03 AUG ZOU~ Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE SECRETARY Manila . '~'J. /3 j)M /7 of~ b"(, - j!i)/i' DEPARTMENT ORDER No. 11 5 Series of 20~ri.""J ) ) ) SUBJECT: REVISED GUIDELINES ON THE ACCREDITATION AND ASSIGNMENT OF DPWH PROJECT ENGINEERS AND INSPECTORS In order to ensure that only qualified and competent field engineers will be assigned to supervise DPWH projects, the hereto attached revised guidelines on the accreditation and assignment of DPWH Project Engineers and Inspectors are hereby prescribed. The Bureau of Quality and Safety shall be responsible for the accreditation of DPWH Project Engineers and Inspectors as redefined under Department Order No. 137, Series of 2015 and shall seek technical assistance and services which are deemed necessary from any office of the Department to effectively carry out its tasks. This Order shall take effect immediately and supersedes the following Department Orders: 1. Department Order No. 73, Series of 1998 2. Department Order No. 12, Series of 1999 3. Department Order Nos. 41 and 61, both Series of 2007 4. Department Order No. 08, Series of 2013 I 5. Department Order No. 25, Series of 2015 ~ v;;:::.--- MARK A. VILLAR Secretary 15.1 MGM/GSR Departrrent of Public Works and Highways Office of the Secretary 1111111111111111111111111111111111111 WIN8U01635

Transcript of AUG ZOU~...Department Order No.----1.1L, Ser.i,esof 2018 Guidelines on the Accreditation and...

  • 03 AUG ZOU~

    Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    OFFICE OF THE SECRETARYManila

    . '~'J. /3 j)M /7of~ b"(, - j!i)/i'

    DEPARTMENT ORDER

    No. 11 5Series of 20~ri.""J

    )))

    SUBJECT: REVISED GUIDELINES ON THEACCREDITATION AND ASSIGNMENTOF DPWH PROJECT ENGINEERS ANDINSPECTORS

    In order to ensure that only qualified and competent field engineers will be assigned tosupervise DPWH projects, the hereto attached revised guidelines on the accreditation andassignment of DPWH Project Engineers and Inspectors are hereby prescribed.

    The Bureau of Quality and Safety shall be responsible for the accreditation of DPWH ProjectEngineers and Inspectors as redefined under Department Order No. 137, Series of 2015 andshall seek technical assistance and services which are deemed necessary from any office of theDepartment to effectively carry out its tasks.

    This Order shall take effect immediately and supersedes the following Department Orders:

    1. Department Order No. 73, Series of 19982. Department Order No. 12, Series of 19993. Department Order Nos. 41 and 61, both Series of 20074. Department Order No. 08, Series of 2013

    I 5. Department Order No. 25, Series of 2015

    ~ v;;:::.---MARK A. VILLARSecretary

    15.1 MGM/GSR

    Departrrent of Public Works and HighwaysOffice of the Secretary

    1111111111111111111111111111111111111WIN8U01635

  • Department Order No. ~, Sehes of 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 2 of 15

    GUIDELINES ON THE ACCREDITATION AND ASSIGNMENT OF DPWH .PROJECTENGINEERS AND INSPECTORS

    1.0 CRITERIA FOR ACCREDITATION

    The following criteria shall be applied in the evaluation for the accreditation of FieldEngineers.

    a. Education and Eligibility

    b. Training and Experience

    - Training 10 points- Experience 25 points

    c. Performance

    d. Accreditation Examination

    1.1 EDUCATION AND ELIGIBILITY

    Pass/Fail

    35 points

    30 points

    35 points

    The applicant must be a Registered Civil Engineer or Registered Architect eRA1080).

    Education and eligibility are a Pass/Fail criterion. Those who fail this criterionshall be disqualified outright.

