Audit Scoring Matrix
-
Upload
beachlover1970 -
Category
Documents
-
view
246 -
download
0
Transcript of Audit Scoring Matrix
-
7/30/2019 Audit Scoring Matrix
1/1
A B C D E F G H I J K L M N L
Man
agement
Sales&Marketing
ProductDesignEngineering
ProcessDesignEngineering
HR&
Training
SupplierManagement
Informatio
nManagement
QualityAssurance
Receiving/Inventory
Man
agement
St
amping
W
elding
As
sembly
Shipping
Billing
Feb-05 Mar-05 Mar-05 Jan-05 Dec-05 Nov-05 Jan-05 Jun-05 Mar-05 Sep-05 Sep-05 Sep-05 Sep-05 Nov-05
4.1
General Requirements
0 0 0 0 0 0 0 0 0 5 0 0 0 0 5
4.1.1
Control of Outsourced
Processes / Products 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3
4.2
General Documentation
Requirements 0 7 0 6 8 21
4.2.3
Control of Documents
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.2.4
Control of Records
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.1
Management
commitment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.1.1
Process efficiency
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.2
Customer Focus
0 0
5.3
Quality policy
3 0 3
5.4
Planning
0 4 0 0 7 0 0 0 4 4 0 5 0 0 24
5.5
Responsibility, authority
and communication 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.6
Management Review
0 0 3 0 0 3
6.1
Provision of resources
0 0 4 0 4
6.2
Human resources
0 0 0 0
6.2.2
Competence,
awareness and training 0 0 0 0
6.2.2.4
Employee motivation &
empowerment 0 0 0
6.3
Infrastructure
0 4 4
6.4
Work environment
0 0 0 2 3 5
7.1Planning of ProductRealization 4 4
7.2
Customer-related
processes 0 0 0 0 0 0
7.2.2.2
Organization
Manufacturing
Feasibility0 0 0 0 0 0 0 0 0 0
7.2.3
Customer
Communication 0 0 0 0 0 0
7.3
Design and
development 9 0 0 0 0 0 9
7.3.1
Design and
development Planning
0 0 0 0 0 0 0 0 0 0 0 0 0 0 07.3.2
Design and
development Inputs 0 0 0 0
7.3.2.3
Special Characteristics
0 0 0
7.3.3
Design and
development Outputs 4 0 6 0 0 0 0 0 0 0 0 0 0 0 10
7.3.4
Design and
development Review 0 0 5 0 6 0 11
7.3.5&6
Design and
development
Verification & Validation1 0 0 0 0 0 1
7.3.6.3
Product Approval
Process 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.3.7
Design and
development Changes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.4
Supplier Management
& Purchasing 0 0
7.4.1.2
Supplier Quality
Management System
Development0 0
7.4.3.1
Incoming Product
Quality 0
7.4.3.2
Supplier Monitoring
0
7.5.1
Control of Production
and Service 0
7.5.1.1
Control plan
0
7.5.1.3
Verification of Job Set-
ups 0
7.5.1.4
Preventive & Pred ictive
Maintenance 0
7.5.1.5
Management of
Production Tooling 0
7.5.1.6
Production Scheduling
0
7.5.1.7&8
Servicing
0
7.5.2
Validation of Processe s
0
7.5.3
Identification and
Traceability 0
7.5.4
Customer Property
0
7.5.5
Preservation of Product
& Inventory
Management 0
7.6Control of measuringand m onitoring devices 0
7.6.1
Measurement System
Analysis 0
7.6.3
Laboratory
Requirements 0
8.1
General
0
8.1.1
Identification of
statistical tools 0
8.1.2
Knowledge of basic
statistical concepts
08.2.1
Customer Satisfaction
0
8.2.2
Internal audits
0
8.2.2.2
Manufacturing process
audits 0
8.2.2.3
Product audits
0
8.2.2.5
Internal auditor
qualifications 0
8.2.3
Monitoring &
Measurement of
processes 0
8.2.3.1
Monitoring &
Measurement of
manufacturing 0
8.2.4
Measurement and
monitoring of product 0
8.2.4.1
Layout inspection &
functional testing 0
8.2.4.2
Appearance items
0
8.3
Control of
Nonconformant Product 0
8.4
Analysis and us e of
Data 0
8.5.1
Continual improvement
0
8.5.1.2
Manufacturing process
improvement 0
8.5.2
Corrective action
0
8.5.3
Preventive action
0
CSRs
GM
0 3 3
CSRs
Ford
0
CSRs
Daimler-Chrysler
5 0 5
CSRs
Delphi
0
CSRs
Visteon
0
CSRs
Other
0
24 16 27 14 12 23 20 16 15 22 25 16 18 12 260
2 3 4 4 4 3 3 2 2 4 5 4 1 3 44
2 3 5 4 5 2 3 1 2 3 5 5 2 3 45
4 2 6 2 3 6 4 3 2 7 8 4 3 2 56
7 4 11 8 7 11 0 12 0 4 20 7 21 3 0 115
Management Communication
Scores
Employee Awareness
Scores
Instructions: This matrix is used to record and analyze internal audit results and is intended to be used in conjunction with the TS 16949 Internal Audit Summary Form, Problem Solver & Improvement Form, and
Audit Effectiveness Survey. Enter a 0 if the element was audited and no nonconformances were found. Otherwise, enter the severity ranking for each finding per element & process. The total value of all OFIs
raised by the auditors should also be enterred for each process. Management communication and employee awareness scores are taken from the TS internal audit summary reports. If used, the audit
effectiveness survey score should also be enterred for each process.
Process Audit Scores
TS 16949 Internal Audit Summary Analysis MatrixQMS Processes
Opportunities for
Improvement Value
Audit Effectiveness Survey
Scores
Audit Dates:
Totals
Form Revision: 2/22/05 CONFIDENTIAL Summary Report Date: 1/7/2013