VDC @ NCC BIM Digital pipeline Patrik Lindvall NCC 2012-11-12 NCC Construction Sverige AB 1

Transcript of Autodesk vault collaboration_information_datahantering_2

Page 1: Autodesk vault collaboration_information_datahantering_2

VDC @ NCCBIM Digital pipeline

Patrik LindvallNCC

2012-11-12 NCC Construction Sverige AB 1

Page 2: Autodesk vault collaboration_information_datahantering_2

NCC Construction Sverige AB 22012-11-12

BIM Digital pipeline

Page 3: Autodesk vault collaboration_information_datahantering_2

Background

2012-11-12 NCC Construction Sverige AB 3

What has happened in the last couple of years……

Construction Industry

• 2D -> 3D

• 3D -> BIM

• 3D -> pdf

Virtual Design and Construction

• The largest inovation in the industry since the lifting crane

IT

• Stationary -> Mobil

• PC Centric-> Diversified

• Central data -> Distributed data

• New echosystems

Page 4: Autodesk vault collaboration_information_datahantering_2

This has given us….

2012-11-12 NCC Construction Sverige AB 4

Page 5: Autodesk vault collaboration_information_datahantering_2

Requirements

2012-11-12 NCC Construction Sverige AB 5

New IT-plattform for NCC’s use of VDC

• Support coordination and production process

• Must integrate current systems

• Version control and traceability

• Available anywhere anytime

• Support ”all” new plattforms

• ”Future proof”

Page 6: Autodesk vault collaboration_information_datahantering_2

Not the solution!!

2012-11-12 NCC Construction Sverige AB 6

Traditional development

• Study / product evaluation

• Specification and development project

• Run Pilot

• Roll out

• 2-3 years and lots of million SEK later…….

Page 7: Autodesk vault collaboration_information_datahantering_2

Today(we need to be faster to market)

2012-11-12 NCC Construction Sverige AB 7

So we did:

• Study, product and external services evaluation

• Identify key actors and trends

• Use external services and existing solutions

• Use open solutions

• Develop integrations

9 months later and with a small investment

During the last 9 months the following has happened:

BIM 360 documents, Buzzsaw client for IOS/AndroidWindows-8, RT and Slate PC

Page 8: Autodesk vault collaboration_information_datahantering_2

2012-11-12 NCC Construction Sverige AB 8

Version 1.0

Page 9: Autodesk vault collaboration_information_datahantering_2

What did NCC achieve:

2012-11-12 NCC Construction Sverige AB 9

Less time during model coordination

• Automatic checks (QA/QC)

• Rule set determining who will:

• See what information

• On which plattform

Automatic generation of:

• pdf, dwf, dwg, ifc and nwd

Allow each system to do what it is best at, we just ensure that the latest information is distributed as efficient as possible

Page 10: Autodesk vault collaboration_information_datahantering_2

Sample Usecase 1

2012-11-12 NCC Construction Sverige AB 10

Information distribution (Data. 2D, 3D)

• Drawing´s are updated in our internal system PDS

• This is then available for:

• NCC purchasing organisation

• Supplier

• Subcontractor / Customer

• PDS

• Autodesk Buzzsaw

• NCC Site office

• PDS (offline use)

• Vault/Buzzsaw for Windows klienter

• Buzzsaw for IOS / Android

Page 11: Autodesk vault collaboration_information_datahantering_2

Distribution

2012-11-12 NCC Construction Sverige AB 11

Page 12: Autodesk vault collaboration_information_datahantering_2

Sample Usecase 2

2012-11-12 NCC Construction Sverige AB 12

New Revit model from NCC Engineering

Server based sync Vault – Buzzsaw

Automation

• Check-in of a Revit model

• Create 3D DWF

• Create ifc

• Create pdf/dwg/dwf of all approved views/sheets

Page 13: Autodesk vault collaboration_information_datahantering_2

Automation

2012-11-12 NCC Construction Sverige AB 13

Page 14: Autodesk vault collaboration_information_datahantering_2

Patrik Lindvall