Provide Construction Services for Replacement of Graceland Park/O’Donnell Heights Elementary/Middle School #240 and Holabird Elementary/Middle School #229 Baltimore City Public Schools (City Schools) 9/19/2017 1 Baltimore City Public Schools “City Schools” Material Management Department. 200 E. North Avenue, Room #401 Baltimore, MD 21202 ADDENDUM #5 September 19, 2017 Solicitation: IFB-18017 New Response Due Date: September 28, 2017 at 11:00 a.m. Local Time Provide Construction Services for Replacement of Graceland Park/O’Donnell Heights Elementary/Middle School #240 and Holabird Elementary/Middle School #229 TO THE BIDDERS: PLEASE ATTACH TO YOUR CONTRACT DOCUMENTS. The following changes, additions, deletions and clarifications are hereby made part of the Contract Documents for the above referenced project and shall be taken into account in the preparation of the proposals and execution of all work. Vendors shall acknowledge receipt of this addendum on the Contract Proposal Form. Notice: The following changes and additions should be considered as amendments to the above referenced bid documents. BID DOCUMENT REVISIONS: Item #1 Prospective contractors and demolition subcontractors for your information City Schools will conduct additional Pre-Bid and Walk through project sites meeting on: Thursday, September 21, 2017 at 9:30 a.m. Local Time (Start at Graceland and move to Holabird) Item #2: Prospective contractors for your information please find attached to this Addendum #5 additional info related to the Construction Services for Replacement of Graceland Park/O’Donnell Heights Elementary/Middle School #240 and Holabird Elementary/Middle School #229. All other terms and conditions shall remain unchanged. Failure to acknowledge and respond to this addendums on the Bid Proposal Form may result in the Bid Proposal being considered non-responsive.

Transcript of Baltimore City Public Schools “City Schools” Material ... · Prospective contractors for your...

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School #240 and

Holabird Elementary/Middle School #229

Baltimore City Public Schools (City Schools)

9/19/2017

1

Baltimore City Public Schools “City Schools”

Material Management Department.

200 E. North Avenue, Room #401

Baltimore, MD 21202

ADDENDUM #5

September 19, 2017

Solicitation: IFB-18017

New Response Due Date: September 28, 2017 at 11:00 a.m. Local Time

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School #240

and

Holabird Elementary/Middle School #229

TO THE BIDDERS: PLEASE ATTACH TO YOUR CONTRACT DOCUMENTS.

The following changes, additions, deletions and clarifications are hereby made part of the

Contract Documents for the above referenced project and shall be taken into account in the

preparation of the proposals and execution of all work. Vendors shall acknowledge receipt of this

addendum on the Contract Proposal Form.

Notice: The following changes and additions should be considered as amendments to

the above referenced bid documents.

BID DOCUMENT REVISIONS:

Item #1

Prospective contractors and demolition subcontractors for your information City Schools will conduct

additional Pre-Bid and Walk through project sites meeting on:

Thursday, September 21, 2017 at 9:30 a.m. Local Time

(Start at Graceland and move to Holabird)

Item #2:

Prospective contractors for your information please find attached to this Addendum #5 additional info

related to the Construction Services for Replacement of Graceland Park/O’Donnell Heights

Elementary/Middle School #240 and Holabird Elementary/Middle School #229.

All other terms and conditions shall remain unchanged.

Failure to acknowledge and respond to this addendums on the Bid Proposal Form may result in the

Bid Proposal being considered non-responsive.

Page 1 of 7

September 22, 2017

GRACELAND PARK/O’DONNELL HEIGHTS ELEMENTARY/MIDDLE SCHOOL NO. 240 BALTIMORE, MARYLAND ADDENDUM #5

TO THE CONTRACT DRAWINGS AND SPECIFICATIONS FOR THE REFERENCED PROJECT, DATED March 13, 2017, AS PREPARED BY GRIMM AND PARKER ARCHITECTS, 11720 BELTSVILLE DRIVE, SUITE 600, CALVERTON, MD 20705.

This Addendum includes changes and clarifications to the Contract Documents. This information includes the following:

I. GENERAL:RFI None

II. BID RFIS:

ITEM NO. BID RFI-01 For the photovoltaic trackers, is there consideration for wind loads and mounting in framework of the buildings for trackers? Response Each school has one dual axis tracker specified. The Solar Contractor must review building structural design and provide shop drawings stamped by a Structural Engineer licensed in the State of Maryland. Refer to specification 26 51 22 for submittal requirements.

