Attachment 2 Data Management Plan - Department of Toxic ......Attachment 2‐8 – Mitigation...

27
Attachment 2 Data Management Plan

Transcript of Attachment 2 Data Management Plan - Department of Toxic ......Attachment 2‐8 – Mitigation...

  • Attachment 2

    Data Management Plan

  •   

    ATTACHMENT 2 TO THE CIP  

    Data Management Plan  

    Phase I Decontamination and Deconstruction Project Vernon, CA 90058 

      

       

    Prepared for  

    Exide Technologies 2700 South Indiana Street Vernon, CA  90058 

                                     

    Prepared by    

      

    1502 E Opp Street Wilmington, CA  90744 

     August 18, 2016 

    Rev January 7, 2017 Rev July 14, 2017

  • Phase 1 Closure at Exide Facility    American Integrated Services, Inc. Vernon, CA    Data Management Plan  

    1  

      

    TableofContentsTable of Contents .............................................................................................................................................. 1 

    1.  Data Management Plan ............................................................................................................................ 2 

    1.1  Project Engineer ................................................................................................................................ 2 

    1.2  Project Administrator ....................................................................................................................... 3 

    1.3  Project Documents ........................................................................................................................... 4 

    Attachment 2‐1 Daily Progress Report ......................................................................................................... 6 

    Attachment 2‐2 Waste / Bin Manifest Tracking Form .................................................................................  7 

    Attachment 2‐3 Storage Area Inspection Form ............................................................................................ 8 

    Attachment 2‐4 Pre‐Loading Checklist ......................................................................................................... 9 

    Attachment 2‐5 Truck Inspection and Decontamination Checklist ............................................................ 10 

    Attachment 2‐6 Truck Driver Sign‐In and Route Acknowledgement Form ................................................ 11 

    Attachment 2‐7 Mitigation Measures Air Quality Checklist Form .............................................................. 12 

    Attachment 2‐8 Mitigation Measures Cultural and Historic Response Checklist ....................................... 13 

    Attachment 2‐9 Mitigation Measures Equipment Noise Control Form ..................................................... 14 

    Attachment 2‐10 Mitigation Measures Noise Monitoring Form ................................................................ 15 

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

  • Phase 1 Closure at Exide Facility    American Integrated Services, Inc. Vernon, CA    Data Management Plan  

    2  

     

     1. DataManagementPlan 

    The purpose of this plan is to outline the duties of the AIS personnel; provide a list of documentation that will be maintained on‐site; and, provide copies of relevant forms and templates that will be prepared and maintained to comply with Project data requirements.  AIS has assigned a Project Engineer and a Project Administrator to the Exide Project. Following are their roles and responsibilities on the Project.  1.1  Project Engineer   The  Project  Engineer  (PE)  has  expertise  in  daily  field  operations  and  documentation 

    requirements  in all phases of  the Project SOW and will provide assistance  to  the Senior 

    Project Manager and Site Superintendents with daily field operations. He will be working 

    closely with them to verify that AIS is on schedule and properly prepared for the next day’s 

    tasks.   He will also be accountable  to the Senior Project Manager  for Client deliverables, 

    including but not limited to daily forms regarding field operations; daily health and safety 

    tail  gate meetings;  and,  preparing  the Daily  Progress  Report  (see Attachment  #1).     As 

    required in the Closure Plan, the Daily Progress Report form includes the following: 

    Project name and date; 

    Weather conditions; 

    Description of activities performed during the day; 

    Description of any tests, sampling or monitoring performed, including data from previous 

    testing; 

    Details of any discrepancies or field conflicts which occurred during the day; 

    Descriptions and quantities of materials,  labor or equipment mobilized to or demobilized 

    from the facility, including delivery and disposal tickets; 

    Description and quantities of materials, labor or equipment used during the day; 

    Actual  engine  runtime  hours  and  fuel  usage  for  all  portable  equipment  engines.    The 

    information will be used by Exide for RECLAIM reporting.  Mobile equipment does not need 

    to be included; 

  • Phase 1 Closure at Exide Facility    American Integrated Services, Inc. Vernon, CA    Data Management Plan  

    3  

    Summary of disposal or recycling shipments, including a table providing manifest number, 

    truck  number,  transporter,  contents,  weight,  destination  facility,  and  other  pertinent 

    information. 

