Bam Earthquake Recovery and Reconstruction
Challenge of Bam Earthquake –
Role of the UN System in Recovery and Reconstruction
Kamal Kishore, RDRA, UNDP/BCPRPublic Forum on Recovery from Catastrophic Disasters
24 August 2004UN House, Tokyo
![Page 2: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/2.jpg)
Bam Earthquake Recovery and Reconstruction
Outline• Earthquake Risk in Iran • The Bam Earthquake• UN’s role in Response & Recovery • Challenges in Long term Recovery • Lessons & Road Map for Safer
Communities
![Page 3: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/3.jpg)
Bam Earthquake Recovery and Reconstruction
Earthquake Risk in Iran• High level of disaster risk
Source: Reducing Disaster Risk: A Challenge for Development, UNDP, 2003.
![Page 4: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/4.jpg)
Bam Earthquake Recovery and Reconstruction
The Bam Earthquake
Quick facts: 26 December 2003
6.5 on the Richter Scale
Damage:-30,000 dead, -75,000 homeless. - 85% of buildings severely damaged or destroyed. - 2,500 year-old historic citadel of Bam (Arg-e-Bam), an internationally known heritage site, almost completely destroyed.
![Page 5: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/5.jpg)
Bam Earthquake Recovery and Reconstruction
The Bam Earthquake
60% of deaths from natural disasters worldwide in 2003 were in Bam (OFDA/ CRED International Disaster Database)
Damaged Arg-e-Bam
![Page 6: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/6.jpg)
Bam Earthquake Recovery and Reconstruction
UN’s role in Response & Recovery Supported short-term relief to address urgent needs and lay foundations for long- term recovery
Conducted Rapid Needs Assessment (UNDAC)
Provided rescue and relief support to government
![Page 7: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/7.jpg)
Bam Earthquake Recovery and Reconstruction UN’s role in Response & Recovery
Launched a Flash Appeal to meet the urgent and immediate needs for the first six months after the earthquake
![Page 8: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/8.jpg)
Bam Earthquake Recovery and Reconstruction
UN’s role in Response & Recovery
From Emergency Humanitarian Assistance to Reconstruction and Risk Management
– U N Strategy for Support to the Government of the Islamic Republic of Iran following the Bam Earthquake: Short, medium and long term
– Lessons Learned from large-scale reconstruction programmes in Japan, India and Turkey International workshop (Tehran 25-26 February 2004).
![Page 9: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/9.jpg)
Bam Earthquake Recovery and Reconstruction
Challenges in long-term Recovery• Setting up appropriate institutional arrangements for the
management of large scale reconstruction programmes
• Using recovery programme as an opportunity to enhance standards of earthquake safety in not only Bam but other vulnerable areas of Iran
• The issue of site selection – where to rebuild Bam? In the same location or on another site?
• Introducing building technologies that are not only earthquake resistant but also cost-effective, locally appropriate, employment generating and sustainable
![Page 10: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/10.jpg)
Bam Earthquake Recovery and Reconstruction
Challenges in Long term Recovery• Ensuring that the local initiative and the resources and
capacities of the affected people are fully utilized
• Using reconstruction as a means of revitalizing the local economy by focusing on both the pre-existing micro-enterprises and creating new livelihood options
• Capturing and institutionalising the lessons learned from Bam
• Developing synergies between reconstruction activities in different sectors such as health, infrastructure, public services and shelter
![Page 11: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/11.jpg)
Bam Earthquake Recovery and Reconstruction
Lessons & Road Map for Safer Communities• Translating policies into practice at the local level
• Strengthening capacities on all aspects of disaster risk management at the local and intermediate levels
• Building a knowledge base on existing and emerging patterns of disaster risk (good information on natural hazards alone is not enough)
• Build capacities to mainstream disaster risk reduction into development processes.
![Page 12: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/12.jpg)
Bam Earthquake Recovery and Reconstruction
• Link disaster management at local, provincial and national levels.
• Use Bam experiences and lessons to reduce risk in other vulnerable parts of Iran and the region.
![Page 13: Bam Earthquake Recovery and Reconstruction Challenge of Bam Earthquake – Role of the UN System in Recovery and Reconstruction Kamal Kishore, RDRA, UNDP/BCPR.](https://reader035.fdocuments.in/reader035/viewer/2022070305/5514bb95550346d36e8b66b6/html5/thumbnails/13.jpg)
Bam Earthquake Recovery and Reconstruction
Thank you