HVAC RENOVATIONS TOPETERBOROUGH POLICE STATION
SITE LOCATION
DRAWING LIST
MECHANICALM-01 PENTHOUSE EXISTING LAYOUTM-02 PENTHOUSE NEW LAYOUTM-03 PENTHOUSE ROOF NEW LAYOUTM-04 PENTHOUSE WEST ELEVATIONM-05 PENTHOUSE SOUTH ELEVATIONM-06 PENTHOUSE EAST ELEVATIONM-07 PENTHOUSE NORTH ELEVATIONM-08 LEVEL 3, TOP FLOOR LAYOUTM-09 LEVEL 2, GROUND FLOOR LAYOUTM-10 LEVEL 1, BASEMENT LAYOUTM-11 BOILER ROOM LAYOUTM-12 BOILER VENT LAYOUTM-13 BOILER VENT ELEVATIONSM-14 EQUIPMENT SCHEDULESM-15 BAS SCHEDULESM-16 BAS SCHEDULESM-17 LEGENDM-18 PENTHOUSE EXISTING SCHEMATICM-19 PENTHOUSE NEW SCHEMATICM-20 BOILER ROOM EXISTING SCHEMATICM-21 BOILER ROOM NEW SCHEMATIC
ELECTRICALE-1 BOILER ROOM LAYOUTE-2 PENTHOUSE DEMOLITIONE-3 PENTHOUSE NEW LAYOUTE-4 PENTHOUSE ROOF LAYOUTE-5 SPECIFICATIONS, LEGEND & DETAILSE-6 SCHEDULESE-7 SINGLE LINE DIAGRAM
ATTACHMENT #2
McDONNEL STREET
WA
TER
STR
EET
Toronto,ON.416.298.8448
LAPASCONSULTINGENGINEERSLTD970LawrenceAvenueW.Suite#801Toronto,ON.M6A3B6416.955.9088
StructuralForensic&RehabilitationServicesBarrie-36MacmillanCres.,Barrie,ON.L4N7H1Toronto-605-3500DufferinSt.,Toronto,ONM3K1N2416.876.4357
Toronto,ON.416.418.7375905.409.8677
Established in 1977Lennis Trotter Architect
Oshawa, Ontario 905.576.6869
STRUCTURALS1-01 GENERAL NOTES & SITE PLANS1-02 EXISTING CONDITIONS - PLAN VIEWSS1-03 PENTHOUSE FRAMING DETAILSS1-04 ROOF FRAMING DETAILSS1-05 STEEL LADDER FRAMING DETAILS
ROOFINGR-1 ROOF FLASHING DETAILS (ROOF PLAN & NOTES)R-2 ROOF FLASHING DETAILS (ROOF CURB SECTIONS)R-3 ROOF FLASHING DETAILS (ROOF REPAIR & HATCH SECTIONS)
ARCHITECTURALA1.1 GENERAL NOTES & CONDITIONSA2.1 DEMOLITION FLOOR PLAN - PENTHOUSEA2.2 DEMOLITION ROOF PLAN - PENTHOUSEA2.3 NEW FLOOR PLAN - PENTHOUSEA2.4 NEW ROOF PLAN - PENTHOUSEA3.1 WEST ELEVATION - PENTHOUSEA3.2 SOUTH ELEVATION - PENTHOUSEA3.3 EAST ELEVATION - PENTHOUSEA3.4 NORTH ELEVATION - PENTHOUSEA4.1 DETAILS - PENTHOUSE
D
C
B
2 5432a
Cx
Bx
Bz
LEGEND
C
B
2 5432a
Cx
Bx
Bz
LEGEND
CM-05
AM-04
FM-06
BM-04
DM-05
EM-06
HM-07
GM-07
C
B
2 5432a
Cx
Bx
Bz
LEGEND
CM-05
AM-04
EM-06
GM-07
43 52a
43 52a
WEST ELEVATION - EXTERIOR
WEST ELEVATION - INTERIORBM-02
AM-02
LEGEND
CD BBxCx Bz
CD BBxCx Bz
SOUTH ELEVATION - EXTERIOR
SOUTH ELEVATION - INTERIORDM-02
CM-02
LEGEND
4 35 2a
4 35 2a
EAST ELEVATION - EXTERIOR
EAST ELEVATION - INTERIORFM-02
EM-02
LEGEND
C DB Bx CxBz
C DB Bx CxBz
NORTH ELEVATION - EXTERIOR
NORTH ELEVATION - INTERIORHM-02
GM-02
LEGEND
E
D
C
B
A
2 765431
NOTE
E
D
C
B
A
2 765431
NOTE
E
D
C
B
A
2 765431
NOTE
E
D
65
E
D
65
BOILER ROOM - NEW LAYOUTBM-11BOILER ROOM - EXISTING LAYOUTA
M-11
E
D
65
E
D
65
BOILER ALTERNATE VENT LAYOUTBM-12 BOILER BASE VENT LAYOUTA
M-12
NOTES
AM-13
AM-13
6 75432
BOILER BASE & ALTERNATE VENT ELEVATIONSAM-13
WEST EXTERIOR ELEVATION
EXISTING EQUIPMENT SCHEDULE
Tag Location Serving Make & Model Data Notes
ACS-1 Penthouse2nd Floor
Air HandlerTrane Climate Changer
31-HF-MP14,000 CFM
15 HP VFD FanRemove & Dispose
ACS-2 Penthouse3rd Floor
Air HandlerMcQuay
MSL122DH13,050 CFM
10 HP VFD FanRemove & Dispose
ACRE-1 Penthouse2nd Floor
Return Air FanAAF-Canada
4W-2H11,625 CFM @ 1" ESP
5 HP VFD FanTo Remain
ACRE-2 Penthouse3rd Floor
Return Air FanAAF-Canada
4W-2H11,650 CFM @ 1" ESP
5 HP VFD FanTo Remain
H-1 Penthouse 2nd FloorNeptronic Humidifier
SK-31440 lb/hr steam
Remove & Relocate,Provide new Neptronic wand tomatch new ducting arrangement
H-2 Penthouse 3rd FloorNeptronic Humidifier
SK-31030 lb/hr steam
To Remain,Provide new Neptronic wand tomatch new ducting arrangement
GC-1 Penthouse Glycol ChillerMcQuay
WHR100D
87.5 ton total50 HP Comp. 160 HP Comp. 2
Pump-out, Reclaim Refrigerant,Safely dispose Glycol,
Remove & Dispose Equipment
GP-1 Penthouse Glycol PumpArmstrong
4380-3x3x8192 usgpm @ 62 ft hd
5 HPRemove & Dispose
GT-1 PenthouseGlycol Expansion
Tank- - Remove & Dispose
GE-1 Penthouse General ExhaustGreenheckBSQ-9-3
725 cfm1/3 HP
Remove & Dispose
TE-2 Penthouse Toilet ExhaustGreenheckBSQ-10-7
1650 cfm3/4 HP
To Remain, replace EA damperpneumatic actuator with electric
UH-1 Penthouse Unit Heater - - Remove & Relocate
C-1 RoofCondenser forGlycol Chiller
Snyder GeneralAPD120CV12
(10) 1 HP Fans Remove & Dispose
RTU-1 Roof1st Floor
Roof Top UnitAAON - To Remain
ERV-1 Roof1st Floor
Energy RecoveryVentilator
Spinnaker - To Remain
ACC-1CRU-1
RoofRoom 307
Split A/C SystemComm. Room 307
Liebert - To Remain
ACC-2CRU-2
RoofRoom 307
Split A/C SystemComm. Room 307
Liebert - To Remain
ACC-3CRU-3
RoofRoom 224
Split A/C SystemServer Room 224
Liebert - To Remain
ACC-4CRU-4
RoofRoom 136
Split A/C SystemData Room 136
Liebert - To Remain
B-1 Boiler Room Hydronic BoilerBryan
HECLM210-W-FDG
2100 mbh input1785 mbh output
Remove & Dispose
B-2 Boiler Room Hydronic BoilerClever Brooks
M-5 2000
2000 mbh input1600 mbh output
Remove & Dispose
DWH-1 Boiler RoomDomestic HotWater Heater
RheemG76-200
76 usgal,200 mbh input
Remove & Dispose
HWT-1 Boiler RoomDomestic HotWater Tank
- 200 usgal Remove & Dispose
T-1 Boiler RoomHydronic
Expansion Tank- - To Remain
P-1(rename P-1A)
Boiler RoomModulation
Hydronic LoopArmstrong
4380 2x2x8131 usgpm @ 48 ft hd
3 HP VFD
Base - To RemainOption - Remove & Relocate
P-2(rename P-2A)
Boiler RoomMain
Hydronic LoopArmstrong
4380 1.5x1.5x860 usgpm @ 45 ft hd
2 HP VFD
Base - To RemainOption - Remove & Relocate
P-3 Boiler Room B-1Armstrong
4380 3x3x6160 usgpm @ 27 ft hd
2 HP VFDRemove & Relocate
P-4 Boiler Room B-2Armstrong
4380 3x3x6160 usgpm @ 21 ft hd
1.5 HP VFDRemove & Relocate
P-5 Boiler Room DHW Recirc.B&GK48
1/12 HP To Remain
NEW EQUIPMENT SCHEDULE
Scope Tag Location Serving Make & Model Performance Data (per unit)
BaseAHU-1AHU-2
Roof2nd Floor3rd Floor
HaakonCustom AirPak
