Axxos OEE English
-
Upload
martin-fredriksson -
Category
Technology
-
view
530 -
download
2
description
Transcript of Axxos OEE English
Axxos Industrial system 1
1
www.axxos.com+ 46 36 33 20 600
Axxos OEE
Axxos Industrial system 2
2
www.axxos.com+ 46 36 33 20 600
Company informationFounded in the 80s.
About 35 employee.
Many employees with background from industry.
Axxos OEE and Axxos Calibration
Axxos Industrial system 3
3
www.axxos.com+ 46 36 33 20 600
Product range
Products Services Educations
Axxos Calibration
Improvement Coaching
Analysis of current situation
Education in Axxos OEE
OEE-education
Lean game
Systematic Improvement Work
Improvement WorkLeadership program
Inspiration Days
Cloud service
Adaptation
Axxos Visualize
Axxos OEE
Axxos Analyze
Axxos Integrator
Axxos OEE Mobile
Axxos Alert
Axxos CIG
Axxos OP Maint
Axxos Industrial system 4
4
www.axxos.com+ 46 36 33 20 600
Position
Scandinavia's fastest growing OEE-system installed in over 200 factories in more than 10 countries.
Axxos office
Resellers / Partners
Countries where Axxos have customers
Countries where Axxos have customers and / or office/partners
Axxos Industrial system 5
5
www.axxos.com+ 46 36 33 20 600
Languages
Available in Swedish, English, Norwegian, Finnish, Danish, Polish, German, France and Chinese. All language are included with the system.
Axxos OEE can be delivered in any language.
Axxos OEE supports different time zones in the same system
Axxos Industrial system 6
6
www.axxos.com+ 46 36 33 20 600
INDUSTRIES
Axxos has clients in the following industries
Metal ElectronicsVehicle
Pharmaceuticals& Process
Plastics & RubberWood
Food
Other
Axxos Industrial system 7
7
www.axxos.com+ 46 36 33 20 600
REFERENCES OF AXXOS OEEMetal Vehicle Electronics
Axxos Industrial system 8
8
www.axxos.com+ 46 36 33 20 600
REFERENCES OF AXXOS OEEWood Plastics & Rubber
Axxos Industrial system 9
9
www.axxos.com+ 46 36 33 20 600
REFERENCES OF AXXOS OEEFood Pharmaceuticals & Process Other
Axxos Industrial system 10
10
www.axxos.com+ 46 36 33 20 600
PRODUCT BENEFITS
Identify and visualize production problems
What type of downtimes, discards, and speed losses
A basis for actions to remove or decrease production problems, based on facts. Says how to increase OEE.
A more efficient production, higher usage of machines, higher competitiveness, produce more and with less costs.
Production reporting
I don’t have time… must work!
-To get the real losses in production ‘on paper’ the way Axxos OEE gives is very important for our improvement work. Axxos OEE has since the start energized the improvement work and is today one of the most important forces in our improvement work.”Douglas Håkansson, Production leader, Swepart Transmission
Axxos Industrial system 11
11
www.axxos.com+ 46 36 33 20 600
EXAMPLE.
If a machine is adjusted 10 minutes per shift ...
... it will be 112 hours downtime
in one year (at 3 shifts)
= A three-shift production week
Axxos Industrial system 12
12
www.axxos.com+ 46 36 33 20 600
EXAMPLE.
If your machine has an expected cycle time of 48 seconds and the real cycle time is 50 seconds...
You will lose 5% of your production time,
which is 18 days of production in a year.
”- Axxos OEE simplifies my work. It is easy to see exactly what is happening in the production and it is much easier to plan orders than before.
Operator at Attends
Axxos Industrial system 13
13
www.axxos.com+ 46 36 33 20 600
OEE Overall Equipment Effectiveness
The best measure/ KPI for production efficiency in a plant
Says how well the machines are used in relation to their potential.
