    Description: The project consists o the construction o a plant or a production o Biodiesel with a capacity production o 120,000 gallons per day.

    The Biodiesel will be use as substitute o diesel. The project is located in the department and province o Lima.

    Current Status:

    Earliest project start date: 2006.

    Operation start date: May 2007.

    Project lietime: Indefnite.

    Current Status: Authorization by Municipality is already given. Environ-

    mental Impact Assessment Study approved by Ministry o Agriculture.

    It has signed an agreement with Endesa Carbono Consultants to deve-

    lop PDD and CERs commercialization. Feasibility study is fnished. Theplant is in operation.

    Estimated Annual Emission Reductions (tCO2/year):

    An average o 412,759 tCO2-equivalent per year.

    Project Participant and Financing

    Total project cost: US$ 15,000,000

    Sources o fnance to be sought or already identifed:

    Equity: 100 %

    Debt: 0 %

    Projects Benefts:

    Number o direct and indirect jobs generated:

    It generates 15,000 indirect works.

    Sustainable development contribution:

    It displaces a ossil uel system with a clean uel that not contains sul-

    phur.

    It contributes signifcantly to reducing global warming by displacing

    GHG emissions.It implements social responsibility activities and social plants.

    CERs negotiation:Sell Commitment.

    Contact Inormation:Name: Samir Abudayeh Giha / Alberto Siles Chehade

    Company: Heaven Petroleum Operators S.A Title: General Manager / Manager

    Phone: (51-1) 4300957E-mail: [email protected]

    [email protected]@hepop.com.pe

    HEAVEN Biodiesel Production and Distribution or Automobile Transportation

    Description: The purpose o the project is to change the energy generation system o Agro Industrial Paramonga S.A., rom the actual residual ueloil based energy generation system, to a new sugar cane bagasse energy system. It will be located in the department o Lima, province o Barranca.

    Current Status:

    Earliest project start date: 2006.

    Operation start date: 2007.

    Project lietime: 30 years.

    Current Status: Feasibility study is fnished. Environmental Impact Stu-

    dies is fnished. I t was approved by Designated National Authority. New

    PDD is under elaboration.

    Estimated Annual Emission Reductions (tCO2/year):

    An average o 85,300 tCO2-equivalent per year.

    Project Participant and Financing

    Total project cost: US$ 5,369,000

    Sources o fnance to be sought or already identifed:

    Equity: 15 %

    Debt: 85 %

    Projects Benefts:

    Sustainable development contribution:

    It displaces a ossil uel system with a biomass based renewable energy

    system.

    It reduces local air pollutants and environmental impacts associated

    with the burning o residual uel oil.

    It contributes signifcantly to reducing global warming by displacing

    GHG emissions.

    CERs negotiation:

    Sell Commitment.

    Contact Inormation:

    Name: Hugo AynCompany: Agroindustrial Paramonga S.A.

    Title: Director o FinancePhone: (51-1) 2021111

    E-mail: [email protected]

    Paramonga CDM Bagasse Boiler Project B3