B127 Project Data Sheet 30 May 2017 - kreuzsubsea.com · ONGC Client / Partner: ... commissioning...

2
End client: ONGC Client / Partner: SapuraKencana Location: Mumbai High Installation Vessel(s): Kreuz Supporter Water Depth: 60 - 110 MSW Commencement Date: March 2017 Completion Date: April 2017 Kreuz Subsea’s diving sup- port and construction barge has been engaged performing construction and installation scopes for B-127 project in Mumbai High. Installation scope included 16” pipeline sectional replace- ments using pipe end con- nectors, stalk-on and spooled risers, SBM removal and pre- commissioning support. Spool installation B - 127 Project Mumbai High Project Datasheet Going beyond limits

Transcript of B127 Project Data Sheet 30 May 2017 - kreuzsubsea.com · ONGC Client / Partner: ... commissioning...

Page 1: B127 Project Data Sheet 30 May 2017 - kreuzsubsea.com · ONGC Client / Partner: ... commissioning support. Spool installation B-127 Project Mumbai High ... Procedures.. Project .

End client: ONGC Client / Partner: SapuraKencana Location: Mumbai High Installation Vessel(s): Kreuz Supporter Water Depth: 60 - 110 MSW Commencement Date: March 2017 Completion Date: April 2017

Kreuz Subsea’s diving sup-port and construction barge has been engaged performing construction and installation scopes for B-127 project in Mumbai High.

Installation scope included 16” pipeline sectional replace-ments using pipe end con-nectors, stalk-on and spooled risers, SBM removal and pre-commissioning support.

Spool installation

B-127 Project Mumbai High

Project Datasheet

Going beyond limits

Page 2: B127 Project Data Sheet 30 May 2017 - kreuzsubsea.com · ONGC Client / Partner: ... commissioning support. Spool installation B-127 Project Mumbai High ... Procedures.. Project .

� 2 x 16” stalk-on risers

� 2 x 6” and 16” tie-in spools

� 1 x 16” SPRU alongwith tie-in spool installation

� 1 x 8” installation of pig launcher

� 1 x bow string installation

� Installation of riser protection frame

� 3 x hydro-testing of spools

� Installation of double elevated and single ele-

vated bow strings

1 x SBM Removal

Tie-in spool installation

SPRU with spool

Riser Stalk-on

www.kreuzsubsea.com

Construction Scope

Removal / Decomm Scope

SPM decomm and removal

Supervisors performed well.. Good