    1.2 TRAINING AND EXPERIENCE

    Training and experience shall be evaluated as follows:

    1.2.1 Training

    35 points

    10 points

    The rating for this criterion shall be based on the relevant trainingsattended by the field engineers. The relevant trainings and theircorresponding points are as follows:

    a. Planning, Design, ConstructionMethods &. Techniques 4 points

    Credit 1 point for the training on Construction Methods andTechniques and another 1 point each for any three trainings relatedto the construction aspect of project implementation as indicated inExhibit "A", to obtain the total points, which shall not exceed 4 points.

  • Department Order No. ~, Se'ri,esof 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 3 of 15

    b. Materials Quality Control 4 points

    Credit 2 points for completing the On-the-Job Training on MaterialsQuality Control (with duration of 176 hours) or Materials QualityControl in Project Implementation (with duration of 176 hours) andanother 1 point each for any two (2) trainings related to the qualitycontrol aspect of project implementation as shown in Exhibit "A", toget the total points, which shall not exceed4 points.

    c. Project Management and Supervision 2 points

    Credit 1 point each for any two trainings on project management asshown in Exhibit "A", to get the total points, which shall not exceed 2points.

    Trainings conducted by agencies/offices other than the Department withequivalent or longer duration than in-house seminars/trainings and thosenot included in Exhibit "A" shall be evaluated by the AccreditationCommittee and subject to approval by the Secretary prior to inclusion inthe list of trainings credited under Section 1.2.1-Training, of thisGuidelines.

    1.2.2 Experience

    The rating for this criterion shall be basedon:

    25 points

    a) The number of contractsA handled by the applicant in a capacity asProvisional Project Engineer, Provisional Project Inspector, ProjectManager, Junior Project Engineer, Project Engineer, ResidentEngineer, Materials Engineer or Project Inspector, whether in thegovernment or private sector, and

    b) The number of years that the applicant has been handling contractsas Provisional Project Engineer, Provisional Project Inspector, ProjectManager, Junior Project Engineer, Project Engineer, ResidentEngineer, Materials Engineer or Project Inspector whether in thegovernment or private sector; or the number of years that theapplicant has been involved in QAU related activities, i.e.assessments, investigation and final inspection forcompletion/acceptance

    c) For non-accredited Materials Engineers, no credit shall be given forcontracts handled after January 02, 2015.

    A Includes contracts for clustered projects, MOAs and projects undertaken by administration

  • Department Order No. ~, Se'rj,esof 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 4 of 15

    Experience shall be rated as follows:

    a. Number of Contracts Handled Corresponding to Costs, 10 maximumpoints

    Contract :::;SOM > SOM to > 200M to > SOOM PointsCost 200M SOOM

    (1) (2) (3) (4)III

    1-5 1-3 4'tl 6-10 4-6 1-2 5RlI-

    11-15 7-9 3-4 1 6.•..c0 16-20 10-12 5-6 2 7u.•..0 21-25 13-15 7-8 3 8I-Q) 26-30 16-18 9-10 4 9.0E More More than More than More than 10:2z than 30 18 10 4 (maximum)

    Points for this criterion shall be the highest point earned based on thenumber of contracts using columns 1, 2, 3 and 4 of the above table.

    Ex.Column No. of Contracts Points

    Column (1) = 3 = 4Column (2) = 5 = 5Column (3) = 8 = 8Column (4) = 1 = 6

    Highest point earned = 8 points

    b. Aggregate number of years handling contracts, 15 maximum points

    • 1 point per year, but the total shall not exceed 15 points

    Submission of proofs/evidences, such as Project Designation Orders (indicatingName of Contract, Contract Amount, Start and Completion Dates) to act asJunior Project Engineer, Provisional Project Engineer, Provisional ProjectInspector, Project Engineer, Project Inspector and Materials Engineer,certification from the head of office with job description, memorandumdesignation or any other documents, e.g. Statement of Work Accomplished andproject billings/vouchers bearing the applicant's signature and authenticated bythe head of office, memoranda/directives in any QAU related activities, UPMODesignation Order to act as Project Manager for UPMO projects are required asbasis for evaluation of work experience.

    For accredited DPWH Materials Engineers, submission of Project DesignationOrders effective January 02, 2015 for contracts handled as Materials Engineershall be credited as work experience.

