Los Angeles County One Gateway Plaza 213.922.2000 Tel metro. net Metropolitan Transportation Authority Los Angeles, CA 90012-2952
Metro
TO:
THROUGH:
FROM:
SUBJECT:
ISSUE
BOARD OF DIRECTORS _j '
PHILLIP WASHINGTON ~~ CHIEF EXECUTIVE OFFICER
August3,2015
BRYAN PENNINGTON, EXECUTIVE DIRECTOR, PROGRAM lhr~ MANAGEMENT AND ROBERT HOLLAND, INTERIM CHIEF OPERATING OFFICER
METRO GOLDLINE FOOTHILL EXTENSION PHASE 2A- EARLY TURNOVER OF OPERATIONS AND MAINTENANCE FACILITY
The Monrovia Operations and Maintenance Facility (Metro Division 24), constructed as part of the Gold Line Foothill Extension Phase 2A Light Rail Project, has been completed ahead of schedule and was certified by Metro staff for turnover to Metro as of Monday, July 27, 2015.
DISCUSSION
The Monrovia Operations and Maintenance Facility being constructed as part of the Foothill Phase 2A Light Rail Project will function as Metro's Division 24 to provide maintenance and storage for up to 84 rail vehicles. Construction of the facility has progressed ahead of its September 2015 completion schedule and was certified by the Foothill Construction Authority as ready for turnover to Metro as of July 27, 2015. Metro staff have verified that all requirements for turnover have been fulfilled in accordance with the Master Cooperative Agreement. A Conditional Acceptance Certification (attached) was signed by the Metro Chief Executive Officer on July 27, 2015, and Metro Operations began moving in personnel and equipment for beneficial occupancy on July 28, 2015.
Early occupancy of Division 24 will be beneficial to Metro including early establishment of maintenance capabilities and our ability to accept and commission new vehicles for operations on the Foothill Extension and the Expo Phase 2 Line.
Cost impacts to Metro will be related to transferring of labor forces to operate the facility, providing security and standard utility costs. Insurance and warranties provided by the Foothill Construction Authority's Contractor will remain in place in accordance with the Master Cooperative Agreement between Metro and the Foothill Construction Authority and
also in accordance with the contract between the Foothill Construction Authority and the Contractor.
NEXT STEPS
Metro will assume beneficial use and control of the facility and begin commissioning, maintaining and storing rail vehicles. Metro will continue to coordinate with the Construction Authority through substantial completion and turnover of the mainline project for Revenue Operations.
LOS ANGELES METRO CONDITIONAL ACCEPTANCE CERTIFICATE
FACILITY: - Division 24- Monrovia Operations and Maintenance Facility
This Certificate transfers control and responsibility of this Facility from the Foothill Construction Authority to los Angeles Metro
Turnover Check List
Item Description Department Date
1 !Complies with Metro Fire-Life-Safety Metro Corp. Safety
2 !Complies with ADA requirements Metro Civil Rights
3 I Complies with Master Cooperative Agreement Metro Eng & Canst
4 I Inspection of Facility - Punch List Developed Metro Eng & Canst
5 I Testing of Facility and Training Complete Metro Operations
6 I Insurance and Warranties- In accordance with MCA Risk Management
7 I Remaining Items to be Completed (See attached) Metro Operations/E&C
&_~ ~- -_L-2..1-1.5 72!?7~¥¥-'"" Bruce Shelburne Date Rick Meade Date
Executive Officer Engineering and Construction
Chief Executive Officer
DIVISION 24- MONROVIA YARD ACCEPTANCE JULY 2015
STATUS OF METRO WORK TO BE COMPLETED.
Metro Rail Operations Strategic Planning and Metro Construction confirm that the stated level of completeness is accurate. As indicated, the facility has also received a Certificate of Occupancy from the Monrovia Fire Department.
In addition to the Foothill Contractor's work, there are several construction activities that are Metro's responsibility. Status of this Metro work is as follows:
Furniture Installation This is substantially complete.
Yard Radio Installation Equipment is installed, but is awaiting some communications wiring. Metro is using the Foothill test channel on a temporary basis.
ITS (Telephone, Network, etc) Metro ITS is currently working to complete the phone system for limited service and network access by Friday 7/24115, PA system operates from the phone system and will not be fully available until phone system is complete.
Traction Power Substation The Metro-furnished substation is substantially complete for the yard and shop. This substation also feeds to adjacent main line which will be substantially complete in September 2015. The Emergency Trip Switch-Fire (ETS-F) is operational, but not placed in the fire-Life Safety-approved orange box at this time, telephones will be available upon completion of the telephone system (see IT above).
Blue Light Stations (BLS/ETS) are awaiting completion of the phone system and are pending resolution of software issues with the Metro substation. Temporary signage and instructions are being posted in the BLS pending completion of pending Metro work.
SCADA (Remote control and Monitoring from Rail Operations Control) This is a mainline function and will not be fully operational until Substantial Completion of the entire project. Remote control/monitoring of the yard substation will be affected, however, fire-watch is not required, because the substation fire system is connected to the main yard fire detection system. In addition, the yard train control system is operated from the yard tower, and does not require SCADA.
Training Contractual (Foothill Contractor) training is complete. However, Metro subcontractor Balfour Beatty will be performing Power Substation Training, and Metro is continuing to train additional operations and maintenance staff using internal Instruction resources. This will be on-going through pre-revenue operations.
Additional Notes:
# OCS disconnect switch training for Rail Fleet Service personnel must be completed 7/24/15 as scheduled. OCS sectionalization training is scheduled (delayed per Metro request). Any removal of power must be total within the yard, pending sectionalization training. Appropriate training sign-offs are
required to remove this Metro restriction. Wheel True equipment training for P3010, Robo-Jac to be scheduled.
* Subject to safety certification prior to ROD for public use. Occupancy of Facility is for Rail Activation to achieve ROD.
** Subject to resolution of flangeway gap on pedestrian crossing (punch list item).
~·Metro Interoffice Memo
Date July 22, 2015
To Rick Meade
M. Harris-Gifford .- . , . ~~ .·. ,' .. - .·.·.·•··.· (V'\, .:::..~J~ .. ·.· ..
Vendor Training- Expo and Foothill TPSS
From
Subject
Vendor-provided training of Metro Traction Power personnel was provided in the period March 2nd through March 20th for all 3 shifts.
Copies of the attendance sheets are available as part of the overall safety certification flies for the substations.
