Transcript of ATO Business Plan 2010

Page 1: ATO Business Plan 2010

Air Traffic Organization

Fiscal Year 2010 Business Plan

800 Independence Avenue, SWWashington, DC 20591

www.faa.gov

Federal Aviation Administration

Page 2: ATO Business Plan 2010

2010 ATO Business Plan

The Air Traffic Organization's (ATO) Fiscal Year 2010Business Plan has been developed through a structuredprocess, targeted both to respond to the Administrator'slatest FAA Flight Plan initiatives and to meet the challengesposed by the turbulent environment in which the ATO willoperate over the next five years. ATO is poised to performwith rigor and to work with our customers and stakeholdersto meet their most urgent needs by leveraging ourstrengths through globalization and innovation. Using adisciplined approach, we have identified the five strategicmulti-year focus areas we must follow to be successful andoperate effectively. These are the 5 focus areas:- Engaged Customers. Partners and Stakeholders: -Achieve a long-term shared commitment to a sustainableand responsive air transportation system;

- People-Driven Service Excellence: - Foster a service-oriented climate in which employees continuously learn,embrace innovation and share accountability for success;

- Safe, Efficient, Responsive Air Transportation System: -Provide a customer-focused, safe, efficient and affordableair transportation system that is environmentallyresponsible;

- New Capabilities through Technology and Tools: - Evolvethe National Airspace System infrastructure to provideefficiency, resilience andNextGen technology; and

- World-Class Administrative and Business Operations:Enhance performance and increase productivity througheffective and responsivebusiness operations.

This Business Plan reflects the specific actions andcommitments we are taking in Fiscal Year 2010 to followthose focus areas. Each year, our Business Plan will mapout the specific activities and commitments for that yearthat lead to a transformed ATO in the future. In 2010 andbeyond, our ATO Plan will build on our success, continuethe strategic transformation we have begun, and accelerateour performance improvements. We will support the FAA'sFlight Plan goals of improved safety, greater capacity,international leadership, and organizational excellence.

Increased SafetyOur first commitment is to safety. The proof of our ability tomaintain that focus is in the actual safety record itself. Infiscal years 2007 and 2008, there were no commercialpassenger fatalities on commercial flights in the U. S.Knowing this, the issue facing FAA comes in the form of asimple question with an exceedingly complex answer:

When a system is so safe, how do you know where toplace your focus to keep it that way? With morepassengers flying than ever, and fuel prices forcing airlinesto look for ways to save money, the test has never beenmore daunting.

To address this challenge, we're moving away from theanecdotal approach to safety and instead using data-analysis to prevent accidents before they happen. SafetyManagement Systems (SMS) are being put in place thatallow us to examine the data of what's actually happeningin the system. With SMS, we examine that data to isolatethe trends that very well could become the precursors toaccidents themselves. Three of the agency's largest linesof business--Air Traffic, Aviation Safety and Airports--havethese programs under way.

These efforts complement other areas of focus, such asthe "Call to Action" we placed to industry regarding runwaysafety. We used the data that had been accumulated withour Safety Management System to isolate trends. Withthat information, we met with chief pilots, put newtechnology in place, and revamped airport signage toincrease the levels of safety on the runway.

Even though commercial aviation draws most of theheadlines, we remain diligent in our efforts to work with thepilots who form the backbone of General Aviation (GA).The FAA continues to work jointly with the Alaska aviationcommunity through a number of organizations and safetyprograms such as: the Medallion Foundation, Alaska AirCarriers Association, Alaska Airman's Association, FAASafety Team, and Circle of Safety. In addition to thesetraining and education efforts, we're using new technologyin Alaska, such as the satellite-based Capstone navigationand terrain awareness avionics. We're also installing 221additional weather cameras throughout the state. Theseweather cameras prove that a picture that is indeed worth athousand words and are a real-time depiction of what'shappening throughout the state. The Alaskan pilot nowhas go/no go information that was previously unavailable.

In addition, we're using ADS-B to solidify the use of satellitesurveillance in Alaska. The breadth of the geography theremakes the use of radar virtually impossible. Satellitesaren't encumbered by terrain. The situational awarenessbenefits provided by the improved surveillance, broadcastservices, and improved avionics has proven to be a greatsuccess; preliminary data indicates a projected 47 percentdrop in the fatal accident rate for aircraft equipped withADS-B in Southwest Alaska.

As a result of that success, we are transferring the lessonslearned in Alaska to the Gulf of Mexico, another location inwhich radar coverage is limited. We are increasing ouroutreach and training to general aviation pilots to increase

Page 1 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 3: ATO Business Plan 2010

their skills and awareness.

We're making similar advances to air traffic control safety.The establishment of "proximity events" last year was arecognition that our focus should be on the more seriousoperational errors and not on those that present little or nosafety risk. Training programs and better automation willhelp us meet our goal in FY 2009.

The section that follows identifies the measures andinitiatives we have in place to improve safety. Because wealways look toward continuous improvement, we haveupdated our safety measures and initiatives. For example,we've put in place a new metric to collect and shareinformation from multiple programs, including the AviationSafety Information Analysis and Sharing (ASIAS) programand the new Air Traffic Safety Action Program. We'respreading safety data as far and wide as we can. Therecan be no secrets in safety, and everyone, including andespecially the passenger, benefits with this approach.

We accelerated the expansion of the Air TransportOversight System (ATOS) for the airlines. We're blendingthe oversight data ATOS is providing with our other datasources to enhance our ability to detect nationwide trendsand provide a better perspective on the health and safetyof the aviation system.

It is not a coincidence that we are in the safest period in thehistory of aviation. It took a lot of hard work and dedicationfrom our employees, the aviation industry and externalstakeholders to get us here. The system is the safest ithas ever been, and we will continue to work to keep it thatway.

Top INCREASED SAFETY Accomplishments for FY 2008

Reduced Commercial Aviation Fatal Accidents. In FY2007, the FAA rolled out a new way to measure airlinesafety. The new measure, fatalities per 100 millionpersons onboard, more accurately reflects risk to the flyingpublic. The FAA's target is to reach a 50 percent reductionby 2025 from a 2007 baseline of 8.88 fatalities per 100million persons on board. At 0.04, we were well below theFY 2008 performance target of 8.7 fatalities per 100 millionpersons on board.

Continued to Reduce Fatal GA Accidents. The success ofcollaborative safety initiatives between the FAA andindustry continues to drive the GA fatal accident rate evenlower. This year marked a 3-year period that was thesafest ever recorded in the history of GA. The FAA will usethese years as the baseline for next year's new GA safetymetric and goal. The aim is to reduce GA fatal accidentsover the next 10 years to no more than one accident per100,000 flight hours.

Maintained Safety Record for Commercial SpaceLaunches. The commercial space launch industrycontinued its safety record of safe launches with noneresulting in a public fatality or injury. This year marked an

increase from previous years in launches from land-basedand offshore sites. All told, there have been elevenlaunches in FY 2008.

Implemented an agency-wide SMS. This year, the FAApublished guidance for implementation of SMS throughoutthe agency. This guidance furthers the practice ofmanaging safety by moving to a more process-orientedsystem safety approach. It also required developing andimplementing a plan for functions under the SMS, includingthe structure of safety oversight relationships with thesegment of industry for which we hold safety oversightresponsibility.

Unmanned Aircraft Systems (UAS) Certifications. As thedemand for these systems expands, our goal is to protectthe safety of all. We established the procedures for issuingexperimental airworthiness certificates of UAS for purposesof research and development, market survey, or crewtraining to UAS. We've issued close to 40 experimentalcertificates for unmanned systems so far.

Fatigue Workshop. FAA is actively engaged in addressingissues involving fatigue in flight crewmembers and airtraffic controllers. We have an ongoing project to addressfatigue management for crews on flights of greater than 16hours duration. We sponsored the highly successfulindustry Fatigue Symposium in June, 2008 when webrought together all the current and best science andpractice on fatigue and fatigue management in a publicforum that will serve as the baseline for future FAA andindustry actions.

Flight Plan Target: CommercialAir Carrier Fatality RateCut the rate of fatalities per 100 million persons on boardin half by FY 2025. FY 2010 Target: 8.1

Implement the Roadmap for Performance-BasedNavigation (PBN) through the continued developmentand implementation of PBN approach procedures withthe goal of achieving improved minima and precision-like approach capability. Through FY 2013, we willpublish at least 300 RNP and RNP-Special Aircraftand Aircrew Authorization Required (SAAAR)approach procedures.

Strategic Initiative: RNP Road Map

Strategic Activity: RNP Procedures

Activity Target 1:Develop and publish at least 10 RNP instrumentapproach procedures. Due June 30, 2010

Provide guidance, oversight, and coordination ofeffort to develop and implement RNP procedures.

Activity Target 2:Develop and publish at least 40 (additional) RNPinstrument approach procedures. Due September30, 2010Activity Target 3:Based on the benefits and priorities for RNP

Page 2 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 4: ATO Business Plan 2010

implementation recommended by the Performance-based Aviation Operations RulemakingCommittee and the Roadmap for Performance-Based Navigation, guide the development andimplementation of at least 50 RNP instrumentapproach procedures in FY10. Due September 30,2010

Strategic Activity: Suport AJR with RNPProcedures

Activity Target 1:Within an agreed upon schedule, develop, flightinspect, and publish at least 50 RNP instrumentapproach procedures in FY10. Due September 30,2010

Support the development and publication of RNPprocedures.

Address the National Transportation Safety Board'sidentified issues.

Strategic Initiative: NTSB SafetyIssues

Strategic Activity: NationalTransportation Safety Board (NTSB)Safety Recommendations

Activity Target 1:For Fiscal Year 10, complete Federal AviationAdministration action acceptable to theAdministrator on six (6) National TransportationSafety Board open items. Due August 30, 2010

Address the National Transportation Safety Board's(NTSB) identified safety issues.

Improve the safety of transporting hazardous materialsby air.

Strategic Initiative: HazardousMaterials Safety

Strategic Activity: Research - HazardousMaterials Safety

Activity Target 1:Initiate research on high energy density lithiumbatteries in passenger carry on items, shipped ascargo and in aircraft power systems. Due January29, 2010

Support the initiative owner by providingcomprehensive fire safety guidance for high energydensity lithium batteries in passenger carry-on items,shipped as cargo and in aircraft power systems.

Where practical, upgrade Runway Safety Areas tomeet standards.

Strategic Initiative: Runway SafetyAreas

Strategic Activity: Runway Safety Area(RSA) NAVAID Improvements

Activity Target 1:

Complete all practical RSA NAVAID improvementsat certificated airports by end of FY 2015.

Provide updated RSA NAVAID completion planand schedule showing year by year targetsthrough FY 2015. Due June 30, 2010Activity Target 2:Provide quarterly RSA sterilization NeedsAssessment Program (NAP) data report. Due endof each quarter. Due September 30, 2010Activity Target 3:Complete NAVAID improvements to four runwaysafety areas through removal or provision offrangibility meeting FAA airport design standards.Due September 30, 2010

Continue research to identify human factors that maycontribute to accidents. Develop and implementstrategies, methods, and technologies that reducesafety risk.

Strategic Initiative: Human Factors

Strategic Activity: Cockpit Display ofTraffic Information

Activity Target 1:Provide draft technical report. Due January 29,2010

Assess human performance tradeoffs with varioustraffic symbols and their combinations proposed foruse on a cockpit display of traffic information.

Activity Target 2:Complete report of initial experiment. DueSeptember 30, 2010

Modernize Aeronautical Information Management(AIM) services to deliver accurate and timely digitalaeronautical information, products and services tocustomers, including improved Notices to Airmen(NOTAM) and improved information on restricted andregulated airspace.

Strategic Initiative: AeronauticalInformation Management (AIM)Modernization

Strategic Activity: Notices to Airmen(NOTAM) Modernization

Activity Target 1:Maintain NOTAM system to collect, quality control,and distribute military and civilian US NOTAMs.Report systems availability monthly. DueSeptember 30, 2010

Implement strategies to modernize the United StatesNOTAM system to improve efficiency, timeliness,safety and value of NOTAMs to global NOTAMcustomers.

Activity Target 2:Provide candidate NOTAM submission capabilityfor public use airports supporting airlines, generalaviation, and emergency services. Due September30, 2010Activity Target 3:Deploy operational, web based NOTAM

Page 3 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 5: ATO Business Plan 2010

distribution system. Due September 30, 2010

Strategic Activity: AeronauticalInformation Services (AISR)Modernization

Activity Target 1:Maintain minimum required systems availability tosupport aeronautical information briefings andflight planning Due September 30, 2010

Provide services to support, pre-flight, in-flight andpost-flight activities for pilots, air traffic control andother NAS customers and systems.

Activity Target 2:Develop Concept of Operations jointly with AirServices Australia. Due August 30, 2010

Strategic Activity: Architecture and AMS

Activity Target 1:Complete final investment decision for AIMModernization - Segment 1. Due September 30,2010

Develop baseline and future AIM architectureconsistent with international and FAA standards andpractices. Ensure FAA AMS processes areincorporated into AIM system development.

Activity Target 2:Integrate "TO BE" AIM enterprise architecture intoNAS enterprise architecture. Due August 30, 2010Activity Target 3:Ensure 90% of new AIM projects are captured byEnterprise Architecture. Due September 30, 2010

Strategic Activity: Military and ATCAirspace Management

Activity Target 1:Maintain minimum required systems availability tosupport military airspace scheduling. ReportSAMS system availability/monthly status DueSeptember 30, 2010

Provide services to support safe and effective use ofmilitary and ATC airspace

Activity Target 2:Improve utilization of the Military Airspace DataEntry (MADE) system by decreasing non-compliance by 10% annually. Due July 30, 2010Activity Target 3:Complete initial Central Altitude ReservationFunction (CARF) capability. Due September 30,2010

Provide third parties the ability to design, flight check,and implement RNP approach procedures with FAAproviding safety oversight.

Strategic Initiative: Third-PartyDevelopment of RNP Procedures

Strategic Activity: Third-Party RNPSAAAR Development

Activity Target 1:Work with third-party vendors who establishedOther Transaction Agreements in FY2009 tocomplete qualification process for end-to-endprocedure development for RNP SAAARapproach procedures. Due September 30, 2010

Provide third party sources the ability to developRequired Navigation Performance (RNP) SpecialAircraft and Aircrew Authorization Required(SAAAR) instrument approaches including designflight verification/validation and maintenance.

Apply appropriate FAA standards and criteria in thehelicopter RNP/RNAV departure proceduredevelopment process.

Strategic Initiative: RNP/RNAVHelicopter Departure Procedures

Strategic Activity: Simultaneous NonInterfering (SNI) Operations forRNP/RNAV Helicopter Routes

Activity Target 1:Assist helicopter industry with development of aprioritized list of potential locations for helicopterroute implementation. Due August 31, 2010

Implement SNI operations to separate flight pathsand landing areas of helicopters and fixed wingaircraft competing for terminal area airspace.Provide guidance, oversight, and coordination indeveloping and implementing RNP/RNAV helicopterroutes.

Activity Target 2:Finalize Air Traffic Control approval andconcurrence for initial helicopter SNI routebetween New York City and Washington, D.C. DueMarch 31, 2010

Develop a plan for ADS-B high altitude performance inspecific regions such as the Gulf of Mexico and off theEast coast.

Strategic Initiative: ADS-B Plan

Strategic Activity: Propose AirspaceProject(s)

Activity Target 1:Develop a proposal to conduct an airspace projectto implement ADS-B performance routes. DueMay 31, 2010

Propose airspace project(s) to capitalize on potentialopportunities for operational benefit through theimplementation of Automatic DependentSurveillance - Broadcast (ADS-B) performanceroutes in areas of the National Airspace System(NAS).

Strategic Initiative: Aviation SafetyInformation Analysis and Sharing

Page 4 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 6: ATO Business Plan 2010

Collect safety data at a national level and consolidatethe data under the Aviation Safety InformationAnalysis and Sharing (ASIAS) program.

Strategic Activity: Air Traffic SafetyAction Program/Aviation SafetyInformation Analysis SharingArchitecture

Activity Target 1:Coordinate and test an interface for sharing airtraffic control safety information between AirTraffic Safety Action Program (ATSAP) andAviation Safety Information Analysis Sharing(ASIAS) by the third quarter of Fiscal Year 10.Due June 30, 2010

Develop and implement an Aviation SafetyInformation Analysis Sharing (ASIAS) enterprisearchitecture interface between Air Traffic SafetyAction Program (ATSAP) and Aviation SafetyInformation Analysis Sharing (ASIAS) Initiative.

Activity Target 2:Demonstrate both Air Traffic Safety ActionProgram (ATSAP) data query and data recoveryusing air traffic control safety information using theAviation Safety Information Analysis Sharing(ASIAS) portal and systems. Due September 30,2010

Strategic Activity: Automated Tools forASIAS

Activity Target 1:Provide regular 3 month ASDE-X track dataupdates and establish design for direct feed ofASDE-X data into ASIAS. Due March 31, 2010

Support the ASIAS initiative by coordinatingintegration of internal FAA databases into ASIASand the integration of voluntarily submitted GA flightdata into ASIAS.

Activity Target 2:Deliver draft plan and procedures for incorporatingappropriate flight data from GA operations intoASIAS. Due September 30, 2010

Provide pilots with safe access to the NAS byanalyzing and disseminating aeronautical andmeteorological information to pilots and controllersthrough innovative systems.

Strategic Initiative: AeronauticalInformation Dissemination

Strategic Activity: Standards for WeatherProducts

Activity Target 1:Assess bandwidth demand of graphical icingproducts (Current Icing Product and Forecast IcingProduct) and graphical turbulance products(Graphical Turbulence Guidance) for potentialdelivery via existing and planned FAA data link

Establish standards for weather products to be datalinked to the cockpit.

services. Due August 15, 2010

Conduct analysis and disseminate findings on LoSStrends in causal factors and operational environmentson a quarterly basis. Conduct analysis anddisseminate findings of Risk Analysis Events (LoSS ofless than 66% required radar separation) on aquarterly basis.

Strategic Initiative: ImproveMeasurement and Analysis of SafetyPerformance

Strategic Activity: Establishing a SystemLoSS Index

Activity Target 1:Publish an ATO directive providing guidance forreporting and collecting Losses of StandardSeparation (LoSS) by end of the calendar year.Due December 31, 2009

Establish a System LoSS Index (SLI) based on allreported radar Losses of Standard Separation thataccurately measures the air traffic system'sconformance to Standard Separation by FY 2010.

Activity Target 2:Provide Chief Operating Officer (COO) monthlyupdates on fiscal year System LoSS Index (SLI)through end of previous month by the secondFriday of each month starting with January 8,2010. Due September 30, 2010Activity Target 3:Limit the System LoSS Index (SLI) to 0.72 throughFY 2014. FY 2010 Target: 0.72 Due September30, 2010

Strategic Activity: Continue the TrafficAnalysis and Review Program

Activity Target 1:Provide required software support during theDeployment Phase of TARP through theestablished change request and SoftwareDevelopment Life Cycle processes. DueSeptember 30, 2010

Continue the Traffic Analysis and Review Programby completing the development and deployment ofTerminal Implementation by the end of the calendaryear 2009 and NAS-wide implementation by the endof fiscal year 2011.

Activity Target 3:Assist in developing facility configurations. DueSeptember 30, 2010Activity Target 4:Assist in modifying host/En-Route AutomationModernization (ERAM) systems in support ofTARP. Due September 30, 2010Activity Target 5:Assess progress towards making Traffic Analysisand Review Program (TARP) facility dataavailable. Due March 31, 2010

Page 5 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 7: ATO Business Plan 2010

Activity Target 6:Provide assistance and local expertise as neededand requested by AJS, to support facility-level postprocessing as TARP is modified. Due September30, 2010Activity Target 7:Interim assessment of the progress towardsmeeting year end objective of having provided thefacility data for TARP and providing assistance tosupport facility-level post processing will bereviewed internally at the end of the secondquarter. Due March 31, 2010

Strategic Activity: Establish a SystemLosses of Standard Separation Index

Activity Target 1:AJT shall work with AJS to establish new AirTraffic Incident Reporting data collection time-frames to be published by directive by March 31,2010. Due March 31, 2010

Establish a system of LoSS Index (SLI) based on allreported radar Losses of Standard Separation(LoSS) that accurately measures the air trafficsystem's conformance to Standard Separation forapplication in FY2010.

Activity Target 2:AJT shall provide investigative data in accordancewith the ATO-published AT incident data collectiontime frames (see Target 1 above) 90% of the time.Due September 30, 2010Activity Target 3:Provide investigative data in accordance with theATO published LoSS directive timelines forreported events at least 90% of the time. DueSeptember 30, 2010

Flight Plan Target: GeneralAviation Fatal Accident RateReduce the fatal accident rate per 100,000 flight hours by10 percent over a 10-year period (2009-2018). FY 2010Target: 1.1

Continue delivery of dependent surveillance to keysites. To increase situational awareness, provide textand graphical data through programs such asAutomatic Dependent Surveillance-Broadcast/TrafficInformation Service-Broadcast, and Flight InformationService Broadcast to the cockpit through flightinformation services.

Strategic Initiative: ADS-B I Delivery

Strategic Activity: Deployment ofAutomatic Dependent Surveillance -Broadcast (ADS-B)

Activity Target 1:

Continue deployment of Surveillance and BroadcastServices (SBS) at key sites in support of the SBSnational program baseline.

Complete Service Acceptance Testing (SAT) atJuneau. Due October 31, 2009Activity Target 2:Complete Initial Operating Capability (IOC) at keysites. Due April 30, 2010Activity Target 3:Achieve In-Service Decision (ISD) for CriticalServices. Due September 30, 2010

Strategic Activity: Develop National andInternational Standards

Activity Target 1:Issue Final Rule for Automatic DependentSurveillance - Broadcast (ADS-B). Due April 30,2010

Develop national and international standards.

Strategic Activity: DemonstrateAutomatic Dependent Surveillance -Broadcast (ADS-B) Applications forImproved Pilot Situational Awareness

Activity Target 1:Demonstrate Final Approach Runway OccupancyAwareness to provide a cockpit display thatdepicts the runway environment and displaystraffic from the surface up to approximately 1,000feet above ground level on final approach. DueApril 30, 2010

Demonstrate applications that utilize ADS-Bcapabilities.

Activity Target 2:Demonstrate Airport Surface SituationalAwareness to provide a cockpit display to increaseawareness of other traffic positions on the airportmovement area, and to determine the position ofground vehicles (e.g., snow plows, emergencyvehicles, tugs, follow-me vehicles and airportmaintenance vehicles). Due April 30, 2010

Develop policies, procedures, and approval processesto enable operation of unmanned aircraft systems(UAS).

Strategic Initiative: UAS Procedures

Strategic Activity: UAS Survey and GapAnalysis

Activity Target 1:Deliver Draft technical report: Development ofRegulatory-based Causal Factor Framework. DueDecember 31, 2009

Complete UAS technology survey and gap analysisand provide technical report to AVS UnmannedAircraft Program Office.

Develop and publish Wide Area Augmentation System(WAAS) approaches. In FY 2010 we will publish 500WAAS approaches.

Strategic Initiative: WAASApproaches

Page 6 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 8: ATO Business Plan 2010

Strategic Activity: Aviation SystemStandards (AJW-3)

Activity Target 1:AVN will develop, flight inspect, and publish 500WAAS LPV/LP procedures, to include 10procedures in Alaska. Due September 30, 2010

Develop and Publish Wide Area AugmentationSystem (WAAS)/Localizer Performance with Vertical(LPV) Guidanceor Localizer Performance (LP) Instrument ApproachProcedures.

Activity Target 2:AJW-3 will formulate two lists of 400 runway endseach which will require new airport obstructionsurveys. The first list of 400 runway ends shall beprovided to AJW-4 by 31 March 2010, and thesecond list of 400 runway ends shall be providedby 31 July 2010, to meet the LPV/LP productiongoals in FY2011. Due July 31, 2010

Strategic Activity: Navigation Services(AJW-4)

Activity Target 1:Provide funding to AJW-3 for 500 WAAS LPV/LPprocedures, to include 10 RNAV (GPS)procedures with LPV/LP minimums to runways inAlaska (cross-reference IPF 10S3A). Due January15, 2010

Fund and deliver airport surveys to Aviation SystemStandards (AJW-3). Provide funding to AJW-3 forprocedures development, flight inspection, andcharting services.

Activity Target 2:Deliver 250 airport surveys no later than June 30,2010, and 250 no later than September 30, 2010,to ensure sufficient numbers of surveys areavailable for AJW-3 to meet the LPV/LPproductions goals in FY2011. Due September 30,2010

Continue research to identify human factors that maycontribute to accidents. Develop and implementstrategies, methods, and technologies that reducesafety risk.

Strategic Initiative: Human Factors

Strategic Activity: Developing ProactiveMethods for General Aviation DataCollection

Activity Target 1:Complete the interview protocol and reportsummarizing the second proactive risk and safetydata collection. Due May 30, 2010

Report results of proactive risk and safety dataanalyses that might be available or developed forGA. Recommend disciplined methods of analyzingfuture GA events, so that investigators may betterlearn from incidents, improve correction of involvedpersonnel, and generate interventions to preventfuture events.

Manage the Automated Flight Service Station (AFSS)contract to provide quality flight services to thecontiguous United States, Puerto Rico, and Hawaii.

Strategic Initiative: AFSS Contract

Strategic Activity: Flight ServiceContract Oversight - Quality Assurance

Activity Target 1:Evaluate and/or validated CONUS AFSS contractperformance data and report results quarterly.Due September 30, 2010

Maintain an effective program to monitorperformance of Contract Service Provider (LockheedMartin) for AFSS Contract to determine achievementof Acceptable Performance Level (APL).

Activity Target 2:Monitor the service provider's compliance with APLlevels as identified in Quality AssuranceSurveillance Plan (QASP) report quarterly. DueSeptember 30, 2010

Strategic Activity: Flight ServicesContract Oversight - Monitor Staffing,Training, and Operational Certifications

Activity Target 1:Use management controls including metrics, todetermine CONUS vendor compliance with AFSScontract service requirements relating to staffing,training controls, and operations certifications.Report monthly. Due September 30, 2010

Continue to execute the Lockheed Martin contract byproviding oversight of Contract Flight Services to thecontiguous United States, Puerto Rico, and Hawaii.

Strategic Activity: Flight ServicesContract Oversight - CustomerSatisfaction

Activity Target 1:Conduct periodic trend analysis with customerfeedback to develop reports andrecommendations for improvements. Due April 30,2010

Collect and evaluate the customer satisfactionassessments and quarterly surveys of LockheedMartin's FS-21 Flight Services delivery to maintainand improve the quality of services provided to FAACustomers.

Activity Target 2:Report quarterly survey results within 60 days ofsurvey completion. Due September 30, 2010

Strategic Activity: Flight ServicesOversight - Monitor Costs

Activity Target 1:Track and report expected savings and cost

Monitor the cost of providing Flight Services andproduce analysis of benefits and identify efficienciesand cost effective improvements.

Page 7 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 9: ATO Business Plan 2010

avoidances resulting from the AFSS A-76 effort.Due August 15, 2010Activity Target 2:Ensure CONUS AFSS contract activities remainwithin the overall 10% established variance andreport on budget performance percentage. DueAugust 15, 2010

Flight Plan Target: AlaskaAccident RateBy the end of FY2019 reduce the Rate of Fatal andSerious Injury Accidents by 10% in 10 years. FY 2010Target: 1.86

Achieve full operational capability of WAAS bycompleting all hardware and software changes neededto complete the system.

Strategic Initiative: WAAS Operation

Strategic Activity: Development ofWAAS

Activity Target 1:Provide funding for publishing of 10 RNAV (GPS)LPV/LP procedures to runways in Alaska, inaccordance with Flight Plan Initiative 10S2K,WAAS Approaches. Due September 30, 2010

Reduce accidents in Alaska for general aviation andall Parts 135 operations.

Continue to optimize weather camera benefits andexplore alternative technologies.

Strategic Initiative: Weather Dataand Images

Strategic Activity: Support of Expandingthe Use of Weather Cameras

Activity Target 1:AJR will complete installation and make servicesavailable to the public for 23 additional weathercamera sites. Due September 30, 2010

AJR will use weather cameras to enhance aviationsafety in the Alaskan Region.

Implement an improved statewide public RNP/RNAVWAAS-enabled route structure.

Strategic Initiative: RNP/RNAVWAAS Route Structure

Strategic Activity: En Route Support forRequired Navigation Performance / AreaNavigation (RNP/RNAV) Routes for ATOThe RNAV/RNP initiative has been in the FAA FlightPlan since 2004 in support of the congressionallymandated Alaska Capstone program. The NationalTransportation Safety Board (NTSB) published aSafety Study in November 1995 that identifieddeficiencies in the Instrument Flight Rules (IFR)system such as inadequate low-altitude navigationinfrastructure and instrument approaches. Inconjunction with the Capstone program, Air TrafficOrganization (ATO), Technical Operations Services,

Activity Target 1:Manage an integrated schedule to expand aGlobal Positioning System (GPS)/RNAV WideArea Augmentation System (WAAS) routestructure in Alaska with a goal to completeimplementation by September 2011. DueSeptember 30, 2010

enabled the operational use of Global PositioningSystem (GPS) and Wide Area Augmentation System(WAAS) for navigation and access to uncontrolledairports by developing GPS airways and instrumentapproach/departure procedures. The RNAV/RNPinitiative provides an avenue for En Route andAviation Safety to work closely to manage anintegrated schedule to operationally enable aGPS/RNAV WAAS Route structure in Alaska tocomplete implementation by 2011. This will improveoperator efficiency, access and safety, whileincrementally reducing dependency on groundbased navigation facilities, with a goal of futuredivestment.

Activity Target 2:Validate requirements and business case forGPS/WAAS route structure development in Alaskafor those routes targeted for FY2010implementation. Due December 31, 2009Activity Target 3:Manage the implementation of the GPS/WAASroutes in Alaska validated under Target 2. DueSeptember 30, 2010

Strategic Activity: ATO-R Support forGlobal Positioning System (GPS) / AreaNavigation (RNAV) Wide AreaAugmentation System (WAAS) Routesfor ATO

Activity Target 1:Support normal implementation activities of ATO-E validated GPS/WAAS routes in Alaska toinclude facility coordination, 18-step process,document changes to codify the implementation ofseparation requirements, etc. Due September 30,2010

ATO-R support for GPS / RNAV WAAS routes forATO.

Activity Target 2:Support ATO-W in completion of airspace actions.Due September 30, 2010

Strategic Activity: ATO-W Support forRequired Navigation Performance / AreaNavigation (RNP/RNAV) Routes for ATO

Activity Target 1:Develop, flight check and publish up to 12GPS/RNAV WAAS routes validated under EnRoute's Activity Target 2 with a goal to complete

RNP/RNAV/Global Positioning System (GPS) WideArea Augmentation System (WAAS) RouteStructure.

Page 8 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 10: ATO Business Plan 2010

implementation by September 2010. DueSeptember 30, 2010

Strategic Activity: Continue toParticipate in and Support the CurrentGlobal Positioning System (GPS) / AreaNavigation (RNAV) Wide AreaAugmentation System (WAAS) RoutesWork Groups

Activity Target 1:Support the implementation of publishedGPS/RNAV WAAS routes inAlaska. Due September 30, 2010

Continue to participate in and support the currentGPS/RNAVWAAS Routes work groups.

Strategic Activity: Support Developmentof Improved Global Positioning System(GPS) / Area Navigation (RNAV) WideArea Augmentation System (WAAS)Route Structure in Alaska

Activity Target 1:Support requirements validation and businesscase for GPS/RNAV WAAS route structure inAlaska for those routes impacting terminaloperations and targeted for FY2010implementation. Due December 31, 2009

Support development of improved GPS/RNAVWAAS route structure in Alaska with a goal tocomplete implementation by September 2011.

Activity Target 2:Support the implementation of GPS/RNAV WAASroute structure identified under Target 1. DueSeptember 30, 2010

Provide high quality flight services to our customers inAlaska.

Strategic Initiative: Flight Servicesin Alaska

Strategic Activity: Maintaininfrastructure and Sustain Equipment inAlaska Flight Services

Activity Target 1:In coordination with AFSIAG, AJW, and WSC,maintain and sustain Alaska AFSS FSS Facilities.Produce four reports describing facilitysustainment activities. Due September 25, 2010

Maintain infrastructure and sustain Flight Serviceequipment used to support the delivery of FlightServices in Alaska.

Activity Target 2:Maintain and sustain Alaska Flight Servicesautomation system, Operation and SupportabilityImplementation System (OASIS). Produce fourreports describing OASIS performance along withany modifications of operational capabilities. DueSeptember 25, 2010

Strategic Activity: Alaska Modernization

Activity Target 1:Complete Alaska Flight Services Modernization(AFSM) proposal evaluations and acquire FinalInvestment Decision (FID) approval Due January31, 2010

Continue preparation for modernizing Alaska FlightServices in order to identify efficiencies andimprovements in delivery of services. [NOTE: Targetdates assume AFSM contract award occurs no laterthan December 2010].

Activity Target 2:Award AFSM contract. Due February 15, 2010

Strategic Activity: Monitor and Maintaina High Quality of Service to OurCustomers in Alaska

Activity Target 1:Conduct two on-site assessments in Alaska tovalidate Flight Services Acceptable PerformanceLevels (APL) and make recommendations. DueAugust 31, 2010

Maintain an aggressive Quality Assurance programto monitor Flight Service Performance in Alaskaaddressing the reduction of operational deficienciesin all areas.

Strategic Activity: Conduct FlightServices Safety related outreach inAlaska and reduction of aviationaccidents in Alaska

Activity Target 1:AFSIAG will continue to conduct Flight Servicessafety related outreach activities each month.Report accomplishments quarterly. DueSeptember 30, 2010

Education is one of the keys to reducing aviationaccidents in Alaska.

Activity Target 2:Maintain a baseline of no more than two (2)Operational Errors (OEs) and six (6) OperationalDeviations (OD) in Alaska annually. DueSeptember 30, 2010

Strategic Activity: Continue to provideFlight Services in Alaska

Activity Target 1:Continue sustainment activities of flight serviceautomation system in Alaska (OASIS) andproceed with activities to implement, transition,and obtain In-Service Decision for the AlaskaFlight Services Modernization, new operatingsystem. Decommission and dispose of OASISequipment. Provide status on a monthly basis.

Continue to provide Flight Services in Alaska byimplementing, maintaining, sustaining andtransitioning Flight Service equipment used tosupport the delivery of Flight Services in Alaska.

Page 9 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 11: ATO Business Plan 2010

Due September 25, 2010

Strategic Activity: Alaska Flight ServicesOversight Performance Monitoring

Activity Target 1:Monitor Service Performance against APL.Report quarterly. Due September 30, 2010

Evaluate and/or validate Performance Data andreport results.

Activity Target 2:Continue to evaluate the data collection methodsand frequency of inspections annually. Submitrecommendations for adjustments as needed afterannual review. Due September 30, 2010

Flight Plan Target: RunwayIncursions (Category A and B)By FY 2010, reduce Category A and B (most serious)runway incursions to a rate of no more than 0.45 permillion operations, and maintain or improve through FY2013. FY 2010 Target: 0.450

Improve training, procedures, evaluation, analysis,testing, and certification to reduce the risk of runwayincursions resulting from errors by pilots, air trafficcontrollers, pedestrians, vehicle operators, tugoperators, and individuals conducting aircraft taxioperations.

Strategic Initiative: Human ErrorRisk Reduction

Strategic Activity: Runway IncursionRisk Reduction

Activity Target 1:Conduct a minimum of 100 Runway Safety ActionTeam meetings by September 30, 2010. RunwaySafety Action Team reports will be issued andrecommendations entered into the Office ofSafety's Runway Safety Action TeamRecommendation Database and tracked on acontinual basis for timely implementation and/ordisposition. Complete an interim goal of 50Runway Safety Action Teams by June 30, 2010.Due September 30, 2010

Improve training, procedures, evaluation, analysis,testing, and certification to reduce the risk of runwayincursions resulting from errors by pilots, air trafficcontrollers, and airport authorized pedestrians,vehicle operators, tug operators, and mechanicsconducting aircraft taxi operations.

Activity Target 2:Conduct/participate in at least 40 of the following:Pilot Seminars that complement the WINGSProgram, the Federal Aviation Administration'sPilot Proficiency Awards Program, and FlightInstructor Refresher Courses, Commercial FlightInstructor/Designated Pilot Examiner refreshercourses, Airport Safety Meetings and/or Air TrafficControl Safety Awareness Initiatives, etc. at both

towered and non-towered airports. Participationwill include dissemination of runway safetyinformation related to human factors issues (e.g.,situation detection and recovery, responsecharacteristics, mental processes). Complete aninterim goal of at least 20 by March 31, 2010. DueSeptember 30, 2010

Continue to evaluate and deploy runway status lightsat AMASS and ASDE-X airports.

Strategic Initiative: Runway StatusLights

Strategic Activity: Deploy Runway StatusLights

Activity Target 1:Start site construction at key site. Due March 31,2010

The Runway Status Lights (RWSL) Systemintegrates a light warning system with approach andsurface surveillance systems to provide a visualsignal indicating to pilots and vehicle operators that itis unsafe to enter, cross or begin takeoff on arunway. The RWSL system is driven automaticallyusing computer processing of integrated AirportSurface Detection Equipment -- Model X andterminal surveillance information. The RWSL systemsoftware detects the presence and motion of aircraftand surface vehicles on or near the runways,illuminates red runway-entrance lights (RELs) if therunway is unsafe for entry or crossing, andilluminates red takeoff-hold lights (THLs) if therunway is unsafe for departure. The systemextinguishes the lights automatically as appropriatewhen the runway is no longer unsafe. The RWSLprogram received approval from the JRC for 22operational and 3 support sites.

The deployment of Runway Status Lights (RWSL)will provide another layer of safety to help reducerunway incursions and provide a direct warningcapability to flight crews and airport vehicleoperators. RWSL Program Segment 1 activitiesinclude start construction at key site, completeFactory Acceptance Test (FAT) for first article anddeliver first article system to key site.

Activity Target 2:Complete Factory Acceptance Test (FAT) for firstarticle. Due June 30, 2010

Design, develop and implement an improved runwayincursion analysis capability.

Strategic Initiative: ImprovedRunway Incursion AnalysisCapability

Strategic Activity: Runway SafetyCouncil ImplementationSenior-level safety officials from a select group oforganizations will be invited to participate and meetregularly. The Council, under the direction of a

Page 10 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 12: ATO Business Plan 2010

Activity Target 1:Runway Safety will provide an agenda at least oneweek prior to the Root Causal Analysis Teammeeting and identify the serious events that will beevaluated accompanied by the Pilot Deviations,Loss of Standard Separation (LoSS) Events, andVehicle/Pedestrian Deviations associated with theevents. Prior to the meeting, the Flight StandardsSubject Matter Expert, on detail to the Office ofSafety, will review Enforcement InvestigationReports and Letters of Investigation identified onthe monthly agenda and will be prepared todiscuss findings. Six (6) will be neededthroughout the fiscal year therefore an interimtarget of three (3) will be needed by March 31,2010. Due September 30, 2010

government (Director of Runway Safety) andindustry (Air Line Pilots Association Executive AirSafety Chairman) co-chair, will set overall policy andoversee the Root Causal Analysis Team.

Activity Target 2:The Root Causal Analysis Team will review andevaluate six (6) events (serious and/or significantincursions) and report results andrecommendations to the Runway Safety Council.Interim target of three (3) reviews by March 31,2010. Due September 30, 2010

Strategic Activity: Runway SafetyCouncil (RSC) Implementation PlanThe Root Causal Analysis Team (RCAT) examinesdata and related information from, but not limited to,Pilot Deviations, Operational Errors and Vehicle/PilotDeviations to determine root causal factors. Theteam then identifies intervention strategies toeliminate and/or mitigate the root causal factorsleading up to the incident and provide a strategy forimplementation of the recommendations to the RSC.

The RCAT will examine data from AFS (PD's), ATO(OE's) and ARP (V/PD's) investigations and attemptto determine root causal factors for the incident. Thedata used in these analyses will be a consolidationof many offices' input and will delve deep into thereasons and/or causes for the incident as well asthose circumstances that allowed the incident tooccur. The diverse makeup of the subject matterexperts (SMEs) will enhance the capability of theteam to discover those factors that have evadeddiscovery to date. Once these root causal factorsare identified, the team will examine ways to createcontrols that will limit, or eliminate, theirreoccurrence.

For those periods of reduced severe Categoryincursions, the team will use historical data toidentify priority airports in an effort to mitigatehazards and offer safety recommendations to reducerisks.

Activity Target 1:AJS-4 will provide an agenda at least one weekprior to the RCAT meeting and identify the seriousevents that will be evaluated. The agenda will beaccompanied by the PD, OE, and V/PD reportedinformation associated with the events. AJT willassign an SME to review the information providedby AJS-4, actively participate in the RCAT processto assist in identifying root causes for the events,and provide inputs on recommended mitigations.Due September 30, 2010

The RSC will review output from the RCAT andadopt a strategy to implement the recommendationsand/or call for further study of an issue.

Activity Target 2:Assess progress to ensure support provided ismeeting monthly expectations and is projected toachieve end of year performance goal. Due March10, 2010

Accelerate the process of evaluating Electronic FlightBags, moving map displays and aural alerting cockpittechnology for the purpose of reducing runwayincursions.

Strategic Initiative: Capstone3 -Runway Safety Technology

Strategic Activity: Capstone 3: AirportMoving Map Displays

Activity Target 1:Initiate Runway Safety related data collection fromthe equipped aircraft. Due August 30, 2010

For pilots, knowing what runway or taxiway they areon is critical information. That knowledge isespecially important at night, in poor weather orwhen the crew is unfamiliar with the airport layout.The Federal Aviation Administration intends to makeit easier for pilots to have electronic tools in thecockpit that will enhance their situational awarenessand improve runway safety. The Federal AviationAdministration has aggressively focused on reducingrunway incursions for the last several years. Afterthoroughly reviewing safety data, including humanfactors research on the safety benefits of own shipposition versus the potential safety risks, the FederalAviation Administration is now interested inconducting an operational and safety evaluation forElectronic Flight Bags with own ship position on anairport moving map.

Activity Target 2:Develop a Test and Evaluation Master Plan. DueSeptember 30, 2010

Flight Plan Target: SafetyManagement SystemIn FY 2010, implement SMS in the Air TrafficOrganization, Office of Aviation Safety, and Office ofAirports. In FY 2012, implement SMS policy in allappropriate FAA organizations. FY 2010 Target: 3LOBs

Page 11 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 13: ATO Business Plan 2010

Design and implement SMS for the delivery of airtraffic services.

Strategic Initiative: Air TrafficServices SMS

Strategic Activity: Safety Policy

Activity Target 1:Develop core competencies requirements forsafety professionals. Interim report due: June 30,2010, final competencies requirements due end ofthe fiscal year. Due September 30, 2010

Develop policy requirements in support ofcertification of safety professionals, enhancementsto Safety Management System specific training andSafety Management System Manual updates.

Activity Target 2:Develop training course requirements forcertification of safety professionals. Interim reportdue: June 30, 2010, final course requirements dueend of the fiscal year. Due September 30, 2010Activity Target 3:Update Safety Management System Manual andrevise Safety Management System Training toreflect Safety Management System Manualupdates. Interim target of having the Manualupdates done by July 31, 2010; and the revisedSafety Management System Training by the end ofthe fiscal year. Due September 30, 2010

Strategic Activity: Safety RiskManagement

Activity Target 1:Review and approve Safety Risk Managementdocumentation associated with National AirspaceSystem Change Proposal, procedure anddocument changes submitted to the Safety RiskManagement Office during FY 2010. Review allfirst and second quarter submissions by April 30,2010. Review and approve remaining Safety RiskManagement documentation submissions by endof the fiscal year. Due September 30, 2010

Monitor the integration of Safety Risk Managementprocesses into National Airspace System changes toensure that these changes have been assessed forsafety risk and that identified safety risks have beenmitigated and/or lowered to an acceptable level priorto inclusion into the National Airspace System.

Activity Target 2:Review and approve Safety Risk Managementdocumentation associated with acquisitionprograms submitted to the System Safety WorkingGroup during FY 2010. Review all first and secondquarter submissions by April 30, 2010. Remainingsubmissions by end of the fiscal year. DueSeptember 30, 2010Activity Target 3:Develop and issue guidance for an integratedsafety risk analysis for NextGen operationalcapabilities. Initial report due June 30, 2010 and

completion of the final report by the end of thefiscal year. Due September 30, 2010

Strategic Activity: Safety Assurance

Activity Target 1:Conduct Safety Management System audits onfour Air Traffic Organization service units. DueSeptember 30, 2010

Develop Safety Assurance processes to detecthazards and verify safety risk mitigations and toassure Safety Management System is effectivelyimplemented across the Air Traffic Organization.

Activity Target 2:Consolidate and analyze safety trends to identifyareas of potential safety risk in the NationalAirspace System and recommend applicablesafety cases. Produce quarterly reports starting inJune 2010. Due June 30, 2010Activity Target 3:Verify mitigation and residual risks associated withhigh risk hazards. Produce quarterly reportsstarting in June 2010. Due June 30, 2010

Strategic Activity: Safety ManagementSystem Promotion

Activity Target 1:Implement the Safety Management SystemLessons Learned database. Prototype due March31, 2010. Final implementation due by the end ofthe fiscal year. Due September 30, 2010

Communicate and disseminate safety informationand manage Safety Management System training tosupport integration of the Safety ManagementSystem across the Air Traffic Organization.

