Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator...

58
Austin Association of Facility & Maintenance Engineers Presented by:

Transcript of Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator...

Page 1: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Austin Association of Facility & Maintenance Engineers& Maintenance Engineers

Presented by:

Page 2: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

• Largest Alerton Dealer on the planet

• Largest, Independent Controls Contractor in the USA

• Staff has worked on CSI INET, TAC Vista, Trane, Johnson Controls, Honeywell, Distech, Solidyne, Siemens…

Page 3: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Focus

• Basic DDC principals

• How systems are integrated in today’s marketsHow systems are integrated in today’s markets

• Things to look out for when integrating systems (old to new)

• Questions to ask during budgeting and bid processes

Page 4: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Goals for Building Controls

• Save Energy, Save Money

•Maintain Occupant Comfort

• Temperature

• Relative Humidity• Relative Humidity

• Indoor Air Quality

• Lighting

Page 5: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Goals for Building Controls

• Control

• Pumps

• Chillers

• Boilers

•Monitor

• Temperature

• Relative Humidity

• Indoor Air Quality• Boilers

• Fans

• Cooling

• Heating

• Lighting

• Dampers

• Indoor Air Quality

• Electrical Demand

• Pressures

• Flow Rates

Page 6: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Building Controls

• Time clocks and Thermostats

• Low Initial Cost

• Maintenance

• Power Losses

• Direct Digital Control (DDC)

• High First Cost

• Maintenance

• Power Losses• Power Losses

• Adjustments

• Energy Savings

• Power Losses

• Adjustments

• Energy Savings

Page 7: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Direct Digital Control

• Improved effectiveness

• Improved operational efficiency

• Increased energy efficiencyIncreased energy efficiency

Page 8: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Components of a DDC System

• Sensors

• Temperature

• Relative Humidity

• CO2

• Actuators

• Valves

• Dampers

• Relays – To control…CO2

• Electrical Demand

• Lighting Level

• Smoke/Fire/Freeze

• Switches (Contacts)

• Relays – To control…

• Fans

• Pumps

• Contactors

• Chillers

• Boilers

• Lighting

Page 9: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Components of a DDC System

• Controllers

• Collect and Process Data

• Data Point Types

• Binary Inputs• Binary Inputs

• Binary Outputs

• Analog Inputs

• Analog Outputs

• Execute Application Requirements

Page 10: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Components of a DDC System

• Controllers

• Execute sequence of operation

• What do you want to happen under certain, specific conditions?certain, specific conditions?

• Is it written down?

• Applications

• One Dedicated for Each Piece of HVAC Equipment

• The Right Controller For the Right Application

Page 11: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Cost Efficiencies

• Scheduling

• Do you have the correct time?

• Schedule for what you need

• Common Area, Cafeteria, Offices, Meeting Rooms,…• Common Area, Cafeteria, Offices, Meeting Rooms,…

• Room air conditioning, demand ventilation (indoor air quality),…

•When do you need it?

• Optimized Scheduling

• Compartmentalize Schedules

Page 12: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Sequence of Operation

• Occupied

• Optimized Start – Start early enough to reach target cooling setpoint by target occupancy time

• On a Start…• On a Start…

• VAV Terminal Units are already open

• Start fan

• Verify status

• Ramp up VFD to maintain duct static pressure to setpoint

• Check for Economizer Operation

• Call for cooling to maintain supply air temperature to setpoint

• Verify Building Static Pressure

Page 13: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Sequence of Operation

• Unoccupied

• Compare unoccupied setpoint to actual temperature

• On a call for cooling…

• Same as Occupied except for outside air damper – remains closed• Same as Occupied except for outside air damper – remains closed

Page 14: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Cost Efficiencies

• System resets • Reset Boiler and Chiller temperatures

• Reset AHU Supply Air Temperatures

• Reset VAV-AHU supply Static Pressure

• Lockout Equipment• Don’t run Heat in High Outside Air Conditions

• Don’t run Cooling in Low Outside Air Conditions

• Day Light Harvesting• Turn on the lighting only where you need it

Page 15: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Cost Efficiencies

• Room Setpoints

• Heating

• Cooling

• Operating Band

• Room Setpoints• How much is the adjustment range?

• Are there seasonal adjustments? Who sets them?

• Training – This is the occupant’s • Operating Band

• Dead-band

(throttling range)

• Setpoint Adjustment

• Training – This is the occupant’s interface to the system.