Board Members:
Doug Tessltor Chair Appointee, City of Pasadena
Sam Pedroza Vice Chair Mayor Pro Tern, City of Claremont Appointee, SGVCOG
Marisol Rodriguez Alternate Appointee, City of Los Angeles
PaulS. Leon Member Mayor, City of Ontario Appointee. City of South Pasadena
John Fasana Member Council Member, City of Duarte Appointee, LACMTA
Bill Bogaard Member, Non-Voting Mayor, City of Pasadena Appointee, City of Pasadena
Carrie Bowen Member, Non- Voting District 7 Director, Caitrans Gubernatorial Appointee
Daniel M. Evans Member, Non-Voting Appointee, City of South Pasadena
Alan D. Wapner Member, Non- Voting Mayor Pro Tern, City of Ontario Appointee, SANBAG
Executive Officer:
Habib F. Balian Chief Executive Officer
Foothill Gold Line Metro Gold Line Foothill Extension Construction Au ty
July 17, 2015
406 East Huntington Drive, Suite 202 Monrovia, CA 91016-3633
Mr. Phillip Washington Chief Executive Officer
p 626.471.9050 f 626.471.9049 www.foothillgoldline.org
BLCA-MTA-424
Los Angeles County Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 90012-2952
Subject:
Reference:
Division 24 Operations and Maintenance Facility Turnover
Metro Gold Line Foothill Extension Project BLCA-MTA-423; BLCA-MTA-418; Metro L TR# 039
Dear Mr. Washington,
The Division 24 Operations and Maintenance Facility (Facility) is complete and the turnover process has been completed per the concurrence of our respective staffs.
Please provide your concurrence that Metro will accept the Facility under the terms and conditions developed by our staffs as of 12:01 AM on July 18, 2015. The Construction Authority would like to express our appreciation to the Metro staff that have helped make this turnover happen, and we look forward to the on-time turnover of the remaining project.
Sincerely,
~ ~Habib F. Balian • Chief Executive Officer
cc: C. Burner, N. Craig
Board Members:
Doug Tessitor Chair Appointee, City of Pasadena
Sam Pedroza Vice Chair Mayor Pro Tern, City of Claremont Appointee, SGVCOG
Marlsol Rodriguez Alternate Appointee, City of Los Angeles
PaulS. Leon Member Mayor, City of Ontario Appointee. City of South Pasadena
John Fasana Member Council Member, City of Duarte Appointee, LACMTA
BiiiBogaard Member, Non-Voting Mayor, City of Pasadena Appointee, City of Pasadena
Carrie Bowen Member, Non- Voting District 7 Director, Caltrans Gubernatorial Appointee
Daniel M. Evans Member, Non-Voting Appointee, City of South Pasadena
Alan D. Wapner Member, Non- Voting Mayor Pro Tern, City of Ontario Appointee, SANBAG
Executive Officer:
Habib F. Balian Chief Executive Officer
July 22, 2015
Foothill Gold Line Pvletro Goid Lnc
406 East Huntington Drive, Suite 202 Monrovia. CA 91016-3633
Mr. Rick M. Meade Executive Officer, Project Management
p 626.471.9050 f 626.471.9049 www.footh1llgoldline.org
BLCA-MTA-425
Los Angeles County Metropolitan Transportation Authority One Gateway Plaza, Mail Stop 99-16-1 Los Angeles, CA 90012-2952
Subject:
Reference:
Dear Mr. Meade,
Division 24 Operations and Maintenance Facility Turnover
Metro Gold Line Foothill Extension Project BLCA-MTA-418; Metro L TR# 039; BLCA-MTA-423
Further to the above-referenced correspondence, attached is a letter from the Metro Gold Line Foothill Extension Construction Authority's (Authority) contractor, Foothill Transit Constructors (FTC), certifying that Division 24 has been constructed in accordance with the contract and that the facility may be used without damage to property or injury to personnel. In support of this certification, the following items have been completed:
• A permanent Certificate of Occupancy has been obtained from the Monrovia Fire Department
• An extensive testing program on the facility and systems has been completed • Training has been provided to the appropriate Metro personnel • Operations and maintenance manuals have been reviewed and approved • An inspection of the facility has been performed by the Construction Authority
and Metro. A punch list was developed, and the items deemed critical have been completed
• Special tools necessary to operate the facility have been provided
The Authority has conducted an extensive oversight program of FTC's work and concurs with FTC's certification that Division 24 has been constructed in accordance with the contract and that the facility may be used without damage to property or injury to personnel.
As you are aware, we established a weekly meeting with Metro regarding the testing, commissioning, and turnover of Division 24 six months ago. Through this meeting, witness testing, and other participation, Metro has been closely involved throughout the process. I appreciate the involvement, cooperation, and input from the Metro personnel who participated.
Mr. Meade July 22, 2015
Page2
As discussed in previous correspondence, the turnover of Division 24 is done so under the following terms and conditions:
• Metro will assume security responsibility for Division 24 after turnover • Metro will assume maintenance (other than landscape) of Division 24 after
turnover • Punch list items will not be added after turnover; however, warranty items will
be corrected • Landscape maintenance will remain as stated in the contract • Insurance requirements will remain as stated in the contract • Warranty will remain as outlined in the amended Master Cooperative
Agreement
As stated above, the Monrovia Fire Department has issued a permanent Certificate of Occupancy for Division 24. As such, the facility has been determined to be safe to occupy and use to its fullest extent. As directed by the California Public Utilities Commission, the safety and security certification is only needed for opening the project to the public, and will be done for the entire project prior to revenue operations.
Given the above and discussions we have had over the past several weeks, Division 24 is ready to be turned over to Metro. I recommend a turnover date and time be set for July 27, 2015 at 8:00AM.
Sincerely,
Christopher T. Burner, P.E. Chief Project Officer
Attachment
cc: N. Craig, R Hiramoto, D. Goods
..... , •• " .. ••l"-\ot ~"' ... t "t '1>1 >! 114
FOOTHILL EXTENSION PHASE 2A ALIGNMENT DESIGN-BUILD PROJECT
July 22, 2015
Chris Burner Chief Project Officer Metro Gold Line Foothill Extension Construction Authority 406 E. Huntington Drive, Suite 202 Monrovia, CA 91016
Re: Subject:
Foothill Extension Phase 2A Design-Build Project (C1135) Division 24- Maintenance Facility Completion Notice
Dear Mr. Burner,
L TR-AUTH-0237
The Division 24 Maintenance and Operations Facility (Facility) is complete, and Foothill Transit Constructors {FTC) hereby certifies that all work associated with the Facility has been done in accordance with the contract requirements and that the facility may be used without damage to property or injury to personnel. In support of this certification, the following items have occurred:
• A Certificate of Occupancy has been obtained from the Monrovia Fire Department, see attached • An extensive testing program on the facility and systems has been completed, see attached
testing log • Training has been provided to the appropriate Metro personnel, see attached training logs • Operations and maintenance manuals have been reviewed and approved • An inspection of the Facility has been performed by the Construction Authority and Metro. A
punch list was developed, and the items deemed critical have been completed • Special tools necessary to operate the Facility have been provided
As agreed to by the California Public Utilities Commission, safety certification of the Facility is not required for turnover to Metro. Spare parts for the project will be provided once the spare parts list is approved. The remaining non-critical punch list items will be completed prior to the contractual Punch List Completion Deadline.
FTC will maintain the Facilities Track Allocation, System Power up and down controls, Red Tag protocols and safety guidelines until July 2th. at 8:00am. If Metro needs to extend this period please contact myself or Matt Kelly at (626) 610-0300 prior to July 24th at 4:00 pm.
