MAXWELL RD MAIN ST Main Street Staging Yard Tie Line 649 Wood-to-Steel Replacement Project Attachment A: Detailed Route Map 1 of 32 0 200 400 Feet 1:2,000 K 32 31 17 30 29 28 27 26 25 24 23 22 21 20 19 18 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 New Stub Pole N New Steel Pole Wood-to-Steel Replacement Pole Overhead Work Only Pole Removal G Guard Structure Wood-to-Steel Replacement Wood-to-Steel Replacement with Distribution Underbuild Wood-to-Steel Replacement Distribution Only Distribution Removal Underground to Overhead Conversion with Distribution Underbuild Underground Distribution Intercept Approximate Disturbance Area* Staging Yard Access Road Turnaround/Staging Yard Pulling Site Stringing Site Existing Access Road Overland Travel Route Access Road Modification * Area is equivalent to the total estimated square footage of disturbance at each pole, but the actual shape of the work area will be determined during the final design. Tie Line 649 Wood-to-Steel Replacement Appendix A: Detailed Route Mapset August 2016 A-1 Administrative Draft IS/MND

Transcript of Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2...

Page 1: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

MAXW

ELL R

D

MAIN ST

Main StreetStaging Yard

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 1 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-1 Administrative Draft IS/MND

Page 2: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

SEALAVENDER WY

TOPSAIL DR

FATHOMCT

WHEELHOUSE DRDENNERY RD

BLACK

CORALWY

1 2 3

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 2 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-2 Administrative Draft IS/MND

Page 3: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

AVNDADE

LAS VISTAS

TOPSAIL DR

84 5 6 7

9

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 3 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-3 Administrative Draft IS/MND

Page 4: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

ENTERTAINMENT CR

10

9

11 12

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 4 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-4 Administrative Draft IS/MND

Page 5: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

HERITAGE RD

ENTERTAINMENT CR

13

15

14

16

18.5

A

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 5 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-5 Administrative Draft IS/MND

Page 6: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

G

G

HERITAGE RD

18.2

18.31

18.4

19

19.1

17

18

18.1

18.5

20

21

18.3

22

C

B

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 6 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-6 Administrative Draft IS/MND

Page 7: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

23

26

24

25 27

D

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 7 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-7 Administrative Draft IS/MND

Page 8: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

29

31

28

3032

33E

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 8 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-8 Administrative Draft IS/MND

Page 9: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

Two-Pole Structure36

34

35

37

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 9 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-9 Administrative Draft IS/MND

Page 10: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

38

39

40

41

42

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 10 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-10 Administrative Draft IS/MND

Page 11: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

43

44

45

46

F

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 11 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-11 Administrative Draft IS/MND

Page 12: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

49

50.1

50.2

52

47

53

48

50

51

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 12 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-12 Administrative Draft IS/MND

Page 13: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

52

53

55

51

54

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 13 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-13 Administrative Draft IS/MND

Page 14: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

55

56

57

58

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 14 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-14 Administrative Draft IS/MND

Page 15: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

59

60

61

62

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 15 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-15 Administrative Draft IS/MND

Page 16: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

63.1

64

63

65

66

67

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 16 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-16 Administrative Draft IS/MND

Page 17: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

68

66

67

69

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 17 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-17 Administrative Draft IS/MND

Page 18: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

N71

69

70

7273G

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 18 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-18 Administrative Draft IS/MND

Page 19: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

N7573

76

77

H

73.1 74

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 19 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-19 Administrative Draft IS/MND

Page 20: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

78

79

80

81

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 20 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-20 Administrative Draft IS/MND

Page 21: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

82

83

84

85

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 21 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-21 Administrative Draft IS/MND

Page 22: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

85

86

87

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 22 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-22 Administrative Draft IS/MND

Page 23: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

PERIMET

ER RD

88

89

90

91

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 23 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset Route

Mapset

August 2016 A-23 Administrative Draft IS/MND

Page 24: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

Richard J. Donovan Correctional Facility

PERIMET

ERRD

92

93

94

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 24 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-24 Administrative Draft IS/MND

Page 25: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

Richard J. Donovan Correctional Facility

PERIMETER RD

9799

95

96

97.1

98100

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 25 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-25 Administrative Draft IS/MND

Page 26: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

102

103

101

104

105

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 26 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-26 Administrative Draft IS/MND

Page 27: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

HARV

EST R

D

LONESTAR RD

107

108

106

108.1

109

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 27 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-27 Administrative Draft IS/MND

Page 28: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

HARV

EST R

D

110

111

112

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 28 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-28 Administrative Draft IS/MND

Page 29: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

HARV

EST R

D

113

114

115

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 29 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-29 Administrative Draft IS/MND

Page 30: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

HARV

EST R

D

116

117

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 30 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-30 Administrative Draft IS/MND

Page 31: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

HARV

EST R

D

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 31 of 32

0 200 400Feet

1:2,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-31 Administrative Draft IS/MND

Page 32: Attachment A: Detailed Route Map 1 of 32 Tie Line 649 Wood ... · G G H E R I T A G E R D 18.2 18.31 18.4 19 19.1 17 18 18.1 18.5 20 21 18.3 22 C B Attachment A: Detailed Route Map

SDG&E will only utilize approximately 4 acres within this staging yard

LONE STAR RD

OTAY MESA RD

Otay StagingYard

Tie Line 649 Wood-to-Steel Replacement ProjectAttachment A: Detailed Route Map 32 of 32

0 200 400Feet

1:3,000 K

3231

17

3029282726 25242322212019181615141312111098765432

1

New Stub PoleN New Steel Pole

Wood-to-Steel Replacement PoleOverhead Work OnlyPole Removal

G Guard Structure

Wood-to-Steel ReplacementWood-to-Steel Replacement with Distribution UnderbuildWood-to-Steel Replacement Distribution OnlyDistribution RemovalUnderground to Overhead Conversion with Distribution UnderbuildUnderground Distribution Intercept

Approximate Disturbance Area*Staging YardAccess Road Turnaround/Staging YardPulling SiteStringing Site

Existing Access RoadOverland Travel RouteAccess Road Modification

* Area is equivalent to the total estimated square footage of disturbance at each pole,but the actual shape of the work area will be determined during the final design.

Tie Line 649 Wood-to-Steel Replacement ProjectAppendix A: Detailed Route Mapset

August 2016 A-32 Administrative Draft IS/MND