Activity Target 2:Track and report training status monthly of theEnterprise Learning Management System SafetyManagement System courses. Reports due by theend of the month, starting with October 2009. DueSeptember 30, 2010Activity Target 3:Conduct three advanced Safety Risk Managementcourses and six Safety Risk ManagementPractitioner courses by the end of the fiscal year.Interim target of three Safety Risk ManagementPractitioner courses by April 30. Due September30, 2010Activity Target 4:Develop and disseminate Safety ManagementSystem promotional materials across the AirTraffic Organization. Interim report due March 30,2010. Final Report due by the end of the fiscalyear. Due September 30, 2010Activity Target 5:Plan and conduct a Safety Summit before the endof the fiscal year. Due September 30, 2010

Page 12 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 14: ATO Business Plan 2010

Strategic Activity: SRM

Activity Target 1:Validate that the SRM Process Model developedwith RNAV/RNP is applicable to another SystemOperations process, procedure, or order. DueSeptember 30, 2010

Ensure Safety Risk Management (SRM) is applied toall changes to the NAS initiated by SystemOperations.

Strategic Activity: Safety Assurance

Activity Target 1:Develop a means to validate, track and trendhazard monitoring by System Operations changeagents. Due September 30, 2010

Evaluate System Operations progress towards SMSImplementation.

Activity Target 2:Establish a process to review, coordinate andtrend System Operations related issues reportedthrough ATSAP (ATC/ATM), ASAP (Systems), andASAP (airline customers). Due September 30,2010

Strategic Activity: Safety Promotion

Activity Target 1:Assess System Operations progress towarddevelopment of a positive safety culture throughSafety Promotion Outreach activities to includesurveys, safety forums, and conferences. DueSeptember 30, 2010

Administer a System Operations Safety promotionand culture awareness program to increaseemployee's knowledge base through continuoustraining and information sharing activities bySeptember 30, 2010.

Strategic Activity: Safety Culture

Activity Target 1:Identify a safety culture activity. Due March 31,2010

Complete a safety culture activity for AJT employeesby September 30, 2010.

Activity Target 2:Complete a safety culture activity. Due September30, 2010

Strategic Activity: Safety Assurance

Activity Target 1:Develop an Internal Evaluation Program (IEP).Due March 31, 2010

Implement an Internal Evaluation Program (IEP) tosatisfy safety assurance requirements.

Activity Target 2:Implement an Internal Evaluation Program. DueSeptember 30, 2010

Strategic Activity: Safety Promotion

Activity Target 1:Plan four (4) Safety Risk ManagementConferences. Due March 31, 2010

Conduct Service Area Safety Risk ManagementConferences.

Activity Target 2:Conduct Safety Risk Management Conferences.Due September 30, 2010

Strategic Activity: Service Availability

Activity Target 1:By September 30, 2010, expand NAS ServiceAvailability program and safety standards to allremaining nationally reportable NAS servicesand/or equipment, including those supporting 35OEP airports Due September 30, 2010

Validate and compare fielded service availabilityperformance with safety standards

Strategic Activity: SMS Implementation

Activity Target 1:Conduct progress review of the SMSimplementation. Due December 31, 2009

Review progress toward SMS implementation anddevelop a roadmap to complete remaining SMSImplementation activities.

Activity Target 2:Ensure all SMS implementation activities arecompleted. Due March 30, 2010

Strategic Activity: SMS Coordination

Activity Target 1:Conduct progress review at the Service Areas andFacilities. Due January 31, 2010

Continue coordinating SMS activities withestablished SMS Point of Contacts (POCs) at allService Areas/Facilities.

Activity Target 2:Ensure all SMS implementation activities arecompleted. Due March 31, 2010

Strategic Activity: Safety Culture

Activity Target 1:Develop a plan for the safety culture activity. DueMay 31, 2010

Identify a safety culture activity for all ATO-Eemployees by September 30, 2010.

Activity Target 2:Conduct the safety culture activity. Due August 31,2010

Strategic Activity: SMS

Activity Target 1:Implement policies and procedures to meet SMScompliance mid-March 2010. Due March 14, 2010

Implement AJP SMS.

Activity Target 2:Initiate an AJP safety promotion activity to supportexpanding and enhancing the AJP Safety Culture.

Page 13 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 15: ATO Business Plan 2010

Due September 30, 2010

Activity Target 3:Conduct internal SMS Compliance audit. DueJanuary 15, 2010

Flight Plan Target: Total RunwayIncursionsBy the end of FY 2013, reduce total runway incursions by10 percent from the FY 2008 baseline. FY 2010 Target:-2%

Install Airport Surface Detection Equipment-Model X(ASDE-X) and retrofit ASDE-X equipment capabilityinto selected Airport Movement Area Safety System(AMASS) installations, such as Los Angeles andNewark airports.

Strategic Initiative: ASDE-XInstallation

Strategic Activity: Airport SurfaceDetection Equipment - Model X (ASDE-X)ASDE-X is a surface surveillance system thatprovides seamless multi-sensor airport surveillancewith identification and conflict alerting to air trafficcontrollers. It provides controllers with a visualrepresentation of the traffic situation on the airportmovement area and arrival corridors. ASDE-Xincludes safety logic, which combined withsurveillance information from ASDE-X, determines ifthe current and/or projected positions and movementcharacteristics of tracked aircraft/vehicles present apotential collision situation. Visual and audible alertsare provided to air traffic controllers. The ASDE-Xsystem is particularly useful as a traffic control aidduring hours of darkness and during other conditionsof poor visibility. ASDE-X was developed to aid inpreventing surface collisions and in reducing criticalCategory A and B runway incursions.

ASDE-X supports the FAA Flight Plan goals forincreased safety and greater capacity. ASDE-Xenhances safety through the improvement of thesurface movement infrastructure. It increasesefficiency by improving air traffic controllers'situational awareness. ASDE-X provides flight callsigns for all transponder-equipped targets. As aresult, controllers are able to view the ASDE-Xdisplay to determine the correct order of aircraftwithin the queue, monitor whether aircraft arefollowing their prescribed taxi routes, and validatethat the proper beacon code is associated with theradar target for each aircraft. Through theimplementation of data tags, ASDE-X provides theability to accurately identify each aircraft within aqueue preventing unnecessary coordination andcommunication. This improved capability will reducethe time spent between clearance deliveries and inturn lead to less taxi time and delays. ASDE-X ispart of the Operational Evolution Partnership (OEP)

Activity Target 1:Complete factory acceptance testing and deliverone (1) Airport Surface Detection Equipment,Model X (ASDE-X) system. Due March 30, 2010

version 1. The program was added to OEP inMarch/April 2006.

Implement technology/equipment to achieve orexceed target safety levels by deploying AirportSurface Detection Equipment Model X (ASDE-X)and retrofitting ASDE-X equipment into ASDE-3locations.

Activity Target 2:Achieve Initial Operating Capability (IOC) at two(2) Airport Surface Detection Equipment, Model X(ASDE-X) sites. Due June 30, 2010Activity Target 3:Complete factory acceptance testing and delivertwo (2) additional Airport Surface DetectionEquipment, Model X (ASDE-X) systems. DueSeptember 30, 2010Activity Target 4:Achieve Initial Operating Capability (IOC) at three(3) additional Airport Surface Detection Equipment,Model X (ASDE-X) sites. Due September 30, 2010Activity Target 5:Achieve Initial Operating Capability (IOC) at two(2) Airport Surface Detection Equipment, Model X(ASDE-X) sites. Due June 30, 2010Activity Target 6:Complete factory acceptance testing and delivertwo (2) additional Airport Surface DetectionEquipment, Model X (ASDE-X) systems. DueSeptember 30, 2010Activity Target 7:Achieve Initial Operating Capability (IOC) at three(3) additional Airport Surface Detection Equipment,Model X (ASDE-X) sites by September 30, 2010.Due September 30, 2010Activity Target 8:Achieve Initial Operating Capability (IOC) at three(3) additional Airport Surface Detection Equipment,Model X (ASDE-X) sites. Due September 30, 2010

Publish a National Runway Safety Plan (NRSP).

Strategic Initiative: National RunwaySafety Plan

Strategic Activity: National RunwaySafety PlanImplementation of the Runway Safety Strategy toachieve a significant reduction in the severity andfrequency of Runway Incursions requires a strategyencompassing a vision, a mission, and a set of goalsand objectives that provide guideposts andmilestones. This document, originally issued in FY2009, laid out a strategy undertaken by the Office ofRunway Safety which ties directly to the Department

Page 14 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 16: ATO Business Plan 2010

Activity Target 1:The Office of Runway Safety will use the NationalRunway Safety Plan as a strategic guide tomonitor progress and make note of any updatesneeded in the plan for the next version, anticipatedin FY 2011. The running list of changes will berecorded and reported to the Director of RunwaySafety on a quarterly basis throughout the fiscalyear. Due September 30, 2010

of Transportation and Federal AviationAdministration missions. The Runway Safety officeis now facilitating and monitoring implementation.

Strategic Activity: 2% Reduction in TotalRIs for FY 2010 by AJT

Activity Target 1:Update ATO-Terminal's Runway IncursionOperational Error (OE) Reduction Plan to includeactivities to reduce Runway Incursion OEs by 2%in FY 2010. Due December 31, 2009

To achieve the reduction in year 2, each LOB shouldupdate their plan and schedule to identify how theyplan to achieve their goal for that year. 1-2-2-2-3%yearly reductions in total Runway Incursions arebased on FY 2008 baseline numbers by which tocalculate the 2% reduction are: OEs - 165 PDs - 648VPDs - 196 = Total - 1009

Activity Target 2:Assess and report progress on implementation ofATO-Terminal's Runway Incursion OperationalError (OE) Reduction Plan to meet the FY 2010target of reducing total RIs by 2%. Due March 31,2010Activity Target 3:Report ATO-Terminal's Runway IncursionOperational Error (OE) Reduction Plan resultstowards achieving the FY2010 goal of a 2%reduction in total Runway Incursions (RIs). DueSeptember 30, 2010

Continue to develop, enhance, and test runway statuslights functionality for application at a wider array ofairports.

Strategic Initiative: RunwayIncursion Reduction Program (RIRP)

Strategic Activity: Runway IncursionReduction ProgramContinue developing, testing, and evaluating runwaystatus lights at Airport Movement Area SafetySystem and Airport Surface Detection Equipment-Model X airports. The Federal AviationAdministration entered a preliminary agreement inFebruary2008 to install an additional Runway Status Lightsystem for evaluation on the north and southairfields at Los Angeles International Airport. LosAngeles International Airport will fund the cost of theRunway Status Lights installation. It will be the first

Activity Target 1:Complete installation of Runway StatusLights/Runway Intersection Lights test bed atBoston Logan Airport. Due March 31, 2010

system installed on high speed taxiways. In April2008, the Federal Aviation Administration entered apreliminaryagreement to install an additional Runway StatusLights system for evaluation at Boston LoganAirport. The Federal Aviation Administration andMassachusetts Port Authority will share in thesystem installation costs of this Runway StatusLights installation. We will establish new test beds atLos Angeles International Airport and Boston LoganAirport during the 2009/2010 timeframe.

Activity Target 2:Complete Runway Status Lights/RunwayIntersection Lights shadow operation at BostonLogan Airport. Due May 31, 2010Activity Target 3:Conduct Field Operational Evaluation of RunwayStatus Lights/Runway Intersection Lights functionat Boston Logan Airport. Due September 30, 2010

Continue to test and plan implementation of low costground surveillance (LCGS) systems.

Strategic Initiative: Low CostGround Surveillance (LCGS)Systems

Strategic Activity: Low Cost GroundSurveillance Systems

Activity Target 1:Procure and install system at site one airport. DueMay 31, 2010

The Federal Aviation Administration is consideringthe use of low-cost, commercially available radarsurveillance systems that would reduce the risk ofrunway incursions at certain small and medium-sized airports. We would install these systems atairports that do not have Airport Surface DetectionEquipment (either ASDE-3 or ASDE-X). We arecurrently testing a prototype system at Spokane,Washington. Controllers and pilots can safelyconduct ground operations through visual and voicecommunication due to lower traffic levels and lesscomplex operations at these airports. A low-costsystem would further reduce the risk of groundincidents or accidents, especially during periods oflow visibility. The Federal Aviation Administrationrecently sent out an industry survey to determinewhat systems are currently in the market. FederalAviation Administration will build additional runwaysafety applications such as Runway Status Lightsand Surface Movement Guidance and ControlSystems upon the basic infrastructure provided bythe Low Cost Ground Surveillance.

Activity Target 2:Procure and install system at site two airport. Due

Page 15 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 17: ATO Business Plan 2010

September 30, 2010

Activity Target 3:Publish an initial pilot system operationalevaluation report. Due September 30, 2010

Ensure the provision of safe terminal air traffic controlservices throughout the terminal portion of the NationalAirspace System (NAS) by meeting or exceeding thesafety outcomes stated in the FY2008-FY2012 FlightPlan. The performance targets for ATO-Terminal safetyare: By FY 2010, limit Category A and B (most serious)runway incursions to a rate of no more than 0.450 permillion operations, and maintain or improve through FY2012 (FY10 Target = 0.450 per million ops); LimitCategory A and B (most serious) operational errors to arate of no more than 1.95 per million activities by FY2012 (FY10 Target = 2.05 per million operations);Decrease by half the fatalities per 100 million persons onboard commercial aircraft by 2025 and Reduce theaccidents in Alaska Part 135 operations from the 2000-2002 base rate of 130 accidents per year to no morethan 99 accidents per year.

Core Business Target: SafeDelivery of Terminal Air TrafficControl Services

Provide safe terminal air traffic control services tomeet target levels for Category A&B Runwayincursions and Category A&B Operational Errors.

Core Business Initiative: Provisionof Terminal Air Traffic ControlServices

Core Activity: Terminal ServicesOperations - Eastern Service Area

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy the annual safetyperformance targets for Category A&B (mostserious) Runway Incursions of no more than 0.450incursions per million operations. Due March 31,2010

Terminal Services operational responsibility isdivided into three geographical service areas(Eastern, Central and Western) to better manage theongoing delivery of terminal ATC services. Theprimary function of each terminal service area is tooversee ATC operations within their geographicalarea and to ensure the annual targets for Safety aremet while supporting other goals for Capacity andOrganizational Excellence.

Activity Target 2:Achieve the annual safety performance targets forCategory A&B (most serious) Runway Incursionsof no more than 0.450 incursions per millionoperations. Due September 30, 2010Activity Target 3:Complete assessment for achieving year-end

performance goal to satisfy the annual safetyperformance targets for Category A&B (mostserious) Operational Errors of no more than 2.05per million operations. Due March 31, 2010Activity Target 4:Achieve the annual safety performance targets forCategory A&B (most serious) Operational Errors ofno more than 2.05 per million operations. DueSeptember 30, 2010

Core Activity: Terminal ServicesOperations - Central Service Area

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy the annual safetyperformance targets for Category A&B RunwayIncursions of no more than 0.450 incursions permillion operations. Due March 31, 2010

Terminal Services operational responsibility isdivided into three geographical service areas(Eastern, Central and Western) to better manage theongoing delivery of terminal ATC services. Theprimary function of each terminal service area is tooversee ATC operations within their geographicalarea and to ensure the annual targets for Safety aremet while supporting other goals for Capacity andOrganizational Excellence.

Activity Target 2:Achieve the annual safety performance targets forCategory A&B (most serious) Runway Incursionsof no more than 0.450 incursions per millionoperations. Due September 30, 2010Activity Target 3:Complete assessment for achieving year-endperformance goal to satisfy the annual safetyperformance targets for Category A&B (mostserious) Operational Errors of no more than 2.05per million operations. Due March 31, 2010Activity Target 4:Achieve the annual safety performance targets forCategory A&B (most serious) Operational Errors ofno more than 2.05 per million operations. DueSeptember 30, 2010

Core Activity: Terminal ServicesOperations - Western Service Area

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy the annual safetyperformance targets for Category A&B (most

Terminal Services operational responsibility isdivided into three geographical service areas(Eastern, Central and Western) to better manage theongoing delivery of terminal ATC services. Theprimary function of each terminal service area is tooversee ATC operations within their geographicalarea and to ensure the annual targets for Safety aremet while supporting other goals for Capacity andOrganizational Excellence.

Page 16 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 18: ATO Business Plan 2010

serious) Runway Incursions of no more than 0.450incursions per million operations. Due March 31,2010Activity Target 2:Achieve the annual safety performance targets forCategory A&B (most serious) Runway Incursionsof no more than 0.450 incursions per millionoperations. Due September 30, 2010Activity Target 3:Complete assessment for achieving year-endperformance goal to satisfy the annual safetyperformance targets for Category A&B (mostserious) Operational Errors of no more than 2.05per million operations. Due March 31, 2010Activity Target 4:Achieve the annual safety performance targets forCategory A&B (most serious) Operational Errors ofno more than 2.05 per million operations. DueSeptember 30, 2010

Ensure the provision of safe and efficient air trafficcontrol services throughout the En Route portion of theNational Airspace System (NAS) by meeting theoutcomes stated in the FY 2009-2013 Flight Plan. Theperformance targets for En Route safety and efficiencymeasures are: 1) Limit Category A and B (most serious)operational errors to a rate of no more than 1.95 permillion activities by FY 2012 and maintain through FY2013 (FY 2010 Target: 2.05) and 2) maintain a NAS on-time arrival rate of 88.00 percent at the 35 OperationalEvolution Partnership (OEP) airports.

Core Business Target: Safe andEfficient Delivery of En Routeand Oceanic Air Traffic ControlServices

Provide safe and efficient En Route and Oceanic airtraffic control services at target levels for the fiscalyear. Annual targets for Category A&B OperationalErrors and NAS On-Time Arrivals have beenestablished.

Core Business Initiative: Provisionof En Route and Oceanic Air TrafficControl Services

Core Activity: En Route and OceanicServices - Program OperationsEn Route and Oceanic Services managesoperations through 21 Air Route Traffic ControlCenters (ARTCC) and two Combined En Route /Approach (CERAP) control facilities, which areallocated among the three Service Areas (Eastern,Central and Western). En Route and OceanicServices oversees air traffic control operationsthroughout their portion of the National AirspaceSystem (NAS) to ensure the annual targets forSafety and Efficiency are met while supporting othergoals for Capacity and Organizational Excellence.

Activity Target 1:Achieve the annual safety performance target forCategory A&B Operational Errors of no more than2.05 per million activities. Due September 30,2010Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: En Route and OceanicServices - Safety and OperationsServices

Activity Target 1:Achieve the annual safety performance target forCategory A&B Operational Errors of no more than2.05 per million activities. Due September 30,2010

En Route and Oceanic Services managesoperations through 21 Air Route Traffic ControlCenters (ARTCC) and two Combined En Route /Approach (CERAP) control facilities, which areallocated among the three Service Areas (Eastern,Central and Western). En Route and OceanicServices oversees air traffic control operationsthroughout their portion of the National AirspaceSystem (NAS) to ensure the annual targets forSafety and Efficiency are met while supporting othergoals for Capacity and Organizational Excellence.

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: En Route and OceanicServices Operations - Eastern ServiceArea

Activity Target 1:Achieve the annual safety performance target forCategory A&B Operational Errors of no more than2.05 per million activities. Due September 30,2010

En Route and Oceanic Services managesoperations through 21 Air Route Traffic ControlCenters (ARTCC) and two Combined En Route /Approach (CERAP) control facilities, which areallocated among the three Service Areas (Eastern,Central and Western). En Route and OceanicServices oversees air traffic control operationsthroughout their portion of the National AirspaceSystem (NAS) to ensure the annual targets forSafety and Efficiency are met while supporting othergoals for Capacity and Organizational Excellence.

Page 17 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 19: ATO Business Plan 2010

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: En Route and OceanicServices Operations - Central ServiceArea

Activity Target 1:Achieve the annual safety performance target forCategory A&B Operational Errors of no more than2.05 per million activities. Due September 30,2010

En Route and Oceanic Services managesoperations through 21 Air Route Traffic ControlCenters (ARTCC) and two Combined En Route /Approach (CERAP) control facilities, which areallocated among the three Service Areas (Eastern,Central and Western). En Route and OceanicServices oversees air traffic control operationsthroughout their portion of the National AirspaceSystem (NAS) to ensure the annual targets forSafety and Efficiency are met while supporting othergoals for Capacity and Organizational Excellence.

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: En Route and OceanicServices Operations - Western ServiceArea

Activity Target 1:Achieve the annual safety performance target forCategory A&B Operational Errors of no more than2.05 per million activities. Due September 30,2010

En Route and Oceanic Services managesoperations through 21 Air Route Traffic ControlCenters (ARTCC) and two Combined En Route /Approach (CERAP) control facilities, which areallocated among the three Service Areas (Eastern,Central and Western). En Route and OceanicServices oversees air traffic control operationsthroughout their portion of the National AirspaceSystem (NAS) to ensure the annual targets forSafety and Efficiency are met while supporting othergoals for Capacity and Organizational Excellence.

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010

Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Maintain and promote the safety and security of the NASthrough Aeronautical Information Services, DataManagement, Safety Risk Management Evaluations, andother System Operations programs.

Core Business Target: EnsureSafe Operations in the NationalAirspace System

Activities required to operate and maintain the AirportSurvey and Geographic Information (GIS) System, theNational Flight Data Center and National AirspaceSystem Resources (NASR), the AirspaceManagement Laboratory, and AIM InternationalStandardization Programs.

Core Business Initiative: NAS DataCollection and Modeling

Core Activity: National Flight DataCenter (NFDC) and the NationalAirspace System Resources (NASR).

Activity Target 1:Manage airport data collected from the airportGeographic Information System for the publicationof daily and 56-day aeronautical data. Reportquarterly. Due September 30, 2010

The NFDC manages the FAA's fixed infrastructureresources for operation and maintenance ofaeronautical elements. NFDC is the primaryorganization that enters, quality checks, coordinates,and publishes the FAA daily and 56-day aeronauticaldata distributions.

NASR provides for the National Airspace System'saeronautical data operations, enhancement, andmaintenance.

Increase safety by transitioning to the use ofAeronautical Information Exchange Model (AIXM)data.

Activity Target 2:Achieve ISO 9001 certification for the NFDC toprovide for increased effectiveness throughrecognized standards in customer service. DueJanuary 30, 2010

Core Activity: Airport Survey andGeographic Information System (GIS)The Airport Survey and GIS supports the Airportdivision's requirement to provide high quality surveydata for NAS airports. System Operations Servicesuses this for obstruction evaluation, and TechnicalOperations uses it for procedure design.

Increase the performance of the Airport SurveyProgram by applying GIS and digital data to improve

Page 18 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 20: ATO Business Plan 2010

Activity Target 1:Implement the survey data collection and qualitycontrol portion of the Airport GIS project. DueMarch 30, 2010

survey data quality for FAA and external customers.

Activity Target 2:Show that airports receiving Airport ImprovementProgram (AIP) funding submit 30% of airport datachange requests electronically (digitally) forairports that receive Airport Improvement Program(AIP) funding for airport layout plans. Report statusmonthly. Due August 30, 2010Activity Target 3:Deploy airport mapping service solution. DueMarch 30, 2010

Core Activity: Airspace ManagementLaboratory

Activity Target 1:Provide analysis and modeling support to FAAand external customers in response to Freedom ofInformation Act (FOIA) and ad hoc requests toensure at least 90% of requests are completed bythe due date. Report quarterly. Due September30, 2010

The Airspace Management Laboratory manages theaeronautical information (AI) chain to supplyaccurate, high integrity, and timely information thatsupports safe and efficient air traffic operationsthrough:

1. Demonstrating and developing new capabilities toimprove the collection, processing, and distributionof NAS resources, including advanced capabilitiesfor evaluating proposed obstructions and protectingairspace from encroachment;

2. Developing information systems, decision supporttools and advanced geo-spatial capabilities tocollect, manage, analyze, and evaluate air trafficcontrol operational data, such as in newtechnologies of the Next Generation AirTransportation System;

3. Providing a single source of high quality data onnavigation aids, airspace, communication systems,routes and procedures;

4. Providing international over-flight billing.

Activity Target 2:Provide international monthly over-flightcalculations to support billing and cost accountingat 90% completion by due date. Provide detailedover-flight report within 7 business days of the endof the month. Report quarterly Due September 30,2010

Core Activity: AIM InternationalStandardization

Activity Target 1:Conduct classes and conferences on theAeronautical Information Exchange Model (AIXM),to at least 100 participants. Report classes andconferences scheduled and number of participantstrained monthly Due September 30, 2010

In order to ensure global improvements in aviationsafety and efficiency, Aeronautical InformationManagement (AIM) standards must be developedand promoted. These AIM standards are promotedby conducting classes and conferences about theAeronautical Information Exchange Model (AIXM)and data exchange standards with SWIM and otherFAA modernization activities.

Global interoperability can be increased byestablishing and participating in the AIXMConfiguration Control Board and the ICAOAeronautical Information Service (AIS) toAeronautical Information Management (AIM) workinggroup.

Activity Target 2:Ensure that the FAA participates in at least 75% ofthe ICAO Aeronautical Information Service (AIS) toAeronautical Information Management (AIM)working group meetings. Report monthly DueSeptember 30, 2010

The Safety Risk Management Group providesoversight and guidance for the conduct of Safety RiskManagement (SRM) activities within SystemOperations. It ensures that all Safety RiskManagement Documents (SRMD) and Safety RiskManagement Decision Memorandum (SRMDM)initiated by, or affecting, System Operations; are inaccordance with the FAA Safety Management System(SMS) Manual, correctly reflect the proposed changesto the National Airspace System (NAS), and accuratelyassess the safety risk associated with the proposedchanges to the NAS. It is responsible for tracking of allSystem Operations SRM activities and providingreports to management on NAS changes requiringSafety Risk Management Documentation (SRMD) or aSafety Risk Management Decision Memorandum(SRMDM). The Group actively participates in allforums developing safety strategy for SystemOperations and the ATO.

Core Business Initiative: SystemOperations Safety Risk Management

Core Activity: Web Based SRMDDevelop and implement a web based capability totrack all proposed, current, and completed SafetyRisk Management Documentation (SRMD) or aSafety Risk Management Decision Memorandum(SRMDM); with the capability to produce data andreports for internal reporting and support System

Page 19 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 21: ATO Business Plan 2010

Activity Target 1:Develop an outline for and then document allproposed data/activity tracking requirements. DueDecember 31, 2009

Operations, ATO Safety, and AOV informationneeds.

Activity Target 2:Develop and test a pilot web-based capability totrack required data/activities for NAS changes fromrequest throughout the SRM lifecycle. DueSeptember 30, 2010

Core Activity: Review SRMD

Activity Target 1:Provide formal organizational comments onSRMD or SRMDMs within 30 days of formalsubmission to System Operations SafetyManagement office for a minimum of 80% ofsubmitted documents. Due September 30, 2010

Review of all required Safety Risk ManagementDocuments (SRMD) or Decision Memoranda (DM)for SRM compliance and provide informal and formalguidance and feedback to ensure that alldocumentation required to support NAS changesmeets final disposition in a timely manner

Activity Target 2:Ensure final formal review and SOSM dispositionis completed on SRMD or SRMDMs submittedSystem Operations Safety Management officewithin 15 days of receipt for a minimum of 80% ofdocuments. Due September 30, 2010

Core Activity: Flight ServicesOperational Policy and Requirements

Activity Target 1:Complete review of safety recommendationswithin 30 days. Due September 30, 2010

Assess each safety recommendation for validity anddetermine if a new requirement should beestablished

Core Activity: Validate and approveOperational Change Proposals

Activity Target 1:Complete validation and approval or disapprovalwithin 180 days of receipt of complete packageincluding SRMD/DM. Due September 30, 2010

Validate and approve when appropriate OperationalChange Proposals submitted by the contractor andDCPs submitted by Alaska.

Complete SRMD/Decision Memos (DM) prior tocoordinating Document Change Proposals (DCP) withother lines of business.

Core Business Initiative: FlightServices Operations and Safety

Core Activity: Safety Assessment

Activity Target 1:Complete SRMD/DMs prior to DCP coordinationwith other lines of business. Due September 30,2010

Complete SRMDs for each operational change thatimpacts safety and affects the NAS. Conduct hazardtracking where hazards are identified.

Activity Target 2:Submit hazard tracking reports within 30 days oftarget due date. Due September 30, 2010

Sustain Flight Services and continue preparation formodernizing Alaska Flight Service in order to identifyefficiencies and improvements in the service delivery.Provide support to other Service Units and FederalAgencies.

Core Business Initiative: FlightService Information Office Alaska

Core Activity: Alaskan FacilitiesSustainment

Activity Target 1:Identify and report sustainment problems, issuesand requirements for Alaska Flight Servicefacilities to meet applicable codes, regulations,and OSHA and ADA standards. Due September30, 2010

The harsh Alaskan climate has caused housing andfacilities to deteriorate to poor levels ofaccommodation for employees who work there. Toincrease productivity AJR-B will restore the facilitiesto Occupational Safety and Health Administration(OSHA) and American Disabilities Act (ADA)compliance.

Activity Target 2:Conduct an annual survey to determine therequirements for future employee housing needs.Due September 30, 2010

Core Activity: Flight Services QualityAssurance in Alaska

Activity Target 1:Address Alaskan Quality Assurance complianceissues and solutions with Alaska Air TrafficManagers and Quality Assurance staff on amonthly basis. Due September 25, 2010

Monitor and maintain Flight Service Performance inAlaska

Activity Target 2:In FY 2010, accomplish the number of Pilotweather briefing evaluations specified in thecurrent AFSIAG performance metric process andreport quarterly. Due September 15, 2010Activity Target 3:In FY 2009, provide quarterly report of AlaskanQuality Assurance activities, results and trends toAir Traffic Managers. Due September 15, 2010

Page 20 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 22: ATO Business Plan 2010

The System Operations Office of LitigationInvestigations group represents the Air TrafficOrganization as liaison to U.S. Department of Justice,to the FAA Office of Chief Counsel EnforcementDivision and FAA Office of Chief Counsel LitigationDivision on activities related to 1.) EnforecementActions involving pilot deviations, 2.) Personal Injury,property damage, and/or worngful death resulting fromaircraft accidents or incidents and 3.) Other Litigationwich require Air Traffic Organization expertise.

Core Business Initiative: SystemOperations Litigation InvestigationsGroup

Core Activity: Develop Web BasedAutomated Accident Package

Activity Target 1:Beta test the server based software (E-Discovery)Due March 30, 2010

The System Operations Office of Litigation currentlyuses a workstation based software package to trackand manage case files for aircraft accidents whichinvolve the provision of Air Traffic Control (ATC)services. The investigation group is transitioning to aserver based software package that offers a Webbased user interface, which will allow multipleemployees in multiple locations to track and managethese case files.

Activity Target 2:Succeed in transfer 50% of air traffic facilities toautomated accident package generator (E-Discovery). Due September 30, 2010

Core Activity: Coordinate LegalInvestigations for Accident Litigation

Activity Target 1:Reduce the number of overdue accident packagesto zero, as tracked by SOP tracking programs.Due September 30, 2010

The System Operations Office of Litigation willsupport all request made by AGC and Department ofJustice attorneys for information on enforcementactions or accident litigation where air traffic serviceswere provided; including tracking via SOP trackingprograms and reviewing all accident packagescreated by the field.

Core Activity: Facilitate Reporting ofCONUS Air Traffic Incidents

Activity Target 1:Report on incidents and review with proper follow-up on all covered events. Report outcomequarterly Due September 30, 2010

CONUS Flight Services supports ATO-S and theFSPO by ensuring that aircraft incident reporting isconducted in accordance with Agency directives.

Core Activity: Review and processCONUS Aircraft AccidentDocumentation

Activity Target 1:Ensure 90% of all accident packages are returnedto CONUS AFSS Contractor within 5administrative days of receipt. Report quarterly.Due September 30, 2010

CONUS Flight Services supports Systems LitigationOffice and FSPO by ensuring that the ServiceProvider (Lockheed Martin) reports and documentsaccidents in accordance with Agency directives.

Demonstrate a ground-movement safety infrastructure by2013 that provides direct warning capability to pilots,drivers, and controllers to reduce the severity of RunwayIncursions. For fiscal year 2010, the Runway SafetyOffice will complete a field evaluation of an initial flightdeck warning capability in at least one pilot airport.

Core Business Target: AssessRunway Safety Technology

The Runway Safety Office assesses emergent runwaysafety technologies to provide direct warning capabilityto pilots, drivers, and controllers. The goal is to reducethe number and severity of Runway Incursions byreducing time to provide alerts, hence enhancing thereaction time for pilots to apply mitigations.

Core Business Initiative: DirectWarning System Study

Core Activity: Direct Warning SystemStudy

Activity Target 1:Identification of operational constraints, limitations,and benefits of a ground based direct alertingsystem using human in the loop simulationresearch. Due July 31, 2010

Continue to conduct an integrated assessment ofemergent runway safety technologies and conductsimulation analyses to assess effectiveness,interoperability and level of readiness for operationaltransition to a National Airspace System groundmovement safety infrastructure.

Activity Target 2:Conduct field evaluations of an initial flight deckdirect warning capability. The evaluation isplanned for Philadelphia airport. Test initialalgorithms in test avionics with industryparticipants. Due August 31, 2010

Manage and oversee full implementation of a SafetyManagement System within System Operations toensure compliance with FAA Order 1100.61, Air TrafficSafety Oversight and ATO Order JO 1000.37, Air Traffic

Core Business Target:Implement a Safety ManagementSystem (SMS) for the ATO

Page 21 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 23: ATO Business Plan 2010

Organization Safety Management System SafetyStandards.

Director of System Operations Safety Management -Provides leadership, direction and guidance to SystemOperations Directorates and staff offices responsiblefor complying with FAA Order 1100.161, Air TrafficSafety Oversight and ATO Order JO 1000.37, AirTraffic Organization Safety Management System. TheSystem Operations Safety Management (SOSM)Office provides oversight and guidance for the conductof Safety Risk Management (SRM) and SafetyAssurance activities within System Operations. Bothfunctions ensure that all proposed changes to theNational Airspace System (NAS) initiated by, oraffecting, System Operations correctly reflect the, andaccurately assess the safety risk associated with theproposed changes to the NAS and are in adherence toFAA Order 1100.161, Air Traffic Safety Oversight, FAAOrder 1000.37, Air Traffic Organization SafetyManagement System, and the FAA SafetyManagement System Manual. In support of SMSimplementation, Safety Promotion and Policy mustensure all employees are aware of the principles ofSMS and that System Operations safety practitionersare trained, educated and experienced in all aspects ofSRM. All functions above can be verified throughdocumentation of safety activity in Safety RiskManagement Documents (SRMD) or a Safety RiskManagement Decision Memorandum (SRMDM). Inaddition, various tracking mechanisms ensure NASchanges on all System Operations SRM activities arereviewed and accepted by management.

Core Business Initiative: Implementa Safety Management System (SMS)for the ATO

Core Activity: Implement a SafetyManagement System (SMS) for the ATO

Activity Target 1:Track and validate conduct of safety riskmanagement for all System Operations initiatedchanges to the NAS. Due September 30, 2010

Provide leadership, direction and guidance toSystem Operations Directorates and staff officesresponsible for complying with FAA Order 1100.161,Air Traffic Safety Oversight and ATO Order JO1000.37, Air Traffic Organization SafetyManagement System.

Activity Target 2:Verify, through monitoring, safety reviews,evaluations, audits and inspections, data trackingand analysis, and investigations, that SMSimplementation, process guidelines, and hazardstracking was conducted to ensure reduced level ofrisk as indicated in associated SRMDs. DueSeptember 30, 2010Activity Target 3:Conduct one trail audit for SMS compliance. DueSeptember 30, 2010

Activity Target 4:Administer safety promotion outreach program forSystem Operations to ensure increased employee'knowledge base and progress toward a positivesafety culture. Due September 30, 2010

Improve the safety of the National Airspace System witheffective identification of risks and development ofmitigations through audits, evaluations and investigationsin compliance with applicable Federal AviationAdministration orders. Provide report to the Senior VicePresident for Operations and Vice President for Safetyon a quarterly basis on status of identified risks andrecommended mitigations.

Core Business Target: QualityAssurance

The Quality Assurance Directorate identifies NationalAirspace System risks and concerns throughassessments of Air Traffic Organization operations.

Core Business Initiative: PerformAssessments of Air TrafficOrganization Operations

Core Activity: Safety Assurance Corefor Assessments of Air TrafficOrganization Operations

Activity Target 1:Conduct on-site assessments of accidents andhigh-profile incidents involving Air TrafficOrganizations operations. Identify recurrent risksand causal factors, disseminate findings andprovide recommendations for corrective actions toappropriate Service Units. Due September 30,2010

Safety assessment and analysis of Air TrafficOrganization operations.

Activity Target 2:Conduct analysis of Significant Safety Events toidentify risks and causal factor trends in Air TrafficOrganization operations. Disseminate findingsand provide recommendations for correctiveactions to appropriate Service Units.

Minimum of one finding of Significant SafetyEvents analysis per service area per quarterbeginning the second quarter of FY 2010. Interimtargets March 31, 2010 and June 30, 2010. DueSeptember 30, 2010

Continue to support the development of RunwayIncursion educational materials for distribution to aid inlimiting Category A and B (most serious) runwayincursions to a rate of no more than 0.450 per millionoperations, and maintain or improve through FY 2013.FY 2010 Target: 0.450. Operational Services will providenew or modified educational materials will be distributed

Core Business Target:Operational Services

Page 22 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 24: ATO Business Plan 2010

to various safety related venues a minimum of once aquarter throughout fiscal year 2010.

The Office of Operational Services will (1) assist andsupport the operational lines of business (LOBs) in thedevelopment and testing of air traffic procedures andtechnology, (2) develop and market products to aid inimproving the performance of air traffic controllers, (3)provides Air Traffic expertise to the LOBs in support ofSafety Risk Management panels (4) acts as the liaisonfor the Office of Safety on Air Traffic operationalprocedures for the Service Units, and (5) acts also asthe ATO liaison for AOV, AAI and JIMDAT/CAST.

Core Business Initiative:Operational Services

Core Activity: Operational Services

Activity Target 1:Development of Educational materials that reduceLoss of Standard Separation (LoSS) Events andRunway Incursions by providing a Back to theBasics approach that focuses on; clearcommunications, situational awareness, visualseparation and protection of runway surfaces. DueSeptember 30, 2010

The Office of Operational Services will developeducational materials on Loss of StandardSeparation (LoSS) Events and Runway Incursionsfor distribution via our Oklahoma City contract andcontinue Crew Resource Management training.

Activity Target 2:Development of an Air Traffic Front Line Manager(FLM) Quick Reference Guide (QRG). Thisreference guide provides FLMs with practicalstrategies for managing and improving controllerperformance as well as addressing specific factorsthat contribute to significant reportable events.Phase 1 and 2, development of best practicestrategies from EnRoute and Tower FLMs havebeen completed already. Phase 3, development ofbest practice strategies from TRACON FLMs willbe done by January 30, 2010. Briefing forSUPCOM by January 30, 2010. A deployment planby February 28, 2010; and the Quick ReferenceGuide (QRG) complete by the end of April. DueApril 30, 2010

Continue to conduct independent assessments of newand Conduct at least two independent assessments peryear on either new and existing programs, systemsmodifications or operational procedures to ensureoperational readiness and compliance with Safety RiskManagement.

Core Business Target: SafetyManagement System SafetyAssurance

Results of independent assessments will be used toidentify potential risks in the National AirspaceSystems so that those risks can be properly mitigated.

Core Business Initiative: SafetyManagement System SafetyAssurance

Core Activity: Independent OperationalTest & Evaluation

Activity Target 1:Working with the Independent Operational Test &Evaluation Designation Working Group and theIndependent Operational Test & EvaluationDesignation Board, prepare the FY 2011Independent Operational Test & EvaluationDesignation Memorandum and deliver to the VicePresident of the Office of Safety. Due June 30,2010

Conduct Independent Operational Test & Evaluationassessments of designated system acquisition andmodification programs to ensure operationalreadiness and compliance with Safety RiskManagement in support of In-Service and otherAcquisition Decisions.

Activity Target 2:Using the Independent Operational Test &Evaluation Follow-up Assessment process and theIn-Service Decisions Action Plan Status, measurethe number of significant issues or hazardsidentified subsequent to and within six months ofthe programs respective In-Service Decisions.Independent Operational Test & Evaluation Follow-up Report target due dates are not listed due tothe inherent dependency on respective programsschedule that are not available at this time. DueSeptember 30, 2010Activity Target 3:Using the Independent Operational Test &Evaluation Follow-up Assessment process,measure the number of significant issues orhazards, identified during Independent OperationalTest & Evaluation, which are addressed within sixmonths of the program's respective In-ServiceIndependent Operational Test & Evaluation Follow-up Report target due dates are not listed due tothe inherent dependency on respective programsschedule that are not available at this time. DueSeptember 30, 2010

Core Activity: Safety ManagementSystem Safety Assurance

Activity Target 1:Measure the number of items in the individualaction plans for each assessment, which areaddressed within six months of being reported to

Conduct Safety Independent Assessments ofselected systems or procedures as directed by theVice President of the Office of Safety or the Directorof the Office of Safety Management System.

Page 23 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 25: ATO Business Plan 2010

the respective Program Office. Due September30, 2010

Ensure monthly gathering and distribution of the Office ofSafety risk reduction data and information.

Core Business Target: Data andAnalysis Group

tbd

Core Business Initiative: RiskReduction Information Group

Core Activity: Risk ReductionInformation Group

Activity Target 1:Continue monthly development of analyticalinformation from data collected to establish andmonitor safety performance metrics. DueSeptember 30, 2010

Ensure monthly gathering and distribution of Officeof Safety risk reduction data and information.

Core Activity: Safety Risk ManagementTracking System Data Enhancements

Activity Target 1:Complete a Phase 2 Preliminary Design Reviewby April 10, 2010. Complete a Phase 2Operational Testing by the end of the fiscal year.Due September 30, 2010

Assist in refining the data used to collect and reportSafety Risk Management information through theSafety Risk Management Tracking System.

Core Activity: Centralized Safety DataRepository

Activity Target 1:Complete development and testing by the end ofthe fiscal year. Due September 30, 2010

Implement a single Safety Data System thatcombines safety information from existingdatabases.

Continue to limit Category A and B (most serious)runway incursions to a rate of no more than 0.450 permillion operations, and maintain or improve through FY2013.

Core Business Target: RunwaySafety

Manage efforts of the Headquarters' Runway SafetyProgram staff and the field offices (in conjunction withthe Regional Administrators) to continue improvingand providing educational training and awarenesstools to commercial and General Aviation pilots, airportvehicle operators and air traffic controllers.

Core Business Initiative: RunwaySafety

Core Activity: Runway Safety

Activity Target 1:Continued support of field activities to educate andpromote runway risk mitigation initiatives. TheRegional Runway Safety Program Managers willconduct and/or support 10 local and regionalRunway Safety Action Team meetings at variousfacilities in each Region. Throughout FY 2010.Due September 30, 2010

Reduce the risk of serious runway incursionsthrough the promotion and raised awareness ofavailable risk mitigations, including: runway safetytechnology; training; education. Ensure nationalrunway safety program coordination to ensureeffective implementation of these mitigations.

Activity Target 2:Continued support of Operational Error andRunway Incursion Reduction activities in the Fieldand support investigations of runway safetyevents. Due September 30, 2010Activity Target 3:Ensure the coordination of national runway safetyprogram field and FAA Headquarters activities.Perform Quarterly Performance Reviews meetingswith the Regional Runway Safety ProgramManagers. The review of the fourth quarter ofFY09 will be conducted before the end of thecalendar year. Due December 31, 2009Activity Target 4:Ensure the coordination of national runway safetyprogram field and FAA Headquarters activities.Perform Quarterly Performance Reviews meetingswith the Regional Runway Safety ProgramManagers. The review of the first quarter of FY10will be conducted before the end of the secondquarter. Due March 31, 2010Activity Target 5:Ensure the coordination of national runway safetyprogram field and FAA Headquarters activities.Perform Quarterly Performance Reviews meetingswith the Regional Runway Safety ProgramManagers. The review of the second quarter ofFY10 will be conducted before the end of the thirdquarter. Due June 30, 2010Activity Target 6:Ensure the coordination of national runway safetyprogram field and FAA Headquarters activities.Perform Quarterly Performance Reviews meetingswith the Regional Runway Safety ProgramManagers. The review of the third quarter FY10will be conducted before the end of the fiscal year.Due September 30, 2010Activity Target 7:Review runway incursion events and assess eventseverity. Review events for trending and newhazard identification. Weekly reports will beprepared based upon Runway IncursionAssessment Meetings. Due September 30, 2010

Page 24 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 26: ATO Business Plan 2010

Activity Target 8:Conduct promotional and outreach activities toraise awareness of runway surface operationalrisks as well as available mitigations. Conductbriefings and promotional activities at two major fly-ins/airshows. Complete one briefing by April 30,2010. Complete remaining briefing by the end ofAugust. Due August 31, 2010Activity Target 9:Conduct an International Runway Safety Summitto raise the awareness of runway safety riskmitigation efforts worldwide, identify new issuesand trends, and coordinate activities. DueDecember 31, 2009

Core Activity: Continuous Improvement

Activity Target 1:Regional Runway Safety Program Managers(RRSPMs), work with personnel from Air Traffic,Airports, the FAA Acquisition System ToolsetTeam, (FAASTeam), Flight Standards, andcooperation airports, industry firms andassociations to design, develop, and updateeducational curricula. The primary focus is toachieve optimal runway safety practices andprocedures with an emphasis on ways to minimizecause-related factors and maximize safety andawareness during surface operations. Curriculumis designed to target aircraft, vehicle andpedestrian runway, taxiway and ramp movements.Specific audiences are pilots, controllers, vehicledrivers, airport management, and ramp personnel.Curriculum's continuing development and multi-media format will be based on targeted audiences.Educational materials are appropriately structuredto convey specific and relevant runway safetymessages. Specifics include determination ofappropriate information and messaging, the bestmedia to transmit information, i.e. printedmaterials, internet, DVDs, email, live briefings,etc., and the assessment of best venues to reachtargeted audiences. Specific identification ofstakeholders to be determined by December 31,2009. Remaining activities due by the end of thefiscal year. Due September 30, 2010

The essence of improving runway safety iseducation and awareness for pilots, air trafficcontrollers and airport vehicle drivers. This includes:training; development, production and disseminationof educational materials; workshops; flight instructorand flight school outreach; curriculum building;collaborative operations planning; and technology.