  • Department Order No. ----1.1L, Ser.i,esof 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 5 of 15

    Submitted proofs/evidences as supporting documents for traiQings/seminarsattended and relevant experiences shall be certified as true copies of the originaldocuments by the concerned Administrative or Records Officer of the concernedimplementing office.

    1.3 PERFORMANCE 30 points

    The criterion rating shall be based on the performance evaluation using theDepartment's Strategic Performance Management System (SPMS) as indicated inthe Individual Performance Commitment and Review (IPCR) form.

    The criterion rating shall be obtained by multiplying the performance rating bythe weight factor of 30%. Performance rating shall be based on the average ofequivalent points of SPMS numerical rating for the last two (2) semestersimmediately preceding the time of application for accreditation or upgrading ofclassification rank.

    For each rating period, the equivalent points of the SPMS numerical rating areshown in Exhibit "B".

    1.4 ACCREDITATION EXAMINATION 35 points

    The rating for this criterion shall be based on the results of the examinationadministered at the end of the Comprehensive Training for DPWH· FieldEngineers or Project Manager's Course. The raw score obtained in theexamination shall be multiplied by the factor weight of 35% to obtain the earnedpoints for this criterion.

    2.0 CLASSIFICATION OF FIELD ENGINEERS

    Field engineers shall be classified according to their total rating. The total rating shallbe the sum of the ratings obtained in training and experience, performance and theaccreditation examination.The classification of field engineers shall be as follows:

    a. The designation of Project Engineer shall be given to those holding permanentitems, with classification ranks determined as follows:

    Total Points76 & above71 - 7561 - 7051 - 6040 - 50

    Classification

    Project Engineer IIIProject Engineer IIProject Engineer IJunior Project EngineerProject Inspector

    b. Classification ranks may be upgraded individually upon the request of each fieldengineer who acquires additional qualification requirements after the initialaccreditation.

  • Department Order No. ~, Se'r.i,esof 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 6 of 15

    3.0 CRITERIA FOR ASSIGNMENT OF PROJECT ENGINEERS/INSF!ECTORS TODPWH PROJECTS

    3.1 The head of the implementing office shall assign Project Engineers within his areaof jurisdiction, subject to the following limitations of assignment:

    For Regional/District Offices

    Classification limits of AssignmentMaximum Number Maximum Cost of

    of Contracts ProjectPE III 15 No cost limit

    PE II 15 100M

    PE I 10 50M

    Junior PE 10 20MAssist the PE IIIjPE IIjPE IjJunior PE in the

    PI implementation of assigned contracts withoutlimits of assignment

    For Unified Project Management Offices (UPMOs)

    Classification limits of AssignmentMaximum Number Maximum Cost of

    of Contracts ProjectPE III 3 >500M

    PE II 3 500M

    PE I 4 250M

    Junior PE 4 100MAssist the PE IIIjPE IIjPE IjJunior PE in the

    PI implementation of assigned contracts withoutlimits of assignment

    3.2 The assignment of Project Engineers shall be subject to the following conditions:

    a. All contracts to be assigned simultaneously shall be located within the sameprovince except for UPMO foreign-assisted projects.

    b. Division Chiefs of the Regional Offices and Section Chiefs of the DistrictEngineering Offices of the Department whether in a permanent or OICcapacity, shall not act as Project Engineers. However, in the case of DistrictOffices with insufficient Project Engineers, exemption for Chiefs ofMaintenance and Planning and Design Sections should be requested forapproval of the Secretary.

  • Department Order No. ~ Serj,esof 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 7 of 15

    c. Assignment of registered architects as Project Engineers shall beJimited to four(4)-storey public/school buildings.

    d. A DPWH field engineer, who is both an accredited Project Engineer andMaterials Engineer, may be assigned to act as both Project Engineer andMaterials Engineer on the same contract but shall be limited to a maximumnumber of five (5) contracts within the same province, each costing not morethan 20 Million Pesos.