• Would you rather they call you or have them make the changes?

• What is the cost impact of a 1 degree change in the Setpoint?

6%

Page 16: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Cost Efficiencies

• Economizers

• Economizer Packages

• Bring in outside air when conditions are “right”

• Do they work properly?• Do they work properly?

• Impact of Relative Humidity on Comfort

• Is everything really turned off?

Page 17: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Cost Efficiencies

• Preventive Maintenance vs. Corrective Maintenance

• Initial Cost

• Longer Term Cost

• Control Valves• Control Valves

• Damper Actuators

• CO2 and Relative Humidity

• Temperature

Page 18: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

•References:

•O&M Best Practices Guide, Release 3.0

•www.ddc-online.org•www.ddc-online.org

Page 19: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Integrating Automation Systems

Page 20: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Definition

• Integration – bringing together separate systems or products into a single and seamless graphical user interface (GUI) which will offer full control and monitoring between systems.

Page 21: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Value Propositions

• Investment Protection

• Extend System Life Cycle

• Limited Tenant ImpactsLimited Tenant Impacts

• Single Seat Operation & Control

• Improved Operation & Performance

• Vendor Independence

• Save Money

Page 22: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Types of Integration

• System or Subsystem Level

• Integration of systems that would/could be standalone. (ie VFD, meters, chillers, etc.)

• Platform Level

• Integration of an entire BAS or Facilities Mgt System into a new GUI.

Page 23: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Platform Integration

• Integration can take place via a number of ways.

• Some integrations are dictated by system, version, system

architecture or available integration means.

• Common Integration Methods -

• BACnet, LON, OPC or Gateway (open or proprietary)

�Building Automation

�Fire & Life Safety

�Lighting

�Access Control or Video

• BACnet, LON, OPC or Gateway (open or proprietary)

• Typical integrated systems -

Page 24: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Considerations

• What manufacturer, model and vintage of the system we integrating?

• Many systems integrate differently.

• What is the network architecture look now?

• Get copy of network riser or sketch it out.• Get copy of network riser or sketch it out.

• Obtain “ALL POINTS” list where capable

• Understanding systems below / equipment counts

• Have we or someone else done this before?

• Where? Issues? Trouble? Unforeseen?

• Do we have people who know the system working for us?

• When in doubt….take pictures!

Page 25: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Platform Integration ExamplePlatform Integration ExampleSiemens Apogee

Page 26: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Terminology• Front End(s) – Insight or Apogee

• Communications Networks –

• BLN – Building Level Network (P1)

• FLN – Floor Level Network (P2)

• Modular Building Controller (MBC)

• Ethernet level device

• Global controller ( 3 FLN / 32 devices per FLN)

• Local I/O

• Modular Equipment Controller (MEC)

• Ethernet level device

• Global controller ( 3 FLN / 32 devices per FLN)

MBCMEC

• Global controller ( 3 FLN / 32 devices per FLN)

• Local I/O (8 DI, 8 AI, 8 DO, 8 AO)

• FLN-3 Controller Board

• Ethernet level device

• Global controller ( 3 FLN / 32 devices per FLN)

• Terminal Equipment Controllers (TEC)

• 32 various application specific devices

• Standalone Control Unit (SCU)

• Local I/O

• Up to 3 subLAN trunks

• Obsolete controller TEC

FLN-3

Page 27: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Current Integration Methods

• Apogee OWS via BACnet over IP

• Tridium JACE via Siemens Driver

• Alerton Foreign Protocol Converter for Siemens (BCM-FPCS)

Page 28: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Apogee OWS via BACnet IP

Page 29: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Alerton System

Integrated System Architecture

Siemens System Data Flow

BACnet Network

Communication

Installation of BACnet

Server/Client Software

Required.