Airflow : 14,000 CFM @ 2.5" ESP, 20 HP premium efficiency, 3/60/208V, VFD Fan, Class II PressureDX Cooling Coils : 2 totalling 500.0 mbh (41.2 tons), R410a, 45F suction, 77.0F db/65F wb EAT, 54.4F db/53F wb LATCooling EAT based on 4,200 cfm OA @ 79.3F db/66.7F wb ERV supply mixing with 9,800 cfm RA @ 76F db/64F wbHeating Coils : 2 totalling 580.5 mbh, 50% E.G., 155F EWT, 125F LWT, 44.4 usgm, 3.0 ft WPD, 62.1F EAT, 100F LATHeating EAT based on 1,500 cfm OA @ -20F db/-15F wb mixing with 12,500 cfm RA @ 72F db/54F wbPre Filter : 2" MERV 8, Final Filter : 12" MERV 14Factory starter panel & control box with one 3/60/208V & one 1/60/120V feeds, BACnet comm. cardMin. 15" high factory roof curb, Orientation of coil connections and door locations to suit layout
BaseCU-1CU-2
RoofAHU-1AHU-2
McQuayRCS045D
Cooling Capacity : 2 circuits totalling 512.4 mbh (42.7 tons), R410a, 45F suction, 95F ambient, 4 compressor, 4 stepcapacity control, Hot gas bypass, Condenser with hail protection, Low ambient fan control to 45FFactory starter panel & control box with one 3/60/208V & one 1/60/120V feeds, BACnet comm. cardRoof curbs & spring isolators
OptionERV-2ERV-3
PenthouseAHU-1AHU-2
CookERV-5500
Arrangement H
Supply Airflow : 4,200 CFM @ 1" ESP, 3 HP premium efficiency, 3/60/208V FanReturn Airflow : 4,200 CFM @ 0.75" ESP, 3 HP premium efficiency, 3/60/208V FanFrost Control Preheat : 2 stage 208V, 9 kWFactory starter panel & control box with one 3/60/208V feed, BACnet comm. cardMount on existing concrete pads using neoprene isolation pads
Base HX-1 Penthouse AHU Heating CoilsB&G GPX
P64 PN:BY5418
Gasketed PHE, 304 SS Plates, Nitrile HT Gaskets, 150 psig ASME design pressure, Suitable for fluids servicedHot Side : 79.3 usgpm Hydronic Hot Water from 160F to 130F, 3.5 psig max. pressure dropCold Side : 88.8 usgpm 50% EG from 125F to 155F, 5.0 psig max. pressure drop, 1,170.7 mbh capacityMount on galvanized steel fully welded drip pan with valved drain connection
Option P-1B Boiler Room
ModulationHydronic Loop
(Standby Pump)
Armstrong4380 2x2x8
Capacity : 131 usgpm 160F Hydronic Hot Water @ 48 ft hd, Non-overloading Impeller, Bronze fitted construction3 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor3 x 2 suction guide, Danfoss VLT VFD starter
Option P-2B Boiler Room
MainHydronic Loop
(Standby Pump)
Armstrong4380 1.5x1.5x8
Capacity : 60 usgpm 160F Hydronic Hot Water @ 45 ft hd, Non-overloading Impeller, Bronze fitted construction2 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor2.5 x 2 suction guide, Danfoss VLT VFD starter
Base P-6 Penthouse HX-1 HW sideArmstrong
4380 2x2x8
Capacity : 80 usgpm 160F Hydronic Hot Water @ 30 ft hd, Non-overloading Impeller, Bronze fitted construction5 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor3 x 2 suction guide, 2" Belimo B349 3 way mixing valve with 24V modulating actuator, Danfoss VLT VFD starter
Base P-7 PenthouseHX-1 EG side
to AHU-1Armstrong
4380 2x2x10
Capacity : 45 usgpm 155F 50% EG @ 40 ft hd, Non-overloading Impeller, Bronze fitted construction7.5 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor2.5 x 2 suction guide, 2" Belimo B347 3 way mixing valve with 24V modulating actuator, Danfoss VLT VFD starter
Base P-8 PenthouseHX-1 EG side
to AHU-2Armstrong
4380 2x2x10
Capacity : 45 usgpm 155F 50% EG @ 40 ft hd, Non-overloading Impeller, Bronze fitted construction7.5 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor2.5 x 2 suction guide, 2" Belimo B347 3 way mixing valve with 24V modulating actuator, Danfoss VLT VFD starter
Base GT-1 Penthouse EG expansion tankArmstrong
AX-15V
Pre-charged, diaphragm style, vertical expansion tank125 psig working pressure, ASME designCapacity : 5 usgal acceptance volume, 8 usgal total volume
Base PF-1 PenthouseEG heating loopHydronic loop
General Filtration PF2X4PChemical Pot Feeder
Capacity : 2 usgal volume
BaseF-1F-2
PenthouseBoiler Room
EG heating loopHydronic loop
Pall LMO-10-3/4Filter Cartridge & Housing
Cast iron head, stainless steel shell, 3/4" NPT inlet & outlet connections, 10" cartridge length
BaseW-1W-2
PenthouseH-1H-2
NeptronicHumidifier
Wands
Replacement Neptronic wands to match existing humdifier rating and new ducting arrangement
Base L-1 (x1) Penthouse AHU EA LouvresTamco
Series 4400
Exterior flange mounting frame, continuous blade, optional aluminum bird screen with frame54"W x 72"H
Option L-2 (x2) Penthouse ERV OA LouvresTamco
Series 3400 & 7000
Exterior flange mounting frame, continuous blade, optional aluminum bird screen with frame42"W x 48"Hwith Back Draft Damper
Base D-1 (x2) Penthouse AHU EA DampersTamco
Series 9000 insulated
50"W x 30"H, Belimo 24V modulating actuator
OptionD-2 (x2)D-3 (x2)
PenthouseERV EA DampersERV SA Dampers
TamcoSeries 9000 insulated
24"W x 18"H, Belimo 24V modulating actuator30"W x 12"H, Belimo 24V modulating actuator
Base B-1,2 Boiler Room Hydronic BoilersDeDeitrich
Gas 310-8 Eco Series
All standard accessories; 1-LH & 1-RH unit; A=control display facing short side; Full modulation burner; 0-10vDC BASremote signal; Local/remote switch; Supply manifold with ASME 60 psig relief, Low water cut-out, Air vent, TP gauge,Safety high limit; Neutralization kit; 4"- 14" WC natural gas; 120v power; Optional flue gas damper;1785 mbh input, 1703 mbh output; 160 usgpm@ 11 ft. press. drop
Base DWH-1 Boiler RoomDomestic HotWater Heater
RheemGE80-200
80 usgal tank volume, 199 mbh input, 187 mbh output, 10.5" WC max. natural gas; 120v power,Neutralization kit & condensate pump
Base HWT-1 Boiler RoomDomestic HotWater Tank
LochinvarGVG200JR
200 usgal tank volume, Glass lined, Jacketed Round, ASME 125 psig certified, Pre-piped 120v Agitator pump (P-10)Armstrong Model THWX-08018-4-1 copper double wall tube bundle, Tube side; 50 usgpm 160F Hydronic waterTube Side; 166.1 mbh, 1.2 psi PD, Tank Side; 166.1 mbtu total in 1 hr, 140F final temp
Base P-9 Boiler RoomHWT-1
Tube BundleArmstrong
4380 2x2x6
Capacity : 50 usgpm 160F Hydronic Hot Water @ 15 ft hd, Non-overloading Impeller, Bronze fitted construction1.5 HP premium efficiency, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor,2 x 2 suction guide, Combination magnetic starter
Base T-2 Boiler RoomDomestic Hot
Water ExpansionTank
ArmstrongAST-5
Pre-charged, diaphragm style, vertical expansion tank for potable water150 psig working pressure, ASME designCapacity : 2.1 usgal acceptance volume, 3.5 usgal total volume