    3.3 The head of the implementing office shall assign Project Inspectors within his areaof jurisdiction, subject to the following conditions:

    a. An accredited Project Engineer may act as Project Inspector in other on-goingDPWH contract where he is not the designated Project Engineer. However,his/her rank shall be lower than the assigned Project Engineer for the contract(e.g. Project Engineer II/I, Provisional/Junior Project Engineer as ProjectInspector if assigned PE is an accredited Project Engineer III).

    b. All DPWH registered civil engineers, holding non-engineering positions i.e.,Engineering Assistant, Construction and Maintenance Foreman/Capataz,Laboratory Technician, Surveyman among others, who have applied andpassed the said accreditation will be accredited and designated only as ProjectInspectors (PIs). Said classification ranks may be upgraded only if they haveacquired an engineering position and met other qualification criteria requiredfor the upgrading of rank.

    3.4 Regional Directors/District Engineers may request the designation of ProjectEngineers/Inspectors from the pool of accredited field engineers in the CentralOffice as the need arises.

    3.5 UPMO Directors may also request from the pool of accredited field engineers inthe Regional/District Offices with jurisdiction over their implemented projects.

    4.0 DUTIES AND RESPONSIBILITIES OF FIELD ENGINEERS

    Project Engineer

    a) In-charge of the overall planning and control of the project.

    b) Ensures that materials and workmanship are at all times in accordance withplans and specifications.

    c) Ensures that inspections and tests are carried out promptly and timely.

    d) Witnesses critical activities of the project. Signs-off at hold points prior toproceeding with the next activity.

    e) Checks/verifies physical and financial status of the project.

    f) Checks/verifies statement of work accomplished.

    g) Approves concrete pouring permit and other job control forms.

    h) Issues' work suspension orders and other site instructions.

  • Department Order No. -1!.L, Se'rj,esof 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 8 of 15

    i) Prepares proposed Change Order, Extra Work Order or Supplemental WorkAgreement, when necessary.

    j) Maintains and/or updates field documentation such as log book, plans andprogram of works, schedules,S-curve, laboratory test results, etc.

    k) Resolvesproblems encountered in the implementation of the project.I) Coordinates with Project Consultants, NGOs and other officials concerned in

    project implementation.

    Project Inspector

    a) Assists the Project Engineer in the overall direction and supervision of the fieldoperation.

    b) Ensures that the works being inspected are in accordance with the plans andspecifications.

    c) Witnessescritical activities of the project.d) Notifies the Project Engineer in case there are deviations from approved plans

    and specifications.e) Conducts and monitors daily activities including weather conditions and

    maintains a logbook to record such activities.f) Preparesand submits Statement of Work Accomplished.g) Preparesand submits physical/financial status to the project engineer.h) Carriesout instructions/orders of the project engineer.

    5.0 PROCEDUREFORACCREDITATION

    5.1 Who may be Accredited

    All DPWH registered Civil Engineers occupying an engineering position fromEngineer II to EngineerV and Project Manager I to Project Manager III includingthose occupying non-engineering positions such as Engineering Assistant,Laboratory Technician, Construction and MaintenanceForeman/Capataz,etc. andregistered Architects occupying a position title of Architect II may apply foraccreditation.

    5.2 Accreditation Requirements

    The following must be submitted to the Bureau of Quality and Safety (BQS) forvalidation and evaluation.

    a) Duly accomplished application form (Exhibit "C"), certified by the Head ofOffice. Applications will be accepted online thru the electronic FieldEngineers Accreditation (eFEA) application when it is launched by theDepartment.

    b) Certified true copy of SPMS Individual Performance Commitment andReview Rating for the last two (2) semesters.

  • Department Order No. --.l!L, Series of 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 9 of 15

    c) Certified true copy of Certificate of Comprehensive Training for FieldEngineers or Certificate of Training for Project Manager's Course.

    d) Certified true copy of Appointment.

    e) Certified true copy of PRCID as registered Civil Engineer/Architect.

    f) Attachments required under Section 1.2 of these guidelines.