Activity Target 2:Structure and implement a communicationsstrategy to reach the maximum number of pilots(GA, airline, business), controllers (federal andcontract towers), drivers, ramp personnel, airportmanagement, and industry groups on a regularand continuing basis. Communications methodsinclude Runway Safety Action Team meetings,

direct mail, advertisements, trade shows, fly-ins,air shows, conferences, Flight Instructor RefresherClinics, meetings, briefings, special events, websites, news releases, news articles and featurestories, brochures, videos, promotional giveawaysand specialty items, i.e. sticky notes or bumperstickers. Plan will address the vast array of issuesand requirements that various stakeholderspresent with respect to runway safety. Outreachthemes will be structured to convey specificmessages to the various audiences, including butnot limited to attention to detail, potentialdistractions, requesting assistance,miscommunications, familiarity with signs andmarkings, available new technology, revised ATCprocedures and instruction language such as "LineUp and Wait", etc. The task will involve dozens ofmessages via hundreds of techniques to reachtens of thousands or more. Communications planto be updated by December 31, 2009. Remainingactivities due by the end of the fiscal year. DueSeptember 30, 2010

Ensure that 100% of applicable programs conform to theIn-Service Decision process.

Core Business Target: In-ServiceDecision Secretariat

Ensure the implementation of the DeploymentPlanning Process and In-Service Decision asgoverned by the Federal Aviation AdministrationAcquisition Management System policy.

Core Business Initiative: In-ServiceDecision Secretariat

Core Activity: In-Service Decision (ISD)Secretariat

Activity Target 1:Provide guidance, facilitate the DeploymentPlanning Process, and ensure compliance of theIn-Service Decision process for applicableprograms, as measured by feedback fromcustomers. Interim progress report due April 15,2010. Due September 30, 2010

Ensure the implementation of the DeploymentPlanning Process and In-Service Decision asgoverned by the FAA Acquisition ManagementSystem policy.

Under the Runway Safety Analysis program, initiatedevelopment of a Runway Safety Hazard TrackingSystem to: (1) identify and track runway safety hazards,(2) Monitor Runway Safety Action Team activity toensure that hazards and Runway Safety Action Teamaction items are consistent. The prototype hazardtracking system will be completed by June 30, 2010.

Core Business Target: Analysisof Surface Safety Data

Page 25 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 27: ATO Business Plan 2010

Runway incursions and other surface incidents meritcontinuous analysis for trends in types of incidents,causal and coincident factors and outcome to helpmanage risk.

Core Business Initiative: Analysis ofSurface Safety Data

Core Activity: Analysis of SurfaceSafety Data

Activity Target 1:Conduct two mandatory briefings on the results ofrunway incursion data analysis. The interimbriefing will be conducted by the second quarter.Due March 31, 2010

This task will include: (1) conducting specificanalyses to address operational issues as they arise(such as specific inquiries and analyses to supportrisk assessments and other Safety Managementtasks), and (2) initiating a contract to developstatistical tools to evaluate hazard mitigationeffectiveness.

Activity Target 2:Conduct two mandatory briefings on the results ofrunway incursion data analysis. The final briefingconducted by the end of the fiscal year. DueSeptember 30, 2010Activity Target 3:Develop material for inclusion in the RunwaySafety Annual Report Due end of the fiscal year.Due September 30, 2010Activity Target 4:A minimum of two reports on the results ofRunway Incursion data analysis coinciding with thebriefings will be produced. First report by the endof the second quarter. Due March 31, 2010Activity Target 5:A minimum of two reports on the results ofRunway Incursion data analysis coinciding with thebriefings will be produced. Final report producedbefore the end of the fiscal year. Due September30, 2010Activity Target 6:Initiate a contract to develop statistical tools(including Coordinate Hierarchical BayesianModeling) to evaluate the effectiveness of hazardmitigations. Due September 30, 2010

In FY 2010 the ATO will adopt a safety managementsystem (SMS) based scheme to analyze all air trafficincidents in which less than 66% of required RADARseparation is maintained, establishing Risk and Reliabilityfactors for each event.

Core Business Target:Expanding Global Awareness ofKey Safety Metrics

Metrics provide baselines for safety performance toassess system performance and to examine theeffects of changes in procedures or equipment onaviation safety. This work will continue to refine andimplement enhanced safety metrics and work with theinternational aviation community Civil Air NavigationServices Organisation to develop global safety metricsand analyze global safety trends using these metrics.

Core Business Initiative: ImproveGlobal Safety Metrics

Core Activity: Refinement of SafetyMetrics through Civil Air NavigationServices Organisation

Activity Target 1:Support to Federal Aviation Administration Civil AirNavigation Services Organisation (CANSO)activities to refine global safety metrics for runwaysafety and losses of Instrument Flight Rule IFR-IFR. In FY 2010, this work is scheduled to includework within Civil Air Navigation ServicesOrganisation to refine the metrics used to describethe severity of IFR-IFR losses of separation andrunway incursions. Due September 30, 2010

Metrics provide baselines for safety performance toassess system performance and to examine theeffects of changes in procedures or equipment onaviation safety. This work will continue to refine andimplement enhanced safety metrics and work withthe international aviation community Civil AirNavigation Services Organisation (CANSO) todevelop global safety metrics. The Office of Safetywill provide support to Federal AviationAdministration Civil Air Navigation ServicesOrganisation activities to develop global safetymetrics for runway safety and losses of InstrumentFlight Rule (IFR)-IFR in FY 2009, this work isscheduled to include work within Civil Air NavigationServices Organisation.

Activity Target 2:Begin development of a runway safety risk modelfor use within Civil Air Navigation ServicesOrganisation (CANSO). Due September 30, 2010

Beginning in FY 2010, the Air Traffic Organization willmaintain a System Loss Index, the average of Measuresof Loss for all reported losses of standard RadioDetection And Ranging (RADAR) separation. The AirTraffic Organization will identify causal and coincidentfactors for all events involving less that 66% requiredRADAR separation and will use a safety managementsystem based risk scheme to focus corrective resourceson the most serious trends. The Air Traffic Organizationwill ensure that the System Loss Index improves by at

Core Business Target: Analysisof Causal and CoincidentFactors in Losses of StandardSeparation

Page 26 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 28: ATO Business Plan 2010

least 0.01 of the FY 2010 baseline index through FY2011.

Selling the Separation Conformance Index as thereplacement to the former Operational Errors A and Bcategorization.Continued analysis of the causal factors for Losses ofStandard Separation is required to support thedevelopment of error mitigation strategies. As newprocedures and decision-support tools areimplemented, trends in Losses of Standard Separationneed to be monitored to detect measurable effects onsafety.

Core Business Initiative: Analysis ofCausal and Coincident Factors inLosses of Standard Separation

Core Activity: Analysis of Causal andCoincident Factors in Losses ofStandard Separation

Activity Target 1:Conduct a briefing on the results of Losses ofStandard Separation (LoSS) data analysis. DueMay 31, 2010

Analyze Federal Aviation Administration reports onLosses of Standard Separation in the TerminalRadar Approach Control and Air Route TrafficControl Center environments. Analyze AviationSafety Reporting System reports, as needed, tocomplement the analyses of Losses of StandardSeparation (LoSS) data. This task will also includespecific analyses to address operational issues asneeded.

Activity Target 2:Produce a written report on the results of Lossesof Standard Separation (LoSS) data analysis. DueAugust 15, 2010

In FY 2010, the Office of Safety's Safety Culture groupwill establish the baseline of how safety culture iscurrently impacting organizational safety throughout100% of the Air Traffic Organization.

Core Business Target: SafetyCulture

The role of the Office of Safety, Safety Culture group isto achieve overall improvements to the safety cultureof the Air Traffic Organization. We intend to enableimprovements to the safety culture within the AirTraffic Organization by providing safety cultureeducation, communication tools and resources.

Core Business Initiative: ContinualImprovement

Core Activity: Safety Culture Awareness

Activity Target 1:

Establish Safety Culture training programs based onsurvey results that ensure we are aligned withagency goals and drive continuous improvement.

Develop a comprehensive plan for training activityby embedding safety thinking throughout thetraining lifecycle. Due April 30, 2010Activity Target 2:Develop safety culture guidance document inaccordance with the Safety Management SystemOrder 1030.1A. Due June 30, 2010Activity Target 3:Develop a coordinated approach forcommunicating safety culture in all safetyprograms. Due August 30, 2010Activity Target 4:Conduct ATO-wide safety culture survey tomeasure improvements in safety culture bycomparing results with baseline data from 2008survey of twelve facilities. Due September 30,2010

In FY 2010, the Air Traffic Organization Office of Safetywill attain International Organization for StandardizationRegistration in two Directorates.

Core Business Target:International Organization forStandardization 9001

The Office of Safety is on the path to InternationalOrganization for Standardization certification.

The International Organization for Standardizationrequires that we:- Plan our services and products- Perform our services and produce our products- Measure the quality of our services and products- Improve our services and products based on theresults of those measurements- International Organization for Standardizationrequires us to integrate six processes into our day-to-day activities. These processes are Document Control,Control of Records, Corrective Action, PreventiveAction, Action to Correct Non-Conforming Productsand Services, and Internal Audits.

Core Business Initiative:International Organization forStandardization 9001 Registration

Core Activity: Realize Benefits ofInternational Organization forStandardization 9001 Implementation

Activity Target 1:

Begin Implementation of International Organizationfor Standardization 9001 process required forInternational Organization for StandardizationRegistration. Implement International Organizationfor Standardization 9001 processes to realizeimprovements in business practices includingdocumentation control, control of records,continuous process improvements and stakeholderfeedback.

Page 27 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 29: ATO Business Plan 2010

Achieve International Organization forStandardization Registration in one Directorate bythe end of the third quarter. Due June 30, 2010Activity Target 2:Achieve International Organization forStandardization Registration in one additionalDirectorate by the end of the fiscal year. DueSeptember 30, 2010

WAAS procedures.

Core Business Target: <STICandidate> Provide WAASservice at 500 runway ends.

Ensure WAAS Service Availability

Core Business Initiative: ProvideWAAS Service

Core Activity: NAS Implementation

Activity Target 1:Provide WAAS service at 500 additional runwayends. Due September 30, 2010

WAAS Procedures

Complete 99% of the required Instrument FlightProcedures and Charting production activities to supportthe safe and efficient movement of aircraft within theNAS.

The production amounts listed in the Activity Targetsrepresent historical averages. FY10 performance will beassessed based on actual production requirements forthe period.

Core Business Target: <STICandidate> Instrument FlightProcedures and Chartingproduction activities

Implement business process re-engineering initiativesas defined within the High Performing Organization(HPO) Plan to achieve efficiency gains and improvequality within the design, development, charting andmaintenance of instrument flight procedures (IFPs);plan/direct the construction, maintenance andpublication of aeronautical charts/publications and thecollection and verification of aeronautical data.

Core Business Initiative: NationalAeronautical Navigation Services

Core Activity: Instrument FlightProceduresPublish new IFPs. Complete IFPamendments/revisions (e.g., NAVAID facilityrelocations, NAVAID decommissionings, airportinfrastructure changes, construction of newobstacles, criteria changes, magnetic variation

Activity Target 1:Publish 150 new IFPs (non-Flight Planrequirements). Due September 30, 2010

changes, or user/customer requests, etc.). Completeobstacle evaluations and analyze for IFP impact.Issue procedural Notice to Airmen (NOTAMs).Complete Army workload (original IFPs,amendments, and reviews) IAW Army ForeignTerminal Instrument Procedure requirements.

The production amounts listed in the followingActivity Targets represent historical averages. FY10performance will be assessed based on actualproduction requirements for the period.

Activity Target 2:Complete 2,500 amendments/revisions. DueSeptember 30, 2010Activity Target 3:Army workload: Complete 80 original; 50amendments; and415 reviews. Due September 30, 2010

Core Activity: Instrument FlightProcedures Automation (IFPA); CIPA14.02-01

Activity Target 1:Deploy (ISD/IOC) AIRNAV 2.0 - Airports, NavAidsby 3rd Qtr FY10 Due March 31, 2010

Develop a next generation IT tool suite whichcreates products using fully integrated solutions forvisual and instrument flight procedures.

Activity Target 2:Complete Requirements for IFP-Enroute by 4th QtrFY10 Due September 30, 2010Activity Target 3:Complete Requirements for IFP-Departure by 4thQtr FY10 Due September 30, 2010

Core Activity: Charting

Activity Target 1:Complete 19,700 non-procedural chartchanges/revisions. Due September 30, 2010

Complete non-procedural chart changes/revisions.Complete revisions on Visual Aeronautical Charts.Complete revisions to Enroute Hi/Low (Controller &Planning) aeronautical charts. CompleteAirport/Facility Directory (A/FD) maintenancerevisions to include line changes; airport diagramchanges; and airport sketch changes. MaintainObstacle Repository System. Complete MinimumSafe Altitude Warning (MSAW) maps, Radar VideoMaps (RVM), and editions for digital productsmaintenance, Complete reproduction anddistribution services.

The production amounts listed in the followingActivity Targets represent historical averages. FY10performance will be assessed based on actualproduction requirements for the period.

Page 28 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 30: ATO Business Plan 2010

Activity Target 2:Complete 60,530 revisions on 200 VisualAeronautical Charts. Due September 30, 2010Activity Target 3:Complete 134,900 revisions on 1,036 EnrouteHi/Low Charts. Due September 30, 2010Activity Target 4:Complete 38,000 Airport/Facility Directory linechanges on 54 books; 800 airport diagrams; and1,300 airport sketches. Due September 30, 2010Activity Target 5:Complete 15,600 obstacle verifications. DueSeptember 30, 2010Activity Target 6:Create/build 18 new MSAW sites, maintain 300MSAW sites, create 1,370 RVM, complete 3,630RVM revisions, and maintain 300 digital producteditions. Due September 30, 2010Activity Target 7:Print 2,608,840 product copies and distribute11,265,000 product copies. Due September 30,2010

Complete 99% of periodic flight inspections prior to theexpiration date.

The production amounts listed in the Activity Targetsrepresent historical averages. FY10 performance will beassessed based on actual production requirements forthe period.

Core Business Target: <STICandidate> Periodic flightinspections

Conduct airborne inspection of electronic signals fromground-based NAVAIDS supporting aircraft departure,en route, and arrival procedures. Evaluate flightprocedures for accuracy, human factors flyability, andobstacle clearance. Perform IFP flight validation basedupon Global Navigation Satellite System and aircraftflight management systems; assess regional/localaugmentation system performance (e.g., WAAS,LAAS, DME/DME). Provide airborne performance andcoverage evaluation of surveillance radars, PrecisionRunway Monitoring systems, and NextGentechnologies like ADS-B and ASDE-X.

Core Business Initiative: FlightInspection Operations

Core Activity: Flight InspectionConduct flight inspection of NAVAIDS forcommissionings, reconfigurations, and restorations.Conduct periodic flight inspection of NAVAIDS.Complete NAVAID decommissioning inspections.Conduct missions to investigate radio frequencyinterference (RFI) impacting NAVAIDs andcommunications. Conduct inspections to supportpost-accident investigations. Conduct inspections of

Activity Target 1:Conduct 3,753 inspections for NAVAIDcommissionings, reconfigurations, andrestorations. Due September 30, 2010

original and amended IFPs. Conduct inspections ofIFPs within the periodic interval. Conduct inspectionsfor Dept of Defense under current agreements anddirectives. Perform aircraft, avionics, and flightinspection systems modifications/upgrades. Conductvisual inspections for sectional and terminal areacharts. Conduct inspections of helicopter IFPs.Develop policy and publish technical directives,revisions, or changes driven by ICAO documents,FAA directives, or aircraft manufacturer guidanceand conduct training IAW FARs and ICAO guidance.

Note: The production amounts listed in the followingActivity Targets represent historical averages. FY10performance will be assessed based on actualproduction requirements for the period.

Activity Target 2:Conduct 6,317 NAVAID periodic flight inspections.Due September 30, 2010Activity Target 3:Complete NAVAID de-commissioning inspectionsas requested (TBD). Due September 30, 2010Activity Target 4:Conduct 16 RFI missions. Due September 30,2010Activity Target 5:Conduct 11 post accident inspections. DueSeptember 30, 2010Activity Target 6:Conduct 2,450 original and amended IFPinspections . Due September 30, 2010Activity Target 7:Conduct 3,579 IFP inspections within periodicinterval. Due September 30, 2010Activity Target 8:Conduct 2,057 inspections for DoD. DueSeptember 30, 2010Activity Target 9:Perform aircraft upgrades as required IAW aircraftmaintenance. Due September 30, 2010Activity Target 10:Conduct 50 visual inspections for sectional andterminal area charts. Due September 30, 2010Activity Target 11:Conduct 271 inspections of helicopter IFPs. DueSeptember 30, 2010Activity Target 12:Publish 37 directives; complete 61 training events;100 aircraft check rides; and 40 missionevaluations. Due September 30, 2010

Page 29 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 31: ATO Business Plan 2010

Core Activity: Aircraft RelatedEquipment (ARE); CIP M12.00-00

Activity Target 1:Next Generation Automated Flight InspectionSystem (NAFIS) - Continue development of AFIStech refresh and system upgrade. Due September30, 2010

Aircraft, Avionics, and Flight Inspection SystemsModifications/Upgrades

Activity Target 2:Continue development of the BE-300 navigationalFMS and avionics systems. Due September 30,2010

WAAS procedure.

Core Business Target: <STICandidate> Add 1 procedure forEmergency Medical Services(EMS) operations flying WAAS

Ensure WAAS Service Availability

Core Business Initiative: ProvideWAAS Service

Core Activity: NAS Implementation

Activity Target 1:Provide one (1) WAAS procedure for EMSoperations. Due September 30, 2010

WAAS Procedure

Provide Navigation Services

Core Business Target: <STICandidate> Achieve 90% ofActivity Targets to ProvideNavigation Landing Aids to NASUsers.

The ground based systems along with requiredapproach lighting systems directly impact both systemsafety and capacity at equipped runways by providingprecision approach for aircraft in adverse weatherconditions.

Core Business Initiative: EnsureGround Based and LightingSystems are available for the NAS

Core Activity: Provide MALSR systems

Activity Target 1:Procure and deliver five (5) Medium IntensityApproach Lighting Systems (MALSR). DueSeptember 30, 2010

Provide MALSR systems

Core Activity: Provide ALSF-2 system

Activity Target 1:Provide one (1) High Intensity Approach LightingSystem with Sequenced Flashing Lights (ALSF-2).Due September 30, 2010 Due September 30,2010

Provide ALSF-2 system

Core Activity: Provide REIL systems

Activity Target 1:Provide ten (10) Runway End Identification Lights(REIL). Due September 30, 2010

Provide REIL systems

Core Activity: Provide RVR systems

Activity Target 1:Procure and deliver five (5) Runway Visual Range(RVR) systems. Due September 30, 2010

Provide RVR systems

Core Activity: Provide PAPI systems

Activity Target 1:Procure and deliver five (5) Precision ApproachPath Indicators (PAPI). Due March 31, 2010

Provide PAPI systems

Activity Target 2:Procure and deliver an additional ten (10) for atotal of fifteen (15) Precision Approach PathIndicator. Due September 30, 2010

Core Activity: Attain service for PAPIsystems

Activity Target 1:Attain service availability for five (5) PrecisionApproach Path Indicators (PAPI). Due September30, 2010

Attain service for PAPI systems

Core Activity: Attain service for MALSRsystems

Activity Target 1:Attain service availability for a total of four (4)Medium Intensity Approach Lighting Systems(MALSR) locations. Due September 30, 2010

Attain service for MALSR systems

Core Activity: Attain service for ALSF-2system

Activity Target 1:Attain service availability for one (1) (Establish)ALSF-2. Due September 30, 2010

Attain service for ALSF-2 system

Page 30 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 32: ATO Business Plan 2010

Core Activity: Attain service for REILsystems

Activity Target 1:Attain service availability for a total of ten (10)Runway End Identification Lights (REIL). DueSeptember 30, 2010

Attain service for REIL systems

Core Activity: Initiate RVR projects atadditional runway ends

Activity Target 1:Initiate five (5) Runway Visual Range (RVR)projects at additional runway ends. DueSeptember 30, 2010

Initiate RVR projects at additional runway ends

Core Activity: Provide DME systems

Activity Target 1:Provide twelve (12) (Establish/CommercialAviation Safety Team(CAST)) DME Systems forinstallation. Due June 30, 2010

Provide DME systems

Core Activity: Attain service for DMEsystems

Activity Target 1:Attain service availability for one (1) (Establish/Commercial Aviation Safety Team CAST) DMESystem. Due June 30, 2010

Attain service for DME systems

Activity Target 2:Attain service availability for two (2) additional(Establish/ Commercial Aviation Safety TeamCAST) DME locations for a total of three (3). DueSeptember 30, 2010

Provide Navigation Services

Core Business Initiative: Achieve90% of Activity Targets to ProvideNavigation Landing Aids to NASUsers

Core Activity: Provide NavigationServices

Activity Target 1:Achieve 90% of activity targets to providenavigation landing aids to NAS users. DueSeptember 30, 2010

Provide Navigation Services

In support of the strategic goals of limiting the Category Aand B runway incursions and airborne events, the Officeof Safety Operational Services will conduct initial

Core Business Target: CrewResource Management Training

Crew Resource Management training for controllerpersonnel at twenty Terminal facilities, and oneremaining EnRoute facility during fiscal year 2010. Ouroffice will also conduct follow-up Crew ResourceManagement workshops at twelve facilities whereworkshops have previously been conducted. This trainingis ATC specific and focuses on individuals and teamsidentifying the risks and threats in the operationalenvironment, and applying methods to avoid mistakeswhich can lead to runway incursions and airborne events.

The Federal Aviation Administration (FAA) CrewResource Management (CRM) workshops are ATC-specific, operationally-oriented, and relevant to thedaily operations and safety culture of each facility. Byfocusing on Teamwork, Individual Performance, andThreat and Error Management, CRM principles andmethods are used to identify and eliminate individual,team, and system vulnerabilities, and applycountermeasures to those that remain.

Operational Services will continue assist theoperational lines of business by implementing CrewResource Management through the following methods- Initial Crew Resource Management workshopdelivery; follow-up with facilities where workshopswere held; develop and deliver refresher CrewResource Management briefings; develop and deliverCrew Resource Management course for front linemanagers; and develop a process to measure theeffectiveness of Crew Resource Management.

Core Business Initiative: CrewResource Management Training

Core Activity: Crew ResourceManagement Training

Activity Target 1:Train controllers at ten Terminal facilities and trainCadre instructors for one remaining EnRoutefacility. Interim target of five Terminal facilities byMarch 31, 2010. The remaining facilities will betrained by end of the fiscal year. Due September30, 2010

The Office of Safety's Operational Servicesdirectorate will continue Crew ResourceManagement training to foster a culture of teamworkdesigned to help the controller detect, and correctcontroller and pilot mistakes before they result inLoss of Standard Separation (LoSS) Events orcollisions.

Activity Target 2:Train controllers at ten facilities identified byTerminal Headquarters as requiring specialattention. Due May 31, 2010Activity Target 3:Conduct follow-up Crew Resource Managementworkshops at twelve facilities where workshopshave been previously conducted. Due August 31,2010

Page 31 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 33: ATO Business Plan 2010

Develop one corporate analytical tool to analyzeinformation and feedback within fiscal year

Core Business Target: AnalyzeInformation

Develop tools to analyze information.

Core Business Initiative: QualityStandards

Core Activity: Provide corporatebusiness processes and technicalquality standards.

Activity Target 1:Develop corporate analytical tools Air TrafficService Business Model (ATSBM). DueSeptember 30, 2010

Provide corporate business processes and technicalquality standards.

Activity Target 2:Develop corporate analytical tools for the DataManagement Team (DMT). Due September 30,2010

By 2014, improve the quality of convective weatherforecasts that support aviation strategic planning at 4 and6 hour lead-time by reducing over and under forecastingby 5%, while also increasing the critical success index by4%.

By 2014, improve the quality of icing forecasts to mitigatethe impact of significant icing on aircraft safety byincreasing the volume efficiency by 5%.

Core Business Target: AviationWeather

Conduct research and development prototyping andevaluation of operational improvements in selectedforecasts.

Core Business Initiative: AviationWeather

Core Activity: Operational Suitability

Activity Target 1:Establish Continental United States (CONUS) 0-6hr convective weather forecast demonstration.Due August 31, 2010

Demonstrate the operational suitability of weatherforecast products required by NextGen todesignated users.

Core Activity: Scientific Advances

Activity Target 1:Develop High Ice Water Content (HIWC) prototypealgorithm and provide case study report. DueAugust 31, 2010

Demonstrate the scientific advances required foradvanced weather forecast products required byNextGen.

Activity Target 2:Complete Alaska In-Flight icing analysis capabilityfor FAA test approval. Due August 31, 2010

Operational implementation of the AerospacePerformance Factor for safety is targeted for FY 2010 tobe concurrent with the full implementation of the FederalAviation Administration Air Traffic Organization's SafetyManagement System.

Core Business Target:Aerospace Performance Factor

The Aerospace Performance Factor is a multiyeargraphic presentation of Air Traffic Organization safetybased on multiple safety indicators that have beencombined, weighted, and normalized by total systemoperations. It offers a "Dow Jones Industrial Average"type of presentation of performance whileincorporating "drill down" capability to analyzecausative factors associated with system wide change.

Through both statistical calculation and historicoperational performance, the Aerospace PerformanceFactor offers the establishment of a performance bandassociated with a Tolerable Level of Safety or anAcceptable Level of Risk, whereby trends can beobserved and managed.

Core Business Initiative: SafetyManagement System Tool -Aerospace Performance Factor

Core Activity: Aerospace PerformanceFactor Progression

Activity Target 1:Develop a multi-En Route facility AerospacePerformance Factor to assess feasibility ofexpanding the methodology throughout theNational Airspace System. Due June 1, 2010

Goal of FY 2010 is to develop multi-En Route facilityAerospace Performance Factor, and enhancedatabase source inputs.

Activity Target 2:Enhance database source inputs into theAerospace Performance Factor(s). DueSeptember 30, 2010Activity Target 3:Complete assessment of feasibility of transitioningto a "departure, cruise, approach" phase of flightfor data display. Due September 30, 2010

By the 5th of every month, document and report TechOps runway incursions.

Core Business Target:Document and report Tech OpsRunway Incursions.

Page 32 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 34: ATO Business Plan 2010

Document and analyze runway incursions

Core Business Initiative: Analyzerunway incursions

Core Activity: Ensure a safe and secureNAS

Activity Target 1:Document and report Tech Ops related surfaceincidents and runway incursions. Due September30, 2010

Ensure a safe and secure NAS

Ensure 100% timely review and completion of all SRMD.

Core Business Target: Complywith SRM requirements.

Complete safety risk management activities.

Core Business Initiative: Completerequired SRM activities.

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Continue to establish SMS policy to enableTechnical Operations to realize benefits of asafety organization. Due September 30, 2010

Ensure a safe and secure NAS.

Activity Target 2:Continue to perform assurance activities to learnand improve using corporate experience andperformance. Due September 30, 2010

Implement and track AOV requirement for the ATO tohave a program that provides internal oversight,evaluation, and quality assurance. At a minimum theprogram must include: internal regularly scheduled andno-notice inspections, evaluating recommended safetycontrols and residual risk, and a process for AOVinclusion, and report status quarterly.

Core Business Target: ApplySafety Risk management (SRM)discipline to the NASconfiguration control process.

Analyze all NAS Changes Proposal (NCPs) to ensurethere are acceptable levels of risk prior to configurationcontrol decision.

Core Business Initiative: AnalyzeNAS Changes for Levels of Risk

Core Activity: Analyze Risk Assessment

Activity Target 1:Ensure SRM documentation (SRMD or SRMDM)is submitted with all NCPs. Due September 30,2010. Due September 30, 2010

Analyze Risk Assessment

Activity Target 2:Conduct Internal Safety Assurance Program(ISAP) audit to assess the establishment of asafety culture. Due September 30, 2010

Pursue a safe and learning culture by distributing safetyinformation.

Core Business Target: Pursue asafe & learning culture.

Through communication pursue a safe and learningculture.

Core Business Initiative: Promotecommunication.

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Actively pursue a safety and learning culture thatpromotes communication and dissemination ofsafety information and proactively manageshuman performances. Due September 30, 2010

Ensure a safe and secure NAS.

Develop and track all safety issues (e.g., risk hazarddatabase), with a yearly commitment to address or fix thetop five of those issues. The first five will be identifiedand reported out at the end of fiscal year 2010.

Core Business Target: ATO Non-Punitive Safety ReportingSystem

As part of the Administrator's Call-to-Action on surfacesafety held during August 2007, it was recommended(and accepted by the Administrator) that the Air TrafficOrganization implement a voluntary reporting systemof safety related events from controllers and otheremployees providing air traffic services.

Core Business Initiative: VoluntarySafety Reporting - Air Traffic SafetyAction Program (ATSAP)

Core Activity: Continue Air TrafficSafety Action Program Implementation

Activity Target 1:Implement Air Traffic Safety Action Program for100% of all currently assigned air traffic control

The Office of Safety continues to implement avoluntary reporting system of safety related eventsfrom controllers and other employees providing airtraffic services.

Page 33 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 35: ATO Business Plan 2010

specialists by the end of second quarter FY 2010.Due March 31, 2010Activity Target 2:Complete initial Air Traffic Safety Action Programtraining to all current air traffic control personnelduring FY 2010, and continue orientation trainingfor new personnel. Due September 30, 2010Activity Target 3:Refine communications strategies andproducts/methods used to distribute systemicsafety issues discovered through the Air TrafficSafety Action Program process to the FederalAviation Administration and all air traffic controlpersonnel. Due September 30, 2010

Complete 95% of Obstacle Evaluations (OE) within 15working days from receipt.The production amounts listed in the Activity Targetsrepresent historical averages. FY10 performance will beassessed based on actual production requirements forthe period.

Core Business Target: <STICandidate> ObstacleEvaluations (OE)

Implement business process re-engineering initiativesas defined within the High Performing Organization(HPO) Plan to achieve efficiency gains and improvequality within the design, development, charting andmaintenance of instrument flight procedures (IFPs);plan/direct the construction, maintenance andpublication of aeronautical charts/publications and thecollection and verification of aeronautical data.

Core Business Initiative: NationalAeronautical Navigation Services

Core Activity: Obstacle Evaluations(OE)

Activity Target 1:Complete 55,300 obstacle evaluations. DueSeptember 30, 2010

.

Issue 80% Notice to Airmen (NOTAMs) for unscheduledfacility outages within the first hour of notification andissue 100% within two hours of notification.

Core Business Target: <STICandidate> Notice to Airmen(NOTAMs) for unscheduledfacility outages

Implement business process re-engineering initiativesas defined within the High Performing Organization(HPO) Plan to achieve efficiency gains and improvequality within the design, development, charting and

Core Business Initiative: NationalAeronautical Navigation Services

maintenance of instrument flight procedures (IFPs);plan/direct the construction, maintenance andpublication of aeronautical charts/publications and thecollection and verification of aeronautical data.

Core Activity: Notice to Airmen(NOTAMs)

Activity Target 1:Issue 31,500 NOTAMs. Due September 30, 2010

The production amounts listed in the Activity Targetsrepresent historical averages. FY10 performancewill be assessed based on actual productionrequirements for the period.

Modify our processes for evaluations and safety audits toreduce operational errors.

Core Business Target:Operational Errors Processes

Continue incorporating the evaluation and auditprocess with air traffic incident investigations processto facilitate identification of mitigations.

Core Business Initiative:Operational Errors Evaluations andInvestigations Processes

Core Activity: Continual Improvementsin Evaluation and InvestigationProcesses

Activity Target 1:Conduct specialized assessments at six EnRoutefacilities, Large/Combined Terminal RadarApproach Control (TRACON) facilities, or OEP-35Airport Traffic Control Towers. Due September 30,2010

Modify our processes for evaluations andinvestigations to reduce operational errors.

Activity Target 2:Conduct six specialized assessment of technicaloperations on the National Airspace SystemTechnical Evaluation Program. Due September 30,2010Activity Target 3:Conduct onsite investigations of serious trends,incidents and accidents as needed; minimum 12per year. Due September 30, 2010

Work towards implementing a voluntary safety reportingsystem in the Air Traffic Organization TechnicalOperations Service Unit

Core Business Target: ATOVoluntary Safety ReportingSystem

Core Business Initiative: VoluntarySafety Reporting SystemNegotiations

Page 34 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 36: ATO Business Plan 2010

As part of the Administrator's Call-to-Action on surfacesafety held during August 2007, it was recommended(and accepted by the Administrator) that the Air TrafficOrganization (ATO) implement a voluntary reportingsystem of safety related events from employeesproviding air traffic services.

Core Activity: Continue the VoluntaryReporting System ProgramImplementation

Activity Target 1:Initiate Formal negotiations with PASS and FAA(ATO and AOV) regarding establishment of avoluntary reporting system agreement by the endof the second quarter of fiscal year 2010. DueMarch 31, 2010

Technical employees of the ATO that activelyoperate, maintain, and certify the systems andequipment of the National Airspace System (NAS)will implement a voluntary reporting system forsafety related events.

Activity Target 2:Draft a Memorandum of Agreement (MOA) thatidentifies items of agreement and remaining issuestowards completion of an MOA by the end of fiscalyear 2010 Due September 30, 2010

Coordinate and leverage the employee safetyperformance activities within 100% of the Air TrafficOrganization's lines of business by the end of fiscal year2010.

Core Business Target: EmployeeSafety Performance

The role of the Office of Safety Employee SafetyPerformance office is to improve and leverageemployee safety performance activities within the AirTraffic Organization. Our goal is to ensure that alllines of business provide a baseline level of training toall Air Traffic Organization employees on a regularbasis. Employee safety performance is measuredthrough the tracking of safety training completions.Then, performance of the practices taught willdemonstrate that the employees comprehend thepractices. This will lead to a safer workingenvironment for all employees. We will also improveemployee safety performance by conducting safetyinspections. The Workplace Inspection Tool capturesinspections. This information can then be used totrack the safety performance of management inproviding a workplace free from recognized hazards.Federal Aviation Administration and OccupationalSafety and Health Administration policy require theinspections. Employee Safety Program ManagementEvaluations have revealed that Supervisors andManagers do have employee safety as a performancemeasure. The next step is to document the workplace

Core Business Initiative: Air TrafficOrganization Employee SafetyAwareness

safety inspection as completed or incomplete in thesupervisor's performance plan documentation.Examining selected inspection reports is a measure ofthe compliance with this Occupational Safety andHealth Administration and FAA requirement.Additionally, we will ensure employee safetyperformance is measured by accurate documentationof injury and illness and hazard reporting in the SafetyManagement Information System. Information fromthis Safety Management Information System databaseis captured and used to validate that injuries arereported and investigated, and that hazards arereported and abated. It is also our responsibility tofollow the Federal Aviation Administration EmployeeSafety Management Evaluation criteria which requiresmanagement to communicate Employee SafetyAwareness messages to employees annually. Asimple examination of the documentation of thiscommunication demonstrates to employees thatmanagement cares about their workplace safety. Allresulting data is reported in the Air TrafficOrganization, Federal Aviation Administration andDepartment of Transportation Annual OccupationalSafety and Health Report to the President of theUnited States through the Department of Labor.

Core Activity: Employee SafetyParticipation

Activity Target 1:Measure and report 100% employee safetytraining completions in the Electronic LearningManagement System. Interim status reports to beprovided to Director of Safety Programs no laterthan the last day of each quarter. Due September30, 2010

Increase employee performance of safety practicesin the Air Traffic Organization.

Activity Target 2:Assess 20% of the workplace inspection trends inWorkplace Inspection Tool. Status report due toDirector of Safety Programs by June 30, 2010.Due September 30, 2010Activity Target 3:Assess 90% of the injury and illness and hazardUnsatisfactory Conditions Report trends in SafetyManagement Information System. Interim statusreports to be provided to Director of SafetyPrograms no later than the last day of eachquarter. Due September 30, 2010Activity Target 4:Assess 100% of management safetycommunications sent to employees and reporttwice annually. First report due no later than April30, 2010. Remaining report due by the end of thefiscal year. Due September 30, 2010

Core Activity: Employee SafetyImplement programs to improve employee safetyculture and to measure workforce actions based onemployee performance of Occupational SafetyHealth policy, practices, and training.

Page 35 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 37: ATO Business Plan 2010

Activity Target 1:Conduct one survey to measure employee safetyperformance. This is done by promoting andcapturing evidence of safe work practices in atleast 20 supervisors' performance assessments.This is followed up by coordinating with the AirTraffic Organization lines of business to makesure that at least two employees and at least twoprogram offices are awarded for exhibiting safework practices. Supervisors' survey is to beconducted by April 30, 2010. Air TrafficOrganization line of business survey is to becompleted by the end of the fiscal year. DueSeptember 30, 2010Activity Target 2:Begin the application process for the VoluntaryProtection Program. A template will be completedby the end of the fiscal year. Due September 30,2010

In fiscal year 2010, provide foundational awareness offatigue risk to two Air Traffic Organization operationalservice units through informational or educationalexposures.

Core Business Target: Air TrafficOrganization Fatigue RiskManagement Program

The role of the Fatigue Risk Management Program isto identify and prioritize operational risks due tofatigue, assist in developing education and trainingefforts regarding fatigue risk, and collaborate closelywith all Service Units, labor organizations and thefatigue science community. This collaboration willtranslate into developing and improving practices andpolicies that positively effect operational performanceand safety through reducing fatigue risk in the AirTraffic Organization work place. Program goals will bepursued through (1) focused information gathering andfatigue research studies to obtain operationallyrelevant data, (2) collaborative assessment andapplication of that data into improved fatigue safetymeans and methods within a Fatigue RiskManagement System to be executed by Service Units,and (3) provision of fatigue safety information to the AirTraffic Organization work force through activecommunications and a properly focused and layerededucation/training program. Fatigue Risk ManagementSystems will also be addressed as a focus topic of the2010 Air Traffic Organization Safety Summit. Goalattainment will be further enabled by activecollaboration in the evolution of a robust and pervasiveSafety Culture.

Core Business Initiative: Air TrafficOrganization Fatigue RiskManagement Program

Core Activity: Fatigue Safety Awareness

Activity Target 1:Develop and coordinate Fatigue Risk awarenesseducation and training plan for operationalemployees and management. Initial Report dueJune 30, 2010. Final implementation plan reportdue end of the fiscal year. Due September 30,2010

Increase fatigue risk awareness throughout the AirTraffic Organization.

Activity Target 2:Develop and coordinate Fatigue Riskcommunication plan to provide for all Air TrafficOrganization operational employees andmanagement. Initial report due June 30, 2010.Final implementation plan report due end of thefiscal year. Due September 30, 2010

Core Activity: Fatigue Risk DataCollection

Activity Target 1:Incorporate Fatigue Risk reports into current AirTraffic Organization safety reporting vehicles.Initial report due June 30, 2010. Final report dueend of the fiscal year. Due September 30, 2010

Implement programs to increase content of fatiguerisk event information and fatigue safetyrecommendations into current and future Air TrafficOrganization safety reporting systems.

Activity Target 2:Draft new fatigue risk information reportingvehicle(s) proposal, as required. Due August 15,

Core Activity: Fatigue Risk ManagementSystem

Activity Target 1:Develop initial draft of a Fatigue Risk ManagementSystem for Controller and Tech Ops work force.Due September 15, 2010

Collaborate with all Air Traffic Organizationstakeholders to develop a draft design of a FatigueRisk Mitigation System and implementationtimetable, and develop Fatigue Risk portion of the2010 Air Traffic Organization Safety Summit.

Activity Target 2:Develop Fatigue Risk Management Systemsegment of the 2010 Air Traffic OrganizationSafety Summit. Draft agenda due January 31,2010. Final event plan due end of the secondquarter. Due March 31, 2010

Conduct research and deliver aircraft safety researchproducts that support FAA strategic goals, AVS missionneeds, identified threats to aviation safety, introduction or

Core Business Target: ConductAircraft Safety Research andDevelopment

Page 36 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 38: ATO Business Plan 2010

application of new technologies, maintain in-house corecompetencies and FAA unique safety laboratories. TheAircraft Safety Research program focus areas are fire,propulsion and fuel, airworthiness assurance, systemsafety, advanced materials, atmospheric hazards,software and digital systems, unmanned aircraft andcatastrophic failure prevention. 100% of commentsreceived from the research sponsors and the ResearchEngineering Development Advisory Committee (REDAC)will be reviewed and reconciled for incorporation into theaircraft safety Research and Development (R&D) plan.

Conduct research and deliver aircraft-safety researchproducts that support FAA strategic goals, AVSmission needs, identified threats to aviation safety,introduction or application of new technologies, andmaintain in-house core competencies.

Core Business Initiative: DeliverAircraft Safety Research Products

Core Activity: Aircraft Safety Researchand Development Plan

Activity Target 1:Develop FY2011 Aircraft Safety R&D plan incoordination with sponsor (AVS) and REDACSubcommittee on Aircraft Safety. Due August 31,2010

Formulate and execute an aircraft safety R&D plan.Plans are developed, implemented and executedthroughout the two year budget cycle resulting incurrent and near term milestones being reported andupdated in the National Aviation Research Plan(NARP).

Activity Target 2:Complete execution of FY2010 Aircraft SafetyR&D plan and report milestone accomplishments.Due September 30, 2010

Provide Laboratory Services for Airport and AircraftSafety Research to develop technologies and testmethods that prevent accidents caused by fire, fueltank explosions and fuel compatibility. Conductlaboratory based research, engineering, anddevelopment that support FAA strategic goals, AVSand ARP mission needs, identified threats to aviationsafety, and introduction or application of newtechnologies.

Core Business Initiative: ConductLaboratory Based Applied Research

Core Activity: Fire Safety Laboratories

Activity Target 1:Conduct three full scale fire tests with magnesium

Conduct full and small scale fire tests to developnew flammability tests for aircraft materials inapplications where regulatory requirements arecurrently nonexistent. In addition, conductflammability tests and analyses in support ofTransport Airplane Directorate (TAD) initiative PolicyStatement on Flammability Testing of InteriorMaterials.

alloy seat structure to determine if this applicationof new metallic alloys would impact post crash firesurvivability. Due July 30, 2010Activity Target 2:Develop a flammability test method that measuresthe in-flight fire resistance of composite fuselagematerials. Draft report due to sponsor bySeptember 30, 2010. Due September 30, 2010

Core Activity: Aviation Fuels Laboratory

Activity Target 1:Initiate jet fuel analysis study on aircraft that haveflown polar routes. Start sample collection byDecember 31, 2009. Due December 31, 2009

Develop a multi-year program plan for alternativefuel research.

Activity Target 2:Develop a multi-year program plan to addressalternative fuels research for General Aviationaircraft. Draft report due to sponsor by September30, 2010. Due September 30, 2010

By the end of FY 2009, reduce accidents in Alaska forgeneral aviation and all Part 135 operations from the2000-2002 average of 130 accidents per year to no morethan 99 accidents per year. This measure will beconverted from a number to a rate at the beginning of FY2010. FY 2010 Target: 1.86

Core Business Target: AlaskaAccidents

Implement ADS-B across Alaska. Based on an AlaskaAviation Industry Memorandum of Agreement (MOA),efforts will include expansion of ADS-B to remoteareas and weather and communicationsimprovements.

Core Business Initiative: ImplementAutomatic Dependent Surveillance -Broadcast (ADS-B) across Alaska.

Core Activity: Continue Deployment ofSurveillance and Broadcast Services(SBS) at Key Alaska Sites

Activity Target 1:Complete Initial Operating Capability (IOC) atJuneau. Due April 30, 2010

Continue deployment of Surveillance and BroadcastServices (SBS) at key Alaska sites in support ofexpanding and accelerating the implementation ofsafety and air navigation improvement programs inAlaska.

Provide program management for capital acquisitionsaimed at increasing safety.