    Health and safety summary, including personal air monitoring; 

    Real time particulate (dust) air monitoring results; 

    Description of inspections performed during the day including attendees; 

    Submittals made during the day or decisions made on previous submittals; 

    List of Site visitors and organizations represented; 

    Site security activities; 

    Any other significant activities; and, 

    Contractor representative’s signature. 

     

    The report will be submitted electronically to Exide, the Resident Engineer, and DTSC by the 

    end  of  the  following  day.      He  will  utilize  Project  specific  Excel  forms  to  track  waste 

    tonnage/volume  and disposal destination;  track  and document  all manifests, both  non‐

    hazardous  and  hazardous.    See  Sample  Waste/Bin  Tracking  Form,  Attachment  #2.  

    Hazardous manifests will be scanned and delivered electronically to Exide Representatives 

    on a daily basis. Generator  copies will be  compiled and delivered  in hard  copy  to Exide 

    representatives on a weekly basis. Data management tasks also  include project schedule 

    maintenance;  tracking  change  orders;  preparing/organizing  daily  forms;  scheduling 

    inspections; managing employees’ time cards; and preparing monthly invoices.   

     1.2  Project Administrator  

    The  Project  Administrator  (PA)  will  be  responsible  for  cost  tracking;  monitoring  log compilations;  tracking  time  and materials work;  assisting  the  PE;  and, maintaining  the following documentation on‐site for the Project duration: 

      Copy of California State Contractor’s License; 

    Cal/OSHA Registration Number; 

    AQMD Equipment Permits; 

    Copies of surveys and notifications;  

    HASP and related documentation including copies of employee safety training certifications, 

    daily tailgate safety meetings; 

  • Phase 1 Closure at Exide Facility    American Integrated Services, Inc. Vernon, CA    Data Management Plan  

    4  

    Regulated Area Entry logs; 

    Waste profiles and manifests; 

    Applicable field forms; 

    Signed manifests; 

    Records of the volume and/or tonnage of recycled and disposed materials; 

    Approximate quantity of waste handled, along with date of movement;  

    Photo documentation;  

    Construction schedule and daily reports; and, 

    Daily reports and field log books which contain field observations and notes, site personnel 

    arrival and departures times, equipment and other vital project information. 

    AIS will provide annual diversion reports to the City of Vernon by March 1 of the year following the reporting year. 

     

    1.3  Project Documents  

    The following forms will be utilized on the Project:  

    Attachment 2‐1 ‐ Daily Progress Report 

    Attachment 2‐2 – Waste / Bin Manifest Tracking Form 

    Attachment 2‐3 ‐ Storage Area Inspection Form 

    Attachment 2‐4 ‐ Pre‐Loading Checklist 

    Attachment 2‐5 ‐ Truck Inspection and Decontamination Checklist 

    Attachment 2‐6 ‐ Truck Driver Sign‐In and Route Acknowledgement Form 

    Attachment 2‐7 – Mitigation Measures Air Quality Checklist Form – to be completed for each 

    off‐road construction equipment at delivery. 

    Attachment 2‐8 – Mitigation Measures Cultural and Historic Responses Checklist Form – to 

    be used only if encountering prehistoric or historical cultural resources or human remains. 

    Attachment 2‐9 – Equipment Noise Controls Form 

    Attachment 2‐10 – Noise Monitoring Form 

     

    The following forms are not included in this document as they are only to be used internally: 

    Attachment 2‐11 ‐ Tailgate Safety Meeting Form 

    Attachment 2‐12 ‐ Daily Superintendent’s Report 

  • Phase 1 Closure at Exide Facility    American Integrated Services, Inc. Vernon, CA    Data Management Plan  

    5  

    Attachment 2‐13 ‐ Request for Information 

    Attachment 2‐14 ‐ Change Order Request 

    Attachment 2‐15 ‐ Change Order Tracking Log 

       

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    6

    Attachment 2-1

    Daily Progress Report

  • ATTACHMENT 2-1: DAILY PROGRESS REPORT

    Daily Progress Report #:Dated:

    Units worked on 

    Unit Fuel: Hrs.:

    Unit Fuel: Hrs.:

    List all visitors

    Waste or Recycling Shipments? If YES attach Form 2.2 YES _____ NO ______

    Name

    Signature

    Notes:

    SubmittalsItems submitted and results/responses to previous submittals, Decisions Based on Submittals1) Test, sampling & monitoring with results from previous day; 2) Real time particulate (dust) monitoring results

    AIS Representative:

    Potential Problems or Concerns and Proposed Solutions:

    Engineering Controls for Upcoming Work:

    Discrepancies or Field Conflicts

    Personnel On Site:List all personnel on site during the reporting period by company and trade (categories would be laborers, operators ,etc.)

    Security and Site Visitors:

    Equipment, Site, Enclosure Inspections, Anemometer Readings, Neg Air Readings 

    Materials and Equipment Delivered (Including Equipment Mobiilized and Demobilized (Attach Tickets)

    Notifications to SCAQMD and DTSC:Fill in with notification of activities that have the potential to result in the release of fugitive lead containing dust.

    Fill in with substantive interaction which could have effect on project

    Example – Level D PPE was utilized for the activities performed at the site.  AIS personnel held a Health & Safety Tailgate Meeting each morning will all workmen prior to work.  Health & Safety Tailgate tings were also held for site visitors upon arrival.  No safety violations or incidents occurred. Peresonel pump readings or summary.

    Equipment Utilized:

    List all operated AIS and outside vendor equipment utilized 

    Engine Runtime Hours + Fuel Usage For All Portable Equipment Engines

    TODAY'S ACTIVITY SUMMARY:

    Interaction with Exide and Regulatory Agencies:

    Health and Safety Summary (including personal air monitoring):

    Decontamination/DeconstructionExide Facility – Phase 1 Closure

    2700 E Indiana Street, Vernon, CA

    Weather:

    Inspection Summary (Enclosure, Neg Readings, Anemometers, Equipment, Site)

    Description of Today's Field Activities

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    7

    Attachment 2-2

    Waste/Bin Manifest Tracking Form

  • ATTACHMENT 2-2: WASTE BIN / MANIFEST TRACKING FORM

    DATE:_______________________________

    Bin ID Vendor DATE IN Truck ID DATE OUT Truck ID ConcreteC&D

    DebrisHazardous

    Waste Metal

    Recycling Reuse Items AsbestosOrigin / UNIT # DESTINATION Profile #

    MANIFEST/ TICKET # Notes :

    TOTALS 0 0 0 0 0 0

    Exide Technologies

    Net Weights

    2700 Indiana St, Vernon, CA

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    8

    Attachment 2-3

    Storage Area Inspection Form

  •                               Attachment 2‐3. Storage Area Inspection Form  Revised July 2017 

    ATTACHMENT 2‐3: STORAGE AREA INSPECTION FORM 

    LOCATION: __________________    DATE:  ________________    DAY:  ________________ 

                 INSPECTOR:  ____________________________ 

    CONTAINER TYPE /  ID NUMBER 

    VISUAL CHECK PERFORMED 

    LEAKS OR SPILLS PRESENT ON 

    CONTAINERS OR CONTAINMENT 

    FLOOR  NOTES AND ACTIONS TAKEN   YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO     YES  NO  YES  NO   

     

    NOTE: Inspection should focus on each container, looking for bulging, expanding and/or hissing,  leaking around vents, bungs or lids. 

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    9

    Attachment 2-4

    Pre-Loading Checklist

  • Attachment 2-4. Pre-Loading Checklist

    Revised July 2017

    ATTACHMENT 2-4: PRE-LOADING CHECKLIST

    EXIDE TECHNOLOGIES

    VERNON, CALIFORNIA

    INSPECTION DATE: __________________ INSPECTION DAY: ________________

    INSPECTOR NAME: _______________________________

    NOTE: IF THIS INSPECTION HAS “NO” CIRCLED, THE TRAILER MUST NOT BE USED UNTIL REPAIRED!!!

    Trailer Number

    Is the

    truck/trailer

    visually clean?

    Are hinges in

    good condition?

    Are the floor,

    walls & tarp

    free of any

    holes?

