Automated traffic control system
-
Upload
likithe -
Category
Technology
-
view
324 -
download
0
Transcript of Automated traffic control system
![Page 1: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/1.jpg)
AUTOMATED TRAFFIC CONTROL SYSTEMo Likitheo Sajivio Assamo Washif
![Page 2: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/2.jpg)
Contents• Introduction
– Problem Statement
– Objectives
• Feasibility Study
– Tools and Technologies
– Risk Identification
• Planning
– Project Activity Sequencing
– Time and Cost Analysis
![Page 3: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/3.jpg)
Contents (continued)• Organizing
– Requirement Gathering
– Project Team Handling
– Task Delivery
• What’s Next
– Implementation
– Final Deliverable
• Conclusion
![Page 4: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/4.jpg)
IntroductionProblem Statement
• Difficult to reduce traffic in 4-point road crossings
• Inefficiency in signal switching
• The lanes with more traffic tolerate more waiting time
• The lanes with less traffic often gets the green signal
• Hence, petrol is heavily consumed within waiting cars
• Conflict arises for pedestrians while crossing lanes
![Page 5: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/5.jpg)
Introduction (continued)Aim
• Implement methods to manage traffic in appropriate lanes
Objectives
• Reduce waiting time for lanes with more traffic
• Maintain proper signal switching with balanced timing
• Prevent traffic collisions
• Allocate timings exclusively for pedestrians to cross lanes
![Page 6: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/6.jpg)
Feasibility StudyTools
• ROSE/RSA/WebSphere Modeler
• Eclipse/RAD/Lotus Forms Designer/Portlet Factory
• WebSphere Portal/WAS/WAS CE/WPS
• DB2 Express – ‘C’ or DB2 UDB
• Tivoli CDP/TSM/Tivoli Directory Server
• Center OS (Red Hat Linux 6.5)
![Page 7: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/7.jpg)
Feasibility Study (continued)Users
• UML
• J2EE
• XML
• E-Forms
• AJAX
• Web 2.0
• Web-services
• SOA
Technologies• City Traffic Management Authority
• Traffic Police
• Car Owners
• Pedestrians
![Page 8: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/8.jpg)
Feasibility Study (continued)Risk Identification
• Some drivers and pedestrians don’t hesitate to violate traffic laws
• Traffic signal posts might loose functionality due to power failure
• Traffic signals posts might loose functionality as it encounters heavy rains
• Traffic control data could be either mishandled or stolen
![Page 9: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/9.jpg)
PlanningProject Activity Sequencing
• Design/Assemble traffic signal posts
• Install Database Server
• Install Linux system
• Install Tivoli Directory Server
• Connect traffic signal posts to the servers
• Configure the servers via Linux
• Configure traffic signal posts via Linux
![Page 10: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/10.jpg)
Planning (continued)Time Analysis
![Page 11: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/11.jpg)
Planning (continued)Cost Analysis
Tool Price ($)WebSphere Modeler Version 6.2.0 120.96Lotus Form Designer 120.96WebSphere Portal (D596YLL) 4,200.00DB2 - C Express 0.00Tivoli Directory Server 133.00Center OS (Red Hat Linux) 11.40Total Price ($) 4,586.32
![Page 12: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/12.jpg)
OrganizingFunctional Requirements• Normal signal control based on historical date and time of the day
• Peak time traffic control based on sensors/satellite information to get data on flow of traffic and dynamically change timings
• VIP/Emergency traffic clearance for vehicles such as ambulance/fire brigade
• Co-ordination with neighbouring traffic control points
• Provision of traffic diversion
• Switching to guided manual control
• Alert system for signal violation
• Timer Control
![Page 13: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/13.jpg)
Organizing (continued)Non-Functional Requirements• Secure access of confidential data (user’s details) with SSL
• 24x7 availability
• Better component design to get better performance at peak time
• Flexible service based architecture for future extension
• VIP Route Mapping
• Advance Traffic Alerts
• Monitoring lane disciplines
• Data analysis of different size and category of vehicles
Optional Requirements
![Page 14: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/14.jpg)
Organizing (continued)Project Team
• The project team consists of five members, while one of them is elected to be the Project Manager.
Project Manager
Hardware Manager
Software Manager Risk Manager Quality Manager
![Page 15: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/15.jpg)
Organizing (continued)Task Delivery
Hardware Manager
• Design/Assemble traffic signal posts
• Install Tivoli Directory Server
• Connect traffic signal posts to the servers
Software Manager
• Install Database Server and Linux System
• Configure the servers via Linux
• Configure traffic signal posts via Linux
Quality Manager
• Review Project Scope and Objectives
• Review Project Progress
• Identify and report customer satisfaction
• Maintain a Quality Manual for the project
Risk Manager
• Identify and analyze risks
• Assess and execute alternatives to respond risks
• Monitor outcomes to project quality
• Report all events in a Risk Logbook
![Page 16: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/16.jpg)
What’s NextImplementation• Tools and techniques must be used to control the project flow
• All project events must be documented in status reports
• Project must be frequently reviewed to realize if it maintains schedule and cost
• Project scope and schedule should be changed to maintain the triple constraint
• Daily traffic movements
• Analytical data
• Average time taken to move from one traffic point to other
• Increase/Decrease tend in traffic flows
Information to be gathered
![Page 17: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/17.jpg)
What’s Next (continued)
• The items that must include with the final outcome of the project are,
– Online/Offline help to system users
– Application Archive (.war/.ear) with source code
– Database backup and DDL script
– Complete system source code
Final Deliverable
![Page 18: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/18.jpg)
Conclusion• The use of 5 phase project management by Weiss and Wysocki is certain to contribute towards
project success.
• Since steps to plan, manage and review the project are included in this methodology, the triple constraint shall be managed.
• As quality and risk management are ensured by the project team, the objectives and benefits are likely to be achieved.
• Hence, we can conclude that the 5 phase project management is a structured method to sustain all project activities and resources.
![Page 19: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/19.jpg)
Additional Information• Gemini Systems LLC, 2013, WebSphere Portal Server, Available at: http://
estore.gemini-systems.com/ibm/software-license/lotus-collaboration-software/websphere-portal/websphere-portal-server/D59FLLL.html
• DB2 Express-C Team Blog, 2010, DB2 Express FTL gets more features, lower price, Available at: http://www.db2teamblog.com/2010/10/db2-express-ftl-gets-more-features.html
• Gemini Systems LLC, 2013, Tivoli Directory Server, Available at: http://estore.gemini-systems.com/ibm/software-license/tivoli-management-software/ibm-tivoli-directory-server/tivoli-directory-server/D56L1LL-J.html
• Amazon, 2016, The Complete Linux Operating System 6.5 (Red Hat Linux 6.1 with enhancements), Available at: http://www.amazon.com/Complete-Linux-Operating-System-enhacements/dp/B00001SHO3
![Page 20: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/20.jpg)
Additional Information (continued)• Gemini Systems LLC, 2013, Forms Designer, Available at:
http://estore.gemini-systems.com/ibm/software-license/lotus-collaboration-software/forms/forms-designer/
• Gemini Systems LLC, 2013, WebSphere Business Modeler Advanced, Available at: http://estore.gemini-systems.com/ibm/software-license/websphere-server-software/websphere-business-integration/websphere-business-modeler-advanced/
![Page 21: Automated traffic control system](https://reader035.fdocuments.in/reader035/viewer/2022062903/58ed37311a28abf0168b466b/html5/thumbnails/21.jpg)
ANY QUESTIONS?