OptionEWSS-1EWSS-2
PenthouseBoiler Room
Combination EyeWash Safety
Shower
BradleyS19314SB
Plastic drench showerhead with pull handle, Eyewash with stainless steel bowl, Galvanized steel assembly with safetyyellow coating, Universal identification sign and inspection tag
EXISTING BAS SCHEDULE
Floor Tag Serving Digital I/O Analog I/O Notes
Penthouse ACS-1 Air Handler for Level 2
Supply Fan ACS-1 start/stopReturn Fan ACRE-1 start/stopHumidifier H-1 start/stopChiller GC-1 enableChiller pump GP-1 start/stop
Supply Fan ACS-1 VFD speed controlReturn Fan ACRE-1 VFD speed controlSupply Fan ACS-1 VFD speed feedbackReturn Fan ACRE-1 VFD speed feedbackSupply Duct pressureOutdoor, Supply, Mixed Air tempsReturn Air temp, humidityExhaust, Return, Outside Air dampersHot/Cold deck Air damperHeat, Cool valves
Remove & Dispose ACS-1,Reuse ACRE-1 & connect to new BAS,Reuse H-1 & connect to new BAS,Remove & Dispose GC-1 & GP-1
Penthouse ACS-2 Air Handler for Level 3
Supply Fan ACS-2 start/stopReturn Fan ACRE-2 start/stopHumidifier H-2 start/stopChiller GC-1 enableChiller pump GP-1 start/stop
Supply Fan ACS-2 VFD speed controlReturn Fan ACRE-2 VFD speed controlSupply Fan ACS-2 VFD speed feedbackReturn Fan ACRE-2 VFD speed feedbackSupply Duct pressureOutdoor, Supply, Mixed Air tempsReturn Air temp, humidityExhaust, Return, Outside Air dampersCool valve
Remove & Dispose ACS-2,Reuse ACRE-2 & connect to new BAS,Reuse H-2 & connect to new BAS,Remove & Dispose GC-1 & GP-1
RoofRTU-1 &
ERV-1Rooftop Unit & ERVfor Level 1
RTU-1 start/stopRTU-1 run statusERV-1 start/stopERV-1 run status
Return, Supply Air temps
Reuse RTU-1, ERV-1 & connect to new BAS
Level 3, Top Floor VAV 3.01
315A NE Corner Office317 Storage318 Media/Training
Electronic modulating reheatElectronic modulating radiationTemp sensor 3.01 in 315A office
Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.02
315A Corridor319 Locker320 Professional Standards321 Resource
Electric 2 position radiation Electronic modulating reheatTemp sensor 3.02 in 315A corridor
Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.03325 Deputy Chief Electric 2 position radiation Electronic modulating reheat
Temp sensor 3.03 in 325Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.04326 Admin. Assistant Electronic modulating reheat
Temp sensor 3.04 in 326Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.05327 Chief Electric 2 position radiation Electronic modulating reheat
Temp sensor 3.05 in 327Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.06331 Boardroom Electric 2 position radiation Electronic modulating reheat
Temp sensor 3.06 in 331Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.07
309 Server329 Storage330 Storage334 Corridor
Electronic modulating reheatTemp sensor 3.07 in 334
Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.08
308 Community Supervisor335 Assoc. Office336 Corridor332 Kitchenette
Electronic modulating reheatTemp sensor 3.08 in 335
Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.09310 Crime Stoppers302 Central Records
Electronic modulating reheatTemp sensor 3.09 in 302
Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.10301 Waiting Room Electronic modulating reheat
Temp sensor 3.10 in 301Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.11315 Corridor311 Copy Room312 File Room
Electronic modulating reheatTemp sensor 3.11 in 311 Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.12337/338 Kitchen/Lunch339 Quiet Room
Electric 2 position radiation Electronic modulating reheat, BC#5,6Temp sensor 3.12 in 337
Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.13314 Switchboard313A Storage
Electric 2 position radiation Electronic modulating reheatTemp sensor 3.13 in 314 Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.14303 Mgr Admin. Support Electric 2 position radiation Electronic modulating reheat
Temp sensor 3.14 in 303 Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.15304 Human Res. Clerk305 Court Office
Electric 2 position radiation Electronic modulating reheatTemp sensor 3.15 in 304 Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.16306 F.O.I. Office Electric 2 position radiation Electronic modulating reheat
Temp sensor 3.16 in 306Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.17
307 Communications Pnuematic modulating reheatTemp sensor 3.17 in 307
Reuse VAV & connect to new BAS,Reuse stand alone AC system with temp &humidity control (Option - connect to BAS)
Level 3, Top Floor VAV 3.18
340 Intel. Crime Analysis341 Intel. Crime Analysis342 Intel. Crime Analysis343 Intel. Crime Analysis
Electric 2 position radiation Electronic modulating BC#7,8,9,10Temp sensor 3.18 in 343
Reuse VAV & connect to new BAS
Level 3, Top Floor VAV 3.19333 Board Admin. Assist. Electric 2 position radiation Electronic modulating reheat
Temp sensor 3.19 in 333Reuse VAV & connect to new BAS
EXISTING BAS SCHEDULE
Floor Tag Serving Digital I/O Analog I/O Notes
Level 2, Ground Floor VAV 2.01
212 EOC / Briefing Room Fan powered box fan relay Electronic modulating reheatElectronic modulating radiationTemp sensor 2.01 in 212
Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.02
213 Uniform Report218 Fleet Office228 CIB Ident229 CIB Ident
Electronic modulating reheatElectronic modulating radiationTemp sensor 2.02 in 229
Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.03
230 CIB Ident Electronic modulating reheatElectronic modulating radiationTemp sensor 2.03 in 230
Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.04227 CIB Ident225 CIB Power / Cold Case210 Corridor
Electronic modulating reheatTemp sensor 2.04 in 210 Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.05
224 Computer Server223 Computer Tech222 Traffic Sergeant221 Community Sergeant219, 245, 240 Corridors
Electronic modulating reheatTemp sensor 2.05 in 222
Reuse VAV & connect to new BAS,Reuse BAS work station in 222,Reuse stand alone AC system with temp control in 224(Option - connect to BAS)
