Attachment Site Maps - California

18
Attachment 1 Site Maps

Transcript of Attachment Site Maps - California

Page 1: Attachment Site Maps - California

Attachment 1

Site Maps

Page 2: Attachment Site Maps - California

I ENVIRONMENTAL Site Location Map 1438 Webster Street Suite302 Oakland, California 4461 2

22 1 1 East Carson Street

m. (510) 8344747 Fax (310) 83rC4199 Carson, California

Draffer: EBH Dale: 911 8107 Conkact Number: 064674

Page 3: Attachment Site Maps - California

EXPLANATION:

TPH values above one-half m r n ~ ~ n d u s l r i a l Rl6k Based ExMng hh-im+c weH l o c a b

PmmW%imate [OEBtiOn of W h g Oil Sump anpound In ur&

- S d ?amp* M b n pa-k Auqus? 1%)

I TPH values abwe Consbucfion GmunCwateraurnplc bcatlon (Park Feb 16%) am d a n c e Worker RBSL

Sol W SamP* YrshM (P'ruk. J w 1896) TPH values atmve

Sc4 and -11 u r n aarnpb M l o n (ERM June 20061

Page 4: Attachment Site Maps - California

Attachment 2

Health and Safety Forms

> Utility Cleara~zce - U~dergrozknd Not~j?cabion Form > Project Site IIPP Sofew Inspection Checklist P Tailgate Safety Meeting Report > Site Entry /Exi t Log > Air Monitoring Log > Dust Monitoring l o g

Page 5: Attachment Site Maps - California

CALL TOLL FREE 800-223-2600 Southern California 800-642-2444 Nothern California 2 working days before you dig

Dig Alert No. :

LOCATION REQUEST FORM

Date: Time: Operator: Company Phone No.: 7148934266 Caller: Company Name: Innovative Construction Solutions

Address: 7125 Fenwick Lane, Suite 0 City: Westminster State: California Zip: 92683 Fax: 714-893-5122 E-mail:

Best hours to reach your company: Foreman: Foreman's PagerICellular Na.: Delineated: yes No • Excavation Address.

City: County:

Thomas Guide Page & Grid: Closest X Street:

Additional Addresses or Descriptive Location:

Type of Work: Boring: yes No Work to Begin:

Instructions: Date: Time:

Mark By X Meet & Mark Validate Permit Only Work being done for: Permit No.: Not required Not Available Blanket Agency

Company to add to Notification List: Telephone No.:

Members being notified by USA:

Update On or Before Date: First Extended Expiration Date:

Second Extended Expiration Date:

ICS Project Name:

ICS Project No.: Project Manager:

Site Superintendent:

mnnovative onsfruct ion

molutions, inc.

Page 6: Attachment Site Maps - California

I nnovative onatruetion elutions, inch

PROJECT SITE llPP SAFETY INSPECTION CHECKLIST

Proiect Name:

Proiect Number

Project Location:

Site Supetvisor:

Inspector's Name:

MEDICAL AND FIRST AID

1. Are First Aid Kis accessible and identified? 2. Are emergency eye wash and safety showers available? 3. Are daily logs for first aid present and up to date? 4. Are First Aid Kis inspected weekly?

PERSONAL PROTECTIVE EQUIPMENT

1. Have levels of personnel protection been established? 2. Do all employees know their level of protection? 3. Are respirators used decontaminated, inspected, and stored according to standard

procedures? 4. Have employees been fd-tested? 5. Is defective personal protective equipment tagged? 6. Does compressed breathing air meet CGA Grade " D minimum? 7. Are there sufficient quantities of safety equipment and repair parts? 8. Does Level D protection consist of safety glasses, hard hats, and steel toe boots?

FIRE PREVENTION

1. Is smoking prohibited in flammable storage areas? 2. Are fire lanes established and maintained? 3. Are flammable dispensing systems grounded and bonded? 4. Are approved safety cans available for storage of flammable liquids? 5. Has the local fire department been contacted? 6. Arefireextinguishersavailablenearrefuetingareas?

YES

Page 7: Attachment Site Maps - California

I nnovative onstruction elutions, inc,

AIR MONITORING YES

1. Is air monitoring being conducted as required by the site safety plan? 2. Are air monitoring instruments calibrated daily? 3. Is the air monitoring logbooks up to date? 4. Are user manuals available? 5. Are instruments clean and charged?