Please contact myself at (626) 61 0-0300 should you have any questions regarding this matter.
Sincerely,
Wes Wegner Project Manager Foothill Transit Constructors wes. [email protected]
FOOTHILL TRANSIT CONSTRUCTORS 1300 W. Optical Drive Suite 500, Azusa, CA 91702
(626) 610-0300 t (626) 628-3987 fax
CITY OF MONROVIA OFFICE Of THE FIRE CHIEF
141 East Lemon Avenue, Monrovia, CaHfornla 91016 Telephone 626.256.8102 Facsimile 626.256.8112
Christopher Donovan Fire Chief
June 26,2015
Metro Goldline Foothill Extension Construction Authority 406 E. Huntington Drive, Suite 202 Monrovia, CA 91016-3640 ATTN: Chris Burner
Dear Chris,
The Monrovia Fire Department has completed an extensive fire and life safety inspection of the Maintenance and Operations Campus and found it to be in compliance of all fire codes and regulations. As such, I am providing this letter to verify Certificate of Occupancy of all buildings on site.
Respectfully,
Christopher Donovan Fire Chief
Cc: Mr. Tom Eng, LA Metro Oliver Chi, City Manager File
Gold Line Foothill Extension Phase 2A
Maintenance and Operations Facility Testing Matrix
1 of3
Gold Line Foothill Extension Phase 2A
Maintenance and Operations Facility Testing Matrix
2 of3
Gold Line Foothill Extension Phase 2A
Maintenance and Operations Facility Testing Matrix
3 of3
3520$. Buckner- Tarsney Road Grain Valley. MO 64029 816-868-1532 816-347-1718 Fax
LACIITA Foothill Extension 2015 Malnte,..nce Training ~- §jgn In Sheet Date :1 v .... e. .. ~ :ltJ IJ
Employee Number Print Name 1 . ..)}!2~ M~~ 2.:ZC62f .. M~ffi.;e""" 6"* 3 ~s ~vo.:A ··--~--------------------~--------~~~------
4 .. ~~~------------~~~~~~----~~~------~ 5 .. ~~--------------~~--~~--------~~------6 .. ~~~--------~~~~~~---~~~==~ 7 .. ~~~------~XL~~----~~~~~ 8 .. ~~~------~~~~--~~~~~ 9. 10. 11.~.~~------~~~~~~~--~~~~~~ 12. L 7 .~.,-./ v 13. >OooGq .,.y-/../;/V 14. , . - ,. VY'//V"V 15 . ., . ~· '. ~~///V 16. ) I 1~1.r '4"/1/"'V 17. <-l·l·:r b ..:~,_._. \-vc ... =t tV///V
18·-----------~--------------------------------------19. __ ~--------------------------------------------20. _______________________________________________ ___
21·------------------------------------~-------22. __________________ ~~------------------------------
C<lmments
161 ('\tn .. o ~ s .t:c::,.., I\.\- II -······----,
17 "::.\~ . C. I""
352{1 S. B!Xkner- Tarsney Road Grain Valley, MO 64029 616-868-1532 816-847-1718 Fax
LACMTA Foothill Extension 2015 Maintenance Training Course Sign In Sheet Date :r ... ~t.. \ r"· ''\ ,,;)~u-
7. '6':.)h IS
8. <'-$ :.1 J.. <1 'j
9. 9L"J!it 10..22(57 11 ~ --"'~ Q
12~~zr:.. 13.q].{:~i
~~:iiffl
f<e ~~~,.. C~ d;~
J" e.J 14v tJ"~ h
16.\5'5~ 17. /,. " .. 18.8t r·Jo
vfl"'vv
;"'l"'VVV v
19. __________________________________________ _
20·--------------~----------------~------~ 21.·-----~------~---------22. ________ ~------~-+-----------------------
Comments:
...,.¥{..- .,--/
1 Russ Becraft
2 Catlos Curiel
3 Kelvan Lowe
4 Clift Naels
5 Dennis Messer
6 Fernando Manlutac
7 Justin Tiples
8, MoS(JS Jones
10 David Tran
11 Tilak Samarastnghe
12 Joel Huerta
13 Samuel Flores
14 Chtang Hen
15 Michael Jank<Yl!YSkl
16 Marco Hall
15566
22057
17269
19351
27419
73465
19983
82666
62673
80146
84284
86110
86175
86191
86213
SIGNAL
]SIGNAL i ~SIGNAL
~SIGNAL
WARRANTY SPEC
SIGNAl INSPECTOR
'SIGNAL SIGNAL INSPECTOR f
I SIGNAL ' t--I SIGNAL ; i
. ··- .. ---..-· ..•. ··--·----·--·· --~----- ··ell
lstGNAL SIGNAL INSPECTOR !
!siGNAL ' !SIGNAL
SIGNAL
SIGNAL INSPECTOR . ······ t£[1/.n::,:~~~i/t:·-·-·-·--········. () "'' i~ ~'"~ tl·----~ ~--·· ~'4J:-7 .. ~L '~ j /J ~-··········-·
-· ............. ~_ ....... L ••
SIGNAL INSPECTOR
SIGNAL INSPECTOR
SIGNAL SIGNAL INSPECTOR -~ 1,' /
.. L~~ :l4 .... -~~---SIGNAL !SIGNAl INSPECTOR
SIGNAl 1.~1\..:>NAL INSPECTOR
17 Austin Yu 1 86183 ~SIGNAL !SIGNAL INSPECTOR
18 .f<'t,l 1\\. L J\.\f\?·\nJ.{-= lq\~D :)(~t,JI\1.- ~ ~~JP~~-1::~<':~ ~. -A.~···~~;;;~r; .. ww -----_,.,,. ... , •. u • , "'" Jl
l" i h~. :•-'• \ ·'X·,..,~.-~, ..J ~-\ '0 ..-;., b '.:> ·'~-- 'S,t.r,..,.,:>.L \No.._.,~~ ~.·~~\.·~~,
1 Carlos Cunei
2 Kelv;n Lowe
3 Cliff Ntels
4 Dennts Messer
5 Fernando Manlutac
6 Jusbn Tiples
7 Rafael Martinez:
8 Moses Jones
9 Ttlak. Samarasmghe
1 0 Joel Huerta
11 Samuel fl()(es
12 Chiang Hen
13 MIChael Jankowski
14 1Marco Hill
15 Austin Yu
16 BOOby Beharry
17 Kevm CurtiS
18
22057 ! SIGNAL l
17269 SIGNAL
19351 !SIGNAL
27419 JSrGNAL
73465 I SIGNAl I
19140 iSIGNAL
19983 SIGNAL
80146 SIGNAL
84284 !SIGNAL
86170 !SIGNAL
86175 SIGNAL
86191 SIGNAL
86213 !SIGNAL i
86183 !SIGNAL
23910 1SIGNAL
85615 SIGNAL
; jSIGNAL INSPECTOR
fstGNAL.INSPECTOR
lstGNAL INSPECTOR
1RAIL WARRANTY SPEC i
SIGNAL INSPECTOR
SIGNAl INSPECTOR
SUPERVISOR
SUPERVISOR
iStGNAL INSPECTOR
!SIGNAL INSPECTOR !