Level 2, Ground Floor VAV 2.06226 CIB Electronic modulating reheat
Temp sensor 2.06 in 226Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.07203 Lobby Electronic modulating reheat
Temp sensor 2.07 in 203Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.08
214 Quality Control220 Data Entry206 Reception207 Staff Sergeant245 Corridor
Electronic modulating reheatTemp sensor 2.08 in 206
Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.09
205 Accident Report244 Interview243 Interview242 Interview
Electronic modulating reheatElectronic modulating radiationTemp sensor 2.09 in 244
Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.10
204 Public Meeting Fan powered box fan relay Electronic modulating reheatElectronic modulating radiationTemp sensor 2.10 in 204
Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.11
241 Interview239 Victim Serv/Volunteer238 Victim Services
Electronic modulating reheatElectronic modulating radiationTemp sensor 2.11 in 241
Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.12211 Operations Inspector210 Corridor
Temp sensor 2.12 in 211Reuse VAV & connect to new BAS
Level 2, Ground Floor VAV 2.13
231 CIB Fraud/Firearm232 CIB Ident233 CIB Ident234 Monitor Room235 Victim Soft Room
Electronic modulating reheatElectronic modulating radiationTemp sensor 2.13 in 232 Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.01102 Weapons & EquipmentStorage
Electronic modulating reheatTemp sensor 1.01 in 102 Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.02121 Exercise Fan powered box fan relay Electronic modulating reheat
Temp sensor 1.02 in 121Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.03117 Female Locker Electronic modulating reheat
Temp sensor 1.03 in 117Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.04
104 Booking105 Video Remand Station106 Mug/Breath107 Telephone
Electronic modulating reheatTemp sensor 1.04 in 106
Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.05
141 Elevator Lobby142 Fingerprint143 Fingerprint
Electronic modulating reheatTemp sensor 1.05 in 141 Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.06138 File Storage137 Storage
Electronic modulating reheatTemp sensor 1.06 in 138 Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.07108 Female Cells Electronic modulating reheat
Temp sensor 1.07 in 108Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.08
127,128 Corridors113 Monitor115 Quartermaster Station116 Liquor & Gun Storage110 Accused Video Interv.
Electronic modulating reheatTemp sensor 1.08 in 115
Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.09
135 Evidence136 Tele/Data
Electronic modulating reheatTemp sensor 1.09 in 135
Reuse VAV & connect to new BAS,Reuse stand alone AC system with temp control in 136(Option - connect to BAS)
Level 1, Basement VAV 1.10132 Evidence144 Evidence131 Evidence
Electronic modulating reheatTemp sensor 1.10 in 144 Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.11129 Storage126 Male Locker Room
Electronic modulating reheatTemp sensor 1.11 in 126
Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.12111 Male Cells Electronic modulating reheat
Temp sensor 1.12 in 111Reuse VAV & connect to new BAS
Level 1, Basement VAV 1.13 120 Corridor Temp sensor 1.13 in 120 Reuse VAV & connect to new BAS
EXISTING BAS SCHEDULE
Floor Tag Serving Digital I/O Analog I/O Notes
Level 1, BasementBoiler Room
MainHydronic
LoopControl
Hydronic HeatingLevel 3 reheat &radiation coils,Penthouse (fieldconfirm)
Boiler B-1 High, Low FireBoiler B-2 High, Low FirePump P-2 (Main Loop) start/stopPump P-3 (Boiler B-1) start/stopPump P-4 (Boiler B-2) start/stopPump P-2,3,4 status
Pump P-2 (Main Loop) VFD speed controlPump P-2 (Main Loop) delta pressure(dP sensor located in penthouse, fieldconfirm)Main Loop Supply, Return temps
Remove & Dispose B-1,2,Reuse P-2,3,4 & connect to new BAS
Level 1, BasementBoiler Room
ModHydronic
LoopControl
Hydronic HeatingLevel 1 & 2 reheat &radiation coils (fieldconfirm)
Boiler B-1,2 AlarmsPump P-1 (Mod Loop) start/stopPump P-1 status
Pump P-1 (Mod Loop) VFD speed controlPump P-1 (Mod Loop) delta pressure(dP sensor located in ceiling of basementexercise room, field confirm)Mod Loop Supply, Return temps3-way mod valve
Remove & Dispose B-1,2,Reuse P-1 & connect to new BAS
NEW BAS SCHEDULE
Floor Tag Serving Digital I/O Analog I/O Notes
Penthouse
AHU-1,ACRE-1,
CU-1,H-1
Level 2 HVAC
Supply Fan AHU-1 start/stopReturn Fan ACRE-1 start/stopHumidifier H-1 enableCondensing Unit CU-1 enable
Supply Fan AHU-1 VFD speed controlReturn Fan ACRE-1 VFD speed controlSupply Fan AHU-1 VFD speed feedbackReturn Fan ACRE-1 VFD speed feedbackSupply Duct pressureOutdoor, Supply, Mixed Air tempsReturn Air temp, humidity, CO2AHU-1 MA, OA & EA dampers
Occupied Mode: System to start & run according toschedule (24 hour occupied, adjustable).Static Control: supply fan VFD to maintain supplyduct pressure (adjustable). Return fan VFD to tracksupply & run at 90% supply fan speed (adjustable).Economizer Control: when OA below coolingsetpoint or above heating setpoint (adjustable),maintain cooling or heating mixed air temps(adjustable) using AHU MA, OA & EA dampers.IAQ Control: when CO2 above setpoint (adjustable),override ERV/Economizer damper settings(adjustable).Temp Control: to maintain target SA temp(adjustable). Cooling; enable CU-1 to operate usingits own self contained controls. Heating; enable HX-1system.Humidity Control: to maintain RA humidity setpoint(adjustable), enable H-1 to operate using its own selfcontained controls.
Penthouse
AHU-2,ACRE-2,
CU-2,H-2
Level 3 HVAC
Supply Fan AHU-2 start/stopReturn Fan ACRE-2 start/stopHumidifier H-2 enableCondensing Unit CU-2 enable
Supply Fan AHU-2 VFD speed controlReturn Fan ACRE-2 VFD speed controlSupply Fan AHU-2 VFD speed feedbackReturn Fan ACRE-2 VFD speed feedbackSupply Duct pressureOutdoor, Supply, Mixed Air tempsReturn Air temp, humidity, CO2AHU-2 MA, OA & EA dampers
To follow controls noted above.