WELDING AND CUTTING (29 CFR 1926 Subpart J)

1. Are fire extinguishers present at welding and cutting operations? 2. Are confined spaces; such as, tanks, pipelines, and trenches; tested prior to cutting and

welding operations? 3. Are Hot Work Permits available? 4. Are proper helmets, goggles, aprons, and gloves available for welding and cuffing

operations? 5. Are welding machines properly grounded? 6. Are oxygen and fuel gas cylinders stored a minimum of 20 feet apart? 7. Are only trained personnel permitted to operate welding and cutting equipment?

HAND AND POWER TOOLS (29 CFR 1926 Subpart I)

1. Are defective hand and power tools tagged and taken out of service? 2. Is eye protection available and u s 4 when operating power tools? 3. Are guards and safety devices in place on power toots? 4. Are power tools inspected before each use? 5. Are non-sparking tools available?

MOTOR VEHICLES

Are vehicles inspected daily? Are personnel licensed for the equipment they operate? Are unsafe vehicles tagged and reported to supervision? Are vehicles shut down before fueling? When backing vehicles, are spotte~ provided? Is safety equipment on vehicles? Are loads secure on vehicles? Are vehicle occupants using safety belts if provided?

EMERGENCY PLANS

1. Are emergency telephone numbers posted? 2. Have emergency escape routes been designated? 3. Are employees familiar with the emergency signal? 4. Has the emergency route to the hospital been established and posted?

Page 8: Attachment Site Maps - California

I nnovatlve onstruction slutions, inc.

MATERIALS HANDLING YES

Are materials stacked and stored as to prevent sliding or collapsing? Are flammables and combustibles stored in non-smoking areas? Is machinery braced when personnel are performing maintenance? Are tripping hazards labeled? Are semi-trailers chocked? Are fixed jacks used under semi-trai ten? Are riders prohibited on materials handling equipment? Are cranes inspected as prescribed and logged? Are OSHA approved manlifts provided for the lifking of personnel? Are personnel in manlifts wearing approved fall protection devices?

FIRE PROTECTION

1. Has a fire alarm been established? 2. Do employees know the location and use of all fire extinguishers? 3. Are fire extinguisher locations marked? 4. Are combustible materials segregated from open flames? 5. Have fire extinguishers been professionally inspected during the last year7 6. Are fire extinguishers visually inspected monthly?

ELECTRICAL (29 CFR 1926 Subpart K)

Is electrical equipment and wiring properly guarded? Are electrical lines, extension cords, and cables guarded and maintained in good conditions? Are extension cords kept out of wet areas? Is damaged electrical equipment tagged and taken out of service? Have underground electrical lines been identified by proper authorities? Has positive lockout system been established by a certified project electrician? Are GFCl's being used as needed? Are extension cords being inspected daily for ground continuity and structural integrity? (i.e., group pin in place, no unapproved splices) Are warring signs exhibited on high voltage equipment (250V or greater)? Is extension cord inspection documented?

CRATES AND RIGGING (29 CFR 1926550)

Are cranes inspected daily? Are crane swing areas barricaded or demarked? Is ail rigging equipment tagged with an identification number and rated capacity? Is rigging equipment inspection documented? Are slings, chains, and rigging inspected before each use? Are damaged slings, chains, and rigging tagged and taken out of setvice? Are slings padded or protected from sharp corners? Do employees keep clear of suspended loads? Are employees in the lift area wearing hard hats?

Page 9: Attachment Site Maps - California

I nnovative onstruction slutions, inc,

COMPRESSED GAS CYLINDERS

Are breathing air cylinders charged only to prescribed pressures? Are like cylinders segregated in well ventilated areas? Is smoking prohibited in cylinder storage areas? Are cylinders stored secure and upright? Are cylinders protected from snow, rain, etc.? Are cylinder caps in place before cylinders are moved? Are fuel gas and 02 cylinders stored a minimum of 20 feet apart? Are propane cylinders stored and used outside the structure?

