AWP Primers - AWP University

39
Plot Plans with CWAs / CWPs P&IDs Engineering Lists Schedule w EWPs 3D Model Exports Vendor Data Digital Pipe Isometrics Digital Structural Details Documents Register Digital EWPs Advanced Revisions Log AWP Primers – Engineering Deliverables

Transcript of AWP Primers - AWP University

Page 1: AWP Primers - AWP University

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

AWP Primers – Engineering Deliverables

Page 2: AWP Primers - AWP University

Virtual Construction Model Assembly

Virtual Work Package Development

Master Project Schedule

Progress Tracking

Procurement / Site Materials

Quality / Completions

Estimating / Cost Controls

3D Plant Design

Piping Lists

Equipment Lists

Instrument Lists

Civil / Structural Lists

Electrical Lists

Other Engr Data

Document Management

Pipe Isometric Detailing

Pipe Fabrication

Structural Detailing

Steel Fabrication

Modular Design Detailing

Module Fabrication

Suppliers Contractors

Concept Plant LayoutAWP-DT.01

AWP-DT.05

AWP-DT.03

AWP-DT.06

AWP-DT.07

AWP-DT.08

AWP-DT.09

AWP-DT.10

AWP-DT.11

AWP-DT.12

AWP-DT.13

AWP-DT.27

AWP-DT.26

AWP-DT.28

AWP-DT.17

AWP-DT.18

AWP-DT.25

AWP-DT.14

AWP-DT.19

AWP-DT.20

AWP-DT.21

AWP-DT.22AWP-DT.23AWP-DT.16

AWP-DT.04

AWP Control Index, Constraint Management & Predictive Analytics

AWP-DT.02

AWP-DT.24

AWP-DT.15

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 3: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 4: AWP Primers - AWP University

CWA01 Tank DA-50

PictureCWA ID Title

CWA02 Tanks 39-81 & 82

CWA03 Tank D-5

Work Scope Summary

CWA04 Scrubbers

• Demo piping around G-10 & G-11

• Install new pipe lines, filters, instruments, power & controls

• Insulate piping & equipment

• Tie-in DA-50 to existing Pz 168 Lot Tanks 174/175

• Tie-in loading from DA-50 to loading line from Tanks 81 & 82

• Demo piping, level switches & temp transmitters

• Reuse/relocate product filter, pump(s), isolation valves(?),

level transmitter & relief(s)

• Install new equipment including 2+ pumps, a product filter

along with associat3ed piping, instruments, power & controls

• Tie-in headers at pipe bridge and E-W pipe rack locations,

as well as loading / unloading header run

• Demo exiting piping and equipment around Tanks D -5/8

• Install new equipment including feed pump, loading pump

motor (vertical), product filter

• Install and insulate piping for Tank 5 and associated

equipment

• Install instruments, power & controls

• Prepare foundations and grade, lay concrete pads for scrubbers

• Install portable scrubbers, in designated locations

• Install piping to support scrubbers

• Install instruments, power & controls

• Insulate equipment and associated piping

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 5: AWP Primers - AWP University

Engineering Deliverables List – Plot Plans with CWAs / CWPs

Deliverable Item Format Timing / Frequency

Critical Input to CWA, CWP, EWP Index Table XLS Draft at POC1, and finalize shortly after

Plot Plan Files with Marked up CWAs PDF Draft at POC1, and finalize shortly after

Work Scope Bullet List by CWA / CWP XLS Draft at POC1, and finalize shortly after

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 6: AWP Primers - AWP University

CWP -- AT.1191-CWA01-406X-440A-CON-01Demo piping around G-10 & G-11, except for check & isolation valves

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 7: AWP Primers - AWP University

Planned Start:07-Feb-2018

CWP -- AT.1191-CWA01-406X-440A-CON-01Demo piping around G-10 & G-11, except for check & isolation valves

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 8: AWP Primers - AWP University

Engineering Deliverables List – P&IDs

Deliverable Item Format Timing / Frequency

PFD (Process Flow Diagrams) Drafts for Early Planning PDF FEL1 & 2

P&IDs for Review, Marked-up where possible to indicate scope of work

PDF P&ID Pass 1 Through 3

P&IDs at IFAs PDF Finalize process design at Pass 4 P&IDs

P&IDs at IFC PDF With EWP IFC Release

Index of P&IDs XLS At issue of P&IDs from Pass 1 to Pass 4

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 9: AWP Primers - AWP University

Field Name Definition Technical RequirementsTag Item Number Equipment Tag number designation Y

Rev Revision of Equipment Design Y

Construction Status The code to specify if the equipent is new, existing and refurbished or modfied. Y

Spec Equipment Specification number Y

P&ID Piping and Instrument Diagram drawing the equipment is on Y

CWA Construction Work Area the Equipment is located Y after CWA identified

System Commissioning & Start-UP System Identified for the equipment tag Y after System identified

