Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry,...

21
Bangalore, India ,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU [email protected] Joint ITU-GISFI Workshop on “Bridging the Standardization Gap: Workshop on Sustainable Rural Communications” (Bangalore, India, 17-18 December 2012)

Transcript of Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry,...

Page 1: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Bangalore, India ,17-18 December 2012

Spectrum for mobile broadband wireless access

Colin Langtry,Chief, Radiocommunication Study

Groups Department, [email protected]

Joint ITU-GISFI Workshop on “Bridging the Standardization Gap: Workshop on

Sustainable Rural Communications”

(Bangalore, India, 17-18 December 2012)

Page 2: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

ITU

ITU-TTelecommunication standardization

- network and service aspects

ITU-RGlobal radio

spectrum management and

radiocommunicationstandardization

ITU-DPromote and assist

the extension of ICTs to all the world’s

inhabitants - narrowing the digital

divide

193 Member States>750 Sector Members,Associates and Academia

Helping the World Communicate

ITU Overview

Page 3: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

assistance to administrations

international regulations

global standards & guidelines

3

Rights of access to the spectrum

Efficient use of spectrum Operation free from

interference Economies of scale Interoperability and roaming Global harmonization Guidelines for national

& regional regulations

GOOD QUALITY AND LESS COSTLY EQUIPMENT

MORE FAVOURABLE INVESTMENT ENVIRONMENT (CLEAR & STABLE )

Page 4: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Technical characteristicsSharing criteria/assessment

Spectrum managementOperational aspects …

ITU Constitution,Convention

High level principles,rights and obligations

Plenipot

Table of Frequency AllocationsSatellite orbit/terrestrial Plans

Frequency coordinationFrequency registration

Emergency procedures …

Radio RegulationsBi/multilateral Agreements

WRCRRC

ITU-R Recommendations

ITU-R Reports,Handbooks, software tools

RA/Mail

Study GroupsWPs, TGs

International spectrum management framework

Page 5: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Radio Regulations

• Intergovernmental treaty covering both legal, operational and technical provisions, serves as a supranational instrument for the optimal international management of the radio spectrum

• Defines rights and obligations of ITU Member States to access spectrum

• Updated every 3 to 4 years

5

Page 6: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Participants: 3000+Countries: 160+Companies: 100+Proposals: 3000+

Page 7: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Good news from WRC-12

800 MHz: sharing problems resolved

700 MHz: allocation to mobile service globally

available from 2015

Additional spectrum: to be considered by

WRC-15

Mobile broadband/IMT spectrum

Page 8: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

ITU-R Studies for WRC-15 on IMT

Spectrum sharing and compatibility with other services including consolidation of draft CPM text

(JTG 4-5-6-7)

Spectrum requirements for the mobile serviceincluding suitable frequency ranges, and other specific requirements including

channelling arrangements(WP 5D)

Agenda items for WRC-15 (Res. 807 (WRC-12)):1.1 - Res. 233 (WRC 12)‑

• consider additional spectrum allocations to MS on a primary basis • identify additional frequency bands for IMT • related regulatory provisions to facilitate development of terrestrial mobile broadband

applications 1.2 - Res. 232 (WRC 12)‑examine the results of ITU R studies on the ‑ use of the frequency band 694-790 MHz by the mobile, except aeronautical mobile, service in Region 1 and take appropriate measures;

Page 9: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

WP WP 5D5D

9

Spectrum identified for IMTSpectrum identified for IMT

Band (MHz) RR Footnotes identifying the band for IMT

450 – 470 5.286AA

698 – 960 5.313A, 5.317A

1 710 - 2 025 5.384A, 5.388

2 110 - 2 200 5.388

2 300 - 2 400 5.384A

2 500 - 2 690 5.384A

3 400 - 3 600 5.430A, 5.432A, 5.432B, 5.433A

Frequency bands identified for IMT in the Radio Regulations (RR):

Page 10: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

10

WP WP 5D5D Description Freq. ranges (MHz) Inputs to WP 5D

< 1 GHz470-694

470-598598-608608-614614-694

694-790 694-790

~ 1.5 GHz 1000-1700

1000-13001300-13751375-1400

1400-1427/1427.91427/1427.9-1452

1452-1462.91462.9-1475.91 475.9-1492

1492-1510/1510.91510/1510.9-1518

1518-1525

1525-1559

1559-16101610-1660.51660.5-1668

1668-1675

1675-1700

Proposed frequency ranges

Page 11: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

WP WP 5D5D Description Freq. ranges (MHz) Inputs to WP 5D

~ 2 GHz

2025-21102025-20902090-2110

2200-22902200-22152215-2290

2700-3400

2700-29002900–2930

3-5 GHz

2930-31003100-32003200-33003300-3400

3400-5000

3400-3492.53492.5-3542.53542.5-35753575-36003600-38003800-42004200-44004400-4900

4900-5000

> 5 GHz5350-5470 5350-5470

5850-64255850-59255925-6425

> 6 GHz Above 6000 Above 6000

Proposed frequency ranges

Page 12: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Initial views on spectrum requirements

