AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights...

12
AXIS programme status AXIS programme status AXIS-I: AXIS-I: Approved November 1999 Approved November 1999 Observations started April 2000 Observations started April 2000 19 nights so far 19 nights so far 19.5 nights remaining 19.5 nights remaining AXIS-II AXIS-II Approved November 2000 Approved November 2000 Total ~50 nights, continuing through Total ~50 nights, continuing through to spring 2001 to spring 2001
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    217
  • download

    2

Transcript of AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights...

Page 1: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

AXIS programme statusAXIS programme status AXIS-I:AXIS-I:

Approved November 1999Approved November 1999 Observations started April 2000Observations started April 2000 19 nights so far19 nights so far 19.5 nights remaining19.5 nights remaining

AXIS-IIAXIS-II Approved November 2000Approved November 2000 Total ~50 nights, continuing through to Total ~50 nights, continuing through to

spring 2001spring 2001

Page 2: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

2

The AXIS teamThe AXIS team

Astrophysikalisches Institut Potsdam (Germany)Institute of Astronomy, Cambridge (UK)Instituto de Astrofísica de Canarias, Tenerife (Spain)Instituto de Física de Cantabria, Santander (Spain)Laboratorio de Astrofísica Espacial, Madrid (Spain)Max-Planck-Institut für Extraterrestriche Physik (Germany)Mullard Space Science Laboratory, UCL (UK)Observatoire Astronomique de Strasbourg (France)Osservatorio Astronomico di Brera, Milano (Italy)University of Bristol (UK)University of Central Lancashire (UK)University of Leicester, (UK)XMM Science Operations Centre, (Spain)

Page 3: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

3

The Observatorio del The Observatorio del Roque de los MuchachosRoque de los Muchachos

JKT (1.0)

GTC (10)

TNG (3.5)

INT (2.5) WHT (4.2)

NOT (2.5)

Page 4: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

4

AXIS:Breakdown of AXIS:Breakdown of observing nightsobserving nights

Telescope So far 2000 2001 TotalINT (2.5m) 7 10 8 18WHT (4.2m) 5 9 14 23TNG (3.5m) 6 7 14 21NOT(2.5m) 1 9 16 25Total 19 35 52 87Fraction 22% 40% 60% 100%

Page 5: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

5

AXIS instruments usedAXIS instruments used

Telescope Instrument CommentsINT 2.5m WFC WF optical imaging

CIRSI WF NIR imaging (H)WHT 4.2m WYFFOS Fibre (2.7”) spectroscopy

ISIS Long-slit spectroscopyNOT 2.5m ALFOSC Long-slit spectroscopyTNG 3.5m OIG Optical imaging

DOLORES Long-slit spectroscopy

Page 6: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

6

AXIS wide-field imagingAXIS wide-field imaging

U(RGO)

g’(SDSS)

r’(SDSS)

i’(SDSS)

Z(Gunn)

H H Total

9 35 43 34 35 12 3 53

Optical: INT/WFCNear IR: INT/CIRSI

(includes M. Watson’s PATT Imaging proposal)

Page 7: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

7

Search for candidate Search for candidate counterpartscounterparts

# counterparts 0 1 >1 TotalG133; >0.005 ct/s 2(10%) 18(78%) 3(12%) 23G133; all 3(8%) 28(72%) 8(20%) 39GRB001025 10(12%) 34(42%) 42(%) 81

i’-band sources within either:5 (statistical) or5 arcsec

Clusters?Reddened sources?

AGNs beyond the Galaxy?

Page 8: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

8

Candidate counterparts &Candidate counterparts &systematicssystematics

•Count rate > 0.005 ct s-1

•|b|>10º•Single candidate counterpart•108 sources66%

x1=2, 33%

P(x|x0)=|x-x0|*exp(-|x-x0|2/2)

Pobs(x)=f0*P(x|0)+f1*P(x|x1)

f0=0.67; x0=0 (fixed) f1=0.33; x1=2.0

Page 9: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

9

AXIS spectroscopy:AXIS spectroscopy: Medium Sample Medium Sample

~20 sources/field~20 sources/field ~10-15 identifiable with single ~10-15 identifiable with single

WHT/WYFFOS configuration (2-3 WHT/WYFFOS configuration (2-3 hours, including overheads)hours, including overheads)

Most of the remaining sources within Most of the remaining sources within reach of long-slit spectrographs.reach of long-slit spectrographs.

~90% completeness expected~90% completeness expected

Page 10: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

10

AXIS identifications: AXIS identifications: Galactic PlaneGalactic Plane

~30-50 sources/field~30-50 sources/field At very low b, most sources have many At very low b, most sources have many

candidate counterparts:candidate counterparts: Multiband photometry (including HMultiband photometry (including H)) 2-3 WYFFOS configurations2-3 WYFFOS configurations High resolution long slit spectroscopyHigh resolution long slit spectroscopy

At intermediate b (10º-20º) the At intermediate b (10º-20º) the average number of candidate average number of candidate counterparts decreases.counterparts decreases.

Page 11: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

11

AXIS identificationsAXIS identifications(as of December 1, 2000)(as of December 1, 2000)

Sources |b|>20 |b|<20 TotalAGN 19 - 19Act Coronae 4 12 16Nonact Stars 6 - 6NELGs 4 - 4Galaxies 4 - 4Acc binaries - 1 1Total 37 13 50

Page 12: AXIS programme status n AXIS-I: uApproved November 1999 uObservations started April 2000 u19 nights so far u19.5 nights remaining n AXIS-II uApproved November.

12

AXIS expectationsAXIS expectationsGoal AXIS-I AXIS-I +

AXIS-IIComments

IP (optical) 40 fields ~75 fieldsIP (infrared) 4 fields ~20 fields CIRSI not availbale in

semester 00BMS 125

sources500 sources Fibre spectroscopy

available in AXIS-IIGP 50 sources 300 sources Sources brighter than 18m

only in AXIS-I: mostlyActive Coronae

BS 100sources

300 sources