Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.
-
Upload
clinton-lambert -
Category
Documents
-
view
234 -
download
0
Transcript of Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.
![Page 1: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/1.jpg)
Aural Null Procedures Air Search
Module 9
of
CASARA ELT Training Plan
![Page 2: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/2.jpg)
Aural Null
Using aircraft communications radio
![Page 3: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/3.jpg)
Aural Null
Procedure A Procedure B
![Page 4: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/4.jpg)
AURAL NULL PROCEDURE
• In the event that your homer is not working, you must know Aural Null methods, “A”, and “B”.
• The only equipment you need is:• VHF receiver
• clock
• map
• pen
![Page 5: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/5.jpg)
Signal ReceptionBeware of a difference of signal
reception on the nose of the search aircraft, as compared to the signal off of the tail. Signal strength may vary enough between the two so as to make the results inaccurate. If this occurs it is recommended that readings be taken off of the nose. It will mean flying out of the signal, then making a 180 degree turn and coming back on the same track. When flying back towards the signal, take your readings once the signal is heard again.
Signal Detected
Signal Faded
![Page 6: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/6.jpg)
• Descend to minimum reception altitude.
• Disable squelch if possible and adjust radio volume to minimum reception.
When signal detected:
![Page 7: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/7.jpg)
• Fly a constant heading and draw a track made good on the map.
• Pinpoint your position on map.
• Once signal is lost, do a 180º turn and mark the spot (A) where the signal is acquired again.
• Maintain constant altitude and volume setting at all times.
When signal detected: AURAL NULL PROCEDURE “A”
Signal Detected
Mark Position Draw Track line
A
![Page 8: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/8.jpg)
When signal fades out
Mark PositionSignal Detected Calculate Halfway pt.
B
A
C
• Fly along the same track and pinpoint position of fade out (B), do another 180º.
• Calculate mid-point of track made good (C).
• From this mid-point plot at 90 degrees, a new desired track which extends on both sides of track made good.
• Return to mid point and fly either direction to make good, the new track.
![Page 9: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/9.jpg)
• When signal strength fades out, plot this point on your map (D)– Reverse course, signal will
build and then fade. Plot point at which signal fades (E)
Mark PositionSignal fade
B
A
C
D
E
Make 180 deg turn
When signal fades out
![Page 10: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/10.jpg)
ELT Location
• In theory, the ELT should be located at the mid point of the second track
• Terrain, obstructions and aircraft wreckage can skew the points and make finding the ELT more difficult.
B
A
C
D
E
Fly to Calculate Halfway pt.Calculated ELT Location
![Page 11: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/11.jpg)
Signal Detected
Mark PositionAnd heading
Draw Track line
A
B
Signal FadedMake 180 deg turnSignal DetectedMark Position
Calculate Halfway pt.
Mark Calculated Halfway pt.
CDraw Track line 90 deg to 1st track line
Fly to Calculated Halfway pt. turn left or right and fly until signal fade
Signal fadedMake 180 deg turnSignal DetectedMark PositionDFly track until signal fade
Signal fadedMake 180 deg turnSignal DetectedMark Position
E
Fly to Calculated Halfway pt.
Calculated ELT Location
![Page 12: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/12.jpg)
Are there any questions?
![Page 13: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/13.jpg)
AURAL NULL PROCEDURE “B”
• This method has both an advantage, and disadvantage:– ADVANTAGE: It is faster than Procedure “A”– DISADVANTAGE: It requires sufficient
cockpit space to adequately plot the information
• Requires:– VHF receiver - pen - dividers– map - ruler - 900 triangle
![Page 14: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/14.jpg)
AURAL NULL PROCEDURE “B
• Position of the aircraft is plotted as soon as the signal is heard
• Continue on same heading for a short distance
• Turn 900 either left or right, and proceed until the signal fades. Note this position
• Turn aircraft 1800 and again plot where the signal is heard, and where it fades
![Page 15: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/15.jpg)
• Approximate position of ELT is plotted by:– drawing chord lines
between each set of “signal heard” and “signal fades” positions
– Drawing perpendicular bisectors of each chord
AURAL NULL PROCEDURE “B
• Aircraft proceeds to the point where the perpendicular bisectors intersect.
• The ELT should be there
![Page 16: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/16.jpg)
Are there any questions?
![Page 17: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/17.jpg)
That’s All For Now
Have a pleasant flight!
![Page 18: Aural Null Procedures Air Search Module 9 of CASARA ELT Training Plan.](https://reader037.fdocuments.in/reader037/viewer/2022102818/56649cf05503460f949bebac/html5/thumbnails/18.jpg)
““THAT OTHERS MAY LIVE”THAT OTHERS MAY LIVE”
THANK YOUTHANK YOU
CA
SA
RA
CA
SA
RA