Page 30: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Benefits vs Draw Backs

• Benefits –

• Bi-Directional Control & Monitoring

• Done at the system level

• Network speed communication

• Draw Backs –

• Customer must purchase driver from Siemens

• Apogee OWS must always be online• Network speed communication

• Dual Sourcing for future projects

• No field installations or impacts

• No system downtime

online

Page 31: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Tridium Jace

Apogee

Server

Ethernet / P1 Trunk

Alerton System

FLN Trunk(s)

MBC

Global

TEC(s)

Tridium Jace

RS-232 Output to –

• Standalone

• Tridium Server

• Open Frontend

Page 32: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Benefits vs Draw Backs

• Benefits –• Can eliminate the Apogee OWS

• Auto-Discovery of Points

• No need to Siemens

• Tridium already a Climatec

• Draw Backs –• Needs one (1) JACE and RS232 and

driver for each MBC (worst case)

• Speed of RS232 connection is 19200kbps

• Tridium already a Climatec product

• Open conversion for integration of open OWS platforms

• Siemens Graphics can be modified to go into JACE

• Keep existing field hardware and wire

19200kbps

• May need additional network wiring

Page 33: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Alerton BCM-FPCS Gateway

• Foreign Protocol Converter Siemens

• 1 Siemens P1 LAN supports up to 32 TEC, MPU or DPU controllers

• 32-bit processor• 32-bit processor

• Memory: 32 MB RAM, 8 MB flash

• Hosts DDC logic and EMS functions

• TEC data is automatically translated to BACnet Objects

Page 34: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Alerton Architecture w/Siemens

Apogee

Server

Ethernet / P1 Trunk

Alerton or

Tridium Server

Ethernet Network

BCMFLN

MBC

Global

FLN

FLN

Terminal Equipment Controllers (TEC)

FLN

FLN

FLN

Terminal Equipment Controllers (TEC)

MS/TP

VLC

Page 35: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Benefits vs Draw Backs

• Benefits –

• Eliminate the Apogee OWS

• Auto-Discovery of Controllers & Points

• No need to Siemens

• Draw Backs –

• Must replicate all I/O directly connected to the MBC or MEC

• Does not support the programmable TEC’s• No need to Siemens

• Brings all systems and points in a BACnet environment

• Keep existing field hardware and wiring

programmable TEC’s

• We now “own” the system (good and bad)

Page 36: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Other considerations with Siemens upgrade

• If an MEC is in place, replace with—• BCM-PWS

• BCM-ETH

• 1 BCM-FPCS

• 8 DI, 8 AI, 8 DO, 8 AO• 8 DI, 8 AI, 8 DO, 8 AO

• If an MBC is in place, replace with—• BCM-PWS

• BCM-ETH

• Up to 3 BCM-FPCS modules

• VLX and EXP modules or

• VLCs as necessary for I/O on MBC

Page 37: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Platform Integration ExamplePlatform Integration ExampleJohnson Controls Metasys (M Series)

Page 38: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Terminology

• Metasys M-Series versus Extended Architecture

• Front End(s) – PMI or M3/M5 Workstations

• Communications Networks –• N1 – Ethernet Level

• N2 – subLAN Level

• Network Control Modules (NCM-200, 300, 350)

DX9100

VMA

MIG

NCM

UNTVAV

N30

• Network Control Modules (NCM-200, 300, 350)• Global Controller – N1 level

• (1) N2 subLAN bus w/100 devices

• N30 has 32 device subLAN and BACnet device

• N2 Controllers –• DX9100 (can have high I/O capacity)

• MIG - Integrator

• AS-UNT, AS-VAV, AS-VMA and AS-AHU

• XTM Modules & TEC Series Stats

• Pay special attention for -• Digital Control Modules/DCM (2 or 5 slot)

• S2 Migrations

• Facilitator

DCM

2-slot

Page 39: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Typical Metasys Configuration

Operator

Workstation(s)

Operator

Workstation(s)

N1 Communications Bus

Network Control

Module (NCM)N2 Communications Bus Network Control

Module (NCM)N2 Communications Bus

Page 40: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Integrated Architecture #1

Tridium

Network

Server

Intranet/Internet/Ethernet

Web Based

Clients

Web Based

Clients

Tridium Jace N2 Communications BusTridium Jace N2 Communications Bus

Page 41: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Benefits v Drawbacks

Benefits

• Eliminate the existing JCI Operator Workstation

• Fully supportable by Climatec

Drawbacks

• Must replicate entire GUI including graphics and global programming• Fully supportable by Climatec

• Can replace NCM 1 for 1

• Can add/modify & delete any N2 devices or controllers

• Standard Tridium toolsets

• FX Explorer Line is compatible (FX60, etc.)

programming

• Not all Metasys is created the same –

• i.e. Facilitator Products

Page 42: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Integrated Architecture #2

Tridium Jace N2 Communications Bus

Page 43: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Benefits v Drawbacks