Core Business Target: ProvideWeather Products

Page 37 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 39: ATO Business Plan 2010

Provide program management for capital acquisitionsaimed at increasing safety. These investments forFY2010 include Terminal Doppler Weather System(TDWR) Service Life Extension Program (SLEP).

Core Business Initiative: TerminalDoppler Weather Radar (TDWR)Service Life Extension Program(SLEP)

Core Activity: TDWR Elevation DriveEnhancement modification.

Activity Target 1:Install the TDWR Elevation Drive Enhancementmodification at one (1) site. Due June 30, 2010

Install the TDWR Elevation Drive Enhancementmodification at two (2) sites.

Activity Target 2:Install the TDWR Elevation Drive Enhancementmodification at one (1) additional site. DueSeptember 30, 2010

Provide program management for capital acquisitionsaimed at increasing safety. These investments forFY2010 include the Juneau Airport Weather System(JAWS) -- Hardening and Implementation.

Core Business Initiative: JuneauAirport Wind System (JAWS) -Harden Prototype & Implementation

Core Activity: Juneau Airport WeatherSystem (JAWS) -- Hardening andImplementation.

Activity Target 1:Conduct JAWS Hybrid (JAWS-H) Hardware FieldShakedown Test. Due June 30, 2010

Provide program management for capitalacquisitions aimed at increasing safety. Theseinvestments for FY2010 include the Juneau AirportWeather System (JAWS) -- Hardening andImplementation.

Activity Target 2:Perform JAWS-Hybrid Front End-to-EndFunctional Test for Data Stream. Due September30, 2010

Provide program management for capital acquisitionsaimed at increasing safety to include NextGen-wideInvestment Analysis (IA) decision documentation toaddress wind shear service needs, concepts andalternatives. Assist AJP to prepare ConceptRequirements Definition (CRD) and preliminaryInvestment Analysis documents in FY 2010 in supportof Initial Analysis Readiness Decision (IARD) forWSDS for Work Package 1 (WP1).

Core Business Initiative: WindShear Detection Service (WSDS)

Core Activity: WSDS Work Package 1

Activity Target 1:Draft OMB Exhibit 300 Attachment 1 for WSDSWork Package 1. Due September 30, 2010

Assist AJP to prepare Concept RequirementsDefinition (CRD) and preliminary InvestmentAnalysis documents in FY 2010 in support of InitialAnalysis Readiness Decision (IARD) for WSDS forWork Package 1 (WP1).

Greater CapacityAmerica's airports are the access point for the Nation to theair transportation network. We must preserve and improveour airports -- both commercial and general aviation -- inorder to prepare for the future and maintain our leadingrole.

Over the last several years, we've made significant stridesto add capacity to the aviation system. Since 2000, 13 newrunways have opened and the numbers tell the story. Withjust 20 miles of concrete, we've added the potential toaccommodate 1.6 million more annual operations anddecrease delay per operation by about five minutes. Withroughly 5,000 aircraft in the sky at any given time, fiveminutes adds up to quite a bit of fuel and a considerableamount of time saved. . In November 2008, FAA willcommission three new runways at three major airports, allon the same day, an event that has never happenedbefore.

Even with these new runways, the capacity of the systemcontinues to be stretched beyond its limits at certainairports and regions. The associated delays are placing astrain on everyone. The FAA must immediately takeextraordinary steps to reverse this trend at these keyairports in the system.

Although FAA and airports have made progress addingcapacity, there are still areas where a sense of urgencyremains. Delays affect everyone. Passengers deal withmissed or canceled flights, lost productivity, not to mentionthe potential for sitting on the tarmac instead of sitting on abeach while vacationing. Beyond this, airlines incurincreased costs for crews, fuel, and maintenance whileplanes sit idling on the airfield surface or circling in holdingpatterns. The U.S. economy suffers both direct andindirect costs from aviation delay as lodging, food service,retail, ground transportation, and other industries areimpacted. Additionally, the environmental impacts continueto mount as aircraft burn more fuel or have to return to thedeicing pads due to delayed departure times.

A few U.S. airports are experiencing significant levels ofcongestion that produce delays locally as well asnationally. Many of these delays result from a persistentmismatch between the demand for and the availability ofcapacity. Given that infrastructure developments such asnew runways can take up to 10 years to implement, theFAA must develop processes and systems to speed

Page 38 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 40: ATO Business Plan 2010

intervention at critical and chronic delay points.

To meet this challenge, we must enhance the partnershipwith the airport operators and airport users to continue todevelop action plans that provide solutions to ensure thebest fit on local and regional levels. Each airport, eachlocal community, each local environment, each geographicregion must play into the solution set, with the specific toolsets identified and implemented appropriately. What worksat one location may not work at another for a variety ofreasons.

FAA recognizes the need to identify and prioritize delayissues, and is implementing a team approach to do this forthe chronic delay airports. FAA is creating congestionaction teams to help alleviate and manage specific capacityissues at the airports that create the greatest impact on thesystem. For the longer-term solutions, FAA prefers anintegrated approach to improve capacity by improvingtechnology, air traffic control procedures and expandingairport and airfield infrastructure. In circumstances whereoperational efficiency and airport capacity expansion is notfeasible or not yet completed, where demand routinelyexceeds airport capacity, and where local delaysreverberate through the NAS, a congestion managementapproach may be the appropriate choice, includingschedule reduction. But it is important to recognize thatthere is no one-size-fits-all in applying strategic mitigationor congestion management.

Top GREATER CAPACITY Accomplishments for FY 2008

Adjusted Operational Availability. The FAA achieved asustained adjusted operational availability of 99.8 percentfor the reportable facilities that support the 35 OperationalEvolution Partnership (OEP) airports. This measurecannot obtain a 100 percent Adjusted OperationalAvailability rate because of the requirements to performformal facility inspections, periodic maintenance andcorrective maintenance on the operational equipmentlocated at the 35 OEP airports.

Average Daily Airport Capacity. We achieved the target ofan average daily airport capacity for the 35 OEP airports of101,868 arrivals and departures per day, and an averagedaily airport capacity for the 7 Metro areas of at least33,676 arrivals and departures per day. We are continuallyworking to maximize available capacity in the NAS to keepup with demand and better serve the flying public.

Area Navigation (RNAV) Procedures and Routes. Thus farin FY 2008, we implemented 63 RNAV Standard TerminalArrival (STAR) and Standard Instrument Departure (SID)procedures at 45 airports, with 15 more proceduresscheduled for publication in September, 2008. RNAV issaving operators millions of dollars per year by loweringfuel consumption due to more efficient routes, whilesimultaneously improving safety, environmental impacts,and user access to the NAS.

Wake Turbulence Program. The Wake Turbulence

Program had two major accomplishments for FY 2008: thedevelopment of a draft National Air Traffic Rule Changeand the Wake Turbulence Mitigation for Departures(WTMD) decision support tool. The National Rule changeallows the use of a dependent parallel instrument landingsystem aircraft approaches to an airport's closely spacedparallel runways. The development of the WTMD air trafficcontrol decision support tool design and functionalrequirements were sufficiently mature to enter intopreparation for the tool's procurement for up to 10 of the 35OEP airports.

Air Traffic Management (ATM). In an effort to reducedelays, ATM, working collaboratively with the aviationcommunity, has made airspace more available duringperiods of bad weather by use of the Airspace FlowProgram (AFP). We estimate that since installation in 2006,ATM efforts during periods of bad weather have savedairlines over $120 million in fuel and operations costs.

Future Airport Capacity Team (FACT). FAA is teamingwith external stakeholders to identify and address capacity-constrained airports and metropolitan areas. This teamhas identified critical high activity airports in the NAS andperformed site visits to the following airports: Atlanta,Chicago Midway, Fort Lauderdale, John Wayne, LasVegas, Long Beach, Oakland, Phoenix, San Diego andSan Francisco. The team has also developed a toolbox ofpotential solutions for each unique location. This toolboxincludes technological, procedural, and infrastructureimprovements to be considered for implementation at theidentified airports based on additional capacity needs in thefuture.

Airport Studies. Eleven projects are in the planning orenvironmental stage at the largest airports including anenvironmental assessment for a proposed runwayextension at Portland, an environmental impact statementfor a proposed runway extension at Ft. Lauderdale, anenvironmental impact statement for a proposed airfieldreconfiguration at Philadelphia, and an environmentalimpact statement for a new supplemental commercialservice airport for Las Vegas. In addition, threecommunities have planning studies underway to examinehow their metropolitan areas will accommodate futuredemand for aviation. They include Chicago, Atlanta andSan Francisco.

Continuous Descent Arrival (CDA) at Los AngelesInternational Airport. The first publicly-charted arrivalprocedure with the vertical profile optimized to permit CDAwas implemented at Los Angeles International Airport onDecember 20, 2007. Procedures with an Optimized ProfileDescent (OPD) allow use of the CDA technique to providelower noise and emissions and increased fuel efficiency.FAA implemented two OPD arrival procedures at LosAngeles. Use of the CDA technique provides advantagesby reducing ground noise along much of the flight path,reducing emissions, and saving time and fuel.

Page 39 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 41: ATO Business Plan 2010

Flight Plan Target: Average DailyAirport Capacity (35 OEPAirports)Achieve an average daily airport capacity for the 35 OEPairports of 103,068 arrivals and departures per day by FY2011 and maintain through FY 2013. FY 2010 Target:102,648

Redesign terminal airspace and change procedures toincrease capacity.

Strategic Initiative: TerminalAirspace Redesign

Strategic Activity: New York/NewJersey/Philadelphia MetropolitanAirspace Project.

Activity Target 1:Complete procedures development, safetyanalysis and training for Stage 2 of the NewYork/New Jersey/Philadelphia MetropolitanAirspace project. Due September 30, 2010

Redesign airspace serving New York andPhiladelphia metropolitan areas, supporting sevenkey airports.

Strategic Activity: Chicago AirspaceProject

Activity Target 1:Complete procedures development and safetyanalysis for departure portion of Stage 3 ofChicago Airspace Project. Due September 30,2010

Redesign airspace serving Chicago metropolitanarea, supporting two key airports, includingaccommodating the future airfield changes at O'HareInternational Airport.

Strategic Activity: Houston Area AirTraffic System Airspace Project

Activity Target 1:Implement Phase 3C of Houston Area Air TrafficSystem Airspace Project. Due September 30,2010

Redesign airspace in Houston metropolitan area,supporting two key airports.

Strategic Activity: Western Corridor -Southern Nevada Airspace

Activity Target 1:Complete environmental and safety analysesrequired for implementation of the Las VegasOptimization proposal. Due September 30, 2010

Redesign airspace in southern Nevada to provideshort-term operational efficiencies andaccommodate the potential future new airport.

Strategic Activity: Emergingmetropolitan airspace projects

Activity Target 1:Complete airspace redesign scoping, initialbusiness cases and other preliminary reports forfour metropolitan areas. Due September 30, 2010

Redesign airspace in other key metropolitan areas,including Charlotte, Dallas, Denver, and SouthernCalifornia.

Implement the roadmap for performance-basednavigation by the continued development andimplementation of Area Navigation (RNAV) routes,Standard Instrument Departures (SIDs), and StandardTerminal Arrivals (STARs). In FY 2009 through 2013,we will publish 50 RNAV SIDs and STARs and 12RNAV routes annually.

Strategic Initiative: RNAV Routes,SIDs, and STARs

Strategic Activity: Develop andImplement RNAV SIDs and STARProcedures

Activity Target 1:Publish 20 RNAV SID/STAR procedures by5/31/10. Due May 31, 2010

Develop and implement RNAV SID and STARprocedures. Implement the performance-basednavigation roadmap by continuing development andimplementation of Area Navigation (RNAV) routes,standard instrument departures (SIDs) and standardterminal arrivals (STARs).

Activity Target 2:Publish (an additional) 30 RNAV SID/STARprocedures. Due September 30, 2010

Strategic Activity: Develop andImplement RNAV Routes

Activity Target 1:Implement at least 3 routes. Due June 30, 2010

Continue to implement RNAV routes (Q routes,Tango routes, and GPS MEAs) in support ofAirspace Management Program and Industryrequests.

Activity Target 2:Implement at least (an additional) 9 routes. DueSeptember 30, 2010

Strategic Activity: Support AJR Developand Implement RNAV Routes

Activity Target 1:Develop procedures, conduct flight checks, andprepare publications for at least 12 routes. DueSeptember 30, 2010

Continue to implement RNAV routes (Q-routes,Tango routes, and GPS MEAs) in support ofAirspace Management Program and Industryrequests.

Page 40 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 42: ATO Business Plan 2010

Activity Target 2:Develop procedures, conduct flight checks, andprepare publications for at least 50 RNAVSIDs/STARS. Due September 30, 2010

Capitalize on Spring/Summer Plan data, developed inpartnership with the airlines and other segments ofaviation, to improve traffic flow in bad weather.

Strategic Initiative: Bad WeatherTraffic Flow

Strategic Activity: Corridor IntegratedWeather System (CIWS)

Activity Target 1:Maintain the CIWS prototype service availability.Due September 30, 2010

The Corridor Integrated Weather System (CIWS)project provides advanced weather productgeneration to help air traffic users reduce convectiveweather delays. CIWS provides national, en route,and terminal air traffic flow managers (TFM) andairline system operation centers (SOC) personnelwith accurate, automated, rapidly updated weatherinformation as well as weather products forintegrated weather-Air Traffic Management (ATM)system (Wx-ATM) to support the weather-assimilated decision making envisioned forNextGen. These weather products include stormlocations, radar measured storm tops, and two-hourstorm forecasts including storm growth and decay.

Increase airport capacity through the use of TrafficManagement Advisor (TMA).

Strategic Initiative: TrafficManagement Advisor

Strategic Activity: Transition toTrajectory Based Flow Management(TBFM), an enhancement to TrafficManagement Advisor (TMA)

Activity Target 1:Brief JRC for a Final Investment Decision (JRC-2B). Due January 31, 2010

Receive formal authority to proceed with TBFMenhancements.

Activity Target 2:Award TMA follow-on enhancements contract. DueMay 31, 2010

Conduct research to improve safety and increasethroughput using wake turbulence monitoring,operational procedures, and controller tools.

Strategic Initiative: Arrival andDeparture Rates

Strategic Activity: Wake Re-Cat (Re-Categorization) for Separation Standards( ATO-R lead)Lead in the domestic and international work groupslooking at alternative sets of aircraft wake classes

Activity Target 1:Develop requirements for changes in US AirTraffic control automation systems to support theselected alternative set of wake separationstandards. Due August 31, 2010

and associated static wake separation standardsthat the international aviation community will adopt.Arrange adequate resources for the analysis,modeling and data collection necessary to developthe recommendation for the alternative set ofstandards. Coordinate recommended alternate set ofstandards with air traffic operations of the ATOservice units. Serves as the FAA spokesperson inwake separation standard discussions with ICAO.

Strategic Activity: WTMA - WakeTurbulence Mitigation for Arrivals ATO-RLead

Activity Target 1:Deliver WTMA feasibility prototype systemoperating in "Shadow Mode" in an airportenvironment. Due August 31, 2010

WTMA: Lead the WTMA development activity andprovide linkage into the operational proceduresdevelopment organizations of AJR, T and E. Providerange of feasible alternatives that potentially could --with technology added -- provide the desiredcapability for CSPR airports. Evaluate and providefeedback on potential WTMA designs.

Strategic Activity: Wake Re-Cat (Re-Categorization) for Separation StandardsATO-P support

Activity Target 1:Develop requirements for changes in US air trafficcontrol automation systems to support theselected alternative set of wake separationstandards. Due September 30, 2010

AJP will take on the technical coordination needed tomeet the goals identified at each Wake Re-Cat workgroupmeeting. AJP will assign tasks to personnel withinFAA and Volpe, through informal matrixmanagement agreements, variousAJP and Volpe contract vehicles, and supportingcontract organizations.

Activity Target 2:Coordinate initial set of wake categories andassociated separation minima, safety argumentsand benefit estimations with at least onestakeholder. Due June 30, 2010

Strategic Activity: WTMA - WakeTurbulence Mitigation for Arrivals - ATO-P SupportWTMA: AJP will provide the technical andcontractual management necessary to supportdevelopment of concept alternatives for providingthe WTMA capability, to perform the benefits andsafety alternatives analysis, and to build a feasibility

Page 41 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 43: ATO Business Plan 2010

Activity Target 1:Deliver WTMA feasibility prototype systemoperating in "Shadow Mode" in an airportenvironment. Due August 31, 2010

prototype of the most promising WTMA capabilityalternative. AJP will also conduct a preliminaryhazards analysis of the chosen WTMA conceptalternative.

Strategic Activity: Wake Re-Cat(Recategorization) for SeparationStandards ATO-T support

Activity Target 1:Assess progress for Reviewing and commentingon Wake Recategorization Safety RiskManagement Document. Due March 31, 2010

Recategorization (Re-Cat) : AJT will participate asrequired in the Wake Re-Cat work sessions. InFY2010, AJT will review and comment on the SafetyRisk Management Document (SRMD) for therecommended wake separation standard changesand assist in the development of requirements forchanges in terminal automation systems to supportthe selected alternative set of wake separationstandards.

Activity Target 2:Review and comment on Wake RecategorizationSafety Risk Management Document. Due July 22,2010

Strategic Activity: WTMA - WakeTurbulence Mitigation for Arrivals - ATO-T Support

Activity Target 1:Assess progress to achieve assessment of WTMAfeasibility prototype system operating in "ShadowMode" in an airport environment and assistance inearly investment analysis and acquisitionplanning. Due March 31, 2010

WTMA: In FY2010, AJT will assist AJP and AJR infielding the WTMA feasibility prototype in an airportenvironment for shadow mode evaluation. AJT willassist in the shadow mode evaluation.

Activity Target 2:Support assessment of WTMA feasibility prototypesystem operating in "Shadow Mode" in an airportenvironment and provide assistance in earlyinvestment analysis and acquisition planning. DueSeptember 30, 2010

Identify and implement procedures and technology toimprove the dissemination of weather information topilots and controllers.

Strategic Initiative: AutomatedWeather Dissemination

Strategic Activity: Integrated TerminalWeather System (ITWS) Service DeliveryIntegrated Terminal Weather System (ITWS) iscompleting deployment at thirty-three host,Operational Evolution Plan (OEP), Terminal RadarApproach Control (TRACON) facilities. ITWS is aweather processor and display that will evolvethrough the NextGen / Reduce Weather Impactsolution set. ITWS further disseminates weatherdata supporting the NextGen Network EnabledWeather (NNEW) solution set. ITWS gathers longrange NEXRAD weather products, Terminal DopplerWeather Radar (TDWR) data, Airport SurveillanceRadar (ASR) "weather channel" information, surfacesensor observations, non-FAA weather productssuch as lightning, and National Weather Service(NWS) forecast model products. ITWS providesaviation users with a seamless one-hour terminalconvective weather forecast, current observations,and hazard alerts using the best available weatherproducts relative to each user's location. ITWScoordinates weather hazard situation awarenessamong many types of users including ATC Towercontrollers and supervisors, TRACON controllers,ARTCC traffic flow management coordinators, andCenter Weather Service Units, the nationalATCSCC, and also serves over one thousandcommercial airline dispatch terminals. ITWS tailoredaviation weather products directly improve approach/ departure capacity, runway usage, safety ofterminal operations, efficient decision-making acrossdomains and satisfies operationally essentialweather hazard information needed to conduct safeOEP terminal operations. ITWS Program Segment 2- Deployment In support of 10C1L, ITWS ProgramSegment 2 host sites will be readied for new servicedelivery. Also advance work for ITWS ProgramSegment 3 expansion of service at commissionedhost sites to serve new OEP Secondary / RelieverAirports (SRA) will commence as Segment 2 windsdown. ITWS Segment 2 activity milestones includeContract Acceptance and Inspection (CAI) andachieving Initial Operational Capability (IOC). ITWSProgram Segment 3 -- SRA Expansion -- In supportof 11C1L, ITWS Program Segment 3 providesexpansion of service availability from commissionedhost sites to serve new OEP Secondary / RelieverAirports (SRA). ITWS Segment 3 Activity milestonesprovide new service availability at select OEP SRAATC Towers in concert with commissioned OEPprimary airport host reconfiguration. SRA serviceavailability is especially needed when hazardousweather closes OEP primary runways demandingsafe divert options for inbound aircraft be quicklygrasped across traffic managers, approachcontrollers and local controllers at secondary towers.In 2010, the final ITWS Program Segment 2 sites willbe readied for new service delivery. This includesContract Acceptance Inspection (CAI) activities atsome sites during which ITWS hosts will be

Page 42 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 44: ATO Business Plan 2010

Activity Target 1:Achieve Equipment Delivery to one (1) ITWS site.Due February 28, 2010

delivered, installed and checked-out on site. Insupport of achieving CAI at each site the ITWSProgram Office will authorize the shipment of anITWS system to each site and insure all sitepreparation, system installation and check-out,acceptance testing and all other acceptanceactivities have been completed at those sites. SomeITWS hosts will also achieve Initial OperationalCapability (IOC). In support of achieving IOC at eachsite the ITWS Program Office will insure that allITWS system optimization, training and other fieldfamiliarization activities have been completed atthose sites.

Activity Target 2:Achieve Contract Acceptance Inspection (CAI) atone (1) ITWS site. Due July 31, 2010Activity Target 3:Achieve Initial Operational Capability (IOC) at one(1) ITWS site. Due July 31, 2010Activity Target 4:Achieve Initial Operational Capability (IOC) at one(1) additional ITWS site. Due September 30, 2010

Strategic Activity: Provide EngineeringServices Site Survey/Site PreparationSupport for ITWS (through CAI)

Activity Target 1:Achieve Contract Acceptance Inspection (CAI) atone (1) ITWS site. Due July 31, 2010

Site Survey/Site Preparation - Provide NationalEngineering Services support to conduct sitesurveys, finalize engineering drawings, complete sitepreparation items and other installation/system hand-off activities at ITWS sites to help achieve ContractAcceptance Inspection (CAI).

Strategic Activity: Provide NASEngineering Site Adaptation Support forITWS (through CAI)

Activity Target 1:Achieve Equipment Delivery to one (1) ITWS site.Due February 28, 2010

Site Adaptation - Provide NAS Engineering Supportto prepare ITWS site adaptation data for eachservice delivery point using ITWS Program SupportFacility tools. Conduct site parameter survey,prepare site adaptation data files and ship ITWS siteadaptation data files to Raytheon prior to FactoryAcceptance Test (FAT) in preparation for shipmentto each ITWS site.

Strategic Activity: Provide NASEngineering Program Support FacilityServices for ITWS (through IOC)Program Support Facility / System SupportModification - Provide NAS Engineering Support to

Activity Target 1:Achieve Initial Operational Capability (IOC) at one(1) ITWS sites. Due July 31, 2010

operate the ITWS Program Support Facility (PSF) todevelop system support modifications (SSM) insupport of ITWS service delivery. Develop ITWSSystem Support Modifications (SSMs) for release ofsite-specific adaptation data, conduct operationaltesting at PSF and officially release to ITWS sitefollowing CAI to achieve operational status at eachsite.

Activity Target 2:Achieve Initial Operational Capability (IOC) at one(1) additional ITWS sites. Due September 30,2010

Strategic Activity: Provide NASEngineering Field FamiliarizationSupport for ITWS (through IOC)

Activity Target 1:Achieve Initial Operational Capability (IOC) at one(1) ITWS sites. Due July 31, 2010

Field Familiarization - Provide NAS EngineeringSupport to conduct support system optimization andfield familiarization activities for each ITWS site andconduct ITWS site-specific certification proceduresfollowing CAI to achieve operational status at eachsite.

Activity Target 2:Achieve Initial Operational Capability (IOC) at one(1) additional ITWS sites. Due September 30,2010

Strategic Activity: Provide NASEngineering Operational SoftwareSupport for ITWS (through IOC)

Activity Target 1:Achieve Initial Operational Capability (IOC) at one(1) ITWS sites. Due July 31, 2010

Operational Software - Provide NAS EngineeringSupport to provide operational software for eachITWS site to help enable IOC. Develop ITWSSystem Support Modification (SSM) for release ofITWS operational software to site, conductoperational testing at PSF and officially release toeach ITWS site.

Activity Target 2:Achieve Initial Operational Capability (IOC) at one(1) additional ITWS sites. Due September 30,2010

Expand FAA's NextGen Implementation Plan toincorporate critical path decisions and milestonesnecessary to accomplish the Mid-Term commitments.

Strategic Initiative: NextGen

Page 43 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 45: ATO Business Plan 2010

Strategic Activity: NextGenImplementation Plan

Activity Target 1:Define Key Messages for incorporation into theNext Generation Implementation Plan. DueOctober 30, 2009

Publish the NexGen Implementation Planincorporating as appropriate, the recommendationsfrom the RTCA NextGen Task Force.

Activity Target 2:Publish NextGen Implementation Plan. DueJanuary 31, 2010

Strategic Activity: AJP-D NextGenModeling & Simulation Office

Activity Target 1:Update FAA NextGen benefits estimates to reflectthe latest NextGen Implementation Plan and trafficforecast. Due December 31, 2009

Generate cost and benefits estimates for FAA'sNextGen activities to support publication of theNextGen Implementation Plan, communication withoutside stakeholders, and reporting to OMB andCongress.

Activity Target 2:Update FAA NextGen cost estimates. Due January31, 2010Activity Target 3:Update FAA NextGen benefits estimates withlatest traffic forecast for reporting to Congress.Due April 15, 2010

Strategic Activity: JPDO Multi AgencyNextGen Enterprise Architecture andConcept of Operations

Activity Target 1:Draft multi-agency NextGen EnterpriseArchitecture and Concept of Operations. Due June30, 2010

JPDO office will work with multiple agencies todevelop NextGen Enterprise Architecture andConcept of Operations.

Activity Target 2:Update multi-agency NextGen EnterpriseArchitecture and Concept of Operations. DueSeptember 30, 2010

By FY 2010, operationally implement AutomaticDependent Surveillance-Broadcast (ADS-B) for airtraffic services at selected sites and continuedevelopment of surface conflict detection in the cockpitand near-term Air-to-Air applications.

Strategic Initiative: AutomaticDependent Surveillance-Broadcast(ADS-B) Decision

Strategic Activity: Deployment ofAutomatic Dependent Surveillance -Broadcast (ADS-B)

Activity Target 1:Complete Service Acceptance Testing (SAT) atJuneau. Due October 31, 2009

Continue deployment of Surveillance and BroadcastServices (SBS) at key sites in support of the SBSnational program baseline.

Activity Target 2:Complete Initial Operating Capability (IOC) at keysites. Due April 30, 2010Activity Target 3:Achieve In-Service Decision (ISD) for CriticalServices. Due September 30, 2010

Strategic Activity: Develop National andInternational Standards

Activity Target 1:Issue Final Rule for Automatic DependentSurveillance - Broadcast (ADS-B). Due April 30,2010

Develop national and international standards.

Strategic Activity: DemonstrateAutomatic Dependent Surveillance -Broadcast (ADS-B) Applications forImproved Pilot Situational Awareness

Activity Target 1:Establish a concept of operations (CONOPS)document for 3 nautical mile separation. Due April30, 2010

Demonstrate applications that utilize ADS-Bcapabilities.

Activity Target 2:Define a set of target level of safety (TLS) metricsfor assessing 3 nautical mile separationoperational performance. Due June 30, 2010

Strategically link funding requests with the acquisitionof research and development products or services thatsupport FAA's transition to NextGen.

Strategic Initiative: Link FundingRequests to Support NextGen

Strategic Activity: NextGen ReviewBoard

Activity Target 1:NextGen Review Board to identify and reviewFY12 funding requests that enable NextGen. DueAugust 30, 2010

The Review Board validates funding requests whichare linked to NextGen.

Activity Target 2:Develop draft FY11 performance metrics includingcost and schedule. Due September 30, 2010

Page 44 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 46: ATO Business Plan 2010

Identify NextGen critical decisions and supportingresearch, capital and implementation activitiesrequired to fulfill FAA NextGen commitments and meet90 percent of the commitments identified in theNextGen Implementation Plan.

Strategic Initiative: NextGenImplementation Plan

Strategic Activity: NextGenImplementation Plan Milestones

Activity Target 1:Establish FY 10 List of Initiatives including,Research Demos and selected milestones. DueJanuary 31, 2010

Provide the management discipline andinfrastructure for tracking, monitoring, and reportingmilestone completions for NextGen ImplementationPlan programs across Line of Business.

Activity Target 2:Monitor and report monthly on establishedprogram schedule activities and dates. DueSeptember 30, 2010

Strategic Activity: AJP-1 Support forNextGen Implementation PlanMilestones

Activity Target 1:Complete draft EA roadmaps. Due October 31,2009

Systems Engineering & Safety (SES) providesannual updates to Enterprise Architecture (EA)roadmaps which includes identification of criticalNextGen decisions that are incorporated into theNextGen Implementation Plan.

Activity Target 2:EA roadmap approval. Due February 28, 2010

Strategic Activity: Develop DataCommunications in support of the NextGeneration Air Traffic System

Activity Target 1:Submit Data Communications Service ProviderScreening Information Request (SIR)documentation to the Office of Chief Council,Procurement Division, for final legal review. DueSeptember 30, 2010

Acquire and deploy NextGen Systems to meet futureneeds.

Strategic Activity: Develop System WideInformation Management (SWIM)

Activity Target 1:Complete Analysis and Documentation to supportJoint Resource Council (JRC) 2B for SWIMSegment 2. Due August 31, 2010

Develop System Wide Information Management(SWIM) in support of the Next Generation AirTransportation System.

Strategic Activity: Develop NAS VoiceSwitch (NVS)

Activity Target 1:Complete Analysis and Documentation to SupportInitial Investment Decision. Due July 31, 2010

Develop NAS Voice Switch in support of the NextGeneration Air Transportation System.

Strategic Activity: Develop GroundBased Augmentation System (GBAS)

Activity Target 1:Complete contract award for Research andDevelopment (R&D) prototype of Category IIIprecision approach. Due September 30, 2010

Develop Ground Based Augmentation System(GBAS) in support of the Next Generation AirTransportation System.

Facilitate and expedite the development and approvalof RNAV or RNP procedures developed by both thepublic and the private sector.

Strategic Initiative: Third PartyRNAV/RNP Procedures

Strategic Activity: Third Party RNAV/RNPProcedures

Activity Target 1:Work with third-party vendors who establishedOther Transaction Agreements in FY2009 tocomplete qualification process for end-to-endprocedure development for RNP SAAARapproach procedures. Due September 30, 2010

Facilitate and expedite the development andapproval of RNAV or RNP procedures developed byboth the public and the private sector.

Work with interagency groups to achieve an agreedupon plan for integrated weather activities.

Strategic Initiative: IntegratedWeather Activities

Strategic Activity: Weather IntegrationApproach

Activity Target 1:Create the draft Weather Integration Plan version2.0. Due August 15, 2010

A system-wide approach to assuring better weatherinformation that is tailored for the individual user.

Activity Target 2:Deliver the Weather Integration Plan version 2.0 tothe NextGen Executive Weather Panel. DueSeptember 30, 2010

Evaluate and expand the use of Converging RunwayDisplay Aids at airports with intersecting runways.

Strategic Initiative: ConvergingRunway Display Aids

Page 45 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 47: ATO Business Plan 2010

Strategic Activity: Enable use ofConverging Runway Display Aids(CRDA) Functionality

Activity Target 1:Conduct detailed simulation for three (3) complexfacilities for implementation of CRDA. Due March31, 2010

Enable the Converging Runway Display Aids(CRDA) capability at locations where benefits maybe derived. Additionally, an annual review processwill be defined and implemented to ensure thatadjustments to airport runway configurations andchanges in airspace design will be periodicallyevaluated to determine if CRDA capabilities willgenerate benefits in the new configurations.

Activity Target 2:Conduct a detail analysis for five (5) candidateairports. Due April 30, 2010Activity Target 3:Enable CRDA capability at up to five (5) additionalcandidate locations showing potential benefits.Due July 30, 2010Activity Target 4:Define a benefits profile from which facilities canuse to adapt their airport operations as an analysistool that proves benefits for use of CRDA. DueSeptember 30, 2010

Develop flexible arrival/departure corridors.

Strategic Initiative: Arrival/DepartureCorridors

Strategic Activity: Efficient, adaptablearrival and departure corridors

Activity Target 1:Conduct experiments and analyses for airspacesupporting the north departure gate for New Yorkmetro area Due September 30, 2010

Develop and implement arrival/departure corridorsthat can be adapted for weather or traffic scenarios.

Evaluate the use of the "proximity event" classificationfor wake turbulence separation on final approach.

Strategic Initiative: Proximity EventClassification

Strategic Activity: Proximity EventInitiative

Activity Target 1:This initiative will be updated/removed when thenew Flight Plan is released. Place holder only, asrequired for IPF release. Due September 30, 2010

Work for this initiative was completed in FY 2009.This initiative should be deleted with the FY 2010-2013 Flight Plan update.

Flight Plan Target: AirportAverage Daily Capacity (7 MetroAreas)Achieve an average daily airport capacity for the 7 Metroareas of 39,484 arrivals and departures per day by FY2009, and maintain through FY 2013. FY 2010 Target:39,484

Work with the aviation community to establish themost feasible policies to enhance capacity andmanage congestion.

Strategic Initiative: Capacity-Enhancing Policies

Strategic Activity: Congestionmanagement solutions in the New YorkArea

Activity Target 1:Provide support for orders, regulations orlegislation rulemaking to address congestion atthe New York Metro airports as needed. DueSeptember 30, 2010

Implement congestion management solutions in theNew York Area.

Update our projections on which metropolitan areaswill have the greatest impact on the total system fordelays over the period of the Flight Plan.

Strategic Initiative: Update MetroArea Impact

Strategic Activity: Update Metro AreaImpact

Activity Target 1:FAA will discuss and review metro areas todetermine any necessary changes to the targetareas and airports. Due June 30, 2010

Coordinate efforts to reassess which metropolitanareas will have the most impact on the total aviationsystem delays over the life of the Flight Plan. Usestudies such as the Future Airport Capacity Teamreport (Capacity Needs in the National AirspaceSystem), Capacity Benchmarks, and the FAAForecast to define the targeted areas and airports.

Redesign the airspace of the 7 Metro areas includingthe continued implementation of the New York/NewJersey Airspace Redesign Project.

Strategic Initiative: MetropolitanAirspace Redesign

Strategic Activity: Chicago AirspaceProject

Activity Target 1:Chicago Airspace Project: realign airspace andimplement new departure routes and new Highand Wide procedures to support new center OMPrunway with triple parallel approaches. Due

Implement phase III of the Chicago AirspaceProject.

Page 46 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 48: ATO Business Plan 2010

September 30, 2010

Strategic Activity: Airspaceimprovements in NY/NJ/PHL

Activity Target 1:Complete analyses for Stage II of the NY/NJ/PHLimplementation will support Westgate departurechanges. Due June 30, 2010

Implement airspace improvements in New York,New Jersey and Philadelphia areas. Stage II of theNY/NJ/PHL implementation will support Westgatedeparture changes, possible area of study is N90.We also will try to implement a 3rd Westbound PHLdeparture. Suggested analyses are expected to becomplete by June 2010.

Activity Target 2:Implement a 3rd Westbound PHL departure. DueSeptember 30, 2010

Expand use of time-based metering at air traffic controlcenters.

Strategic Initiative: Time-basedMetering

Strategic Activity: Continue Time BasedMetering activities under AJR

Activity Target 1:Brief JRC for a Final Investment Decision (JRC-2B) Due January 31, 2010

Receive formal authority to proceed with TBFMenhancements.

Activity Target 2:Award TMA follow-on enhancements contract. DueMay 31, 2010

Track average flight and surface times within the NASby including ASDE-X data in the Performance Dataand Analysis Reporting System data set andintegrating that data with the Terminal and En-Routedata already available to provide a consolidated gateto gate measurement and analysis capability.

Strategic Initiative: Flight andSurface Time Tracking

Strategic Activity: Calculate Metrics

Activity Target 1:Program the performance data and analysisreporting system(PDARS) to calculate surfacemetrics at five airports. Due March 31, 2010

Calculate average flight and surface times within theNAS to provide a consolidated gate-to-gatemeasurement and analysis capability.

Activity Target 2:Program the performance data and analysisreporting system(PDARS) to calculate surfacemetrics at five airports for a total of ten. DueSeptember 30, 2010

Implement Traffic Management Advisor/Time BasedMetering at John F. Kennedy and LaGuardia Airports.

Strategic Initiative: TrafficManagement Advisor/Time BasedMetering at JFK and LGA

Strategic Activity: Transition toTrajectory Based Flow Management(TBFM), an enhancement to TMA

Activity Target 1:Brief JRC for a Final Investment Decision (JRC-2B). Due June 30, 2010

Receive formal authority to proceed with TBFMenhancements.

Activity Target 2:Award TMA follow-on enhancements contract. DueMay 31, 2010

Flight Plan Target: AnnualService VolumeCommission nine new runway/taxiway projects,increasing the annual service volume of the 35 OEPairports by at least 1 percent annually, measured as afive-year moving average, through FY 2013. FY 2010Target: 1% 2 runways

Future Airport Capacity Team (FACT) will continue towork with aviation stakeholders to develop a strategyfor implementing solutions from the toolbox developedfor each airport projected to have an anticipatedcapacity shortfall in 2025.

Strategic Initiative: FACT

Strategic Activity: Update Future AirportCapacity Team (FACT) Report (Locatedwithin the 7 major metro areas)

Activity Target 1:Prepare draft scope of work for FACT 3. Due June30, 2010

FACT Team will continue to work with aviationstakeholders to identify solutions at airportsprojected to have an anticipated capacity shortfall in2025.

Activity Target 2:Coordinate final Airport Action Plans for Airportsrequiring additional capacity in 2025. DueSeptember 30, 2010

Ensure that runway capability commitments areestablished in partnership with stakeholders.

Strategic Initiative: OEP RunwayCommitment

Strategic Activity: Commission RunwaysProvide AJR support to ARP, ARC, AVS, AJT, andAJW in order to meet the runway template actionplan (RTAP) schedules, milestones and completiondates for commissioning new NextGenrunway/extensions. AJR will support any necessary

Page 47 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 49: ATO Business Plan 2010

Activity Target 1:Ensure that all FY-10 FAA activities outlined in theRTAP schedules are either accomplished on-timeor mitigated sufficiently to remain on-track to meetthe NextGen new/extended runway capabilitycommitments established in partnership withstakeholders. Due September 30, 2010

airspace changes as needed.

Activity Target 3:Ensure that all FY-10 FAA activities outlined in theRTAP schedules are either accomplished on-timeor mitigated sufficiently to remain on-track to meetthe NextGen new/extended runway capabilitycommitments established in partnership withstakeholders. Due September 30, 2010Activity Target 4:Deliver OEP full operational capabilities forCharlotte-Douglas International Runway 17/35.Due September 30, 2010Activity Target 5:Deliver OEP full operational capabilities forCharlotte-Douglas International Runway 17/35.Due September 30, 2010

Establish priorities for infrastructure investments tomaintain existing capacity in a cost-effective manner.

Strategic Initiative: InfrastructureInvestments Prioritization

Strategic Activity: InfrastructureInvestment Prioritization

Activity Target 1:Complete prioritization process of F&E projects forF&E budget sumbission as approved by the AirTraffic Organization Executive Council. Due June5, 2010

Establish priorities for F&E capital investmentportfolio. Intent of this activity is to provideinvestment prioritization for the NAS - not just OEPairports.

Using the cross-organizational Airport ObstructionsStandards Committee (AOSC), develop recommendedstandards and action plans for runway proceduressuch as end-around taxiways, and establish databasesand data collection tools to improve airport flightoperations, while maintaining an optimal balanceamong safety, capacity, and efficiency considerations.

Strategic Initiative: Agency FlightOperations Guidance

Strategic Activity: Airport ObstructionStandards Committee (AOSC)Using the cross-organizational Airport ObstructionStandards Committee (AOSC) developrecommended standards and action plans forrunway procedures and other initiatives identified byAOSC Steering Committee, while maintaining anoptimum balance among safety, capacity andefficiency considerations.

Activity Target 1:Participate at each ASOC Working Group (WG)and Steering Group meeting. Support the reviewof meeting notices and minutes, track and statusassigned action items, and coordinate withstakeholders to help resolve issues identified.Provide technical input to discussions on airportgeographic information system (aGIS), exhaustplumes, consolidated surfaces, one engineinoperative (OEI), end-around taxiway, windturbines, and low visibility general aviation.Provide quarterly updates on the status ofassigned action item associated with the aboveprojects. Due September 30, 2010Activity Target 3:Assess the progress for completing participation atASOC Working Group (WG) as requested.Supporting the review of meeting notices andminutes, tracking and statusing assigned actionitems, and coordinating with stakeholders to helpresolve issues identified. Providing technical inputto discussions on airport geographic informationsystem (aGIS), exhaust plumes, consolidatedsurfaces, one engine inoperative (OEI), end-around taxiway, wind turbines, and low visibilitygeneral aviation. And providingquarterly updates on the status of assigned actionitem associated with the above projects bySeptember 30, 2010. Due March 31, 2010

Flight Plan Target: AdjustedOperational AvailabilitySustain adjusted operational availability of 99.7 percentfor the reportable facilities that support the 35 OEPairports through FY 2013. FY 2010 Target: 99.7%

Enhance NAS performance for the 35 OEP airportsthrough advanced engineering and program support.

Strategic Initiative: NAS SystemPerformance

Strategic Activity: Monitor and ReportOEP Service Availability and Mean TimeBetween Outages (MTBO)

Activity Target 1:Help sustain Adjusted Operational Availability at99.7 percent for reportable facilities that supportthe 35 OEP airports, harvest and corporatelyreport NAS targeted performance weeklythroughout FY10. Due September 30, 2010

Follow policies and procedures for NAS monitoring,control, maintenance, and restoration to optimizeserviceavailability for the 35 OEP airports.

Activity Target 2:Perform 2 Data Forensic Activities using availableNAS databases on services or systems that arebelow the 99.7 Adjusted Operational Availabilitymetric. Both due September 30, 2010. Due

Page 48 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 50: ATO Business Plan 2010

September 30, 2010

Flight Plan Target: NAS On-TimeArrivalsAchieve a NAS on-time arrival rate of 88.0 percent at the35 OEP airports and maintain through FY 2013. FY2010 Target: 88.00%

Implement high altitude airspace redesign to reducecongestion.

Strategic Initiative: High AltitudeAirspace Redesign

Strategic Activity: Implement multi-center Q-routes to create efficientrouting structure where needed.

Activity Target 1:Complete design and implement 2010 portion ofSegment 1 Q-routes. Due September 30, 2010

Design and implement Q-routes.

Strategic Activity: Increase the use ofnavigational reference system (NRS).

Activity Target 1:Improve field facility understanding and use ofexisting sparse NRS. Work with customers tomitigate FMS loading issues. Develop "smart"expansion plan of NRS for key applications (e.g.SUA avoidance). Due September 30, 2010

Increase use of the existing sparsely populated NRSgrid points and selectively expand the NRS tosupport additional functionality.

Strategic Activity: Explore mid-term high-altitude airspace concepts

Activity Target 1:Complete analysis for high altitude operations fortransition to mid-term operational concepts. DueSeptember 30, 2010

Integrate proposed mid-term concepts in high-altitude airspace into a cohesive set of proposedoperational improvements; including realignment,restratification and/or resectorization.

Improve on-time performance and operator andpassenger access to information by using Traffic FlowManagement (TFM), Traffic Management Advisor(TMA), and Collaborative Air Traffic ManagementTechnologies (CATMT), such as Airspace FlowPrograms (AFPs).

Strategic Initiative: FlightInformation

Strategic Activity: Collaborative AirTraffic Management (CATMT)EnhancementsComplete the CATMT Work Package 1 activities ofthe enhanced Flight Schedule Monitor cross impactmodeling (phase 2) capability. This will allow an

Activity Target 1:Prepare and distribute Post ImplementationReview for Spring 2009 build. Due November 30,2009

enhanced analysis capability to examine the impactsof both the Airspace Flow Program (ASP) and theGround Delay Program (GDP) while preparing aplanning traffic management initiative. Additionally,CATMT will add another 2-3 airport surface datasources for selected airports into the surfacedatabase used for TFM.

Activity Target 2:Prepare and distribute Post ImplementationReview for Fall 2009 build. Due May 31, 2010Activity Target 3:Deploy reroute impact assessment functionalityonto TFMS. Due September 30, 2010

Strategic Activity: CATM Flow ControlManagement - Strategic FlowManagement

Activity Target 1:Conduct studies, engineering assessments or anyother design/development activity in support of theNextGen program related to SFM. Due September30, 2010

Explore the concept of Strategic Flow Managementfor NextGen.

Implement ocean capacity metrics and targets, usingcomprehensive Advanced Technologies and OceanicProcedures (ATOP) data collection and analysiscapability and oceanic simulation and modelingcapability.

Strategic Initiative: Ocean CapacityMetric

Strategic Activity: Oceanic Simulationand Modeling Capability

Activity Target 1:Improve oceanic fuel efficiency per passengerseat for select city pairs and similar fleet by anaverage savings of at least 1% compared to theprevious fiscal year's two year rolling average.Due September 30, 2010

Based on Oceanic simulation and modelingcapability, verify the improvements to Oceanic andOffshore capacity and efficiency.

Activity Target 2:Develop fuel burn performance metric for FY 2011and beyond. Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Reduce oceanic separation in U. S. controlled oceanicairspace.

