ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of...

61
Attachments to Item 13.4 - Page | 1 ATTACHMENTS TO REPORTS Item 13.4 DA 15/0284 Construction and Operation of a KFC Restaurant 98 Bowral Road, Mittagong ORDINARY COUNCIL MEETING Wednesday 9 December 2015 COPIES CIRCULATED SEPARATELY HEREWITH Distribution: Mayor Clr L A C Whipper Clr J G Arkwright Clr H R Campbell Clr J R Clark Clr T D Gair Clr G McLaughlin Clr I M Scandrett Clr G M Turland Clr J Uliana General Manager Deputy General Manager Corporate, Strategy & Development Services Deputy General Manager Operations, Finance & Risk Group Manager Corporate & Community Group Manager Planning, Development & Regulatory Services Administration Officer (for Archives)

Transcript of ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of...

Page 1: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 1

ATTACHMENTS TO REPORTS –

Item 13.4 – DA 15/0284 Construction and Operation of a KFC Restaurant – 98 Bowral

Road, Mittagong

ORDINARY COUNCIL MEETING

Wednesday 9 December 2015

COPIES CIRCULATED SEPARATELY HEREWITH

Distribution:

Mayor Clr L A C Whipper

Clr J G Arkwright

Clr H R Campbell

Clr J R Clark

Clr T D Gair

Clr G McLaughlin

Clr I M Scandrett

Clr G M Turland

Clr J Uliana

General Manager

Deputy General Manager Corporate, Strategy & Development Services

Deputy General Manager Operations, Finance & Risk

Group Manager Corporate & Community

Group Manager Planning, Development & Regulatory Services

Administration Officer (for Archives)

Page 2: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

Attachments to Item 13.4 - Page | 2

Attachments to Reports Item

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination ........................................... 4

ATTACHMENT 2 11 November 2015 Council Report ................................ 29

ATTACHMENT 3 Plans of Proposed Development .................................... 54

Page 3: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

Attachments to Item 13.4 - Page | 3

ATTACHMENTS TO REPORT

Item 13.4

DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

Attachment 1 Draft Notice of Determination

Attachment 2 11 November 2015 Council Report

Attachment 3 Plans of Proposed Development

Page 4: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 4

1. Approved Development

The development shall be generally in accordance with development application number DA15/0284 submitted by the applicant on 7 April 2015 and in accordance with the submitted supporting documentation.

Drawing No. Revision/ Issue

Name of Plan Date

Architectural (or Design) Drawings prepared by Beraldo Design (ref 09119).

A00 A Title Sheet Feb 15

A01 C Site Plan Oct 15

A02 B Floor Plan Oct 15

A03 A Elevations Sheet 1 Feb 15

A04 A Elevations Sheet 2 Feb 15

A05 A Sections Feb 15

A06 A Site Signage Feb 15

A07 A Landscape Plan Feb 15

Statement of Environmental Effects prepared by Planning Ingenuity, dated 12 March 2015, ref 0245/13.

Environmental Site Assessment prepared by Environmental Consulting Services, dated July 2015.

Stormwater Management and Civil Design Report (including plans C101-C111 Rev A, dated June 2015) prepared by Eclipse Consulting Engineers, dated 8 July 2015 (ref. 8912-001-r1).

Construction and Waste Management Plan, prepared by Beraldo Design, undated.

Traffic, Transport and Pedestrian Impact Assessment prepared by McLaren Traffic Engineering Issue B, dated 4 December 2014.

Arboricultural Assessment Report prepared by Jacksons Nature Works, dated 10 August 2014.

Odour Impact Assessment prepared by Pacific Environment Limited, dated 25 June 2015, ref. 08844.

Bushfire Protection Assessment prepared by Australian Bushfire Protection Planners Pty Ltd, dated 11 March 2015, ref. B142226.

Traffic Addendum Letter prepared by McLaren Traffic Engineering, dated 13 October 2015.

except where amended by any conditions below.

2. Inconsistencies between Notice of Determination and Plans

In the event of any inconsistency between conditions of this consent and the drawings/documents referred to above, the conditions of this consent prevail to the extent of the inconsistency.

ATTACHMENT 1

Page 5: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 5

3. Compliance

Development is to take place in accordance with the approved plans and documentation submitted with the application and subject to the conditions below, to ensure the development is consistent with Council's consent.

4. Use not to Commence

The approved use is not to commence until the proposed development has been completed in accordance with this consent and any other Council approvals which may be required, and a final inspection carried out and approved by Council staff.

5. Qualifications and Responsibility for Documentation

Council requires that all design plans be prepared to Council’s standards by a person, who has proven experience and suitable relevant qualifications in the preparation of plans specifications and any other relevant documentation for the approved development. All of these requirements are outlined in Council’s Engineering Policies. The Developer shall be responsible for the correctness of all information contained in the drawings, specifications or any other documentation. The Council will not accept responsibility for any errors or inaccuracies that may be found in such documents, regardless of whether these documents have been checked and/or approved by Council.

6. Responsibility for Works

The Council will hold the Developer (Applicant/Owner), to whom the development approval was issued, solely responsible for constructing the required development works to Council’s satisfaction and maintaining them during any specified period.

7. Developers Representative during Construction of Works

A minimum of 48 hours prior to commencement of any construction works on site the Developer must nominate to Council in writing their representative (Construction Supervisor) who will be responsible for all aspects of construction and site control, including Traffic Control, Sediment and Erosion Control and liaison with Council Officers and all other Authorities. Details to be submitted include:-

Name of Representative:

Company:

Position:

Contact Ph:

Contact Fax:

After Hours Contact:

Signature of Representative:

Signature & Acceptance of representative by the Developer:

Council requires that the nominated “ Construction Supervisor” either hold qualifications acceptable for Corporate Membership of the Institute of Engineers, Australia, or be Approved by the Director and/or has proven experience and suitable relevant

Page 6: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 6

qualifications for the control, supervision and management of civil engineering works as required for carrying land development.

Prior to commencing any works on site the representative shall:-

Inform Council in writing of their intention 7 days before entering the site.

Submit to Council a proposed Schedule of Works.

The Developer may be required to arrange for Council to peruse all other contract documentation PRIOR TO THE CONTRACTOR ARRIVING ON SITE TO COMMENCE WORK. (Schedule of Works, Specifications Bill of Quantity, traffic control plan and Soil and water management plan). Failure to comply with the requirements as set out above will result in an immediate stop work order.

8. Hours of Demolition and Construction Works

In order to minimise impacts upon the locality demolition and construction activities must be limited to between 7.00am - 5.00pm Monday to Saturdays and with no work on Sundays and public holidays. Any variation of these hours will only occur with Council's consent.

9. Workers Compensation & Public Liability

It is the Developer’s Responsibility to ensure that Contractors engaged to carry out works indicated on the Approved Plans carries current Workers Compensation Insurance and hold Public Liability Insurance for $20,000,000 cover.

