ATTS – On-Going Projects

37
ADVANCED TRIAD TURBINE SERVICES LTD. MAJOR PROJECTS BY ATTS Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR 1 Maintenance & Repair of Black Start & Starting Units SEC SOA 2017/2023 2 GRLA - SEC WOA SEC WOA 2017/2020 3 Supply & Installation of New Hypo Chlorinators MARAFIQ YANBU 2019/2021 4 AOS & Primary Cooling Water Basins SASREF 2019/2021 5 Transformers Maintenance - Multiple Locations SEC WOA 2019/2022 6 Relocation of Bus Duct from JPP3 to Makkah PP SEC WOA 2020 1 HP Air Compressor supply Sharoura PP SEC SOA 2019/2020 2 Transformers maintenance - multiple locations SEC WOA 2016/2019 3 SARAH COMPOUND FCI 2018/2019 4 Travelling screens - MARAFIQ MARAFIQ YANBU 2015/2019 STATUS ATTS – On-Going Projects ONGOING ONGOING ONGOING ONGOING COMPLETED ONGOING ONGOING ATTS – Completed Projects COMPLETED COMPLETED COMPLETED ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 1 of 37

Transcript of ATTS – On-Going Projects

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR

1 Maintenance & Repair of Black Start & Starting Units SEC SOA 2017/2023

2 GRLA - SEC WOA SEC WOA 2017/2020

3 Supply & Installation of New Hypo Chlorinators MARAFIQ YANBU 2019/2021

4 AOS & Primary Cooling Water Basins SASREF 2019/2021

5 Transformers Maintenance - Multiple Locations SEC WOA 2019/2022

6 Relocation of Bus Duct from JPP3 to Makkah PP SEC WOA 2020

1HP Air Compressor supply Sharoura PP SEC SOA

2019/2020

2Transformers maintenance - multiple locations SEC WOA

2016/2019

3SARAH COMPOUND FCI

2018/2019

4Travelling screens - MARAFIQ MARAFIQ YANBU

2015/2019

STATUS

ATTS – On-Going ProjectsONGOING

ONGOING

ONGOING

ONGOING

COMPLETED

ONGOING

ONGOING

ATTS – Completed ProjectsCOMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 1 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

5FRP Pipe Line - RPP SEC WOA

2018/2019

6SASREF - NDT ANABEEB

2018/2019

7HAWAMAT VILLA PRIVATE (Osama Alsayed)

2018/2019

8UPS Jazan PP

SEC SOA 2016/2019

9STP Bioshaft - Upgrade & Replacement of STP - Al Salam Palace

SETE SAUDIA2018

10Gas Dampers - RPP - PHASE-II SEC WOA

2015/2018

11Vital AC - Rabigh PP SEC WOA

2016/2018

12De-watering of Canal # 01 MASA JUBAIL

2018

13STP Bioshaft - KAIA Plant KP-01 ALMABANI

2017/2018

14Gas Dampers - RPP - PHASE-I SEC WOA

2015/2017

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 2 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

15Maintenance of Generators at COA SEC COA

2016/2017

16TIMS - 8 Locations SEC WOA

2014/2017

17Installation of H25 Detectors at MASA - Jubail MASA JUBAIL

2017

18Replacement of High Bay Lighting in HAIL- 2 PP

SEC-COA 2017

19Motor Fans - Makkah PP

SEC-WOA 2014/2016

20Transformers - Multiple Locations

SEC-WOA 2013/2016

21Droplet Catchers - PP3 Jeddah

SEC-WOA 2015/2016

22Diagnostics of Generator Rotor

SEC-WOA 2013/2016

23Install & Commission 1.5MVA Transformer Makkah PP

SEC-WOA 2016

24Coaelescing filters - Duba & Al Wadjh

SEC-WOA 2014/2016

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 3 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

25NWPS - MASA MASA JUBAIL

2015/2016

26BSDG - Madinah PP2 SEC WOA

2014/2015

27Battery Bank Project - RPP SEC WOA

2014/2015

28 Construction of Lube oil tank - Sharourah SEC SOA 2014/2015

29LP CO2 at Tihama PP

SEC SOA 2014/2015

30Rehabilitation of evaporator TP9 - MASA MASA JUBAIL

2013/2014

31Chlorination - Rabigh PP SEC WOA

2013/2014

32Aircraft lighting - Rabigh PP SEC WOA

2013/2014

33Alarm & Trip for transformers at PP3 jeddah

SEC-WOA 2013/2014

34CO2 - Makkah PP

SEC-WOA 2013/2014

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 4 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