Strategic Initiative: Reduce OceanicSeparation

Page 49 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 51: ATO Business Plan 2010

Strategic Activity: Reduce OceanicSeparation

Activity Target 1:Based on the Safety Case work accomplished in2009, develop a plan for the implementation of30/30 separation in the New York FlightInformation Region. Due September 30, 2010

Reduce Oceanic separation.

Activity Target 2:Based on the Safety Case work accomplished in2009, develop a plan for the implementation of30/30 separation in the Anchorage FlightInformation Region. Due September 30, 2010Activity Target 3:Initiate an analysis program to assess thefeasibility and requirements of separation in theoceanic environment below the 30/30 standard.Due September 30, 2010Activity Target 4:Conduct operational trials of Automatic DependentSurveillance -- Contract (ADS-C) In-TrailProcedures. Due September 30, 2010Activity Target 5:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Use new equipment and technology to reduce en routecongestion.

Strategic Initiative: En RouteCongestion

Strategic Activity: Traffic FlowManagement Modernization (TFMM)

Activity Target 1:Perform technology refresh of all TFM remotesites Due September 30, 2010

Complete the TFMM activities for the test anddeployment of the final operating software upgradeand to provide for continued development of TFMMhardware and software enhancements.

Strategic Activity: TrajectoryManagement Operations

Activity Target 1:Deliver plan for 4D Oceanic TrajectoryManagement operations trials by July 2010 DueJuly 31, 2010

En route Congestion. Initiate TrajectoryManagement Operations Trial.

In FY 2009, develop a pair of coupled performancemeasures, throughput and delay, to represent thecapacity of the National Airspace System.

Strategic Initiative: DevelopThroughput Delay Metrics

Strategic Activity: Throughput DelayMetric

Activity Target 1:Interim report on the validation of coupled metrics.Due June 30, 2010

Continue to develop and validate the models used tocompute coupled throughput and delay metrics.

Activity Target 2:Final report on the validation of coupled metrics,including estimates of uncertainty ranges. DueSeptember 30, 2010

Identify airports forecasted to have chronic delays inthe next six months.

Strategic Initiative: DelayIdentification

Strategic Activity: Demand Projection

Activity Target 1:Complete an initial demand projection. DueOctober 31, 2009

Project near-term demand, on a quarterly basis, forthe OEP 35 airports, and compare year-over-yearchanges in demand at these airports. Identify thosewhich show unusually large growth.

Activity Target 2:Update the demand projections every threemonths after the initial demand projection iscompleted. Due September 30, 2010

Strategic Activity: Delay Projection

Activity Target 1:Complete an initial delay projection. Due October31, 2009

Use results of demand projections to determinewhich airports are likely to experience a significantincrease in delay as a result of demand growth.Compare year-over-year changes in delay peroperation at impacted airports, and identify thoseairports which will be chronically delayed. Thisanalysis is to support identification of airports thatwill be impacted along with recommended ranking tothe Congestion Action Teams (CAT), as appropriate,based on delay factors used. Secondly, as the CATsare formed, the Performance Analysis and Strategyoffice may be asked to participate in discussionabout what factors led to their selections of airportsto help gain a better appreciation of what themitigations should be. This input could help the CATidentify a list of causal factors and solutions.Moreover, since the Performance Analysis andStrategy office plays such a critical role with theinitial efforts, their input and ideals will be importantwith future updates and recommended airports.

Activity Target 2:Update the delay projections every three monthsafter the initial delay projection is completed. DueSeptember 30, 2010

Page 50 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 52: ATO Business Plan 2010

Enhance Traffic Management Tools, net-centricinformation sharing vehicles and processes to yield themost effective NAS decisions through the CDMprocess.

Strategic Initiative: CollaborativeDecision Making

Strategic Activity: Collaborative RoutingProcess

Activity Target 1:Continue to enhance, expand, and trainemployees on the ICR process for use during thesevere weather season. Due September 30,2010. Due September 30, 2010

Utilize the Integrated Collaborative Routing (ICR)process during weather events.

Strategic Activity: Share Airport SurfaceData

Activity Target 1:Develop an airport CDM process model at a targetairport in the NAS. Due September 30, 2010

Develop a process to share airport surface data withstakeholders.

Flight Plan Target: NoiseExposureReduce the number of people exposed to significantnoise by 4 percent per year through FY 2013, asmeasured by a three-year moving average, from thethree-year average for calendar years 2000-2002. FY2010 Target: -20%

Work with several airports (including Los Angeles, SanDiego, Louisville, Charleston, and Atlanta) toimplement Continuous Descent Arrival (CDA) for nightoperations, and initiate research into CDA applicabilityto airports with greater traffic levels, general mixedfleet, and mixed operations.

Strategic Initiative: Implement CDA

Strategic Activity: OPD Procedures

Activity Target 1:Conduct industry briefings on the OPDimplementation initiative and benefits analysis.Due December 31, 2009

Work with several airports to demonstrate OptimizedProfile Descent (OPD) procedures for night/lowcapacity operations to advance the development ofenvironmentally beneficial operational procedures.

Activity Target 2:Develop, implement, and demonstrate OptimizedProfile Descent procedures at select airports asidentified in environmental/capacity/efficiencyanalyses completed in FY09. Due June 30, 2010Activity Target 3:Conduct benefit analysis, including emissions,noise reduction, fuel savings, and operationalefficiency of selected OPD implementation sites.Due September 30, 2010

Implement Environmental Management Systems toensure that FAA operations protect the environment,meet statutory and regulatory environmentalrequirements, and improve reliability and costeffectiveness.

Strategic Initiative: EnvironmentalManagement Systems

Strategic Activity: EnvironmentalManagement Systems (EMS)

Activity Target 1:Initiate EMS at ATO Service Areas Due August31, 2010

ATO is fully committed to conducting all ATOoperations and activities in a manner that isprotective of the environment. In keeping with thiscommitment, ATO management and staff workcontinuously to integrate environmentalconsiderations into operations, conserve energy andresources, and to avoid or minimize the use ofenvironmentally detrimental materials. Thiscommitment extends to all ATO facilities andoperations, including those relevant to NextGenenvironmental targets, and is implemented andgiven effect through an ATO-wide EnvironmentalManagement System .

Activity Target 2:Conduct internal EMS audits and managementreviews and report status to AEE. Due August 31,2010Activity Target 3:Maintain ATO's EMS to be consistent with AEEHigher tier EMP's as applicable Due August 31,2010Activity Target 4:Use the cost and performance baseline developedin FY09 to analyze and report EMS performanceDue July 31, 2010

Strategic Activity: EnvironmentalManagement Systems (EMS) AviationSystem Standards (AVN)

Activity Target 1:Conduct internal EMS audits and managementreviews Due August 31, 2010

Support for Environmental Management Systems

Activity Target 2:Maintain AVN ISO 14001 registration to beconsistent with FAA targets and objectives DueAugust 31, 2010Activity Target 3:Evaluate effectiveness of AVN EMS and establishnew targets and objectives as necessary to ensurecontinuous improvement and support of FAA goalsand objectives. Due July 31, 2010

Page 51 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 53: ATO Business Plan 2010

Strategic Activity: EnvironmentalManagement Systems (EMS) ACT

Activity Target 1:Conduct internal EMS audits and managementreviews Due August 31, 2010

Support for EMS

Activity Target 2:Conduct an External EMS conformance Audit(external audit may comprise either a third partyregistration audit or an external audit performed byAEE-400) Due September 30, 2010

Flight Plan Target: Aviation FuelEfficiencyImprove aviation fuel efficiency by another 1 percent overthe FY 2008 level (for a total of 7 percent) through FY2009, and 1 percent each subsequent year through FY2013 to 11 percent, as measured by a three-year movingaverage of the fuel burned per revenue mile flown, fromthe three-year average for calendar years 2000-2002.FY 2010 Target: - 8%

Work with several airports (including Los Angeles, SanDiego, Louisville, Charleston, and Atlanta) toimplement Continuous Descent Arrival (CDA) for nightoperations, and initiate research into CDA applicabilityto airports with greater traffic levels, general mixedfleet, and mixed operations.

Strategic Initiative: Implement CDA

Strategic Activity: OPD Procedures

Activity Target 1:Conduct industry briefings on the OPDimplementation initiative and benefits analysis.Due December 31, 2009

Work with several airports to demonstrate OptimizedProfile Descent (OPD) procedures for night/lowcapacity operations to advance the development ofenvironmentally beneficial operational procedures.

Activity Target 2:Develop, implement, and demonstrate OptimizedProfile Descent procedures at select airports asidentified in environmental/capacity/efficiencyanalyses completed in FY09. Due June 30, 2010Activity Target 3:Conduct benefit analysis, including emissions,noise reduction, fuel savings, and operationalefficiency of selected OPD implementation sites.Due September 30, 2010

Identify candidate locations to optimize profiledescent/CDA at smaller airports.

Strategic Initiative: CDAs at SmallAirports

Strategic Activity: Plan OPD/CDA

Activity Target 1:Conduct industry briefings on the OPDimplementation initiative and benefits analysis.Due December 31, 2009

Develop a strategy to implement OPD procedures.

Activity Target 2:Develop, implement, and demonstrate OptimizedProfile Descent procedures at select airports asidentified in environmental/capacity/efficiencyanalyses completed in FY09. Due June 30, 2010Activity Target 3:Conduct benefit analysis, including emissions,noise reduction, fuel savings, and operationalefficiency of selected OPD implementation sites.Due September 30, 2010

En Route and Oceanic Services will meet future capacitydemands by ensuring the provision of safe and efficientair traffic control services throughout the En Routeportion of the National Airspace System (NAS) throughtargeted capacity increases to: 1) Achieve an averagedaily airport capacity for the 35 Operational EvolutionPartnership (OEP) airports of 103,068 arrivals anddepartures per day by FY 2011 and maintain through FY2013 (FY 2010 Target: 102,648) and 2) maintain a NASon-time arrival rate of 88.00 percent at the 35 OEPairports.

Core Business Target: IncreaseEn Route and Oceanic Capacityto Meet Expected Demand

Provide the support and technology to enable the safeincrease in En Route and Oceanic capacity. En Routeand Oceanic Services manages operations through 21Air Route Traffic Control Centers (ARTCC) and twoCombined En Route / Approach (CERAP) controlfacilities, which are allocated among the three ServiceAreas (Eastern, Central and Western).

Core Business Initiative: EnableIncreases in En Route and OceanicCapacity

Core Activity: En Route and OceanicServices - Program Operations

Activity Target 1:Achieve an average daily airport capacity for the35 OEP Airports of 102,648 arrivals anddepartures per day. Due September 30, 2010

Provide the operational support functions necessaryto enable safe increases in capacity when deliveringair traffic control services.

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010

Page 52 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 54: ATO Business Plan 2010

Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: En Route and OceanicServices - Safety and OperationsServices

Activity Target 1:Achieve an average daily airport capacity for the35 OEP Airports of 102,648 arrivals anddepartures per day. Due September 30, 2010

Provide the operational support functions necessaryto enable safe increases in capacity when deliveringair traffic control services.

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: En Route and OceanicServices Operations Support - EasternService Area

Activity Target 1:Achieve an average daily airport capacity for the35 OEP Airports of 102,648 arrivals anddepartures per day. Due September 30, 2010

Provide the operational support functions necessaryto enable safe increases in capacity when deliveringair traffic control services. The Eastern Service Areais comprised of seven Air Route Traffic ControlCenters (ARTCC) and one Combined En Route /Approach (CERAP) control facility.

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: En Route and OceanicServices Operations Support - CentralService Area

Activity Target 1:Achieve an average daily airport capacity for the35 OEP Airports of 102,648 arrivals anddepartures per day. Due September 30, 2010

Provide the operational support functions necessaryto enable safe increases in capacity when deliveringair traffic control services. The Central Service Areais comprised of eight Air Route Traffic ControlCenters (ARTCC).

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.

Due September 30, 2010

Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: En Route and OceanicServices Operations Support - WesternService Area

Activity Target 1:Achieve an average daily airport capacity for the35 OEP Airports of 102,648 arrivals anddepartures per day. Due September 30, 2010

Provide the operational support functions necessaryto enable safe increases in capacity when deliveringair traffic control services. The Western Service Areais comprised of six Air Route Traffic Control Centers(ARTCC) and one Combined En Route / Approach(CERAP) control facility.

Activity Target 2:Achieve the annual efficiency performance targetfor NAS On-Time Arrivals of not less than 88.00%.Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Increase the percentage of oceanic airspace usingreduced separation standards from the FY 2005baseline. FY 2010 target: 95 percent of oceanicairspace.

Core Business Target: ExpandOceanic and Offshore Services

Provide Oceanic and Offshore Services to SupportCapacity Requirements.

Core Business Initiative: Oceanicand Offshore Services CoreBusiness

Core Activity: Improve GlobalInteroperability in the Oceanic andOffshore Domains

Activity Target 1:Develop operational and software requirementsfor operational prototyping of Pre-DepartureOceanic Trajectory Management 4D (OTM4D).Due September 30, 2010

Improve global interoperability in the Oceanic andOffshore domains via collaboration with strategicpartners and support longer-term Joint Planning &Development Office / Next Generation Air TrafficSystem (JPDO/NextGen) initiatives.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Page 53 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 55: ATO Business Plan 2010

Core Activity: Conduct ConceptDevelopment, Analysis and Trials forAutomatic Dependent Surveillance-Contract (ADS-C) In Trail Procedures

Activity Target 1:Initiate operational trials of ADS-C In TrailProcedures in the Pacific. Due September 30,2010

Conduct concept development, analysis and trialsfor ADS-C In Trail Procedures. The FAA isdeveloping a reduced separation standard based onDistance Measuring Equipment (DME) In TrailProcedures, but using ADS-C surveillance to verifydistance between aircraft pairs. This procedurewould allow more aircraft to reach fuel efficientaltitudes.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Core Activity: Dynamic Airborne Re-Route Program (DARP)

Activity Target 1:Implement DARP rerouting between Oakland andTahiti. Due November 30, 2009

Expand DARP trials. DARP is designed to promoteairborne re-routes to flights when wind conditionshave changed since the original route was filed andcleared.

Develop and implement ATOP software.

Core Business Initiative: Deliver andImplement Advanced Technologiesand Oceanic Procedures (ATOP)

Core Activity: Develop and ImplementAdvanced Technologies and OceanicProcedures (ATOP)

Activity Target 1:Complete Alaska Center (ZAN) tech refresh. DueNovember 30, 2009

Implement ATOP Technical Refresh.

Activity Target 2:Complete Oceanic Integration and InteroperabilityFacility (OIIF) tech refresh. Due March 31, 2010

Core Activity: Implement Planned ATOPImprovements

Activity Target 1:Deliver planned Advanced Technologies andOceanic Procedures (ATOP) system upgrade(FY10 Build 1). Due December 31, 2009

Provide new Oceanic technology to allow fortechnology insertion and avoid obsolescence.

Activity Target 2:Deliver planned ATOP system upgrade (FY10Build 2). Due April 30, 2010

Activity Target 3:Deliver planned ATOP system upgrade (FY10Build 3). Due August 31, 2010

Sustain adjusted operational availability of select terminalequipment at 99.7 percent for the reportable facilities thatsupport the 35 OEP airports through FY 2012. (FY10Target = 99.7% adjusted equipment availability forselected systems assigned to ATO Terminal Services forbudget formulation).

Core Business Target: SustainTerminal Equipment OperationalAvailability

Sustain the operation of the NAS Terminalenvironment by defining, designing, building, deployingand sustaining terminal automation and surveillancesystems along with modernization and replacement ofTowers and TRACONs to meet target levels ofperformance.

Core Business Initiative: Providesupport to Sustain TerminalOperation of the National AirspaceSystem (NAS) TerminalEnvironment

Core Activity: Terminal ServicesProgram Operations

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy annual updates forexisting Office of Management and Budget (OMB)-300 Exhibits as required by Federal AviationAdministration/Department of Transportationsubmission schedules. Due March 31, 2010

Provide the acquisition and support functionsnecessary to deliver terminal Air Traffic Control(ATC) services. These functions include: 1)acquiring terminal systems such as surveillance,automation, and weather; 2) facilities sustainment,modernization and replacement; and 3) second-levelsupport for terminal automation systems.

Activity Target 2:Deliver annual updates for existing Office ofManagement and Budget (OMB)-300 Exhibits asrequired by Federal AviationAdministration/Department of Transportationsubmission schedules. Due September 30, 2010Activity Target 3:Complete assessment for achieving year-endperformance goal to satisfy 90% of major systemacquisitions on schedule and within 10% of annualbudgets. Due March 31, 2010Activity Target 4:Achieve 90% of major system acquisitions onschedule and within 10% of annual budgets. DueSeptember 30, 2010

Page 54 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 56: ATO Business Plan 2010

Activity Target 5:Complete assessment for achieving year-endperformance goal to satisfy the annual terminalequipment performance target by ensuring 99.7%adjusted equipment availability for systemsassigned to ATO Terminal Services for budgetformulation. Due March 31, 2010Activity Target 6:Achieve the annual terminal equipmentperformance target by ensuring 99.7% adjustedequipment availability for systems assigned toATO Terminal Services for budget formulation.Due September 30, 2010

This Initiative highlights the alignment between majorprogram budget submissions and the FAA Flight Planfor Terminal Services OMB Exhibit 300 Programs byensuring that all Capacity focused FAA MajorInvestments (Exhibit 300 Programs) are identified inthe Flight Plan. The FY2010 Budget Submission andassociated FY2008 -- FY2012 Capital Investment Planidentifies these Exhibit 300 Programs as StrategicInvestments.

Core Business Initiative: IncreaseCapacity and Better OperationalPerformance within Terminal byImplementing Major StrategicCapital Investments

Core Activity: Standard TerminalAutomation Replacement System(STARS) Terminal Enhancements(TAMR Phase 1)

Activity Target 1:

The Standard Terminal Automation ReplacementSystem (STARS) is a digital radar/flight dataprocessing and display system for use by terminalair traffic controllers to ensure the safe separation ofmilitary and civilian aircraft throughout the nation'sairspace. STARS technology is open, expandableand able to accommodate future growth as well asnew hardware and software. STARS investmentreplaces the aging air traffic control equipment at 47sites (43 Automated Radar Terminal Systems(ARTS) IIIA sites and 4 ARTS IIE sites) of ournations terminal radar approach control facilities(TRACONs) and airport traffic control towers(ATCT). STARS bridges the performance gap andmakes a major contribution to the agency's strategicgoals in two specific areas: increased capacitythrough the deployment of higher availabilitysystems; and improved safety through thedeployment of a more secure automation system.

In order to support the operational availability,improved safety, and support the automationinfrastructure on which to build the NextGenoperational initiatives, provide softwareenhancements and refinements twice a year.

Manage the Contractor's software developmentactivities, provide technical guidance, and resolvetechnical issues that may arise and the completionof the Design Qualification Testing of softwaredelivery of build Revision 22 to the William J.Hughes Technical Center. Due May 31, 2010Activity Target 2:Manage the Contractor's software developmentactivities, provide technical guidance, and resolvetechnical issues that may arise and the completionof the Design Qualification Testing of additionalsoftware delivery of build Revision 23 to theWilliam J. Hughes Technical Center. DueSeptember 30, 2010

Core Activity: Standard TerminalAutomation Replacement System(STARS) Technical Refresh (TAMRPhase 1)

Activity Target 1:Contract Award for CCP-700. Due February 28,2010

The Standard Terminal Automation ReplacementSystem (STARS) is a digital radar/flight dataprocessing and display system for use by terminalair traffic controllers to ensure the safe separation ofmilitary and civilian aircraft throughout the nation'sairspace. STARS technology is open, expandableand able to accommodate future growth as well asnew hardware and software. STARS investmentreplaces the aging air traffic control equipment at 47sites (43 ARTS IIIA sites and 4 ARTS IIE sites) ofour nation's terminal radar approach control facilities(TRACONs) and airport traffic control towers(ATCTs). STARS bridges the performance gap andmakes a major contribution to the agency's strategicgoals in two specific areas: increased capacitythrough the deployment of higher availabilitysystems; and improved safety through thedeployment of a more secure automation system. Inorder to support the operational availability of theexisting operational sites, it is necessary to performplanned technical refreshment of the automationsystems to eliminate obsolescence, and support theadjusted operational availability of 99.7% for thereportable facilities through FY2011 by initiatingacquisition of Main Display Monitor (MDM)replacement and performing Qualification of the SunOperating System Version 10 (OS-10).

Activity Target 2:Qualify G3 hardware. Due August 30, 2010

Core Activity: Terminal AirportSurveillance Radar - Model 9 (ASR-9) -Mode S Service Life Extension Program(SLEP), Phase 1BASR-9 systems provide aircraft detection andweather information to air traffic controllers at thehighest activity airports. The ASR-9 tracks all aircraft

Page 55 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 57: ATO Business Plan 2010

Activity Target 1:Complete installation of ASR-9 TransmitterModification Kits at 15 sites. Due May 31, 2010

within its range and provides those tracks, as well assix-level weather intensity information. This data isprovided to terminal automation systems and utilizedby air traffic controllers to safely and efficientlyseparate aircraft in the terminal environment. TheASR-9 provides data to AMASS and ASDE-X, to aidin the prevention of accidents resulting from runwayincursions. The purpose of the investment is toaddress the most troublesome components withinthe ASR-9 transmitter - the modulator pulseassembly, trigger amplifier, and post chargeregulator - to ensure that we maintain the currentlevel of system availability and reliability. TheModulator Pulse Assembly (MPA) and relatedcomponents are responsible for up to 50% of thefailures associated with the transmitter, and thus thissubassembly is considered the greatest single risk tosystem reliability and availability. Without thesemodifications to the ASR-9 transmitter, the ASR-9will continue to experience decreasing reliability andavailability over time. The cost of technology refreshhas been deemed more cost-effective than acquiringfull replacement systems, because the currentperformance is effective in meeting both the safetyand capacity needs of the nation's air traffic systemat major airports.

This investment will begin to lower O&M costsassociated with the ASR-9/Mode-S SLEP, Phase 1Bbeginning in 2009. The ASR-9/Mode-S SLEP, Phase1B directly supports the Flight Plan Goal to "Sustainthe adjusted operational availability of 99.7% for thereportable facilities that support the 35 OEP airportsthrough FY2013", by 1) Completing installation ofmodifications at 15 sites; and 2) Completinginstallation of modifications at an additional 15 sites.

Activity Target 2:Complete installation of ASR-9 TransmitterModification Kits at 15 additional sites. DueSeptember 30, 2010

Core Activity: Airport SurveillanceRadar Model 11 (ASR-11)The ASR-11 Program provides a single integrateddigital primary and secondary radar system toreplace multiple aging analog terminal radarsystems. The ASR-7/8 and associated secondaryradars (Air Traffic Control Beacon Interrogators orATCBI-4/5, or Mode-S) are at the end of theirprojected useful life cycle. All ASR-7s and manyASR-8s, along with collocated ATCBI-4/5/Mode-Ssystems, will be replaced. Air traffic controllers useterminal surveillance radar systems to detect andtrack aircraft in the area surrounding airports, knownas the terminal environment. Primary radars locateall aircraft, with and without onboard transponders.

Activity Target 1:Achieve Initial Operating Capability (IOC) at 1ASR-11 site. Due September 30, 2010

Secondary radars locate only those aircraft that havetransponders.

The ASR-11 radar system supports the air trafficcontrol automation systems in use today, and otherNAS modernization efforts. ASR-11 capabilitiesinclude digital or analog output, LAN architecture fordata distribution, remote certification and control, allsolid-state components, and a 6-level NationalWeather Service calibrated weather capability - animprovement upon the limited weather capability inthe ASR-7/8 systems.

The ASR-11 has completed the planning phase andis currently a Mixed Life Cycle project with mostefforts in the Full Acquisition Phase, equating to theControl Phase for the current cycle; and iscontinuing into the In-Service Phase, equating to theEvaluate Phase in the Capital Planning andInvestment Control (CPIC) review. The ASR-11Program completed all test and evaluation andachieved an In-Service Decision for systemdeployment on September 22, 2003. As ofSeptember 24, 2009 there are 57 systems in fulloperational capability and commissioned into theNational Airspace System (NAS). Implementation ofmore systems will improve ASR OperationalAvailability (OA) and reduce O&M costs.

Activity Target 2:Start dismantling of 1 legacy ASR-7/8 site. DueMay 31, 2010Activity Target 3:Start dismantling of 2 additional legacy ASR-7/8sites. Due September 30, 2010

Core Activity: Airport SurveillanceRadar, Model 11 (ASR-11) TechnicalRefreshThe ASR-11 Technology Refresh program providesfor the replacement and upgrade of known obsoleteASR-11 Commercial-Off-The-Shelf (COTS)hardware and software to ensure the continuedoperation of the radar system through its designatedlifecycle. The program will replace the obsoletehardware cards within the signal data processingcard rack with the Advanced Signal Data Processor(ASDP). The ASDP reduces the number ofprocessing cards from 14 to 3. The program willprovide funding to DoD under InteragencyAgreement (IAA) to purchase and install 68 ASDPretrofit kits.

The benefits of the ASR-11 Technology Refreshretrofit of the ASDP into the 68 production systemswill reduce Operations and Maintenance (O&M) costby reducing the number of line-replaceable units(LRUs) required for the system and associated

Page 56 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 58: ATO Business Plan 2010

Activity Target 1:Achieve In-service Decision. Due June 30, 2010

maintenance and repair. It will provide a projectedcost savings to the O&M budget by allowing for moreefficient future signal processing softwaremodifications.The retrofitting of the ASDP into the ASR-11 systemallows increased processing speed and memory.

Taking advantage of this processing capability, theASDP software, as delivered, will include baselinechanges that were not possible in the original SignalData Processor due to processing and memorylimitations. Additionally, further changes to the signalprocessing software become possible due to theinherent scalability of the ASDP. This scalabilityallows for increasing the processing capability bysupporting the addition of processor cards withoutrequiring a major restructuring of the software. Withthis ease of adding processing capability, additionalchanges to the signal processing design (from asoftware perspective) are straightforward and easilyaccomplished. The changes to the signal processingwould allow targeting of known shortcomings of thesystem that would improve the system performanceand target detection capability in the presence ofwind farms and other anomalous propagation.Ultimately, the ASR-11 Technology Refresh retrofitof the ASDP into production systems will reduceOperations and Maintenance (O&M) cost by allowingfor more efficient future signal processing softwaremodifications.

Activity Target 2:Provide funding to DoD under InteragencyAgreement (IAA) to purchase eight (8) ASR-11ASDP Retrofit Kits. Due May 31, 2010Activity Target 3:Install four (4) ASR-11 ASDP Retrofit Kits. DueSeptember 30, 2010

Core Activity: Terminal AirportSurveillance Radar - Model 9 (ASR-9) -Service Life Extension Program (SLEP),Phase 2ASR-9 systems provide aircraft detection andweather information to air traffic controllers at thehighest activity airports. The ASR-9 tracks all aircraftwithin its range and provides those tracks, as well assix-level weather intensity information. These dataare provided to terminal automation systems andutilized by air traffic controllers to safely andefficiently separate aircraft in the terminalenvironment. The ASR-9 provides data to AMASSand ASDE-X, to aid in the prevention of accidentsresulting from runway incursions. A business case iscurrently being made to determine the scope of theASR-9 SLEP, Phase 2. ASR-9 SLEP Phase 2 ispending a positive investment decision. Withoutthese modifications to the ASR-9, the ASR-9 will

Activity Target 1:Assess progress for the preparation of a BusinessCase Analysis Report for ASR-9 SLEP/Improve,Phase 2. Due March 31, 2010

continue to experience decreasing reliability andavailability over time. The cost of technology refreshhas been deemed more cost-effective than acquiringfull replacement systems, because the currentperformance is effective in meeting both the safetyand capacity needs of the nation's air traffic systemat major airports. The benefits of this investment willlower O&M costs associated with the ASR-9beginning with the first installation in 2012. The ASR-9 SLEP, Phase 2 directly supports the Flight PlanGoal to "Sustain adjusted operational availability of99.7% for the reportable facilities that support the 35OEP airports through FY2013", by achieving thefollowing: 1) Drafting an Implementation Strategyand Plan 2) Drafting the Screening InformationRequest (SIR).

Activity Target 2:Prepare Business Case Analysis Report for ASR-9SLEP/Improve, Phase 2. Due September 30, 2010

Core Activity: Terminal AutomationModernization / Replacement (TAMR)Phase 3

Activity Target 1:Complete OMB 300 Submission to OST. DueJune 30, 2010

Terminal automation systems are essential forhelping controllers manage the tempo of operationsat our nation's busiest airports. The automationsystems rely on information from radar and weathersensors, along with flight plan information for eachaircraft to inform controllers of the aircraft's locationand intended path of flight so they can safely andefficiently maintain aircraft separation at or nearairports.

The Terminal Automation Modernization andReplacement program provides a phased approachto modernizing the automation systems at the FAA'sTerminal Radar Approach Control (TRACON)facilities and their associated Airport Traffic ControlTowers (ATCT) throughout the NAS.

TAMR Phase 3 begins planning for themodernization/replacement of automation systemsat the remaining 106 TRACONS not beingaddressed by the investments in other earlierphases of the program. The FAA will continue tosustain the automation systems at these sites whilemonitoring system performance to identify anydeterioration in service. Planning and business casedevelopment for TAMR Phase 3 will begin in 2009with future activities pending a JRC decision.

Activity Target 2:Obtain JRC Final Investment Decision. DueSeptember 30, 2010

Page 57 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 59: ATO Business Plan 2010

This Initiative highlights other Strategic CapitalInvestment Programs in Terminal that do not requirean OMB Exhibit 300 and are focused on increasing thecapacity and/or efficiency of the National AirspaceSystem.

Core Business Initiative: IncreaseCapacity and Better Performancewithin Terminal by ImplementingOther Strategic Capital Investments

Core Activity: Flight Data Input/Output(FDIO) Replacement

Activity Target 1:Complete operational analysis and system supportanalysis to identify end of life/obsoletecomponents. Due April 30, 2010

The FDIO system provides standardized flight plandata, safety related data, and other information to airtraffic controllers at more than 500 TRACON, ATCT,and ARTCC facilities. The FDIO system prints flightdata information on paper strips to assist controllersin tracking aircraft and anticipating the arrival ofaircraft in the sector under their control.

The FDIO Replacement program replaces the end-of--life/obsolete FDIO equipment with fully compatible(form/fit/function) commercial off-the-shelf (COTS)equipment.

Activity Target 2:Award contract for replacement components. DueSeptember 30, 2010

Core Activity: Integrated DisplaySystems (IDS) Technology Refresh andSustainment

Activity Target 1:Contract Award. Due May 31, 2010

The Integrated Display System (IDS4) is a local andwide area network information dissemination anddisplay system. IDS4 consolidates information fromseveral operational NAS weather subsystems andother operational sources onto a single display, anddistributes the data to air traffic controllers andairspace managers at TRACON, ATCT, and ARTCCfacilities. The FAA began regional procurements in1990 and currently has 2,230 IDS4 workstationslocated at approximately 390 FAA facilitiesnationwide. Recent obsolescence issues and loss ofproprietary software support make it necessary toreplace this system to sustain its functionality.

Activity Target 2:Delivery and Installation of First Article System toWJHTC. Due September 30, 2010

Core Activity: Electronic Flight StripSystem

Activity Target 1:Complete Joint (FAA/DOD) Operational UtilityEvaluation at two sites. Due September 30, 2010

The FAA currently relies on paper flight strips toprovide air traffic controllers with a physicalrepresentation of the aircraft they are controlling.The strips are used to coordinate and planoperations regarding individual flights, includingarrivals, departures, and surface movement ofaircraft. As flights are processed, the correspondingflight strips are passed from one controller to thenext -- each of whom is concerned with a specificsegment of the overall sequence to be completed.This process is inefficient and restrictive sinceinformation hand-written on the flight strips duringthe progress of a flight is not easily shared with otherpersonnel or facilities.This program will automate the flight strips, providingcontrollers with electronic tools and functions tobetter manage air traffic operations, facilitating asafer and more efficient Air Traffic Control (ATC)operational environment. This system will facilitatethe efficient distribution and management ofelectronic flight plan operations as well as thesharing of flight plan data and system information.

Activity Target 2:Complete Operational Utility Evaluation Reports(HF, ATC, Tech Ops and Logistics) to supportTerminal Planning's CONOPS development andRequirements definition. Due September 30, 2010Activity Target 3:Assess Progress for completing Joint (FAA/DOD)Operational Unit Evaluation at two sites and alsofor completing Operational Utility EvaluationReports (HF, ATC, Tech Ops and Logistics) tosupport Terminal Planning's CONOPSdevelopment and Requirements definition. DueMarch 31, 2010

Core Activity: Terminal Flight DataManagement SystemThe NAS currently relies on several flight datamanagement systems in Air Traffic Control Towers(ATCTs) to provide flight object data and trafficmanagement tools in the terminal environment.These systems include, but are not limited to, AirportResource Management Tool (ARMT), Flight DataInput Output (FDIO), Tower Data Link Services(TDLS), Integrated Display System (IDS), ElectronicFlight Strip Transfer System (EFSTS), andAdvanced Electronic Flight Strip (AEFS). In order toachieve the modernization of the NAS envisioned byNextGen, it is necessary to develop an integratedTerminal Flight Data Management (TFDM) platformthat provides all of the functionality currentlyavailable to controllers as well as emergingcapabilities anticipated in the modernization of theNAS such as Electronic Flight Strip (EFS) and

Page 58 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 60: ATO Business Plan 2010

Activity Target 1:Support Terminal Planning in engineeringmodeling, requirements definition, and investmentplanning activities. Due March 31, 2010

Terminal Data Display System (TDDS). This phaseof TFDM intends to integrate the functionality of theexisting terminal flight data systems and decisionsupport tools in order to reduce operating costs andfacilitate increased capacity in the terminalenvironment through the consolidation of thesesystems.

The TFDM program is an integrated approach tomaximize the efficient collection, distribution, andupdate of the data and improve access to theinformation necessary for the safe and efficientcontrol of air traffic. The system will collect andportray terminal flight object (flight and flow) data aswell as provide traffic management tools on anintegrated display; and, interface to information anddecision support tools.

Activity Target 2:Support Terminal Planning in completingengineering analyses, initial cost/scheduleestimates and other documentation necessary tosupport Investment Analysis Readiness. DueSeptember 30, 2010

Core Activity: ATCT/TRACONModernization

Activity Target 1:Conduct 16 Facility Life Cycle and/or ConditionAssessments to determine sustainment needs.Due September 30, 2010

The FAA has an extensive program forATCT/TRACON realignment and sustainment inorder to increase the facility condition index. TheFAA must continually realign or sustain thesefacilities to ensure an acceptable level of air trafficcontrol services and to accommodate proposedNextGen enhancements. ATO-T's Air Traffic ControlFacilities program contributes to the FAA greatercapacity goal by sustaining ATCTs and realigningand modernizing TRACONs to meet current andfuture operational requirements. This programaddresses requirements to accommodate growth inair traffic; provide added space for new equipment.The ATCT/TRACON sustainment and TRACONrealignment programs upgrade and improve facilitiesto support the NAS modernization strategy forachieving efficient aerospace systems andoperations. These projects will enable facilities tomeet current operational, environmental, and safetyneeds economically instead of replacing the entirefacility.

Activity Target 2:Assess Progress for Initiating 30 new projects foreither realignment, modernization and/orsustainment of ATCT/TRACON facilities by theend of the fiscal year. Due March 31, 2010

Activity Target 3:Initiate 30 new projects for either realignment,modernization and/or sustainment ofATCT/TRACON facilities. Due September 30,2010

Core Activity: ATCT/TRACONReplacement

Activity Target 1:Assess Progress for initiating four constructionawards and continuation with multiple Phase IVand V activities by the end of the fiscal year. DueMarch 31, 2010

An Air Traffic Control Tower (ATCT) and TerminalRadar Approach Control (TRACON) are integralparts of many airports. It is from these facilities theair traffic controllers direct aircraft in the terminalairspace environment. There are more than 500ATCTs and TRACONs within the Department ofTransportation. The average age of these facilities isapproximately 30 years old, and the oldest facilityhas been in service for over 70 years. The primarymethod of controlling the immediate airportenvironment is visual observation from the controltower. The tower is a tall, windowed structurelocated on the airport grounds. Tower controllers areresponsible for the separation and efficientmovement of aircraft and vehicles operating on thetaxiways and runways of the airport itself, andaircraft in the air near the airport. A TRACON is afacility that provides radar separation services within30 to 50 miles of an airport but does not alwaysneed to be located at the airport. The FAA has arigorous program for ATCT/TRACON replacement.The FAA must also continually replace facilities toensure an acceptable level of air traffic controlservices. ATO-T's Air Traffic Control Facilitiesprogram contributes to the FAA greater capacitygoal by replacing ATCTs and TRACONs to meetcurrent and future operational requirements. Thisprogram addresses requirements to accommodategrowth and safety concerns (e.g., to ensure thatcontrollers have an unobstructed view of therunways and taxiways).

Activity Target 2:Initiate four construction awards and continue withmultiple Phase IV and V activities. Due September30, 2010

Core Activity: Terminal AirportSurveillance Radar Model 8 (ASR-8)Service Life Extension Program (SLEP)The Airport Surveillance Radar, Model-8 (ASR-8)was procured in the mid-1970s and fielded between1975 and 1980 to provide primary surveillance radardata to air traffic controllers at low and mediumactivity airports. Forty-two ASR-8 systems (39operational systems, 3 support systems) will remainin use in the National Airspace System (NAS) afterthe Airport Surveillance Radar, Model-11 (ASR-11)

Page 59 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 61: ATO Business Plan 2010

Activity Target 1:Assess progress for completing a Business CaseAnalysis Report by the end of the fiscal year. DueMarch 31, 2010

program implementation is complete. The NASArchitecture Surveillance Roadmap retains the ASR-8 systems through the year 2025. The NASArchitecture also identifies Automatic DependentSurveillance-Broadcast (ADS-B) as the primarymeans of surveillance for the future. The approvedADS-B backup strategy assumes, primary radarservices will remain in all terminal areas covered byprimary radar today and will serve to mitigate single-aircraft avionics failures in the event of loss of ADS-B positioning source. The ASR-8 systems are wellpast their intended life span and need modificationsto contain operating costs and ensure the systemsare able to operate within the NAS and meet thedemands of projected traffic profiles through 2025.The ASR-8 was developed using technology that isnow obsolete. Many parts are no longer availableand the ASR-8 analog data output can not interfacedirectly with newer digital technology. Currently 11ASR-8 operational systems are converted to digitalformat to feed existing automation systems. In theAutomation Roadmap all automation systems willrequire digital radar input as a result of the migrationfrom ARTS-IIE to ARTS-IIIE or STARS. TheSurveillance Roadmap includes a decision point forimplementation of Internet Protocol (IP) addressingat radar facilities which will also require digital radardata. The Surveillance Roadmap also retains theSecondary Surveillance Radar (SSR) after therequirement to provide digital radar input to theautomation systems; this will require digitization ofthe SSR as well. To support the agency effort toestablish consolidated Terminal Radar ApproachControl (TRACON) facilities approximately half of theremaining ASR-8 systems will require a digital targetoutput as well as a 6-level weather output. Providinga digital weather output will also support the agencyto meet the recent NTSB recommendation forstandardized 4-level weather reporting. The FAAalso provides ASR-8 data to support the DoDmission. Currently the DoD Air Defense Sectorreceives radar data from 8 of the 39 operational ASR-8 systems. In FY2010 Complete documents andreviews required for a Final Investment Decision(FID).

Activity Target 2:Complete the Business Case Analysis Report. DueSeptember 30, 2010

Core Activity: Wake TurbulenceMitigation for Departures (WTMD)The Wake Turbulence Mitigation for Departure(WTMD) Program includes two tasks. First, anational rule change is needed to allow increaseddepartures from closely spaced parallel runways(CSPR) when WTMD is being utilized. Second, this

Activity Target 1:Assess progress towards meeting the year-endcommitment for providing analysis support toenable decision to either terminate, modify, orcontinue the program. Due March 31, 2010

WTMD program will field new equipment in AirTraffic Control Towers. WTMD equipment appliesNASA research using MIT Lincoln Laboratory(MIT/LL) software algorithms to process both surfacewind observations and forecast winds aloft, todetermine when favorable crosswinds exist inrelation to the CSPR. WTMD alerts Air TrafficControl (ATC) supervisors when these favorablemeteorological conditions might allow reduceddeparture spacing. The ATC supervisors useWTMD inputs and other operational decision aids,when to decide when to reduce departure spacing.WTMD also provides alarms when such favorablecrosswind conditions cease to exist. Reducedspacing on departure yields significantimprovements in use of available capacity at airportswith CSPR. Ten of thirty-five Operational EvolutionPlan (OEP) airports and five of fifteen OEPMetropolitan Growth Areas will be served by WTMD.Benefits range between two and eleven moredepartures per hour, weather permitting, through theuse of WTMD techniques. The ten targeted OEPairports with CSPR include Houston, St. Louis,Boston, Detroit, Newark, Memphis, Miami,Philadelphia, Seattle, and San Francisco.

Activity Target 2:Provide analysis support to enable decision-making to either terminate, modify, or continue theprogram. Due September 30, 2010

Terminal Services will meet future capacity demands byensuring the provision of safe and efficient terminal airtraffic control services throughout the terminal portion ofthe National Airspace System (NAS) through targetedcapacity increases to 1) Achieve an average daily airportcapacity for the 35 OEP airports of 104,338 arrivals anddepartures per day by FY 2011 and maintain through FY2012 (FY10 Target = 102,220 arrivals and departures perday); and 2) Achieve an average daily airport capacity forthe seven major metropolitan areas of 39,484 arrivalsand departures per day by FY 2009, and maintainthrough FY 2012 (FY10 Target = 39,484 arrivals anddepartures per day); and 3) Achieve a NAS on-timearrival rate of 88.76 percent at the 35 OEP airports by FY2011 and maintain through FY 2012 (FY10 Target =89.31 percent).

Core Business Target: IncreaseTerminal Capacity to MeetExpected Demand

Core Business Initiative: ProvideTerminal Services Support toEnable Increases in Airport Capacity

Page 60 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 62: ATO Business Plan 2010

Provide the oversight, management and supportnecessary to enable safe increases in capacity andefficiency through changes in airspace, improvedprocedures, and insertion of new technology into theoperation.

Core Activity: Terminal Services Safetyand Operations Support

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy an average dailyairport capacity for the 35 OEP Airports of102,220. Due March 31, 2010

Provide the operational support functions necessaryto enable increases in airport capacity whendelivering terminal air traffic control servicesincluding Contract Tower and Contract WeatherObserver Program Management, SafetyEngineering, Airspace & Procedures Analysis andDevelopment, Quality Assurance and OperationsAnalysis.

Activity Target 2:Achieve an average daily airport capacity for the35 OEP Airports of 102,220. Due September 30,2010Activity Target 3:Complete assessment for achieving year-endperformance goal to satisfy an average dailyairport capacity for the Seven Metropolitan Areasof 39,484. Due March 31, 2010Activity Target 4:Achieve an average daily airport capacity for theSeven Metropolitan Areas of 39,484. DueSeptember 30, 2010Activity Target 5:Complete assessment for achieving year-endperformance goal to satisfy a NAS on-time arrivalrate of 89.31 percent at the 35 OEP airports. DueMarch 31, 2010Activity Target 6:Achieve a NAS on-time arrival rate of 89.31percent at the 35 OEP airports. Due September30, 2010

Core Activity: Terminal ServicesOperations - Eastern Service Area

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy an average dailyairport capacity for the 35 OEP Airports of102,220. Due March 31, 2010

Provide the operational oversight and managementof terminal air traffic control operations in theEastern Terminal Service Area to ensure thatinitiatives to redesign airspace and changeprocedures are increasing the overall capacityand/or efficiency of the terminal domain.

Activity Target 2:Achieve an average daily airport capacity for the

35 OEP Airports of 102,220. Due September 30,2010Activity Target 3:Complete assessment for achieving year-endperformance goal to satisfy an average dailyairport capacity for the Seven Metropolitan Areasof 39,484. Due March 31, 2010 Due March 31,2010Activity Target 4:Achieve an average daily airport capacity for theSeven Metropolitan Areas of 39,484. DueSeptember 30, 2010 Due September 30, 2010Activity Target 5:Complete assessment for achieving year-endperformance goal to satisfy a NAS on-time arrivalrate of 89.31 percent at the 35 OEP airports. DueMarch 31, 2010Activity Target 6:Achieve a NAS on-time arrival rate of 89.31percent at the 35 OEP airports. Due September30, 2010

Core Activity: Terminal ServicesOperations - Central Service Area

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy an average dailyairport capacity for the 35 OEP Airports of102,220. Due March 31, 2010

Provide the operational oversight and managementof terminal air traffic control operations in the CentralTerminal Service Area to ensure that initiatives toredesign airspace and change procedures areincreasing the overall capacity and/or efficiency ofthe terminal domain.