~SIGNAL INSPECTOR
! SIGNAL INSPECTOR
)SIGNAL INSPECTOR
SIGNAL INSPECTOR
SIGNAL INSPECTOR
SIGNAL INSPECTOR
SIGNAL ENGINEER
.r ' /_ "·" ·,.J > > -,
·"~ !:l,!:!!iW.i'--'' ~ ·"···-
~}4~ .iJ~,..~.t/l (/ #'1..-{.J
.,., >
l [-.t4 / · ... · ..
~M ~,t;K--:-
' . -. .•
r ' \1._.._ & -""""'" \
' he:·~, f::>~l i ~M'-- ~
1 Carlos Curiel
2 'Ketvm Lowe
3 Cliff N•ets
4 Dennis Mtissm
5 Fernando Manlutac
6 Justm Ttples
7 Rafael Martinez
8 Moses Jonas
9 Tllak Samarasmghe
10 Jool Huerta
11 Samuel Flofes
12 Chiang Hen
·13 MIChael Jankowski
14 Marco Hill
15 Austin Yu
16 Bobby Beharry
17 Kevm Curh~
18
15566
22057 SIGNAL
17269 SIGNAL
19351 :SIGNAL
27419 !SIGNAL
73465 iSIGNAL.
19140 SIGNAL
19983 SIGNAL
80146 SIGNAL
84284 'SIGNAL
86170 SIGNAL
86175 SIGNAL
86191 !SIGNAL i
86213 jSIGNAL
86183 SIGNAL
23910 • SIGNAL
85615 tSIGNAL
SIGNAL INSPECTOR
SIGNAl INSPECTOR
,.,,uf'U"'L INSPECTOR ' iRAIL WARRANTY SPEC
!siGNAL INSPECTOR
I SIGNAl INSPECTOR
!SUPERVISOR '
:SUPERVISOR t
! SIGNAL INSPECTOR I
~SIGNAL INSPECTOR I
jSIGNAL INSPECTOR
,SIGNAL INSPECTOR
I SIGNAL INSPECTOR
~SIGNAL INSPECTOR I
tsiGNALINSPECTOR
I SIGNAL INSPECTOR
SIGNAL ENGINEER
l'l· ·" Q ' A/l/_Jpt!!.t;~f::/ 'nl. ~ ~.i-/) 7<L~..~·l~ r_ . --'"' . --- . . ·"· . ~,;f.. . •. , ( " 47 .:
' ~.i?"l.---~· ' • ~l'k...4
~-.--~2-/
~· ---1 d~ r? , \ ,- -::."" .~,~~t 1 °~~ C::rl~---·---"'.c•••
1 Carlos Cone! ! 15566 1SIGNAL
:
2 Kelvin Lowe 22057 jSIGNAL !SIGNAL INSPECTOR ~
I ! 3 Cliff Niels I 17269 !SIGNAL ! SIGNAL INSPECTOR
I '
4 Denrns Messer I 19351 !SIGNAL jRAIL WARRANTY SPEC l
5 Fernando Manlutac 27419 SIGNAL jSIGNAL INSPECTOR l I
6 Justin Tiples !
73465 ;SIGNAL ~SIGNAL INSPECTOR l
7 Rafael Mart1noz 19140 SIGNAL J SUPERVISOR
8 Moses Jooes 19983 .SIGNAL !suPERVISOR
9 Ttlak Samarasingna 80146 SIGNAL !siGNAL INSPECTOR •
1 0 Joel Huerta 84284 !SIGNAL !SIGNAL INSPECTOR I ' ' (,
11 Samuel Flores 66170 I SIGNAL i SIGNAL INSPECTOR ' f
lstGNAl I
12 Chiang Hen 86175 !SIGNAL INSPECTOR
13 Michael Jankowski 86191 !siGNAL SIGNAL INSPECTOR
14 Marco Hill 86213 !SIGNAL SIGNAL INSPECTOR
15 Austin Yu 86183 !SIGNAL SIGNAL INSPECTOR l ··:a<:.·.~· ~ ~·· -~~ ~~ -~~,~ ,, "' .. ,., ..
JSIGNAL i
1- ;. :-. ~ \ ~-l 16 6obby Bef'larry 23910 \SIGNAL INSPECTOR ~ , I \ ~
17 Kevm Cuths 85615 !SIGNAL SIGNAL ENGINEER 1. ~vM ~~.~
18
1 Carlos Curiel 15566 )SIGNAL
2 Kel~o~in Lowe l 22057 ;SIGNAL i SIGNAL INSPECTOR '
3 Cliff Niels 17269 !SIGNAL lstGNAL INSPECTOR l
4 .Dennis Messer !
I RAIL WARRANTY SPEC 19351 !SIGNAL I [
5 Femando Manlutac ' 27419 (SIGNAL
6 Justm Tlples 73465 iSIGNAL i
7 Rafael Martmez 19140 iSIGNAL !SUPERVISOR ' i
8 rMoses Joo&.s ! 19983 I SIGNAL I SUPERVISOR t
9 Tllak Samarasmghe lSIGNAL 80146 ISIGNAL INSPECTOR I r -~~-
lSIGNAL ' e r'
10 Joel Huerta 84284 1 SIGNAL INSPECTOR ·,JCJ+-1!~ 11 Samuel Flores 86170 :SIGNAL lstGNAL INSPECTOR -! ' ;.:" .
--;'J.'r;"'t l \
i '-~~ I - I . I ~
12 Ch~ang trlen 86175 SIGNAL iSIGNAL INSPECTOR ! (.iM·.·~ ,_ lit_~- . 13 MIChael Jankowski 86191 SIGNAL ; SIGNAL INSPECTOR
t114-~t'P ·1'{ '(' .. I
14 'Marco Hill 66213 ~SIGNAL !siGNAL INSPECTOR I
i i /~~ 15 Austin Yu 86183 1StGNAL !SIGNAL INSPECTOR ' _....,...,. l
\siGNAL INSPECTOR
i -·Xo."<r
i i,\ ~ 16 Bobby 8Uharry 23910 !SIGNAL v --~~ - -~l ._,__~ \- ·---·- ..... ..