35CO2 - Jeddah PP3

SEC-WOA 2013/2014

36 NDT INSPECTION SERVICES FOR GAS TURBINE UNITS AT SEC-WEST POWER PLANTS

SEC-WOA 2012/2013

37 WATER AND FOAM PIPELINES REPLACEMENT FOR 12 NOS STORAGE TANKS, PP7, RIYADH

SEC-COA 2012

38 GTG CONDITION ASSESSMENT ANALYSIS AND REMAINING LIFE ASSESSMENT FOR HITACHI FRAME 7001E

MARAFIQ 2012

39DISMANTLING, PRESERVATION AND TRANSPORT OF ELECTROMECHANICAL EQUIPMENT AT ANPP,7G, AL

JABRIAH AND YPR SUBSTATIONS-YANBU MARAFIQ 2012

40 REMAINING LIFE ASSESSMENT OF GENERATOR OF ABB & GE UNITS AT ALL WESTERN REGION PP's, SEC

SEC-WOA 2012

41 GENERATOR REMAINING LIFE ASSESSMENT FOR HITACHI GTG 1-8, YANBU, MARAFIQ

MARAFIQ 2012

42 ELECTRICAL TESTS FOR UNIT #12 AT SWCC JEDDAH PP3 SWCC 2012

43 GENERATOR LEAP TESTING AT MAKKAH PP SEC-WOA 2012

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 5 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

44 SERVICING OF POWER TRANSFORMER 2 AT SUB STATION 3C YANBU

MARAFIQ 2011/2012

45 NDT INSPECTION OF RETAINING RINGS AND COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2011/2012

46 NDT INSPECTION OF RETAINING RINGS AND COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2011/2012

47 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF STEAM CONVERTER FEED WATER TANK, STAGE 1

RABIGH PP/SEC-WOA 2011/2012

48 SUPPLY AND INSTALLATION OF AC/DC LIGHTING SYSTEM AT TIHAMA AND ABHA

TIHAMA PP/SEC-WOA ABHA PP/SEC-WOA

2011/2012

49REPLACEMENT OF CABLES OASSING UNDER EXHAUST AND TURBINE COMPARTMENTS IN GE GAS TURBINE UNITS NO

04, 05 & 06MAKKAH PP/SEC-WOA 2011/2012

50 GENERATOR LIFE ASSESSMENT OF GENERATOR GT#14, 20 & 24 TYPE ABB 11D5

JEDDAH PP3/SEC-WOA 2011/2012

51ELECTRICAL TEST FOR GENERATOR STATOR OF GT#1

(TANDELTA TEST, PARTIAL DISCHARGE AND COUPLING RESISTANCE)

LAILA PP/SEC-COA 2011

52 ENDOSCOPIC INSPECTION OF STATOR AND ROTOR OF ABB 11D5 STG# 06 GENERATOR

SHOAIBA PP/SWCC-WOA 2011

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 6 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

53 EXTENSION OF WATER SUPPLY PIPE LINE FROM SWCC TO PP9

RIYADH PP9/SEC-COA 2011

54 GENERATOR LIFE ASSESSMENT G.T # 01 TAIF PP/SEC-WOA 2011

55 GENERATOR LIFE ASSESSMENT G.T # 01 DUBA PP/SEC-WOA 2011

56 GENERATOR LIFE ASSESSMENT G.T # 06 MADINAH PP/SEC-WOA 2010

57 ANNUAL INSPECTION OF MHI STEAM UNIT # 4 RABIGH PP/SEC-WOA 2010/2011

58 ANNUAL INSPECTION OF MHI STEAM UNIT # 5 RABIGH PP/SEC-WOA 2010/2011

59 NDT INSPECTION OF GT # 06COMPRESSOR BLADES

MADINAH PP/SEC-WOA 2010/2011

60 NDT INSPECTION OF GT # 04COMPRESSOR BLADES

TAIF PP/SEC-WOA 2010/2011

61 NDT INSPECTION OF GT # 04COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2010/2011

62 NDT INSPECTION OF GT # 19COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010/2011

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 7 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

63 NDT INSPECTION OF GT # 03COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2010/2011

64 NDT INSPECTION OF GT # 11COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2010/2011

65 NDT INSPECTION OF GT # 05COMPRESSOR BLADES

MADINAH PP/SEC-WOA 2010/2011

66 NDT INSPECTION OF GT # 21COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010/2011

67 NDT INSPECTION OF GT # 29COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010/2011

68 NDT INSPECTION OF GT # 13COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010/2011

69 NDT INSPECTION OF GT # 01COMPRESSOR BLADES

DUBA PP/SEC-WOA 2010/2011

70 NDT INSPECTION OF GT # 04COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2010/2011

71 NDT INSPECTION OF GT # 01COMPRESSOR BLADES

TAIF PP/SEC-WOA 2010/2011

72 NDT INSPECTION OF GT # 16COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010/2011

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 8 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

73 NDT INSPECTION OF GT # 22COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010/2011

74 NDT INSPECTION OF GT # 05COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2010/2011

75 NDT INSPECTION OF GT # 01COMPRESSOR BLADES

MADINAH PP/SEC-WOA 2010/2011

76 NDT INSPECTION OF GT # 08COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2010/2011

77 NDT INSPECTION OF GT # 07COMPRESSOR BLADES

RABIGH PP3/SEC-WOA 2010/2011

78 NDT INSPECTION OF GT # 35COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010/2011

79 NDT INSPECTION OF GT # 05COMPRESSOR BLADES

RABIGH PP3/SEC-WOA 2010/2011

80 NDT INSPECTION OF GT # 06RETAINING RING + WEDGES

MADINAH PP/SEC-WOA 2010/2011

81 NDT INSPECTION OF GT # 19RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

82 NDT INSPECTION OF GT # 29RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 9 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