Activity Target 2:Achieve an average daily airport capacity for the35 OEP Airports of 102,220. Due September 30,2010Activity Target 3:Complete assessment for achieving year-endperformance goal to satisfy an average dailyairport capacity for the Seven Metropolitan Areasof 39,484. Due March 31, 2010Activity Target 4:Achieve an average daily airport capacity for theSeven Metropolitan Areas of 39,484. DueSeptember 30, 2010Activity Target 5:Complete assessment for achieving year-endperformance goal to satisfy a NAS on-time arrivalrate of 89.31 percent at the 35 OEP airports. DueMarch 31, 2010Activity Target 6:Achieve a NAS on-time arrival rate of 89.31percent at the 35 OEP airports. Due September30, 2010

Page 61 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 63: ATO Business Plan 2010

Core Activity: Terminal ServicesOperations - Western Service Area

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy an average dailyairport capacity for the 35 OEP Airports of102,220. Due March 31, 2010

Provide the operational oversight and managementof terminal air traffic control operations in theWestern Terminal Service Area to ensure thatinitiatives to redesign airspace and changeprocedures are increasing the overall capacityand/or efficiency of the terminal domain.

Activity Target 2:Achieve an average daily airport capacity for the35 OEP Airports of 102,220. Due September 30,2010Activity Target 3:Complete assessment for achieving year-endperformance goal to satisfy an average dailyairport capacity for the Seven Metropolitan Areasof 39,484. Due March 31, 2010Activity Target 4:Achieve an average daily airport capacity for theSeven Metropolitan Areas of 39,484. DueSeptember 30, 2010Activity Target 5:Complete assessment for achieving year-endperformance goal to satisfy a NAS on-time arrivalrate of 89.31 percent at the 35 OEP airports. DueMarch 31, 2010Activity Target 6:Achieve a NAS on-time arrival rate of 89.31percent at the 35 OEP airports. Due September30, 2010

Core Activity: Widely Spaced Parallelswithout Final Monitors.

Activity Target 1:Assess progress for completing Safety Analysis.Due December 31, 2009

Conduct an analysis to determine the safety ofproviding simultaneous parallel approaches withoutthe use of monitors and or no-transgression zone.Each facility that has widely space parallelsapproaches will be analyzed to determine if benefitscan be derived from removing the requirements tostaff finally monitor position. The analysis will alsodetermine minimum runway separation for such aprocedure.

Activity Target 2:Complete Safety Analysis. Due March 31, 2010

Core Activity: Closely Spaced ParallelOperationsDetermine the ability to conduct independentoperations on closely spaced parallel runwaysseparated by 3000 feet. An analysis will be

Activity Target 1:Assess Progress for Completing FeasibilityAnalysis by end of fiscal year. Due March 31,2010

conducted to determine the feasibility of reducing theseparation for dependent operations from 4300 feetto 3000 feet. This will provide more flexibility tothose facilities that has closely spaced parallels.

Activity Target 2:Complete Feasibility Analysis. Due September 30,2010

Core Activity: Obstruction ClearanceRequirements

Activity Target 1:Assess Progress for Completing Study assessingthe level of safety for various separation minimafor differing surveillance sources by the end of thefiscal year. Due March 31, 2010

Conduct a study to access the viability of reducingthe separation minima from obstructions. To ensureterminal facilities can maximize airspace design forarrivals and departures it is important to understandthe separation minima as defined per technologyelement with the advent of NextGen technologies.Any reduction of separation minima for obstructionthat is based upon new radar capabilities orNextGen technologies for terminal approach controlswill be accessed.

Activity Target 2:Complete Study assessing the level of safety forvarious separation minima for differing surveillancesources. Due September 30, 2010

Core Activity: Parallel InstrumentApproaches Without PrimarySurveillance

Activity Target 1:Assess Progress for Completing Risk Assessmentby the end of August 2010. Due March 31, 2010

Conduct a risk assessment of being able to conductsimultaneous parallel instrument approaches atairports with the primary surveillance radar systemsnot located on the airport. This initiative will identifyadditional airports that maybe able to provideparallel instrument approaches without the use ofparallel surveillance radar.

Activity Target 2:Complete Risk Assessment. Due August 31, 2010

Increase terminal direct employee productivity byachieving the Terminal Services Productivity target of9,295 operations per direct employee by September2012 (FY10 Target = Achieve the ATO Terminal ServicesProductivity target of 9,061operations per directemployee). This target is consistent with those identified

Core Business Target: ImproveTerminal Services Productivity

Page 62 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 64: ATO Business Plan 2010

in the Controller Workforce Plan, which was first providedto Congress in December 2004.

Provide the planning and systems engineering supportnecessary to enable safe increases in direct employeeproductivity using improved procedures andtechnology.

Core Business Initiative: ProvideSupport to Enable Increases inTerminal Services Productivity

Core Activity: Terminal ServicesPlanning

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy the ATO TerminalServices Productivity target of 9,061 operationsper direct employee. Due March 31, 2010

Provide the planning support functions necessary tosupport the transition to NextGen and increaseproductivity when delivering terminal Air TrafficControl (ATC) services including systemsengineering, facility planning, strategic planning andperformance reporting, and workforce planning.

Activity Target 2:Achieve the ATO Terminal Services Productivitytarget of 9,061 operations per direct employee.Due September 30, 2010Activity Target 3:Complete assessment for achieving ear-endperformance goal to satisfy 90% of the NextGenIntegrated Work Plan (IWP)/NAS EnterpriseArchitecture (EA) Decision Milestones as planned.Due March 31, 2010Activity Target 4:Achieve 90% of the NextGen Integrated Work Plan(IWP)/NAS Enterprise Architecture (EA) DecisionMilestones as planned. Due September 30, 2010

Sustain NAS power systems to allow for continuousoperations. Sustain adjusted operational availability at99.70% for reportable power system facilities thatsupport the 35 OEP airports.

Core Business Target: <STICANDIDATE> Sustain adjustedoperational availability at 99.70%for reportable power systemfacilities that support the 35 OEPairports

AJW-22 provides numerous program managementactivities in support of the procurement, installation,

Core Business Initiative: Providepower systems engineering,implementation, and operationsexpertise

and operation of power systems in the NAS.

Core Activity: Sustain power systems.

Activity Target 1:Complete 60 engine repair/replacement projects inthe corporate work plan. Due September 30, 2010

AJW-22 is responsible for ensuring that there is aconstant power supply to the essential systems inthe NAS. They support this activity through theinstallation of multiple systems.

Activity Target 2:"Complete 6 UPS REPLACE + POWERDISTRIBUTE repair/replacement projects in thecorporate work plan." Due September 30, 2010Activity Target 3:"Complete 15 lightning protect ground bondingrepair/replacement projects in the corporate workplan." Due September 30, 2010Activity Target 4:"Complete 35 DC Bus system repair/replacementprojects in the corporate work plan." DueSeptember 30, 2010Activity Target 5:"Complete 44 GNAS & 5 ACEPS (Note: strings ateach site: 3, 2, 3, 3, and 4) sites BatteryReplacement projects in the corporate work plan."Due September 30, 2010Activity Target 6:"Complete 6 power cable replacement projects inthe corporate work plan." Due September 30, 2010Activity Target 7:"Complete upgrade/replacement of 2 ARTCCpower systems." Due September 30, 2010Activity Target 8:"Complete 2 CPDS systems to support terminalupgrades/replacements" Due September 30, 2010Activity Target 9:Sustain operational availability at 99.70 percent forreportable power system facilities that support the35 OEP airports. Due September 30, 2010Activity Target 10:Proactively improve the power equipmentreplacement process through new test proceduresand performance based data analysis. Achieve aminimum ratio of 85%. Due September 30, 2010Activity Target 11:Replace the NAS power equipment supportingOEP ATC operations that are technologicallyobsolete and unsupportable. Complete 90% of JAIPlanned FY10 OEP Projects. Due September 30,2010Activity Target 12:Inventory 5% of the NAS power equipmentsupporting OEP ATC operations that aretechnologically obsolete and unsupportable(BASED ON RANKING TABLES DATASET). Due

Page 63 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 65: ATO Business Plan 2010

September 30, 2010

Analyze actual versus projected benefits of En Routeairspace changes and airspace utilization efforts toincrease future capacity by creating a prioritized list byMarch 31, 2010.

Core Business Target: Identifyand Prioritize En RouteApproved Airspace Changes andImplement Technical InitiativesBased on Outcomes and Costs

Identify and prioritize En Route airspace changes andairspace utilization efforts that increase futurecapacity.

Core Business Initiative: Deliver onAirspace Modernization Programs

Core Activity: Houston Area Air TrafficSystem (HAATS)

Activity Target 1:Complete Phase 3C. Due June 30, 2010

Coordinate Houston Area Air Traffic System(HAATS) activities.

Provide for a future air transportation system byachieving the percentage of Air Traffic Organization, EnRoute and Oceanic Services research milestonesplanned in support of NextGen. FY 2010 target: 100percent.

Core Business Target: Supportthe Next Generation Air TrafficControl System (NextGen)

Conduct proof of concepts, demonstrations and flighttrials in support of NextGen.

Core Business Initiative: ConductTechnical Development Activities inSupport of NextGen

Core Activity: Draft Five-year En Routeand Oceanic Research andDevelopment Plan

Activity Target 1:Prepare the initial draft of the En Route andOceanic Research and Development Plan(FY2010 -- 2015). Due May 31, 2010

Develop a draft Five-Year En Route and OceanicResearch and Development Plan. The Plan willcover research and development activities betweenFY2010 and FY2015 and will include activities forNextGen Mid-term and beyond.

Activity Target 2:Prepare the final draft of the En Route andOceanic Research and Development Plan(FY2010 -- 2015). Due September 30, 2010

Core Activity: Collaborative Pre-Departure Oceanic TrajectoryManagement 4D (OTM4D)

Activity Target 1:Provide operational support for operational trials inPolar and/or Pacific airspace. Due September 30,2010

Conduct technical development activities forCollaborative Pre-Departure Oceanic TrajectoryManagement 4D (OTM4D). The FAA is developing aconcept to improve the probability that an aircraftoceanic entry altitude and En Route preferred profilewill be available by suggesting minor adjustments totrack altitude and time requests for oceanic entry.

Activity Target 2:Complete assessment for Atlantic and Caribbeanairspace. Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: Oceanic TrajectoryManagement 4D (OTM4D) In-FlightEvaluator

Activity Target 1:Finalize the technology software and hardwarerequirements for prototype development. DueSeptember 30, 2010

Conduct technical development for OceanicTrajectory Management 4D (OTM4-D) In-FlightEvaluator. The FAA is developing a program tooptimize aircraft profiles against known traffic forairborne flights.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Core Activity: Draft En Route andOceanic Integrated Concept ofOperations

Activity Target 1:Prepare the initial draft of the En Route andOceanic Integrated Concept of Operations forNextGen Mid-Term and beyond. Due May 31,2010

Develop a draft En Route and Oceanic IntegratedConcept of Operations for NextGen Mid-Term andbeyond.

Activity Target 2:Prepare the final draft of the En Route andOceanic Integrated Concept of Operations forNextGen Mid-Term and beyond. Due September30, 2010

Core Business Target: EnhanceNational Airspace SystemEfficiency

Page 64 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 66: ATO Business Plan 2010

The overall outcome ATO customers most want ispredictability of flight operations, with emphasis on on-time arrivals and flexibility for routing and altitudes. AsATO can provide desired routes and altitudes, we helpcustomers reduce both costs and delays. SystemOperations works to minimize the impact of weather,congestion, and security restrictions on aircraftoperations in the National Airspace System.

The activities performed to balance air traffic demandwith system capacity in order to maximize airspaceuse.

Core Business Initiative: TrafficFlow Management (TFM) Operations

Core Activity: Collaborative DecisionMaking Operations

Activity Target 1:Assess the previous severe weather season byconducting an end of season review with aviationstakeholders. Due November 15, 2009

Activities performed to coordinate with systemstakeholders to maximize system efficiency. Thegoal of these activities is to balance air trafficdemand with system capacity on an ongoing, dailybasis to maximize airspace use. The CommandCenter conducts a yearly end of season review withaviation stakeholders and daily strategic planningtelcons to assess the daily operation of the NAS.

Activity Target 2:Conduct annual review of Playbook/CDR use toidentify and prepare changes needed to supportthe upcoming severe weather season. DueFebruary 28, 2010

Core Activity: TFM System Sustainment

Activity Target 1:Distribute 56 Day Chart updates of NAS databaseelements (e.g., navigational fixes, routes, sectorchanges) to TFMS sites every 56 days. DueSeptember 30, 2010

Upgrades to sustain the Traffic Flow ManagementSystem (TFMS) that cover all activities to maintainsystems, including but not limited to: technicalrefresh of existing hardware and software of theTFMS, 56 Day Chart Updates, development ofrequisite information security documentation as wellas system documentation, PTR fixes, and updates tothe information contained within the system.

Activity Target 2:Complete TFMS Security documentation. DueJune 30, 2010Activity Target 3:Complete installation of TFMS equipment at newfacilities, as necessary. Due September 30, 2010Activity Target 4:Provide TFMS roadshow support, as necessary.Due September 30, 2010

Activity Target 5:Complete ASDI audit process for vendors. DueJune 30, 2010

Core Activity: Departure SpacingProgram (DSP)

Activity Target 1:Complete deployment of DSP tech refresh. DueJune 30, 2010

All activities to maintain systems, including but notlimited to technical refresh of existing hardware andsoftware of the DSP, Adaptation ControlledEnvironment System Chart Update, development ofrequisite information security documentation as wellas system documentation, PTR fixes, and updates tothe information contained within the system.

Activity Target 2:Distribute 56-day Chart update of NAS databaseelements to DSP locations. Due September 30,2010

Core Activity: Center Weather ServiceUnit (CWSU) Support

Activity Target 1:Complete annual site evaluations of currentCWSU services. Due October 15, 2009

Provide funding for an Inter-Agency agreement withthe National Weather Service (NWS) to providemeteorological consultation, nowcasting, and adviceregarding weather events that may have potentialimpacts on air traffic operations to FAA operationspersonnel at 21 Air Route Traffic Control Centers(ARTCCs) 16 hours per day/7 days per week.

Activity Target 2:Based on site evaluations, providerecommendations for improvements. DueDecember 31, 2009Activity Target 3:Update/establish performance baseline standardsfor CWSU operations. Work with the NWS todevelop metrics that track performanceinformation. Due March 1, 2010

Develop and maintain national standards for airspaceredesign. Manage AMP programs.

Core Business Initiative: AirspaceManagement Program

Core Activity: Airspace ManagementProgram Planning

Activity Target 1:Conduct regular national program reviews. DueSeptember 30, 2010

Revise, update and maintain national standards forairspace redesign. Manage AMP programs.

Activity Target 2:Update the Airspace Management Handbook. DueSeptember 30, 2010

Page 65 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 67: ATO Business Plan 2010

Achieve situational awareness and trajectory-basedoperations for increased airspace capacity throughexpanded capabilities of aeronautical information.

Core Business Initiative:Aeronautical Information Integration

Core Activity: Common Status andStructure Data

Activity Target 1:Develop data/exchange model draftrecommendations for proposed informationexchange of scenario data. Due May 30, 2010

Deliver an integrated source of aeronauticalinformation that supports tactical and strategicsituational awareness. Provide a comprehensivepilot briefing and flight planning service,incorporating NAS status and NAS constraintinformation that improves planning of NASoperations. Deliver forecasting and benchmarkingoperational performance tools to improve air trafficmanagement.

Activity Target 2:Develop detailed Concept of Operations JointRequirements for leading scenarios integrated intoNAS Enterprise Architecture. Due August 30, 2010

Protect the US from Air Security threats and mitigate theaffect of Air Security measures on NAS users.

Core Business Target: MitigateSecurity Impacts on the NAS

The Tactical Operations Security will operationallycoordinate with and support DHS, DoD, and othercritical aviation security stakeholders on real-timesecurity related activities and incidents involving theNAS through the Domestic Events Network (DEN),onsite collaboration at the National Capital RegionCoordination Center (NCRCC) and DoD locations, andother mechanisms. Air Traffic Security Coordinators(ATSCs) will operate from four locations to respond toaviation security related incidents, including violationsof the National Capital Region's (NCR) Special FlightRules Area (SFRA) and Flight Restricted Area (FRZ),as well as suspect No-Fly passengers, Special InterestFlights (SIF), stolen aircraft, etc. Through closecollaboration with stakeholders, security measures willbe enhanced and information will be efficiently sharedwhile mitigating impacts on the safety and efficiency ofthe NAS.

Core Business Initiative: SystemOperations Security TacticalOperations

Core Activity: Collaborate with SecurityPartnersCollaborate with security partners to developsecurity related TFRs and NOTAMs and to ensuretimely distribution of the information to reduce theimpact the measures have on NAS operations.

Activity Target 1:Complete actions to publish TFR and othersecurity NOTAM information via the Internet withinone hour of finalizing the details. Due September30, 2010Activity Target 2:Quarterly review TFR and NOTAM data to identifytrends and work flow requirements. Brief seniorAJR-2 management of findings. Normally this willbe accomplished within 45 days of the conclusionof the quarter and briefed within 60. DueSeptember 30, 2010

Core Activity: Coordination of NSSE,SFRA and FRZ Operations

Activity Target 1:Quarterly review and publish an updated DENuser customer guide; if no update is needed, notifythe customers that the previous version remainscurrent. Due September 30, 2010

Air Traffic Security Coordinators (ATSCs) willoperate from four locations and respond to aviationsecurity related incidents, including NSSEoperational issues, violations of the National CapitalRegion's (NCR) Special Flight Rules Area (SFRA)and Flight Restricted Zone (FRZ), as well as suspectNo-Fly passengers, Special Interest Flights (SIF),stolen aircraft, etc.

Activity Target 2:Collaborate with AJR-22 to establish a formalquality assurance program and accomplish at leastone full Quality Assurance evaluation by the end ofthe fiscal year at each location. Due September30, 2010

The Special Operations Security (AJR-21) group willcollaborate with the Department of Defense (DoD) andDepartment of Homeland Security (DHS) to provide airtraffic operations related support to national defenseand homeland security missions through the use ofliaisons officers embedded in the military's air defensesector and major commands, including DHS' AirMarine Operations Center (AMOC). This group willcollaborate with DHS and other security stakeholdersto protect National Special Security Events (NSSE)and other special events such as the United NationsGeneral Assembly, Presidential Inauguration, State ofthe Union Address, and the Super Bowl from aviationrelated threats through the use of Temporary FlightRestrictions (TFRs), operational coordination with airtraffic control (ATC) facilities, and other air trafficoperational measures. The group assists the UnitedStates Secret Service (USSS) to guard the Presidentof the United States (POTUS), Vice President of theUnited States (VPOTUS), Heads of State and otherdignitaries as needed from aviation related security

Core Business Initiative: SystemOperations Security SpecialOperations

Page 66 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 68: ATO Business Plan 2010

threats through the use of temporary flight restrictions(TFRs), operational coordination with ATC facilities,and other air traffic operational measures. This groupalso provides air traffic related support to local, stateand federal law enforcement partners and classifiedsupport to federal partners for national defense andhomeland security missions.

Core Activity: National Special SecurityEvents

Activity Target 1:Identify and implement protective airspacesecurity measures (including the publication of thepreliminary advisory notice) for all NSSEs andspecial events. Normally preliminary advisorynotices will be accomplished two weeks prior tothe event. Conduct a quarterly review of events toensure 90% of the notices are published twoweeks prior to the event. Due September 30, 2010

National Special Security Events: Cooperate with theDHS and other security stakeholders to protectNational Special Security Events (NSSE) andSpecial Events such as the United Nations GeneralAssembly, Presidential Inauguration, State of theUnion Address, and the Super Bowl from aviationrelated threats through the use of Temporary FlightRestrictions (TFRs), operational coordination with AirTraffic Control (ATC), and other air traffic operationalmeasures.

Core Activity: System OperationsCollaboration with Homeland Security

Activity Target 1:Conduct a quarterly review using DoD's interceptoperations reports and identify actions to be takenby FAA to mitigate the impact of interceptoperations in the NAS while still meeting nationalsecurity objectives. The review will normally beconducted within 45 days of the close of thequarter and actions such as meeting with DoD,DHS and internal FAA representatives willnormally occur within 60 days of the reviewcompletion. The result and actions taken will bebriefed to appropriate FAA executives. DueSeptember 30, 2010

Cooperate with Department of Defense (DoD) andDepartment of Homeland Security (DHS) to provideair traffic operations related support to nationaldefense and homeland security missions through theuse of liaisons officers embedded in the military's airdefense sector and major commands, includingDHS' Air Marine Operations Center (AMOC).

Core Activity: Classified SystemOperations Collaboration with FederalPartnersCooperate with Department of Defense (DoD),Department of Homeland Security (DHS) and otherFederal partners to provide classified air trafficrelated support to federal partners for nationaldefense and homeland security missions.

Activity Target 1:Conduct a quarterly review using DoD's classifiedoperations reports and identify actions to be takenby FAA to mitigate the impact of classsifiedoperations in the NAS while still meeting nationalsecurity objectives. The review will normally beconducted within 45 days of the close of thequarter and actions such as meeting with DoD,DHS and internal FAA representatives willnormally occur within 60 days of the reviewcompletion. The result and actions taken will bebriefed to appropriate FAA executives. DueSeptember 30, 2010

Core Activity: System OperationsCollaboration with Local, State, andFederal Law Enforcement Partners

Activity Target 1:Conduct a quarterly review using law enforcementflight activity reports and identify actions to betaken by FAA to mitigate the impact of lawenforcement flight activities on the NAS while stillmeeting national security objectives. The reviewwill normally be conducted within 45 days of theclose of the quarter and actions such as meetingwith law enforcement and internal FAArepresentatives will normally occur within 60 daysof the review completion. The result and actionstaken will be briefed to appropriate FAAexecutives. Due September 30, 2010

Cooperate with Department of Homeland Security(DHS) and other law enforcement partners at thelocal, state and federal levels to provide air trafficrelated support for law enforcement missions.

The Strategic Operations Security (AJR-22) group willcollaborate with DoD and DHS on over 50 national,regional, and local exercises each year to enhance theoperational readiness of key national defense andhomeland security capabilities while mitigating theimpact of DoD and DHS operations and relatedmeasures on the safety and efficiency of the NationalAirspace System (NAS). As the lead for ATO and FAA,this group will coordinate with Department of State(DOS) and other stakeholders on special air trafficrelated handling (e.g., secure routing) of flights byselect States (e.g., countries of special securityinterest to the U.S.) designated as Special InterestFlights (SIF) in order to mitigate potential securitythreats. The group will provide air traffic operationsrelated support of and coordination on (e.g., specialATC handling) of flights operating in the U.S. under theOpen Skies treaty, which enables 35 party states toconduct reconnaissance flights over party states tocollect data on military forces and activities. Thisgroup will take action to mitigate the impact of OpenSkies flights on the safety and efficiency the NAS.

Core Business Initiative: SystemOperations Security StrategicOperations

Page 67 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 69: ATO Business Plan 2010

Also, this group will provide national level standards,procedures, procurement, and logistical support forATO's conduct of classified voice and datacommunications (referred to as COMSEC) bothinternally and with other government agencies.Through active oversight of security related programs,procedures and analyses including updates for FAAOrder 7610.4 Special Operations and responses tocongressional letters, this group will ensurecompliance with security related mandates within theFAA and provides guidance to other aviation securitypartners. Strategic Operations will also seek methodsto enable faster identification of potential airbornethreats in US territorial airspace such as the ADAPTinitiative. This group's objective is to mitigate theimpact of these measures on the safety and efficiencyof the NAS through effective planning andimplementation.

Core Activity: Emergency PlanningActivities

Activity Target 1:Conduct monthly ATO emergency planningmeetings and publish meeting minutes within 10business days. Due September 30, 2010

Coordinate and manage the ATO's emergencyplanning activities.

Activity Target 2:Draft project plan for the implementation of anATO Crisis Response/Emergency OperationsDirective by March 2010. The project plan willinclude approach to be used, coordinationrequirements, required participants, andmilestones. Brief status of Directive to ATOexecutives by September 2010. Due September30, 2010Activity Target 3:Publish an integrated Exercise calendar monthly.Due September 30, 2010Activity Target 4:Draft an ATO Crisis Response / EmergencyOperations order that responds to AgencyDirectives, the National Response Framework, andTitle 49 obligations. Due December 30, 2009

Core Activity: Support National Strategyfor Aviation Security

Activity Target 1:Support completion of remaining NSAS items.Due September 30, 2010

Support and represent DOT/FAA in development ofplans that support National Strategy for AviationSecurity.

Activity Target 2:Finalize ATO MANPADS plan. Due July 31, 2010

Core Activity: Develop QualityAssurance Program

Activity Target 1:Complete one full facility quality assuranceevaluation on one of the four field TacticalOperations facilities (DEN, CONR, CRCC,NORAD). Brief AJR-2 management of results andissues to be resolved within 30 days ofevaluations. Due September 30, 2010

Develop and manage the AJR-2 Quality AssuranceProgram.

Activity Target 2:Complete a draft AJR Quality Assurance Order.Due December 31, 2009Activity Target 3:Complete a final version of the AJR QualityAssurance Order. Due April 30, 2010Activity Target 4:Develop framework for a standardized trainingprogram for FAA DEN facilities. Due September30, 2010

Provide and test at least one support plan in the case ofan emergency by September 30, 2010.

Core Business Target: Create adisaster support infrastructure.

Provide support assistance to NAS systems in case ofemergency or disaster.

Core Business Initiative: Providedisaster support.

Core Activity: Ensure readiness fornational disasters and emergencyresponse.

Activity Target 1:Complete annual BCP activation test. Due June 9,2010

Ensure readiness for national disasters andemergency response.

Support customers and those maintaining the NAS byresponding and reacting to customer feedback.

Core Business Target: SecureCustomer Feedback.

Provide customer support by securing feedback.

Core Business Initiative: CustomerSupport

Core Activity: Customer Support andFeedback.

Activity Target 1:Participate in 2 Technical Exchange or Workshopsthat support Field ISM activities. Due September

Customer Support and Feedback.

Page 68 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 70: ATO Business Plan 2010

30, 2010

Activity Target 2:Each Team provide, collect and report 2 customerservice surveys. Due September 30, 2010Activity Target 3:Attend 50% of AJW-13 monthly line of businesstelecons. Due September 30, 2010

Manage NAS performance by working with Second Leveland the Service Areas to provide briefings to ATOexecutives within 24 hours of a significant issue.

Core Business Target: ManageNAS Performance.

As necessary report on NAS status and be able toexplain and/or resolve significant issues.

Core Business Initiative: Report onNAS Status.

Core Activity: Facilitate management ofNAS performance.

Activity Target 1:Provide daily briefings on NAS status to ATOexecutives, work with 2nd level and Service Areasto resolve/explain significant events within thefiscal year. Due September 30, 2010

Manage NAS performance.

Protect the integrity and performance of NAS facilitiesfrom obstruction.

Core Business Initiative: ProtectNAS facilities.

Core Activity: Facilitate management ofNAS performance.

Activity Target 1:Refine simulation tools for obstruction evaluationand provide training. Due September 30, 2010

Facilitate management of NAS performance.

Manage maintenance contracts within 95% of theirrequirements.

Core Business Target: ManageNAS Maintenance Contracts.

Ensure contract tasks are completed.

Core Business Initiative: Managecontracts.

Core Activity: Facilitate management ofNAS performance.

Activity Target 1:Manage maintenance contracts to within 95% oftheir requirements for: Automated SurfaceObserving System ( ASOS), Integrated

Facilitate management of NAS performance.

Communication Switching System (ICSS),Remote Monitoring Maintenance System (RMMS),Recovery Communication (RCOM), RCOMAntenna, Operational Support Telephone System(OSTS), Harmonic Cancellation System (HCS)Due September 30, 2010

By the 5th of every month, provide analysis and report onthe ATO equipment delay program.

Core Business Target: Analyzethe Equipment Delay Program.

Reduce equipment related delays within the NAS.

Core Business Initiative: Reduceequipment related delays within theNAS.

Core Activity: Facilitate management ofNAS performance.

Activity Target 1:Provide for program management and analysis ofthe ATO equipment delay program. DueSeptember 30, 2010

Facilitate management of NAS performance.

Complete 100% of the SCAPs for TechNet within thefiscal year.

Core Business Target: CompleteSecurity Certification andAuthorization Packages (SCAPs)

Ensure all ATO systems requiring a SCAP or annualassessments are complete by certification date.

Core Business Initiative: Completesecurity certifications on NASsystems.

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Complete SCAPs for TECHNET. Due September30, 2010

Ensure a safe and secure NAS.

Spectrum Engineering Services obtains, assigns,certifies, and protects radio frequencies for the FAA'scommunication, navigation, and surveillance programs.

Core Business Target: ProvideSpectrum Engineering Services

To secure, manage, and protect the necessary radiofrequency spectrum resources to support the safe and

Core Business Initiative: Achieve95% of Activity Targets to provideSpectrum Services for NAS users.

Page 69 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 71: ATO Business Plan 2010

efficient operation of the National Airspace System.

Core Activity: Resolve Radio FrequencyInterference (RFI)

Activity Target 1:Resolve 82% of RFI cases within 9 days. DueSeptember 30, 2010

Resolve Radio Frequency Interference (RFI)

Activity Target 2:Provide 3 -- 5 RFI training sessions for FAAtechnicians. Due September 30, 2010

Core Activity: Manage radio frequencyspectrum efficiently to satisfy NASrequirements

Activity Target 1:Provide 100% of new frequency assignmentrequirements by the commissioning date. DueSeptember 30, 2010

Manage radio frequency spectrum efficiently tosatisfy NAS requirements

Activity Target 2:Develop land mobile, microwave, and radarmodels for the Automated Frequency Management(AFM) engineering tool. Due September 30, 2010Activity Target 3:Complete each ESV request in support of RNAV /RNP requirements within 90 days. Due September30, 2010Activity Target 4:Conduct Electromagnetic Compatibility (EMC)analysis for Military Electronic Attack, CounterImprovised Explosive Devices, etc. DueSeptember 30, 2010

Navigation technology to improve efficiency of operationsor maintenance.

Core Business Target: <STICandidate> Ensure the provisionof safe and efficient NavigationServices of legacy systemsthroughout the NAS by meetingthe outcomes stated in the FAANAS Enterprise Architecture.

Increase capability for takeoffs and departures duringperiods of low visibility.

Core Business Initiative: Maintaincapacity at airports duringinstrument meteorologicalconditions (IMC).

Core Activity: Low visibility operationalimprovements through lower RVRminima

Activity Target 1:Complete validation of RVR enhancements at testairport site. Due September 30, 2010

Utilize existing Category I equipped runways inconditions that exceed normal Category I minimumsthrough the use of Runway Visual Range systemsand appropriate equipage and training in the cockpit.

Activity Target 2:Conduct data collection to support improvementsin Low Visibility Operations. Due September 30,2010Activity Target 3:Conduct data reduction and analysis. DueSeptember 30, 2010

Providing situational awareness on the airport surface.

Core Business Initiative: Establishresearch and analysis program toenable surface navigation capabilityin support of improved airportoperations.

Core Activity: R&D for surfacenavigation supporting NextGen mid-and far-term OIs

Activity Target 1:Support establishment of Test Bed to demonstrateuse of GNSS provided navigation services toenable surface navigation capability. DueSeptember 30, 2010

Pathway to NextGen is defined for surfacenavigation and virtual tower.

Provide WAAS service.

Core Business Target: EnsureWAAS Service Availability

WAAS Follow-On Release 2

Core Business Initiative: WAASPerformance

Core Activity: Technology Refresh

Activity Target 1:Complete Radio Frequency Uplink (RFU) / SignalGenerator Subsystem Type 1 (SGST) Integration.Due September 30, 2010

WAAS Performance

Page 70 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 72: ATO Business Plan 2010

Core Activity: GEO Satellite Leases

Activity Target 1:Maintain leases for two (2) WAAS geostationarysatellites. Due June 30, 2010

WAAS Performance

WAAS Equipage

Core Business Initiative: CompleteThree (3) Supplemental TypeCertification (STCs) approved forCommercial Transport Aircraft

Core Activity: NAS Implementation

Activity Target 1:Complete three (3) STCs approved forCommercial Transport Aircraft. Due September30, 2010

WAAS equipage

WAAS Outages

Core Business Initiative: MonitorNumber of WAAS Outages

Core Activity: WAAS O&M

Activity Target 1:Provide support for second level engineering,contractor depot logistics, terrestrialcommunications infrastructure lease costs,maintenance labor costs and training expenses.Due September 30, 2010

WAAS Outages

Business Case Analysis Report

Core Business Target: DevelopGround Based AugmentationSystem (GBAS)

Navigation Services is to work with Federal and otherGovernment and airspace users to provide increasedcapacity in the United States airspace system.

Core Business Initiative: NextGenand OEP Portfolio

Core Activity: Develop Ground BasedAugmentation System (GBAS)

Activity Target 1:Develop draft benefits and cost analysis report.Due July 30, 2010

Develop Ground Based Augmentation System(GBAS) in support of the Next Generation AirTransportation System.

Provide Navigation Services

Core Business Target: <STICandidate> Achieve 90% ofActivity Targets to provideNavigation Landing Aids for NASusers.

Ensure Navigation Services supports the NASperformance for operational equipment

Core Business Initiative: NASSystem Performance

Core Activity: Provide ApproachLighting Capability

Activity Target 1:Install MALSRs at two (2) locations. DueSeptember 30, 2010

Provide Approach Lighting Capability

Activity Target 2:Install RLMS at five (5) sites using stimulus funds.Due September 30, 2010

The ground based systems along with requiredapproach lighting systems directly impact both systemsafety and capacity at equipped runways by providingprecision approach for aircraft in adverse weatherconditions.

Core Business Initiative: EnsureGround Based and LightingServices are available for the NAS

Core Activity: Procure Establish/CASTDME systems

Activity Target 1:Procure twelve (12) (Establish/CAST) DMESystems. Due June 30, 2010

Procure Establish/CAST DME systems

Core Activity: Attain service for SustainDME locations

Activity Target 1:Attain service availability for six (6) (Sustain) DMElocations. Due September 30, 2010

Attain service for Sustain DME locations

Core Activity: Establish/Sustain ILS

Activity Target 1:Procure five (5) (Establish/Sustain) ILS Systems.Due June 30, 2010

Procure Establish/Sustain ILS

Page 71 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 73: ATO Business Plan 2010

Core Activity: Attain service forEstablish/Sustain ILS

Activity Target 1:Attain service availability for (Establish/Sustain)five (5) ILS locations. Due September 30, 2010

Attain service for Establish/Sustain ILS

Core Activity: Procure VOR/DMEElectronics and VOR/DME Antenna Kits

Activity Target 1:Procure five (5) VOR/DME Electronics. Due June30, 2010

Procure VOR/DME Electronics and VOR/DMEAntenna Kits.

Activity Target 2:Procure six (6) VOR Doppler Antenna Kits. DueJune 30, 2010

Core Activity: Attain service for VORfacilities

Activity Target 1:Attain service availability for one (1) (Dopplerize)VOR Facilities Due September 30, 2010

Attain service for VOR facilities

Core Activity: Provide CongressionalCategory I/II/III ILS

Activity Target 1:Provide one (1) Full & two (2) Partial ILSs. DueSeptember 30, 2010

Congressional Category I/II/III ILS Implementation

Core Activity: Attain service forCategory I/II/III ILS

Activity Target 1:Attain service availability for: one (1) Full & two (2)Partial ILSs. Due September 30, 2010

Attain service for Category I/II/III ILS

The NextGen DME/DME will provide increasedavailability/accuracy on airport runways and aid inreducing congestion.

Core Business Initiative: EnsureNextGen DME/DME Capabilities areavailable for the NAS

Core Activity: NextGen DME

Activity Target 1:Award DME/DME Contract Due September 30,2010

NextGen DME Acquisition

Replace incandescent lamps with Light EmittingDiodes (LED)

Core Business Initiative: OptimizeNextGen Navigation LightingSystems in the NAS

Core Activity: Optimize NextGenNavigation Lighting Systems in the NAS

Activity Target 1:Award MALSR LED Contract Due July 31, 2010

NextGen LED Acquisition

Activity Target 2:Award LED Precision Approach Path Indicator(PAPI) contract. Due September 30, 2010

Increased capacity for takeoffs and departures duringperiods of low visibility.

Core Business Initiative: Achieve90% of Activity Targets to ProvideNavigation Landing Aids to NASUsers

Core Activity: Provide NavigationServices

Activity Target 1:Achieve 90% of activity targets to providenavigation landing aids to NAS users. DueSeptember 30, 2010

Provide Navigation Services

Provide upgrades to fuel storage systems.

Core Business Target: <STICandidate> Increase percentageof ACEPS facilities with fieldedfuel storage system upgrades by8%

AJW-22, in collaboration with AJW-23, is providingsafety upgrades to candidate fuel storage systems.

Core Business Initiative: Provideprogram management support inorder to ensure necessarymodifications are made to candidatefuel storage systems.

Core Activity: Fuel Storage Tankupgrades

Activity Target 1:Sustain infrastructure; Sustain/improve NASfacilities, power system and improve safety.Increase percentage of ACEPS facilities withfielded fuel storage system upgrades by 8% bySeptember 2010. Due September 30, 2010

Fuel Storage Tank upgrades

Activity Target 2:Sustain infrastructure: Sustain/improve NASfacilities, power system and improve safety.Complete fall protection safety modifications on 50

Page 72 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 74: ATO Business Plan 2010

fuel storage tank documented known candidateinventory by September 30, 2010. Due September30, 2010

Address Environmental and Mold related EOSH issueswithin NAS facilities.

Core Business Target: <STICandidate> Identify candidatesfor mold remediation andcomplete remediation of 95% ofidentified facilities within four (4)fiscal quarters.

AJW-23 is responsible for ensuring that NAS facilitiescomply with Local, State and Federal environmentallaw and that workers are able to perform their duties ina healthy work atmosphere.

Core Business Initiative: Ensurecompliance with environmentalrequirements for NAS facilities.

Core Activity: Continue to identify andremediate contaminated sitesthroughout the Agency.

Activity Target 1:Remove 5% of the total sites listed in the 2009Environmental Site Cleanup Report (ESCR) bySeptember 30, 2010. Due September 30, 2010

Continue to identify and remediate contaminatedsites throughout the Agency.

Core Activity: Complete moldremediation projects.

Activity Target 1:Identify candidates for mold remediation andcomplete remediation of 95% of identified facilitieswithin four (4) fiscal quarters. Due September 30,2010

Complete mold remediation projects.

Provide lifecycle management of the functional andphysical integrity of NAS unstaffed facilities.

Core Business Target: Providelifecycle management of thefunctional and physical integrityof NAS unstaffed facilities

AJW-24 is responsible for ensuring that unstaffedinfrastructure in the NAS is sustained in theoperational environment of the NAS. Additionally, it is

Core Business Initiative: Providelifecycle management of the of thefunctional and physical integrity ofNAS unstaffed facilities.

AJW-24's role to examine the potential forimprovements as well as decommission any facilitiesthat are no longer necessary.AJW-24 is responsiblefor providing physical security at NAS facilities. Thisincludes construction of security related structures andupgrades to already standing structures.

Core Activity: Sustain UnstaffedInfrastructure in the NAS.

Activity Target 1:Accomplish 250 unstaffed infrastructuresustainment projects. Prioritize these projects topdown by impact by September 30, 2010. DueSeptember 30, 2010

Sustain Unstaffed Infrastructure in the NAS.

Activity Target 2:Perform seismic evaluations of 10 Major FAAfacilities and review Geotechnical Investigationreports by September 30, 2010. Due September30, 2010Activity Target 3:Conduct 20 accessibility surveys of major FAAfacilities and three (3) Architectural Barriers ActAccessibility Standard training sessions bySeptember 30, 2010. Due September 30, 2010Activity Target 4:Consolidate 10 facilities and pass redundantfacilities to Disposition program by September 30,2010. Due September 30, 2010

Core Activity: Facility Security and RiskManagement

Activity Target 1:Complete security upgrades at 30 facilities insupport of accreditation by September 30, 2010.Due September 30, 2010

Facility Security and Risk Management

Activity Target 2:Complete 12 C&As documentation (3 full SCAPsand 9 annual reviews) on ATC facilities systems bySeptember 30, 2010 Due September 30, 2010Activity Target 3:"Design and install SSDI equipment at 20 FAAFacilities by September 30, 2010." Due September30, 2010Activity Target 4:Complete 3 Brick and Mortar projects (e.g. guardhouses, parking lots, access roads,reconfigurations and fencing) by September 30,2010 Due September 30, 2010

Core Activity: Eliminate redundantunstaffed NAS facilities

Activity Target 1:Deconstruct 300 NAS facilities, performEnvironmental, Site restoration and closeout, and

Decommissioning: eliminate redundant unstaffedNAS facilities

Page 73 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 75: ATO Business Plan 2010

release to ARC. Due September 30, 2010

Core Activity: Implement an energyconservation program

Activity Target 1:Produce trials of emerging technologies anddevelop business cases for 5 applications. Deploy3,000 energy efficient light sources. Replace oldair conditioning units with modern high seer units(100 units) by September 30, 2010. DueSeptember 30, 2010

Decrease energy consumption in order to make NASfacilities more environmentally conscientious

Provide Navigation Services.

Core Business Target: Providemanagement and technicaloversight for FAA supportcontracts (NISC and TSSC)

Both the TSSC and NISC program vehicles provideinvaluable contractor support services to the FAA. It isthe job of AJW-28 to ensure that these contractorsupport services are available continuously andreceive the proper oversight.

Core Business Initiative: Providemanagement and technicaloversight for FAA support contracts(NISC and TSSC)

Core Activity: Manage TechnicalSupport Services Contract (TSSC)

Activity Target 1:Maintain the TSSC program vehicle in accordancewith Federal Acquisitions law throughout thecourse of Fiscal Year 2010. Due September 30,2010

Manage the TSSC program vehicle to make supportservices available and easy for customers to use asrequired to support the Flight Plan.

Activity Target 2:Continue to manage TSSC with a 90 % customersatisfaction rate and increase TSSC programvehicle utilization by 95% over the FY 2009baseline utilization rate. Due September 30, 2010

Core Activity: Manage the NISCprogram vehicle

Activity Target 1:Maintain the NISC-II Bridge program vehicle inaccordance with Federal Acquisitions law untiltransition to NISC-III program vehicle during FiscalYear 2010. Due September 30, 2010

Manage the NISC program vehicle to make supportservices available and easy for customers to use asrequired to support the Flight Plan and theimplementation of NextGen.

Activity Target 2:Perform the necessary procedures to recompetethe NISC program vehicle and ensure thecontinuity of contractor operations during transitionfrom NISC-II Bridge to NISC-III throughout thecourse of Fiscal Year 2010. Due September 30,2010

Develop standardized lifecycle policies and processes inorder to successfully integrate systems into the NAS.Obtain 99% sustainment of operations rate for WebCMV4.0

Core Business Target: <STICandidate> Obtain 99%sustainment of operations ratefor WebCM Version 4.0

Develop standardized lifecycle policies and processesin order to successfully integrate systems into theNAS.

Core Business Initiative: Developstandardized lifecycle policies andprocesses in order to successfullyintegrate systems into the NAS.

Core Activity: Manage strategic,enterprise, and related CM andengineering initiatives, tasks andactivities for the FAA.

Activity Target 1:Obtain 99 % sustainment of operations rate forWebCM V4.0 through 4th qtr FY 2011. DueSeptember 30, 2010

Sustainment and maintenance of WebCM softwareConfiguration Management (CM) training. Supportfor Integrating Standards and ConfigurationManagement. CAEG training.

Activity Target 2:Implement at least one maintenance build forWebCm V4.0 Due September 30, 2010Activity Target 3:Implement FAA agency-wide CM training programby 4th quarter FY 2010. Due September 30, 2010Activity Target 4:Complete CM Automation business plan by 4thquarter FY 2010 Due September 30, 2010Activity Target 5:Complete one (1) Power Systems physicalconfiguration audit (PCA). Due September 30,2010Activity Target 6:Investigate and implement, as feasible, a distancelearning initiative for CAEG software for theengineering staff and drafters by 4th quarter FY2010. Due September 30, 2010

Page 74 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 76: ATO Business Plan 2010

Activity Target 7:Implement a Disaster Recovery Solution for CAEGProgram. Due September 30, 2010

Implement and integrate facilities, systems, andequipment into the operational environment of the NAS.

Core Business Target:Implement and integratefacilities, systems, andequipment into the operationalenvironment of the NAS.

AJW-29 provides engineering support services toother organizations within the FAA. Throughaccomplishing this task, they better incorporateprocedures and design elements into NAS facilitiesand systems.

Core Business Initiative: Implementand integrate facilities, systems,and equipment into the operationalenvironment of the NAS.

Core Activity: Improve ATC FacilitiesCWP processes and project schedule.

Activity Target 1:Provide linkage between ATCF and NextGenFacilities for budget formulation, budget executionand facility engineering as part of the largerNextGen deployment by September 30, 2010.Due September 30, 2010

Safe and efficient Implementation of facilities andsystems.

Activity Target 2:Provide linkage between ATCF and ATCCommunications for budget formulation andbudget execution of the DataComm Program aspart of the larger NextGen deployment bySeptember 30, 2010. Due September 30, 2010Activity Target 3:Provide linkage between ATCF and NavigationServices for budget formulation and budgetexecution of the ATCF Decommissioning Programas part of the larger decommissioning effortassociated with NAV Systems: VOR, VASI, NDB,DF, and MM by September 30, 2010. DueSeptember 30, 2010

Core Activity: Facilitate Procedures toimprove Worker Safety in the NAS

Activity Target 1:Facilitate inclusion of Lock Out/ Tag Outprocedures for new construction and include withFacility Reference Data Files to the SystemSupport Centers at the JAI time by September 30,2010. Due September 30, 2010

Facilitate Procedures to improve Worker Safety inthe NAS

Core Activity: Increase NESinvolvement in ATO programs duringthe planning and R&D phases of AMS.