I I ·r"' 1
17 Kevin Curtis 85615 ,SIGNAL !SIGNAL ENGINEER . t..--0~·'-';\-, G,#.,.J•() '
18
3520 S. Buckner· Tarsney Road Gratn Valley, MO 64029 816-868-1532 816-847-1718 Fax
LACMTA Foothill Extension 2015 Maintenance Training Course Sign In Sheet Date ,J:..._c.~- ;)4 • .lC I r -· ___ _
Print Name L/ef'-"1 Tft
O"ii,t, l-~''\·"' r ~ t/lltl /.I v
V -v'rvvV
v ,,,., t" v v y .... .-.1-~'V"
9 .., i"~ r ,"7,'-"/ - ' '- ·r / j vvvvv
10~~ ;; Z9 8 /~1\ jc:o~.,-;o~,,~,,~: :· :u- . ~ vNY'
1121 .. , i. :2~ ~:. :.- /7' / /?; "'p _-,c. ~~ :~~' . ,;-';j . ~ :~~~ o «;;·T • t. JI•T:.·'d) J;.,'f-1./ •. :' .""-- r:;.;../::.._ ___ ~"
13. ________________________________________ __ 14. _______________________________________________ _ 15. __________________________________________ _
16·-------------------------~-----------------17. ________________________________________ ~_
18·----~-------------------------------------19. ___________________________________________ _ 20. ____________________ ~---21. _______ ......,....... _____________ _
22·-------H--+--------------
1 Randy Larsen 1 27418 !SIGNAl j l
2 Kent Vo I ~i
!SIGNAL INSPECTOR LEAD 17792 I SIGNAL i I,
3 Lan Le ! 27297 !SIGNAL jSIGNAL INSPECTOR ;:
I ".·/: k<_4 ' '
4 ·Michael Kugies I 27199 I SIGN~ ~ Sl(7t:4AL~NSPECTOR ~- 'L -=• -"' .,._....,,,..........
1: r ....
! ! ... l SIGNAL~ INSPECTOR I 5 ~tupe Gomez I 27913 SIGNAL
r: 6 i Ntck Khondkarian
~ I suPERVISOR I . : . - 2729_8, SIGNAL ll \
'I 7 I Rudy Monsalud I 24291 i l
r \!
8.UemTa t 73464 I SIGNAL JSI(?NAl INSPECTOR ~ .. 9!Trl Truong f 75354 I SIGNAL
l~~~!~:::ECTOR n
I ' 10jRoger Mart'tnez 27229 iSIGNAL
111 Dante! Mandac i 75375 NSIGNAL SUPI;R\flSOR .. i -
121 David Tran 82673 I siGNAL SIGNAL. INSPECTOR
' 13'
14
15 -<.~;.~:;,:::«-~:;>~""
1 Randy Larsen I 27418 jSIGNAL !SIGNAL INSPECTOR
I
2 Kent Vo 17792 jSIGNAL !SIGNAL INSPECTOR LEAD'
3JLan Le 27297 [siGNAL .SIGNAL INSPECTOR ~ L.~· u:_. .,
I § I &tZ~> . ~/·/,. .·. __.,.;~· ~··
41 Michael Kugies I 27199 !SIGNAl SIGNAL INSPECTOR .~YA-.<: ~~·~:-... , 5 • Lupe Gomez 27913 lSIGNAl !SIGNAl.. INSPECTOR V'"('," ., 1 I
j
6: Nick Khondkarian 27298 [SIGNAL JSUPERVISOR l ! 1 r
I I
7. Rudy Monsalud I
24291 ~SIGNAL I SIGNAL tNSPECTOR LEAD I ! j
8 Llem Ta l 73464 ~SIGNAL j SIGNAL .~NS~ECTOR
9[Tn Truong I
!su~ERVISOR 75354 SIGNAL
1 0! Roger Martinez 27229 SIGNAL ~SIGNAL INSPECT()~ I
~SUPERVISOR 11j Dante! Mandac 75375 SIGNAL
12!David Tran 82673 SIGNAL I siGNAL INSPECTOR i
13 1
' 14
15
1 1 Randy Larsen 27418 ·SIGNAL
2 Kent Vo 17792 !SIGNAL
3'Lan Le 27297 :SIGNAL
4 Michael Kugies 27199 \SIGNAL
5LupeGomez l
27913 !SIGNAL !
I
6 Nick Khondkanan i 27298 )SIGNAL !
7 ·Rudy Monsalud 24291 I SIGNAL l l
8 liam Ta 73464 1SIGNAL :
9iTri Truong I 75354 [SIGNAL
1 0 1 Roger Martinez ! 27229 ;SIGNAL
11 Daniel Mar\Clac 75375 SIGNAL
12 David Tran 82673 SIGNAL
13
14
J, ~5
/;;~JA0. r/. ~....,.~ ... -7' i 'VL-/ (..__.
1~\·-~~--\~{ri-,, t~ ,?
l 0 ,'LI 'A," I ..........,.~ ' I ; -~.. , II>.~ //; .... w ( ,(;, /
1 SIGNAL INSPECTOR LEAD
SIGNAL INSPECTOR
.SIGNAL INSPECTOR ~;/ J ' /
SIGNAL INSPECTOR ·"".-~· 1/.li 1·/ '·>"' ' • ' ,,_
SUPERVISOR ,.- lr :i'\01 ..,,.... SIGNAL INSPECTOR LEAD .. 7 tf~J[ t{)uJ~C-~.) SIGNAL INSPECTOR [:u.~ r-~ SUPERVISOR
'SIGNAL INSPECTOR 1
j SUPERVISOR
. SIGNAL INSPECTOR !
~~\.%. t
<.l~·~ ... -.... -~. ~~r· ... -(<~-l~ .. ----.,. I ., . ~··· ' U r-· , \A .~-·•··· \ ~-'
-~· ~" .. ¥_.~·
!' .I
1 Randy larsen
2 KentVo
3 Lan Le
4 ·Michael Kugies
5 LupeGomez
6 NICk Khondkanan
7, Rudy Moosalud
8ILiem Ta '
27418
17792
27297
27199
27913
! I SIGNAL
I SIGNAl l ]SIGNAl
~SIGNAL l
jSIGNAL
i 27298 ISIGNAL
. SIGNAL INSPECTOR M/f-1 ~/L-j~IGNA~ INSPECTOR LEAO _ _fi _' ·,",
i SIGNAL INSPECTOR l~tH ~f , ((__ !SIGNAL INSPECTOR
;SIGNAL INSPECTOR
~SUPERVISOR ~
'-~ ; ~ _/ '• .. ' '"*""
1//;, -~~~:; 1 ·Y'/ ,•' • __. .. •·'
I /,. -::;;z·. / J / '.,.' .·. v·.r./ ,_· 1'
'it'/""' - -· -~ /-• ··A ({./
j 1-J/ (' t
24291 SIGNAL !SIGNAL INSPECTOR LEAD ! ""
II· l I; ! .. >,
i 73464 SIGNAL I SIGNAL INSPECTOR !
I I,_.A.,.{_,_{.,,-"'--·'
' I . l C-·-~
' 86168 SIGNAr--~·triG_,N"'"'At,...,lNSPECTOFC ~·~-:' __ , _______________ · -----------------~~--- ....
10jTn Truong ! 75354 SIGNAL :SUPERVISOR ; ~ i ' J i~
9-JWie MiRero Flores
111 (·-~ "'8";~ 1¥\"r +I r\t ~ 27 n 'i S.l &NAI.. ";,f(;.(VAt.. LN'> !\;:< if) ;a l ({ '' :-~ "- j/,/. ,, /
12! lli 'f\ ·, e l \V\:J.l'\c:bc_ 15315 5\ bNA-'- , 51 ~IJAL '5uf'f'lt'I•S~ s:~,ili~---13 · [ Jf\'- 1•.:> t-KA I\,
14
15
. l
'itG.'t) 'f::.,i!:},VItL5 . ' _..,.-' ..t-1V<;; •1!!-::r<).l'l ~~-~
(,_, -
.-....,._ -· ........