Increased OEE gives:
Lower cost per produced unit = Higher competitiveness, better financial result
Possibility to produce more with current equipment – Reduces need to invest in more machines or more shifts to increase production
Axxos Industrial system 14
14
www.axxos.com+ 46 36 33 20 600
OEE Overall Equipment Effectiveness
0,70 x 0,97 x 0,95 = OEE 64%
70 %
97 %
95 %
O = OverallE = EquipmentE = Effectiveness
Axxos Industrial system 15
15
www.axxos.com+ 46 36 33 20 600
OEE improvement -> PROFITPossible capacity OEE = Production volume
3600 sec
36 sec50% OEE =50 pcs./hx
3600 sec
36 sec70% OEE = 70 pcs./hx
x
Example (simplified):Goal Cycle time: 36 sec -> Possible capacity 100 units/hFixed cost (machines, personnel, factory aso): 2 000 € /hourMaterial cost: 25€Sales price: 80€
Profit/unit
80-25-40=15€
80-25-28=27€
Fixed cost/unit
2 000/50= 40€
2000/70=28€
Profit/year
15€*50pcs*168h*48w=
6.0 Million €
27€*70pcs*168h*48w=
15.2 Million €
Axxos Industrial system 16
16
www.axxos.com+ 46 36 33 20 600
EXAMPLE. No. of machines 10
No. of shifts 2 shifts
If production stop cost is 70 €/h:
5% increase of availability 90 000 €/year
20% increase 360 000 €/ year
If production stop cost is 150 €/h:
5% increase of availability 270 000 €/year
20% increase 1 080 000 €/ year
Axxos Industrial system 17
17
www.axxos.com+ 46 36 33 20 600
RESULTS. By highlighting the downtime causes, the OEE tend to increase by 5-10% within a short time.
Swepart Transmission increased the OEE by 50%.
GKN Driveline has in 2 years increased the OEE with 35 % in their factory.
Seco Tools has reduced downtimes with 55%.
Siljan Timber increased their OEE with 27% during the last year.
Axxos Industrial system 18
18
www.axxos.com+ 46 36 33 20 600
RESULTS. “-Only by installing Axxos OEE, we improved the production with 10%. The machine operators started to focus on their machines and wanted to know the reason for the downtimes.”
Jens Krisat, LEAN-coordinator, Seco Tools
Axxos Industrial system 19
19
www.axxos.com+ 46 36 33 20 600
DATA COLLECTION.
Machine status (one or several signals)
Unit counting
Automatic coding of downtime cause
Automatic scrap counting and coding of scrapping cause
Logging measurements like Temperature (analogue signals), Capability measure, Vibrations and Crash control
Machine signals:
Axxos Industrial system 20
20
www.axxos.com+ 46 36 33 20 600
System OverviewComputers and touch screensComputers for reporting and evaluation.
Axxos OEE is web-based and fully supported by Internet Explorer and Chrome.
Machine
Integration
Axxos Visualize
Server
Local server
Centralserver
CloudserverCommunication solutions
• PLC• OPC• Database
to MPS/ERP-system
Machine signals• Status• Unit count
Axxos Industrial system 21
21
www.axxos.com+ 46 36 33 20 600
Reporting
Enter stop cause for downtime when the machine stops
Enter what is produced in Axxos OEE (possibly via ERP-system), see stop statistics and cycle times for articles/orders.
Also possible to report: ScrappingCompleted operator maintenanceLogbook entries at various incidents.Quality control reports (limited)
“- Using Axxos OEE is not easy, it is extremely easy! I have never heard anyone say that it is hard to use.
Sören Larsson, IT-manager, Siljan Timber
Axxos Industrial system 22
22
www.axxos.com+ 46 36 33 20 600
Article monitoring
Enables measuring of speed/cycle times and efficiency for each individual article.
Analyze stop times, OEE-value etc. for each individual article.
What stop causes are linked to a specific article?
How long is the setup time for a specific article?
