b480dfa265754860b13182a8713d70fc1
-
Upload
nurdeny-hidayanto-pribadi -
Category
Documents
-
view
221 -
download
0
Transcript of b480dfa265754860b13182a8713d70fc1
-
8/2/2019 b480dfa265754860b13182a8713d70fc1
1/6
Alstom Indonesia, September 2011
Anita Bonang
Jakarta
Alstom Indonesia Corporate HQ
Bandung, West JavaAlstom Transport, Signalling
Jakarta, West JavaAlstom Power ESI, Sales and Service office
Surabaya, East JavaAlstom Power ESI, Manufacturing site
JakartaAlstom Grid (PT Alstom Grid and PT Unindo)Turnkey solutions and Manufacturing site
KEY DATA
- ALSTOM Indonesia
- PT Alstom Power EnergySystems Indonesia
- PT Alstom Grid
- PT UNINDO
- PT Alstom Transport
- 5 sites
- 1,400 employees
Sengkang, South SulawesiAlstom Power ESI, Customer site
-
8/2/2019 b480dfa265754860b13182a8713d70fc1
2/6
Alstom Indonesia, September 2011
Anita Bonang
History
1966: First Alstom office establishment in Indonesia
1969: Established first JV in Indonesia with PT PLN for transformers
1986: Forming JV in Indonesia with PT PAL and PT Barata for Boiler Manufacturing Facility in Surabaya, East Java
1996: Permanent Boiler manufacturing facility in Surabaya, East Java
2010: Alstom acquired PT Areva T&D (now Alstom Grid)
Partnerships
Alstom in Indonesia has made strategic partnerships with strong local players to bring in advanced technologies to contribute to thepower need in Indonesia.
Alstom and PT PLN in 1969A JV to manufacture transformers in Indonesia
Alstom and PT PAL and PT Barata Indonesia in 1986Strategic partnerships in engineering and manufacturing boilers in Indonesia
Corporate Social Responsibility
Building 85 meter suspension bridge for locals in Tadang Palie and Bekke Villages in South Sulawesi:Alstom Foundation granted 100,000 (approximately Rp 1.5 billion) in 2008 to build 85 m bridge in cooperation with the localcommunity, NGOs and contractors. The bridge was completed in 8 months. The bridge has become an important connectionbetween Tadang Palie and Bekke villages, crossing the Cenranae River. The bridge connects the north and south villages, making iteasier for children to go to school and providing shoppers with a safer means to buy their goods, and allowing farmers and traders to
access an area that was previously only accessible by boat or a 30 km journey
Humanitarian Relief for Situ Gintung dam burst in Banten, West Java:Alstom Foundation granted 25,000 (approximately Rp 325 million) in 2009 to help Situ Gintung dam burst victims for health andsanitary care as well as the scholarships for 18 children.
Preservation of Indonesia Endemic Bamboo Species to save water catchment areas in West Java:In 2010 Alstom Foundation granted 50,000 (approximately Rp 600 million) to preserve Indonesian Endemic Bamboo Species tosave water catchments area. The actions include nursery and plantation of 3,000 endemic bamboos, building 2 bamboo communitycentres for a better community empowerment and protecting water shed area in two major rivers. The one-year program will takeplace on the third quarter of 2010/2011 and involved 600 local people in bamboo plantation and training.
-
8/2/2019 b480dfa265754860b13182a8713d70fc1
3/6
Alstom Indonesia, September 2011
Anita Bonang
Awards and Certification
Power:ISO 9001:2000, ISO 14001, OHSAS 18000, ASME, European Pressure Equipment Directive (PED) and European Norm (EN)certified , Zero Accident Awards in year 2004, 2005 and 2006
Grid:ISO 9001, ISO 14001, OHSAS 18 000
-
8/2/2019 b480dfa265754860b13182a8713d70fc1
4/6
Alstom Indonesia, September 2011
Anita Bonang
Power
Alstom is the leader in the gas and coal generations in Indonesia, supplying large boilers and gas turbines to the country over thelast 20 years and has an established boiler manufacturing facility in East Java.
References:Over 100 contracts awarded covering engineering, manufacturing, project management, commissioning and services for projects inIndonesia amongst others:
Tanjung Priok CCPP in Jakarta - 1,140 MW
Muara Tawar Block 1&2 CCPP, West Java 923 MW
First IPP CCPP project in Sengkang, South Sulawesi as well as its O&M contract 135 MW
Supplied Utility Boiler for Paiton 1& 2 - 2x400 MW
Supplied Utility Boiler for first Steam IPP project in Indonesia Paiton 5,6,7 & 8 - 4x660 MW
Ombilin 1&2 Steam Coal Power Plant in West Sumatra 2 x 100 MW
Bukit Asam 1 & 2 Steam Coal Power Plant in West Sumatra 2 x 65 MW
Tarahan 3 & 4, Supplied the first CFB Boiler Plant - 2x100 MW
Provided HRSG for Fajar Surya Wisesa Industry for gas project
Provided HRSG for Indralaya PLN gas project
Provided HRSG for Tangguh gas plant in Manokwari, Irian Jaya
Provided HRSG for Cikarang Listrindo Industrial Estate
Maintenance contract for Paiton Steam Coal Power Plants 5,6,7 and 8
Lahendong, geothermal plan in Manado, South Sulawesi 1x20 MW
Ongoing projects:
Muara Tawar 5 CCPP, with domestic HRSG, 240 MW Sengkang Extension CCPP and HRSG
LTSA for gas plants: Tanjung Priok, Gilimanuk and Muara Tawar
O&M contract for Sengkang CCPP
Maintenance contracts for steam plants: Paiton 5,6,7 & 8
Transport
In the rail sector, Alstom is the leader in signalling and control systems.