10. Construction Certificate

The building works are not to commence until a Construction Certificate has been issued in accordance with the Environmental Planning and Assessment Act 1979. A Building Code of Australia assessment has not been undertaken on the proposal. For further advice you may contact Council's Accredited Certifiers.

11. Other Approvals

Prior to any work commencing, written approval under Section 68 of the Local Government Act 1993 shall be obtained for stormwater drainage, sanitary drainage and water plumbing, from the Council as the appropriate Water Supply Authority. Separate approval by the Roads Authority is required pursuant to Section 138 of the Roads Act 1993 for any works within the road reserve.

12. Occupation Certificate Inspection

Prior to Occupation Certificate being issued, an inspection by the Principal Certifying Authority shall be undertaken to ensure that all conditions of this development consent have been complied with.

Page 7: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 7

13. Occupation Certificate

The building, or part of the building, shall not be occupied or used until such time as an Occupation Certificate has been issued in respect of it.

14. Demolition

The existing buildings onsite shall only be demolished in accordance with the requirements of AS2601-2001 "The Demolition of Structures". Amongst others, precautions to be taken shall include compliance with the requirements of the WorkCover Authority of New South Wales and Council’s Water and Sewer Asset Protection, including:- (a) Protection of site workers and the general public. (b) Erection of hoardings where appropriate. (c) Asbestos removal handling and disposal where applicable by licensed contractors. (d) Ensuring only licensed demolition contractors are used as required pursuant to

Occupational Health and Safety Legislation. (e) Appropriate precautions are taken in regard to lead based paints. (f) Water and Sewer Asset Protection

All water and sewer assets on the site or on adjacent road reserve or lands that may be affected by the demolition works are to be clearly identified on site and protected from damage. Those water and sewer protection measures are to be shown on the site plan and are to be approved by Council’s Water and Sewer Planning and Development Engineer before any demolition works can commence.

(g) Sewer Assets Temporary Disconnection or Closure

The site sanitary drainage is to be temporarily disconnected or closed off by a suitably qualified Plumber from any of Council’s sewer sidelines, sewer junctions and or boundary traps that are to be retained and reused to prevent ingress contaminants into Council’s sewer mains. This work shall be sited and approved by Council’s Water and Sewer Planning and Development Engineer before demolition works can commence.

(h) Removal of Redundant Council Sewer Assets and Water Services

The site sanitary drainage is to be temporarily disconnected or closed off by a suitably qualified Plumber from any of Council’s sewer sidelines, sewer junctions and or boundary traps that are to be disconnected by Council to prevent ingress of contaminants into Council’s sewer mains. This work shall be sited and approved by Council’s Water and Sewer Asset Inspector before demolition works can commence.

Make application and pay fees for the removal of redundant sewer assets and or water services. These fees shall be paid before any demolition works can commence.

Page 8: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 8

Redundant water meter shall not be removed to allow for final readings and removal by Council staff.

(i) Temporary Use of Council Sewer Junctions and Water Services

During demolition or building works Council may permit temporary use of sewer junctions and water services. Details of the proposed use shall be shown on the site plan and are to be approved by the Water and Sewer Planning and Development Engineer before any demolition works can commence. Water services that are to be temporarily retained shall not have the water meter disconnected or removed. An approved backflow prevention device shall be installed. Details shall be shown on the site plan and are to be approved by the Water and Sewer Planning and Development Engineer before any demolition works can commence.

The disposal of refuse is to be to approved locations. Council will require documentary proof of destination for hazardous materials such as asbestos and contaminated soils and may request evidence on disposal of other demolition materials.

15. Management of Construction

A detailed Construction Management Plan is required to be SUBMITTED TO COUNCIL WITH ANY APPLICATION FOR A CONSTRUCTION CERTIFICATE. The required Construction Management Plan SHALL indicate the measures to be implemented to protect the environment as well as public health, safety and convenience. The plans SHALL detail provisions for: Off-street parking for employees, contractors and sub-contractors.

(b) Site access for construction vehicles and equipment purposes.

(c) Public safety in the use of roads and footpaths where development activities adjoin such

facilities.

(d) The storage and removal, on a regular frequency, of builder’s rubble and waste by trade waste contractors.

(e) Storage of ALL building materials and equipment wholly within the construction site.

(f) Public risk policies and management for all contractors’ employees using or gaining

access over public footpaths and roads.

(g) External lighting and security alarms proposed for the construction site.

(h) Fire fighting measures to be available on site during development and construction.

(i) Sanitary amenities and ablutions proposed on site during development and construction.

(j) Ensuring the safety of members of the public and Council staff who may have occasion to enter and be in attendance on the site.

Page 9: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 9

16. Compliance with Relevant Legislation

Compliance with the Environmental Planning & Assessment Act 1979 and Local Government Act 1993, the Building Code of Australia, SAA Codes and adopted Local Policies shall be observed.

17. Protection of Council’s Road Reserve, Kerb and Gutter and Footpath

The building supervisor is responsible to ensure that all contractors, sub-contractors, and delivery trucks use a designated access point to prevent damage to Council's property. Repairs to damaged grass verges, concrete footpath, kerb and gutter are to be carried out by the builder to Council's specification and supervision prior to occupation of the development.

18. Building Location

All building work shall be constructed wholly within the boundaries of the property. The location of the boundary shall be verified by survey prior to construction commencing.

19. Grass Swale, Overland Flowpaths, Rainwater Tanks and Detention Basin Maintenance

The creation of a "Positive Covenant" on the linen plan and title of the proposed development showing the location of stormwater facilities and requiring that the proposed stormwater facilities be maintained in a safe and functional manner. In addition, the Section 88B Instrument is to make provision for Council to conduct maintenance on the subject stormwater facilities at the owner's expense if the stormwater facilities are not maintained to the agreed standard. Details shall be provided for the approval of the Director Environment and Planning PRIOR TO ISSUE OF AN OCCUPATION CERTIFICATE. NOTE: A standard format is available from Council.

20. Grass Swale, Overland Flowpaths, Rainwater Tanks and Detention Basin Alterations

The creation of a "Restriction as to User" on the linen plan and title of the proposed development to prevent any change in shape or alteration in structure of the proposed stormwater facilities after the final approval of the structure has been given by Council. Details to be provided for the approval of the Director Environment and Planning PRIOR TO ISSUE OF AN OCCUPATION CERTIFICATE.

21. Title Restrictions Re Drainage

Details of function, form and levels of essential earth or other surface works including floodways, shall be legally attached to the titles of affected land to help ensure the permanency and designed operation of such facilities.