83 NDT INSPECTION OF GT # 13RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

84 NDT INSPECTION OF GT # 21RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

85 NDT INSPECTION OF GT # 17RETAINING RING + WEDGES

MAKKAH PP/SEC-WOA 2010/2011

86 NDT INSPECTION OF GT # 16RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

87 NDT INSPECTION OF GT # 10RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

88 NDT INSPECTION OF GT # 01RETAINING RING + WEDGES

TAIF PP/SEC-WOA 2010/2011

89 NDT INSPECTION OF GT # 33RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

90 NDT INSPECTION OF GT # 34RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

91 NDT INSPECTION OF GT # 35RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010/2011

92 NDT INSPECTION OF GT # 15RETAINING RING + WEDGES

MAKKAH PP/SEC-WOA 2010/2011

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 10 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

93 NDT INSPECTION OF GT # 08RETAINING RING + WEDGES

MAKKAH PP/SEC-WOA 2010/2011

94 NDT INSPECTION OF GT # 24RETAINING RING + WEDGES

MAKKAH PP/SEC-WOA 2010/2011

95 NDT INSPECTION OF GT # 30RETAINING RING + WEDGES

MAKKAH PP/SEC-WOA 2010/2011

96 SUPPLY OF GT FUEL ADDITIVES JEDDAH PP3/SEC-WOA 2010/2011

97 INSPECTION & REPAIR OF EXCITOR ROTOR ABB GT # 34 RIYADH PP5/SEC-COA 2010

98 REPAIR OF EXCITOR STATOR & ROTOR ABB GT # 27 RIYADH PP5/SEC-COA 2010

99 REPAIR OF EXCITOR STATOR ABB GT#34 RIYADH PP5/SEC-COA 2010

100 ABB EXCITER ROTOR OVERHAULING OF GT#35 RIYADH PP5/SEC-COA 2009

101 INSPECTION & REPAIR OF EXCITER ROTOR ABB GT # 26 RIYADH PP5/SEC-COA 2010

102 INSPECTION & REPAIR OF EXCITOR STATOR AND ROTOR

ABB GT # 33RIYADH PP5/SEC-COA 2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 11 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

103 REPAIR OF COMPLETE ABB 11D5 EXCITER RIYADH PP8/SEC-COA 2010

104 MINOR REPAIR OF EXCITER ROTOR RIYADH PP8/SEC-COA 2010

105 ELECTRICAL TESTING OF ALTERNATOR YANBU PP/SWCC-WOA 2010

106REWINDING OF BLOW DOWN MOTOR 11KW &

BALANCING ROTOR OF MAKE UP WATER PUMP MOTOR SHOAIBA PP/SWCC-WOA 2010

107OVERHAULING OF VIBRATOR MOTOR 0.22KW,REPAIR

FREQUENCY CONVERTER MOTOR & REWINDING BREAK SHOAIBA PP/SWCC-WOA 2010

108 NDT INSPECTION OF GT # 05COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2010

109 NDT INSPECTION OF GT # 06COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2010

110 NDT INSPECTION OF GT # 03COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2010

111 NDT INSPECTION OF GT # 16COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2010

112 NDT INSPECTION OF GT # 11RETAINING RING + WEDGES

MAKKAH PP/SEC-WOA 2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 12 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

113 NDT INSPECTION OF GT # 11COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2010

114 NDT INSPECTION OF GT # 05RETAINING RING + WEDGES

MAKKAH PP/SEC-WOA 2010

115 NDT INSPECTION OF GT # 18COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2009

116 NDT INSPECTION OF GT # 18RETAINING RING + WEDGES

MAKKAH PP/SEC-WOA 2009

117 INSPECTION OF MHI BOILER CHIMNEY OF STAGE # 1 and G.T & HRSG CHIMNEYS OF STAGE # 2

RABIGH PP/SEC-WOA 2010

118 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NEW 32 NO. FUEL ADDITIVE DOSING PUMPS

JEDDAH PP3/SEC-WOA 2010

119POWER RENTAL AND OPERATION & MAINTANENCE OF

POWER PLANT FOR GENERATION OF ELECTRICAL POWER FOR THE ISOLATED DISTRIBUTION NETWORK

AL-ULAH/SEC-WOA 2010

120 ONLINE LEAK SEALING SERVICES FOR ALL MAJOR POWER PLANTS OF SEC

MAJOR PPS/SEC-WOA 2010

121 ABB EXCITOR ROTOR OVERHAULING (REWINDING) GT #34 RIYADH PP5/SEC-COA 2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 13 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