References:
1986: ALSTOM Transport B.V. has it first project in Indonesia to install relay interlocking in Medan Station1988: Introduction of VPI (Vital Processor Interlocking) for Cikampek Cirebon Line (135 km)1991: VPI Interlocking for 136 km Cirebon Pekalongan & 90 km Pekalongan Semarang1993: Introduction of SSI (Solid State Interlocking) by ALSTOM Transport S.A. (France) for Jabotabek1995: SSI Interlocking for 24 km Padalarang Gedebage & 57 km Bekasi Cikampek1995: SSI Interlocking for 20 km Tn Abang Serpong1996: SSI Interlocking for 20 km Duri Tangerang1997: SSI Interlocking for 25 km Ps Senen Kampung Brandan Tn Abang1999: VPI Interlocking for 90 km Cikampek Padalarang2002: VPI Interlocking for 54 km Cikampek Cirebon double-tracking segment 12005: VPI Interlocking 81 km Cikampek Cirebon double-tracking segment 32007: completion of Cikampek Cirebon double-tracking2009: renaming into PT Alstom Transport2010: Cirebon modification segment III on Java North Line
-
8/2/2019 b480dfa265754860b13182a8713d70fc1
5/6
Alstom Indonesia, September 2011
Anita Bonang
Ongoing projects:
2010: Cirebon modification segment III on Java North Line 2011: Contract signing with Freeport Indonesia for underground mining
Alstom Grid is the major player in the transmission sector in Indonesia, providing turnkey solutions for substations up to 500kV,automation solutions (for substations, networks: SCADA and telecom) and high voltage products for all projects.
The local activities are managed in two sites / companies.
PT Alstom Grid (over 200 employees):Turnkey HV substations up to 500kV (GIS, AIS) including:
Erection, commissioning of all T&D equipments, for turnkey s/s
Civil works expertise (design, QS, supervision)
EngineeringAutomation and protection solutions for substations and networks (DCS, relays, SCADA, telecom)
PT UNINDOManufacturing of:
All types of transformers up to 275kV
Power transformers, auto-transformers, generator step-up transformers, shunt reactors, etc
Traction transformers for railway applications
References:Over 60 contracts for turnkey substations in Indonesia from Alstom Grid solutions team and supply of more than 240 powertransformers from PT Unindo for projects in Indonesia
2008: ADB B-4 and B-6 turnkey contracts for 2 new 150kV substations, extension and upgrade of 150kV and 500kVsubstations
2008: 150kV gas-insulated substations for Tanjung Priok gas f ired power plant repowering project
2008: 150kV substation for Muara Karang CCPP
2008: 500kV GIS for new Paiton CFPP
2008: 150kV substation and power evacuation block for Rembang CFPP
2009: Supply of 275kV power transformers for Poso energy hydro power plant
2009: 150kV power plant switchyard for Cirebon coal fired power plant
2009: 500/150kV substation extension at Cilegon BaruOngoing projects:
150 kV gas and air-insulated substations, underground cables for the transmission and distribution of electricity as part ofthe 10 GW phase 1 generation program for PLN
SCADA EMS for Sumatra (3 DCC: Medan, Padang, Palembang)
500/150kV substation in Ujung Berung
275/150kV substation in Binjai (Sumatra)
275kV switchyard for Sumatra Utara CFPP
Supply, delivery and installation of 60 sets of 150kV, 70kV power transformers (30 and 60MVA) for PLN
Recent export projects include:Vietnam
2009: Supply of primary equipment and accessories for 500 kV Hiep Hoa substation
2009: Supply with supervision of 550 kV and 123 kV Hoa Binh substation
2009: Supply transmission equipment for the extension of the 500 kV Phu My substation and Song May transmission line
2009: Supply with supervision of 500 and 110 kV equipment for the 500 kV Tan Dinh substation
-
8/2/2019 b480dfa265754860b13182a8713d70fc1
6/6
Alstom Indonesia, September 2011
Anita Bonang
2009: Supply with supervision of 500, 220 and 35 kV equipment for the Dak Nong substation and connecting branch
Philippines
2010: Supply and delivery of 230, 138 and 68 kV substation equipment for the Gensan Tacurong substation
Export of power transformers from UNINDO: export to over 50 countries (around 50% of the total production)
2010: Mobile s/s transformers for PDVSA in Venezuela, and supply to Canada, Honduras, UK, Qatar
2009: Supply of transformers for over 15 projects in Venezuela, and to Canada, Myanmar, Gabon
2008: Supply of transformers to Qatar, Vietnam, Philippines, Canada, Malaysia, Ivory Coast, Togo, Trinidad & Tobago, ...