22. Creation of Right of Carriageway and Easements

Prior to the earlier of the issue of any occupation certificate or the commencement of occupation of the development, the Applicant must cause at the Applicant’s expense the following easements and rights of carriageway to be registered by the Registrar-General on the relevant folio of the Register kept under the Real Property Act 1900:

Page 10: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 10

(a) Right of carriageway and easement for services minimum 13 metres wide over Lot 1 DP 1187383 and Lot 2 DP 1187383 in favour of Lot 3 DP1187383, Lot 15 DP 1137891, Lot 18 DP 1108714, Lot 33 DP 1138429, Lot 11 DP 817002, Lot 12 DP 817002 and Wingecarribee Shire Council.

(b) Right of carriageway and easement for services 20m wide over Lot 3 DP1187383 in

favour of Lot 1 DP 1187383, Lot 2 DP 1187383, Lot 15 DP 1137891, Lot 18 DP 1108714, Lot 33 DP 1138429, Lot 11 DP 817002 and Lot 12 DP 817002 and Wingecarribee Shire Council.

(c) Stormwater drainage easement over Lot 3 DP1187383 in favour of Wingecarribee Shire

Council sized to carry 1 in 100 year ARI flow or minimum 5 metres wide, whichever is greater.

The terms of the easements and rights of carriageway in (a) and (b) shall require all landowners to be responsible for constructing, maintaining and repairing the pavement required over the easement and also require all landowners to indemnify Council against all liability for and associated with the use of the easements and rights of carriageway. The terms of the easement in (b) shall ensure it is clear to any future developer that the easement shall be placed in a location where its intersection with the shared driveway over Lots 1 & 2 DP1187383 does not result in adverse vehicular conflict potential.”

23. Storage Materials

No storage, or placing of any building materials to occur on adjacent public roads or footpath areas in association with the construction, maintenance or use of the development or site, without prior Council approval.

24. Pedestrian Safety

All care to be taken to safeguard both contractors and the public while the works are being carried out. The Contractor shall endeavour to minimise disturbance to pedestrian / vehicle traffic in the vicinity of the site. If required by Council a hoarding shall be erected after appropriate consents are issued by Council – see Council’s Adopted Policy No 44.

25. Structure not to be built over Easements

No portion of any structure may be erected over any existing sullage or stormwater disposal drains, easements, sewer mains, or proposed sewer mains.

26. Developer Must Advise of Damage to Property

The Developer must advise Council of any damage to property controlled by Council which adjoins the site including kerbs, gutters, footpaths, walkways, reserves and the like, prior to commencement of any work on the site. Failure to identify existing damage will result in all damage detected after completion of the building work being repaired at the Developer’s expense.

Page 11: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 11

27. Vehicular Access Point

A suitable entry point is to be nominated on site and utilised by construction and delivery vehicles. This entry point is to be located so that the possibility of damage to Council's property is minimised during construction. The access point is to be surfaced with all weather materials of a minimum of 100mm in size.

28. Guarantee for Civil Works

Prior to allowing occupation of the building a cash bond or irrevocable bank guarantee is to be lodged for a period of twelve (12) months for a sum equal to five (5) % of the engineering works or a minimum of $1,000 that are to become the property of Council to ensure the effective performance of these works.

29. Identification of Fill on Site

Prior to application for the occupation certificate the Applicant is to submit to council for its approval a plan detailing the extent of fill, with engineering certification identifying the specification of the filling operation in terms of the level of compaction achieved for each layer of fill placed. The certification shall be completed by a Council approved Geotechnical Engineer. A Restriction as to User shall be created over the extent of filling, which ensures than any structure placed over that area is constructed with a suitable footing system.

30. Geotechnical Survey

The submission, at the Applicant's expense, of a Geotechnical Survey report prepared by an approved Geotechnical Engineer certifying the structural adequacy of the site for the proposed development. The report is to be prepared in accordance with Council's "Guidelines to Developers for Presentation of Stability Reports - Land Subdivision/Building", for assessment with the Construction Certificate.

31. Retaining Wall Design Criteria

All retaining walls shall be constructed as per the submitted plans. Retaining wall must be designed by a suitably qualified Civil and/or Structural Engineer and shall be detailed on engineering plans which include, but is not limited to the following: a) A plan of the wall showing location and proximity to property boundaries; b) An elevation of the wall showing ground levels, maximum height of the wall, materials to

be used and details of the footing design and longitudinal steps that may be required along the length of the wall;

c) Details of fencing or handrails to be erected on top of the wall; d) Sections of the wall showing wall and footing design, property boundaries and backfill

material. Sections shall be provided at sufficient intervals to determine the impact of the wall on existing ground levels. The designer must note that the retaining wall and footing structure must be contained wholly within the subject property;

Page 12: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 12

e) The proposed method of subsurface and surface drainage, including water stormwater disposal.

32. Imported Fill Material

Fill material shall not be obtained from contaminated land (as defined in Part 7A of the Environmental Planning & Assessment Act 1979). All imported fill shall be validated in accordance with NSW Department of Environment and Climate Change guidelines prior to it being brought onto the site.

33. Placement of Fill on the Development Site

All fill placed on the site shall be placed in a controlled manner in accordance with the requirements of Council’s Engineering Policies.

34. Excavations and Backfilling

All excavations and backfilling associated with the erection or demolition of a building must be executed safely and in accordance with appropriate professional standards properly guarded and protected to prevent them from being dangerous to life or property.

35. Waste Management

An approved litter receptacle with a tight fitting lid shall be provided on site for the disposal of builder refuse that may be wind blown (all polystyrene waste must be bagged and securely contained). The bin shall be onsite during all demolition and construction works. Sorting of waste materials shall occur on site in accordance with the approved Waste Management Plan.

36. Waste Management Plan

A Waste Management Plan shall be lodged prior to the issue of the Construction Certificate outlining the implementation during construction and ongoing operation of the development. The Plan shall identify quantities, material and disposal methods. Council’s standard Waste Management Plan template can be used as a guide for completing the Plan.

37. Excavated Material - Overburden

Prior to the removal of any excavated material from the site, the developer/contractor shall undertake testing of all materials to be excavated with material to be classified as follows:

- Virgin Excavated Neutral Material - General Solid - Hazardous Waste

The test results shall be provided to Council as well as the destination of the material prior to any material leaving the site. The Applicant/Developer is responsible for ensuring that the proper approvals are in place prior to disposal of fill. Copies of any approvals are to be retained and provided to Council upon request.

