Autism Team Progress Report 2012 Central Consolidated School District.

15
Autism Team Progress Report 2012 Central Consolidated School District

Transcript of Autism Team Progress Report 2012 Central Consolidated School District.

Page 1: Autism Team Progress Report 2012 Central Consolidated School District.

Autism Team Progress Report 2012

Central Consolidated School District

Page 2: Autism Team Progress Report 2012 Central Consolidated School District.

Initial Thoughts . . .

How Hard Can This Be?

Page 3: Autism Team Progress Report 2012 Central Consolidated School District.

• 1. No Teacher is an Island

Conclusions . . .

Page 4: Autism Team Progress Report 2012 Central Consolidated School District.

2. It takes a Team to Educate a Child with Autism

Conclusions . . .

Page 5: Autism Team Progress Report 2012 Central Consolidated School District.

• Clyde Howell (Team Leader & Psych)• Phyllis Pine (School Psychologist)• Mary Ann Sherman (Program Coach)• Tina Quintos (Teacher)• Floating OT and Floating SLP• Eric James (Program Coach)• Dr. Andrew Egel

District Team Members

Page 6: Autism Team Progress Report 2012 Central Consolidated School District.

• Covers 2200 Square Miles• 1057 Students with IEPs (Not Gifted)• 6500 Total Students• 24 Students with Autism• 17 School Sites + 9 NN Headstarts• 4 Psychs, 12 SLPs, 4 OTs, 1 PT• 95% Native American

District Demographics

Page 7: Autism Team Progress Report 2012 Central Consolidated School District.

• Program Year 1 for the 2nd time.• Due to numerous snow days last year and

changes in administration, CCSD has been able to address program implementation requirements for SY 11-12

Program Year . . .

Page 8: Autism Team Progress Report 2012 Central Consolidated School District.

• Beginning of Program = 18 (1 in 361)• Began checking local mercury levels• Pulled records for vaccines used• Looked at # of Math Geniuses• Looked at homes located near power lines• Listened to George Norros AM Coast to

Coast radio for subliminal clues.• As of Today = 24 (1 in 271)

Students with Autism

Page 9: Autism Team Progress Report 2012 Central Consolidated School District.

• Autism Assessment Team

• Autism Technical Assistance Team

• Parent and Staff Training

• Student Support

Areas of Emphasis for Year 1

Page 10: Autism Team Progress Report 2012 Central Consolidated School District.

• Key team members received training in the ADOS, the “gold standard” in Autism evaluation tools. CARS and GARS CASL

• IEP teams were trained on how to access the Evaluation Team for assistance and evaluations.

• Result: Increased number of students identified with Autism AND quality information for intervention planning.

Autism Evaluation Team

Page 11: Autism Team Progress Report 2012 Central Consolidated School District.

• Electronic referral system – TIENet based.• Team onsite visits.• Research-based intervention responses

based on actual observation and data collection.

• Result: High quality interventions and some students be referred for testing due to inaccurate diagnosis from the past.

Technical Assistance Team

Page 12: Autism Team Progress Report 2012 Central Consolidated School District.

• Lawsuit over identification and services

• Team qualifications accepted by attorneys and results of testing and interventions administered were validated through legal challenge and subsequent IEP.

Team Validation

Page 13: Autism Team Progress Report 2012 Central Consolidated School District.

• Additional training• Resource and Referral website• Professional library• IPADs for intervention teams to

electronically collect data and respond to intervention requests

• Supplies and Materials

What about the $5K??

Page 14: Autism Team Progress Report 2012 Central Consolidated School District.

• Itinerant Autism Teacher (Ability to spend multiple days in the classrooms)

• Pursuit of ICP Model Autism Program • Expansion of website and tools• Expanded support on the collateral areas

of autism, specifically cognitive deficit areas and extreme behavior.

• PARENTAL SUPPORT for the 24/7 Home

Future Directions

Page 15: Autism Team Progress Report 2012 Central Consolidated School District.

THANK YOU!Your Logo