AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

15
Air Traffic Management Panel Madrid 21-22 May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP RVSM Implementation in Europe Chris Bouman Deputy RVSM Programme Manager EUROCONTROL

description

AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP RVSM Implementation in Europe Chris Bouman Deputy RVSM Programme Manager EUROCONTROL. 24hr EUR Air Traffic. EUR RVSM overview (1). 6 additional flight levels between FL290 and FL410 1000ft VSM, as already

Transcript of AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Page 1: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION

WORKSHOP

RVSM Implementation in Europe

Chris BoumanDeputy RVSM Programme Manager

EUROCONTROL

Page 2: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

24hr EUR Air Traffic

Page 3: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

EUR RVSM overview (1)

6 additional flight levels between FL290 and FL410 1000ft VSM, as already <FL290

Main benefits (14:1 benefit/cost ratio): airspace capacity less fuel burn delay reduction

41 States, 9400 airframes, 2300 aircraft operators

Page 4: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

EUR RVSM overview (2)

Page 5: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

RVSM in operation since24 January 2002

Page 6: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Implementation elements

ATC System modificationsAirspace adaptationsAircraft Modifications and

ApprovalsATC & Flight Crew trainingSafety Case (incl. monitoring)Awareness Activities!!

Page 7: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Implementation Time ScalesICAO work started in 1960’sICAO Implementation

Principles agreed early 1990’sRVSM implemented in NAT in

1997Completion of EUR RVSM initial

feasibility work: June’97Master Plan approved April’99Implementation January’02

Page 8: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Implementation Issues

Endorsement implementation date Programme Structure (41 States,

2300 operators, EUROCONTROL, ICAO, JAA, IFATCA, IFALPA, etc)

Time scales a/c approvals & ATC system upgrades

Simulations, LoA’s, ATC training Set up Monitoring Infrastructure Legal enablers (ICAO, State

legislation)

Page 9: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Implementation 24 Jan’02Smooth introductionSome flight planning aspectsNo RVSM specific TCAS or Wake

Vortex issuesPerformance of some aircraft types

in questionGradually all operators taking

advantageFull benefits expected over

summer

Page 10: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Benefits of RVSMBenefits of RVSM

6 extra flight levels available6 extra flight levels availableoptimisation of airspace optimisation of airspace

structurestructureimproved ATS route networkimproved ATS route networkmore than 20 new sectors createdmore than 20 new sectors created

ATC capacity increaseATC capacity increase

Page 11: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Example: MAASTRICHT UAC BRUSSELS SECTORS EVOLUTION OF CAPACITY

15

20

25

30

35

40

45

50

55

24/10/01 24/01/02 29/01/02 16/02/02 31/03/02 25/04/02

Date

Se

cto

r c

ap

ac

ity

: fl

igh

ts p

er

ho

ur EBMABHN

EBMABEH

EBMABWHEBMAWSLEBMAWSTEBMAOHI

EBMALNLEBMALNTEBMALXLEBMALUX

LAUTER

RVSMRVSM

BEH*BEH*

* Brussels East High sector

Page 12: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Flight Level Re-distribution

0

500

1000

1500

2000

2500

18-Jan

25-Jan

15-Feb

15-Mar

12-Apr

Page 13: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Fuel & Emission aspectsTaking advantage of operating

more often, more close to optimum levels

Studies: conservative estimate: average 80kg fuel saving per flight in RVSM

10,000 flight daily in EUR RVSM yearly saving 290,000 tons yearly 913,500 tons less CO2

yearly 4,350 tons less NOx

Page 14: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

Benefit assessment

Main 1st benefits expected over Summer’02

Co-operation with operators1st indications confirm

anticipated fuel benefitsCapacity benefits in co-

operation with Capacity Enhancement Function (CEF)

Page 15: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP

Air Traffic Management Panel Madrid 21-22 May 2002

AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION

WORKSHOP

Thank you !