Page 13: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 13

38. Structural Engineering Details - Dilapidation

The submission of independent structural engineering details by a suitably qualified and experienced structural engineer (with appropriate insurance coverage) to the Principal Certifying Authority, prior to the release of the Construction Certificate addressing the following matters:

a) A dilapidation report shall be prepared on the adjoining buildings. The report shall

consider the impact of the proposed construction and make recommendations to protect the adjoining buildings from damage during construction. Existing damage on adjoining buildings shall be documented in the report. This includes but is not limited to deflections in walls, cracks to brickwork and concrete, zone of influence of existing footings etc.

b) The developer or his agent shall also undertake a site inspection and document any

evidence of existing damage to public assets. Failure to adequately identify existing damage will result in all damage detected by Council after completion of the building work being repaired at the applicant’s expense

39. Flood Compatible Development

Any proposed development which is to occur within the area identified as inundated by the 1:100 year ARI event, shall ensure compliance with the following:- (a) Requirements of Council’s Mittagong Development Control Plan . (b) Requirements of Wingecarribee Local Environment Plan 2010, Clause 7.9.

40. Work, Health and Safety Compliance

All site works shall comply with the occupational health and safety requirements of WorkCover NSW.

41. Erosion and Sediment Control Plan Approval

An Erosion and Sediment Control Plan shall be prepared in accordance with Council’s Engineering Policies by a suitably qualified person, and approved by Council and/or Department of Environment, Climate Change and Water PRIOR TO ISSUE OF CONSTRUCTION CERTIFICATE.

42. Erosion and Sediment Control Plan Compliance

All site works shall be carried out in accordance with the Erosion and Sediment Control Plan. Implementation of the Erosion and Sediment Control Plan shall be supervised by personnel with appropriate training or demonstrated knowledge or experience in erosion and sediment control. In the event of non-compliance with the approved plan, Council Officers have the ability to issue Penalty Notices, being an on the spot fine.

43. Erosion Control on Completed Development

Adequate erosion and sediment control measures are to be maintained in place on the development to the satisfaction of Council until site stabilisation and revegetation is finalised.

Page 14: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 14

44. Soil and Water Management – Stockpiles

Stockpiles of topsoil, sand, aggregate, soil or other material are not to be located on any drainage line or easement, natural watercourse, footpath or roadway and shall be protected with adequate sediment controls.

45. Soil and Water Management – Building Operations

Building operations such as brick cutting, washing tools or brushes and mixing mortar are not permitted on public roadways or footways or in any other locations which could lead to the discharge of materials into the stormwater drainage system.

46. Erection of Signs

A sign shall be prominently displayed on any site on which building, subdivision or demolition work is being carried out by the builder / developer: (a) showing the name, address and telephone number of the principal certifying authority for

the work; (b) showing the name of the principal contractor (if any) for any building work and a

telephone number on which that person may be contacted outside working hours; and (c) stating that unauthorised entry to the work site is prohibited.

47. Reducing Glare Nuisance

Any external lighting associated with the development (including signage backlighting) shall be positioned and shielded in such a manner so as to prevent a glare nuisance to motorists and nearby residential areas. Glare nuisance shall ensure compliance with Australian Standard AS4282-1997 ‘Control of the Obtrusive Effects of Outdoor Lighting’, particularly the relevant recommendations within Table 2.1 and Table 2.2.

48. Lighting Intensity

The intensity, location, direction and hours of illumination shall be varied if, in the opinion of the Council, injury is being caused to the amenity of the neighbourhood.

49. Lighting Curfew

At the cease of daily trade, lighting associated with the development (other than for site safety and security purposes) shall be switched off. Illuminated signage shall only be switched on at dusk.

50. Amenity Nuisance

The development shall be conducted in such a manner so as not to interfere with the amenity of the neighbourhood by reason of noise, smoke, smell, vibration, gases, vapours, dust, particulate matter or other impurities from the premises.

Page 15: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 15

51. Blade Sign

The blade sign shall stand at a height no greater than 4.5m above the finished ground level.

52. Use of Parking Spaces

All parking spaces shall be used solely for the parking of motor vehicles for staff and customers, and on no account shall such spaces be used for storage or garbage purposes. No signposting or restrictions on individual spaces shall be permitted.

53. Property Numbering

A street number, allocated by Council, shall be prominently displayed so that it is visible from the road, PRIOR TO ISSUE OF OCCUPATION CERTIFICATE.

54. Lighting Plan

PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE, a Site Lighting Plan shall be submitted to Council for consideration and shall be in accordance with section A10.3 of the Bowral Development Control Plan.

55. Plan of Management

A Plan of Management shall be prepared in accordance with B.12(b) of the Mittagong Development Control Plan. The Plan shall be submitted to Council for approval PRIOR TO THE ISSUE OF OCCUPATION CERTIFICATE. The Plan shall consider, but not be limited to, measures to manage noise, waste and safety and security of patrons and staff.

56. Eastern Elevation Amendments

The eastern elevation of the building that comprises Exotec Façade Panel, red in colour shall be replaced with Lysaght wallclad with a corrugated façade, same colour as that proposed on the eastern façade.

57. Mechanical Extraction System Retrofitting

The mechanical extraction system shall be designed to allow retro-fitting of odour control equipment, should complaints regarding air quality/odour be received during the operation of the business.

58. Noise

a) The use shall comply with relevant noise control provisions contained within the Protection of

the Environment Operations Act 1997 and noise control regulations and policies to ensure local amenity is not adversely affected by noise impacts associated with the development.

b) Noise levels when measured at the nearest adjacent residential dwelling shall comply with

current Environmental Planning and Assessment Act 1979 guidelines for a residential environment. Council reserves the ability to request owner/venue management to produce a

Page 16: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 16

noise assessment in the event of Council being in receipt of complaints relating to excessive noise from the use.

59. Vehicular Deliveries

Deliveries to the site shall not occur between 10.00pm and 7.00am, 7 days a week, so as to maintain the amenity of nearby residential areas. Deliveries during the morning trade (10.00am to 12.00pm) are desirable so as to reduce the potential impact on the car park.

60. Hours of Operation

The hours of operation shall be limited to the following: Monday to Thursday 10.00am to 10.00pm Friday and Saturday 10.00am to 11.00pm Sunday and public holidays 11.00am to 9.00pm

61. Advertising Signs

No advertising signs (or the like) shall be displayed on the public footway, any external pedestrian areas, or within the site to maintain the visual amenity of the locality and to ensure public safety.

62. Water and Sewer Authority Conditions

Prior to issue of a Construction Certificate, the Developer must obtain approval from Council (as the Water Supply Authority and/or as required under Section 68 of the Local Government Act) for the works to be undertaken by submitting adequate documentation including plans, calculations and specifications which justify that the required works are in accordance with all Council’s standards and all other relevant codes and guidelines.

63. Provision of Works and Services

The provision, by the Developer, at their expense, of the following works and services to be documented and constructed in accordance with Council's Engineering Policies, to the satisfaction of the Development Control Engineer. PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE the Developer must obtain approval for the works to be undertaken by submitting adequate documentation including plans, standard notes and completed design checklists, calculations and specifications, to Council which justify that the proposed works are in accordance with all Council’s standards and all other relevant Codes and guidelines. (a) Stormwater Drainage

(i) Connection to Kerb

All stormwater connections to the kerb shall be done using minimum 2mm thick galvanised steel section in accordance with Standard Drawing No SD102.