ITEM NO. BID RFI-02 In Addendum 1 of this rebid, item #534 regarding spec section 265561 indicates that there was a revision to the section 2.6/E. "Fixtures to be supplied with pole operated pan/tilt mount." This feature is not available on the type of fixture spec’d. Please advise. Response Refer to response to Bid RFI -07 following.

ITEM NO. BID RFI-03 Please see the attached substitution request for lighting control systems and network lighting systems. Response This substitution request is denied. The request did not follow the requirements in the spec.

ITEM NO. BID RFI-04 The following sections in the project manual state Infrared Thermography as a requirement to final acceptance testing at varying intervals:

260519 (3.8) LOW VOLTAGE ELECTRICAL POWER CODUCTORS AND CABLES 262200 (3.4) LOW VOLTAGE TRANSFORMERS 262413 (3.5) SWITCHBOARDS 262416 (3.4) PANELBOARDS 262816 (3.4) ENCLOSED SWITCHES AND CIRCUIT BREAKERS 263600 (3.3) TRANSFER SWITCHES

Normally IR photos and reports are provided for equipment showing significant variations in heat only. Are we to provide IR reports and digital photos for all equipment scanned or just of these anomalies that need to be corrected?

Page 2 of 7

Response IR reports for all equipment scanned are needed. No digital photos required except for the anomalies that need to be corrected. ITEM NO. BID RFI-05 Drawings E-0.3G and E-0.3H show various options on how to get temporary power to the temporary modular classroom trailers. Without knowing how BGE will want the contractor to install the temporary power, can the owner provide a cost allowance to be carried for the temporary power for the modular classroom trailers? Response Cost allowance will not be provided. ITEM NO. BID RFI-06 Section 11-61-42 Platform Curtains:

a. Is there a curtain Schedule? b. Is there a drawing that shows the pipe grid layout?

Response There is no curtain schedule or a pipe grid layout drawing. ITEM NO. BID RFI-07 Section 26-55-61 Theatrical Lighting Systems:

a. Section 2.6/E – Provide four fixtures. Fixtures to be supplied with pole operated pan/tilt mount. Are you looking for automated intelligent moving lights? If not, is manual pan/tilt mount OK? Please provide example of what you are looking for. Or is the Martin Light spec’d preferred?

Response Clarification: The specification stays as written. Manual pan/tilt mount is preferred. Litepanels and Desisti are two manufacturers that provide yokes on which the specified lights are mounted. ITEM NO. BID RFI-08 Please verify that the proscenium around the stage opening is plastic laminate panels and not painted gyp board, as shown at the proscenium bulkhead detail D20, on new drawing A5.6 from Addendum #1. Response The proscenium around the platform opening on the Multipurpose Room side is plastic laminate panels on sheathing (not painted gypsum board) as shown on detail A15/a-7.7. The proscenium bulkhead detail D20/A-5.6 has been revised to reflect this coordination in this Addendum (see Sketch SK-A-5.1). ITEM NO. BID RFI-09 Please clarify where spec section 071800 - Traffic Coatings occurs. Response Refer to response in Addendum 03 ITEM NO. BID RFI-10 Please clarify the location of spec section 102600 – Protective Wall Covering. Response Refer to details A3, A6, A9 and A12 on A-9.6

Page 3 of 7

ITEM NO. BID RFI-11 Please clarify the location of spec section 102623 – Protective Wall Panels. Response Refer to details A8, J5, J9, J13 and J18 on A-6.5 and detail J3 on A-6.3 ITEM NO. BID RFI-12 Please clarify what the “demountable graphic wall panel system” is, shown on interior elevations on drawing A-6.5. Response: Refer to Section 102623 Protective Wall Panels. ITEM NO. BID RFI-13 Is there a spec for the outdoor basketball backboards/hoops/poles shown on drawing L-400? Response: This information is being added to Detail 4/L-4.00 (See Item No. L1 below):

Manufacturer: Bison, Inc. Product: Mega Duty BA780XL Pole with BA472PC Steel Backboard and Goal Size: 5-9/16” OD Pole with 96 Inch “Safe Play Area”

ITEM NO. BID RFI-14 Please clarify the material and finish for the mesh guardrail/frames at the stairs where shown. Response See specification revision item “S5” in this Addendum. ITEM NO. BID RFI-15 Please confirm that the modular classrooms don’t require an automatic sprinkler system per Building Code Notes on drawing A-0.9G. Whereas drawing E 0.3G says under fire alarm riser general notes number 8 - sprinkler system required, and drawing P-0.9G shows a FDC? Response The note in E 0.3G does not apply since the building is not sprinklered and can be deleted. ITEM NO. BID RFI-16 Please answer the following food service questions:

• Item #22- The specified model has been discontinued. Please provide new specification.