Skid Skid tag number the equipment is part of. N

Req Number Requisiton Number Y after Req issued

PO Number Purchase Order Number Y after PO issued

Manufacturer Manufacturer of the equipment i.e. Dresser Rand, Hughes Anderson etc N

Weight Erection Weight of the equipment Y

Weight UOM Unit of Measure Erection Weight Y

Responsible Discipline Responsible Discipline for the equipment N

Equipment Location Plan Location Drawing i.e (B01-xxxx-yyyyy) N

Motor Tag Tag of the Motor on Equipement..i.e Pump Compressor Y if a motor exists

Support Drawing Support Drawing Number N

Grout Drawing Grout Drawing Number N

Grounding Drawing Grounding Drawing Number N

Electrical Drawing Electrical Drawing Number N

Paint Code Required Paint Spec number. Designates color and specific mill thickness requirements Y if paint required

Insulation Class (Shell) Type of Insulation on Shell Side of Tube Heat Exchanger Y if insulation required

Insulation Class (Channel) Type of Insulation on Tube Side of Tube Exchanger Y if insulation required

Tracing Code Heat Tracing Code ID that specifies the type of heat tracing required Y if tracing required

Fireproof Code Heat Tracing Code ID that specifies the type of fireproofing required Y if fireproofing required

Equipment List - Data Field Definitions

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 10: AWP Primers - AWP University

Field Name Definition Technical RequirementsTag Item Number Equipment Tag number designation Y

Rev Revision of Equipment Design Y

Construction Status The code to specify if the equipent is new, existing and refurbished or modfied. Y

Spec Equipment Specification number Y

P&ID Piping and Instrument Diagram drawing the equipment is on Y

CWA Construction Work Area the Equipment is located Y after CWA identified

System Commissioning & Start-UP System Identified for the equipment tag Y after System identified

Skid Skid tag number the equipment is part of. N

Req Number Requisiton Number Y after Req issued

PO Number Purchase Order Number Y after PO issued

Manufacturer Manufacturer of the equipment i.e. Dresser Rand, Hughes Anderson etc N

Weight Erection Weight of the equipment Y

Weight UOM Unit of Measure Erection Weight Y

Responsible Discipline Responsible Discipline for the equipment N

Equipment Location Plan Location Drawing i.e (B01-xxxx-yyyyy) N

Motor Tag Tag of the Motor on Equipement..i.e Pump Compressor Y if a motor exists

Support Drawing Support Drawing Number N

Grout Drawing Grout Drawing Number N

Grounding Drawing Grounding Drawing Number N

Electrical Drawing Electrical Drawing Number N

Paint Code Required Paint Spec number. Designates color and specific mill thickness requirements Y if paint required

Insulation Class (Shell) Type of Insulation on Shell Side of Tube Heat Exchanger Y if insulation required

Insulation Class (Channel) Type of Insulation on Tube Side of Tube Exchanger Y if insulation required

Tracing Code Heat Tracing Code ID that specifies the type of heat tracing required Y if tracing required

Fireproof Code Heat Tracing Code ID that specifies the type of fireproofing required Y if fireproofing required

Equipment List - Data Field Definitions

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 11: AWP Primers - AWP University

Engineering Deliverables List – Engineering Lists

Deliverable Item Format Timing / Frequency

Mechanical Equipment List XLS Throughout project at specified frequency

Piping Line List XLS “ ”

Instrument Index XLS “ ”

Cable Schedule XLS “ ”

Electrical Equipment List XLS “ ”

Lighting & Devices List XLS “ ”

Conduit & Trays List XLS “ ”

Grounding List XLS “ ”

Electrical Heat Trace Schedule XLS “ ”

Pilings List XLS “ ”

Modules Index XLS “ ”

Foundations Index XLS “ ”

Primary Structures Index XLS “ ”

Secondary Structures and Supports XLS “ ”

Engineering Lists Demarked at Key Stages of Design PDF / XLS 30%, 60%, 90% Design Reviews

Engineering Lists Demarked at IFC PDF / XLS With EWP IFC Releases

Engineering List Revisions PDF / XLS At issue of P&IDs from Pass 1 to Pass 4

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 12: AWP Primers - AWP University

Finalize (baseline)

RefineDefine

Path of Construction Development

Level 2 Schedule by

Discipline

Level 3 Schedule by CWAs, CWPs,

EWPs & PWPs

InteractivePlanning

Schedule Development

CWAs, CWPs,EWPs,TOPS

Path of Construction Working Sessions

RefineRefine

POC 2POC 1

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 13: AWP Primers - AWP University

CWA 03A

CWP P02.03A.01Install Large Bore Pipe in CWA 03A

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 14: AWP Primers - AWP University

The following checklist facilitates backward pass alignment of the engineering EWP with this CWP:

❑ List the target engineering deliverables for this CWP (this forms the EWP)

❑ Identify baseline ‘delivery’ date required for the EWP in order to allow the CWP (and requisite purchase and material delivery) to proceed according to schedule

❑ List all input dependencies to the EWP deliverables

❑ Identify latest possible ‘Need Dates’ for the input dependencies in order to be able to meet the required EWP delivery date

❑ Incorporate the EWP into the overall EWP Delivery plan, along with the target ‘Delivery Date’ and Input Need Dates for the input dependencies

❑ Track and iterate with recurring reporting of EWP Delivery Plan and EWP Constraints out from the responsible engineer for the EWP

CWA 03A

CWP P02.03A.01Install Large Bore Pipe in CWA 03A

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 15: AWP Primers - AWP University

Engineering Deliverables List – Schedule with EWP

Deliverable Item Format Timing / Frequency

Sample Export of Engineering Schedule and WBS XLS After POC 1 and before POC 2

Documentation on project Schedule WBS and Column configuration for CWPs, EWPs, etc …

PDF After POC 1 and before POC 2

Periodic Exports during Schedule Development PDF / XLS Following Engineering IAP Session

Baseline Schedule of Engineering after IAP PDF / XLS Following Engineering IAP Session

Routine Export of Engineering Schedule Progress PDF / XLS Bi-Weekly from Start of Detailed Design

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 16: AWP Primers - AWP University

Plant design models provide the basic input for AWP automation tools for 3D work package development.

Smart PlantE3D

Revit

3D Plant Design Model Processing

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 17: AWP Primers - AWP University

Engineering Model Attributes

Pipe System Attributes

ISO Number*

Line NumberArea /Unit*

CWACWPModuleBore Size 1*

Bore Size 2Bore Size 3Schedule*

Fluid CodeFromToPID*

Specification*

PhaseTest Pressure*

Test Type*

Insulation TypeInsulation ThicknessPainting SpecHeat TracingNotes

Pipe Part Level AttributesName/Tag*(e.g. /QV-1100620; /TRUNNION/3P10-1265)

CWA (e.g. 01)CWP ISO Number* (e.g. /3P10A/80-DMW-110-00013-013470Z-N-01)Line NumberBore Size 1*

Bore Size 2Bore Size 3Sched 1Sched 2Sched 3Pressure Rating 1Pressure Rating 2Pressure Rating 3Specification (e.g. /013470Z/PP3-0000LL_1)Commodity Code (e.g. /013470Z/VLAJ4-F1L270000LL_1) Description* (e.g. Globe Flg, BS 1873, RF, 150 Lbs, Bolted Bonnet, Trim No.: 12, Acc. to API 600, 602, -, Swivel Plug Disc, Stem: O.S./..)Material* (e.g. ASTM A351 Gr. CF8M)

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 18: AWP Primers - AWP University

Engineering Deliverables List – Schedule with EWP

Deliverable Item Format Timing / Frequency

Sample export of 3D plant design modelNWD / VUE + XLS

After POC 1 and before POC 2

Documentation on project 3D plant design model organization, component types and attribution

PDF After POC 1 and before POC 2

Routine export of 3D plant design modelNWD / VUE + XLS

Bi-Weekly from Start of Detailed Design

3D model export demarked at key stages of designNWD / VUE + XLS

30%, 60%, 90% Design Reviews

3D model export demarked at IFC of one or more EWPs

NWD / VUE + XLS

At EWP(s) IFC Release

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 19: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 20: AWP Primers - AWP University

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Engineering Deliverables List – Vendor Data Deliverables

Deliverable Item Format Timing / Frequency

Index of Equipment Vendors, Parts and Materials Suppliers

XLSAs vendors are selected for bid inquiry or PO award on the project

Supplier information on ETA (Estimated Time of Arrival) for planned shipments

XLS Updated daily or weekly

List of documents associated with the equipment, materials or parts with status on design / approvals

XLSUpdated as vendor document deliverables are added to the PO line items and further identified post PO award

List of 'Ship Loose' parts and part container / boxes associated with the primary equipment or p

XLSUpdated as vendor shipment lots and ‘ship loose’ materials are identified post PO award

List of 'Spares' parts associated with the primary equipment or part

XLSUpdated as vendor shipment lots and ‘ship loose’ materials are identified post PO award

Page 21: AWP Primers - AWP University

Digital Pipe Isometrics

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 22: AWP Primers - AWP University

Page 1 or 2 Page 2 or 2

https://www.alias.ltd.uk/pcf.asp

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 23: AWP Primers - AWP University

Critical to understand if pipe spool demarcation is done by engineering or

separate detailing shop with fabrication scope

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 24: AWP Primers - AWP University