122 REPAIR OF ABB EXCITOR STATOR (REWINDING) GT# 34 RIYADH PP5/SEC-COA 2010

123 INSPECTION AND REPAIR FOR EXCITOR ROTOR (REWINDING) GT# 34

RIYADH PP5/SEC-COA 2010

124 INSPECTION AND REPAIR OF EXCITOR STATOR AND ROTOR (REWINDING) GT # 27

RIYADH PP5/SEC-COA 2010

125 REPAIR AND REWINDING OF GENERATOR EXCITOR TYPE WBF6-4G FOR ABB 9D1N GT#6

TAIF PP/SEC-WOA 2010

126 GENERATOR LIFE ASSESSMENT G.T # 10 JEDDAH PP3/SEC-WOA 2010

127 GENERATOR LIFE ASSESSMENT G.T # 04 MAKKAH PP/SEC-WOA 2010

128 GENERATOR LIFE ASSESSMENT G.T # 15 MAKKAH PP/SEC-WOA 2010

129 GENERATOR LIFE ASSESSMENT G.T # 17 MAKKAH PP/SEC-WOA 2010

130 SUPPLY OF GT FUEL ADDITIVES RABIGH PP/SEC-WOA 2010

131 GENERATOR LIFE ASSESSMENT G.T # 08 JEDDAH PP2/SEC-WOA 2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ON GOING

ON GOING

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 14 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

132 GENERATOR LIFE ASSESSMENT G.T # 019 JEDDAH PP3/SEC-WOA 2010

133 GENERATOR LIFE ASSESSMENT G.T # 21 JEDDAH PP3/SEC-WOA 2010

134 GENERATOR LIFE ASSESSMENT G.T # 13 JEDDAH PP3/SEC-WOA 2010

135 GENERATOR LIFE ASSESSMENT G.T # 16 JEDDAH PP3/SEC-WOA 2010

136 GENERATOR LIFE ASSESSMENT G.T # 20 JEDDAH PP3/SEC-WOA 2010

137 GENERATOR LIFE ASSESSMENT G.T # 24 JEDDAH PP3/SEC-WOA 2010

138 GENERATOR LIFE ASSESSMENT G.T # 01 MAKKAH PP/SEC-WOA 2010

139 ANNUAL INSPECTION OF STEAM UNIT # 4 AT SHOAIBA PP SHOAIBA PP/SEC-WOA 2009/2010

140 ANNUAL INSPECTION OF MHI STEAM UNIT # 6 at RPP RABIGH PP/SEC-WOA 2009/2010

141 ANNUAL INSPECTION OF MHI STEAM UNIT # 4 at RPP RABIGH PP/SEC-WOA 2009/2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 15 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

142 MAJOR OVERHAUL of GE GAS TURBINE UNIT # 28 at JPP3 JEDDAH PP3/SEC-WOA 2009/2010

143 MAJOR OVERHAUL of GE GAS TURBINE UNIT # 32 at JPP3 JEDDAH PP3/SEC-WOA 2009/2010

144 MAJOR OVERHAUL of ABB GAS TURBINE UNIT # 26 at JPP3 JEDDAH PP3/SEC-WOA 2009/2010

145 MAJOR OVERHAUL of ABB GAS TURBINE UNIT # 27 at JPP3 JEDDAH PP3/SEC-WOA 2009/2010

146GENERATOR MAJOR OVERHAUL for ABB9D1N OF GT UNIT

#05TAIF PP/SEC-WOA 2009/2010

147 GENERATOR ROTOR WEDGE REPLACEMENT UNIT # 17 JEDDAH PP3/SEC-WOA 2010

148 GENERATOR ROTOR WEDGE REPLACEMENT UNIT # 18 JEDDAH PP3/SEC-WOA 2010

149 SUPPLY OF BOILER FUEL ADDITIVES RABIGH PP/SEC-WOA 2010

150INSPECTION &REPAIR AND REWINDING OF EXCITOR

ROTOR GT# 11 QASSIM PP/SEC-COA 2009/2010

151REPAIR AND INSPECTION OF EXCITOR STATOR AND ROTOR

ABB GT # 27RIYADH PP5/SEC-COA 2009/2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 16 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

152UPGRADING OF EXISTING CONTROL SYSTEM OF ABB

TURBINES UNIT # 08 MAKKAH PP/SEC-WOA 2009/2010

153UPGRADING OF EXISTING CONTROL SYSTEM OF ABB

TURBINES UNIT # 09 MAKKAH PP/SEC-WOA 2009/2010

154UPGRADING OF EXISTING CONTROL SYSTEM OF ABB

TURBINES UNIT # 12 MAKKAH PP/SEC-WOA 2009/2010

155 REWINDING OF GENERATOR STATOR OF G.T UNIT # 1 JEDDAH PP3/SEC-WOA 2009/2010

156 REWINDING OF GENERATOR STATOR OF G.T UNIT # 9 JEDDAH PP3/SEC-WOA 2009/2010

157 REWINDING OF GENERATOR STATOR OF G.T UNIT # 12 RABIGH PP/SEC-WOA 2009/2010

158 GENERATOR LIFE ASSESSMENT G.T # 17 JEDDAH PP3/SEC-WOA 2010

159 GENERATOR LIFE ASSESSMENT G.T # 18 JEDDAH PP3/SEC-WOA 2010

160 GENERATOR LIFE ASSESSMENT G.T # 27 JEDDAH PP3/SEC-WOA 2010

161 GENERATOR LIFE ASSESSMENT G.T # 03 MAKKAH PP/SEC-WOA 2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 17 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