    5.3 Validation/Evaluation of DocumentsSubmitted

    a) Only valid, complete and authentic documents shall be considered by theAccreditation Committee for evaluation.

    b) The applicants will be evaluated strictly in accordance with the criteria setforth in the preceding sections of these Guidelines.

    5.4 Issuance of Certificate and Identification Card.

    a) A Certificate of Accreditation and Identification Card will be issued to thosewho will meet the requirements for accreditation.

    b) The Certificate of Accreditation and Identification Card shall indicate theclassification rank and accreditation number of field engineers based ontheir overall rating.

    6.0 TESTIMONIAL ACCREDITATION

    The requirements for testimonial accreditation are as follows:

    a) The applicant must be a BSCE graduate and a registered Civil Engineer (RA1080).

    b) The applicant should be at least 50 years of age.

    c) The applicant should meet any of the following:

    c.l) Minimum 15 years experience in handling projects/contracts as ProjectEngineer/Materials Engineer/Project Inspector/Project Manager

    c.2) Served as contributor/examiner in the qualifying examination foraccreditation of DPWH Project Engineers/Materials Engineers

    c.3) Acted as resource person in the Comprehensive Training for DPWH FieldEngineers or Project Manager's Course

    d) The applicant must have obtained Very Satisfactory rating for the last two (2)consecutive rating periods.

    The Accreditation Committee shall evaluate the applicant's qualification and if foundacceptable, recommend testimonial accreditation for approval of the Secretary.

  • Department Order No. ~, SerIes of 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 10 of 15

    Exhibit "A"

    RELEVANTTRAININGS WITH THEIR CORRESPONDING POINTS

    Weight

    A. Planning, Design, Construction Methods &. Techniques 4 points

    1. One (1) point for completing anyone (1) of the following Construction Methods andTechniques:

    1.1 Construction Methods and Techniques for Bridges/Bridge Construction1.2 Construction Methods and Techniques for Buildings1.3 Construction Methods and Techniques for Flood Control and Drainage

    Structures1.4 Construction Methods and Techniques for Highways/Road Construction

    Methods and Techniques

    2. One (1) point each for completing any three (3) of the following trainings/seminars:

    Planning2.1 Computer Aided Preparation of Plans2.2 Flood Prevention and Mitigation2.3 Planning and Design of Flood Control Structures2.4 Safety in Construction2.5 Subsurface Exploration2.6 Traffic Engineering2.7 Training in Various Courses in Road Safety2.8 Transportation Engineering2.9 Workshop on Hydraulics and River Hydraulics Model using GIS, HEC-HMS and

    HEC-RAS

    Design2.10 Applications of Gabions and Mattresses2.11 Bridge Design with Computer Application using STAAD-Pro2.12 Computer Aided Design (Civil 3D)2.13 Earthquake Engineering and Infrastructure Rehabilitation2.14 Flood Control and Urban Drainage Design with Computer Application2.15 Geotechnical Engineering2.16 Highway Design with Computer Application using STAAD-Pro2.17 Highway Foundation Investigation and Analysis2.18 Hydrology Seminar2.19 Principles of Bridge Design2.20 Principles of Highway Design2.21 Principles of Highway Location, Survey and Design2.22 River and SABa Engineering2.23 Slope Stability2.24 Structural Analysis and Design Software (STAAD Pro)2.25 Structural Design2.26 Surveys and Site Investigation

    --- 1

  • Department Order No. -.l!L, Se'rj,esof 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 11 of 15

    Construction

    2.27 Bridge and Flood Control Project Implementation and Assessment2.28 Bridge Assessment, Maintenance and Repair/Rehabilitation2.29 Bridge Engineers Accreditation Course2.30 Bridge Management System2.31 Construction of Ports and Harbors2.32 Construction of Water Supply Project2.33 Labor-Based Technology2.34 Pothole Patching Technology2.35 Quality Assurance Seminar2.36 Road and Bridge Information Application2.37 Road Maintenance and Rehabilitation

    B. Materials Quality Control 4 points

    1. Two (2) points for completing anyone (1) of the following:

    1.1 On-the-Job Training on Materials Testing (with duration of 176 hours)1.2 Materials Quality Control in Project Implementation (with duration of 176

    hours)

    2. One (1) point each for completing any two (2) of the following trainings/seminars:

    2.1 Materials Quality Control in Project Implementation (with duration of less than176 hours)

    2.2 Materials Testing Procedures2.3 Materials Engineering and Quality Control2.4 Soil Engineering2.5 Asphalt Technology2.6 Concrete Technology2.7 Project Quality Assurance

    C. Project Management and Supervision 2 points1. One (1) point for completing Project Management by PERT/CPM or Precedence

    Diagram Method (PDM).