Activity Target 1:Ensure that all programs have developed pre-deployment check lists and have completed alldocumentation prior to Solution Implementationphase of the program. Due September 30, 2010

Increase NES involvement in ATO programs duringthe planning and R&D phases of AMS.

Develop at least one joint program between FAA andanother agency outside of the DOT by September 30,2010.

Core Business Target:Administer joint programbetween agencies.

Develop interagency program to promote data sharing.

Core Business Initiative: Developinteragency programs.

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Develop and administer a joint program with DODand DHS on GPS data sharing. Due September30, 2010

Ensure a safe and secure NAS.

Complete at least 1 change proposal within the fiscalyear.

Core Business Target: CompleteChange Proposals.

Complete and publish change proposals and noticesrelated to the NAS.

Core Business Initiative: Completeand publish change proposals.

Core Activity: Publish policies,handbooks and directives.

Activity Target 1:Complete 1 Case file/National Change Proposal(NCP) and 1 Notice (NOT) within fiscal year. DueSeptember 30, 2010

Publish policies, handbooks and directives.

Publish, distribute, maintain, and improve at least 90%of orders, directives, handbooks and notices that effectthe NAS within the fiscal year.

Core Business Target: Completedocument improvements.

Page 75 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 77: ATO Business Plan 2010

Publish and distribute scheduled documentimprovements.

Core Business Initiative: Publishdocument improvements.

Core Activity: Publish policies,handbooks and directives.

Activity Target 1:Complete 40 document improvements within fiscalyear. Due September 30, 2010

Publish policies, handbooks and directives.

Complete 100% quality control reviews in each OCC.

Core Business Target: Completequality control review in OCCs.

Perform quality control review of AFAAR programs.

Core Business Initiative: Performquality control reviews.

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Complete quality control review of AFAARprograms in each OCC. Due September 30, 2010

Ensure a safe and secure NAS.

Through the deployment of field support complete 100%request for assistance.

Core Business Target: FieldSupport Technical Assistance.

Complete request for assistance as requests aresubmitted.

Core Business Initiative: Completerequests for assistance.

Core Activity: Provide technicalassistance through field support.

Activity Target 1:Complete 5000 request of assistance within thefiscal year. Due September 30, 2010

Provide technical assistance through field support.

Complete 100% system improvement by September 30,2010.

Core Business Target: Completesystem improvements.

Enhance the NAS by completing needed systemimprovements.

Core Business Initiative: Enhancethe NAS.

Core Activity: Through systemsengineering analysis, fix and enhanceNAS and non-NAS hardware, softwareand documentation.

Activity Target 1:Complete 160 systems improvements within fiscalyear. Due September 30, 2010

Through systems engineering analysis, fix andenhance NAS and non-NAS hardware, software anddocumentation.

Enhance the NAS by completing systemimprovements.

Core Business Initiative: Performsystem improvements.

Core Activity: Through systemsengineering analysis, fix and enhanceNAS and non-NAS hardware, softwareand documentation.

Activity Target 1:Complete 160 systems improvements within fiscalyear. Due September 30, 2010

Through systems engineering analysis, fix andenhance NAS and non-NAS hardware, software anddocumentation.

Enhance the NAS by completing 95% of systemimprovements.

Core Business Initiative: Producesystem docs, engineering studiesand software builds.

Core Activity: Through systemsengineering analysis, fix and enhanceNAS and non-NAS hardware, softwareand documentation.

Activity Target 1:Complete 1 System Doc Release (SDR); 11Engineering Studies (ES) and 2 Software Builds(SWB) within fiscal year. Due September 30, 2010

Through systems engineering analysis, fix andenhance NAS and non-NAS hardware, software anddocumentation.

Publish, distribute, maintain, and improve at least 90%of orders, directives, handbooks and notices that effectthe NAS within the fiscal year.

Core Business Target: ImproveNAS related documents.

Publish and distribute scheduled documentimprovements.

Core Business Initiative: Publishdocument improvements.

Page 76 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 78: ATO Business Plan 2010

Core Activity: Publish policies,handbooks and directives.

Activity Target 1:Complete 35 document improvements within fiscalyear. Due September 30, 2010

Publish policies, handbooks and directives.

Provide field support to maintain at least 4 systems withinthe NAS by September 30, 2010.

Core Business Target: Maintainand Manage Multiple Systems.

Maintain MPSEN, ODS, EM and RMLS.

Core Business Initiative: Providesupport personnel to maintainmultiple systems.

Core Activity: Provide technicalassistance through field support.

Activity Target 1:Provide effective systems administration to includemaintaining MPSEN, ODS, EM and RMLS . DueSeptember 30, 2010

Provide technical assistance through field support.

Ensure SRM requirements for maintenance alerts are100% compliant.

Core Business Target: Maintainviable maintenance alerts.

Maintain and manage maintenance alerts and themaintenance moratorium program.

Core Business Initiative: Maintainand manage maintenance alerts.

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Maintain a viable ATO maintenance alert andmaintenance moratorium program. DueSeptember 30, 2010

Ensure a safe and secure NAS.

Publish, distribute, maintain, and improve at least 90%of orders, directives, handbooks and notices that effectthe NAS within the fiscal year.

Core Business Target: Manageand maintain NAS relateddocuments.

Core Business Initiative: Manageand maintain current orders andstandard operating procedures.

Ensure current orders and SOPs are current.

Core Activity: Publish policies,handbooks and directives.

Activity Target 1:Maintain currency of 8020.16 (AFAAR section),JO 1920.5 (FIR) and NOCC SOP. Due September30, 2010

Publish policies, handbooks and directives.

At least twice per quarter, host meetings supporting newsystem acquisitions.

Core Business Target: Managesystem acquisitions.

Enhance the NAS by providing support for new systemacquisitions.

Core Business Initiative: Providesupport for system acquisitions.

Core Activity: Technical support fornew system acquisition and technicalrefresh efforts.

Activity Target 1:Hold 2 meetings per quarter with program office.Due September 30, 2010

Technical support for new system acquisition andtechnical refresh efforts.

Develop NEXTGEN policy.

Core Business Target: NASMaintenance Policy

Develop NAS Policy.

Core Business Initiative: DocumentDevelopment.

Core Activity: NAS Policy

Activity Target 1:Develop NAS maintenance policy for NEXTGEN.Due September 30, 2010

NAS Policy

Manage and assist in post accident response 100% ofthe time for accidents involving Tech Ops equipment.

Core Business Target: FacilitatePost Accident Response

Provide post accident response for accidents involvingTech Ops equipment.

Core Business Initiative: Providepost accident response.

Page 77 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 79: ATO Business Plan 2010

Core Activity: Provide technicalassistance through field support

Activity Target 1:Facilitate post accident response 100% of the timefor accidents involving Tech Ops equipment. DueSeptember 30, 2010

Provide technical assistance through field support

Provide 100% technical assistance for restorations.

Core Business Target: Providerestoration support as needed.

Complete restorations as requests are submitted.

Core Business Initiative: Completerestorations.

Core Activity: Provide technicalassistance for restoration.

Activity Target 1:Complete 200 restoration/on-site support requestwithin the fiscal year. Due September 30, 2010

Provide technical assistance for restoration.

Provide 100% technical assistance for restorations.

Core Business Target: Providerestoration/on-site support asneeded.

Provide on-site support as requested.

Core Business Initiative: Provide on-site support.

Core Activity: Provide technicalassistance for restoration.

Activity Target 1:Complete 300 restoration/on-site support requestswithin the fiscal year. Due September 30, 2010

Provide technical assistance for restoration.

Through the deployment of field support complete 100%request for assistance.

Core Business Target: Providetechnical assistance as needed.

As requests are made, provide assistance bydeploying field support.

Core Business Initiative: Providetechnical support or assistance.

Core Activity: Provide technicalassistance through field support.

Activity Target 1:Complete 6500 request for assistance within thefiscal year. Due September 30, 2010

Provide technical assistance through field support.

Publish Maintenance CONOPS documents.

Core Business Target: Plan anddevelop Maitenance CONOPSDocuments

Plan and develop Maintenance Concept of Operations(CONOPs) documents.

Core Business Initiative: DocumentImprovement

Core Activity: Publish policies,handbooks and directives.

Activity Target 1:Publish Maitenance CONOPS documents DueSeptember 30, 2010

Publish policies, handbooks and directives.

Through the deployment of field support complete 100%request for assistance.

Core Business Target: Requestfor assistance.

Complete requests for assistance by deploying fieldsupport.

Core Business Initiative: Completerequests for assistance.

Core Activity: Provide technicalassistance through field support.

Activity Target 1:Complete 120 Requests of Assistance within fiscalyear. Due September 30, 2010

Provide technical assistance through field support.

Provide 100% technical assistance for restorations.

Core Business Target:Restoration support.

Provide on-site support as requested.

Core Business Initiative: Completerestorations.

Core Activity: Provide technicalassistance for restoration.

Activity Target 1:

Provide technical assistance for restoration.

Page 78 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 80: ATO Business Plan 2010

Complete 6 restorations within fiscal year. DueSeptember 30, 2010

Facilitate, manage and enhance the Strategic EventCoordination process

Core Business Target: FacilitateStrategic Event Coordinationprocess

Through field support, facilitate and manage allaspects of the Strategic Event Coordination process.

Core Business Initiative: Facilitate,manage and enhance process.

Core Activity: Provide technicalassistance through field support.

Activity Target 1:Facilitate, manage and enhance the agency-wideStrategic Event Coordination process. DueSeptember 30, 2010

Provide technical assistance through field support.

Administer at least one emergency operations plan withinthe fiscal year.

Core Business Target:Administer EmergencyOperations Plan.

Administer policies, training and planning to enhanceemergency operations.

Core Business Initiative: Improveemergency operations

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Administer a Tech Ops wide emergencyoperations program pertaining to policy, training,incident response, continuity of operations,contingency planning and other requirements. DueSeptember 30, 2010

Ensure a safe and secure NAS.

By 2014, enable operational delivery of six data setsthrough network-enabled mechanisms.

Core Business Target: AviationWeather

Conduct coordination with service units and externalagencies to ensure weather information developmentefforts are consistent with the NextGen Concept ofOperations.

Core Business Initiative: AviationWeather NextGen

Core Activity: NextGen NetworkEnabled Weather (NNEW)/ReduceWeather Impact (RWI) InvestmentAnalysis

Activity Target 1:Preliminary OMB-Exhibit 300 for NNEW/RWISegment One first draft Due April 30, 2010

NextGen Network Enabled Weather (NNEW), one offive NextGen Transformational Programs, enablesuniversal access to weather information to enablecollaborative and dynamic NAS decision making.NNEW is a key FAA contribution to an interagencyeffort to provide quick, easy, and cost effectiveaccess to weather information across all NAS users.

Activity Target 2:Preliminary OMB-Exhibit 300 for NNEW/RWISegment One. Due August 31, 2010

Core Activity: Weather Integration

Activity Target 1:Publish a Document establishing Initial OperatingCapability (IOC) Final Versions of WeatherSpecific Services Design Standards and WeatherProduct Data Format Standards. Due September10, 2010

Demonstrate the ability to integrate weatherinformation from multiple US Government agenciesthrough the use of an electronic catalog of aviationweather data.

Activity Target 2:Demonstrate and evaluate dissemination/Four-Dimensional (4-D) Weather Data Cubecapabilities. Due September 28, 2010

Achieve 90% of the planned activity target dates set forATC- Communications Activities.

Core Business Target: <STICandidate> Provide ATCCommunications Services

Acquire ASTI in accordance with the FAA AcquisitionManagement System (AMS).

Core Business Initiative: AcquireAlaskan SatelliteTelecommunications Infrastructure(ASTI)

Core Activity: Acquire Alaskan SatelliteTelecommunications Infrastructure(ASTI)

Activity Target 1:Award contract for Tech Refresh. Contract awardis contingent upon JRC approval. Due April 30,2010

Alaskan Satellite Telecommunications Infrastructure

Page 79 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 81: ATO Business Plan 2010

Activity Target 2:Achieve JRC Investment Decision. Due February28, 2010

Provide communications infrastructure and servicesfor air traffic control within NAS and the Department ofDefense (DOD) .

Core Business Initiative: Operateand maintain FAATelecommunications Infrastructure(FTI)

Core Activity: FAA TelecommunicationsInfrastructure - FTI deployment

Activity Target 1:Complete the transition of 10 systems off thedefined 2GHz Spectrum. Due March 31, 2010

Complete FTI deployment of sites and services.

Activity Target 2:Complete the transition off the defined 2 GHzSpectrum. Due September 30, 2010Activity Target 3:Complete the backbone build out at the Co-location facilities. Due February 28, 2010Activity Target 4:Complete the Sprint ATM replacement. DueSeptember 30, 2010

Core Activity: TelecommunicationsServices Group (TSG)

Activity Target 1:Continue the acquisition and implementation forFAVES. Due September 30, 2010

Program, Policy Management, Business andFinancial Management, Network Operations,Engineering and Customer Service, and ProductSupport.

Activity Target 2:Continue management services for NETWORXtransition. Due September 30, 2010Activity Target 3:Manage administration telecommunications forFAA (Working Capital Fund and admin tel.) DueSeptember 30, 2010

Deploy Voice Recorder Replacement Program(VRRP).

Core Business Initiative: DeployVoice Recorder ReplacementProgram (VRRP)

Core Activity: Voice RecorderReplacement Program

Activity Target 1:Deploy 50 voice recorders to ATC Facilities,bringing the cumulative total to 50 of 100. Due

Deliver units.

March 31, 2010

Activity Target 2:Deploy additional 50 voice recorders to ATCFacilities, bringing the cumulative total to 100 of100. Due September 30, 2010

Deploy replacement terminal voice switching systems.

Core Business Initiative: DeployTerminal Voice Switch Replacement(TVSR)

Core Activity: Terminal Voice SwitchReplacement (TVSR) III

Activity Target 1:Deliver 5 Terminal Voice Switch systems to ATCFacilities. Due June 30, 2010

Deploy TVSR

Activity Target 2:Deliver 5 Terminal Voice Switch systems to ATCFacilities. Due September 30, 2010

Expand Air-to-Ground Voice Communications.

Core Business Initiative: ExpandCommunications FacilitiesEnhancement (CFE)

Core Activity: CommunicationsFacilities Enhancement Expansion(CFE)

Activity Target 1:Expand communications coverage at 4 locationsbringing the cumulative total to 4 of 8 CFElocations. Due March 31, 2010. Due March 31,2010

Attain service availability for communicationenhancement facilities projects.

Activity Target 2:Expand communications coverage at 4 additionallocations bringing the cumulative total to 8 CFElocations. Due September 30, 2010. DueSeptember 30, 2010

Deploy Multimode Digital Radios to ATC Facilities.

Core Business Initiative: DeployNext Generation ofCommunications: Very HighFrequency (VHF) Air-to-Ground(A/G)- Segment 1 (nexCom1)

Core Activity: Very High Frequency(VHF) Air-to-Ground (A/G) Radios

Activity Target 1:

Deploy Multimode Digital Radios - Segment 1

Page 80 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 82: ATO Business Plan 2010

Deploy 600 new Multimode Digital Radios intooperation bringing the cumulative total to 600 of1600. Due March 31, 2010Activity Target 2:Deploy an additional 1000 new Multimode DigitalRadios into operation bringing the cumulative totalto 1600. Due September 30, 2010

Deploy Multimode Digital Radios in high-densityterminal areas and flight service operations.

Core Business Initiative: DeployNext Generation ofCommunications: Very HighFrequency (VHF) Air-to-Ground(A/G)- Segment 2 (nexCom2)

Core Activity: Very High Frequency(VHF) Air-to-Ground (A/G) Radios -Segment 2

Activity Target 1:Complete and release VHF and UHF RadiosScreening Information Request (SIR). Due March30, 2010

Deploy Multimode Digital Radios - Segment 2

Activity Target 2:Complete system level specifications for VHF andUHF Radios. Due September 30, 2010

Deploy Ultra High Frequency (UHF) Air-to-Groundcommunications for the Department of Defense(DOD).

Core Business Initiative: DeployUltra High Frequency (UHF) Radios

Core Activity: CommunicationsFacilities Enhancement: UHFReplacement

Activity Target 1:Deploy 400 of 1300 replacement UHF Radios.Due June 30, 2010

Communications Facilities Enhancement - UHFReplacement - Segment 1

Activity Target 2:Deploy 900 replacement UHF Radios at ATCFacilities bringing the cumulative total to 1300.Due September 30, 2010

Replace radio signaling and tone control equipment.

Core Business Initiative: DeployRadio Control Equipment (RCE)Units

Core Activity: Radio CommunicationsEquipment

Activity Target 1:

Deliver radio communication equipment (RCE).

Test Plan developed for Future RCE interfacesinto the RCE test bed. Due March 31, 2010Activity Target 2:Complete draft Purchase Description PD for newRCE. Due September 30, 2010

Deploy receiver multicouplers.

Core Business Initiative: DeployRadio Frequency Interference (RFI)Elimination

Core Activity: Radio FrequencyInterference Elimination

Activity Target 1:Deliver 50 Receiver Multicouplers for sustainmentrequirements bringing the cumulative total to 50 of110. Due March 31, 2010

Deliver receiver multicouplers

Activity Target 2:Deliver 60 Receiver Multicouplers for sustainmentrequirements bringing the cumulative total to 110of 110. Due September 30, 2010

Install Fiber Optic Cable Loop at Airport.

Core Business Initiative: InstallFiber Optic Cable Loop at Airport

Core Activity: Airport Cable Loop

Activity Target 1:Award Channel Bank Contract. Due April 30, 2010

Install fiber optic cable loop

Activity Target 2:Complete Channel Bank Factory AcceptanceTesting. Due September 30, 2010

Technical refresh hardware and software.

Core Business Initiative: ImplementVoice Switching and Control System(VSCS)

Core Activity: Voice Switching andControl System (VSCS)

Activity Target 1:Complete MTSR (Maintenance Test SetReplacement) test program and deliver MTSR todepot. Due September 30, 2010

Design, develop, and test VSCS technical refreshhardware and software.

Activity Target 2:Complete 75% of Ground to Ground PLM to C++software conversion. Due September 30, 2010

Core Business Initiative: DevelopData Communications in support of

Page 81 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 83: ATO Business Plan 2010

Acquire and deploy NextGen Systems to meet futureneeds

the Next Generation Air TrafficSystem

Core Activity: Acquire datacommunication system

Activity Target 1:Award Government Industry Agreement foravionics standards validation, prototyping, anddemonstration. Due November 30. DueNovember 30, 2009

Acquire data communication system

.

Core Business Initiative: DevelopNAS Voice Switch

Core Activity: Develop NAS VoiceSwitch (NVS)

Activity Target 1:Complete Business Case Analysis developmentand finalize report. Due April 30, 2010

Develop NVS in support of the Next Generation AirTransportation System.

Develop System Wide Information Management(SWIM) in support of the Next Generation AirTransportation System

Core Business Initiative: DevelopSystem Wide InformationManagement (SWIM)

Core Activity: Develop System WideInformation Management (SWIM)

Activity Target 1:Design of ITWS capability. Due June 30, 2010

Develop System Wide Information Management(SWIM) in support of the Next Generation AirTransportation System

Serve as the agency NextGen demonstrations focalpoint, assuring 90 percent of each demonstration plancomments and recommendations from service units andexternal agencies are responded to and or resolvedwithin 60 days of receipt to ensure each NextGendemonstration is consistent with the NextGen Concept ofOperations.

Core Business Target: NextGenDemonstrations

Conduct research activities and demonstrations to testemerging technologies in order to meet NextGenConcept of Operations goals and objectives.

Core Business Initiative: NextGenDemonstrations

Core Activity: 4D Flight ManagementSystem

Activity Target 1:Identify performance capabilities for analysis. DueMarch 30, 2010

Complete initial analysis report of the performancecapabilities for GE Flight Management Systemavionics.

Activity Target 2:Complete initial analysis report. Due September30, 2010

Core Activity: Florida Test Bed

Activity Target 1:Establish physical presence in Florida. Due May30, 2010

Provide infrastructure to support NextGendemonstration activities.

Activity Target 2:Conduct initial demonstration at site. DueSeptember 30, 2010

Core Activity: Surface Conformance

Activity Target 1:Initial Simulation Plan. Due December 31, 2009

Complete first Surface Conformance Human-in-the-Loop simulation.

Activity Target 2:Human-in-the-Loop Simulation. Due May 30, 2010

Core Activity: Traffic Alert & CollisionAvoidance System (TCAS)

Activity Target 1:Complete deployment of 5 TRAMS. Due February28, 2010

Complete deployment of 10 TCAS ResolutionAdvisory Monitoring Systems (TRAMS).

Activity Target 2:Complete deployment of 10 TRAMS. Due July 30,2010

Core Activity: Unmanned AircraftSystems (UAS)

Activity Target 1:Develop Interim Plan. Due March 30, 2010

Finalize UAS Demonstration Plan by August 2010 inorder to prepare for future exploration of NextGen4D Trajectory Concepts.

Activity Target 2:Finalize Plan. Due August 30, 2010

Core Activity: Staffed Tower

Activity Target 1:Complete Integrated Test Plan. Due May 30, 2010

Conduct the Staffed NextGen Tower Demonstration.

Page 82 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 84: ATO Business Plan 2010

Activity Target 2:Complete the demonstration. Due September 30,2010

Core Activity: Staffed Tower (Human-in-the-Loop)

Activity Target 1:Conduct the Human-in-the-loop simulation. DueMarch 31, 2010

Conduct Human-in-the-Loop Simulations for staffedNextGen Tower.

GPS civil requirements.

Core Business Target: Completeinteragency agreement betweenFAA and Air Force GPS Wing

Prepare interagency agreements to fund civilianunique capabilities for GPS-III per DOT/DOD MOAand NSPD-39.

Core Business Initiative: ImplementDOT/DOD MOA for Civilian UniqueRequirements

Core Activity: Implement DOT/DODMOA for Civilian Unique Requirements

Activity Target 1:Provide funding to U.S. Air Force GPS Wing toimplement Civil Signal Monitoring of the new L1Csignal program oversight and technical support.Due 120 days upon receipt of funds. DueSeptember 30, 2010

Prepare interagency agreements to fund civil uniquecapabilities for GPS- III per DOT/DOD MOA andNSPD-39.

Manage reportable NAS facilities and accomplishnecessary activities to sustain Adjustable OperationalAvailability at 99%.

Core Business Target: <STICandidate> Sustain adjustedoperational availability of 99%for NAS reportable facilities inthe Central Service Area

Complete scheduled activities to ensure optimalsystem reliability.

Core Business Initiative: MaintainNAS system reliability.

Core Activity: Complete PreventativeMaintenance.

Activity Target 1:Complete a minimum of 95% of all scheduled

Complete preventative maintenance activities.

preventive maintenance on time. Due September30, 2010

Core Activity: Install EquipmentModifications.

Activity Target 1:Install a minimum of 95% of nationally issuedmodifications on time. Due September 30, 2010

Install nationally issued equipment modifications.

Core Activity: Complete ServiceCertifications

Activity Target 1:Complete a minimum of 98% of servicecertifications within identified schedules. DueSeptember 30, 2010

Complete service certifications on FAA owned NASEquipment.

Core Activity: Coordinate scheduledmaintenance activities

Activity Target 1:Sustain adjusted operational availability of 99.0%at NAS reportable facilities. Due September 30,2010

Coordinate scheduled maintenance activities tosustain NAS reportable facilities adjusted operationalavailability

Core Activity: Sustain SystemReliability

Activity Target 1:Maintain system reliability at 99.850% at NASreportable facilities. Due September 30, 2010

Monitor and control restoration activities at NASreportable facilities to sustain system reliability

Complete activities to maintain operational integrity ofNAS related equipment, facilities and infrastructure

Core Business Initiative: SystemIntegrity

Core Activity: Close NASTEP Findings

Activity Target 1:Close 99% of critical issues by the documenteddue date. Due September 30, 2010

Close NASTEP issues by due date.

Activity Target 2:Close 95% of all other issues (not critical) by thedocumented due date. Due September 30, 2010

Core Activity: Continuity of Service

Activity Target 1:Baseline the percentage of facilities that reachedthe three outage warning and did not haveadditional outages requiring service downgrade.Due September 30, 2010

Sustain Cat 2 and Cat 3 service IAW ICAOStandards.

Page 83 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 85: ATO Business Plan 2010

Facilitate timely enhancements to the NAS facilities andservice delivery within the Central Service Area

Core Business Target: Facilitatetimely enhancements to the NASin the Central Service Area

Manage Project Implementation

Core Business Initiative: ManageProject Implementation

Core Activity: JAI Program Management

Activity Target 1:Clear 75% of current FY agreed upon non-as builtJAI Exceptions within 120 days of the DistrictManager signature date. Due September 30, 2010

JAI Program Management

Activity Target 2:Clear 70% of current FY as built JAI Exceptionswithin 180 days of the District Manager signaturedate. Due September 30, 2010

Core Activity: Project Implementation

Activity Target 1:Complete 90% of Non-Reimbursable CWPprojects on time as agreed to in the Project ScopeAgreement. Due September 30, 2010

Project Implementation

Manage reportable NAS facilities and accomplishnecessary activities to sustain Adjustable OperationalAvailability at 99%.

Core Business Target: <STICandidate> Sustain adjustedoperational availability of 99%for NAS reportable facilities inthe Western Service Area

Complete scheduled activities to ensure optimalsystem reliability.

Core Business Initiative: MaintainNAS system reliability.

Core Activity: Complete PreventativeMaintenance.

Activity Target 1:Complete a minimum of 95% of all scheduledpreventive maintenance on time. Due September30, 2010

Complete preventative maintenance activities.

Core Activity: Install EquipmentModifications.

Activity Target 1:Install a minimum of 95% of nationally issuedmodifications on time. Due September 30, 2010

Install nationally issued equipment modifications.

Core Activity: Complete ServiceCertifications

Activity Target 1:Complete a minimum of 98% of servicecertifications within identified schedules. DueSeptember 30, 2010

Complete service certifications on FAA owned NASEquipment.

Core Activity: Coordinate scheduledmaintenance activities

Activity Target 1:Sustain adjusted operational availability of 99.0%at NAS reportable facilities. Due September 30,2010

Coordinate scheduled maintenance activities tosustain NAS reportable facilities adjusted operationalavailability

Complete activities to maintain operational integrity ofNAS related equipment, facilities and infrastructure

Core Business Initiative: SystemIntegrity

Core Activity: Close NASTEP Findings

Activity Target 1:Close 99% of critical issues by the documenteddue date. Due September 30, 2010

Close NASTEP issues by due date.

Activity Target 2:Close 95% of all other issues (not critical) by thedocumented due date. Due September 30, 2010

Core Activity: Continuity of Service

Activity Target 1:Baseline the percentage of facilities that reachedthe three outage warning and did not haveadditional outages requiring service downgrade.Due September 30, 2010

Sustain Cat 2 and Cat 3 service IAW ICAOStandards.

Facilitate timely enhancements to the NAS facilities andservice delivery within the Western Service Area

Core Business Target: Facilitatetimely enhancements to the NASin the Western Service Area

Core Business Initiative: ManageProject Implementation

Page 84 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 86: ATO Business Plan 2010

Manage Project Implementation

Core Activity: JAI Program Management

Activity Target 1:Clear 75% of current FY agreed upon non-as builtJAI Exceptions within 120 days of the DistrictManager signature date. Due September 30, 2010

JAI Program Management

Activity Target 2:Clear 70% of current FY as built JAI Exceptionswithin 180 days of the District Manager signaturedate. Due September 30, 2010

Core Activity: Project Implementation

Activity Target 1:Complete 90% of Non-Reimbursable CWPprojects on time as agreed to in the Project ScopeAgreement. Due September 30, 2010

Project Implementation

Manage reportable NAS facilities and accomplishnecessary activities to sustain Adjustable OperationalAvailability at 99%.

Core Business Target: <STICandidate> Sustain adjustedoperational availability of 99%for NAS reportable facilities inthe Eastern Service Area

Complete scheduled activities to ensure optimalsystem reliability.

Core Business Initiative: MaintainNAS system reliability.

Core Activity: Complete PreventativeMaintenance.

Activity Target 1:Complete a minimum of 95% of all scheduledpreventive maintenance on time. Due September30, 2010

Complete preventative maintenance activities.

Core Activity: Install EquipmentModifications.

Activity Target 1:Install a minimum of 95% of nationally issuedmodifications on time. Due September 30, 2010

Install nationally issued equipment modifications.

Core Activity: Complete ServiceCertifications

Activity Target 1:Complete a minimum of 98% of servicecertifications within identified schedules. Due

Complete service certifications on FAA owned NASEquipment.

September 30, 2010

Core Activity: Coordinate scheduledmaintenance activities

Activity Target 1:Sustain adjusted operational availability of 99.0%at NAS reportable facilities. Due September 30,2010

Coordinate scheduled maintenance activities tosustain NAS reportable facilities adjusted operationalavailability

Core Activity: Sustain SystemReliability

Activity Target 1:Maintain system reliability at 99% at NASreportable facilities. Due September 30, 2010

Monitor and control restoration activities at NASreportable facilities to sustain system reliability

Complete activities to maintain operational integrity ofNAS related equipment, facilities and infrastructure

Core Business Initiative: SystemIntegrity

Core Activity: Close NASTEP Findings

Activity Target 1:Close 99% of critical issues by the documenteddue date. Due September 30, 2010

Close NASTEP issues by due date.

Activity Target 2:Close 95% of all other issues (not critical) by thedocumented due date. Due September 30, 2010

Core Activity: Continuity of Service

Activity Target 1:Baseline the percentage of facilities that reachedthe three outage warning and did not haveadditional outages requiring service downgrade.Due September 30, 2010

Sustain Cat 2 and Cat 3 service IAW ICAOStandards.

Facilitate timely enhancements to the NAS facilities andservice delivery within the Eastern Service Area

Core Business Target: Facilitatetimely enhancements to the NASin the Eastern Service Area

Manage Project Implementation

Core Business Initiative: ManageProject Implementation

Core Activity: JAI Program Management

Activity Target 1:Clear 75% of current FY agreed upon non-as builtJAI Exceptions within 120 days of the District

JAI Program Management

Page 85 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 87: ATO Business Plan 2010

Manager signature date. Due September 30, 2010

Activity Target 2:Clear 70% of current FY as built JAI Exceptionswithin 180 days of the District Manager signaturedate. Due September 30, 2010

Core Activity: Project Implementation

Activity Target 1:Complete 90% of Non-Reimbursable CWPprojects on time as agreed to in the Project ScopeAgreement. Due September 30, 2010

Project Implementation

Sustain adjusted operational availability of select EnRoute equipment at 99.7 percent for the reportablefacilities that support the 35 Operational EvolutionPartnership (OEP) airports.

Core Business Target: Operate21 ARTCCs and Two CERAPs.

Support the safe, efficient and expeditious flow of airtraffic, and issue safety alerts and advisories.

Core Business Initiative: Operate 21Air Route Traffic Control Centers(ARTCC) and 2 CombinedCenters/Radar Approach Controls(CERAP)

Core Activity: ARTCC Modernization

Activity Target 1:Conduct five (5) condition assessment surveys toidentify areas of poor physical plant conditions.Due September 30, 2010

Reduce operational risk and out-year capitalliabilities by modernizing and sustaining physicalplant infrastructure.

Activity Target 2:Initiate and award three (3) major constructionprojects to correct poor physical plant conditions.Due September 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Maintain service availability at facilities.

Core Business Initiative: MaintainService Availability at Facilities

Core Activity: Avoid PartsObsolescence and Improve Reliabilityof Secondary Surveillance

Activity Target 1:

Air Traffic Control Beacon Interrogator (ATCBI)replacement. Replaces existing obsolete En RouteATCBI-4/5 beacons to maintain service continuityand decrease maintenance costs.

Achieve Initial Operational Capability (IOC) at thelast replacement site. Due May 31, 2010

Core Activity: Beacons

Activity Target 1:Start radar tower construction at Yakutat, AKestablishment site. Due August 31, 2010

Beacon-only site. Facility establishment siting,facility infrastructure and system installation of newEn Route beacons.

Core Activity: Avoid PartsObsolescence and Improve Reliabilityof Beacon Buildings

Activity Target 1:Complete nine (9) site upgrades. Due September30, 2010

Long Range Radar (LRR) improvements andinfrastructure upgrades. Limited refurbishment ofinfrastructure at En Route LRR facilities with beaconcapability. Upgrade facility lighting, grounding,bonding, and shielding. Implement heating,ventilation and air conditioning (HVAC), power,display console and antenna drive modifications asrequired.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Core Activity: Replace Obsolete, Non-supportable Equipment - VoiceSwitching and Control System (VSCS)

Activity Target 1:Complete PL/M to C++ Ground-to-Groundsoftware conversion. Due September 30, 2010

VSCS technology refresh. Maintain serviceavailability of En Route voice switch by selectivelyreplacing obsolete and difficult to maintain software.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Maintain service availability to achieve an average dailyairport capacity for the 35 OEP Airports of 102,648arrivals and departures per day.

Core Business Target: ManageAirspace Use

Maintain current En Route software systems tosupport other system changes.

Core Business Initiative: Deliver AirTraffic Service in accordance withthe En Route Operations Plan

Core Activity: Provide New En RouteTechnology to Allow for TechnologyInsertion and Avoid ObsolescenceContinue replacement of Host with En RouteAutomation Modernization (ERAM).

Page 86 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 88: ATO Business Plan 2010

Activity Target 1:Achieve ERAM initial operating capability (IOC) at16 of 20 Air Route Traffic Control Center (ARTCC)sites. Due September 30, 2010Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Core Activity: Implement En RouteCommunications Gateway (ECG) - Build0

Activity Target 1:Monitor the performance of the ECG system andproduce quarterly Sustainment TechnologyEvolution Plan (STEP) and Operational Analysis(OA) Reports to identify and mitigate performanceand obsolescence issues. Due December 31,2009

Implement ECG - Build 0 to replace PeripheralAdapter Module Replacement Item (PAMRI)

Activity Target 2:Monitor the performance of the ECG system andproduce quarterly STEP and OA Reports toidentify and mitigate performance andobsolescence issues. Due March 31, 2010Activity Target 3:Monitor the performance of the ECG system andproduce quarterly STEP and OA Reports toidentify and mitigate performance andobsolescence issues. Due June 30, 2010Activity Target 4:Monitor the performance of the ECG system andproduce quarterly STEP and OA Reports toidentify and mitigate performance andobsolescence issues. Due September 30, 2010

Maintain 90 percent of En Route and Oceanic criticalprogram costs that are within 10 percent of the totalbaseline. Achieve 90 percent of designated acquisitionmilestones. The alignment between major programbudget submissions and the FAA Flight Plan for EnRoute Office of Management and Budget (OMB) Exhibit300 Programs is maintained by ensuring all En Route ledFAA Major Investments (Exhibit 300 programs) areidentified in the Flight Plan. The FY 2010 BudgetSubmission and associated FY 2009 -- FY 2013 CapitalInvestment Plan identify these Exhibit 300 programs asStrategic Investments. Achieving acquisitioncommitments and protecting baselines support thestrategic goals of the FAA Flight Plan.

Core Business Target: Deliveron En Route and OceanicServices AcquisitionCommitments and ProtectBaselines

Provide executive discipline and infrastructure tomonitor critical programs, protect priority programbaselines and deliver products on schedule.

Core Business Initiative: Deliver onAcquisition Commitments andProtect Baselines

Core Activity: Monitor Critical ProgramBaselines - Cost

Activity Target 1:Maintain 90 percent of En Route and Oceaniccritical program costs that are within 10 percent ofthe total baseline. Due September 30, 2010

Provide executive discipline and infrastructure tomonitor critical program baselines.

Activity Target 2:Conduct bi-annual program reviews. DueSeptember 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: Monitor Critical ProgramBaselines - Schedule

Activity Target 1:Achieve 90 percent of designated En Route andOceanic acquisition milestones. Due September30, 2010

Provide executive discipline and infrastructure tomonitor critical programs and deliver products onschedule.

Activity Target 2:Conduct bi-annual program reviews. DueSeptember 30, 2010Activity Target 3:Assess progress towards achieving year-endperformance goals. Due March 31, 2010

Core Activity: Annual Office ofManagement and Budget (OMB)-300Exhibits

Activity Target 1:Deliver annual updates for existing OMB-300Exhibits as required by Federal AviationAdministration/Department of Transportationsubmission schedules. Due September 30, 2010

Deliver annual OMB-300 Exhibits.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Serve as the agency NextGen Operational Concept focalpoint, assuring 90 percent of each Operational concept

Core Business Target:Operational ConceptDevelopment

Page 87 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 89: ATO Business Plan 2010

comments and recommendations from service units andexternal agencies are responded to and or resolvedwithin 60 days of receipt to ensure each NextGenOperational concept is consistent with the NextGenConcept of Operations.

Develop NAS level and Second Level OperationalConcepts in support of NextGen, conduct research toassess the operational feasibility of the operationalconcepts, and develop concept level requirements foruse in investment decisions and for implementation.

Core Business Initiative:Operational Concept Development

Core Activity: Deliver NextGenOperational Concepts andRequirements for National AirspaceSystem

Activity Target 1:Deliver Set of Detailed Operational Scenarios forthe Midterm. Due June 30, 2010

Deliver NextGen Operational Concepts andRequirements.

Activity Target 2:Version 2.0 of NextGen Midterm Concept ofOperations for the NAS. Due September 30, 2010Activity Target 3:Deliver Data Communications Segment 2Requirements. Due September 30, 2010

Core Activity: Traffic Flow ManagementAdvisor (Three-Dimensional PathArrival Management 3D PAM)

Activity Target 1:Begin the technical transfer of information. DueMay 31, 2010

Begin the technical transfer of information fordevelopment of a capability to efficiently andpredictably deliver aircraft from the top of descent toa metering fix. Provisions shall be made to extendcapability into Terminal Radar Approach Control(TRACON).

Core Activity: Determine SurveillanceRequirements for Terminal AirspaceRedesign (Big Airspace)

Activity Target 1:Preliminary Operational Safety Assessment. DueJuly 31, 2010

Determine Requirements for Terminal AirspaceRedesign (Big Airspace) Integrated Arrival andDeparture.

Activity Target 2:Big Airspace Automation Feasibility Study. DueAugust 31, 2010

Core Activity: Develop ResearchManagement Plan on ConflictAdvisories

Activity Target 1:Develop Research Management Plan on ConflictAdvisories. Draft Initial Research ManagementPlan for FY10 Activities by June 30, 2010. DueJune 30, 2010

Develop Research Management Plan on ConflictAdvisories.

Activity Target 2:Complete Research Management Plan. DueSeptember 30, 2010Activity Target 3:Literature Survey and Engineering Analysis ofBasic Technologies. Due September 30, 2010

Core Activity: Conduct Research onTrajectory Based Operations (TBO)-Separation Management for HighAltitude Airspace

Activity Target 1:High Altitude Generic Part Task Simulation. DueSeptember 30, 2010

Conduct research on TBO-Separation Managementfor High Altitude Airspace.

Activity Target 2:Generic Airspace Design Analysis. Due May 30,2010

Complete any and all activities necessary to sustainadjusted operational availability of NAS reportablefacilities at 99 percent.

Core Business Target: Sustainadjusted operational availabilityof 99% for NAS reportablefacilities.

Complete activities to maintain operational integrity ofNAS related equipment, facilities and infrastructure.

Core Business Initiative: SystemIntegrity

Core Activity: Automated TechnicalPerformance Records

Activity Target 1:Develop requirements documentation forAutomated TPR's. Due May 1, 2010

Automated Technical Performance Records.

Develop Quality Assurance Initiative within fiscal year.

Core Business Target: QualityAssurance Initiatives

Page 88 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 90: ATO Business Plan 2010

Develop Reliable Trending Data.

Core Business Initiative: FacilitateNAS Performance

Core Activity: Reliability CenteredMaintenance Activity.

Activity Target 1:Conceptualize the Maintenance Program Analysis(MPA) process. Due September 30, 2010

Reliability Centered Maintenance Activity.

Activity Target 2:Conduct one MPA. Due September 30, 2010

Activity Target 3:Draft RCM Logic Tree for Technical Operation.Due September 30, 2010

Provide 4-Remote Maintenance Monitoring (RMM)Workshops by September 30, 2010.

Core Business Target: RemoteMaintenance Monitoring Training

Incorporate RMM as preferred method ofmaintenance.

Core Business Initiative: Managethe NAS

Core Activity: Facilitate management ofNAS performance

Activity Target 1:Provide Remote Maintenance Monitoring (RMM)workshops to various levels of TechnicalOperations or support LOBs. 1) SOC, 2) TSOG,3)2nd Level Engineering, 4) Academy Instructors.Due September 30, 2010

Facilitate management of NAS performance

Facilitate NAS performance by reporting performance.

Core Business Target: EnhanceNAS Performance

Faciliate management of performance

Core Business Initiative: FacilitateNAS performance

Core Activity: Support, populate,harvest and/or report NAS database andNAS metrics

Activity Target 1:Implement the use of FEQ/FMO for maintenancetracking. Due September 30, 2010

Support, populate, harvest and/or report NASdatabase and NAS metrics.

Activity Target 2:Enhance Web NASPAS & convert databasesystem to RMLS data structure. Due September30, 2010Activity Target 3:Revalidate FSEP field requirements needed forMMS/RMLS. Due September 30, 2010Activity Target 4:Develop & implement CHG 1 for 6032.1Modification Program. Due September 30, 2010Activity Target 5:Develop & implement CHG 1 for 6010.7 JAI. DueSeptember 30, 2010Activity Target 6:Harvest LAST/LONG/Altitude information from 2corporately maintained databases into FSEP. DueJuly 31, 2010

Resolve 80% of operational issues by 9/30/10 identifiedfrom operations forum telcons, technical exchangemeetings, and contract maintenance activities.

Core Business Target: Resolveoperational issues

Resolve operational issues as identified.

Core Business Initiative: Managethe NAS

Core Activity: Facilitate management ofNAS performance

Activity Target 1:Enter issues from Tech Exchanges and/orOperations forum Telecons within 15 days. DueSeptember 30, 2010

Facilitate management of NAS performance

Activity Target 2:Resolve 80% of operational issues by 9/30/10identified from operations forum telcons, technicalexchange meetings, and contract maintenanceactivities. Due September 30, 2010

Manage and maintain the daily operations of the NOCC.

Core Business Target: Managethe NOCC (National OperationsControl Center).

Manage the daily operations of the NOCC byoverseeing, reporting and making decisions pertainingto NAS systems and equipment.

Core Business Initiative: Managethe NAS.

Page 89 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 91: ATO Business Plan 2010

Core Activity: Facilitate management ofNAS performance.

Activity Target 1:Maintain and enhance daily National OperationsControl Center (NOCC) operations support ofoverseeing, reporting, and national decisionspertaining to NAS systems and equipment. DueSeptember 30, 2010

Facilitate management of NAS performance.

Maintain TechNet web portal with daily updates on NASsystems and equipment.

Core Business Target: MaintainTechNet.

Ensure TechNet provides up-to-date operational andperformance data regarding the NAS.

Core Business Initiative: MaintainTechNet.

Core Activity: Facilitate management ofNAS performance.

Activity Target 1:Maintain visibility of TechNet as a central portal forNAS operational and performance data. DueSeptember 30, 2010

Facilitate management of NAS performance.

Develop at least one method that identifies, reduces ormitigates operational and human risk factors in the NAS.

Core Business Target: Securethe NAS

Continue to conduct human factors research for TechOps activities.

Core Business Initiative: Secure theNAS

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Create one document addressing the migration ofControl Centers into NextGen environment. DueSeptember 30, 2010

Ensure a safe and secure NAS.

Improve NAS performance by implementing at least onesoftware upgrade at the National Technical OperationControl Center.

Core Business Target: ImproveNAS Performance

Through NAS performance upgrade, implement TOCCTechnical Refresh.

Core Business Initiative: Enhancethe NAS

Core Activity: Through systemsengineering analysis, fix and enhanceNAS and non-NAS hardware, softwareand documentation.

Activity Target 1:Continue Implementation of National TechnicalOperation Control Center (TOCC) TechnicalRefresh Due September 30, 2010

Through systems engineering analysis, fix andenhance NAS and non-NAS hardware, software anddocumentation.

Review trends for operational analysis (OA) for 12 facilitytypes, three per quarter.

Core Business Target: ReviewTrends for Operational Analysis

Review Trends for Operational Analysis.

Core Business Initiative: Managethe NAS.

Core Activity: Facilitate management ofNAS performance

Activity Target 1:Document findings of operational analysis (OA) for12 facility types, three per quarter and 1 OEPairport per quarter with recommendations forincreasing performance. Due September 30, 2010

Manage and maintain operation of NAS systems &equipment.

Maintain current weather data collection, processingdistribution capabilities, system capabilities andinterfaces. Conduct coordination with service units andexternal agencies to ensure weather informationdevelopment efforts area consistent with the NextGenConcept of Operations. Automated Surface WeatherObservation Network (ASWON) development andsupport. NEXRAD Product Improvement (NPI) updates.