162 NDT INSPECTION OF GT # 018COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010

163 NDT INSPECTION OF GT # 015COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010

164 NDT INSPECTION OF GT # 017COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010

165 NDT INSPECTION OF GT # 05COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010

166 NDT INSPECTION OF GT # 023COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010

167 NDT INSPECTION OF GT # 028RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010

168 NDT INSPECTION OF GT # 18RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010

169 NDT INSPECTION OF GT # 15RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010

170 NDT INSPECTION OF GT # 17RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2010

171 NDT INSPECTION OF GT # 27ROTOR WEDGES

JEDDAH PP3/SEC-WOA 2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 18 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

172 NDT INSPECTION OF GT # 032COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010

173 NDT INSPECTION OF GT # 027COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010

174 NDT INSPECTION OF GT # 07COMPRESSOR BLADES

MADINAH PP/SEC-WOA 2010

175 NDT INSPECTION OF GT # 03COMPRESSOR BLADES

DUBA PP/SEC-WOA 2010

176 NDT INSPECTION OF GT # 03RETAINING RING + WEDGES

DUBA PP/SEC-WOA 2010

177 NDT INSPECTION OF GT # 03COMPRESSOR BLADES

TABUK PP/SEC-WOA 2010

178 GENERATOR LIFE ASSESSMENT G.T # 03 DUBA PP/SEC-WOA 2010

179 GENERATOR LIFE ASSESSMENT G.T # 08 MAKKAH PP/SEC-WOA 2010

180 NDT INSPECTION OF GT # 010COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2010

181 SUPPLY OF GT FUEL ADDITIVES RABIGH PP/SEC-WOA 2010

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 19 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

182REPLACEMENT OF WATER, FOAM AND COOLING WATER

PIPELINE OF FIREFIGHTING SYSTEMTABOUK PP1/SEC-WOA 2008/2009/2010

183 SUPPLY OF GT FUEL ADDITIVES JEDDAH PP3/SEC-WOA 2007/2008/2009/2010

184 NDT INSPECTION OF GT # 05COMPRESSOR BLADES

TAIF PP/SEC-WOA 2009

185 NDT INSPECTION OF GT # 06COMPRESSOR BLADES

TAIF PP/SEC-WOA 2009

186 NDT INSPECTION OF GT # 05RETAINING RING + WEDGES

TAIF PP/SEC-WOA 2009

187 NDT INSPECTION OF GT # 06RETAINING RING + WEDGES

TAIF PP/SEC-WOA 2009

188 NDT INSPECTION OF GT # 01COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2009

189 NDT INSPECTION OF GT # 02COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2009

190 NDT INSPECTION OF GT # 23RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2009

191 NDT INSPECTION OF GT # 28COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2009

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 20 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

192 NDT INSPECTION OF GT # 08RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2009

193 NDT INSPECTION OF GT # 12RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2009

194 NDT INSPECTION OF GT # 11RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2009

195 NDT INSPECTION OF GT # 25RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2009

196 NDT INSPECTION OF GT # 08RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2009

197 NDT INSPECTION OF GT # 12RETAINING RING + WEDGES

JEDDAH PP3/SEC-WOA 2009

198 NDT INSPECTION OF GT # 025COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2009

199 NDT INSPECTION OF GT # 014COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2009

200 NDT INSPECTION OF GT # 012COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2009

201 GENERATOR LIFE ASSESSMENT G.T # 05 MAKKAH PP/SEC-WOA 2009

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 21 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

202 GENERATOR LIFE ASSESSMENT G.T # 11 MAKKAH PP/SEC-WOA 2009

203 GENERATOR LIFE ASSESSMENT G.T # 18 MAKKAH PP/SEC-WOA 2009

204 GENERATOR LIFE ASSESSMENT G.T # 02 MADINAH/SEC-WOA 2009

205 GENERATOR LIFE ASSESSMENT G.T # 05 TAIF PP/SEC-WOA 2009

206 GENERATOR LIFE ASSESSMENT G.T # 08 JEDDAH PP3/SEC-WOA 2009

207 GENERATOR LIFE ASSESSMENT G.T # 11 JEDDAH PP3/SEC-WOA 2009

208 GENERATOR LIFE ASSESSMENT G.T # 15 JEDDAH PP3/SEC-WOA 2009

209REPLACEMENT OF WATER,FOAM & COOLING WATER

LINESTABOUK PP/SEC-WOA 2009

210REPLACEMENT OF CABLES RUNNING UNDER EXHAUST OF

G.T UNIT # 7MAKKAH PP/SEC-WOA 2009

211 GENERATOR LIFE ASSESSMENT G.T # 25 JEDDAH PP3/SEC-WOA 2009

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 22 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