• Item #41- Posts and shelves do not match. Please provide revised specification. Response Item 22: Vollrath 37001 with sliding top door. Item 41: MQ2148G shelves with MQ63UPE posts ITEM NO. BID RFI-17 Please confirm that Unit Price C – Sheeting and Shoring, on the Bid Form, is not applicable. Response Unit Price is required to provide unit cost for reference during construction. ITEM NO. BID RFI-18 Please advise/give details for the “millwork art display wall” found on elevation D18/A-6.3, and the “millwork wall displays” found on plans at Corridors C180, C190, and C220. Response Details will be issued in subsequent Addendum.

Page 4 of 7

ITEM NO. BID RFI-19 Flooring subcontractors have informed us that Alternate #11 is a Deduct, not an Add. The Bid Form

states that the Alternate is an Add. Please clarify. Response No change is required.

III. SPECIFICATION ITEMS: ITEM NO. S1 TABLE OF CONTENTS REVISE to read 02 41 19 SELECTIVE DEMOLITION (BUILDING) ITEM NO. S2 01 23 00 ALTERNATE BIDS ADD ADD Subsection 1.4.L to read:

L. Bid Alternate No. 12: Salvage Items from Buildings per Spec 02 41 19 Part 1.3.A.3 ITEM NO. S3 02 41 13 SELECTIVE DEMOLITION REVISE Title and footer to read “SELECTIVE DEMOLITION (SITE) REVISE Part 1.4.C.2 to read: “Owner’s salvage list will be provided 60 days after Notice to

Proceed” ITEM NO. S4 02 41 19 SELECTIVE DEMOLITION REVISE Title and footer to read “SELECTIVE DEMOLITION (BUILDING) REVISE Part 1.3.A to read: “Items to be Salvaged: Refer to drawings and spec for items

indicated to be salvaged and reinstalled.” ADD Chart to Part 1.3.A.3: 3. Remove and Reinstall the following Items (Add Alternate X is noted). Verify final

location with Architect and Owner prior to removal. Storage by General Contractor. Holabird Notes Graceland Notes

Dedication Plaque(s)

Dedication Plaques(s)

Cornerstone(s) Cornerstone(s)

Gym Floor with Logo (Alternate 12)

Cut center court circle with logo to be refurbished and installed as interior wall panel in Dining Wonder Wall.

Limestone Coping Refer to Sheet L-4.00G for size/amount of coping to salvage and repurpose into exterior benches

Wood Cut Panels in Gym (Alternate 12)

All wood cut (white) and solid panels (blue) to be salvaged. Owner and Architect to determine how many to be reinstalled in new school.

Pond Sculpture and Base

Survey existing cracks or repairs with Owner prior to removal.

Not used Auditorium Seating (2 rows of 8 sets each, Architect’s preference. (Add Alternate 12)

Refurbish and install seating in waiting rooms of both Holabird and Graceland

Page 5 of 7

ITEM NO. S5 05 72 10 ORNAMENTAL RAILINGS ADD to Part 2.1.A.1 a. Basis of Design: Custom Wire Mesh Infill Panels with No. 45 Panel Clips by Holleander

Manufacturing REVISE Part 2.1.A.1 sub lettering to follow new “a.” ADD new Section A to Part 2.4A 2.4A WIRE MESH INSERT PANELS

A. Panel 1. Welded wire mesh; woven wire not acceptable 2. Pattern: 1-1/2” square; horizontal strands to remain parallel to treads on incline3. 3. Frame: U-channel; corners welded and ground smooth. 4. Finish: Manufacturer’s powder coating; color to match Architect’s sample.

ITEM NO. S6 SECTION 23 52 00 SUBSECTION 8 A REVISE A. Graphical User Interface Computer-Laptop

1. Contractor shall supply a stationary wall mounted Operator Terminal, all necessary

software, and interfaces to provide for the uploading/downloading of controller

databases and programs, monitoring of all network variable types, including display

of all bound SNVTs, monitoring and overrides of all controller physical input/output

points, and editing of controller resident time schedules.

2. Provide a wall mounted all-in-one computer including a VESA compliant wall

mount, and all software configuration tools that shall be capable of accessing all

system data. This device may be connected to any point on the system network or

may be connected directly to any controller for programming, set-up, and

troubleshooting.

