: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

8 | P a g e Bangladesh Regional Weather and Climate Services

Entire structure affected

OR where structures

partially affected such that

the remaining structure is

unviable for continued use.

Owner with valid Title to land

Cash compensation for the structures at market rate and compensation for the utility facilities. -Transfer/shifting allowance.

-Transition allowance for six months.

Tenant -cash compensation for six months -Transfer/shifting allowance

-Assistance in alternate rental accommodation.

Squatters Same as before

Encroachers - Early notice on the demolition - Technical advice in demolition, relocation

and repairing of affected structure - Payment for repairing only those damages

to structure resulting from demolition, if required

- Transfer/shifting allowances - Transitional allowance

Loss of business /

incomes

or employment

Temporary or permanent

loss of business/ incomes/

employment

Affected individuals

(titled/non-titled)

-Employment in reconstructed enterprise or package

for re-employment or starting a business

-Transition allowance for the permanent loss of

business, incomes & wages equivalent to the loss of

income/wages for a period of 6 months for each

affected members of households.

-In case of temporary loss of business of incomes /

businesses, compensation will be wages equivalent

to closure period. Compensation rates will be agreed

with the business owners and daily laborers and

calculated on the basis of local surveys.

-Priority will be given to PAPs when staff would be

hired for the project

Standing crops Crops affected by land

acquisition or temporary

acquisition/easement

Owner of affected

crops (titled/non-

titled)

-Compensation in cash at market value.

Trees Trees lost Owner of affected

trees (titled/non-

titled)

-Compensation in cash calculated on the basis of

type, age and productive value of affected trees.

Loss of public

infrastructure

Infrastructure (electric

water supply, sewerage &

telephone lines; public

health center; public water

tanks)

Relevant agencies. -Compensation in cash at replacement cost to

respective agencies or restoration of affected assets.

Page 10: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

9 | P a g e Bangladesh Regional Weather and Climate Services

Unforeseen

Losses

As identified As identified Appropriate mitigation measures as determined to

meet the objectives of this policy framework

7 Baseline Conditions: Project planning processes will include preparation of a baseline on the socio-economic profile

and resource dependence of the small ethnic groups in the project are, along with other relevant

information on the small ethnic population in the project area, such as their participation in

community decision-making, participation within local institutions and customs, and language

and cultural markers. Based on the consultations, key issues of the small ethnic community and

other marginalized groups with respect to project interventions would be summarized, and will

form part of the baseline. Every project plan will contain a separate section on the baseline

small ethnic group situation, if present. This baseline will be used in the preparation of the

SEVCDP and will include the following:

List of communities with presence of small ethnic communities and their identification

(name of small ethnic community, other marginalized social groups, if any);

Community-wise listing of all small ethnic and other marginalized households

Community-wise socio-economic profile of small ethnic and marginalized

groups/households and other social groups (occupations, land holdings, debt status,

etc.)

Details of any traditional forest usage rights of small ethnic and marginalized groups in

the area

Participatory assessment methods will be used during the planning stages, and the key issues

of small ethnic groups and other vulnerable communities will be summarized in SECVDP

Report.

8 Consultation with the ethnic community: Free, prior and informed consultations will be held with small ethnic and other vulnerable

communities, CBOs, NGOs, and small ethnic community institutions (if any) where small ethnic

community populations are found to be in the sub-project areas. These free, prior and informed

consultations will take place during resource development planning process, and their broad

community support will be documented. The following mechanisms will be followed:

Separate consultations with small ethnic and other vulnerable communities will be

organized for every such group identified during the sub-project preparation stage

Where small ethnic communities populations are in the minority, exclusive consultations

with small ethnic community women and men, leaders, NGOS, and any relevant

stakeholders to identify the priorities and strategies for ensuring small ethnic community

inclusion in project institutions, interventions, and project benefits

Fortnightly meetings in small ethnic communities for information sharing and

consultation during the planning stages;

Page 11: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

10 | P a g e Bangladesh Regional Weather and Climate Services

Monthly meetings during the implementation stages of the project.

Project will enhance awareness of the project’s interventions among local small ethnic

community populations through timely and routine publication and dissemination of

information on the sub-project interventions in communication strategies that are locally

acceptable and understandable

9 Capacity Building The project will provide an action plan to address the capacity enhancement needs

of vulnerable groups including tribal communities and ensure that they will be able to

know real time information of climate related hazards and adopt mitigation measures.

BMD, BWDB and DAE will be involved in mobilizing the tribal people for group

formation and strengthening through training. Likewise capable members of local ethnic

groups, including women will be engaged by the concerned agencies of PMU to

undertake information dissemination works, preparing the beneficiary groups for

project activities and contributory works.