212 GENERATOR LIFE ASSESSMENT G.T # 26 JEDDAH PP3/SEC-WOA 2009

213 NDT INSPECTION OF GT # 02COMPRESSOR BLADES

MADINAH PP/SEC-WOA 2009

214 NDT INSPECTION OF GT # 02RETAINING RING + WEDGES

MADINAH PP/SEC-WOA 2009

215COMPLETE REWINDING OF ABB EXCITOR TYPE WBF6-4K

OF ABB 11D5 GT UNITJEDDAH PP3/SEC-WOA 2008/2009

216 ANNUAL INSPECTION OF ALSTOM STEAM UNIT # 11 SHOAIBA PP/SEC-WOA 2008/2009

217 ANNUAL INSPECTION OF MHI STEAM UNIT # 2 RABIGH PP/SEC-WOA 2008/2009

218 ANNUAL INSPECTION OF MHI STEAM UNIT # 5 RABIGH PP/SEC-WOA 2008/2009

219 MAJOR OVERHAUL of GE GAS TURBINE UNIT # 6 JEDDAH PP3/SEC-WOA 2008

220 MAJOR OVERHAUL of GE GAS TURBINE UNIT # 7 JEDDAH PP3/SEC-WOA 2008

221 GENERATOR LIFE ASSESSMENT G.T # 07 RABIGH PP/SEC-WOA 2008

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 23 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

222 GENERATOR LIFE ASSESSMENT G.T # 02 RABIGH PP/SEC-WOA 2008

223 GENERATOR LIFE ASSESSMENT G.T # 01 RABIGH PP/SEC-WOA 2008

224 GENERATOR LIFE ASSESSMENT G.T # 05 RABIGH PP/SEC-WOA 2008

225 GENERATOR LIFE ASSESSMENT G.T # 10 MAKKAH PP/SEC-WOA 2008

226 GENERATOR LIFE ASSESSMENT G.T # 09 MAKKAH PP/SEC-WOA 2008

227 GENERATOR LIFE ASSESSMENT G.T # 12 MAKKAH PP/SEC-WOA 2008

228 GENERATOR LIFE ASSESSMENT G.T # 08 MAKKAH PP/SEC-WOA 2008

229 GENERATOR ROTOR WEDGE REPLACEMENT UNIT # 09 MAKKAH PP/SEC-WOA 2008

230 GENERATOR ROTOR WEDGE REPLACEMENT UNIT # 10 MAKKAH PP/SEC-WOA 2008

231 GENERATOR LIFE ASSESSMENT G.T # 06 JEDDAH PP3/SEC-WOA 2008

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 24 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

232 GENERATOR LIFE ASSESSMENT G.T # 07 JEDDAH PP3/SEC-WOA 2008

233 GENERATOR LIFE ASSESSMENT G.T # 07 MAKKAH PP/SEC-WOA 2008

234 GENERATOR LIFE ASSESSMENT G.T # 01 JEDDAH PP3/SEC-WOA 2008

235 GENERATOR LIFE ASSESSMENT G.T # 03 JEDDAH PP3/SEC-WOA 2008

236 GENERATOR LIFE ASSESSMENT G.T # 09 JEDDAH PP3/SEC-WOA 2008

237 GENERATOR LIFE ASSESSMENT G.T # 13 MAKKAH PP/SEC-WOA 2008

238 GENERATOR LIFE ASSESSMENT G.T # 06 MAKKAH PP/SEC-WOA 2008

239REPLACEMENT OF MAKEUP AND DRINKING WATER

PIPELINERIYADH PP8/SEC-COA 2008

240UPGRADING OF EXISTING CONTROL SYSTEM OF ABB

TURBINES UNIT # 11 MAKKAH PP/SEC-WOA 2008

241REPLACEMENT OF ROTOR RETAINING RINGS OF GE GAS

TURBINE GENERATOR TABOUK PP/SEC-WOA 2008

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 25 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

242 REPLACEMENT OF RETAINING RINGS OF GT#1 ROTOR & INSTALLING ROTOR IN GT#5 STATOR

NAJRAN PP/ SEC - SOA 2008

243 SUPPLY OF COMPRESSOR CLEANER RABIGH PP/SEC-WOA 2007/2008

244 SUPPLY OF COMPRESSOR CLEANER JEDDAH PP3/SEC-WOA 2007/2008

245 SUPPLY OF WATER TREATMENT CHEMICAL RABIGH PP/SEC-WOA 2007/2008

246 SUPPLY OF WATER TREATMENT CHEMICAL JEDDAH PP3/SEC-WOA 2007/2008

247 SUPPLY OF FUEL INJECTION SYSTEM RABIGH PP/SEC-WOA 2007/2008

248 SUPPLY OF BOILER FUEL ADDITIVES RABIGH PP/SEC-WOA 2006/2007/2008

249 SUPPLY OF BOILER FUEL ADDITIVES SHOAIBA PP/SEC-WOA 2006/2007/2008

250 GENERATOR LIFE ASSESSMENT G.T # 04 MAKKAH PP/SEC-WOA 2007

251 GENERATOR LIFE ASSESSMENT G.T # 08 MAKKAH PP/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 26 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

