Bahja Gathering station was recently by Always walk the ... · .لمعلا ةيرط زيهجت...

2
What do you think happened? الذي حدث؟ ماWhat could be done to prevent this from happening? لحادث؟تجنب وقوع مثل اه لذا يمكن فعل ماKey Learning لمستفادة الدروس اBahja Gathering station was recently by passed and the Operations team were preparing for the facility to be Decommissioned. When the team proceeded with depressurizing the Gas section the Flare KOD vessel ruptured and exploded injuring the operator. It was a closed valve in the flare line after this low pressure vessel resulted in pressure build up, followed by rupture, explosion and fire. Align LO/LC register with PEFS and ensure compliance with 3-month and 6-month checks & audit. Preparatory activities for Decommissioning to be Planned Method statement prepared Risk assessment done Actual site conditions verified with drawings Walk the line Necessary resources and interfaces be identified and confirmed Always walk the line and make sure your PEF’s are up to date كان فريقتشغيل ال في محطة التجميع في بهحة مؤخرا يستعديقاف تشغيل مرافق المحطة. بينما كان الفريق يقوم بتخفيض ضغطلغاز، ا حدث شق ثم إنفجار في أحد مرافقشعلة ال أسفر عن إصابةمشغل ال. كان هناكام صم مقفل داخلشعلة ال عند تخفيض الضغطب تسب في إرتفاع الضغط تبعهاق إنشق ثم إنفجار فالحريق. موائمةت سجتشغيل المتعلقة ال بالموضوعلتأكد ل منفقها توا معيق التدق الدوري كل3 أو6 أشهر. نشطة امتعلقة ال بإيقاف تشغيل المحطة يجب أن: يكون مخطط لها. يتم تجهيز طريقةعمل ال. يتملقيام ا بتقييملمخاطر ا. يتميق التدق على حالة الموقع الحقيقيةلرسومات وا. تتم معاينة الخط. يتم التعرف على جميعطلبات المت وتأكي د ها. يجب أن تتم معاينة الخط بشكل مستمر والتأكد من تحديث كل الخرائط ولرسومات ا

Transcript of Bahja Gathering station was recently by Always walk the ... · .لمعلا ةيرط زيهجت...

Page 1: Bahja Gathering station was recently by Always walk the ... · .لمعلا ةيرط زيهجت متي•.رطاخملا مييتب مايلا متي•.تاموسرلاو ةييحلا

What do you think happened?

ما الذي حدث؟

What could be done to prevent this from happening?

ماذا يمكن فعله لتجنب وقوع مثل الحادث؟

Key Learning

الدروس المستفادة

Bahja Gathering station was recently by passed and the Operations team were preparing for the facility to be Decommissioned. When the team proceeded with depressurizing the Gas section the Flare KOD vessel ruptured and exploded injuring the operator. It was a closed valve in the flare line after this low pressure vessel resulted in pressure build up, followed by rupture, explosion and fire.

Align LO/LC register with PEFS and ensure compliance with 3-month and 6-month checks & audit. Preparatory activities for Decommissioning to be

•Planned •Method statement prepared •Risk assessment done •Actual site conditions verified with drawings •Walk the line

Necessary resources and interfaces be identified and confirmed

Always walk the line and make sure your PEF’s are up to date

في التجميع محطة في التشغيل فريق كان

مرافق تشغيل إليقاف يستعد مؤخرا بهحة

بتخفيض يقوم الفريق كان بينما .المحطة

أحد في إنفجار ثم شق حدث الغاز، ضغط

.المشغل إصابة عن أسفر الشعلة مرافق عند الشعلة داخل مقفل صمام هناك كان

الضغط إرتفاع في تسبب الضغط تخفيض

.فالحريق إنفجار ثم إنشقاق تبعه

من للتأكد بالموضوع المتعلقة التشغيل سجالت موائمة .أشهر 6 أو 3 كل الدوري التدقيق مع توافقها :أن يجب المحطة تشغيل بإيقاف المتعلقة األنشطة

.لها مخطط يكون• .العمل طريقة تجهيز يتم• .المخاطر بتقييم القيام يتم• .والرسومات الحقيقية الموقع حالة على التدقيق يتم• .الخط معاينة تتم• .هادوتأكي المتطلبات جميع على التعرف يتم•

الخط معاينة تتم أن يجب

من والتأكد مستمر بشكل

و الخرائط كل تحديث الرسومات

Page 2: Bahja Gathering station was recently by Always walk the ... · .لمعلا ةيرط زيهجت متي•.رطاخملا مييتب مايلا متي•.تاموسرلاو ةييحلا

Place Image Here

(Up Side Down)

Resize

الحروق ديسمبر 8 2016

08.12.2016 Burns