Development of beneficiary groups during the subcomponent implementation will

include social mobilization and information campaign, and skills upgrading.

Representation of the vulnerable groups and their active involvement in project activities

during and post implementation phases will increase their access to the services to be

provided by the project. These groups will also have sufficient opportunities for gaining

skills and getting other benefits of the project, such as income generation, developing

capacity for disaster mitigation etc.

Involvement of local media will uplift the advocacy organization at local level to promote

project benefit on more sustainable manner. It will act as useful tool particularly in the

field and the application of climate information in sectoral developments.

Mitigation measures will prioritize while addressing the susceptibility of diverse

vulnerable groups including ethnic groups.

The PMU will be actively involved in disseminating information on to the target groups

beneficiaries about the key project components, subcomponents, activities, eligibility and

selection criteria, stakeholder involvement, contribution of the project and project

implementation process.

10 Grievance Redress Mechanisms Wherever relevant and wherever traditional mechanisms are prevalent, grievance redress

mechanisms (GRM) will be customized for the needs of small ethnic and vulnerable community

people and to address the needs of small ethnic and vulnerable community communities. In

addition, wherever small ethnic and vulnerable community people are in large numbers, there

will be a small ethnic and vulnerable community representative in the grievance committees.

A two-tier bottom up GRC system will be established in this Project. First, there will be GRCs at

the local level, hereafter called Local GRC (union/municipality level); and second, GRC at the

project level to give room for grievances to be fairly reviewed. These GRCs will be established

Page 12: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

11 | P a g e Bangladesh Regional Weather and Climate Services

through gazette notifications from the Ministry. The APs will be informed through public

consultation that they have a right to have their grievances redressed by the local committees

as well as by the project management. The APs can also call upon the support of the

implementing NGO (INGO) engaged to implement the RAP to assist them in presenting their

grievances or queries to the GRC. Other than disputes relating to ownership right under the

court of law, the GRC will review grievances involving all resettlement assistance, relocation

and other support. The local GRCs (at the union/municipal level) will hear the grievances first.

Only unresolved cases will be forwarded to the next tier – Project level GRC for further review

and resolution. Grievances will be redressed within a month from the date of lodging the

complaints. GRC decisions will be on a majority basis and will be disclosed and available for

review by the stakeholders. If any disputant is unhappy or unsatisfied with the outcome of the

Project level GRC, he/she may file cases in the court.

GRCs at the union/municipality level (community level) will be formed with representatives from

BWDB/DAE/BMD, local elected representatives from the Local Government Institutions (LGI),

representatives of the affected persons (preferably women representative in case of women

Apsbut have to be from the ethnic community), and RAP implementing NGO. There will be one

GRC at local (union/municipality) level by the project to make it accessible to affected people

both in terms of distance and time.

The Project-Level GRC will review all unresolved cases forwarded to by Local GRCs. It will be

headed by the Project Director (PD). The Project-level GRC with representation of senior

elected Upazila official and civil society member will further establish fairness and transparency

in the resolution of disputes or grievances. In specific cases, Project-level GRC may seek legal

advice from the INGO Legal Advisor or any external legal advisor, if required.

11 Monitoring and Reporting

PMU will be responsible for monitoring and evaluation of activities related to SECVDP. PMU,

with the help of the IA, will collect ethnicity-disaggregated data. IA will regularly analyze Project

output and impact indicators, including by ethnicity. A Gender and TP specialist may be

appointed who would build the capacity of the EA and relevant IA personnel to collect ethnicity-

disaggregated Project data and ensure that monitoring and evaluation procedures include

indicators for monitoring impact on the Project’s beneficiaries. PMU will provide World Bank any

related information for their review of performance and compliance with the World Bank policies.

12 Specific Measures Specific measures for vulnerable groups including indigenous peoples, tribal people,

minor ethnic communities, women, and powerless communities are outlined in following

table. Source of funding and the agencies responsible to implement the proposed

strategies are included in the table below.

Table 02: Specific measures for SEVCDP

Page 13: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

12 | P a g e Bangladesh Regional Weather and Climate Services

Proposed Strategies Source of funding

Responsible

A. Inclusion

Ensure of participants awareness campaign, project implementation and monitoring

Ensure equal wages for similar work during implementation

Launch project information campaign to inform the target groups about the key features of the project and sub component

The project PMU

B. Project Planning

Access and analyze the presence of tribal people and other vulnerable communities in project sites

Treat and support tribal and vulnerable people preferentially.