3. The Operator’s Terminal shall be a 32” panel PC, Teguar model TP-5045-32 or

equal, including all software and hardware required. The PC shall contain a

minimum:

a. Intel Core i5 Processor 2.8 GHz minimum, 6 MB cache

minimum

b. 32” Touch Screen Display; Projected Capacitive Multi-touch;

1920 x 1080 resolution

c. 16.0 GB DDR3 Memory

d. 1TB Hard Drive, 7200 RPM

e. Windows Operating System (Version 10 or newer)

f. AMD Radeon HD 7730M 2GB

g. Wireless LAN Card

h. (4) USB 3.0 Ports

i. (1) HDMI Port

j. (2) Mini-PCIe

k. (1) Display Port (DP++)

l. (2) RJ45 GbE

m. (1) DC-in

n. (1) Audio Line Out

o. (1) Audio Line In

Page 6 of 7

4. PC shall be mounted on wall (Ergotron Model #61-081-085) in Main Mechanical

Room and be provided with a wireless mouse (Logitech Model #MX Master 2s, or

equal) and keyboard (Logitech Model #K800, or equal)

ITEM NO. S7 26 05 33 Raceways and Boxes for Electrical Systems REVISE 3.1-A-5 to read: Boxes and Enclosures, Aboveground: NEMA 250, Type 3R. ITEM NO. S8 26 29 13 Enclosed Controllers REVISE 2.3-A-2 to read: Outdoor Locations: Type 3R ITEM NO. S9 26 29 23 Variable-Frequency Motor Controllers REVISE 2.5-A-2 to read: Outdoor Locations: Type 3R ITEM NO. S10 26 32 13 Engine Generators ADD 2.1-A to read:

A. MANUFACTURERS: Subject to compliance with requirements, provide products by one of the following: 1. Caterpillar; Engine Div. 2. Generac Power Systems, Inc. 3. Kohler Co.; Generator Division 4. Onan/Cummins Power Generation; Industrial Business Group 5. MTU

ITEM NO. S11 26 43 13 Surge Protection for Low-Voltage Electrical Power Circuits REVISE 2.3-B to read: Outdoor Locations: NEMA 250 Type 3R ITEM NO. S12 28 31 11 Digital, Addressable Fire-Alarm System ADD 2.1-A to read:

A. MANUFACTURERS: Subject to compliance with requirements, provide products by one of the following: 1. NOTIFIER; a Honeywell company. 2. Siemens Building Technologies, Inc.; Fire Safety Division. 3. SimplexGrinnell LP; a Tyco International company. 4. Edward EST

IV. DRAWING ITEMS: LANDSCAPE

ITEM NO. L1 L-4.00 DETAILS ADD Note to Detail 4/L-4.00 Manufacturer: Bison, Inc. Product: Mega Duty BA780XL Pole with BA472PC Steel Backboard and Goal Size: 5-9/16” OD Pole with 96 Inch “Safe Play Area”

Page 7 of 7

ARCHITECTURAL ITEM NO. A1 A-3.1 FINISH SCHEDULE REVISE Floor 2201 back to PT (it was erroneously changed to TRF in Addendum 3). REVISE Floor for Mechanical Rooms 2205 to be “TRF” Traffic Coating ADD “TRF TRAFFIC COATING” to Finish Materials Key under Floors. ITEM NO. A2 A-4.4 WALL SECTIONS – GYM & COMMUNITY AREA (Graceland Only) REVISE Detail A5 for Graceland per attached Sketch SK-A-5.2 to incorporate installation details

for salvaged limestone panels. ITEM NO. A3 A-5.6 ENLARGED PLAN DETAILS REVISE Detail D20 per attached Sketch SK-A-5.1 to coordinate painted gypsum board/plastic

laminate bulkhead at proscenium opening to match A15/A-7.7.

End of Addendum 5 *****

FIRST FLOOR0' - 0"

9.19

12' -

2"

45.00°

EQ

.E

Q.

EQ

.

1' -

4"

2" 1" TYP.

2" 1 1/4"

2"

2"

2"

2"

11" 1' - 6" 1' - 6"

CONCRETE STEPS ONGRADE - SEE STRUCTURAL

WOOD TREAD AMD RISERS,WOOD FURRING,CONCRETE STEPS

SCHEDULED FLOOR FINISHON SLAB ON GRADE

PLATFORMCURTAINS

PAINTEDGYPSUM BOARD

BULKHEAD ONMETAL STUD

SCHEDULEDSUSPENDED

ACOUSTICCEILING

4' -

0"

2' -

0"

1' - 9 1/4"

1' - 11 5/8" 2' - 0"

PLASTIC LAMINATE PANELSON 5/8" PLYWOOD ON 6", 16GA. METAL STUDS AT 24"O.C.