252 GENERATOR LIFE ASSESSMENT G.T # 09 MAKKAH PP/SEC-WOA 2007

253 GENERATOR LIFE ASSESSMENT G.T # 17 MAKKAH PP/SEC-WOA 2007

254 GENERATOR LIFE ASSESSMENT G.T # 18 MAKKAH PP/SEC-WOA 2007

255 GENERATOR LIFE ASSESSMENT G.T # 01 JEDDAH PP3/SEC-WOA 2007

256 GENERATOR LIFE ASSESSMENT G.T # 04 JEDDAH PP3/SEC-WOA 2007

257 GENERATOR LIFE ASSESSMENT G.T # 13 JEDDAH PP3/SEC-WOA 2007

258 GENERATOR LIFE ASSESSMENT G.T # 19 JEDDAH PP3/SEC-WOA 2007

259 GENERATOR LIFE ASSESSMENT G.T # 21 JEDDAH PP3/SEC-WOA 2007

260 GENERATOR LIFE ASSESSMENT G.T # 27 JEDDAH PP3/SEC-WOA 2007

261 GENERATOR LIFE ASSESSMENT G.T # 01 MADINAH PP/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 27 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

262 GENERATOR LIFE ASSESSMENT G.T # 03 MADINAH PP/SEC-WOA 2007

263 GENERATOR LIFE ASSESSMENT G.T # 05 MADINAH PP/SEC-WOA 2007

264 GENERATOR LIFE ASSESSMENT G.T # 07 MADINAH PP/SEC-WOA 2007

265 GENERATOR LIFE ASSESSMENT G.T # 03 RABIGH PP/SEC-WOA 2007

266 GENERATOR LIFE ASSESSMENT G.T # 04 RABIGH PP/SEC-WOA 2007

267 GENERATOR LIFE ASSESSMENT G.T # 08 RABIGH PP/SEC-WOA 2007

268 GENERATOR LIFE ASSESSMENT G.T # 01 YANBU PP/SEC-WOA 2007

269 GENERATOR LIFE ASSESSMENT G.T # 02 YANBU PP/SEC-WOA 2007

270 REMOVAL OF ROTOR RETAINING RING OF GAS TURBINE UNIT # 01

YANBU PP/SEC-WOA 2007

271 GENERATOR LIFE ASSESSMENT G.T # 03 TABOUK PP/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 28 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

272 GENERATOR LIFE ASSESSMENT G.T # 04 TABOUK PP/SEC-WOA 2007

273 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O2

RABIGH PP/SEC-WOA 2007

274 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O4

RABIGH PP/SEC-WOA 2007

275 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O5

RABIGH PP/SEC-WOA 2007

276 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O6

RABIGH PP/SEC-WOA 2007

277 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O7

RABIGH PP/SEC-WOA 2007

278 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O8

RABIGH PP/SEC-WOA 2007

279 NDT INSPECTION OF GT # 08 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

280 NDT INSPECTION OF GT # 14 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

281 NDT INSPECTION OF GT # 19 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 29 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

282 NDT INSPECTION OF GT # 22 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

283 NDT INSPECTION OF GT # 11 COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2007

284 NDT INSPECTION OF GT # 12 COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2007

285 NDT INSPECTION OF GT # 04 COMPRESSOR BLADES

TAIF PP/SEC-WOA 2007

286 NDT INSPECTION OF GT # 06 COMPRESSOR BLADES

TAIF PP/SEC-WOA 2007

287 NDT INSPECTION OF GT # 04 COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2007

288 NDT INSPECTION OF GT # 06 COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2007

289 NDT INSPECTION OF GT # 07 COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2007

290 NDT INSPECTION OF GT # 03 COMPRESSOR BLADES

MADINAH PP/SEC-WOA 2007

291 NDT INSPECTION OF GT # 01 COMPRESSOR BLADES

YANBU PP/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 30 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

292 NDT INSPECTION OF GT # 04 COMPRESSOR BLADES

TABOUK PP/SEC-WOA 2007

293 NDT INSPECTION OF GT # 02 COMPRESSOR BLADES

QUARAYAH PP/SEC-EOA 2007

294 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 10

JEDDAH PP3/SEC-WOA 2007

295 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 16

JEDDAH PP3/SEC-WOA 2007

296 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 20

JEDDAH PP3/SEC-WOA 2007

297 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 04

RABIGH PP/SEC-WOA 2007

298 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 06

RABIGH PP/SEC-WOA 2007

299 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 08

RABIGH PP/SEC-WOA 2007

300 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 01

YANBU PP/SEC-WOA 2007

301 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 02

YANBU PP/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 31 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

