Background info senior project

10
SYSTEMS ENGINEERING II JESSICA CASAMASSIMA WORKING IN CONJUNCTION WITH ALLIE MASCIANA AND MARY KATE INNACE Mast Campus Expansion Project

description

 

Transcript of Background info senior project

Page 1: Background info  senior project

SYSTEMS ENGINEERING II

JESSICA CASAMASSIMA WORKING IN CONJUNCTION WITH ALLIE MASCIANA AND

MARY KATE INNACE

Mast Campus Expansion Project

Page 2: Background info  senior project

Individual Design Brief

Design the structure and exterior of a building expansion project for the Marine Academy of Science and Technology to provide to Dr. Christopher to propose to the Board of Education, and to provide to the landscape architect/civil engineer to plan the exterior site and interior architect to complete interior designs.

Page 3: Background info  senior project

Specifications and Limitations

Specifications: • The design must:

Have a separate main entrance Have handicap accessibility Be combatable with other buildings on Sandy Hook Support an open, multipurpose room capable of housing 600 hundred people Be made of materials that are affordable and appropriate for the purposes Adhere to building codes

Limitations: • The design must:

Stay within the limits of MAST’s campus. Adhere generally to the following square footage requirements and include the following rooms:

(4) Classrooms 23x 27 = 621 sq ft each = 2,484 sq ft (1) Naval Science Office 15 x 18 = 270 sq ft Uniform Storage 110 x 13.5 = 1,485 sq ft Mens/Women’s Toilets 32 x 20.5 = 656 sq ft Multipurpose Drill Hall 73 x 102 = 7446 sq ft

Assembly use Audience-504 sq ft, Stage-112 sq ft Stage and Chair Storage 32 x 21 = 672 sq ft Common and Corridor space 8 x 175 = 1,400 sq ft Administrative Offices 2,500 sq fto Total= 16,913 sq ft

Adhere to the stakeholder’s requests

Page 4: Background info  senior project

Problem, Opportunity, or Situation

• What is the Problem?MAST’s campus is overcrowded. Classroom spaces are far too small for the capacity they are now holding (fig. 1). Also, the campus lacks a large, multipurpose indoor space for events such as battalion practices (fig.2).

• What is the Opportunity? The campus now has the ability to expand within the next few years. Buildings can be added or existing buildings can be added on to. The current existing campus can be seen in figure 3.

Fig. 1

Fig. 2

Fig. 3

Page 5: Background info  senior project

Problem, Opportunity, or Situation (cont.)

• What is the Situation?The group will work together to create a set of working drawings for a possible design for the future campus expansion, paying close attention to the existing campus (fig. 4). Four different alternate solutions will be drawn up (fig. 5) and considered before a final design is chosen. Jessie will be designing the exterior of the buildings, while Allie while focus on the interiors and Mary Kate will create the exterior sites.

Fig. 4

Fig. 5

Page 6: Background info  senior project

People Involved

There are many people involved in this project, from the architects to the MCVSD Board of Education. However, those who will be most directly affected by this project are the students and faculty of MAST (fig 7). For example, they will no longer have an overcrowded lunch room (fig. 10), will be able to practice drill in a gym (fig 9), will not have to play sports outside when it is raining (fig 8), and will not have to run uniform supply out of small trailers (fig 6).

Photo courtesy of Maddi Sorrentino Fig. 6

Fig. 7

Fig. 8

Fig. 9

Fig. 10

Page 7: Background info  senior project

Why Must This Be Addressed?

This campus expansion project would have many benefits. The new, improved campus would have more spacious classrooms (fig 1, fig 13), large rooms for uniform supply rather than trailers (fig 11), more room for students to eat lunch (fig 10), and a large gymnasium (fig 12) for drill events and pt that could also be converted into an auditorium for assemblies, plays, and graduations.

Fig. 1

Fig. 11

Fig. 10

Fig. 12

Fig. 13

Page 8: Background info  senior project

Stakeholders

The stakeholders of this project vary greatly. They include of course the students and faculty of MAST (fig 18, 19, 20). They also include the MCVSD administration such as Timothy M. McCorkell (fig 14), the superintendent, Anthony Schaible (fig. 15), the assistant superintendent, and Collette Flatt (fig 16), the school business administrator, all shown to the left. Stakeholders also include the tax payers of Monmouth County (fig 17).

Fig. 15

Fig. 14

Fig. 16 Fig.

17

Fig. 18

Fig. 19

Fig. 20

Page 9: Background info  senior project

Intended Mood

The expanded campus will present students with a new, organized feel. Easily accessible pathways will be provided along commonly used routes from one building to another. The buildings themselves will have simple, well-organized layouts. The classrooms will have an open, spacious feel (fig 13). Where it is appropriate, the exteriors of the new buildings may reflect the beautiful architecture of old Fort Hancock Buildings (fig 24), such as Building 22 (fig 23). Others will blend right in with the existing campus (fig 21, 22). The new campus will be safe, comfortable, and much improved.

Fig. 21

Fig. 22

Fig. 23

Fig. 24

Fig. 13

Page 10: Background info  senior project

Works Cited

“Administrative Staff.” Monmouth County Vocational School District. (21 April 2012). Retrieved from http://www.mcvsd.org/admin/“Fort Hancock at Sandy Hook.” New Jersey Memories. (28 August 2012). Retrieved from http://www.newjerseymemories.com/2012/08/fort-hancock-at-sandy-hook.htmlGoogle. (2012). Google Earth (Version 6.2) [Mobile application software]. Retrieved from http://itunes.apple.com/“The Learning Factory.” Penn State College of Engineering. (2012). Retrieved from http://www.lf.psu.edu/Facilities/Location.htmlWeichert.(2012). Retrieved from http://www.weichert.com/NJ/Monmouth/

~All other pictures used were photographed by Jessie Casamassima.~