SCAFFOLDING (29 CFR 1926A51)

Is scaffolding placed on a flat, firm surface? Are scaffold planks free of mud, ice, grease, etc.? Is scaffolding inspected before each use? Are defective scaffold parts taken out of service? Does mobile scaffold height exceed 4 times the width or base dimension? Does scaffold planking overlap a minimum of 12 inches? Does scaffold planking extend over end supports between 6 to 18 inches? Are employees restricted from working on scaffolds during storms and high winds? Are ail pins in place and wheels locked? Is perimeter guarding (top rail, mid rail, and toe board) present?

WALKING AND WORKING SURFACES

Are ladders a Type I or Type II? Are access ways, stairways, ramps, and ladders clean of ice, mud, snow, or debris? Are ladders being used in a safe manner? Are ladders kept out of passageways, doors, or driveways? Are broken or damaged ladders tagged and taken out of setvice? Are metal ladders prohibited in electrical service? Are staiways and floor openings guarded? Are safety feet installed on straight and extension ladders? Is general housekeeping up to FElS standards? Are ladders tied ofP

SITE SAFETY PLAN

1. Is a site safety plan available on site or accessible to all employees? 2. Does the safety plan accurately reflect site conditions and tasks? 3. Have potential hazards been described to employees on site? 4. Is there a designated safety official on site? 5. Have ail employees signed the acknowledgment form?

YES

Page 10: Attachment Site Maps - California

I nnovative ossstruct'ion elutions, inc.

SITE POSTERS YES

7. Are the following documents posted in a prominent and accessible area? A. Minimum Wage 8. OSHA Health and Safety C. Equal Employment Opportunity

SITE CONTROL

1. Are work notes clearly defined? 2. Are support trailers located to minimize exposure from a potential release? 3. Are support trailers accessible for approach by emergency vehicles? 4. Is the site properly secured during and alter wotk hours?

HEAVY EQUIPMENT (29 CFR 1926 Subpart 0)

1. Is heavy equipment inspected as prescribed by the manufacturer? 2. Is defective heavy equipment tagged and taken out of service? 3. Are project roads and structures inspected for load capacities and proper clearances? 4. Is heavy equipment shut down for fueling and maintenance? 5. Are back-up alarms installed and working on equipment3 6. Are designated operators only operating equipment? 7. Are riders prohibited on heavy equipment? 8. Are guards and safety appliances in place and used?

EXCAVATION (29 CFR 1 926 Subpart P j

Has a "competent person" been designated to supenrise this excavation activity? Have utility companies been advised of excavation activities? Prior to opening excavations, are utilities located and marked? Has a professional engineer evaluated all excavations greater than 20 feet deep? Is there rescue equipment on-site and accessible to excavation? Is excavated material placed a minimum of 24 inches from the excavations? Are the sides of excavations sloped or shored to prevent caving in on employees? Has excavation greater than 4-feet deep been monitored for hazardous atmospheres (i-e. LEL102 deficiency)? Are ladders used in excavations over 4-feet deep? Are ladders present every 25 feet? Are barriers, i.e. guardrails or fences placed around excavations near pedestrian or vehicle thoroughfares? Is excavation inspected daily by competent persons and documented?

Page 11: Attachment Site Maps - California

I nnovative onstruction slutlons. inc

CONFINED SPACES (Proposed Regulation 29 CFR 191 0.146)

1. Have employees been trained in the hazards of confined spaces? 2. Are confined space permits available on project site? 3. Is the cantractom confined space safety procedure on the project? 4. Has a rescue plan been established?

YES

PERSONNEL DECONTAMINATION

1. Are decontamination stations set up on site? 2. Are waste receptacles available for contaminated clothing? 3. Are steps taken to contain liquids used for decontamination? 4. Have decontamination steps and procedures been covered by the site supervisor or safety

official? 5. Is all personal protective equipment and respiratory equipment being cleaned on a daily

basis?

EQUIPMENT DECONTAMINAION

1. Has equipment decontamination been established? 2. Is contamination wash water properly contained and disposed of3 3. Are all pieces of equipment inspected for proper decontamination before leaving the site? 4. Is all equipment being cleaned on a daily basis?

HAZARD COMMUNICATION (29 CFR 1926.59)

1. Is there a written program on-site? 2. Is there a MSDS FOR EACH CHEMICAL present on-site? 3. Are all containers properly labeled, as to content, hazard? 4. Have em~lovees been trained on chemical hazards? . . 5. Are employee's trained on chemical hazards while doing non-routine tasks? 6. Do employees (including subcontmctors) know and understand the acute and chemical

effects of exposure from the chemicals on-site? 7. Have all subcontractors signed the Hz-Comm acknowledgment form?