Involve tribal people during the project planning stage

The project PMU

C. Capacity Building

Conduct project related meetings in tribal and vulnerable community areas to encourage their participation. Ensure a quorum which includes representation from tribal groups

Provide targeted assistance/training aimed atvulnerable groups to enhance livelihoods and participation in the subcomponents

Built in awareness campaign about the project in the project

Develop capacity through trainings on application of Agriculture Information system to small farmers

Build capacity of tribal peoples and other vulnerable communities promoting necessary knowledge and skills to participate in subcomponent activities

The Project BMD, DAE, BWDB and PMU

Page 14: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

13 | P a g e Bangladesh Regional Weather and Climate Services

Annex-1: Social Safeguard Screening for the Ethnic Communities [To be filled in for each community jointly by Project Proponent(s) and consultants. Where private lands are to be acquired or public lands are to be resumed from authorized and unauthorized private users, census of affected persons and inventory of losses to be carried out.]

A. Identification 1. Name of Area: ………..……………… Ward No/Union name :

…………………………………… District/Upozila/City Name:

………….............................….......... 2. Project component: ...................................................................................... ......................... ....... 3. Brief description of the physical works: …………………………………………………………………. ……………………………………………………………………………………………………………............. ……………………………………………………………………………………………………………............. 4. Screening Date(s): ………………………………………………………………………………...... B. Participation in Screening

5. Names of consultants’ representatives who screened the subproject : 6. Names of DAE/BWDB/BMD officials participated in screening: 7. Local Government representatives and community members & organizations participated in screening:

List them in separate pages with names and addresses, in terms of community selection and any other information to identify them during preparation of impact mitigation plans.

8. Would-be affected/benefited persons participated in screening: List them in separate pages with

names, addresses in terms of community selection where they would be affected, and any other information to identify them during preparation of impact mitigation plans.

C. Land Requirements & Ownership 9. Will there be a need for additional lands* to carry out the intended works under this contract?

[ ] Yes [ ] No (* ‘Additional lands’ mean lands beyond the existing available land) 10. If ‘Yes’, the required lands presently belong to (Indicate all that apply): [ ] Private citizens [ ] Government – khas & other GoB agencies [ ] Others (Mention): …………………………………………….......................................... D. Current Land Use & Potential Impacts 11. If the required lands belong to Private Citizens, they are currently used for

(Indicate all that apply): [ ] Agriculture # of households using the lands: …………..............................

[ ] Residential purposes # of households living on them: …………..............................

[ ] Commercial purposes # of persons using them: …………............. #of shops: ......

[ ] Other Uses (Mention): ..………………………………..……………… # of users: …

12. If the required lands belong to Government agencies, they are currently used for (Indicate all that apply): [ ] Agriculture # of persons/households using the lands: …….…….....................

[ ] Residential purposes # of households living on them: ……………................................

[]Commercial purposes # of persons using them: …………… # of shops: ……

Page 15: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

14 | P a g e Bangladesh Regional Weather and Climate Services

[ ] Other Uses (Mention): ……………………………….………..……….. # of users: .……

13. How many of the present users have lease agreements with the concerned government agencies? …………………………………………………………………............................................................ 14. Number of private homesteads that would be affected on private lands:

Entirely, requiring relocation: …….. Partially, but can still live on present homestead: ...... 15. Number of business premises/buildings that would be affected on private lands: …………..

Entirely and will require relocation: …………......... # of businesses housed in them: …....

Partially, but can still use the premises: ...……… # of businesses housed in them: …....

16. Residential households will be affected on public lands: …………..

Entirely affected and will require relocation: # of these structures: ………….

# of structures built with brick, RCC, & other expensive and durable materials: …………..

# of structures built with inexpensive salvageable materials (bamboo, GI sheets, etc.: .…

Partially affected, but can still live on the present homestead: # of structures: …….…….

# of structures built with brick, RCC, & other expensive and durable materials: ………….. # of structures built with inexpensive salvageable materials (bamboo, GI sheets, etc.): .…

17. # of business premises that would be affected on public lands:

Entirely affected and will require relocation:

# of these structures: …………. # of businesses housed in these structures: …………… # of persons presently employed in the above businesses: …………… # of these structures built with brick, RCC, & other durable materials: …………… # of structure built with inexpensive salvageable materials (bamboo, GI sheets, etc.): ……

Partially affected, but can still stay in the present premises:

# of these structures: ...………. # of businesses housed in these structures: ……………. # of persons presently employed in these businesses: …………… # of these structures built with brick, RCC, & other durable materials: …………… # of structure built with inexpensive salvageable materials (bamboo, GI sheets, etc.): ……