1 Randy Larsen
2,Kent Vo
:i 3:Lim t.e
4[Michael Kugies
5 i Lupe Gomez.
:: 6 j Nick !{h~ndkarian I
71 Rudy M(]flsalud
8jliem Ta I
9ITri Truong I
1 0! Roger Martinez
11 Daniel Mandac
12 David Tran
13
14
15
27418 ;siGNAL
17792 rSIGNAL
27297 SIGNAL
27199 SIGNAL
27913 rSIGNAL
27298 SIGNAL
24291 ,SIGNAL
73464 ,SIGNAL
75354
27229
75375
82673
1
!SIGNAL
~SIGNAL ~I SIGNAL
I SIGNAL
I I
!SIGNAL INSPECTOR
j SIGNAL _INSPECTOR
'SIGNAL INSPECTOR •
SUPERVISOR
1SIGNAL INSPECTOR LEAD I
[SIGNAL !NSPECTOR
, SUPERVISOR I
'SIGNAL INSPECTOR
\SUPERVISOR 1 I SIGNAL INSPECTOR i
I I !
_,l
,/~' /) -·
??: ~- -::;·>'< '
' ( :/ 'f. 't~
t{ . (... • : • ~ ' ,. "" "\ "'!
!1 j \I' ~~' "' $ -!,.I
... 1
L<-L~·-- J --~::-\ . /'/
~-)A~ I
ct;.;_ "'/' --+-··· ---~/ I~·/·// \ ~ ' / I __ ---:-- - . 1 \.... '. ::_...,. 1
Time Name
Time Name
John Carroll
lien Nguyen Tim Williams
Jay Setengamudali Thanh Nguyen
Gary Felix
Time Name Ken Wherry Richard lake
Armando Pantoja
Joseph Salvatierra
Angel Hernandez
Dreyton James Craig lu Paul larson
JamesCoe Walker Anderson
Foothill Communications Training Sign In Sheet
6AM-230PM
Email [email protected] [email protected]
[email protected] [email protected]
svelasco2007 @yahoo.com
[email protected] [email protected] [email protected]
230PM-10PM
[email protected] [email protected]
nguyenti@metro. net
[email protected] [email protected]
[email protected] [email protected]
930PM-545AM
Email [email protected]
[email protected] [email protected] [email protected] [email protected]
[email protected] [email protected] [email protected] [email protected]
"' LAK •j··;' )/ t: ,_; ,.c '- I .)
Training Participation Sign-in
Name: Date: Company: 1. -:Jew sh~ ____ _~, -~_:,r:/ ~Tere'~-" _ 2.~~_( /lft (_fl' __
4. _l(tl/11~/ f!l v tv -l~~~--i _6· ___ 1:J£/ t1-1 -r tl __
s.~c_t.::__ tAr t-.r ~.:e-- /~_:?_:J~ 1 I,Ael~L -i-rtc•~ 6.ZG'\.(.kj\~~v: ~~JvrQ_~_j 6- J -/f) MI------'11 __ 1 .. !Lcw;SU /~f:::,ljiVcAr 1 "-:3 -lJ/ VII~
8. ~0\ ~,\0~-- ___ ;h·Btl$1 \VtTA._
10. SAkroJ· ~&/?Q"?/7 / /- r -/r; /"1 rA _____ ,,_~------~-~~·'. ---·---~ '----·--·-·--·---·-···-··
f\lliCH A- e L l>vFt-t AI to - 3 I~ f"-1 T A
dLx?· k/\.61. vt ~~ ~':::. f::$- 3 --} 6 (\..1\_ TJt ti? Cc ~l..... i, 711 t 7 c..v 6 I J //f) /lll T ))-
AO<I~&:i09 J~..es L Hll11 P111kY111y Ypsilanll, fl\148197 E-maoi r,;~li_:J@n:;t !!I:!Hf:l!iif'1 ~:•:lnl Weoll Site: 'IIWN.Interdean com
Phooe: 73.4-961-3300 Fax 7:J.4·961-00B2
FOOTHILL EXTENSION. PHASE 2A !'-llGNMENT DESIGN-BUilD ~OJECT
_ Kardex Rem$tar Part Carous~ls Training
_-. June.8th 2015 _· . ' -· ' .
-NAME ""'' ' -SIGNATURE
FOOTHILL lRANSIT CONSTRUCTORS 1300 West Optical Drive, Suite 500, Azusa, CA 91072
{626) 61(!..()300 • {62€) 628-39871ax Equal Opportunrly Employer
' <. ~.
Ingersoll Rand Compressor Train~ng · ·
·riAME
t:OOTHlLL TRANS!'!' CONS1"RUC'TOiRS 1300 West Optlt:al Drive, Suite 500, Az1.1sa. CA 9107Z
(625} 1310..0$00 ~ (626) 628·3967 fi.u,; Equal Opportunity Employer
, June 4Jh, ~015
FOOTHIU EXTENSION PHASE 2A ALIGNMENT OESIGN·BUILD PROJECT
Railqulp Portable Rerail Equipment Commissioning & Training
OnfE:IOAY
May 15th, 2015
in direct
accordance with the provided and attached test procedure/checklist. The below
individuals were present for witness testing and training of this particular piacels of equipment
~--------. -~------~-~--
----------·-----
-·-··-·-----·-· ~-
FOOTHII.l. TRANSIT CONSTRUCTORS 13QO 'A'Eisl Optical Otivo. 54•iltr 500, MU$11, CA 91072
{1326)61()..0300 • (626) 628-3987 fllX Equal Opportunity Employer
1.
.·SERVICE _ DESIGN INST AL.l.ATIQN
.·LINK-NILSEN CORPORATION ~J'm~RWRrfERS APPROVED FIRE l'ROTECTION SYS'fh"'MS, CONTR.4.C1'0RS LI<;E."iSE NO., ~5~~
- ' 130 E. SANTA CLARA STREET ARCADIA. CALIFORNIA91006 · . · .....
(626) 445-3414 FAX (626) 445-3441 www.linknilsen.com "· · · · ,, . '"•.
I • ~'
Trainers:
METRO GOLDllNE FOOTHill EXTENSION PHASE 2A . M&O FACILITIES
··. ·. _FIRE PB.OTECTIO.N _SYSTEMS Tt:(AININ~ A.GENP.A . ·.···-~' .:: ... :·.·~·-·.~·· ·-·: ... ,. .. 512712015 ~ .... ·.- ... _ .. ·.· ... · .. : .-:.: ·.·
Mike Moffatt, manufacturer's representative forFiretrol pump controllers · Paul Bennett, manufacturer's representative for ITT AC. fire puwps .
Qavf.l. Lin.k. President l-ink-Nilsen Corporation · . ' . . . ' ~ - . ~
<A ~ .. 0. ~ ~ + V > ~.
