Automated design of floating platforms - norwep.com · Semi & FPSO Laminaria 1999 ... Global &...
Transcript of Automated design of floating platforms - norwep.com · Semi & FPSO Laminaria 1999 ... Global &...
© 2015 Aker Solutions Preferred partner
Preferred partner
Automated design of floating platformsINTSOK Conference - Houston, 2016-02-24
Rolf Eide | Senior Director – Floating Solutions
© 2015 Aker Solutions Preferred partner
Table of contents
■ Short presentation of Aker Solutions and our history
■ #thejourney
■ KBeDesign
■ Standardization
■ Summary - QA
© 2015 Aker Solutions Preferred partner
This is Aker Solutions
■ Aker Solutions is a global provider ofproducts, systems and services to the oiland gas industry
■ Built on more than 170 years of industrialtradition
■ Employs approximately 16,000 people inabout 20 countries
Employees: 16,000
Revenue: 33.0 bn
EBITDA: 2.7 bn
EBIT: 2.0 bn
Market Cap: 11.3 bn
25 February 2016Slide 3
Revenues and profits are in NOK and are based onthe annual results for 2014.
Market capitalization as of July 15, 2015.
Subsea
Subsea Umbilical
Field Design
EngineeringMaintenance,Modifications
and Operations
© 2015 Aker Solutions Preferred partner25 February, 2016Slide 4
Engineering - Floating Solutions
Core Team: ~ 90
Locations:- Oslo (45)- Kristiansand (25)- Houston (20)
- Perth (sales)- KL (sales)- London (sales)- St. Johns (sales)
World class core team
■ Engineering and Project management■ Naval architecture■ Riser analyses and design■ Marine systems■ Marine operations■ Arctic technology■ Drilling
■ Constructability
© 2015 Aker Solutions Preferred partner
1972 19911989 19961995 1997
2000 20052001 20082007 2010 2012
37 × H3Semis
Veslefrikk Snorre TLP Norne FPSOGenesisSpar
Heidrun TLP
Asgard B Snorre B Blind Faith 2 x Aker H6e Gjøa IchthysSemi & FPSO
Laminaria
1999
4 decades of experience50+ floating facilities
BrowseTLP
2011
25 February 2016Slide 5
Floating Solutions – Experience / References
White RoseFPSO
AastaHansteen
SPAR
Hadrian NorthSemi Concept
BuckskinSemi Concept
2012 20132012
Castberg
Semi/FPSO
2014 2016
Ongoing NWA
© 2015 Aker Solutions Preferred partner
#thejourney in Engineering- a three pillar program supported by six improvement areas
February 25, 2016Slide 6
Reduce E&P servicescost by 30% within 2017
Support ourcustomers in
reducingdevelopment cost,
forging a sustainablefuture for our industry
© 2015 Aker Solutions Preferred partner25 February 2016Slide 7
#thejourney in Engineering- a three pillar program supported by six improvement areas
Global DeliveryModel
EngineeringEfficiency
CustomerPerspective
GlobalWorkshare
Leadership &Competence
WorkProcesses
IM & Tools
Innovation
Technology &Solutions
© 2015 Aker Solutions Preferred partner25 February 2016Slide 8
#thejourney in Engineering- a three pillar program supported by six improvement areas
Global DeliveryModel
EngineeringEfficiency
CustomerPerspective
GlobalWorkshare
Leadership &Competence
WorkProcesses
IM & Tools
Innovation
Technology &Solutions
© 2015 Aker Solutions Preferred partner
Blind Faith - Deep Draft Semi (GoM)
Slide 9 Slide 9
Photo: Aker Solutions & Chevron
© 2015 Aker Solutions Preferred partner
The KBeDesignTM - Our Approach to Design Optimization
25-Feb-16Slide 10
Reuse, arrange and adjust tomeet field requirements
Define rule based,Adaptive & re-usableBuilding Blocks
Generate analyses models,drawings & estimates
Based on captureddesign knowledge
1. Capture the design process2. Break the best practice products & designs
into knowledge based building blocks3. Re-use, adjust and rapidly optimize (today
mainly: size & weight)
Overall Width
Column Height
Deckbox Height
Poontoon Height
Column Width
© 2015 Aker Solutions Preferred partner
Small to XXL
Blind Faith
■ Pontoon section
■ Hull Weight: 9,000 tonnes
February 25, 2016Slide 11
Ichthys
■ Pontoon section
■ Hull Weight: 36,000 tonnes
© 2015 Aker Solutions Preferred partner
High Quality Design – the Standard is Based on ProvenDesign and Experience Transfer
■ Global & local arrangement based on as-built designs and lessons learnt
■ Classification societies rules and regulations
■ Detail standards and procedures
■ Adapt to client lessons learnt
10 April, 2013Slide 12
© 2015 Aker Solutions Preferred partner
KB
eD
es
ign™
Ou
tpu
tK
Be
De
sig
n™
Pro
ce
ss
25 February 2016Slide 1325 February 2016 Slide 13
SizingConfigure & Arrange
Tailor-making based on reuseStandardized Building Blocks
Global/Local Analyses Multidiscipline 3D CAD
MultidisciplinePiping & Outfitting Arr.