Page 17: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 17

(ii) Construction of Stormwater

Provision of adequate stormwater drainage infrastructure (pits/pipes/open channels/detention storage) for the conveyance of stormwater passing through the site from upstream, and sourced from the development to a discharge outlet to be in accordance with Stormwater Management & Civil Design Report Ref.: 8912-001-r1 dated 8/07/2015 prepared by Eclipse Consulting Engineers and approved by the Development Control Engineer.

(iii) Boundary Grated Catch Drains Prevention of "sheet flows" over the public footpath by provision of a grated catch drain across or inlet pit adjacent to the driveway(s) at the property boundary, with piped water discharged to the satisfaction of the Development Control Engineer / Council’s Building Surveyor

(iv) Roof/Impervious/Stormwater All stormwater runoff from the development shall be collected within the property and discharged in a manner approved by the Development Control Engineer and/or Council’s Building Surveyor

(v) Control of Peak Discharge Adequate and suitable infrastructure is to be provided to ensure the peak discharge from the site is no greater than the pre-developed peak discharge. This infrastructure shall be designed in accordance with Council’s Engineering Policies. Calculations to demonstrate that the post-development peak discharge will not exceed the pre-development peak discharge SHALL BE PROVIDED WITH THE APPLICATION FOR A CONSTRUCTION CERTIFICATE

(vi) Existing Drainage Augmentation The augmentation of the existing drainage system to accommodate drainage from the proposed development and to protect other property to the satisfaction of the Development Control Engineer

(vii) Infrastructure Maintenance Considerations The design of all infrastructure shall take into consideration the maintenance aspects and costs associated with the techniques being proposed

(b) Parking, Loading, Access and Roadworks

(i) Internal Driveway and Car Parking

The internal driveway and car park shall meet the following requirements:

a) The internal driveway and car park layout shall general be designed as shown on Stormwater Management & Civil Design Report and Plans Ref.: 8912-001-r1 dated 8/07/2015 prepared by Eclipse Consulting Engineers

Page 18: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 18

and submitted Architectural Plans; subject to compliance with relevant Australian Standards.

b) Construction of internal access road minimum 12 metres wide, driveways,

turning areas and off street vehicular parking spaces are to be surfaced with reinforced concrete.

c) A standard concrete vehicular gutter layback and concrete footpath

crossing with Pram Ramps shall be constructed at the driveway entrance in accordance with Council’s No SD102, SD108 and SD111 for internal access road fronting Bowral Road.

c) The development shall make provision for a total of 24 car parking spaces.

This requirement shall be reflected on the Construction Certificate plans. d) Internal driveway(s) shall be designed in accordance AS2890 to eliminate

cars scraping/bottoming out on the driveway. The parking dimensions, internal circulation, aisle widths, kerb splay corners, and grades of the car parking areas are to be in conformity with Australian Standard AS2890.1 and AS2890.2.

e) The parking spaces and associated line marking are to be in accordance with AS2890.

f) Parking spaces adjacent to walls or other obstructions which may affect door opening or vehicle manoeuvring to be widened by 300mm on the side of the obstruction(s) to facilitate safe use of these spaces.

g) Parking spaces opposite to walls or landscaping beds are to be provided with wheel stops.

i) The levels of the driveway/s and landscaped areas adjacent to the buildings must be designed so as to prevent stormwater runoff from overland flows or pipe blockages from entering the buildings.

j) Engineering design plans shall be submitted to and approved by Council

PRIOR TO THE ISSUE OF AN CONSTRUCTION CERTIFICATE.

(ii) Construction of Kerb & Gutter and Drainage Concrete kerb and gutter and associated drainage pits in right of carriageway for the adequate discharge of stormwater.

(iii) Restoration of Footway and Kerb and Gutter All redundant vehicle crossings and stormwater outlets shall be removed. The footway and kerb and gutter are to be restored. All damaged kerb and gutter and footpath shall be replaced

Page 19: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 19

(iv) Provision of Vehicular Direction Signs Vehicle direction signs indicating the entry and exit points to the proposed development together with direction to the location of visitor parking spaces. Size and type of sign to be approved by the Director of Environment and Planning

(v) Traffic Control Plan A minimum of seven (7) days prior to the commencement of work, the developer shall submit to Council a Certified Traffic Management Plan for each activity of work in accordance with the current version of Roads and Traffic Authority document “Traffic Control at Work Sites”. This plan must include each construction activity that involves works on or adjacent to public land. If the work site alters, further plans are to be submitted to Council. A copy of the plan(s) is to be kept on site at all times.

(vi) Disabled Carparking Carparking spaces shall be provided at the rate of not less than one disabled carparking space for each 100/50 spaces or part thereof in a carpark required to be accessible, and a carparking area on the same allotment as a building required to be accessible. The spaces are not required to be signposted where there is a total of not more than 5 carparking spaces, so as to restrict the use of the carparking space only for people with disabilities. The spaces shall comply with the requirements for parking in the current version of AS 2890.1 for people with disabilities.

(vii) Vehicle Manoeuvring All vehicles to enter and leave the site driving forwards to ensure traffic / pedestrian safety. Internal driveways and parking are to be designed such that all vehicles are able to manoeuvre and leave the development driving forwards

(viii) Road Occupancy Licence Prior to commencement of work within the road reserve, a Road Occupancy Licence shall be obtained from the Roads and Traffic Authority Traffic Operations Unit. The application shall be accompanied by a Traffic Management Plan, prepared by a person who is certified to prepare Traffic Control Plans

(ix) Site Servicing The car park shall be designed to accommodate the turning movements of the largest vehicle servicing the development. The car park design shall incorporate the following: (a) Service vehicles shall manoeuvre into and out of the site in a forward

direction.

(b) The front overhang, and swept path made by the service vehicle shall not encroach onto parking spaces.

Page 20: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 20

(c) The vehicle swept path shall be reflected on the engineering design plans.

(d) Loading and unloading of service vehicles shall be undertaken onsite with no intrusion onto the internal road system.

(c) Sewer Mains

(i) Construction of Sewer Sidelines

Sidelines and junctions shall be installed for sewer connections to the development by Council at the Developer’s cost. Council’s application form shall be completed by the applicant and the appropriate fee paid. If sideline is to be extended from a sewer main in adjoining property, written permission of affected landowner allowing work to be undertaken, is to be submitted with the application form.

(d) Water Mains Supply

(i) Construction of Water Service A water service shall be installed to the development by Council at the applicant’s cost. Council’s application form shall be completed by the Developer and the appropriate fee paid.