PLASTIC LAMINATE PANELSON 5/8" PLYWOOD ON 6", 16GA. METAL STUDS AT 24"O.C.ELECTRICALLY

OPERATEDRECESSED

PROJECTIONSCREEN 5

ADD

11720 Beltsville DriveSuite 600

Calverton, MD 20705

DATE

www.grimmandparker.com

SCALE: 3/4" = 1'-0"GRACELAND PARK/O'DONNELL HEIGHTS ES/MSREVISION TO SHEET A-5.6 ENLARGED PLAN DETAILS 09/15/17 SK-A-5.1

ADD 5

3/4" = 1'-0"D20WALL SECTION @ PLATFORM ADDENDUM 5

8"

A-9.6

E9

SOLDIER COURSE, BRICK COLOR 1

EXTERIOR WALL TYPE CONSISTING OF:

4" NOM. MASONRY VENEER1.5" AIR SPACEFLUID APPLIED AIR AND MOISTURE BARRIERINSULATED CONCRETE FORM WALL CONSISTING OF:2-5/8" EPS INSULATION10" CONCRETE2-5/8" EPS INSULATIONINTERIOR: 5/8" ABUSE-RESISTANT GYPSUM BOARD

1' - 9"

5/8"

2 5/8"

10"

2 5/8" 1 1/2"

3 5/8"

BRICK COLOR 1

AT GRACELAND ONLY:REINSTALL SALVAGED LIMESTONE PANELS HEREPER ELEVATION G18/A-2.4G IN LIEU OF BRICK.LIMESTONE PANELS TO BE FLUSH WITH BRICKSOLDIER COURSE. HEAD DETAIL SIMILAR TOK/S-5.2G WITH CONCRETE HAUNCH, EMBEDDEDPLATE, AND GALVANIZED ANGLE. LENGTH OFANGLE IS EQUAL TO LENGTH OF REINSTALLLEDLIMESTONE PANELS. STANDARD STONEANCHORS TO TIE SALVAGED 4" LIMESTONEPANELS TO CONCRETE 5

ADD

11720 Beltsville DriveSuite 600

Calverton, MD 20705

DATE

www.grimmandparker.com

SCALE: 3/4" = 1'-0"GRACELAND PARK/O'DONNELL HEIGHTS ES/MSREVISION TO SHEET A-4.4 WALL SECTIONS 09/15/17 SK-A-5.2

ADD 5

Page 1 of 7

September 22, 2017

HOLABIRD ELEMENTARY/MIDDLE SCHOOL NO. 229 BALTIMORE, MARYLAND ADDENDUM #5

TO THE CONTRACT DRAWINGS AND SPECIFICATIONS FOR THE REFERENCED PROJECT, DATED March 13, 2017, AS PREPARED BY GRIMM AND PARKER ARCHITECTS, 11720 BELTSVILLE DRIVE, SUITE 600, CALVERTON, MD 20705.

This Addendum includes changes and clarifications to the Contract Documents. This information includes the following:

I. GENERAL:RFI None

II. BID RFIS:

ITEM NO. BID RFI-01 For the photovoltaic trackers, is there consideration for wind loads and mounting in framework of the buildings for trackers? Response Each school has one dual axis tracker specified. The Solar Contractor must review building structural design and provide shop drawings stamped by a Structural Engineer licensed in the State of Maryland. Refer to specification 26 51 22 for submittal requirements.

ITEM NO. BID RFI-02 In Addendum 1 of this rebid, item #534 regarding spec section 265561 indicates that there was a revision to the section 2.6/E. "Fixtures to be supplied with pole operated pan/tilt mount." This feature is not available on the type of fixture spec’d. Please advise. Response Refer to response to Bid RFI -07 following.

ITEM NO. BID RFI-03 Please see the attached substitution request for lighting control systems and network lighting systems. Response This substitution request is denied. The request did not follow the requirements in the spec.

ITEM NO. BID RFI-04 The following sections in the project manual state Infrared Thermography as a requirement to final acceptance testing at varying intervals:

260519 (3.8) LOW VOLTAGE ELECTRICAL POWER CODUCTORS AND CABLES 262200 (3.4) LOW VOLTAGE TRANSFORMERS 262413 (3.5) SWITCHBOARDS 262416 (3.4) PANELBOARDS 262816 (3.4) ENCLOSED SWITCHES AND CIRCUIT BREAKERS 263600 (3.3) TRANSFER SWITCHES

Normally IR photos and reports are provided for equipment showing significant variations in heat only. Are we to provide IR reports and digital photos for all equipment scanned or just of these anomalies that need to be corrected?