Penthouse(ERV Option)
Add toAHU-1system;ERV-2
Level 2 HVAC
Add to AHU-1 system;ERV-2 enable
Add to AHU-1 system;ERV-2 EA & SA dampers(normally closed)
Add to AHU-1 system;ERV Control: when OA above cooling setpoint orbelow heating setpoint (adjustable), enable ERV tooperate using its own self contained controls.Maintain cooling or heating mixed air temps(adjustable) using ERV EA & SA dampers.
Penthouse(ERV Option)
Add toAHU-2system;ERV-3
Level 3 HVAC
Add to AHU-2 system;ERV-3 enable
Add to AHU-2 system;ERV-3 EA & SA dampers(normally closed)
Add to AHU-2 system;ERV Control: when OA above cooling setpoint orbelow heating setpoint (adjustable), enable ERV tooperate using its own self contained controls.Maintain cooling or heating mixed air temps(adjustable) using ERV EA & SA dampers.
PenthouseP-6P-7P-8
HX-1 HW pumpAHU-1 glycol pumpAHU-2 glycol pump
Pumps P-6,7,8 start/stop Pumps P-6,7,8 VFD speed controlPumps P-6,7,8 VFD speed feedbackHW, AHU-1, AHU-2 3-way mod valvesHW, AHU-1, AHU-2 mixed glycol tempsHX-1 HW off, HGR on, HGS off temps
Heating Temp Control: Adjust P-6 speed based on 1or 2 AHU call for heat, adjust HW 3-way mix valve tomaintain HW loop temp (adjustable). Adjust P-7,8speed based on offset from AHU SA temp setpoint,adjust AHU 3-way mix valve to maintain mixed glycolloop temp (adjustable).
PenthouseExisting
Fire AlarmShutdown
Fire Alarm Shutdown input toBAS
Monitor only, no control
Penthouse
ExistingGenerator
LoadShed
Non-essential loadsdo not operate whengenerator runs
New CRNP N.O. contact (closedin normal position) input to BAS.New CRNP N.O. contacts asrequired to connect newequipment (see ElectricalDrawings)
When Generator runs, BAS to modulateAHU-1,2 supply fan VFD to preset reducedspeed (adjustable).
Generator Load Shed of following non-essentialloads (see Electrical Drawings);Existing H-1,2 (connected already)Existing RTU-1 & ERV-1 (connected already)Existing Elevator (connected already)New CU-1,2 (replaces GC-1, C-1 & GP-1)New ERV-2,3New P-6,7,8 (note - no AHU heat, close OAdampers & run on hydronic reheat & radiation only)New P-9 (no secondary DHW heating)
NEW BAS SCHEDULE
Floor Tag Serving Digital I/O Analog I/O Notes
RoofRTU-1 &ERV-1
Level 1 HVAC
RTU-1 start/stopRTU-1 run statusERV-1 start/stopERV-1 run status
Return, Supply Air temps Occupied Mode: System to start & run according toschedule (24 hour occupied, adjustable).ERV-1 starts after RTU-1 run status confirmed.Temp Control: to maintain target SA temp(adjustable). RTU-1 controls SA temp and staticpressure based on its own self contained controls.RA setpoint is 22C (71.6F) (adjustable) andoperating range is 2.5C (4.5F). As RA goes from20.75 to 23.25C (69.4 to 73.9F), SA will go from 24to 12.5C (75.2 to 54.5F). When RA is at 22C (71.6F)setpoint, SA setpoint will be 18C (64.4F).
Roof(Option to add
stand alone A/Csystems to new
BAS);
ACC/CRU-1ACC/CRU-2ACC/CRU-3ACC/CRU-4
A/C Systems for;Comm. Room 307Comm. Room 307Server Room 224Data Room 136
ACC-1 start/stopACC-1 run statusACC-2 start/stopACC-2 run statusACC-3 start/stopACC-3 run statusACC-4 start/stopACC-4 run status
Temp & Humidity sensor in 307Temp sensor in 224Temp sensor in 136
Existing equipment not on existing BAS,Add new temp & humidity sensors in rooms shown,Add graphics, control, monitoring, alarming ofexisting stand alone A/C systems.
Level 3, Top Floor19 VAVs,
VAV3.01 toVAV3.19
Per Existing BASSchedule
Per Existing BAS Schedule
Per Existing BAS Schedule(Option for additional VAV controls toprovide improved temperature control inrooms served by VAV)
Per Existing VAV Control Schedule,(Option for additional VAV controls);Add new temp sensor 3.15A in room 305,Replace 3.17 pnuematic reheat valve with electronic,Add new temp sensor 3.18A in room 341
Level 2, GroundFloor
13 VAVs,VAV2.01 to
VAV2.13
Per Existing BASSchedule
Per Existing BAS Schedule
Per Existing BAS Schedule(Option for additional VAV controls toprovide improved temperature control inrooms served by VAV)
Per Existing VAV Control Schedule,(Option for additional VAV controls);Add new temp sensor 2.09A in room 242,Add new temp sensor 2.11A in room 238,Add new temp sensor 2.13A in room 231,Add new temp sensor 2.13B in room 233
Level 1, Basement13 VAVs,
VAV1.01 toVAV1.13
Per Existing BASSchedule
Per Existing BAS Schedule Per Existing BAS Schedule Per Existing VAV Control Schedule
Level 1, BasementBoiler Room
BoilerControl
Boiler B-1Pump P-3 (for B-1)Boiler B-2Pump P-4 (for B-2)
B-1,2 enableB-1,2 statusP-3,4 start/stop by boilersP-3,4 status
0-10vDC B-1,2 HWS setpointsB-1,2 HWS temps
Outdoor Air Reset: HWS 60 to 70C (140 to 160F) for0 to -20C (32 to -4F) OA (adjustable),Boiler Lead/Lag,Boiler Control: Enable lead boiler when OA tempfalls below setpoint (adjustable) & cycle/modulate tomaintain HWS setpoint. If lead boiler goes intoalarm, lag boiler will start & run until lead boilerreturns to normal state. Enable lag boiler on offsetfrom HWS setpoint (adjustable).
Level 1, BasementBoiler Room
P-2AMain Loop
Control
Hydronic HeatingLevel 3 reheat &radiation coils,Penthouse (fieldconfirm)
Pump P-2A(Main Loop) start/stopPump P-2A status
Pump P-2A (Main Loop) VFD spd controlPump P-2A (Main Loop) delta pressure(dP sensor located in penthouse, fieldconfirm)Main Loop Supply, Return temps
P-2A to run continuously when boiler controlenabled. VFD to modulate P-2A speed based on dPsensor.
Level 1, BasementBoiler Room
P-1AMod Loop
Control
Hydronic HeatingLevel 1 & 2 reheat &radiation coils (fieldconfirm)
Pump P-1A(Mod Loop) start/stopPump P-1A status
Pump P-1A (Mod Loop) VFD spd controlPump P-1A (Mod Loop) delta pressure(dP sensor located in ceiling of basementexercise room, field confirm)Mod Loop Supply, Return temps3-way mod valve
P-1A to run continuously when boiler controlenabled. VFD to modulate P-1A speed based on dPsensor. Target mod loop supply temp from 30 to 70C(86 to 160F) for 15 to-15C (59 to 5F) OA(adjustable).