    2. One (1) point for completing any of the following trainings/seminars:

    2.1 Implementing Rules and Regulation on RA 9184 (Government ProcurementReform Act)

    2.2 Project Assessment and Documentation2.3 Infrastructure Planning and Programming Procedures2.4 Construction Supervision and Management2.5 Project Management2.6 Construction Planning & Scheduling w/ Computer-Aided Engineering/Computer

    Aided Design and Drafting2.7 Supervision Management for Field Engineers2.8 DPWH Project Development and Implementation2.9 Networking/Scheduling (PERT/CPM or PDM)2.10 Project Monitoring and Evaluation

  • Department Order No. ~, Se'r!~sof 2018Guidelines on the Accreditation and Assignment of DPWHProject Engineers and Inspectors

    Page 12 of 15

    Exhibit "8"EQUIVALENT POINTS OF THE SPMS PERFORMANCE RATING

    QUALITATIVE SPMS EQUIVALENTRATING NUMERICAL POINTS

    RATINGOUTSTANDING 5.00 100.00

    VERY 4.99 99.88SATISFACTORY 4.98 99.75

    4.97 99.634.96 99.504.95 99.384.94 99.254.93 99.134.92 99.004.91 98.884.90 98.754.89 98.634.88 98.504.87 98.384.86 98.254.85 98.134.84 98.004.83 97.884.82 97.754.81 97.634.80 97.504.79 97.384.78 97.254.77 97.134.76 97.004.75 96.884.74 96.754.73 96.634.72 96.504.71 96.384.70 96.254.69 96.134.68 96.004.67 95.884.66 95.754.65 95.634.64 95.504.63 95.384.62 95.254.61 95.134.60 95.004.59 94.884.58 94.754.57 94.634.56 94.504.55 94.384.54 94.254.53 94.134.52 94.004.51 93.884.50 93.75

    SPMS EQUIVALENTNUMERICAL POINTS

    RATING- -

    4.49 93.634.48 93.504.47 93.384.46 93.254.45 93.134.44 93.004.43 92.884.42 92.754.41 92.634.40 92.504.39 92.384.38 92.254.37 92.134.36 92.004.35 91.884.34 91.754.33 91.634.32 91.504.31 91.384.30 91.254.29 91.134.28 91.004.27 90.884.26 90.754.25 90.634.24 90.504.23 90.384.22 90.254.21 90.134.20 90.004.19 89.884.18 89.754.17 89.634.16 89.504.15 89.384.14 89.254.13 89.134.12 89.004.11 88.884.10 88.754.09 88.634.08 88.504.07 88.384.06 88.254.05 88.134.04 88.004.03 87.884.02 87.754.01 87.634.00 87.50

  • Department Order No. ~, Sehes of 2018Guidelines on the Accreditation and Assignment of DPWHProject Engineers and Inspectors

    Page 13 of 15

    QUALITATIVE SPMS EQUIVALENTRATING NUMERICAL POINTS

    RATINGSATISFACTORY 3.99 87.38

    3.98 87.253.97 87.133.96 87.003.95 86.883.94 86.753.93 86.633.92 86.503.91 86.383.90 86.253.89 86.133.88 86.003.87 85.883.86 85.753.85 85.633.84 85.503.83 85.383.82 85.253.81 85.133.80 85.003.79 84.883.78 84.753.77 84.633.76 84.503.75 84.383.74 84.253.73 84.133.72 84.003.71 83.883.70 83.753.69 83.633.68 83.503.67 83.383.66 83.253.65 83.133.64 83.003.63 82.883.62 82.753.61 82.633.60 82.503.59 82.383.58 82.253.57 82.133.56 82.003.55 81.883.54 81. 753.53 81.633.52 81.503.51 81.383.50 81.25