Page 2 of 7

Response IR reports for all equipment scanned are needed. No digital photos required except for the anomalies that need to be corrected. ITEM NO. BID RFI-05 Drawings E-0.3G and E-0.3H show various options on how to get temporary power to the temporary modular classroom trailers. Without knowing how BGE will want the contractor to install the temporary power, can the owner provide a cost allowance to be carried for the temporary power for the modular classroom trailers? Response Cost allowance will not be provided. ITEM NO. BID RFI-06 Section 11-61-42 Platform Curtains:

a. Is there a curtain Schedule? b. Is there a drawing that shows the pipe grid layout?

Response There is no curtain schedule or a pipe grid layout drawing. ITEM NO. BID RFI-07 Section 26-55-61 Theatrical Lighting Systems:

a. Section 2.6/E – Provide four fixtures. Fixtures to be supplied with pole operated pan/tilt mount. Are you looking for automated intelligent moving lights? If not, is manual pan/tilt mount OK? Please provide example of what you are looking for. Or is the Martin Light spec’d preferred?

Response Clarification: The specification stays as written. Manual pan/tilt mount is preferred. Litepanels and Desisti are two manufacturers that provide yokes on which the specified lights are mounted. ITEM NO. BID RFI-08 Please verify that the proscenium around the stage opening is plastic laminate panels and not painted gyp board, as shown at the proscenium bulkhead detail D20, on new drawing A5.6 from Addendum #1. Response The proscenium around the platform opening on the Multipurpose Room side is plastic laminate panels on sheathing (not painted gypsum board) as shown on detail A15/a-7.7. The proscenium bulkhead detail D20/A-5.6 has been revised to reflect this coordination in this Addendum (see Sketch SK-A-5.1). ITEM NO. BID RFI-09 Please clarify where spec section 071800 - Traffic Coatings occurs. Response Refer to response in Addendum 03 ITEM NO. BID RFI-10 Please clarify the location of spec section 102600 – Protective Wall Covering. Response Refer to details A3, A6, A9 and A12 on A-9.6

Page 3 of 7

ITEM NO. BID RFI-11 Please clarify the location of spec section 102623 – Protective Wall Panels. Response Refer to details A8, J5, J9, J13 and J18 on A-6.5 and detail J3 on A-6.3 ITEM NO. BID RFI-12 Please clarify what the “demountable graphic wall panel system” is, shown on interior elevations on drawing A-6.5. Response: Refer to Section 102623 Protective Wall Panels. ITEM NO. BID RFI-13 Is there a spec for the outdoor basketball backboards/hoops/poles shown on drawing L-400? Response: This information is being added to Detail 4/L-4.00 (See Item No. L1 below):

Manufacturer: Bison, Inc. Product: Mega Duty BA780XL Pole with BA472PC Steel Backboard and Goal Size: 5-9/16” OD Pole with 96 Inch “Safe Play Area”

ITEM NO. BID RFI-14 Please clarify the material and finish for the mesh guardrail/frames at the stairs where shown. Response See specification revision item “S5” in this Addendum. ITEM NO. BID RFI-15 Please confirm that the modular classrooms don’t require an automatic sprinkler system per Building Code Notes on drawing A-0.9G. Whereas drawing E 0.3G says under fire alarm riser general notes number 8 - sprinkler system required, and drawing P-0.9G shows a FDC? Response The note in E 0.3G does not apply since the building is not sprinklered and can be deleted. ITEM NO. BID RFI-16 Please answer the following food service questions:

• Item #22- The specified model has been discontinued. Please provide new specification.

• Item #41- Posts and shelves do not match. Please provide revised specification. Response Item 22: Vollrath 37001 with sliding top door. Item 41: MQ2148G shelves with MQ63UPE posts ITEM NO. BID RFI-17 Please confirm that Unit Price C – Sheeting and Shoring, on the Bid Form, is not applicable. Response Unit Price is required to provide unit cost for reference during construction. ITEM NO. BID RFI-18 Please advise/give details for the “millwork art display wall” found on elevation D18/A-6.3, and the “millwork wall displays” found on plans at Corridors C180, C190, and C220. Response Details will be issued in subsequent Addendum.