Level 1, BasementBoiler Room
HWT-1P-9
Secondary DHWheating
P-9 start/stopP-9 statusDWH-1 alarm
HWT-1 tempP-9 enabled when boiler control enabled. P-9 to runon offset from DWH setpoint (adjustable) or whenDWH-1 goes into alarm.
Level 1, BasementBoiler Room(Option for
Hydronic StandbyPumps)
P-2BP-1B
(StandbyPumps)
Hydronic Heating
Pump P-2B(Main Loop) start/stopPump P-2B statusPump P-1B(Mod Loop) start/stopPump P-1B status
Pump P-2B (Main Loop) VFD spd controlPump P-1B (Mod Loop) VFD spd control
P-2B is standby to P-2A, P-1B is standby to P-1A.If pump A goes into alarm, pump B will start, run &modulate speed until pump A returns to normalstate. A & B pumps shall not run simultaneously andbe electrically & BAS interlocked.
EXISTING & NEW VAV CONTROL SCHEDULE
Normal OperationCooling Control: VAV to modulate between maximum & minimum flow rates to satisfy cooling demand. Increase flow for more cooling and decrease flow for less cooling. If VAV is at minimum flow androom temperature is still too cool, then VAV is to modulate to Reheat Air Flow (50% of maximum) and modulate reheat coil valve to satisfy the heating setpoint.Level 3 Heating Control: Rooms with radiation have 2 position on-off control valves. According to existing documentation, the valve actuator operation calls for a 5 minute delay on opening for heatingcall and 5 minute delay on closing for end of heating call. Radiation valve to open when control signal to reheat valve reaches 50% (adjustable) and close when control signal decreases to 10%(adjustable).Level 2 Heating Control: Rooms with radiation have modulating control valves. Radiation valves will modulate with the same control signal as the reheat valve.Level 1 Heating Control: No radiation heating, only reheat coils with modulating control valves.Temperature setpoints: Heating setpoint is room thermostat setpoint minus 0.5C (1F), cooling setpoint is room thermostat setpoint plus 0.5C (1F).
Unoccupied OperationWhen the associated air handling system is in unoccupied mode, the VAV will also be in unoccupied mode. Heating for maintaining room temp will be at unoccupied setpoint. During unoccupied VAVmode, pressing the override button on the thermostat will revert VAV control back to occupied mode for 1 hour (adjustable).
Morning Warmup OperationIf SA temp to the VAV increases to 24C (75F), the VAV damper will modulate between maximum & minimum flow rates. Increase flow for more heating and decrease flow for less heating. When SAtemp to VAV falls below 21C (70F), the VAV will return to normal operation (open for cooling, close for heating).
Fan Powered Box OperationLevel 1 Exercise Room, Level 2 EOC/Briefing Room & Public Meeting Room all have fan powered boxes. Fan will start & run continuously whenever the box is in occupied mode. All other sequencesare the same as VAV box sequences.
GENERAL LEGEND & ABBREVIATIONS COMPONENT, VALVE & CONTROL LEGEND AIR HANDLING LEGEND EQUIPMENT LEGEND
ACS-1
H-1
TO 2nd FLOOR
ACRE-1 TE-2 GE-1
ACRE-2
ACS-2
TO 3rd FLOOR
GP-1
H-2
C-1
GC-1
GT-1
UH-1
P-7
H-1
TO 2nd FLOOR
ACRE-1 TE-2
ACRE-2
UH-1
TO 3rd FLOOR
H-2
GT-1
AHU-1
CU-1
AHU-2
CU-2
ERV-2
D-2
D-3L-2
W-2
ERV-2D-2
D-3L-2
D-1
D-1
W-1
HX-1P-6 PF-1 F-1 P-8
EWSS-1
L-1
EXISTING HYDRONIC HEATING LOOPEXISTING DOMESTIC WATER HEATING LOOP
B-1
P-3
P-1
P-2
T-1P-4
EAST WALL
NORTH WALL
P-5
B-2
DWH-1HWT-1PF-1 F-1
NEW HYDRONIC HEATING LOOPNEW DOMESTIC WATER HEATING LOOP
P-3
B-2
P-5
DWH-1HWT-1
P-9
T-2
B-1
P-10
EWSS-2
PF-1 F-1
P-1A
EAST WALL
NORTH WALL
P-1B
P-2A
P-2B
T-1
P-4
E
D
65
E
D
65
BOILER ROOM - EXTG. LAYOUT
1
BOILER ROOM - NEW LAYOUT
2
C
B
2 543
120/208V 3Ø 4W
225A MAINS
RP-BR (NEW)
N
ELECTRICAL SPECIFICATIONS:
ELECTRICAL LEGEND
N.T.S.
TYPICAL VFD STARTER WIRING DIAGRAM
1
208V 3Ø 3W
(C/W CUSTOM LUGS TO SUIT EXTG. FEEDER)
PP-PH (NEW)
REUSE EXTG. 2X(3#350MCM-3") FEEDER
208V 3Ø 3W
600A MAINS
PP-MCC (EXTG.)
400A MAINS
(EXTG. CHILLER REMOVED)
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
NTS
A1.1
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.GENERAL NOTES AND CONDITIONS
WL
1 ISSUED FOR TENDER FEB 18 2014
GENERAL NOTES
1. GENERAL NOTES APPLY TO ALL ARCHITECTURALDRAWINGS.
2. CONTRACTOR SHALL CONFORM TO ALL INDUSTRYSTANDARDS FOR INSTALLATION, ACCORDING TO BESTPRACTICES.
3. THE ARCHITECT IS NOT RESPONSIBLE FOR THE ACCURACYOF THE INFORMATION CONCERNING THE SITE WHENFURNISHED BY OTHERS.
4. DRAWINGS PREPARED BY THE ARCHITECT ARE HISCOPYRIGHT PROPERTY AND SHALL BE RETURNED TO HIMON REQUEST. REPRODUCTION OF DRAWINGS ANDSPECIFICATIONS IN WHOLE OR IN PART IS FORBIDDENWITHOUT THE ARCHITECT'S WRITTEN PERMISSION.
5. CONTRACTOR SHALL CONFIRM EXISTING CONDITIONS.
6. CONTRACTOR SHALL REPORT ANY DISCREPANCIES IN THEDRAWINGS IMMEDIATELY TO THE ARCHITECT.
7. GENERAL CONTRACTOR TO COORDINATE WITH PLUMBER,ELECTRICIAN, ALL OTHER SUB-TRADES AND SUPPLIERS, TOENSURE THAT THERE IS ADEQUATE ROOM FOR NEWMECHANICAL AND ELECTRICAL SYSTEMS. GENERALCONTRACTOR TO COORDINATE LOCATION WITH ALLTRADES THE LOCATION OF FIXTURES AND EQUIPMENTBEFORE ROUGH-INS BEGIN.