· ·· Trainees: ... . .-: .. · · :·. · '~- ,_ • .-=. ' ~ •. ,
•• ~ ~ • v ". • •••• >
·----.,_,---~----~-----........,....,------~--~- ·------~----·-· ~ f . '
-,---·---.;,.._... __ ~ ~ 1 r 'j
Bi·fold Doors ·rr~in~~g.
NAME·
FOOTHILL EXTENSION PHASE 2A ALIGNMENT DESIGN-BUILD PROJECT
... "' · · Jun~ 5th, 201 S
. ··~'
SIGNAtURE
FOOTHILL TRANSIT CONSTRUCTORS 1300 West Optical Olive, Suile 500, AzUsa, CA 91072
-...._, (626) 610.0300 + (626) 628-3007 fax Equal Opportunity Employer
FOOTHILL EXTENSJON PHASE 2A. AUGNME.NT OES1GN.SUILD PROJECT
EuroVac Body Shop Training
NAME
June 4th, 2015
SIGNATURE
~t. &L ~an;; ~--JiiE:~-----=~-Tflomqr ULe/P _ AMrfiP
'1/J. l ·~ fo vto~ !1-~f
--···-····-----··-=:-:--~·~---... ---·- ..... _ .. FOOTlltLL TRANSIT CONSTRUClORS
1360 ~s! Optical Dri'<'-e, &Jit13 000, Azusa. CA 9'1077. (e26} 610-0300 t (G26)ti2i-J9lP' fi;r.(
~qual 0PfJ<)rturl6'1y Employer
i 25 I
26
27 I 28
1 29 i 30 l
Instructor: -~ . -·-- ---
Course Name: Date:
Foothiii/LA Metro Goldline Training Sign In Sheet
.~
: Job Title i .
. £-ClC{f'(JCiPit"-' i El<.. t_( flit! F~ -!~'c.,. \.,.
lei,· ~~5~~~<:..+~v-; t:.=' u5~ 1 r-e- c c1 rArJ 1 ct.t t7r!tt"lc:;J.1 ~ l .zc till '-.ri ,,_Y)
i fne-fr-,·-,·~V\ J ~ ~,;:~<('"~t::;'-l t/\ A(;-;l \ .. ~l
1 Ptt_ot"'•~-~~.L- 1\J\ k~At:kl,.. ~-- '
j - ( ,_··;;(J . ~ .ec~. rl.C:..l..~ -~--.
j 'f~(ll1'{ l'-Jfi\I}J!AI\1~ ! ~?<!,c.,,. ,e. I""" .-r;4 ,e./
-~r8~~cY?I.~ ~" ('.>f"N'\
-If y~·~ ly pfc ./'~(. l(_ (J
frof<F i-y /l;L~\ k\t "' ~'{ r ~ - "' ·-----...
FfcJI:( $V/'~ "''ISO~~ _
~~ J E'll. !'-~ t\J\t\ 'N~f\l!Vt.:;:!.J$ f.S1
'•,,.
Sp· 1 , SP & ~--~ ... -,.,..~r::-..... ---~·--·~·UA~·~-.,.,.,,__....,,..... ....................... ""f<_......_~-·:·.---·--r--~-·-·--V··~-....... _..., ..... _~~--·--;-·--;·-..... --............... ~~-,J~~~. ---;---• V "
. ~ . .. . .. . "' .......
. , ....... .
· ·-"'\' ~:-, r;;;'"";;;> .. ~A7.""::,;c:;~ ,__.. vv... -~: t,A ~~- v'\ c:. ,. ... -. -. : :Je_s >H-. l!!J4t,;rrt:f7;4, ... ;-trA~- p,t.a." __ ... , ...... ~ . j2o ;w,GD Nu-f'-4c... J~ - . }-47)'.1 r?l~
· -~ fit1~--e.. ~i 'i. - g\.l(-rt+ PA-·c . · &e-v~AJ #c_(~~ 1/Jt&-t.- Asu~.u~~ : _ /11l1 f19v/QIN' ·-. · .... / fl:lt P .. '. ' . -..... ,_
~ - • • • •• <
•• • •• "<>•, ' . ,,. ~ ' .... "~
. "' ~ . . .. , '•
.. ~ '
.,, '• ··, ' ,., ..
""··
',.,_
"·' .:.•' -~ ~ :, . . '·.: '_ '•,.
...
·' . ' .·,-
,j A 1.. p~~vv lo t.o;
tt}IJ-51/-7 BA t/TI6 ., d
cL,;v IS (J~"f' .J '1::--
. ' .. '
I ,;; ·~ . ' .· '
I '·
---·-..bY! t g a ·r\, l&t•!C.. :IflAl~t~·····-- __ l:i t(...------~-:-:--::-::·-:-·- ..
lf ~y M-1 - €' 142<:.:~-a.lc.. ~4·t£'...a H &4T'ftt2. . A r Ci'W :.c;_., z.. J
.tr~ H .. 2.. e '41!""'..,.~~... icc. liP .ll>-'t"&-4. Ht&..'\.'t<;!" t'·r- ~ ~~,., ,....,..,
. · fUIT,.,~ ho 3rt> Fla. fl,es.r~c;;. .AA+O ' ... · ..
''-'>,.
, A~ " r
'•·
........ '
' .,,,_
. '''•.. ..,.
'•• ...
--··----h'.'A.:f-.I!J=.~ _ _l.Q_t s:-____ 8__:~.4 ~. "~-" .:r:t~t~ l~'-· . -~.--~~~ .. _........,.__.,_
41~ ~~~.;J·
Fo,,_ &.$"'":/ ~v--"-'1~~"( '5 ~~..tt,-.
/.!"M~3..1t.. '/ 'liy~ ~I\$ c....
. :
w~- t ~-~~ i tA,.r' ..,, v "- - i 14 o•
1 v~··n.At- A ~>A- 1
S;1-l p. Q4. I~ l.aC#~~ I l>~ _,
·~ .. · ~ ;;;:__ 1/1*!-:- -". P.+ "f,.F lb~ " A-t\t'
'·,· " .....
. --~ -.
< •••
-··f -,.
'··-,.,_ •• <.'
·-, ~ .. .. ··~, .. .. . . . . . . '""'·· .. ~
c. tea. ~.~4 '\ -- i
vr;;...A t.1 'i)Jt!wo-~ .._..,
~~ ...
.. . ...
.... •• <
·--,. /
FOOTHiLL EXTENSION PHASE 2A ALIGNMENT DESIGtlf-SUILD PROJECT -------·
MJO Whe~l. -~anding ~~~t~m Training · - May 8tJ1~ 2015
NAME
· lqM<L La-vts
it -
(~> (:::: ;':V"';-'Ei'""{,\7 \
_______ ,.......;, ______ _.... ___ _
---~~------------- --··---
FOOTHILL TRANSIT COlliS I RUCTORS 1300 West Opticol Drive, Suite 500, Azusa, CA 91 072
{626) 610-0300 ~ {626} 628-3987 fax Eqltal Opportunity Employer
. ,, · EQUIPMENT & TOOL CORP.