Page 4 of 7

ITEM NO. BID RFI-19 Flooring subcontractors have informed us that Alternate #11 is a Deduct, not an Add. The Bid Form

states that the Alternate is an Add. Please clarify. Response No change is required.

III. SPECIFICATION ITEMS: ITEM NO. S1 TABLE OF CONTENTS REVISE to read 02 41 19 SELECTIVE DEMOLITION (BUILDING) ITEM NO. S2 01 23 00 ALTERNATE BIDS ADD ADD Subsection 1.4.L to read:

L. Bid Alternate No. 12: Salvage Items from Buildings per Spec 02 41 19 Part 1.3.A.3 ITEM NO. S3 02 41 13 SELECTIVE DEMOLITION REVISE Title and footer to read “SELECTIVE DEMOLITION (SITE) REVISE Part 1.4.C.2 to read: “Owner’s salvage list will be provided 60 days after Notice to

Proceed” ITEM NO. S4 02 41 19 SELECTIVE DEMOLITION REVISE Title and footer to read “SELECTIVE DEMOLITION (BUILDING) REVISE Part 1.3.A to read: “Items to be Salvaged: Refer to drawings and spec for items

indicated to be salvaged and reinstalled.” ADD Chart to Part 1.3.A.3: 3. Remove and Reinstall the following Items (Add Alternate X is noted). Verify final

location with Architect and Owner prior to removal. Storage by General Contractor. Holabird Notes Graceland Notes

Dedication Plaque(s)

Dedication Plaques(s)

Cornerstone(s) Cornerstone(s)

Gym Floor with Logo (Alternate 12)

Cut center court circle with logo to be refurbished and installed as interior wall panel in Dining Wonder Wall.

Limestone Coping Refer to Sheet L-4.00G for size/amount of coping to salvage and repurpose into exterior benches

Wood Cut Panels in Gym (Alternate 12)

All wood cut (white) and solid panels (blue) to be salvaged. Owner and Architect to determine how many to be reinstalled in new school.

Pond Sculpture and Base

Survey existing cracks or repairs with Owner prior to removal.

Not used Auditorium Seating (2 rows of 8 sets each, Architect’s preference. (Add Alternate 12)

Refurbish and install seating in waiting rooms of both Holabird and Graceland

Page 5 of 7

ITEM NO. S5 05 72 10 ORNAMENTAL RAILINGS ADD to Part 2.1.A.1 a. Basis of Design: Custom Wire Mesh Infill Panels with No. 45 Panel Clips by Holleander

Manufacturing REVISE Part 2.1.A.1 sub lettering to follow new “a.” ADD new Section A to Part 2.4A 2.4A WIRE MESH INSERT PANELS

A. Panel 1. Welded wire mesh; woven wire not acceptable 2. Pattern: 1-1/2” square; horizontal strands to remain parallel to treads on incline3. 3. Frame: U-channel; corners welded and ground smooth. 4. Finish: Manufacturer’s powder coating; color to match Architect’s sample.

ITEM NO. S6 SECTION 23 52 00 SUBSECTION 8 A REVISE A. Graphical User Interface Computer-Laptop

1. Contractor shall supply a stationary wall mounted Operator Terminal, all necessary

software, and interfaces to provide for the uploading/downloading of controller

databases and programs, monitoring of all network variable types, including display

of all bound SNVTs, monitoring and overrides of all controller physical input/output

points, and editing of controller resident time schedules.

2. Provide a wall mounted all-in-one computer including a VESA compliant wall

mount, and all software configuration tools that shall be capable of accessing all

system data. This device may be connected to any point on the system network or

may be connected directly to any controller for programming, set-up, and

troubleshooting.

3. The Operator’s Terminal shall be a 32” panel PC, Teguar model TP-5045-32 or

equal, including all software and hardware required. The PC shall contain a

minimum:

a. Intel Core i5 Processor 2.8 GHz minimum, 6 MB cache

minimum

b. 32” Touch Screen Display; Projected Capacitive Multi-touch;

1920 x 1080 resolution

c. 16.0 GB DDR3 Memory

d. 1TB Hard Drive, 7200 RPM

e. Windows Operating System (Version 10 or newer)

f. AMD Radeon HD 7730M 2GB

g. Wireless LAN Card

h. (4) USB 3.0 Ports

i. (1) HDMI Port

j. (2) Mini-PCIe

k. (1) Display Port (DP++)

l. (2) RJ45 GbE

m. (1) DC-in

n. (1) Audio Line Out

o. (1) Audio Line In

Page 6 of 7

4. PC shall be mounted on wall (Ergotron Model #61-081-085) in Main Mechanical

Room and be provided with a wireless mouse (Logitech Model #MX Master 2s, or

equal) and keyboard (Logitech Model #K800, or equal)