64. Energy Service Provider Requirements

The provision of underground electricity to service the development in accordance with the requirements of the Energy Service Provider. The Developer prior to release of a Construction Certificate will be required to submit to Council documentary evidence from the Energy Service Provider qualifying that the requirements of that provider have been obtained. The requirements of the supply authority will need to be met prior to occupation of the development or the application for a Subdivision Certificate.

65. Works as Executed Plans

Following the completion of the work, one full set of work-as-executed drawings shall be submitted to and retained by Council. Sufficient details including locations and levels of the below ground infrastructure are required in order to enable a complete check of the work as executed as compared to the original approved design. Any deviation from the approved engineering plans shall be shown on the work-as-executed drawings. Each sheet of the drawings shall carry the certification of the developers supervising engineer.

66. Relocation of Existing Services

Where existing services including drainage, sewerage and water may be required to be relocated as a result of the development, a plumber’s permit is required from Council prior to commencing work. Inspection of these works by Council as the Water Supply Authority is required.

Page 21: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 21

67. Asset Management

The Developer is to provide a detailed summary of the Assets that will fall into Council’s care and control at the end of the maintenance period. The details are to be provided in a tabular form so as to allow Council to update its Assets register.

The assets to be identified include;

Roadways length and width and type of surface

Drainage systems length and size of pipes, number of pits, total area (m2) 68. Certification of Internal Civil Works

On completion of works and prior to occupation, certification from a practising appropriately qualified Engineer shall be submitted to Council detailing that all internal civil works (ie, internal driveways, paths and stormwater drainage systems including any onsite detentions) are in accordance with the approved plans and specifications.

69. Water NSW Concurrence

The following are the requirements of the Water NSW with regard to State Environmental Planning Policy (Sydney Drinking Water Catchment) 2011:

General

(i) The site layout and works shall be as shown on the Site Plans prepared by Beraldo Design (Proj. No. 09119; Dwg. A01 Rev A; dated February 2015) except where modified by these conditions. No revisions to site layout, staging or external works that will impact on water quality, shall be permitted without the agreement of Water NSW.

Reason for Condition (i) - Water NSW has based its assessment under State Environmental Planning Policy (Sydney Drinking Water Catchment) 2011 on this version of the development.

Management of Potentially Contaminated Land

(ii) The management of potentially contaminated materials and the disposal of excavated soil from land previously assessed by CH2MHILL, shall consider the Results, Conclusions and Recommendations of the Phase 1 Contamination Report for the Old Mobil Siding (Ref 110067.S17) prepared by CH2MHILL (dated December 1999).

Reason for Condition (ii) – To ensure that potentially contaminated sites are appropriately managed and rehabilitated in a way that prevents a detrimental impact on water quality in the future.

Stormwater Management

(iii) Stormwater management measures shall be implemented as per the Site Stormwater Drainage Layout Plan (File No. 13232-SW01a Rev A; dated 21 July 2014) and External Work Layout Plan (File No.13232-R05; dated 18 July 2014) both prepared by Michael Ell Consulting Engineers Pty Ltd, but shall incorporate the following stormwater treatment and management measures.

Stormwater Runoff

(iv) All stormwater from upstream of Lot 2 DP 1187383 shall be diverted through or around the site, and not be discharged into the Onsite Detention Basin and filtration system.

Page 22: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 22

(v) The access driveway, driveways and car park areas shall be constructed such that stormwater runoff drains via stormwater pits fitted with mesh filter baskets (e.g. Enviropod or similar) to the Onsite Detention Basin located at the northeast side of the site.

(vi) The Onsite Detention Basin shall be constructed such that stormwater is linked to a storm filtration system - 10 cartridge Stormfilter360 and is then directed to Council’s stormwater drainage system located at the north side of the site.

Rainwater Collection and Reuse System

(vii) A rainwater collection and reuse system shall be installed to capture roof runoff and shall incorporate the following specific requirements:

rainwater tanks with a minimum total capacity of 10,000 litres

rainwater tanks plumbed to toilets and areas of non-potable use including landscape watering

building roofs and gutters designed such that all roof runoff is captured in the rainwater tanks, and

rainwater tank overflow directed to the site stormwater system.

(viii) No revisions to stormwater management and treatment that will impact on water quality, shall be permitted without the agreement of Water NSW.

Operational Environmental Management Plan

(ix) An Operational Environmental Management Plan (OEMP) shall be prepared in consultation with Water NSW by a person with knowledge and experience in the preparation of such plans prior to the issuance of an Occupation Certificate. The OEMP shall include but not be limited to:

details on the location, description and nature of stormwater management structures such as stormwater drains, pits and pipes, gross pollutant traps, filtration systems and rainwater collection and reuse system

an identification of the responsibilities and detailed requirements for the inspection, monitoring and maintenance of all stormwater management structures, including the frequency of such activities

the identification of the individuals or positions responsible for inspection and maintenance activities including a reporting protocol and hierarchy, and

checklists for recording inspections and maintenance activities.

Reason for Conditions (iii) to (ix) – To ensure appropriate stormwater treatment and quality control measures are designed and maintained so as to achieve a sustainable neutral or beneficial impact on water quality over the longer term, and to be consistent with Sydney Catchment Authority’s current recommended practices and standards.

Construction Activities

(x) A Soil and Water Management Plan shall be prepared for all proposed works, including demolition work by a person with knowledge and experience in the preparation of such plans. The Plan can incorporate elements of the Sediment and Erosion Control Plan (File No. 13232-SW03a; dated 21 July 2014) prepared by Michael Ell Consulting Engineers Pty Ltd and shall meet the requirements outlined in Chapter 2 of NSW Landcom’s Soils and Construction: Managing Urban Stormwater (2004) manual - the “Blue Book”, and be to the satisfaction of Council.

Page 23: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 23

(xi) Effective erosion and sediment controls shall be installed prior to any construction or demolition work, including site access, and shall prevent sediment and contaminated water leaving the construction site or entering any stormwater system or natural drainage network. The controls shall be regularly maintained and retained until works have been completed and ground stabilized.

Reason for Conditions (x) & (xi) – To manage adverse environmental and water quality impacts

during the construction phase of the development and to minimise the risk of erosion,

sedimentation and pollution within or from the site during this construction phase.

70. Food Shop Requirements

a) The premise must be set up and operated in accordance with the Food Act, the Food

Regulations and the Food Safety Standards. b) The premise is to be fitted out in accordance with the Australian Standard AS4674 – 2004

‘Construction and fit out of food premises’.