18. # of businesses/trading activities that would be displaced from make-shift structures on the project area: …………….. 19. Do the proposed project works affect any community groups’ access to any resources that are used

for livelihood purposes? [ ] Yes [ ] No 20.If ‘Yes’, description of the resources: ……………………………………………….…….............................................................................................................................................................. ……………………………………………………..…………………............................................................ ……………………………………………………………………………………………………………............. ………………………………………………………………………………………..………………….............. …………………………………………………………………………………………………..……….............. 21. Do the proposed works affect community facilities like school, cemetery, mosque, temple, or others

that are of religious, cultural and historical significance? [ ] Yes [ ] No

Page 16: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

15 | P a g e Bangladesh Regional Weather and Climate Services

22. If ‘Yes’, description of the facilities: ………………………………. ……………………………………………..………………………………………………………..………......... …………………………………………………………..…………………………………………………........... ………………………………………………………………………………………………………………......... …………………………………………………………………………..…………………………………........... …………………………………………………………………………..…………………………………........... 23. Describe any other impacts that have not been covered in this questionnaire? …………………………………………………………………………..……………………………….............. ……………………………………………………………………………..………………….…………….......... ………………………………………………………………………..…………………………….……............. ……………………………………………………………………………………………………………............. 24. Describe alternatives, if any, to avoid or minimize use of additional lands: ……………………………………………………………………..………………………….…………............. ………………………………………………………………………………………..………………….............. ………………………………………………………………………………………..………………….............. ……………………………………………………………………………………………………………............. ………………………………………………………………………………………….………………............... E. ADDITIONAL INFORMATION ON SMALL ETHNIC COMMUNITY PEOPLES (This section must be filled in if sites are located in areas that are also inhabited by small ethnic community peoples.) 25. Is the subproject site located in an area inhabited by small ethnic community peoples?

[ ] Yes [ ] No If the answer is no, skip this section of the form. 26. If the answer is Yes, is there any TPs Impacted by the land acquisition or any other interventions of

the project? [ ] Yes [ ] No

27. If the answer is Yes to question no. 26, is there any TPs also likely to be benefited from the

subproject?

[ ] Yes [ ] No 28. If the answer is Yes to question no. 26, is there any TPs likely to be affected by the subproject?

[ ] Yes [ ] No If the answers to questions 26, 27 and/or 28 are no, skip the following sections of the form. 29. Have the TP community and the potential affected TPs been made aware of the potential positive and negative impacts and consulted for their feedback and inputs? [ ] Yes [ ] No

Has there been a broad-based community consensus on the proposed works? [ ] Yes [ ] No

30. Total number of would-be affected TP households: .....…………………………………………. 31. The potential affected TP households have the following forms of rights to the required lands: [ ] Legal: # of households: …………

[ ] Customary: # of households: …………

[ ] Lease agreements with any GoB agencies: # of households: …..…..… [ ] Others (Mention): .………………………………….… # of households: ...……

Page 17: Bangladesh Weather and Climate Services Regional Projectdocuments.worldbank.org/curated/en/888771468094185552/... · 2016-01-06 · Bangladesh Weather and Climate Services Regional

Small and Ethnic and Vulnerable Communities’ Development Framework

16 | P a g e Bangladesh Regional Weather and Climate Services

32. Does the project affect any objects that are of religious and cultural significance to the TPs?

[ ] Yes [ ] No 33. If ‘Yes’, description of the objects: …………………………………………………………………………………………………… …………………………………………………………………………………………………… 34. The following are the three main economic activities of the potential affected TP households: a. .……………………………………………………………………………………

b. ……………………………………………………….……………………………

c. …………………………………………………….……………………………

35. Social concerns expressed by TP communities/organizations about the works proposed under the

subproject: .……………………………………........................................................................... …………………………………………………………………………………………………… …………………………………………………………………………………………………… 36. The TP community and organizations perceive the social outcomes of the subproject: [ ] Positive [ ] Negative [ ] Neither positive nor negative

37. Names of TP community members and organizations who participated in screening: ……………………………………………………….……………………………………………. 38. Apart from TP, Are the PAP otherwise vulnerable? a. Female headed HH Affected persons F M b. Other Female PAP Affected persons F M c. Disabled PAP Affected persons F M d. Tribal PAP Affected persons F M e. Hijra PAP ========================================================== 39. Probable rehabilitation/ development assistance What Quantity Likely Cost On behalf of the project consultant, this Screening Form has been filled in by: Name: ………………………………………… Designation: ……………..…….. Signature: ……………………………………… Date: …………………...