I have reviewed this inspection checklist with the safety inspector and fully understand the recommendation and will make every attempt to correct them immediately.

Sisnature Date

Site Supervisor:

Project Manager:

FElS Compliance Inspector:

Page 12: Attachment Site Maps - California

I nnovative onstruction olutions, inc.

TAILGATE SAFETY MEETING REPORT

Project Name: ICS Project No.:

Project Location:

Site Address:

Cross Street & TGP:

Date: Time: Page: 1 of 1

Emergency Client Contact: Name:

Tel:

Field Activity Subject:

SAmEY TOPICS PRESENTED

Protective Clothing I Equipment: Level D (hard hat, ear plugs, safety glasses, gloves, vest, steel toed shoes)

Monitoring Equipment: Photo Ionization Detector (PID) or Organic Vapor Analyzer (OVA)

Chemical Hazard: TPH and Heavy Metals

Physical Hazard: > Emergency Procedures: Contact ICS Health & Safety Officer - Extreme Emergency - Dial 91 1

HospitallClin ic: Pacific Hospital - Long Beach Phone: 562-997-2500

Hospital Address: 2776 Pacific Avenue, Long Beach, California 90806 - Special Equipment: Odor Supressing equipment available for odiforous soils

Other: Level D upgrades: protective gloves, coveralls, dust mask or respirator ATTENDESS

NAME PRINTED COMPANY SIGNATURE

Meeting Conducted By

Name (Printed) Signature

Page 13: Attachment Site Maps - California

I nnovative onstruction elutions, inc.

SITE ENTRY I EXIT LOG

SITE: LOCATION:

Site Entry Log

DATE

In NAME TIME

Out ORGANIZATION PHONE

Page 14: Attachment Site Maps - California

I nnovative onstruction oiutions, inc.

AIR MONITORING LOG

Date:

Project Name:

Project No.:

Name:

CALIBRATION RECORD Time

....

Location PI DlF I D ( ppm) Comments

Page 15: Attachment Site Maps - California

I nnovative onstructlon sfutions, inc

DUST MONITORING LOG

Date:

Project Name:

Project No.:

Name:

CALIBRATION RECORD

Time Instrument Reading Comments

Page 16: Attachment Site Maps - California

Attachment 3

Hospital Route Map

Page 17: Attachment Site Maps - California

Driving Directions from 221 1 E Carson St, Long Beach, CA to 2776 Pacific Ave, Long B... Page 1 of 2

Start: 2211 E Carsan St Long Beach, CA 90810-1227, US

End: 2776PacificAve Long Beach, CA 90806-2613, US

What is your Credit Score?

Directions Distanca

Total Est. Tirne&&minutes total Est. Distance: 3.50 mil&&

1: Start out going &ST on E CARSON ST toward ARNOLD CENTER RD* 0.8 mites

"- 'urn RIbn i onto S SANTA FE AVE. 0.5 mites

3: 1 -. . I LEFT onto W yAR,WLOW p. 1.2 miles

4 4: Turn RIGHT onto PACIFIC 6 0.2 miles

b: PACIFIG kL becomes PACIFIC AVE. && mk%,

6: Make a U-TURN onto PACIFIC AVE. <0.1 miles

7: End at 2776 Pacific Ave Long Beach, CA 90806-2613. US

T-I Eg..qme: 4 pinutes Tutal Est. Distance: 3.50 mi l s '

Page 18: Attachment Site Maps - California

Driving Directions from 221 1 E Carson St., Long Beach, CA to 2776 Pacific Ave, Long B... Page 2 of 2

Start: 2211 E Carson St Long Beach, CA 90810-1227, US

End: 2776 Pacific Ave -ong Beach, CA 90806-2613, US

&I1 riahts resewed. Use Subiect to License/Copwt rhese directions are informational only. No represe&tion is made or warranty glven as to their content, road mnditions or route usability or expedltlousness. User assumes all risk of use. Mafluest and Its suppliers assume no &spomibillty fpr any Ims or delay resulting from such use.