ITEM NO. S7 26 05 33 Raceways and Boxes for Electrical Systems REVISE 3.1-A-5 to read: Boxes and Enclosures, Aboveground: NEMA 250, Type 3R. ITEM NO. S8 26 29 13 Enclosed Controllers REVISE 2.3-A-2 to read: Outdoor Locations: Type 3R ITEM NO. S9 26 29 23 Variable-Frequency Motor Controllers REVISE 2.5-A-2 to read: Outdoor Locations: Type 3R ITEM NO. S10 26 32 13 Engine Generators ADD 2.1-A to read:

A. MANUFACTURERS: Subject to compliance with requirements, provide products by one of the following: 1. Caterpillar; Engine Div. 2. Generac Power Systems, Inc. 3. Kohler Co.; Generator Division 4. Onan/Cummins Power Generation; Industrial Business Group 5. MTU

ITEM NO. S11 26 43 13 Surge Protection for Low-Voltage Electrical Power Circuits REVISE 2.3-B to read: Outdoor Locations: NEMA 250 Type 3R ITEM NO. S12 28 31 11 Digital, Addressable Fire-Alarm System ADD 2.1-A to read:

A. MANUFACTURERS: Subject to compliance with requirements, provide products by one of the following: 1. NOTIFIER; a Honeywell company. 2. Siemens Building Technologies, Inc.; Fire Safety Division. 3. SimplexGrinnell LP; a Tyco International company. 4. Edward EST

IV. DRAWING ITEMS: LANDSCAPE

ITEM NO. L1 L-4.00 DETAILS ADD Note to Detail 4/L-4.00 Manufacturer: Bison, Inc. Product: Mega Duty BA780XL Pole with BA472PC Steel Backboard and Goal Size: 5-9/16” OD Pole with 96 Inch “Safe Play Area”

Page 7 of 7

ARCHITECTURAL ITEM NO. A1 A-3.1 FINISH SCHEDULE REVISE Floor 2201 back to PT (it was erroneously changed to TRF in Addendum 3). REVISE Floor for Mechanical Rooms 2205 to be “TRF” Traffic Coating ADD “TRF TRAFFIC COATING” to Finish Materials Key under Floors. ITEM NO. A2 A-4.4 WALL SECTIONS – GYM & COMMUNITY AREA (Graceland Only) REVISE Detail A5 for Graceland per attached Sketch SK-A-5.2 to incorporate installation details

for salvaged limestone panels. ITEM NO. A3 A-5.6 ENLARGED PLAN DETAILS REVISE Detail D20 per attached Sketch SK-A-5.1 to coordinate painted gypsum board/plastic

laminate bulkhead at proscenium opening to match A15/A-7.7.

End of Addendum 5 *****

FIRST FLOOR0' - 0"

9.19

12' -

2"

45.00°

EQ

.E

Q.

EQ

.

1' -

4"

2" 1" TYP.

2" 1 1/4"

2"

2"

2"

2"

11" 1' - 6" 1' - 6"

CONCRETE STEPS ONGRADE - SEE STRUCTURAL

WOOD TREAD AMD RISERS,WOOD FURRING,CONCRETE STEPS

SCHEDULED FLOOR FINISHON SLAB ON GRADE

PLATFORMCURTAINS

PAINTEDGYPSUM BOARD

BULKHEAD ONMETAL STUD

SCHEDULEDSUSPENDED

ACOUSTICCEILING

4' -

0"

2' -

0"

1' - 9 1/4"

1' - 11 5/8" 2' - 0"

PLASTIC LAMINATE PANELSON 5/8" PLYWOOD ON 6", 16GA. METAL STUDS AT 24"O.C.

PLASTIC LAMINATE PANELSON 5/8" PLYWOOD ON 6", 16GA. METAL STUDS AT 24"O.C.ELECTRICALLY

OPERATEDRECESSED

PROJECTIONSCREEN 5

ADD

11720 Beltsville DriveSuite 600

Calverton, MD 20705

DATE

www.grimmandparker.com

SCALE: 3/4" = 1'-0"HOLABIRD ES/MSREVISION TO SHEET A-5.6 ENLARGED PLAN DETAILS 09/15/17 SK-A-5.1

ADD 5

3/4" = 1'-0"D20WALL SECTION @ PLATFORM ADDENDUM 5