1 Dr. Visoth CHEA Assistant General Director Phnom Penh Water Supply Authority (PPWSA), Cambodia [email protected] Phnom Penh’s Experience Capacity Building Workshop Bangkok - Thailand Performances Improvement Sap River Basac River Land: 181,035 km 2 Population: 13 millions Mekong River 375 km 2 1.3 Million

Transcript of Bangkok - Thailand Performances · PDF file1 Dr. Visoth CHEA Assistant General Director Phnom...

Page 1: Bangkok - Thailand Performances · PDF file1 Dr. Visoth CHEA Assistant General Director Phnom Penh Water Supply Authority (PPWSA), Cambodia chea@ppwsa.com.kh Phnom Penh’s Experience

1

Dr. Visoth CHEAAssistant General Director

Phnom Penh Water Supply Authority (PPWSA), [email protected]

Phnom Penh’s Experience

Capacity Building Workshop

Bangkok - Thailand

Performances Improvement

Sap River

BasacRiver

Land: 181,035 km2

Population: 13 millions

Mekong R

iver

375 km2

1.3 Million

Page 2: Bangkok - Thailand Performances · PDF file1 Dr. Visoth CHEA Assistant General Director Phnom Penh Water Supply Authority (PPWSA), Cambodia chea@ppwsa.com.kh Phnom Penh’s Experience

2

1993-Over staff, not qualified, 22/1,000 connections -Low salary, self interest, low discipline-Very poor service, no clean water, 2m, <10 hr/day-High NRW 72%, 1,945 public underground tanks -Very low willingness to pay,

collection <50% of 26,800 bill-Heavy subsidy, >50% of operation cost -No maintenance, no investment

Opportunities-Different International Assistances:

Japan, France, UNDP-Loans available from WB, ADB-New Leader

1.Policy:from Gov. Subsidy to Full Cost Recovery

Need to Change or Die !

2.Operation:from By Chance to Effective O&M

Page 3: Bangkok - Thailand Performances · PDF file1 Dr. Visoth CHEA Assistant General Director Phnom Penh Water Supply Authority (PPWSA), Cambodia chea@ppwsa.com.kh Phnom Penh’s Experience

3

Since 2000-Service extension-Social responsiveness-Quality of service

65.000m3/d

20.000m3/d

150.000m3/d

1994-1996-Prepare for Autonomy-Rehabilitation Period-Autonomy in Dec. 1996-Accountable Tariff in 1997

Block Tariff (m3 /month) (Riels/m3 )

0 -7 5508 -15 77016 - 50 1,010> 50 1,270

flat rate 1,0300 -100 950101 -200 1,150201 -500 1,350> 500 1,450

Domestic

Administrative

CommercialsIndustrials

PPWSA’s OwnershipStrong Leadership Exsample from the TopCommitment to Improve Effective ManagementEffective Investment

on Hardwareon Software

Board of Directors

General Director

Assist. General Director

Secretariat

Deputy General Director

Commercial Department

• House Connection

• Customers Relation

• Revenue District• Computer Center

Inspections

Admini.+HRDepartment

• Administration• Human

Resource• Protocol

Account.+Finan.Department

• Accounting • Finance

Planning + Tech. Department

• Planning • Design• Project Mgnt.

Production Department

• DistibutionPipes

• DistibutionMgnt.

• Production

Deputy General Director Deputy General Director

Page 4: Bangkok - Thailand Performances · PDF file1 Dr. Visoth CHEA Assistant General Director Phnom Penh Water Supply Authority (PPWSA), Cambodia chea@ppwsa.com.kh Phnom Penh’s Experience

4

PPWSA’s Ownership …Effective O & MMaximum Billing – Computerized Customers Management

& Billing System – Surveying & Updating Customers File – Proper Water Meter Reading

Maximum Collection– Disconnection of Late Payment – Dept monitoring

Maximize NRW– 24hrs Leak Repair Team – Active Detection of Leak & Illegal Use – Regular Meters Maintenance & Replacement

28

72

38

62

50

60

70

59

97.2

57.8

97.9

58.1

98.9

48.5

99.5

35.5

99.6

22.9

99.7

21.5

99.8

17

99.9

14.1

100

11

'93 '94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05

Minimizing NRW RateMaximizing Billing Ratio

Page 5: Bangkok - Thailand Performances · PDF file1 Dr. Visoth CHEA Assistant General Director Phnom Penh Water Supply Authority (PPWSA), Cambodia chea@ppwsa.com.kh Phnom Penh’s Experience

5

The Differences

Operating ratio

Production

Coverage area

Duration Pressure

Connections

NRW

Collection ratio Metering

Network

28%

235,000m3/d

95%

24hr/d25 m

138,000

11%

100%100%

1.230km (new)

2005

200%

65,000m3/d

25%

10hr/d2 m

26,881

72%

48%12%

280km (old)

1993

Staff/1,000 Connections 422

• Consultation with the Poor • Broadcasting of Supply Policy :

• Low Cost for Basic Need• Installment Payment

10, 15, 20 month (1998)• Same Quality of Service• 30%, 50%, 70%, 100% subsidy for the poorest (2005)

• Find Out the Poor & Poor Communities

Page 6: Bangkok - Thailand Performances · PDF file1 Dr. Visoth CHEA Assistant General Director Phnom Penh Water Supply Authority (PPWSA), Cambodia chea@ppwsa.com.kh Phnom Penh’s Experience

6

1014742,134

1,257

2,540

2,806

2,077

1999200020012002200320042005

11.389

1. 5 to 10 times cheaper. Savings round 300,000 Riels (USD75) /Family/Year

2. Alleviate Burden of Women & Children

3. Health Improvement by Quality

Chbar Ampov and Prek Pra - River Water

Toek Thla and Pochentong - Well Water

.

Riels

550770

10101270

0

500

1000

1500

2000

2500

< 7m3 8-15m3 16-50m3 > 50m3

Riel

RielRie

lRiel

Chroy Changwar and Kilometer 6 - River Water

Chak Angre and Kean Svay - River Water

Boarder of 2005

Supply Area in 2005 and 2020

Boarder of 2020

Page 7: Bangkok - Thailand Performances · PDF file1 Dr. Visoth CHEA Assistant General Director Phnom Penh Water Supply Authority (PPWSA), Cambodia chea@ppwsa.com.kh Phnom Penh’s Experience

7

Political willPreparation for Autonomy

Strong Leadership (proactive)

Restructure of the Organization (appropriate)

Qualified Personal with Discipline (HRD&M)

Clear & Reasonable Policies, Roles, Regulations, Standards (with Monitoring)

Effective Operation & MaintenanceEfficient Investment

Full Autonomy (commercial basis)

Willingness to Pay, (Gov. Customers, too)

Good Partnership (national & inter.)

LESSONSlearnedLESSONSlearned