BAB IV ANALISA DATA

Transcript of BAB IVdigilib.its.ac.id/public/ITS-Undergraduate-17170...BAB IV ANALISA DATA 4.1 Analisa Hidrologi...

BAB IVANALISA DATA

4.1 Analisa Hidrologi4.1.1 Perhitungan Curah Hujan Rata – Rata Thiessen Polygon

Hasil R = 198.61 mm

4.1 Analisa Hidrologi4.1.2 Analisa Distribusi Frekuensi

4.1.2.1 EJ Gumbelhasil R = 227.02 mm

4.1.2.2 Log Pearson Type III hasil R = 216.84 mm

4.1.3 Uji Kesesuaian Distribusi Frekuensi

4.1.3.1 Uji Kesesuaian Chi Square

4.1.3.2 Smirnov Kolmogorov

4.1.4 Kesimpulan Analisa Frekuensi

PersamaanDistribusi

Uji Kecocokan

Evaluasi

Uji Kecocokan

Evaluasi

Chi - Kuadrat Smirnov Kolmogorov

Xh2 Nilai Xh2 Dmaks Nilai Do

Gumbel 20.371 > 7.815NOT OK

0.1 < 0.2 OK

Log Pearson

Tipe III

5.971 < 7.815 OK

4.1 Analisa Hidrologi4.1.5 Perhitungan Curah Hujan Efektif Periode Ulang 100 tahun

Perhitungan Distribusi Hujan dari hasil tabel 4.17 nantinya akan dipakai untuk

perhitungan debit hidrograf satuan Nakayasu.

4.1 Analisa Hidrologi4.1.6 Perhitungan Hidrograf Banjir4.1.7 Perhitungan Debit Metode Nakayasu

debit maksimum terbesar pada periode ulang 100 tahun dengan Metode Nakayasuadalah sebesar 404,401 m3/dt

t Q

Q akibat hujan netto m3/dtQ

banjirjam ke-1

jam ke-2

jam ke-3

jam ke-4

jam ke-5

jam m3/dt 95.140 24.720 17.402 13.824 11.710 m3/dt

1 2 3 4 5 6 7 8

0 0.0000 0.000 0.000

1 0.2736 26.032 0.000 26.032

2 1.4442 137.398 6.764 0.000 144.162

3 3.8215 363.580 35.700 4.761 0.000 404.041

4 2.6920 256.122 94.469 25.131 3.782 0.000 379.504

5 1.9207 182.740 66.548 66.501 19.964 3.204 338.957

6 1.3704 130.383 47.481 46.846 52.828 16.911 294.449

7 1.0280 97.802 33.877 33.424 37.214 44.748 247.066

8 0.8208 78.092 25.412 23.848 26.552 31.523 185.426

9 0.6554 62.354 20.291 17.889 18.945 22.491 141.969

10 0.5233 49.788 16.201 14.283 14.211 16.047 110.530

11 0.4178 39.754 12.936 11.405 11.347 12.037 87.479

12 0.3354 31.913 10.329 9.106 9.060 9.611 70.020

13 0.2833 26.956 8.292 7.271 7.234 7.674 57.428

14 0.2393 22.769 7.004 5.837 5.776 6.128 47.514

15 0.2022 19.233 5.916 4.930 4.637 4.893 39.609

16 0.1708 16.246 4.997 4.165 3.917 3.928 33.252

17 0.1442 13.723 4.221 3.518 3.308 3.318 28.088

18 0.1218 11.591 3.566 2.971 2.795 2.802 23.725

19 0.1029 9.791 3.012 2.510 2.360 2.367 20.040

20 0.0869 8.270 2.544 2.120 1.994 1.999 16.928

21 0.0734 6.986 2.149 1.791 1.684 1.689 14.298

22 0.0620 5.901 1.815 1.513 1.423 1.427 12.078

23 0.0524 4.984 1.533 1.278 1.202 1.205 10.202

24 0.0443 4.210 1.295 1.079 1.015 1.018 8.617

25 0.0374 3.556 1.094 0.912 0.857 0.860 7.279

4.2 Lengkung Kapasitas Waduk

ElevasiLuas

Genangan

Volume

Genangan

Volume

Kumulatif

m m2 m3 m3

185 1087.0438 0 0190 7127.4760 20536.300 20536.300195 17170.7875 60745.659 81281.958200 29579.1098 116874.743 198156.702205 43089.8776 181672.469 379829.170210 60257.4149 258368.231 638197.401215 78693.8908 347378.264 985575.666220 104546.7413 458101.580 1443677.246225 135567.8929 600286.586 2043963.831230 172919.5857 771218.697 2815182.528235 221157.6009 985192.967 3800375.494240 254433.4516 1188977.631 4989353.126245 298583.8998 1382543.379 6371896.504250 348184.8564 1616921.891 7988818.395255 398845.5915 1867576.120 9856394.514260 449453.2454 2120747.092 11977141.607265 493843.8626 2358242.770 14335384.377Peta Topografi Daerah Genangan

Bendungan Tugu TrenggalekSumber: PT. Indra Karya

4.2 Lengkung Kapasitas Waduk

4.3 Penelusuran Banjir ( Flood Routing )

Elevasi puncak spillway ditetapkan = +251,0 m

Periode ulang = 100 tahun (Q100)

Lebar spillway 30 meter = L

Letak bangunan pelimpah ini direncanakan berada pada As bendungan

Tinggi pelimpah ditetapkan 3 meter = P = W

Elevasi (H) dihitung tiap 0.25 meter

Waktu (t) tiap 1 jam

Tampungan S = Volume Waduk (dari topografi/kurva lengkung kapasitas waduk)

Inflow I = dari perhitungan unit hidrograf banjir

Debit Outflow Q=CxLxH3/2

Dimana :

Cari Grafik Hubungan Elevasi , Debit Outflow, Tampungan

untuk mempermudah penelusuran banjir lewat waduk

9900.0

0416,0200,2

W

HdxCd

2.Qt

S

4.3 Penelusuran Banjir ( Flood Routing )

4.3 Penelusuran Banjir ( Flood Routing )

4.3 Penelusuran Banjir ( Flood Routing )

BAB VPERENCANAAN SPILLWAY