Axxos Industrial system 23
23
www.axxos.com+ 46 36 33 20 600
Order reportingWork with order reporting
Separately in Axxos OEE
Integrated with your ERP-system
Analyze stop times, cycle times, OEE, setup time, etc. for eachindividual order.
Real-time visualization of the order situation, tex. no of units produced
Axxos Industrial system 24
24
www.axxos.com+ 46 36 33 20 600
EXISTING INTEGRATIONS.
Axxos Industrial system 25
25
www.axxos.com+ 46 36 33 20 600
Import of order informationImport the following information to Axxos OEE from your ERP-system at fixed intervals:
Order noArticle noPlanned start timePlanned end timeTarget cycle timePlanned set-up time etc.
Axxos Industrial system 26
26
www.axxos.com+ 46 36 33 20 600
Export of order informationExport the following information from Axxos OEE to your ERP-system at fixed intervals:
Produced unitsUsed production timeNo of units scrappedMean cycle timeActual set-up time, etc.
Automatic production reporting to your ERP-system saves a lot of time and providesmore accurate data.
Axxos Industrial system 27
27
www.axxos.com+ 46 36 33 20 600
5 standard ways of presenting collected data
Time graph
Machine overview Production situation
Reports Factory overview
Axxos Industrial system 28
28
www.axxos.com+ 46 36 33 20 600
Reports
Approximately 25 report templates that can be filtered in various ways. For example: date, shift, orders/article, department and factory.
Examples of reports: OEE-report, setup time report, cycle time report, stop cause report, order report.
A report can at a fixed interval automatically be e-mailed, printed or saved as a file in the system.
See pdf-file with report examples on our website.
Axxos Industrial system 29
29
www.axxos.com+ 46 36 33 20 600
EXAMPLE REPORT.
Axxos Industrial system 30
30
www.axxos.com+ 46 36 33 20 600
TIME GRAPH.
Axxos Industrial system 31
31
www.axxos.com+ 46 36 33 20 600
3 options for visualization and analysisAxxos Visualize (option) Axxos Analyze (option)
Custom reports (option)
Axxos Industrial system 32
32
www.axxos.com+ 46 36 33 20 600
AXXOS ANALYZE.
Download and try out a demo version on our website
www.axxos.com
Quick analysis
Smooth analysis
Powerful analysis
Axxos Industrial system 33
33
www.axxos.com+ 46 36 33 20 600
AXXOS ANALYZE.Saves time for the user
Analyses is actually made
A little time on analysis and a lot of time for improvement
Difficult analysis becomes easier
Material that may not otherwise be found becomes the basis for the decisions
-”Axxos Analyze is best in breed.” Anders Wiberg, Production Manager, Ekenäs Mekaniska
-”Axxos Analyze is easy and interactive way to analyse data regarding lines, downtime causes, scrap reasons, time periods, aso. It is a fast tool. ” Andreas Adolfsson ,Quality Manager, Attends
Axxos Industrial system 34
34
www.axxos.com+ 46 36 33 20 600
AXXOS VISUALIZE.Visualizes the production status on the TV screens, computers and mobile phones, etc.
Web-based and may be used in hardware that have web browsers.
Axxos Visualize is availablein two versions:
Standard (templates)
Customized (custom)
“We earn approx. 3 MSEK per year from visualizing our production with Axxos Visualize, through improved OEE values.“
Mikael Klasson, Quality Manager, Promens
Axxos Industrial system 35
35
www.axxos.com+ 46 36 33 20 600
AXXOS VISUALIZE.Example of Axxos Visualize Standard
Axxos Industrial system 36
36
www.axxos.com+ 46 36 33 20 600
AXXOS VISUALIZE.Example of Axxos Visualize Standard
Axxos Industrial system 38
38
www.axxos.com+ 46 36 33 20 600
Axxos OEE Mobile
This App displays among others:Stop time & stop causeOEE-valueSpeedAvailability, facility utilizationand quality yieldOrder tatusCycle time & scrap count
Demoversion of Axxos OEE Mobile is free
to download at Google Play and App Store.