8. PATCH AND MAKE GOOD ALL SURFACES AND FINISHESWHERE DEMOLITION OCCURS.
9. ENSURE THAT THE INTEGRITY OF ANY FIRE RATING IN ALLWALLS AND FLOOR ASSEMBLIES
10. CONTRACTOR SHALL PATCH AND MAKE GOOD ALLSURFACES AND FINISHES.
11. CONTRACTOR TO VERIFY ALL FINISHES AND FIXTURESWITH CLIENT BEFORE INSTALLATION.
12. NEW SUPPORT BLOCKING IN ALL WALLS WHEREINSTALLATION OF ALL MILLWORK, TOWEL DISPENSERS,SOAP DISPENSERS AND ANY OTHER WALL MOUNTEDACCESSORY OCCURS.
13. REFER TO DOCUMENTS PREPARED BY OTHERCONSULTANTS FOR THE ENGINEERING RELATED TO:STRUCTURAL MECHANICAL AND ELECTRICAL.
14. NEW PRODUCTS SHALL MATCH EXISTING ADJACENTPRODUCTS: (SIZE, COLOUR, AND FINISH OF EXISTINGMATERIALS)
15. GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGSTO ARCHITECT FOR APPROVAL OF ALL ARCHITECTURALITEMS.
EXISTING STRUCTURALCOLUMN
7'-2
"3'
-4"
6"1'
-1"1'
-41 2"
35'-6
"
3'-3"22'-112"5'-31
2"30'-8"
7'-4
1 2"8'
-6"
1'-8
1 2"35
'-6"
30'-8"
REMOVE EXISTING MECHANICAL LOUVREAND INSULATED CONCRETE WALL PANELSYSTEM ABOVE AND BELOW
EXISTINGMECHANICAL LOUVRE
EXISTING H.M. DOORAND FRAME
ROOF TOPPENTHOUSE
P01
8'-6
"
REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM
3'-5
"3'
-11 2"
6'-1
11 2"2'
-7"
7'
REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM
REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM
REMOVE EXISTING MECHANICAL LOUVREAND INSULATED CONCRETE WALL PANELSYSTEM ABOVE AND BELOW
REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM
REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM
REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
1'-4
1 2"
5'-018"4'-10"
CUT NEW OPENING IN EXISITINGCONCRETE INSULATED WALL PANEL. REFER
TO MECHANICAL DRAWINGS.
01A3.4
01A3.2
01
A3.1
01A3.3
7'
North
2a3
4
C BxCx Bz
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
3/16"=1'
A2.1
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.DEMO FLOOR PLAN
WL
1 ISSUED FOR TENDER FEB 18 2014
NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,AND STRUCTURAL DRAWINGS.
NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,AND STRUCTURAL DRAWINGS.
NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,
AND STRUCTURAL DRAWINGS.
FOR MECHANICAL ROOF CURBS, REPAIR /REPLACEMENT OF FLASHING AND ROOFREPAIR REFER TO ROOFING SPECIALIST'S
DRAWINGS AND NOTATION. PATCH AND MAKEGOOD ON ALL SURFACES AND FINISHES.
13'
12'-9
1 2"7'
7'
NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,
AND STRUCTURAL DRAWINGS.
01A3.4
01A3.2
01A3.1
01A3.3
North
C Bz BxCx
2a3
4
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
3/16"=1'
A2.2
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.DEMO ROOF PLAN
WL
1 ISSUED FOR TENDER FEB 18 2014
03A4.1
EXISTING STRUCTURALCOLUMN
7'-2
"3'
-4"
6"1'
-1"1'
-41 2"
35'-6
"
3'-3"22'-112"5'-31
2"30'-8"
7'-4
1 2"8'
-6"
1'-8
1 2"35
'-6"
5'-018"
NEW PREFIN. METAL MECHANICAL LOUVREAND NEW INSULATED CONCRETE WALLPANEL SYSTEM ABOVE AND BELOW
EXISTINGMECHANICAL LOUVRE
NEW DOOR HARDWARE ON EXISTING H.M. DOOR AND FRAME (NEWHARDWARE TO MATCH EXISTING FOR POLICE STANDARDS)
01A10.2
ROOF TOPPENTHOUSE
P01
8'-6
"
NEW INSULATED CONCRETE WALL PANELSYSTEM
3'-5
"3'
-11 2"
6'-1
11 2"2'
-7"
7'
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
EXISTING INSULATED CONCRETE WALLPANEL SYSTEM
1'-4
1 2"
NEW INSULATED CONCRETE WALL PANELSYSTEM
NEW INSULATED CONCRETE WALL PANELSYSTEM
NEW INSULATED CONCRETE WALL PANELSYSTEM
NEW INSULATED CONCRETE WALL PANELSYSTEM
NEW INSULATED CONCRETE WALL PANELSYSTEM
NEW PREFIN. METAL MECHANICAL LOUVREAND NEW INSULATED CONCRETE WALLPANEL SYSTEM ABOVE AND BELOW
7'
30'-8"4'-10"
PATCH AND MAKE GOOD ON EXISTINGINSULATED CONCRETE WALL PANEL. NEW
SEALANT AROUND NEW PREFIN. METALMECHANICAL LOUVRE
02A3.4
02A3.2
02A3.1
02A3.3
02A4.1
01A4.1
03A4.1
02A4.1
01A4.1
02A4.1
02A4.1
North
C Bz BxCx
2a3
4
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
3/16"=1'
A2.3
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.NEW FLOOR PLAN
WL
1 ISSUED FOR TENDER FEB 18 2014
NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,AND STRUCTURAL DRAWINGS.
NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,AND STRUCTURAL DRAWINGS.
NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,
AND STRUCTURAL DRAWINGS.
FOR MECHANICAL ROOF CURBS, REPAIR /REPLACEMENT OF FLASHING AND ROOFREPAIR REFER TO ROOFING SPECIALIST'S
DRAWINGS AND NOTATION. PATCH AND MAKEGOOD ON ALL SURFACES AND FINISHES.
13'
12'-9
1 2"7'
7'
NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,
AND STRUCTURAL DRAWINGS.
02A3.4
02A3.2
02A3.1
02
A3.3
North
C Bz BxCx
2a3
4
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
3/16"=1'
A2.4
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.NEW ROOF PLAN
WL
1 ISSUED FOR TENDER FEB 18 2014
4'-6
"5'
-6"
3'-0
14"
13'-0
14"
11"
6'-2
"
EXISTING H.M. DOOR AND FRAME
REMOVE EXISTING MECHANICALLOUVRE AND INSULATEDCONCRETE WALL PANEL SYSTEMABOVE AND BELOW
REMOVE EXISTING INSULATEDCONCRETE WALL PANEL SYSTEM
11"
REMOVE EXISTING INSULATEDCONCRETE WALL PANEL SYSTEM
PROTECT EXISTING UPSTAND AND ROOFING.PATCH AND MAKE GOOD ON ALL SURFACESAND FINISHES.
12'-1
14"
12'-1
14"
REMOVE EXISTING LIGHT CAREFULLY,AND REINSTALL LIGHT AFTERINSTALLATION OF NEW PANELS
6'-2
1 2"4'
2'-9
78"
13'-0
14"
11"
6'-2
" NEW DOOR HARDWARE ON EXISTING H.M.DOOR AND FRAME (NEW HARDWARE TOMATCH EXISTING FOR POLICE STANDARDS)
REINSTALL EXISTING LIGHT FIXTURE. NEWSEALANT AROUND.
NEW INSULATED CONCRETE WALL PANELSYSTEM
12'-1
14"
12'-1
14"
NEW CONTINUOUS SEALANT ATINTERSECTIONS OF EXISING AND NEW PANELS
NEW PREFIN. METAL MECHANICAL LOUVREAND NEW INSULATED CONCRETE WALL PANELSYSTEM ABOVE AND BELOW. NEW SEALANTAROUND NEW LOUVRE.