    Are two 6-mil

    liners present in

    the trailer?

    Is the truck using

    ultra-low sulfur

    diesel (ULSD)?

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO NOTE: IF THIS INSPECTION HAS “NO” CIRCLED, THE TRAILER MUST NOT BE USED UNTIL REPAIRED!!!

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    10

    Attachment 2-5

    Truck Inspection and Decontamination Checklist

  • Attachment 2-5 Truck Inspection and Decontamination Checklist

    Revised July 2017

    ATTACHMENT 2-5: TRUCK INSPECTION AND DECONTAMINATION CHECKLIST

    EXIDE TECHNOLOGIES

    VERNON, CALIFORNIA

    INSPECTION DATE: __________________________ INSPECTION DAY: ________________________

    INSPECTOR NAME: __________________________

    NOTE: IF THIS INSPECTION HAS "NO" CIRCLED, THE TRAILER MUST NOT BE ALLOWED TO BE SHIPPED WITHOUT CORRECTING THE "NO" !!!

    Has visible dust and material been

    removed from:

    Is the truck and

    trailer dry and not

    dripping liquids

    before entering

    Truck Wash?

    Trailer Number

    Have liners been

    secured over

    wastes?

    Is the trailer tarp

    secured?

    Are tarp securing

    latches/straps in

    good condition?

    Trailer sides Truck and trailer

    wheels and sides

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO YES NO

    NOTE: IF THIS INSPECTION HAS "NO" CIRCLED, THE TRAILER MUST NOT BE ALLOWED TO BE SHIPPED WITHOUT CORRECTING THE "NO" !!!

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    11

    Attachment 2-6

    Truck Driver Sign-In and

    Route Acknowledgement Form

  • ATTACHMENT 2‐6: Truck Driver Sign‐In and Route Acknowledgement Form 

    Date

    First Name Last Name Time In Time Out

    Route Map Received 

    and Reviewed

    Truck Number

    Trailer, Bin or Other Number

    Manifest Number (if applicable Vendor Trailer Type

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    12

    Attachment 2-7

    Mitigation Measures Air Quality Checklist Form

    For MM-AQ-1 and MM-AQ-2 Items

  • ATTACHMENT 2-7: MITIGATION MEASURES AIR QUALITY 1 AND 2 (MM-AQ-1; MM-AQ-2) CHECKLIST

    EXIDE TECHNOLOGIES

    VERNON, CALIFORNIA

    DESCRIPTION OF OFF-ROAD

    EQUIPMENTMODEL NO. SERIAL NO.

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    YES NO YES NO YES NO YES NO YES NO

    Explanation for no answers:

    Explanation for no answers:

    USE ELECTRIC-

    POWERED CRANES

    WHERE TECHNICALLY

    FEASIBLE? YES/NO

    MM-AQ-2: 100% OF CONSTRUCTION EQUIP. INCLUDING ON-ROAD TRUCKS

    Explanation for no answers:

    Explanation for no answers:

    Explanation for no answers:

    Explanation for no answers:

    HAVE USEPA TIER 4

    ENGINES? YES/NO

    MM-AQ-1: 100% OF

    ALL OFF-ROAD

    EQUIPMENT

    USE CLEAN DIESEL

    (

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    13

    Attachment 2-8

    Mitigation Measures Cultural and Historic Responses Checklist

    Form For MM-CHR-1 and MM-CHR-2 Items

  • ATTACHMENT 2-8: MITIGATION MEASURES CULTURAL AND HISTORIC RESPONSES 1 AND 2 (MM-CHR-1; MM-CHR-2) CHECKLIST

    EXIDE TECHNOLOGIES

    VERNON, CALIFORNIA

    DESCRIPTION OF WORK ACTIVITY AND LOCATION WHERE PREHISTORIC OR

    HISTORICAL ARCHEOLOGICAL RESOURCES OR HUMAN REAMAINS ARE

    ENCOUNTERED.

    TIME AND DATE

    TIME:

    DATE:YES NO YES NO

    TIME:

    DATE:YES NO YES NO

    TIME:

    DATE:YES NO YES NO

    TIME:

    DATE:YES NO YES NO

    TIME:

    DATE:YES NO YES NO

    Explanation for YES answers:

    MM-CHR-2: STOP WORK IN AREA IF

    HUMAN REMAINS ARE ENCOUNTERED.