Axxos Industrial system 39
39
www.axxos.com+ 46 36 33 20 600
HARDWARE OPTIONS.
Standard PC, Compact PC, laptop & thin client
Smartphones & PDA
There is both industry-specific and non-industrial hardware options
Touch Screen PC
Tablet
Axxos Industrial system 40
40
www.axxos.com+ 46 36 33 20 600
OTHER FEATURES.Axxos Alarm – Alarm if machine stops. To mobile phone, wristband, Visualize, light tower (Option)
Axxos Andon – Ask for help from support functions (Production leaders, Maintenance, Technicians, other operators, aso. (Option)).
Axxos Operator’s Maintenance – Inform operator when to perform maintenance and what actions to take. Checklist and control function. (Option)
Process locking - If necessary, compelling cause coding can be used. Flashing light is an alternative (Option).
Axxos Industrial system 41
41
www.axxos.com+ 46 36 33 20 600
Integration with maintenance systems
Run-times can automacally be sent from Axxos OEE to a maintenance system. Provides a more condition-based maintenance.
Error report from Axxos OEE to the maintenance system.Report maintenance-related shutdowns when necessaryInformation about the start time of stop, stop cause, any notes and what machine, is reported to the maintenance system.
Axxos Industrial system 42
42
www.axxos.com+ 46 36 33 20 600
IMPLEMENTATION.
Involve every part of your company that is concerned (production manager, operators, maintenance personnel, union, etc).
Inform about the purpose.
Possible to rent or buy the system.
We can offer support around the clock.
Axxos Industrial system 43
43
www.axxos.com+ 46 36 33 20 600
INSTALLATION / EDUCATION.
Pre-study by phone or at your plant.Discuss signalsDiscuss IT, such as server, network, PC/Panels
Installation time is normally 2-4 days.
Machine operators and administrators are trained (all in one day normally).
Axxos Industrial system 44
44
www.axxos.com+ 46 36 33 20 600
Services
Improvement-coaching
Situation analysis of your improvement work
Cloud service
Adaptation
We help you to take your improvement efforts a step further.A situation analyze is conducted and an action plan is set up.Coaching on site once/month and phone support.
Get a clear picture of your current situation, where you wantto be and how to get there. Relevant key figures to measureyour improvement. 2 days workshop for 2-10 persons.
We manage the systems running Axxos OEE.You need not consider server hardware, licenses for operational & database, as well as backup.
Axxos OEE is easy to customize according to your needsand requirements but sometimes a unique solution isneeded that does not exist today. We can help you adaptthe system according to these requirements.
Axxos Industrial system 45
45
www.axxos.com+ 46 36 33 20 600
TrainingTraining Axxos OEE
OEE-training
Lean games
Systematic Improvement work
Development program
Inspiration days
Training of administrators, operators and report training.Follow-up training after a period of use.
Learn to understand and use the key value OEE in your improvement work.
Learn to work with and understand the basics ofLean Production. Gives you knowledge about how to implement continuousimprovements in your everyday work with Axxos OEE.2 days on site.
Three separate trainings, Efficient production, Lean basics and 6-sigma Green Belt. All 3 in one affordable package. Gives your staff the knowledge to run your improvement work.Single day inspiration days in improvement work.OEE, Lean games, SMED, 5S, 6-sigma, Team-work.
Axxos Industrial system 46
46
www.axxos.com+ 46 36 33 20 600
WHY AXXOS OEE?
Automatic data collection
The users can focus on improvement work instead of data collection
Very user friendly
Makes users use it
Standard visualizing of production
Easy analyzing through Axxos Analyze
Standard reports – Easy reporting
Great experience in installing OEE software
Integration with ERP/Maintenance
Axxos Industrial system 47
47
www.axxos.com+ 46 36 33 20 600
CONCLUSION.
What you do not measure, you can not
improve!