Engineering Deliverables List – Digital Pipe Isometrics

Deliverable Item Format Timing / Frequency

Sample digital pipe isometricIDF / PCF files

Before Issuance of IFC EWP

List of digital isometrics with EWP Release XLS At IFC Release of EWP(s)

Set of digital isometrics with EWP ReleasePDF files + IDF / PCF files

At IFC Release of EWP(s)

Technical support to include AWP requirements in pipe fabrication contracts for delivery of digital data

XLS / DOC / PDF

At Inquiry Issue for fabrication contracts

Set of ‘modified’ digital isometrics with from detailing provided if spool demarcation is included in fabricator scope of work

PDF files + IDF / PCF files

Upon detailing of isometric by fabricator

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 25: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 26: AWP Primers - AWP University

Critical to request digital structural detail models from

steel fabricator, by CWA

http://dcom.arch.gatech.edu/aisc/idm/process_map

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 27: AWP Primers - AWP University

https://www.caddigest.com/3-new-releases-for-tekla-users/

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 28: AWP Primers - AWP University

Engineering Deliverables List – Digital Structural Details

Deliverable Item Format Timing / Frequency

Technical support to include AWP requirements in steel fabrication contracts for delivery of digital data for structural detailing and fabrication tracking

XLS / DOC / PDF

At Inquiry Issue for fabrication contracts

Sample digital structural details filesIFC BIMSTeelfiles

Before Issuance of steel fabrication contracts

Digital structural detailing file(s) exported from 3D steel detailing application (Tekla or equivalent)http://dcom.arch.gatech.edu/aisc/content/em11_final_steel_detailing_model

IFC BIMSTeelfiles

Upon detailing of isometric by fabricator

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 29: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 30: AWP Primers - AWP University

Work in Progress

Specialist design team, fabricators

and specialty contractors

Specialist design team, fabricators

and specialty contractors

Work in Progress

Specialist design teams, fabricators and construction

contractors

Published

Validated design output for use by

Project Team, suitable for Tender and Construction.

Client Archive

Project history maintained for

knowledge, regulatory and legal

requirements.

Shared

Non-verified design data and documents

used by in-house design teams only

Work in Progress

Non-verified design data and documents

used by in-house design teams only V

eri

fie

d

Au

tho

rize

dA

uth

ori

zed

Authorized

Approved

Ap

pro

ved

Tier 1 Contract

Work in Progress

Non-verified design data and documents

used by in-house design teams only

Work in Progress

Non-verified design data and documents

used by in-house design teams only

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 31: AWP Primers - AWP University

Engineering Deliverables List – Documents Register

Deliverable Item Format Timing / Frequency

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 32: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 33: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

CWP

CWA

CWPCWPCWPCWPCWP

CWPCWPEWP

CWPCWPPWP

TOP 1

TOP 2

TOP xIWP 1

IWP 2

IWP x

CWP

Dwg 1

Dwg 2

Dwg 3

Dwg x

PO 1

PO 2

PO 3

PO x

PredecessorWork Scope

RequisiteDrawings

SuccessorWork Scope

RequisiteMaterials

WorkSequences

Page 34: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

CWP

CWP

CWPExternal

EngineeringCWPEWP

CWPCWPPWP

TOP 1

TOP 2

TOP x

EWP

InterfacingWork Scope

InterfacingWork Scope

MaterialRequisitionRequests

Turnover Requirements

Construction Requirements

Vendor Data

Material Requirements

Engineering Analyses

Specifications

Drawings

EWP deliverables roll-into the CWPCWP boundaries define the EWP

EngineeringDeliverables

PO 1PO 2PO 3

PO x

Page 35: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 36: AWP Primers - AWP University

Engineering Deliverables List – Digital EWPs

Deliverable Item Format Timing / Frequency

Routine publishing of advanced revision log

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 37: AWP Primers - AWP University

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 38: AWP Primers - AWP University

Advanced Revision Notices

Provide status information back to engineering on IWP Plans.

Immediately notify field supervision where IWP are released to build. Escalate notifications where work has been started.

Provide weekly report for WFP Team to update IWPs that are not yet released to build.

Documents& Drawings

WFP Team

Field Change Notices

Field Crews

1

2

3

4

Assemble into IWPs

Drawings Issued for Construction Release IWPs

to Build

Engineering Changes

Detect IWPs To Update

Report Status of

IWPs4

Issue Advanced Revision Notices / Holds once engineering determines a design / drawing change is underway.

1 23

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log

Page 39: AWP Primers - AWP University

Engineering Deliverables List – Advanced Revisions Log

Deliverable Item Format Timing / Frequency

Routine publishing of advanced revision log XLSOn demand when revisions / holds are assessed to impact construction

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs

P&IDs

Engineering Lists

Schedule w EWPs

3D Model Exports

Vendor Data

Digital Pipe Isometrics

Digital Structural Details

Documents Register

Digital EWPs

Advanced Revisions Log