Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 [email protected] Practices in Project Manage hat’s Happening in the World of PM
  • date post

    23-Jan-2016
  • Category

    Documents

  • view

    217
  • download

    0

Transcript of Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A...

Page 1: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

Nick Clemens, PMPEdwards Industries

10632 Little Patuxent Parkway, Suite 200A

Columbia, MD 21044-3273

[email protected]

Best Practices in Project Management“What’s Happening in the World of PMI”

Page 2: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterThe Talk

• PMI Standards and Documentation– PMBoK Guide and Supplements– OPM3 (PMI’s Project Management Maturity

Model)– New Standards

• Role of the Project Manager

• Questions and Discussion

Page 3: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterPMI Documents

Projects People

Organizations

Page 4: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

1987

1996

2000

20051983

PMBok Evolution

Page 5: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterPMBoK

• Published December 2004

• Adopted By The American National Standard Institute (ANSI) as ANSI/PMI 99-001-2000

• Next Update Due 2008/10 (3/5-year cycle)

Page 6: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterProgram Management

• Published December 2006

• PMI Global Standard• (3/5-year cycle)• Based on the PMBoK• Programs are a

collection of projects managed as a group

Page 7: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterPortfolio Management

• Published December 2006

• PMI Global Standard• 3/5-year cycle• Extension of Program

Management• Enterprise Level• Linked to OPM3

Page 8: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

PM Competency Framework

• Published September 2002

• Focus is on the Individual Professional

• Not for Personnel Assessments

• Some Unresolved Issues

Page 9: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterOPM3

• Published December 2003

• PMI Global Standard• Looks at the

Organization• Specific Levels Not

Defined (Continuum)• Links to PMBOK,

Program and Portfolio Standards

Page 10: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

OPM3 Standard Elements

The essence for OPM3 is the blending of knowledge, assessment, and improvement.

Page 11: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterOPM3 Construct

Page 12: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterOPM3 Continuum

Page 13: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

Government Extensions

• Published 2002 / 2003• Applies to National

State/Provincial and Local Governments

• Internationally Based• US DoD Extension

Also

Page 14: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

Other Extensions

• Construction Extension• Automotive Extension• Earned Value

Management Standard• Configuration

Management Standard• Scheduling Standard• WBS Standard• Combined Standard

Glossary

Page 15: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

Program Manager Responsibilities

Source: Defense Acquisition University (DAU)

Page 16: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

Project Life-Cycle

• Basic types* of project life-cycles– Linear multiphase

– Evolutionary

– Spiral

MS A

Demo

Demo

Demo

AoATechnology

Development

DAB

MS B

MS B MS C

MS C

ConceptRefinement

Incre ment 1

MS B

MS C

DABJROC

Incre ment 2

Incre ment 3

DoDI 5000.2

MS A

Demo

Demo

Demo

AoATechnology

Development

DAB

MS B

MS B MS C

MS C

ConceptRefinement

Incre ment 1

MS B

MS C

DABJROC

Incre ment 2

Incre ment 3

DoDI 5000.2

MS A

Demo

Demo

Demo

AoATechnology

Development

DAB

MS B

MS B MS C

MS C

ConceptRefinement

Incre ment 1

MS B

MS C

DABJROC

Incre ment 2

Incre ment 3

DoDI 5000.2

Engineer& ApplySystem

Solutions

ArchitectField

SystemEngineer

Test & ValidateSystem

Solutions -Feedback

Assessment &Feedback

ExecutableModels

Rules Dynamics

Executable Model

Rules Dynamics

Executable Model

Rules Dynamics

OA Review & Changes

SA Changes & Needs / Mission

AnalysisNetwork Integration

Design,Develop &Engineer

TechnicalIntegration

& Test

Spiral Development:Spiral Development:

Evolutionary Development:Evolutionary Development:

Phase IVPhase IIIPhase IIPhase I

Start End

Phase IVPhase IIIPhase IIPhase I

Start End

Initial Phase Final PhaseIntermediate Phase(s)

Linear Development:Linear Development:

* Other types include waterfall and incremental

Page 17: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

Traditional Optimal Zone For Design

Changes

Conceptual BreadthDetail Available

“Cost” to Resolve C4I Support Issues

time

Optimal Zone forIssue Identification

MS- A MS - B MS - CMS- A MS - B MS - C

Source: Clemens, CCRTS 2004

Ability to Influence

Conceptual Breadth

Detail Available

“Cost” to Resolve C4I Support Issues

time

Optimal Zone forIssue Identification

MS- A MS - B MS - CMS- A MS - B MS - C

Source: Clemens, CCRTS 2004

Conceptual Breadth

Detail Available

“Cost” to Resolve C4I Support Issues

time

Optimal Zone forIssue Identification

MS- A MS - B MS - CMS- A MS - B MS - C

Source: Clemens, CCRTS 2004

Ability to Influence

Adapted From Clemens, CCRTS 2004

Conceptual Breadth

Detail Available

“Cost” to Resolve C4I Support Issues

time

Optimal Zone forIssue Identification

MS- A MS - B MS - CMS- A MS - B MS - C

Source: Clemens, CCRTS 2004

Ability to Influence

Conceptual Breadth

Detail Available

“Cost” to Resolve C4I Support Issues

time

Optimal Zone forIssue Identification

MS- A MS - B MS - CMS- A MS - B MS - C

Source: Clemens, CCRTS 2004

Conceptual Breadth

Detail Available

“Cost” to Resolve C4I Support Issues

time

Optimal Zone forIssue Identification

MS- A MS - B MS - CMS- A MS - B MS - C

Source: Clemens, CCRTS 2004

Ability to Influence

Adapted From Clemens, CCRTS 2004

Page 18: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

Evolutional Acquisition Change Zones

Source: Clemens, CCRTS 2004

Conceptual BreadthDetail Available

“Cost” to Resolve C4I Support Issues

time

MS 0MNS

MS IORD

MS IIEngineering/

Manufacturing

MS IIIProduction/

Fielding

Optimal Zone forIssue Identification

Conceptual BreadthDetail Available

“Cost” to Resolve C4I Support Issues

time

MS 0MNS

MS IORD

MS IIEngineering/

Manufacturing

MS IIIProduction/

Fielding

Optimal Zone forIssue Identification

Cluster 2

Cluster x

Conceptual BreadthDetail Available

“Cost” to Resolve C4I Support Issues

time

MS 0MNS

MS IORD

MS IIEngineering/

Manufacturing

MS IIIProduction/

Fielding

Optimal Zone forIssue Identification

Cross Cluster Optimal Zones for-Issue Identification

Technology InsertionSystem Enhancements

Role of the JPOManage across clusters and over time to smoothly enhance system capabilities in support of near, mid and long term program objectives and requirements

Shape the JTRS ProgramManage the Program

Support JV 2020

Cluster 1

,Role of the Project Manager:Manage across increments and over time to smoothly enhance system capabilities in support of near, mid, and long-term program objectives and requirements.

Increment X

Increment 1

Increment 2

Cross Increment Optimal Zones for Issue Identification

Technology InsertionSystem Enhancements

Page 19: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterThe Project Manager

• Manage Stakeholder Expectations

• Manage Change

• Deliver of Unique Product, Service or Result– “In” Time– Within Cost– “On” Scope

Page 20: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore Chapter

Questions

Nick Clemens, PMP

Past President, Baltimore Chapter

www.pmibaltimore.org

[email protected]

410-715-9370 or 443-538-5583

www.edwards-ind.com

Page 21: Baltimore Chapter Nick Clemens, PMP Edwards Industries 10632 Little Patuxent Parkway, Suite 200A Columbia, MD 21044-3273 nclemens@edwards-ind.com Best.

Baltimore ChapterLegal Notice

Images of PMI material such as the PMBok and the use of related logos and trademarked terms such as OPM3 ™ or PMP ™ are the property of The Program Management Institute. All rights are reserved by The Program Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299, USA, ‘www.pmi.org, 610-356-4600.

INCOSE material when used is noted in the brief and remains the property of the International Council on Systems Engineering, 2150 N. 107th St., Suite 205, Seattle, Washington, 98133-9009, ‘www.incose.org, 800-366-1164

Other material is sourced as noted and the originating author(s) maintain full rights where appropriate.