Backlog Estimation and Management
for Real-Time Data Services
Kyoung-Don Kang , Jisu Oh, and Yan ZhouDepartment of Computer Science
State University of New York at Binghamton
20th Euromicro Conference on Real-Time Systems (ECRTS ’08), July 2~4, 2008
2
Real-time data service is challenging
Real-time database (RTDB) applications e-commerce, traffic monitoring
Requirements Processing user requests in a timely manner Maintaining the freshness of temporal data
Challenges Dynamic database workloads due to data/resource
contention Difficult to precisely analyze the amount of data the
database will need to process Conflicts between the transaction timeliness and data
freshness
Feedback Control
A promising approach to manage the performance of RTDBs
In the presence of dynamic workloads
Required procedure System modeling (SYSID) – using a linear relationship Controller design (ex, P, PI, PID) Controller tuning (Root Locus tool in Matlab)
to support performance requirements and closed-loop system stability requirements
Actuator design
Shortcomings of existing work
System modeling problem An inaccurate metric for measuring data service workload:
the queue length vs. service delay Coarse-grain approach When the amount of data accessed by each request
varies, cannot correctly measure the workload
Mostly based on simulations due to a lack of real-time database testbeds
Reveal limitations in modelling real system behaviours
5
Our Approach
Goal: Supporting the target service delay bound and enhancing the data service throughput
Key technologies 1) A database backlog estimation mechanism
2) Modeling of the system dynamics based on the relation between the estimated backlog and service delay
3) A systematic backlog adaptation via a fine-grained feedback-based admission control based on the backlog model
4) Workload smoothing using a hint based scheme
6
Implemented and evaluatedin a real database system
Chronos a soft real-time database testbed built on top of Berkeley DB processes thousands of client’s data service requests
for stock quotes and stock trading periodically updates 3,000 stock prices for data
freshness management critical for real-time data services
7
RTDB Architecture
Commit
UserRequests
Ready Queue
…
Database
Dispatch
User RequestService Threads
… … Stock UpdateThreads
Stock PriceUpdate Server
…
BacklogEstimator
Metadata
FeedbackController
Perf.Monitor
Service Delay s(k)
Backlog Adjustment
δd(k)
Target Service Delay
AC & TS
dt(k) = dt(k-1) + δd(k)
8
Backlog
The amount of data for the database to process
For backlog estimation, Use database schema and semantics of queries and
transactions Maintain metadata
System statistics (# rows per table, row sizes, etc.) Materialized portfolio information (# stock items each client
owns)
About 1.2% CPU utilization overhead
9
Backlog estimation: example (1) “view-stock” query
A user query about stock prices for a set of companies ex): “view-stock, IBM, DELL, Microsoft”
Chronos accesses two tables to answer this query STOCKS table to read a set of companies’ information QUOTES table to get the associated stock prices
Backlog for this query is nc ∙ {r(STOCKS) + r(QUOTES)} Where nc is the number of companies in a query r(x) is the average size of a row in table x
10
Backlog estimation: example (2) “view-portfolio” transaction
A client transaction about stock information in his/her portfolio
ex) “view-portfolio, client-id 150”
Chronos accesses two tables to answer this query PORTFOLIOS table to look up a set of company stock IDs of
the stocks owned by the client QUOTES table to get associated stock prices
Backlog for this query is |portfolio(id)| ∙ {r(PORTFOLIOS) + r(QUOTES)}
Where |portfolio(id)| is the number of stock items in the portfolio owned by the client whose ID is id
11
The database backlog at time t
• d(t) : the database backlog at time t
• ni : the amount of data to be processed by a request Ti in the ready queue
• q(t) : the number of the requests in the ready queue at time t
)(
1i
)(tq
in=td
q(t)
12
The relation between database backlog d(k) and service delay s(k)
A fine-grained modeling Because it can closely capture system dynamics when the
transaction size varies
Derive a model using the ARX (Auto Regressive eXternal) model
Apply the Recursive Least Square (RLS) method
RTDB Model
13
System Identification (SYSID)
System settings No feedback control, admission control, or traffic
smoothing Number of clients: 1200 Inter-request time: [0.5s, 2.5s] Experimental duration: 3600 seconds At every 10 seconds, the recursive least square estimator
predicts the response time
14
System Identification (cont.)