71. Section 94A Contributions Plan

A Developer Charges – Notice of Payment is attached to the back of this consent and outlines monetary contributions and unit rates applicable at the time of issue of this consent. The contributions listed in the Notice of Payment must be paid prior to the release of Construction Certificate. All contributions are indexed quarterly in accordance with upward movements in the Producer Price Index (Tables 15. Output of the General Construction Industry, Index Numbers and Percentage Changes – Index Number; Non-residential building construction (3020) New South Wales) as published by the Australian Bureau of Statistics (www.abs.gov.au); Section 25J(4) of the Environmental Planning and Assessment Regulation 2000; and Council’s Developer Contributions Plans. Copies of the Contributions Plans are available at Wingecarribee Shire Council’s Administration building Moss Vale or are available for download from Council’s website www.wsc.nsw.gov.au.

72. Certificate of Compliance

A Certificate of Compliance under Division 5 of Part 2 of Chapter 6 of the Water Management Act 2000 must be obtained prior to the issue of Occupation Certificate. Notes: Section 64 of the Local Government Act 1993 authorises Council to issue Certificates of Compliance under Section 306 of the Water Management Act 2000. Section 64 of the Local Government Act 1993 also authorises Council to impose pre-conditions to the issuing of Certificates of Compliance. As a precondition to the issuing of a Certificate of Compliance Council requires the payment of Developer Charges, prior to the issue of Construction Certificate, as prescribed by Wingecarribee Shire Council’s Development Servicing Plans:

Page 24: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 24

Water Supply Development Servicing Plan;

Sewerage Development Servicing Plan; and

Stormwater Development Servicing Plan A developer Charges – Notice of Payment is attached to the back of this consent and outlines monetary contributions and unit rates applicable at the time of issue of this consent. The water, sewer and stormwater head works levies are indexed quarterly in accordance with upward movements in the Consumer Price Index (All Groups, Sydney) as published by the Australian Bureau of Statistics (www.abs.gov.au); and Council’s Development Servicing Plans Copies of Development Servicing Plans are available at Wingecarribee Shire Council’s Administration building Moss Vale or are available for download from Council’s website www.wsc.nsw.gov.au. The Water and Sewerage Development Servicing Plans (DSP’s) were adopted by Council on 22 November 2006 and came into effect on 1 January 2007. The Stormwater DSP was adopted on 9 November 2010 and came into effect on 8 December 2010. The current charges under these Plans are listed as follows:

CPI Period Water DSP Sewer DSP Stormwater DSP

1 May 2015 to 31 July 2015

$6,380 per ET $8,120 per ET $3,357 per ET

Note: The charges shown above are amounts applicable during the stated time period. These amounts will be subject to adjustment quarterly in accordance with upward movements in the Consumer Price Index (CPI) once they become operational. The CPI is published quarterly by the Australian Bureau of Statistics, www.abs.gov.au.

Should new DSP’s be prepared, it is possible that the charges may increase significantly. Draft DSP’s must be advertised by Council for a period of 30-days prior to adoption.

73. Compliance Certificate

Compliance Certificate fees, in accordance with Council’s Revenue Policy are as follows and shall be paid prior to the issue of Construction Certificate:- Water $90 + Sewer $90 + Stormwater $90 = $270.00 Prior to final release, you will need to contact Council’s Environmental Assessment Branch for an inspection to ensure that Council will accept the infrastructure constructed. In response, the Development Engineer of Water and Sewer will specify requirements which will have to be met. In the case of other forms of development, the Construction Certificate will not be issued until the Water Management Act charges have been paid and/or secured and the approval of Council has been obtained.

74. NSW Rural Fire Service

Asset Protection Zones The intent of measures is to provide sufficient space and maintain reduced fuel loads so as to ensure radiant heat levels of buildings are below critical limits and to prevent direct flame contact with a building. To achieve this, the following conditions shall apply:

Page 25: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 25

1. At the commencement of building works and in perpetuity, the entire property shall be

maintained as an inner protection area (IPA) as outlined within section 4.1.3 and Appendix 5 of ‘Planning for Bushfire Protection 2006’ and the NSW Rural Fire Service’s document ‘Standards for asset protection zones’.

2. To allow for emergency service personnel and residents to undertake protection activities, a defendable space that permits unobstructed pedestrian access is to be provided around the building

Water and Utilities The intent of measures is to provide adequate services of water for the protection of buildings during and after the passage of a bushfire, and to locate gas and electricity so as to not contribute to the risk of fire to a building. To achieve this, the following conditions shall apply:

3. Water, electricity and gas are to comply with section 4.1.3 of ‘Planning for Bushfire

Protection 2006’.

Access

The intent of measures for property access is to provide safe access to/from the public road system for fire fighters providing property protection during a bush fire and for occupants faced with evacuation. To achieve this, the following conditions shall apply:

4. Property access roads shall comply with section 4.1.3 (2) of ‘Planning for Bush Fire

Protection 2006’.

Landscaping

5. Any proposed landscaping is to conform to the requirements of Appendix 5 of ‘Planning for Bush Fire Protection 2006’ and the Rural Fire Service ‘Standards for asset protection zones’.

75. Roads and Maritime Services

Prior to the issuing of the construction certificate, the developer must enter into a Works Authorisation Deed (WAD) with the RMS for all works on Bowral Road.

Only one access point from Bowral Road to Lot 2 of DP1187383 will be permitted. This must be the proposed access road. Any other existing vehicular access points to Bowral Road must be physically closed by reinstating the kerb and gutter.

Prior to any occupation, “Right of Way” arrangements must be legally certified on the titles of the burdened lots by way of a Section 88B Instrument under the Conveyancing Act, 1919. These Right of Way arrangements must allow Lot 1 of DP 1187383, Lot 2 of DP 1187383, Lot 3 of DP 1187383, Lot 15 of DP 1137891, Lot 18 of DP 1108714, Lot 33 of DP 1138429, Lot 11 of DP 817002, Lot 12 of DP 817002 (as highlighted in blue in Attachment B) to have access to Bowral Road via the proposed access road.

Note: The proposed access road appears to be mostly on Lot 2 of DP1187383 and partially on Lot 1 of DP1187383.

Page 26: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 26

Prior to any occupation, the developer must upgrade the junction of Bowral Road and the proposed access road generally in accordance with Attachment C to the satisfaction of RMS and Council. The upgrade must include the following:

- a CHR(S) together with a AUL in accordance with Austroads Guide to Road Design: Part 4A - Unsignalised and signalised intersections; and

- road widening on Bowral Road to create a 13m wide carriageway from kerb to kerb for the full length of the afore mentioned CHR(S) and AUL intersection treatments.

Prior to any occupation, a pedestrian refuge on Bowral Road must be provided in accordance with relevant standards.

All pavement design on the State road network must be in accordance with Austroads standards. It should be noted that pavement investigations need to consider the suitability of the existing shoulder to accommodate new loadings and if necessary, the developer must upgrade the existing shoulder.

Where required, the developer must upgraded/provided lighting in accordance with Australian Standard AS/NZS1158.

The developer must mitigate any increased road traffic noise associated with the road widening on Bowral Road nearby residents (and other sensitive receivers) in accordance with the Department of Environment, Climate Change and Water’s Environmental Criteria for Road Traffic Noise.