NEW INSULATEDCONCRETE WALLPANEL SYSTEM
FOR REPAIR / REPLACEMENT OF FLASHING ANDROOF REPAIR REFER TO ROOFING SPECIALIST'SDRAWINGS AND NOTATION. PATCH AND MAKE
GOOD ON ALL SURFACES AND FINISHES.
03A4.1
01A4.1
02A4.1
02A4.1
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
AS NOTED
A3.1
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.WEST ELEVATION DRAWINGS
WL
A3.101 DEMOLITION ELEVATION
SCALE 1 4" = 1'
A3.102 NEW CONSTRUCTION ELEVATION
SCALE 1 4" = 1'
1 ISSUED FOR TENDER FEB 18 2014
11"
12'-1
14"
13'-0
14"
CUT NEW OPENING IN EXISITINGCONCRETE INSULATED WALLPANEL. REFER TO MECHANICALDRAWINGS.
2'-1
078"
6'-4
"
REFER TO MECH. AND ELEC. FORDEMOLITION NOTATION.
EXISTING RADIO TOWER
11"
12'-1
14"
13'-0
14"
PATCH AND MAKE GOOD ON EXISTINGINSULATED CONCRETE WALL PANEL. NEWSEALANT AROUND NEW PREFIN. METALMECHANICAL LOUVRE
PATCH AND MAKE GOOD ON EXISTINGINSULATED CONCRETE WALL PANEL WHEREMECHANICAL / ELECTRICAL HAS BEENREMOVED. MATCH EXISTING COLOUR ANDFINISH.
2'-1
078"
6'-4
"
03A4.1
01A4.1
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
AS NOTED
A3.2
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.SOUTH ELEVATION DRAWINGS
WL
A3.201 DEMOLITION ELEVATION
SCALE 1 4" = 1'
A3.202 NEW CONSTRUCTION ELEVATION
SCALE 1 4" = 1'
1 ISSUED FOR TENDER FEB 18 2014
4'-6
"5'
-6"
3'-0
14"
13'-0
14"
REMOVE EXISTING MECHANICALLOUVRE AND INSULATEDCONCRETE WALL PANEL SYSTEMABOVE AND BELOW
11"
REMOVE EXISTING INSULATEDCONCRETE WALL PANEL SYSTEM
PROTECT EXISTING UPSTAND ANDROOFING. PATCH AND MAKE GOODON ALL SURFACES AND FINISHES.
4'-6
"5'
-6"
3'-0
14"
13'-0
14"
11"
NEW CONTINUOUS SEALANT ATINTERSECTIONS OF EXISING AND NEW PANELS
NEW INSULATED CONCRETE WALL PANELSYSTEM
NEW PREFIN. METAL MECHANICAL LOUVREAND NEW INSULATED CONCRETE WALL PANELSYSTEM ABOVE AND BELOW. NEW SEALANTAROUND NEW LOUVRE.
FOR REPAIR / REPLACEMENT OF FLASHING ANDROOF REPAIR REFER TO ROOFING SPECIALIST'SDRAWINGS AND NOTATION. PATCH AND MAKE
GOOD ON ALL SURFACES AND FINISHES.
03A4.1
01A4.1
02A4.1
02A4.1
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
AS NOTED
A3.3
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.EAST ELEVATION DRAWINGS
WL
A3.301 DEMOLITION ELEVATION
SCALE 1 4" = 1'
A3.302 NEW CONSTRUCTION ELEVATION
SCALE 1 4" = 1'
1 ISSUED FOR TENDER FEB 18 2014
7'3'
3'-0
14"
13'-0
14"
EXISTING MECHANICAL LOUVRE(TYPICAL)
EXISTING INSULATED CONCRETEPANEL WALL SYSTEM. (TYPICAL)
EXISTING PREFINISHED METALFLASHING (TYPICAL)
EXISTING ROOF UPSTAND SYSTEM(TYPICAL)
11"
7'3'
3'-0
14"
13'-0
14"
NEW SEALANT AROUND EXISTINGPREFIN. METAL MECH. LOUVRE
NEW MECHANICAL UNIT REFERTO MECHANICAL AND ELECTRICALDRAWINGS (TYPICAL)
11"
1 ISSUED FOR TENDER FEB 18 2014
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
AS NOTED
A3.4
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.NORTH ELEVATION DRAWINGS
WL
A3.401 DEMOLITION ELEVATION
SCALE 1 4" = 1'
A3.402 NEW CONSTRUCTION ELEVATION
SCALE 1 4" = 1'
NEW SEALANT
NEW PREFINISHED METAL FLASHING
NEW INSULATED CONCRETE PANELWITH ROCK FINISH (MATCH EXISTING
COLOUR, SIZE, AND FINISH)
NEW 312" STRUCTURAL STEEL STUDS
@ 12" O.C. MAX.
NEW 312" HORIZONTAL STEEL STUDS
@ 24" O.C. MAX.
PATCH AND MAKE GOOD ON EXISTING PREFINISHEDMETAL FLASHING (MATCH EXISTING COLOUR, SIZE,
AND FINISH) REFER TO ROOFING SPECIALIST'SDRAWINGS AND NOTATION
REMOVE EXISTING ROOFING 24" BACK FROM NEW
NEW PREFINISHED METAL FLASHING
NEW INSULATED CONCRETE PANELWITH ROCK FINISH (MATCH EXISTING
COLOUR, SIZE, AND FINISH)
NEW 312" STRUCTURAL STEEL STUDS
@ 12" O.C. MAX.
NEW 312" HORIZONTAL STEEL STUDS
@ 24" O.C. MAX.
NEW 6 MIL POLY. VAPOUR BARRIER
NEW SEALANT
NEW PREFINISHED METAL FLASHING
NEW PREFINISHED METALMECHANICAL LOUVRE
NEW 312" STRUCTURAL STEEL STUDS
@ 12" O.C. MAX.
NEW 312" HORIZONTAL STEEL STUDS
@ 24" O.C. MAX.
NEW PREFINISHED METAL FLASHING
PATCH AND MAKE GOOD ON EXISTINGUPSTAND AND ROOFING
NEW INSULATED CONCRETE PANELWITH ROCK FINISH (MATCH EXISTING
COLOUR, SIZE, AND FINISH)
NEW 312" STRUCTURAL STEEL STUDS
@ 12" O.C. MAX.
NEW 312" HORIZONTAL STEEL STUDS
@ 24" O.C. MAX.
NEW 6 MIL POLY. VAPOUR BARRIER
1 ISSUED FOR TENDER FEB 18 2014
Lennis Trotter Architect
Oshawa, Ontario 905.576.6869REVISION
DATE PROJECT NO
SCALE
DRAWING NO
PROJECT NAME
DRAWING CLIENT
DRAWN BY
1334FEB 20 2014
AS NOTED
A4.1
PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.
PETERBOROUGH
P.L.P.S.DETAILS
WL
A4.101 SECTION DETAIL AT TOP OF NEW LOUVRE
SCALE 1" = 1'
A4.102 DETAIL AT EXISTING ROOF CURB
SCALE 1" = 1'
A4.103 SECTION DETAIL AT BOTTOM OF NEW LOUVRE
SCALE 1" = 1'