302 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 03

MADINAH PP/SEC-WOA 2007

303 REPLACEMENT OF WATER WASH DRAIN PIPES OF GE UNITS

QASSIM PP/SEC-COA 2008

304 GENERATOR LIFE ASSESSMENT G.T # 08 MAKKAH PP/SEC-WOA 2007

305 GENERATOR LIFE ASSESSMENT G.T # 14 MAKKAH PP/SEC-WOA 2007

306 GENERATOR LIFE ASSESSMENT G.T # 16 MAKKAH PP/SEC-WOA 2007

307 GENERATOR LIFE ASSESSMENT G.T # 02 JEDDAH PP3/SEC-WOA 2007

308 GENERATOR LIFE ASSESSMENT G.T # 05 JEDDAH PP3/SEC-WOA 2007

309 GENERATOR LIFE ASSESSMENT G.T # 07 JEDDAH PP3/SEC-WOA 2007

310 GENERATOR LIFE ASSESSMENT G.T # 12 JEDDAH PP3/SEC-WOA 2007

311 GENERATOR LIFE ASSESSMENT G.T # 02 TABOUK PP2/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 32 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

312 GENERATOR LIFE ASSESSMENT G.T # 01 TABOUK PP2/SEC-WOA 2007

313 GENERATOR LIFE ASSESSMENT G.T # 01 TABOUK PP1/SEC-WOA 2007

314 SUB CONTRACTOR FOR YBA KANOO FOR POWER RENTAL TO SEC ISOLATED POWER PLANT (TOTAL = 35 MW)

VARIOUS LOCATIONS IN SAUDI ARABIA

2007

315 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 02

JEDDAH PP3/SEC-WOA 2007

316 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 05

JEDDAH PP3/SEC-WOA 2007

317 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 07

JEDDAH PP3/SEC-WOA 2007

318 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 12

JEDDAH PP3/SEC-WOA 2007

319 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 14

MAKKAH PP/SEC-WOA 2007

320 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 16

MAKKAH PP/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 33 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

321 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 01

RABIGH PP/SEC-WOA 2007

322 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 02

RABIGH PP/SEC-WOA 2007

323 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 05

RABIGH PP/SEC-WOA 2007

324 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 07

RABIGH PP/SEC-WOA 2007

325 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 01

TABOUK PP/SEC-WOA 2007

326 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 02

TABOUK PP/SEC-WOA 2007

327 NDT INSPECTION OF GT # 02 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

328 NDT INSPECTION OF GT # 07 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

329 NDT INSPECTION OF GT # 11 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

330 NDT INSPECTION OF GT # 12 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 34 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

331 NDT INSPECTION OF GT # 15 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

332 NDT INSPECTION OF GT # 16 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

333 NDT INSPECTION OF GT # 17 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

334 NDT INSPECTION OF GT # 18 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

335 NDT INSPECTION OF GT # 23 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

336 NDT INSPECTION OF GT # 24 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

337 NDT INSPECTION OF GT # 25 COMPRESSOR BLADES

JEDDAH PP3/SEC-WOA 2007

338 NDT INSPECTION OF GT # 01 COMPRESSOR BLADES

TAIF PP/SEC-WOA 2007

339 NDT INSPECTION OF GT # 02 COMPRESSOR BLADES

TAIF PP/SEC-WOA 2007

340 NDT INSPECTION OF GT # 09 COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2007

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 35 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

341 NDT INSPECTION OF GT # 15 COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2007

342 NDT INSPECTION OF GT # 17 COMPRESSOR BLADES

MAKKAH PP/SEC-WOA 2007

343 NDT INSPECTION OF GT # 01 COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2007

344 NDT INSPECTION OF GT # 02 COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2007

345 NDT INSPECTION OF GT # 05 COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2007

346 NDT INSPECTION OF GT # 06 COMPRESSOR BLADES

RABIGH PP/SEC-WOA 2007

347 NDT INSPECTION OF GT # 06 COMPRESSOR BLADES

MADINAH PP/SEC-WOA 2007

348 NDT INSPECTION OF GT # 07 COMPRESSOR BLADES

MADINAH PP/SEC-WOA 2007

349 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O3

RABIGH PP/SEC-WOA 2006

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 36 of 37

ADVANCED TRIAD TURBINE SERVICES LTD.

MAJOR PROJECTS BY ATTS

Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS

350 REWINDING OF GENERATOR STATOR BAHA PP/SEC-SOA 2006

351MAJOR OVERHAUL OF WESTINGHOUSE (WH251B2) GAS

TURBINEJEDDAH PP2/SEC-WOA 2005

352 CABLING OF GAS TURBINE CONTROL SYSTEM MAKKAH PP/SEC-WOA 2005

353 GENERATOR LIFE ASSESSMENT JEDDAH PP3/SEC-WOA 2004

354 MAJOR OVERHAUL OF ROLLS ROYCE AVON GAS TURBINE TABARJAL PP/SEC - EOA 2003

355DIESEL GENERATOR SETS FOR POWER GENERATION ON

POWER RENTAL BASISRANIYAH PP/SEC-SOA 2003

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 37 of 37