    Explanation for YES answers:

    Explanation for YES answers:

    Explanation for YES answers:

    Explanation for YES answers:

    HAVE PREHISTORIC OR HISTORICAL

    ARCHAEOLOGICAL RESOURCES BEEN

    ENCOUNTERED? YES/NO

    MM-CHR-1: STOP WORK IN AREA IF

    PREHISTORIC OR HISTORICAL

    ARCHAEOLOGICAL RESOURCES ARE

    ENCOUNTERED.

    USE CLEAN DIESEL (

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    14

    Attachment 2-9

    Equipment Noise Controls Form

  • ATTACHMENT 2-9

    MITIGATION MEASURES NOISE MONITORING: CONSTRUCTION EQUIPMENT CONTROLS FORM (MM-NV-1)

    EXIDE TECHNOLOGIES – VERNON, CA

    PAGE __ OF __

    Attachment 2-9 Equip Noise Controls Form 12JUL2017

    TO BE COMPLETED FOR EACH PIECE OF ENGINE-POWERED EQUIPMENT/MACHINERY UPON ARRIVAL AT SITE

    YES NO YES NO

    Explanation for NO answers:

    YES NO YES NO

    Explanation for NO answers:

    YES NO YES NO

    Explanation for NO answers:

    YES NO YES NO

    Explanation for NO answers:

    YES NO YES NO

    Explanation for NO answers:

    DESCRIPTION OF MOBILE/STATIONARY ENGINE

    POWERED EQUIPMENT OR MACHINERY

    MODEL NO. SERIAL NO. EQUIPPED WITH

    SUITABLE EXHAUST AND

    AIR-INTAKE SILENCERS

    EXHAUST AND AIR-INTAKE

    SILENCERS IN WORKING

    ORDER

    YES NO YES NO

    Explanation for NO answers:

  • Phase 1 Closure at Exide Facility American Integrated Services, Inc.

    Vernon, CA Data Management Plan

    15

    Attachment 2-10

    Noise Monitoring Form

  • ATTACHMENT 2‐10 MITIGATION MEASURES NOISE MONITORING FORM (MM‐NV‐2)

    EXIDE TECHNOLOGIES ‐ VERNON, CA

    PROJECT NAME: EXIDE ‐ VERNON MONITORING LOCATION:

    DATE: MONITORING OBSERVER:

    Type: II Sound Level Meter  Brand: SoftdB

    Model: Piccolo Serial #:

    Calibration Check:Approximate 

    Ambient Level:

    Time Monitoring Location (A or B)

    Time

    Additional Monitoring Location (near equipment or offsite 

    sources)

    Typical Ambient Level:

    Logged Data Reviewed and Confirmed

    Signature: Name:

    Observed Project Peak Levels:

    Results (dBA)Activity & Photodocumentation

    If noise exceeds 85 dBA for > 5 minutes, additional measurements, observations, photo/video documentation will be recorded. If measurements indicate that the maximum sustained noise level generated by the deconstruction equipment and activities at the Exide Facility exceeds 85 dBA the contractor will change site activities to reduce the noise.  Steps may include one or more of the following: 1) reduce the number and/or types of equipment operating simultaneously outside of the building; 2) erect partial sound barriers around the noisy equipment; 3) erect a temporary noise barrier along the property line between the Exide Facility and the adjacent industrial building; and/or 4) use quieter equipment or processes.

    Results (dBA)

    SAMPLE FREQUENCY FOR NOISE: Monitoring will be conducted a minimum of every two hours at neighboring properties on days of new or excessive noise generating activities.

    ACTION LEVEL FOR NOISE/SOUND: ≥85 dBA sustained for 5 minutes at A) 3800‐3840 East 26 Street or B) 4010 East 26th Street.  

    Monitoring DetailsActivity

    A) 3800‐3840 East 26 StB) 4010 East 26th St

    Instrument Information

    Monitoring Position: Microphone located 4 to 5 feet above ground and at least 3.5 feet from any walls or barriers.