)2(006.0)1(015.0)2(104.0)1(003.0)( kdkdksksks
Use the square roots of the performance data to reduce the impact of burstiness
Model evaluation metric: If R2 > 0.8, a model is acceptable
Choose the second order model
R2: 0.86 (1st << 2nd ≈ 3rd ≈ 4th)
delay) service (actual var
)predictiondelay (service var12 R
15
Target Performance
Based on a fine-grained RTDB model using the database backlog
Target Performance Target service delay bound (St) : 2s
E*Trade (www.etrade.com)
Service Delay Overshoot (Sv) : 2.5s
Settling Time (Tv) : 10s
16
Design of Feedback Controller and Backlog Adaptation
The closed-loop for data service delay is
Design a PI controller using Root Locus method in Matlab Controller input: e(k) = St – s(k) Controller output δd(k) : the backlog adjustment The closed-loop poles: -0.308, 0.52 ±0.106i KP = 2.77, KI = 5.28
New target backlog dt(k) = dt(k-1) + δd(k)
17
Admission Control
nnew : the amount of data to process required by a user request Tnew ni : the amount of data to be processed by a request Ti in the ready queueq(t) : the number of the requests in the ready queue at time t
User request Tnew
)(
1
)(tq
=iin=td
A transaction Tnew arriving at time t during the (k+1)th sampling period is admitted if d(t) + nnew ≤ dt(k) where dt(k) is the desired backlog
q(t)
d(t) + nnew ≤ dt(k)Yes
No
18
Load Smoothing
Purpose Reducing the burstiness of workload
Key idea Use only under overload Each client voluntarily delays the submission of the
request by an additional period of time Increase the chances of a client's request being
admitted
19
Load Smoothing (cont.)
Mechanism Chronos provides the rejection rate p(k) as the
current server status
Clients delay their request submission in a predefined range [ta, tb] with probability p(k) in addition to the arbitrary inter-request time between [t1, t2]
Benefit Enhances the stability of the system Distributed traffic smoothing reduced overhead
20
Load Smoothing: example
When inter-request time is in a range of [t1, t2] = [0.1s, 0.5s], a client submits = 3.3 requests/s
If p(k) > 0 (e.g., 0.5) and a predefined extra delay is in a range of [ta, tb] = [0.1s, 0.3s] , a client submits
= 2.5 requests/s
The total arrival rate is expected to be reduced by
srequestst+t
/)(0.5
1
21
srequestst+tkp+t+t ba
/)))(((0.5
1
21
%25100%3.3
2.5-3.3=
21
Experimental Environments
Chronos serverDell laptop
1.66 GHz dual core1GB of RAM
Linux 2.6.15 kernelClients
Dell Desktop3GHz CPU
4GB of RAMLinux 2.6.15 kernel
1 Gbps Ethernet switch
Stock Price Update ServerDell Desktop
3GHz CPU / 2GB of RAMLinux 2.6.15 kernel
22
Workload Settings
1200 clients60% Queries (view-stock)40% Transactions (view-portfolio, purchase, sale)
Chronos server
3000 stock prices
0 5m 10m 15m
Inte
r-re
ques
t tim
e [3.5s~4.0s] [0.1s~0.5s]
To generate bursty workload
increase workload by 7~40 times
23
Tested Approaches
Open Pure Berkeley DB
AC Ad-hoc admission control
FC-Q Feedback control – queue length vs. delay model
FC-D Feedback control – database backlog vs. delay model
FC-TS Feedback control of database backlog & traffic smoothing
24
Performance Metrics
Performance metrics Data service delay Data service throughput: average number of the data
processed by the committed transactions and queries Total Timely (data processed by the timely transactions
completed within St)
Each experimental run is 15 minutes long
take the average of 10 runs with 90% confidence interval
25
Average Service Delay
FC-D 1.52±0.07s By adapting database
backlog systematically
FC-TS 1.24±0.03s By further reducing the
workload burstiness
Baselines Fail to support 2s Target service delay
26
Transient Service Delay
FC-D & FC-TS Outperform the baselines Overshoots decay in less than
three sampling periods, satisfying Tv < 10s
27
Data Service Throughput
FC-D - Process more than 18,680,000 data - Around 86% data were processed
within the desired delay bound
FC-TS - Process around 35% more data
than FC-D by further smoothing incoming workload
Baselines - Show similar throughput
The average number of the data processed by the committed transactions, which is normalized to the corresponding number for FC-D.
28
Conclusions
To enhance RTDB performance without degrading the data freshness, Predict the database backlog as the amount of data for the
database to process, using the meta data extracted from the database schema and transaction semantics
Adjust the database backlog via a fine-grained closed loop admission control based on the backlog model to support the desired service delay
Reduce the burstiness of incoming data service requests via hint-based incoming load smoothing