BEWARE THE GOLDEN GOOSE CELLULAR ANTENNA INSTALLATIONS ON ELEVATED WATER TANKS November 17, 2015 James Michel, PE, Water Resources Engineer II Fayetteville Public Works Commission (NC)

Transcript of B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17,...

Page 1: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

BEWARE THE GOLDEN GOOSE

CELLULAR ANTENNA INSTALLATIONS ON ELEVATED WATER TANKS

November 17, 2015James Michel, PE, Water Resources Engineer II

Fayetteville Public Works Commission (NC)

Page 2: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

Introduction

2

• Background - Fayetteville PWC

• What are the Benefits?

• Issues created by antenna installation

• Solutions found by Fayetteville PWC

Page 3: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

3

• Since 1997 leasing on water tanks to cellular carriers:

AT&T Sprint Crown CastleVerizon T-Mobile Nextel (now Sprint)

• Agreements for seven water tanks• Five-year term• Three automatic five-year renewals • Termination with six months notice

Background

Page 4: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

4

• Agreements for up to a specific number of antennas

• 147 Antennas currently installed (171 counting radio units)

• Commitments for 250 antennas

• Capacity for 135 antennas

Background

Page 5: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

5

Benefits

Page 6: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

6

Issues

• Structural

• Maintenance Conflicts

• Site Access

• Contracts

• Capacity vs. Obligation

Page 7: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

7

Issues - Structural

Page 8: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

8

Issues - Structural

Page 9: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

9

Issues - Structural

TANK

Page 10: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

10

Issues – Maintenance Conflicts

Page 11: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

11

Issues – Site Access

• Requires Multiple Locks

• Requires On-Call Staff

• Contractors Provide Little Notice

Page 12: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

12

Issues – Contracts

• Short Review Times

• Limited requirements for access

• Are Fees Reasonable

• Are Monthly Billings needed

Page 13: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

13

Solutions - Structural

Page 14: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

14

• Antenna installation now required on corrals

• Engaged in design of new/upgraded corrals

• Fleming & Associates (F&A) for third party Structural review of proposed installations

• F&A to perform post construction review and verification

Solutions - Structural

Page 15: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

15

Solutions - Maintenance

• Antenna installation now required on corrals

• Maintenance considered when looking at cable routings

Page 16: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

16

Solutions – Site Access

• Require 48 hours notice for access

• Gang locks only allow site access, PWC Staff needed to access tanks

• Third party access control/security

Page 17: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

17

Solutions – Contracts

• Access notice written into contract

• Reasonable review times

• Pro-rata share of corral upgrades

• Annual fees instead of monthly

Page 18: B EWARE THE G OLDEN G OOSE C ELLULAR A NTENNA I NSTALLATIONS ON E LEVATED W ATER T ANKS November 17, 2015 James Michel, PE, Water Resources Engineer II.

QUESTIONS?

Presented by:James Michel, PE, Water Resources Engineer II