Note: The widening brings the travel lane of Bowral Road closer to residents on the northern side of the road. This could have noise implications.

Council should ensure that post development storm water discharge from the subject site into the classified road drainage system does not exceed the pre-development application discharge.

All roadworks, traffic control facilities and other works associated with this development will be at no cost to RMS. All works must be completed prior to occupation.

All roadworks and traffic control facilities must be undertaken by a pre-qualified contractor. A copy of pre-qualified contractors can be found on the RMS website at:

http://www.rta.nsw.gov.au/doingbusinesswithus/tenderscontracts/prequalifiedcontractors.html

RMS will be exercising its powers under Section 64 of the Roads Act, 1993 to become the roads authority for works on Bowral Road. Given this, Section 138 consent under the Roads Act, 1993 must be obtained from the RMS prior to construction.

Note: It is requested that Council advise the applicant that conditions of development consent do not guarantee RMS final consent to the specific road work, traffic control facilities and other structures and works on the classified road network. In this regard, prior to undertaking any such work, the applicant is required to submit detailed design plans and all relevant additional information prior to commencing work on the State road network. The developer will need to pay all RMS fees and charges associated with works. In the first instance, to progress the post consent process, the applicant should email the conditions of development consent to: [email protected]

The developer must apply for, and obtain a Road Occupancy Licence (ROL) from the RMS Traffic Operations Unit (TOU) prior to commencing roadworks on a State Road or any other works that impact a travel lane of a State Road or impact the operation of traffic signals on any

Page 27: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Attachments to Item 13.4 - Page | 27

road. The application will require a Traffic Management Plan (TMP) to be prepared by a person who is certified to prepare Traffic Control Plans. Should the TMP require a reduction of the speed limit, a Speed Zone Authorisation will also be required from the TOU. The developer must submit the ROL application 10 business days prior to commencing work. It should be noted that receiving an approval for the ROL within this 10 business day period is dependant upon RMS receiving an accurate and compliant TMP.

Endorsement of Date of Consent: 2015 NOTES: 1. To ascertain the date from which this development consent operates, refer to Section 83 of the

Environmental Planning and Assessment Act 1979. 2. Development consent will lapse five (5) years after the date from which it operates. In the case

of staged development, consent will lapse five (5) years after the date from which it operates. (Refer Section 95 (2) of the Environmental Planning & Assessment Act 1979).

3. Section 97 of the Environmental Planning and Assessment Act 1979 confers on an applicant who

is dissatisfied with the determination of a consent authority a right of appeal to the Land and Environment Court exercisable within six (6) months after receipt of this notice.

4. The approval granted by the Council does NOT consider nor negate or vary any private

easement, covenant or restriction. The owner is advised to investigate any encumbrance or restriction that may be noted on the title to the land.

5. All conditions on this consent have been imposed having regard to all matters listed for

consideration under Section 79C of the Environmental Planning & Assessment Act 1979. 6. An applicant may request pursuant to Section 82A of the Environmental Planning & Assessment

Act 1979 Council to review a determination of the application where that application is of a type referred to in that Section of the Act within six (6) months after receipt of this notice.

Date: 2015 Signed:

Ellie Varga

Acting Team Leader Town Planners

Page 28: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 1 Draft Notice of Determination

Page | 28

15/0284 8 October 2015 Brett Cooper PO Box 2833 TAREN POINT NSW 2229 Re: 15/0284 Lot 2 DP 1187383 98 BOWRAL ROAD MITTAGONG NSW 2575 Development Description: KFC RESTAURANT, ANCILLARY SIGNAGE, CARPARKING and LANDSCAPING Water, Sewerage and Stormwater Headworks charges are levied under Section 64 of the Local Government Act and Section 306 of the Water Management Act 2000. Other contributions are levied under Section 94 of the Environmental Planning and Assessment Act 1979 and Council’s Section 94 Contributions Plans.

Amount

Contributions Levy Units Rate Payable

Section 94A Plan $1,988,644.36 1% $19,886.44

S64 Sewer Compliance Certificate 1.00 $90.00 $90.00

S64 Stormwater Compliance Certificate 1.00 $90.00 $90.00

Stormwater DSP Mittagong 3.70 $3,388.43 $12,537.20

Wastewater - Sewerage DSP 2.12 $8,195.67 $17,374.81

S64 Water Compliance Certificate 1.00 $90.00 $90.00

Water Supply DSP 2.12 $6,439.44 $13,651.61

Total $63,720.06

Payments must be either in the form of cash, bank cheque or credit card (credit cards subject to 1% surcharge. Amex and Diners not accepted).

IMPORTANT – The charges shown above are valid for payment until the date given below. After this period the charge will need to be recalculated due to adjustments in the Consumer Price Index. DATE CHARGES ARE VALID TO – 07 Nov 2015 Prepared by – David Matthews Cashier Receipt No: ________________ Total Paid: ________________ Date Paid: ________________

Page 29: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 29

ATTACHMENT 2

Page 30: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 30

Page 31: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 31

Page 32: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 32

Page 33: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 33

Page 34: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 34

Page 35: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 35

Page 36: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 36

Page 37: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 37

Page 38: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 38

Page 39: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 39

Page 40: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 40

Page 41: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 41

Page 42: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 42

Page 43: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 43

Page 44: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 44

Page 45: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 45

Page 46: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 46

Page 47: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 47

Page 48: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 48

Page 49: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 49

Page 50: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 50

Page 51: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 51

Page 52: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 52

Page 53: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong

ATTACHMENT 2 11 November 2015 Council Report

Attachments to Item 13.4 - Page | 53

Page 54: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 3 Plans of Proposed Development

Attachments to Item 13.4 - Page | 54

ATTACHMENT 3

Page 55: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 3 Plans of Proposed Development

Attachments to Item 13.4 - - Page | 55

Page 56: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 3 Plans of Proposed Development

Attachments to Item 13.4 - Page | 56

Page 57: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 3 Plans of Proposed Development

Attachments to Item 13.4 - - Page | 57

Page 58: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 3 Plans of Proposed Development

Attachments to Item 13.4 - Page | 58

Page 59: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 3 Plans of Proposed Development

Attachments to Item 13.4 - - Page | 59

Page 60: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 3 Plans of Proposed Development

Attachments to Item 13.4 - Page | 60

Page 61: ATTACHMENTS TO REPORTS Item 13.4 Operation of a KFC ...13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 1 Draft Notice of Determination

ATTACHMENTS TO REPORTS Wednesday 9 December 2015

13.4 DA 15/0284 Construction and Operation of a KFC Restaurant - 98 Bowral Road, Mittagong ATTACHMENT 3 Plans of Proposed Development

Attachments to Item 13.4 - - Page | 61