PRINT SIGN 1 .A ... 1: ll ill! COMPANY
I f ~----------------4-----------------~~---·- -----~
~-·--------------~------------------~--------------~
~·--·---··--·----- ---··--·---·------1·-·-----------1
-207 WASHINGTON AVENUE. DRAVOSBURG, PA 15(}34 TEL: (412)·46H900 FAK: (412)-4864345-
One Gateway Plaza 213.~2z.zooo Tel Los Angeles, CA 9(;1otz•zg,sz metra. net
June 30, 21115
Mr. C!irist~pherT,Bume,r,P .. E. Metro GotH Line FoothiUE~enslon Constructton AuUtorFty 406 E. Huntirr€J{an. Drive, .Suite: 402 Monrovra. CA S'tG16"'3&35 ·· ·
Reference: ~~tr<\l Gat~ Un~ F<>t>ft:lill E~rls~on (Phase 2A} ·BtCA-MlA-'418
Metro l TR# 039
Subject. Division 24 OpeFations and Maintenance Facirity Turnover
Dear Mr. Burner:
We. !lave re.ceived your tetter MTA-418teg:arding Oivtsion 24 Turnover and sul:nmttaJ of the permanent e'ertificate of occupancy. Jvtetta Is please~· f(.} a~apt eatfytumovet ofDivision 24 Operations and Mc;Iintemarice Faciltty pursuant to tne·f.tefi11$· n~maWrng for completron and timefine identifie<;f in the fetter.
Starting June $0, 2015, Metro will take occupancy and begin moving personnel and equipment into the Facifity. Our expectation is for the turnover process to continue until July 15, 2015 as the public address, telephone and closed circuit television systems are compteted. The first 3010 Light Rail Vehicle is schedule for delivery on or about July 7th.
The Authority will provide security through the turnover process.
Please contact me ·at213-Q~2'-79fl if you have any questions regarding this matter.
Rick M. Meade, P.E. Executive Officer
cc: A. Chavira, B. Pennington, B. Shelburne, F. Alejandro, J. Owen, Harris-Gifford, R. Lozano, V. Khawani, Fife
B®i·T~
·~~ sam;'tt~
5JT=:~. A~kltee:,~~
AI~ Q:,:VIt!i- . . Mitmi!K;.~ Vgtj,. Maw r>n:rf~rr~; · Cl~llf'Q'nlil.i~ Appointee, ~s
Hitblli F. Balli!!>} Chief E:i<ewlk<~Sffice'
~ u~~n.~ t ~2~>A.?1,9i14'l ~fQ.~t~~~~g
BlCA..MTA-418
~~·;'~t:·.· .. ,... ·i~efi~i--ijl\i~4t)~~~~J,f:~£11RVet }a ... :. ····::~~l~~~tm""i~
~ .. · .... · .. ··.· ·•·. •. . . . ··.· .. ·1AI& ratter~ "fi\j,f¥J~;~~~:jec e;X~~ ttlmk•·~~lif!lfa~<two weekS·aoo:will · !~· .. fi~ltila•V~tJ~s:
'"' ··~f!m!t;~wtu ~mfJ{ete·tle~ubft~·ad~afl<li•etes@cifcuit: 'te~~tjl$,6le-~':welt ~;~ .J!WJil-HSf• items aetemfiFI:ed ·to IS:e tritieaf;
• ~~lt~t4diel!'! A~ WiiEtp~de ~nca€1· se:eurity at the' Fe:qufast of Metro mt~~~tt:t~Nim~rtpr~ces~;
• Metrowiit•~pf$te irtf~ttan techoot~y w~rked deClJI:oy: oomrMtes, ""i>l\11~' ., ~.;~ .. .,.~~:..,..,. ... .,. """"'!'!' "'''"~ .;.,.•,~Y."f'~''""'"""~~ .. .... f,~~. ·111~4'·~:~ ·Gllr·~r:afSEia\
I~'~FaSifl~and'Pf~P•~·fer . e)(gre~to;:affi~,~OMst'an 2'4
·~~~~tl$o~~ll·wiffqinte·~G~ver•av'mMslf1n'.~4·1ff.~.·m~$\lililr~; .. ~~~~bn· .. · · $rttyls~mta~o:tW!U~inu~tQ ~vwite·fam~
~e~aci~and
t..eik.swilt bs ~R@Jed from temporary· eoostructton (ocks to permanent Metro teo~s.
Metro
TO:
THROUGH:
FROM:
SUBJECT:
ISSUE
Los Angeles County Metropolitan Transportation Authority
One Gateway Plaza Los Angeles, CA 90012-2952
213.922.2000 Tel metro. net
APRIL 29, 2015
BOARD OF DIRECTORS
STEPHANIE WIGGINSk Q J INTERIM DEPUTY CHI~ 'ixECUTIVE OFFICER {0f BRYAN PENNINGTON, EXECUTIVE DIRECTOR, ENGINEERING & CONSTRUCTION AND Rl1ll / ROBERT HOLLAND, INTERIM CHIEF OPERATING OFFICE~ y METRO GOLDLINE FOOTHILL EXTENSION PHASE 2A- EAR[Y TURNOVER OF OPERATIONS AND MAINTENANCE FACILITY
The Monrovia Operations and Maintenance Facility is being constructed as part of the Gold Line Foothill Extension Phase 2A Light Rail Project. This report is to advise the Board that progress on construction of the Monrovia Operations and Maintenance Facility is ahead of schedule and will be ready for turn over to Metro in June 2015.
DISCUSSION
The Foothill Gold Line Light Rail Extension Phase 2A is on schedule for substantial completion in September of 2015. After substantial completion, Metro will conduct prerevenue operations to prepare for revenue operations in early 2016.
The Operations and Maintenance Yard being constructed in Monrovia as part of the Foothill Phase 2A Project will function as Metro's Division 24 to provide maintenance and vehicle storage capacity for up to 84 rail vehicles. Construction of this facility has progressed ahead of its September 2015 completion schedule and is on track for early completion in June 2015.
Metro and the Construction Authority have been working together to coordinate early turnover of the Monrovia Yard Facility and concur that early turnover will be beneficial. Metro has evaluated the costs and benefits of accepting the facility upon completion and determined that early turnover has a number of advantages including early establishment of maintenance capabilities and our ability to accept and commission new vehicles for operations on the Foothill Extension and the Expo Phase 2 Line.
Additional Cost to Metro will be related to implementation of labor forces to operate the faciftty, provide security and standard utility costs. Insurance and warranties will remain in place in accordance with the Master Cooperative Agreement between Metro and the Foothill Construction Authority.
NEXT STEPS
Metro staff will review and evaluate all testing and completion of formal requirements for turnover of Division 24 Maintenance and Operations Facility. Upon Metro approval of requirements. Metro will accept the facility from the Foothill Construction Authority. Metro will continue to coordinate with the Authority through substantial completion and turnover of the project for Revenue Operations.
Prepared by: Rick Meade, Executive Officer (213) 922-7917