Gen Arr. Drawings
Overall Width
Column Height
Deckbox Height
Poontoon Height
Column Width
Use of KBeDesign™ for Design of Aker Solutions SEMI Structures
Weights, MTO
Reports
© 2015 Aker Solutions Preferred partner
KBeDesignTM - Automated Design & Detailing Based onReuse of Standardized, Rule Based Flexible Building Blocks
25 February 2016Slide 14
Hull shell with stiffeners andcast items
Frames including brackets
Hull Systems Pipingarrangement & routing
Stairflights
Hull Systems Equipment Layout
Bulkheads and decks inclgirders, stringers and brackets
© 2015 Aker Solutions Preferred partner
Quickly Establishes & Updates Design - With Flexibility
■ Easily adapt to a wide range of client functions & requirementsfrom various payloads, various environments, authorities etc.
10 April, 2013Slide 15
© 2015 Aker Solutions Preferred partner25-Feb-16Slide 16
Aker Solutions Offers Standardized Solutions Which AccommodatesClient Tailoring
© 2015 Aker Solutions Preferred partner25 February 2016Slide 17
KBeDesign™ - Efficient Reuse of Best Practice
KBeDesign generatedTopside main structures +major outfitting structures
© 2015 Aker Solutions Preferred partnerSlide 18
Topside EPOutfitting Structures
Onshore EPServices, specialist support and development
TopsideFEED
TopsideModule Study
Topsie Study
SEMI study
Topside Study
Topside study
Topside Study
Standardized Best Practice Available Through the Use ofKBeDesign™ - Examples
Onshore EP
FloaterPostFEEDTopside EP
Topside /floater studyTopside Study Topsides Study/FEED/EP Joint design
Topside EP
Topside PreFEED
Topside Study
Topside Study Topside Study
Topside FEEDTopside FEED
Topside WHPFEED
Topside CPPFEED
Topside FEED
© 2015 Aker Solutions Preferred partner
Summary
Benchmarked Results•Improve Capability to deliver
• Rapid creation of several concepts with high eng.quality
• Handle major changes rapidly
•Improve Quality on deliverables• Best practice and standards shared across and
made easily available for projects
•Productivity – less time and man-hours• Modeling and detailing tasks are automated• Reduced need for engineers to create models &
deliverables
2/25/2016
Floater AsiaFloater North Sea
Floater North Sea
Floater Gulf of Mexico
© 2015 Aker Solutions Preferred partner25-Feb-16Slide 20
KBeDesign™ Used on Gjøa SEMI Hull
Thank you!Rolf Eide
[email protected]+1 832 860 4016
www.akersolutions.com
© 2015 Aker Solutions Preferred partner
Copyright and disclaimer
CopyrightCopyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions andthird party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form norused in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shallbe altered or removed from any reproduction.
DisclaimerThis Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks anduncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations,estimates and projections about global economic conditions, the economic conditions of the regions and industries that are majormarkets for Aker Solutions ASA and Aker Solutions ASA’s (including subsidiaries and affiliates) lines of business. These expectations,estimates and projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similarexpressions. Important factors that could cause actual results to differ materially from those expectations include, among others,economic and market conditions in the geographic areas and industries that are or will be major markets for Aker Solutions’ businesses,oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currencyexchange rates and such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believesthat its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations willbe achieved or that the actual results will be as set out in the Presentation. Aker Solutions ASA is making no representation or warranty,expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of itsdirectors, officers or employees will have any liability to you or any other persons resulting from your use.
Aker Solutions consists of many legally independent entities, constituting their own separate identities. Aker Solutions is used as thecommon brand or trade mark for most of these entities. In this presentation we may sometimes use “Aker Solutions”, “we” or “us” whenwe refer to Aker Solutions companies in general or where no useful purpose is served by identifying any particular Aker Solutionscompany.
Slide 21 February 25, 2016