Benefits

• Eliminate the existing JCI Operator Workstation

• Fully integrated to Alerton

Drawbacks

• Must replicate entire GUI including graphics and global programming

• Fully integrated to Alerton BACtalk architecture

• All graphics can be standard Alerton templates

• Fully supportable by Climatec

programming

• Any controller adds to N2 will need to be done at Jace and then BACtalk levels

Page 44: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Integrated Architecture #3

JCI Operator

Workstation(s)

N1 Communications Bus

Network Control

Module (NCM)

N2 Communications Bus

S4 Group

N2 Router

Page 45: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Benefits v Drawbacks

Benefits

• Can keep existing OWS, graphics and global programming

• Good for aggregating just data

Drawbacks

• Some level of JCI support might be required for software support at JCI OWS

• Good for aggregating just data

• Can cross control from Alerton BACtalk

at JCI OWS

• Can not incorporate the DCM (5-slot or 2-slot) controllers

Page 46: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Connectivity List

Page 47: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

References

• DDC Online - http://www.ddc-online.org/

• Niagara Central - http://www.niagara-central.com

• Controlco/CSI Cubed - http://www.csicubed.com/

• Johnson Controls - http://cgproducts.johnsoncontrols.com• Johnson Controls - http://cgproducts.johnsoncontrols.com

• S4 Group - http://www.thes4group.com/

• Alerton Support Network – http://asn.alerton.com

• Control Solutions, Inc. – http://www.csimn.com/CSI_pages/BB100.html

• FieldServer - http://www.fieldserver.com/

• Engenuity (LON) - http://www.engenuity.com/

Page 48: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

Page 49: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• Provide bidders with

• Detailed scope

• Develop scope with bidders

• Proposal• Proposal

• Clearly defined scope

• Sample graphics

• Three references

• Contractor qualifications defined by contractor

Page 50: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• Submittal

• Drawing Package

• Wiring Details

• Bill of Materials

• Product Data Sheets• Product Data Sheets

• Sequence of operation

• Subcontractor List

Page 51: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• Navigation

• Navigation Tree

• User Name and Passwords for every user

• Easy access to schedules trends alarmsEasy access to schedules trends alarms

• Return to Home on every Page

Page 52: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• Graphics

• HTML5 – Access from any web browser and from any platform without the need

• Graphics

• Site Plan

• Floor Plan Graphics

• Outside Air Temperature and platform without the need for plug-ins or apps (Java, Adobe Flash,…)

• Capable of re-sizing to fit Window

• Outside Air Temperature and Relative Humidity

• Thermal gradient indicating temperature deviation from setpoint

• Links to Home Page

Page 53: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• BACnet

• Require PIC Statements

• Require BACnet BTL Certification or proof that products ar einsubmission phasesubmission phase

• Provide BACnet over IP at global controller and/or field controller

• Provide BACnet MS/TP at field controller

Page 54: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• Programming

• Provide all programming tools

• Provide documentation of the sequence of operation for every devicedevice

• Define operation during occupied and unoccupied times

• Define startup and shutdown

• Define scheduling and setpoints

• Define operation on the failure of a device or controller

• Define alarms and their annunciation requirements

• Define trending requirements

Page 55: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• Record Documents

• Updated Submittal

• Provide table of device addressing

• Provide floor plans• Provide floor plans

• Include Controller and device locations

• Include network routing

• Provide clearly defined warranty letter with agreed upon start and end dates

Page 56: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• Training

• Provide Site Specific Training

• Review Record documents

• Inspect accessible field

• Provide Software Training

• User definitions

• Navigation• Inspect accessible field controllers. Understand wiring and configurations

• Inspect field devices

• Review LAN routing

• Navigation

• Alarms, escalation, annunciations, messaging…

• Trends, sinlge, multi-point, archiving…

• Schedules, standard, holiday, events,…

Page 57: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Best Practices

• After Completion

• Warranty Phase

• Quarterly inspections

• Seasonal Sequence checks

• Yearly Maintenance Agreement

• Physically inspection of all devices and their operation

• Seasonal Sequence checks

• Review Operators Log • System Review

• Sensor verification

• Sequence Checks

• Software backups

• Discounted Service and Material Rates

Page 58: Austin Association of Facility & Maintenance Engineers · Typical Metasys Configuration Operator Workstation(s) Operator ... N2 Router. Benefits v Drawbacks ... submission phase

Final Comments and Questions