    SPMS EQUIVALENTNUMERICAL POINTS

    RATING3.49 81.133.48 81.003.47 80.883.46 80.753.45 80.633.44 80.503.43 80.383.42 80.253.41 80.133.40 80.003.39 79.883.38 79.753.37 79.633.36 79.633.35 79.503.34 79.383.33 79.253.32 79.133.31 79.003.30 78.883.29 78.753.28 78.633.27 78.503.26 78.253.25 78.133.24 78.003.23 77.883.22 77.753.21 77.633.20 77.503.19 77.383.18 77.253.17 77.133.16 77.003.15 76.883.14 76.753.13 76.633.12 76.503.11 76.383.10 76.253.09 76.133.08 76.003.07 75.883.06 75.753.05 75.633.04 75.503.03 75.383.02 75.253.01 75.133.00 75.00

  • Department Order No. j!L, Series of 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 14 of 15

    Department of Public Works and Highways DPWH-BQS-QSAD-02-F02-Rev.002

    Exhibit "C"

    APPLICATION FORM FORTHE ACCREDITATION OF DPWH FIELD ENGINEERS*

    EMPLOYEE ID NO. : _

    EMPLOYMENT TYPE : D Permanent D Job OrderNAME: _

    (Surname) (First Name) (Middle Name)

    MAIDEN NAME (if applicable): _

    OFFICE ASSIGNED:

    DPWH E-MAIL ADDRESS: _

    ELIGIBILITY :

    D Registered Civil Engineer Registration No.D Registered Architect Registration No. _

    TRAININGS/SEMINARS:

    Course Title

    License Expiry Date _

    License Expiry Date _

    Duration

    (Provide separate sheet, if necessary)

    *Sample format, application form is downloadable at the DPWH intranet site under Quick Links,Bureaus and Services, Bureau of Quality and Safety, Accreditations

  • Department Order No. -.l!L, Ser.iesof 2018Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors

    Page 15 of 15

    Department of Public Works and Highways DPWH-BQS-QSAD-02-F02-Rev.002

    * Includes contracts for clustered projects, MOAs and Projects by Administration

    NUMBER OF YEARS HANDLING CONTRACTS* WITH OUTSIDEDPWH DPWH

    As Project ManagerAs Junior/Provisional Project Engineer/Project EngineerAs Resident Engineer (Prior to 1998 or outside)As Materials EngineerAs Accredited Materials Engineer (from 2015 onwards) N/AAs Project Inspector/Provisional Project InspectorNo. of years as Active QAU Member N/A

    A. NUMBER OF CONTRACTS* WITH OUTSIDEDPWH DPWH

    As Project ManagerAs Junior/Provisional Project Engineer/Project EngineerAs Resident Engineer (Prior to 1998 or outside)As Materials EngineerAs Accredited Materials Engineer (from 2015 onwards) N/AAs Project Inspector/Provisional Project Inspector ..

    PERFORMANCE (Last two consecutive SPMS-IPCR rating periods):

    Rating Period Numerical Rating

    ACCREDITATION EXAMINATION: Raw Score = _

    I certify that the information contained in and attached to this application is accurate. Iunderstand that if any information is determined to be inaccurate, my application will be deniedand I will be subjected to disciplinary action.

    Please attach

    recent Passport

    Size ID picture on a

    white background

    with nametag

    Applicant's Signature

    Name and Signature of the Head of Office

    page1titles03 AUG ZOU~ ~ v;;:::.---

    imagesimage1

    page2tablestable1

    page3page4tablestable1table2

    page5page6tablestable1table2

    page7page8page9page10titles--- 1

    page11page12titlesExhibit "8"

    tablestable1table2

    page13tablestable1table2

    page14imagesimage1

    page15imagesimage1image2

    tablestable1