Review of the methodology (D. Rev. Rec. ITU-R M.1768) WP 5D members are considering the following

Total/Additional spectrum requirements (in MHz):

by 2014: 275*;

by 2015: 600-800**;

by 2017: 300*;by 2020:1081/300*; 1065/385*; 2020**; 1700-2100**;

1240a/1880b**; 1600-1800* or (300)+200*

*Using an original methodology **Using Rec. ITU-R M.1768a for lower user density b for higher user density

WP WP 5D5D

Page 13: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Input to JTG 4-5-6-7 on Agenda item 1.2Frequency arrangements/spectrum requirements in the band 694-790 MHz

Various channelling arrangements are under consideration (for harmonisation) with:

Conventional FDD duplex arrangement (uplink below downlink), or downlink only;

IMT uplink transmissions starting around 694 MHz, 696 MHz, 701 MHz, 703 MHz and 718 MHz.

Sharing parameters Provide the list of IMT technical parameters for use in sharing studies under Agenda item 1.2

WP WP 5D5D

Page 14: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

3

Date* Venue

1 30 Jan – 6 Feb 2013 Geneva

2 10-17 Jul 2013 [Japan]

3 16-23 Oct 2013 TBD

4 Mid-Feb 2014 TBD

5 Mid-Jun 2014 TBD

6 Mid-Oct 2014 TBD*Dates to be confirmed

WP 5D schedulesWP 5DWP 5D

Page 15: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Joint Task Group 4-5-6-7related items

http://www.itu.int/ITU-R/index.asp?category=study-groups&rlink=jtg4-5-6-7&lang=en

Page 16: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

JTG 4-5-6-JTG 4-5-6-77

Background and Terms of Reference

• Decision to create JTG 4-5-6-7 – CPM-15-1

• Chairman: Thomas Ewers, Germany

• CPM text on WRC-15 Agenda items 1.1 and 1.2 CPM-15 (August 2014)

• Sharing studies taking into account:

• Spectrum requirements for the mobile service, including frequency ranges from WP 5D

• Spectrum requirements, technical and operational characteristics, performance objectives and protection requirements of other services from other Working Parties

Page 17: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

JTG 4-5-6-JTG 4-5-6-77

Interaction with other concerned Working Parties• Collect necessary information from WP’s and SG’s

• JTG 4-5-6-7 is self-sufficient – no need to liaise results to other Working Parties

• Urgent sharing studies - Agenda item 1.2• Technical and operational characteristics, protection

requirements from concerned Working Parties, and WP 5D and 6A to provide spectrum requirements before

31 December 2012

• Sharing studies – Agenda item 1.1• Technical and operational characteristics, protection

requirements and information on current and planned use from concerned Working Parties, and WP 5A and 5D to provide spectrum requirements preferably before

31 July 2013

Page 18: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

JTG 4-5-6-JTG 4-5-6-77

StructureAd Hoc 1: Work Plan JTG 4-5-6-7Chairman: J. Lewis, Samsung

WG 4-5-6-7/1: CPM-15 textChairman: C. Cook, Canada

WG 4-5-6-7/2: Broadcasting and SAB/SAPChairman: N. Laflin, United Kingdom

WG 4-5-6-7/5: Science ServicesChairman: A. Vassiliev, Russian Federation

JTG

4-5

-6-7

WG 4-5-6-7/4: Satellite ServicesChairman: P. Hovstad, Asiasat

WG 4-5-6-7/3: Terrestrial ServicesChairman: E. Rocksvold, USA

Page 19: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

JTG 4-5-6-JTG 4-5-6-77 Work Plan

Draft CPM text

Sharing studies in potential candidate bands

Compatibility studies : 694 – 790 MHz

Options for lower edge : 694 – 790 MHz

Solutions for SAB/SAP

Information received (WP’s 5A, 5D)

Information received (WP’s 5D, 6A)

Jul 2

012

Nov

201

2

Jul 2

013

Oct

201

3

Feb

2014

Jul 2

014

Agen

da it

em 1

.2Ag

enda

item

1.1

JTG 4-5-6-7 meetings

Page 20: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

3

Date Venue

1 23 - 27 July 2012 CICG, Geneva

2 21 - 28 November 2012 CICG, Geneva

3 22 - 31 July 2013 Invitation received

4 17 - 25 October 2013* TBD

5 20 - 28 February 2014* TBD

6 21 - 31 July 2014* TBD*Dates to be confirmed

JTG 4-5-6-7 schedules

JTG 4-5-6-JTG 4-5-6-77

Page 21: Bangalore, India,17-18 December 2012 Spectrum for mobile broadband wireless access Colin Langtry, Chief, Radiocommunication Study Groups Department, ITU.

Thank you!

3