Core Business Target: ProvideWeather Program Services

Maintain current weather data collection, processingand distribution capabilities.

Core Business Initiative: WeatherData Collection, Processing andDistribution Capabilities

Core Activity: Maintain Current WeatherSystem Capabilities and Interfaces

Activity Target 1:Complete Critical Design review (CDR) for WARPtech Refresh Segment 1. Due July 31, 2010

Maintain and sustain Weather and Radar Processor(WARP) service.

Page 90 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 92: ATO Business Plan 2010

Automated Surface Weather Observation Network(ASWON) includes eight separate programs: 1) theAutomated Weather Observing System (AWOS), 2)Automated Surface Observing System (ASOS), 3)ASOS Pre-Planned Product Improvement (P3I)project, 4) Automated Weather Sensors Systems(AWSS), 5) Stand Alone Weather Sensors (SAWS), 6)AWOS Data Acquisition System (ADAS), 7) F-420Wind System, and 8) Digital Altimeter Setting Indicator(DASI). ASWON provides automated surface weatherobservations to meet the needs of pilots, operators,and air traffic personnel. Only ASOS P3I remainsactive with other ASWON programs in service. ASOSP3I consists of five efforts: 1) ASOS ProcessorRehost, 2) Dewpoint Sensor Replacement, 3) Ice-FreeWind Sensor, 4) Enhanced Precipitation Identification(EPI) sensor, and 5) Ceilometer Replacement. TheASOS P3I program is managed by the NWS underInteragency Agreement. Development and test of theEPI sensor is complete, but the EPI sensor productionis delayed because the sensor did not meet all NWSperformance specifications. Ceilometer Replacementdevelopment has begun.

Core Business Initiative: AutomatedSurface Weather ObservationNetwork (ASWON)

Core Activity: Ceilometer ReplacementSupport

Activity Target 1:FAA support the National Weather Service in thedeployment of thirty (30) CeilometerReplacements. Due June 30, 2010

FAA support to the National Weather service in thedevelopment of sixty (60) Ceilometer Replacements.

Activity Target 2:FAA support the National Weather Service in thedeployment of thirty (30) additional CeilometerReplacements for a total of sixty (60) for the year.Due September 30, 2010

NEXRAD weather product improvements are criticalfor replacing aging infrastructure components, andintroducing required new capabilities to multiple FAAsystem interdependent weather systems.

Core Business Initiative: WeatherRadar Program - NEXRAD

Core Activity: Next Generation WeatherRadar (NEXRAD) Legacy, Icing & HailAlgorithmsThe NEXRAD Product Improvement (NPI) updatesNEXRAD technology providing two upgrades whichinclude Super Resolution Products, an on-goinginfrastructure upgrade; and Dual Polarization (DUALPOL), a targeted technology upgrade boostingNEXRAD data quality for better precipitation dataproducts used by ITWS, CIWS, and WARP.NEXRAD is a supporting activity enabling NextGenOperational Improvements under the NNEW and

Activity Target 1:Complete NEXRAD Dual Polarization NWSContract System Test Readiness Review (STRR).Due June 30, 2010

RWI Solution sets, and specifically the 4-D WeatherData Cube and Weather Processor Work Packages1/2/3, and improved forecasts by the National Centerfor Environmental Prediction (NCEP) which in turn,are used universally by FAA Traffic FlowManagement Decision Support Tools. DUAL POLprovides for improved flash flood warnings, severethunderstorm warnings, biological targetidentification, and various types of winter stormwarnings. Aviation applications include newwarnings of hail and icing conditions, turbulencewarnings, and bird strike warnings.

Activity Target 2:Complete NEXRAD Dual Polarization NWSContract Operational Test Readiness Review(OTRR). Due September 30, 2010

Provide ARC data associated with targeted congestedairports.

Core Business Target: DelayMitigation

The process entails updates of targeted congestedairports. Each RA will introduce additions to thetargeted airport list to the CAT members. Moreover,affected LOBs will support their RAs in any current orongoing activities of the CAT.

Core Business Initiative: DelayMitigation

Core Activity: Mitigate Delays

Activity Target 1:Review the list of impacted airports incollaborationwith the CAT (Reference - Delay Mitigation FlightPlan Goal). Due September 30, 2010

The process entails updates of targeted congestedairports. Each RA will introduce additions to thetargeted airport list to the CAT members. Moreover,affected LOBs will support their RAs in any currentor ongoing activities of the CAT.

Activity Target 2:Coordinate on factors that led to the selection ofrecommended list of impacted airports. DueSeptember 30, 2010

Improve by 50% the overall quality of SkyWatch data bySeptember 30, 2010. Establish baseline by January 31,2010.

Core Business Target: Studyand identify trends in SkyWatchdata

Page 91 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 93: ATO Business Plan 2010

Improve air domain awareness and NAS security bystudying and identifying trends in SkyWatch data.

The FAA SkyWatch Program is a repository for NASsecurity events and incidents from multiple geographiclocations. The recent development of analyticcapabilities enables analysis of SkyWatch entries,sorts NAS incidents and event data, and manipulates itfor data trend analysis.In FY10, AJR-2 will audit and validate this analysis toverify its accuracy.

Core Business Initiative: IdentifyNAS Security Issues

Core Activity: Study and Identify Trendsin SkyWatch Data

Activity Target 1:Complete baseline review of SkyWatch data usinga 10% representative data sample. DueSeptember 30, 2010

Examine a representative example (10%) ofSkyWatch entries to baseline compliance withstandards for formatting, completeness, and content.Develop an action plan to improve SkyWatch entryquality using findings from the baseline. Reexaminequality on a quarterly basis. Demonstrate 50%improvement in overall quality by the end of thefiscal year.

Activity Target 2:Summarize baseline and improvementrecommendations in an action plan. Due March31, 2010Activity Target 3:Complete quarterly analysis of SkyWatch dataquality using 10%representative sample. DueApril 30, 2010 and July 31, 2010 Due July 31,2010Activity Target 4:Complete final analysis of SkyWatch data qualityas compared to start-of-year baseline.Demonstrate a 50% improvement. Due September30, 2010

Core Activity: Gather Laser Data

Activity Target 1:Identify an automated capability that will compileyearly laser event data by day and hour. Reportdue March 31, 2010 Due March 31, 2010

Identify a uniform way of gathering laser data. Oncegathered, the data will help determine impact on theNAS.

Activity Target 2:Review laser event data collection protocols toidentify any gaps in laser event reporting or datacollection. Report due July 31, 2010. Due July 31,2010Activity Target 3:Publish FY 2010 laser event baseline data. Reportby September 30, 2010. Due September 30, 2010

Core Activity: Mitigation of SecurityRelated Threats/Procedures on the NAS

Activity Target 1:Analyze global positioning satellite (GPS) testactivity within the NAS for security impacts. Takeimmediate action if needed such as publishingNOTAMs, briefing FAA executives, andmaintaining an archive of actions taken to mitigateimpact on the NAS. Provide monthly brief tointernal FAA management. Due September 30,2010

Initiate appropriate action to mitigate the impact ofsecurity related threats or procedures have on theNAS.

Activity Target 2:Track military spill-out activity within the NAS. Takeimmediate action if needed. Conduct quarterlyreviews of military spill-out reports for trends andimpact on the NAS. Publish report and briefagency representatives within 45 days of thequarter's conclusion and meet as needed with theDoD representatives. Due September 30, 2010Activity Target 3:Assess semi-annually security related proceduresin 7610.4 -- Special Operations and other FAAdirectives and publications for accuracy and initiatechanges as needed. Provide management amonthly report on the status of any changesrequired. Due September 30, 2010

Provide and test at least one support plan in the case ofan emergency by September 30, 2010.

Core Business Target: Create adisaster support infrastructure

Coordinate and manage the ATO's emergencyplanning activities.

Core Business Initiative: ATOEmergency Planner Readiness

Core Activity: Assure ATO''sEmergency Planners are Ready

Activity Target 1:Conduct monthly ATO emergency planningmeetings and publish meeting minutes within 10business days. Due September 30, 2010

Coordinate and manage the ATO''s emergencyplanning activities.

Activity Target 2:Publish an integrated Excercise calendar monthly.Due September 30, 2010

Core Activity: ATO CrisisResponse/Emergency OperationsPolicy

Activity Target 1:

Establish and maintain a CR/EO program and policyin support of agency directives, the NationalResponse Framework, and Title 49 Obligations.

Page 92 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 94: ATO Business Plan 2010

Draft an ATO Crisis Response/EmergencyOperations order that responds to AgencyDirectives, the National Response Framework,and Title 49 obligations. Due December 30, 2009Activity Target 2:Draft program plan for the development of an ATOCrisis Response/Emergency Operations Directiveby March 2010. The plan will include approach tobe used, coordination requirements, requiredparticipants, and milestones. Brief status ofDirective to ATO executives by September 2010.Due September 30, 2010

Achieve 90% of the planned activity target dates set forATC Comm. Activities.

Core Business Target: ProvideATC Communications Services.

Acquire ASTI in accordance with the FAA AcquisitionManagement System (AMS).

Core Business Initiative: AcquireAlaskan SatelliteTelecommunications Infrastructure(ASTI)

Core Activity: Alaskan SatelliteTelecommunications Infrastructure(ASTI)

Activity Target 1:Complete Final Investment Analysis for ASTI TechRefresh. Due September 30, 2010. DueSeptember 30, 2010

Acquire ASTI in accordance with the FAAAcquisition Management System (AMS).

Activity Target 2:Complete Contract Award for ASTI Tech Refresh.Due September 30, 2010. Due September 30,2010

Ehance NAS performance for the 35 OEP airportsthrough advanced engineering and program support.

Core Business Target: NASSystem Performance

Follow policies and procedures for NAS monitoring,control, maintenance and restoration to optimizeservice availability for the 35 OEP airports. Sustainadjusted operational availability at 99.7 percent for thereportable facilities that support the 35 OEP airportsthrough 2012

Core Business Initiative: AdjustedOperational Availability

Core Activity: Monitor, control, maintainand restore OEP airport facilitiesFollow policies and procedures for NAS monitoring,control, maintenance and restoration to optimizeservice availability for the 35 OEP airports.

Activity Target 1:Sustain Adjusted Opertional Availability at 99.7percent for reportable facilities that support the 35OEP airports. Due September 30, 2010

International LeadershipAs the number of international passengers and aviationactivities across the globe increase every year, it becomeseven more important for the United States to continue to bethe gold standard for aviation safety. To make this happen,the FAA actively builds partnerships and shares knowledgeto create a safe, seamless, and efficient global aviationsystem. Our premise is simple: national boundary linesshould not be impediments to safety. That's why we'veworked with over 130 countries and regional organizationsto provide technical assistance and training. We'vecontinued to work closely with the International CivilAviation Organization (ICAO) to promote our critical safetyand capacity initiatives with the larger internationalaudience, with a clear focus to ensure global harmonizationof NextGen's performance-based systems and procedures.We also promote the important work that ICAO doesthrough its Universal Safety Oversight Audit Program(USOAP). Adherence to international standards iseveryone's responsibility, and everyone's gain.

With NextGen technologies and procedures, FAA works toimprove aviation system efficiency and establish seamlessoperations beyond our borders while reducing aviation'senvironmental footprint. We continue harmonizingstandards and procedures with our neighbors in Mexicoand Canada. We are comparing our aviation system withthose of Japan and the European Union to identify futureequipment and procedural needs. We also are expandingour cooperative efforts with China to collaborate on futureNextGen air traffic initiatives.

Environmental issues continue to be a large part of ourefforts. The FAA is a key player in ICAO's Group onInternational Aviation and Climate Change as it developsan international strategy to address aviation greenhousegas emissions. We continue our work with European andindustry partners through the Atlantic InteroperabilityInitiative to Reduce Emissions (AIRE). To addressenvironmental issues in the Pacific region, we establishedthe Asia and South Pacific Initiative to Reduce Emissions(ASPIRE) partnership. We expect that initiatives like AIREand ASPIRE will serve as a framework for similarcooperative efforts in other parts of the world.

The FAA's international priorities support the future needsof the global aviation system by addressing fundamentalinternational aviation challenges today. Throughpartnerships, innovation, and collaborative efforts, we workwith the rest of the world to ensure the safety of air travel,increase the efficiency of the global aviation system, andcontribute to the well-being of the environment.

Top INTERNATIONAL LEADERSHIP Accomplishments forFY 2008

Page 93 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 95: ATO Business Plan 2010

Aviation Safety Leadership. The hard work and dedicationof the multi-agency U. S. government team, led by theFAA, resulted in a successful audit of the NAS by the ICAOUniversal Safety Oversight Audit Program (USOAP) office.The audit covered multiple areas of safety oversightincluding air navigation services, air traffic oversight,search and rescue, airports, shipment of dangerous goods,accident investigation and environment. The audit resultswere issued by ICAO in August 2008. The U. S. score of91 far exceeds the global average of 58.

Bilateral Agreements. At the 2008 Singapore Air Show, theU. S.-Korea Bilateral Aviation Safety Agreement (BASA)Executive Agreement and Implementation Procedures forAirworthiness (IPA) were signed. This safety agreementdemonstrates the strong relationship the FAA maintainswith the Korean Civil Aviation Safety Authority and ourcombined efforts toward international aviation safety. TheIPA allows for the U. S. acceptance of Korean aviationequipment that meets U. S. specifications. A revision toupdate the U. S./Canada BASA IPA was also signed inJune 2008. During the Transatlantic Issues Conference inJune 2008, the U. S. and the European Commissionsigned a safety agreement that broadens and deepenscooperation between the FAA and its Europeancounterpart, the European Aviation Safety Agency. Theagreement, once ratified by both parties, will provide forreciprocal acceptance of safety findings in aircraft design,airworthiness and repair station facilities.

Environmental Leadership. Our second internationalpartnership to promote good environmental stewardship,the Asia and South Pacific Initiative to Reduce Emissions(ASPIRE), was launched in February 2008. UnderASPIRE, the FAA is partnering with Airservices Australiaand Airways New Zealand to share and promote wind-based and oceanic technologies that reduce fuel burn andcarbon dioxide emissions while accommodating air trafficgrowth in the Asia-Pacific region. The ASPIRE partnershipis a significant representation of the international effort tolessen aviation's environmental footprint.

NextGen Technologies. In February 2008, the FAA AirTraffic Organization and the Air Traffic ManagementBureau of the Civil Aviation Administration of China signedan agreement to cooperate on harmonizing our respectiveair traffic system modernization programs. The agreementcreated the NextGen Air Traffic Management SteeringGroup and serves as a formal building block for thefoundation that allows the two countries to work together toharmonize their broader NextGen strategies

External Funding. The 2008 Flight Plan target for ExternalFunding was set at $15 million. Due to hard work andcontinual outreach, FAA's international team secured fundsto surpass the target, including U. S. Department of Statefunding for an International Visitor Leadership Programproject for Singapore, U. S. Trade and DevelopmentAgency funds for developmental projects in India, and twoorientation visits for Brazil's air traffic organization and civil

aviation agency. The program benefited reconstructionprograms by securing funds to ship radars to Afghanistanand for a technical assistance project to the Iraqi CivilAviation Authority.

Flight Plan Target: CAST SafetyEnhancementsWork with the Chinese aviation authorities and industryto adopt 27 proven Commercial Aviation Safety Team(CAST) safety enhancements by FY 2011. This supportsChina's efforts to reduce commercial fatal accidents to arate of 0.030 fatal accidents per 100,000 departures byFY 2012. FY 2010 Target: 4 CAST SafetyEnhancements

Create government-industry partnerships to helptransfer aeronautical products, services, andtechnologies to key developing regions.

Strategic Initiative: GovernmentIndustry Partnerships

Strategic Activity: International Tasks forTechnology Services

Activity Target 1:Develop one new international task for technologyservices to be tested in FY2010. Due July 31,2010

Continue to develop new international tasks fortechnology services to be demonstrated.

Flight Plan Target: NextGenTechnologyBy FY 2013, expand the use of NextGen performance-based systems and concepts to five priority countries.FY 2010 Target: 1 country

Work with the international civil aviation community toadopt enabling systems, such as the GlobalNavigation Satellite System (GNSS) and ADS-B, toimprove safety of flight operations.

Strategic Initiative: ExportTechnologies

Strategic Activity: Global NavigationSystems Support

Activity Target 1:Manage bilateral and regional cooperative GPS-based projects to encourage adoption andincreased use of GPS and augmentation-relatedtechnologies with key global partners. DueSeptember 30, 2010

Promote strategic U.S. navigation technologies,including the Global Positioning System (GPS) andits wide and local area augmentations systems, withkey civil aviation authorities and global aviationcommunity.

Page 94 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 96: ATO Business Plan 2010

Strategic Activity: Global SurveillanceSystems Support

Activity Target 1:Manage bilateral and regional cooperative ADS-Bprojects to encourage adoption and increased useby key global partners. Due September 30, 2010

Promote strategic U.S. surveillance technologies,including Automatic Dependent Surveillance -Broadcast (ADS-B), with key civil aviation authoritiesand global aviation community.

Develop and implement capacity enhancingapplications such as Performance Based Navigation(PBN), embracing current operational capabilities tothe maximum extent possible.

Strategic Initiative: EnhanceCapacity

Strategic Activity: Technical Cooperationwith China - ATMB

Activity Target 1:Conduct the 7th Joint Air Traffic Steering Group(JATSG/7) meeting with the China Air TrafficManagement Bureau (ATMB). Due April 30, 2010

ATO will support cooperative activities with the CivilAviation of China (CAAC) and its Air TrafficManagement Bureau (ATMB) under the Joint AirTraffic Steering Group (JATSG)

Activity Target 2:Finalize the JATSG 2010 Work Plan. Due May 31,2010Activity Target 3:Manage ATO support to the US/China AviationCooperation Program (ACP). Due September 30,2010

Strategic Activity: RNAV/RNPApplications

Activity Target 1:Demonstrate RNAV/RNP applications viaeducational seminars or concept demonstrationsin at least two countries. Due September 30, 2010

Promote global implementation of U.S. RNAV/RNPconcepts and applications.

Strategic Activity: RNP Standardization

Activity Target 1:Support ICAO PBN Study Group meetings, ICAOregional forums, and bilateral forums with positionpapers and expertise as necessary. DueSeptember 30, 2010

Support ICAO and the global aviation communitywith performance-based navigation (PBN)implementation.

Manage the international strategy in support of theNextGen Global Harmonization Working Group andwork with civil aviation and interagency partners to

Strategic Initiative: Next Gen GlobalHarmonization IPT

continually assess and implement the strategy.

Strategic Activity: NextGen InternationalActivity

Activity Target 1:Coordinate with the NextGen and Ops PlanningService Unit to support established and maturingcooperative projects and initiatives with thecountries of Japan, China, Canada, and Mexico.Due September 30, 2010

Manage the planning and execution of key NextGeninternational activities with key regional aviationauthorities, organizations, USG stakeholders andindustry members.

Activity Target 2:Manage ATO support for European CommissionIndustry Consultation Body (ICB) meetings,EUROCONTROL Coordination Committee andStrategic Executive Meetings (SEM), and NextGenand SESAR Joint Undertaking (SJU)harmonization efforts. Due September 30, 2010Activity Target 3:Update the Joint Planning Environment to reflectglobal harmonization initiatives. Due September30, 2010

Work with the international community to supportpartnerships, such as AIRE and ASPIRE, that adopttechnologies, systems, procedures and concepts toimprove global interoperability and systemharmonization, and support a reduction of aviation'senvironmental footprint.

Strategic Initiative: OptimizeEfficiencies

Strategic Activity: AIRE Procedures andTest Demonstrations

Activity Target 1:Conduct the third annual Industry Day for theAtlantic Interoperability Initiative to ReduceEmissions program to status partners andstakeholders. Due July 30, 2010

Evaluate tools and procedures under the AtlanticInteroperability Initiative to Reduce Emissions(AIRE) Program in order to minimize aviation'senvironmental footprint.

Activity Target 2:Conduct flight trial for enhanced operationalprocedures using Optimized Profile Descent. DueSeptember 30, 2010Activity Target 3:Continue to collect metrics and evaluatethroughout FY10 to determine the amount of jetfuel and emissions being reduced by the AIREpartnership demonstrations. Due September 30,2010

Page 95 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 97: ATO Business Plan 2010

Strategic Activity: AJE - En Route &Oceanic Services

Activity Target 1:Assess progress towards achievement of year-end performance goal. Due March 31, 2010

Ensure harmonization of service improvementsthrough collaboration with international and industryservice providers by active participation andleadership in regional International Civil AviationOrganization and inter-organizational workgroupsand decision making process.

Activity Target 2:Coordinate with international partners at selectedinternational meetings. Due September 30, 2010

Strategic Activity: CANSO

Activity Target 1:Identify strategic ATO support activities forFY2010. Due December 30, 2009

Manage ATO participation in the Civil Air NavigationServices Organization (CANSO), including but notlimited to the Chief Executive Officers conferences,the Executive Committee meetings, and selectworking groups.

Activity Target 2:Manage ATO support of and participation inCANSO Working Groups, senior level meetings,and regional projects. Due September 30, 2010

Strategic Activity: ASPIRE Proceduresand Test Demonstrations

Activity Target 1:Publish the 2nd annual ASPIRE Progress Report.Due September 30, 2010

Expand the environmental approach to oceanic airtraffic management through the multi-State Asia andSouth Pacific Initiative to Reduce Emissions(ASPIRE) partnership.

Activity Target 2:Develop a plan with the Civil Aviation Burea,Japan (JCAB) to promote ASPIRE initiatives in theNorth Pacific ocean region, possibly including thedevelopment of a strategic plan or flightdemonstrations. Due September 30, 2010

Implement and directly relate 100% of Strategy 2014objectives to Air Traffic Organization (ATO) activities.

Core Business Target: Strategyand Performance InternationalActivities

Provide leadership and a focal point for ATO'sinternational activities through its strong internationalknowledge base and ability to build coalitions andglobal consensus with planned ATO systems,

Core Business Initiative: Strategyand Performance Planning -International

procedures, standards, and policies. Provide directtechnical support and strategic guidance to carry outday-to-day requirements by operational facilities thatinterface with foreign air navigation service providers.

Core Activity: ATO InternationalCorporate Development

Activity Target 1:Coordinate ATO activities in support of ongoingand future employee exchange programs withforeign Air Navigation Service Providers (ANSPs)to assist the ATO with its development of bestbusiness practices. Due September 30, 2010

Coordinate ATO international activities and initiativesthat support the continued development of ATO bestbusiness practices and processes.

Core Activity: ATO InternationalSupport

Activity Target 1:ICAO Headquarters - Coordinate ATO support forICAO Global efforts, including but not limited tooversight of USOAP action plan commitments, theannual filing of differences to ICAO standards inaccordance with FAA Order JO7000.6, and ATOparticipation in panels and other groups, and leadATO coordination with the API International PolicyOffice. Due September 30, 2010

Support ATO strategic global, regional, and bilateralmeetings, events and activities in an effort toharmonize U.S. and international technologies andsystems.

Activity Target 2:Americas - Coordinate ATO support for strategicactivities, including but not limited to ICAOCaribbean and South America Regional Meetings,North American Aviation Trilateral (NAAT) efforts,and specific bilateral and multilateral projects, andlead ATO coordination with the API WesternHemisphere Office. Due September 30, 2010Activity Target 3:Asia Pacific - Coordinate ATO support for strategicactivities, including but not limited to ICAO AsiaPacific Regional Meetings, Asia Pacific DirectorsGeneral Meeting, Informal air traffic coordinationgroups, and specific bilateral and multilateralprojects. Due September 30, 2010Activity Target 4:Europe/Africa/Middle East and Global - CoordinateATO support for strategic activities, including butnot limited to ICAO European Regional Meetings,Cross Polar Air Traffic Working Group activities,and Iraq/Afghanistan infrastructure rebuildingefforts. Due September 30, 2010

Core Business Target: TrafficManagementPlanning/Coordination with

Page 96 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 98: ATO Business Plan 2010

Enhance the efficiency of global air traffic managementby coordinating with appropriate internationalorganizations.

International Air Traffic FlowManagement Organizations

Enhance the efficiency of global air trafficmanagement by coordinating with appropriateinternational organizations.

Core Business Initiative: TrafficManagement Planning withInternational Organizations

Core Activity: Traffic ManagementPlanning with InternationalOrganizations

Activity Target 1:Establish planning telcons with the Japanese AirTraffic Flow Management organization. DueSeptember 30, 2010

Enhance the efficiency of global air trafficmanagement by coordinating with appropriateinternational organizations.

Activity Target 2:Update international geographical data in theTraffic Flow Management System (TFMS) fromColumbia by 12/31/2009 and from Mexico by07/31/2010. Due July 31, 2010Activity Target 3:Coordinate Hurricane Hunter operationalprocedures with international air traffic flowmanagement organizations. Due April 30, 2010Activity Target 4:Develop Air Traffic Flow Management trainingprograms for use by international air traffic flowmanagement organizations in the South AmericanRegion. Due April 30, 2010

As the lead for ATO and FAA, System OperationsSecurity will coordinate with Department of State (DOS)and other stakeholders on special air traffic relatedhandling (e.g., secure routing) of flights by select States(e.g., countries of special security interest to the U.S.)designated as Special Interest Flights (SIF) in order tomitigate potential security threats. The group will provideair traffic operations related support of and coordinationon (e.g., special ATC handling) of flights operating in theU.S. under the Open Skies treaty, which enables 34party States to conduct security related activities. Also,this group will provide national level standards,procedures, procurement, and logistical support forATO's conduct of classified voice and datacommunications (referred to as COMSEC) both internallyand with other government agencies.

Core Business Target:Collaborate with InternationalPartners on Air Domain Security

Collaborate with partners to strengthen ATMoperational and security capabilities within the NAS.

Core Business Initiative: StrengthenATM Operational and SecurityCapabilities with InternationalPartners

Core Activity: Work with ICAO andRegional Forums

Activity Target 1:Participate in development of air trafficmanagement (ATM) security terminology andprocedures with the NATO/EUROCONTROL ATMSecurity Coordination Group. Brief internal FAArepresentatives on the results and issues oftrimester meetings within 30 days of meetings.Due September 30, 2010

Work through appropriate ICAO and regional forumsto develop and implement strategies to enhancecooperation among Civil Aviation Authorities,ANSPs, military, and/or other defense/securityentities to strengthen ATM operational and securitycapabilities.

Activity Target 2:Participate in the next Civil/Military Air TrafficManagement Conference (CMAC) to discusscommon issues and solutions to air trafficmanagement (ATM) problems affecting significantareas of ATM security particularly the increasedsignificance and demand for airspace by civil andmilitary users and associated issues related tooperations, airspace infrastructure, future systems,regional cooperation and global utilization. Briefinternal FAA management on accomplishmentsand issues within 30 days of meetings. DueSeptember 30, 2010Activity Target 3:Participate in the ICAO Global Civil MilitaryConference, in Montreal, October 19 - 21, 2009.Brief internal FAA management onaccomplishments and issues within 30 days ofmeetings. Due December 1, 2009

Core Activity: Regional Acceptance ofUS ATM Security Processes

Activity Target 1:Interface with International Air Traffic SystemOperations Security counterparts in organizationsand facilities with similar ATM securityresponsibilities for tours of facilities, discussionsregarding air security issues, and development oftrusted relationships that could lead to

Promote regional acceptance of U.S. ATM securityprocesses through expanded outreach efforts,proliferation of U.S. expertise and exchange ofinformation, support of targeted training andeducational events, and pursuit of strategic bilateralarrangements to improve operational communicationand expansion of flight data exchange.

Page 97 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 99: ATO Business Plan 2010

establishment of ATM security interface with theUnited States Domestic Events Network (DEN).Brief internal FAA management onaccomplishments and issues within 30 days ofmeetings. Due September 30, 2010Activity Target 2:Develop reporting procedures in accordance withICAO Annex 9 for sick passengers with possiblecommunicable diseases on international flights.Quarterly (and, if appropriate, within 30 days ofany meetings), brief internal FAA management onaccomplishments and issues. Due September 30,2010

Core Activity: Strengthen Air DomainWorldwide Crisis Management

Activity Target 1:Participate in ICAO Regional Aviation MedicineTeam meetings addressing issues regardingCooperative Arrangements for Preventing theSpread of Communicable Diseases Through AirTravel (CAPSCA). Brief internal FAA managementon accomplishments and issues within 30 days ofmeetings. Due September 30, 2010

Participate in worldwide crisis management venuesto ensure ATM security issues are properlyaddressed for crisis activities such as disaster relief,reconstitution following terror attacks, andcontainment of pandemic diseases.

Provide technical expertise on Air Domain securitypolicies and procedures to other Civil AviationAuthorities.

Core Business Initiative: ProvideTechnical Expertise on Air DomainSecurity to International Partners

Core Activity: Air Domain SecurityPlans for 2010 Olympics

Activity Target 1:Support ATM security planning with Canadianauthorities for the Vancouver Olympics. Briefinternal FAA management on accomplishmentsand issues within 30 days of meetings. DueFebruary 28, 2010

Provide technical assistance to adjacent FIRs toensure safety and seamless operations between ourcommon border.

Organizational Excellence.

Flight Plan Target: Leadershipand Accountability(Objective) Make the organization more effective withstronger leadership, a results-oriented, high performanceworkforce, and a culture of accountability.

Develop and implement Corporate and LOB/SOOrganizational Excellence Action Plans that addressemployee feedback and engagement, and improveorganizational effectiveness, accountability andperformance.

Strategic Initiative: OrganizationalExcellence Action Plans

Strategic Activity: ATO OrganizationalExcellence Plan

Activity Target 1:LOB/SOs will report to their workforce on theimplementation status and accomplishments oftheir OE Action Plans. Due December 30, 2009

Monitor and assess implementation of FAACorporate and LOB/SO Organizational Excellence(OE) Action Plans to address employee feedbackand engagement, and improve organizationaleffectiveness, accountability and performance.

Activity Target 2:LOB/SOs will monitor the implementation of theirOE Action Plans and use identified methods tocontinue soliciting feedback from their employeeson organizational/workforce issues to improveplanned or ongoing actions. Due March 30, 2010Activity Target 3:LOB/SOs will implement any necessary changesin their OE Action Plans based on employeefeedback and/or changes in organizationaldirection or requirements, and communicate thosechanges to employees and continueimplementation. Due June 30, 2010Activity Target 4:LOB/SOs will document their accomplishmentsand lessons learned in implementing their OEAction Plans and communicate results to theiremployees. Due September 30, 2010

Work with the Administration, Congress, andstakeholders to develop and implement FAAreauthorization legislation.

Strategic Initiative: LegislativeProposal for Reauthorization

Strategic Activity: FAA Reauthorization(AJF)

Activity Target 1:Provide supporting documentation for capitalfunding requirements to justify Reauthorizationlevels as necessary through the fiscal year untillegislation is approved. Due September 30, 2010

Support the ongoing activity to establish newReauthorization levels for FAA Capital F&E.

Each LOB/SO will track and report quarterly on theircompliance with corporate leadership developmentpolicies and initiatives.

Strategic Initiative: LeadershipDevelopment

Page 98 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 100: ATO Business Plan 2010

Strategic Activity: ATO LeadershipDevelopment Compliance

Activity Target 1:Report quarterly on steps taken to improve orsustain timely completion of probationary trainingand certification. Due September 30, 2010

Each FAA organization will track and report quarterlyin pbviews on their compliance with leadershipdevelopment policies and initiatives in the areas ofmandatory probationary manager training,probationary manager certification, ContinuingManagement Education, and steps taken to improvecompliance rates.

Activity Target 2:Report quarterly on steps taken to meetContinuing Management Education requirementsfor incumbent managers. Due September 30, 2010

Each FAA organization will track and report quarterlyon LOB/SO actions to foster a workplace free ofharassment, reprisal, and retaliation.

Strategic Initiative: Harassment,Reprisal, and Retaliation FreeWorkplace

Strategic Activity: ATO Harassment- andRetaliation-Free Workplace Training

Activity Target 1:Develop a training schedule for ATO distribution tothe Office of Human Resources (AHR), the Officeof Civil Rights (ACR), and ATO Service Units. DueFebruary 28, 2010

Each FAA organization will track and report quarterlyin pbviews on their compliance with this initiative interms of the numbers of people trained.

Activity Target 2:Ensure that ATO management workforce attendsModel Workplace and Diversity Workshops, whichincludes Accountability Board training. Due August31, 2010Activity Target 3:Report quarterly the number of employeesattending Accountability Board training for FAAManagers. This includes in-person trainingsessions provided by the Accountability Board orby Accountability Board Human Resources pointsof contacts; and other Accountability BoardTraining such as Interactive Videoteleconferencing (IVT's) and Brown Bag Lunches.Due September 30, 2010

Each FAA organization will track and report quarterlyon actions taken in support of the Secretary ofTransportation's fiscal year goal that 3 percent of allnew hires are individuals with targeted (severe)disabilities.

Strategic Initiative: New Hires withTargeted Disabilities

Strategic Activity: ATO actions insupport of DOT FY goal that 3% of allnew hires are individuals with targeteddisabilities

Activity Target 1:ATO will provide to ACR a standard quarterlyreport outlining actions taken to increase theirworkforce percentage of individuals with targeteddisabilities. Due September 30, 2010

ATO will track and report quarterly on actions takento support the Secretary of Transportation's fiscalyear goal that 3 percent of all new hires areindividuals with targeted (severe) disabilities.

Flight Plan Target: Cost ControlOrganizations throughout the agency will continue toimplement cost efficiency initiatives such as:10-15 percent savings for strategic sourcing for selectedproducts and services;By the end of FY 2009, reduce leased space forAutomated Flight Service Stations from approximately510,000 square feet to approximately 150,000 squarefeet;Annual reduction of $15 million in InformationTechnology operating costs;By FY 2010, reduce overhead costs 5-10 percentthrough automation of invoice processing. FY 2010Target: 90% of targeted savings Note: For FY10, ITsavings base is $25 million.

Ensure that financial policies and procedures areupdated and that management and staff are welltrained in the use of FAA cost data, as derived fromFAA's acquisition, cost accounting, accounting, payrolland personnel systems, to make managementdecisions.

Strategic Initiative: Cost Data Toolsand Training

Strategic Activity: ATO CAS COSTEFFICIENCY MEASURE

Activity Target 1:Submit to CFO a proposal of an additional ATOefficiency measure using CAS/LDR data that willresult in cost containment, cost avoidance, orefficiency improvements. Due March 31, 2010

Establish additional cost efficiency measures usingCAS/LDR data.

Activity Target 2:Provide to CFO an implementation plan forapproved ATO efficiency measure. Due July 31,2010Activity Target 3:Complete all actions in for implementing new ATOefficiency measure in FY 2011. Due September30, 2010

Page 99 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 101: ATO Business Plan 2010

Implement line of business-specific cost efficiency aswell as agency-wide initiatives to reduce costs orimprove productivity.

Strategic Initiative: Cost ControlProgram

Strategic Activity: ATO-G Service AreaRestructuring

Activity Target 1:ATO will provide a revised Service AreaRestructuring savings target and updated plan toABA. Due November 1, 2009

ATO will continue to restructuring of Service Centerand Technical Operations in order to realizedsavings from reduced federal and contractor FTEs.

Activity Target 2:ATO will complete and report on a Service Centerand Engineering Service Center Contract headcount quarterly. Due September 30, 2010Activity Target 3:ATO will complete a federal employee head countand report to ABA monthly. Due September 30,2010Activity Target 4:ATO will complete and report on an IT contractorhead count annually. Due September 30, 2010Activity Target 5:AJF will brief the FAA CFO on the current state ofthe Service Area Restructuring Initiative. DueNovember 1, 2009

Strategic Activity: ATO-WDiscontinuance of NavAids

Activity Target 1:Discontinue service of 50 NavAids. Due June 30,2010

ATO-W will eliminate or reduce FAA obsoletetechnology by either removing from service ortransferring from federal operation 100 NavAids bySeptember 2009.

Activity Target 2:Discontinue service of an additional 50 NavAids.Due September 30, 2010

Each FAA organization will develop, track, and reportquarterly on a comprehensive measure of its operatingefficiency or financial performance. These measureswill include: Cost per flight controlled, Research,Engineering, and Development (RE&D) ManagementStaff Efficiency Measure, Grant AdministrationEfficiency Measure, Direct labor costs of certification offoreign and domestic repair stations, Direct labor costsof surveillance of foreign and domestic repair stations.

Strategic Initiative: Productivity andFinancial Metrics

Strategic Activity: ATO EfficiencyMeasure: System Planning andResource Management Budget

Activity Target 1:Report quarterly to ABA on results of SystemPlanning and Resource Management budget. DueJanuary 31, 2010

Sustain FY 2010 System Planning and ResourceManagement budget at 2% or less of total RE&Dbudget.

Activity Target 2:Report quarterly to ABA on results of SystemPlanning and Resource Management budget. DueApril 30, 2010Activity Target 3:Report quarterly to ABA on results of SystemPlanning and Resource Management budget. DueJuly 31, 2010Activity Target 4:Report 4th quarter FY 2009 to ABA on results ofSystem Planning and Resource ManagementBudget. Due October 31, 2009Activity Target 5:Provide updated FY 2011 template for review andapproval in time to be included in the FY 2011Business Plan. Due September 30, 2010Activity Target 6:Combined efficiency measures must account for75% of operating resources. any additionalmeasures needed to meet the 75% requirementmust be approved by the end of the calendar year.Due December 31, 2009

Strategic Activity: ATO EfficiencyMeasure: RE&D Management Workforce

Activity Target 1:Report quarterly to ABA on the percentage of themanagement workforce comprising the overallRE&D workforce. Due January 31, 2010

Maintain an RE&D management workforcecomprising no more than 10% of the overall RE&Dworkforce.

Activity Target 2:Report quarterly to ABA on the percentage of themanagement workforce comprising the overallRE&D workforce. Due April 30, 2010Activity Target 3:Report quarterly to ABA on the percentage of themanagement workforce comprising the overallRE&D workforce. Due July 31, 2010Activity Target 4:Report 4th quarter to ABA on the percentage ofthe management workforce comprising the overallRE&D workforce. Due October 31, 2009Activity Target 5:Provide updated FY 2011 template for review andapproval in time to be included in the FY 2011

Page 100 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 102: ATO Business Plan 2010

Business Plan. Due September 30, 2010

Activity Target 6:Combined efficiency measures must account for75% of operating resources. Any additionalmeasures needed to meet the 75% requirementmust be approved by the end of the calendar year.Due December 31, 2009

Strategic Activity: ATO EfficiencyMeasure: Cost per Controlled Flight

Activity Target 1:Report quarterly to ABA on the cost per controlledflight. Due February 28, 2010

Measure the cost per controlled flight and reportquarterly to ABA. The estimated target for FY 2010will be determined in October 2009 based onupdated FY 2009 cost and flight data.

Activity Target 2:Report quarterly to ABA on the cost per controlledflight Due May 31, 2010Activity Target 3:Report quarterly to ABA on the cost per controlledflight Due August 31, 2010Activity Target 4:Report FY09 4th quarter results to ABA on costper controlled flight. Due November 30, 2009Activity Target 5:Provide updated FY 2011 template for review andapproval in time to be included in the FY 2011Business Plan. Due September 30, 2010Activity Target 6:Combined efficiency measures must account for75% of operating resources. Any additionalmueasures needed to meet the 75% requirementmust be approved by the end of the calendar year.Due December 31, 2009

Strategic Activity: ATO EfficiencyMeasure: ATO Overhead Rate

Activity Target 1:On or before October 1, 2009 establish FY 2010target. Due October 1, 2009

Track and report ATO overhead obligations, toinclude service area, service unit and HQ overhead,as a percent of total ATO labor obligations andreport quarterly to ABA. FY 2010 target: 18.1%.

Activity Target 2:Continue to report 4th quarter measure results toABA. Due October 31, 2009Activity Target 3:Continue to report 1st quarter measure results toABA. Due January 31, 2010Activity Target 4:Continue to report 2nd quarter measure results toABA. Due April 30, 2010Activity Target 5:Continue to report 3rd quarter measure results to

ABA. Due July 31, 2010

Activity Target 6:Provide updated FY 2011 template for review andapproval in time to be included in the FY 2011Business Plan. Due September 30, 2010

Improve management of FAA's real property assets byoptimizing maintenance costs and disposing of excessassets.

Strategic Initiative: AssetManagement

Strategic Activity: Annual Real PropertyInventory

Activity Target 1:Complete 80 percent of the annual real propertyinventory target. Due September 30, 2010

Support Real Property Asset Management Inventoryby utilizing efficient methodologies to determineexistence and condition of real property.Methodology will utilize reliable data, replacementand repair request data, statistical sampling andlimited physical testing.

Flight Plan Target: CriticalAcquisitions on BudgetIn FY 2009, 90 percent of Major System Investments arewithin 10 percent variance of current baseline totalbudget estimate at completion (BAC). FY 2010 Target:90%

Implement and improve program managementprocesses to remain within acquisition cost andschedule baselines.

Strategic Initiative: ProgramManagement Processes

Strategic Activity: For FY2010 90% ofAcquisition programs are within 10% ofCIP total funding amount

Activity Target 1:Establish FY10 list of critical acquisition programsfor 90%goal by October 1, 2009. Due October 1,2009

For FY2010 90% of Acquisition programs are within10% of CIP total funding amount: Track and reporton Critical Acquisition Programs: Provide themanagement discipline and infrastructure formonitoring critical programs and delivering productson schedule and on budget

Activity Target 2:Complete coordinated 5 year Capital InvestmentPlan to establish Cost targets and submit with theFY2011 Budget. Due February 28, 2010

Develop, document, and use investment criteria tomanage major capital programs.

Strategic Initiative: Use InvestmentCriteria to Manage Programs

Page 101 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 103: ATO Business Plan 2010

Strategic Activity: Capital Planning andInvestment Control

Activity Target 1:Publish a Business Case Analysis Guidebookoutlining the Business Case Analysis processusing best practices and agency examples. DueSeptember 30, 2010

Ensure that Capital Planning activities are conductedin a sound, business-like way, and in accordancewith cyclical (e.g. budget, strategic, and acquisition)planning requirements

Flight Plan Target: CriticalAcquisitions on ScheduleIn FY 2009, 90 percent of Major System Investmentsselected annual milestones are achieved. FY 2010Target 90%

Implement and improve program managementprocesses to remain within acquisition cost andschedule baselines.

Strategic Initiative: ProgramManagement Processes

Strategic Activity: Program MgmntProcesses

Activity Target 1:Establish FY10 list of critical programs and theirselected milestones by October 1, 2010 DueOctober 1, 2009

Provide the management discipline andinfrastructure for tracking, monitoring, and reportingprogram milestone completions for criticalacquisition programs. These processes will be usedto manage all programs that are reporting againstthe 90% Acquisition goal

Activity Target 2:Monitor, identify, and report monthly onestablished program schedule activities and datesby September 2010. Due September 30, 2010

Develop, document, and use investment criteria tomanage major capital programs.

Strategic Initiative: Use InvestmentCriteria to Manage Programs

Strategic Activity: Capital Planning andInvestment Control (CPIC)

Activity Target 1:Publish a Business Case Analysis Guidebookoutlining the Business Case Analysis processusing best practices and agency examples. DueSeptember 30, 2010

Ensure that Capital Planning activities are conductedin a sound, business-like way, and in accordancewith cyclical (e.g., budget, strategic, and acquisition)planning requirements.

Flight Plan Target: InformationSecurity ProgramAchieve zero cyber security events that disable orsignificantly degrade FAA services. FY 2010 Target: 0

Protect FAA's information infrastructure usingadvanced cyber defense strategies.

Strategic Initiative: Cyber-SecurityPlan

Strategic Activity: Achieve Zero CyberSecurity Events that Disable orSignificantly Degrade FAA Systems.

Activity Target 1:Recertify 12 ATO administrative informationsystems by each system's anniversary date. DueSeptember 30, 2010

Implement an efficient and effective cyber securityprogram in accordance with the Federal InformationSecurity Management Act of 2002.

Activity Target 2:Perform Annual assessments on 16 ATOadministrative information systems. DueSeptember 30, 2010

Strategic Activity: ISS ComplianceProgram.

Activity Target 1:Identify key personnel with significant ISS rolesand responsibilities by 10/31/09 and ensure ISSAwareness training is taken and documented forFISMA compliance by May 31, 2010. Due May 31,2010

ATO will implement an efficient and effective cybersecurity program.

Activity Target 2:Participate in the ISS Compliance Program Planactivities and implement compliance reviewchecklists. Due March 31, 2010Activity Target 3:Coordinate and implement agency IT/ISS orders.Due September 30, 2010Activity Target 4:Sensitvity levels for each system must be identifiedand documented based on Federal requirementsand guidelines contained in OMB Circular A-130,FIPS 199. Due September 30, 2010Activity Target 5:Contingency and Disaster Recovery Plan (C/DRP)must be developed, tested, and maintained for allFAA information systems. Due September 30,2010Activity Target 6:Report cyber incident information to the CSMC onan on-going basis. Due September 30, 2010Activity Target 7:All information systems owned or operated by the

Page 102 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 104: ATO Business Plan 2010

FAA or on the behalf of the FAA must be C&A'd bythe system's C&A anniversary date. DueSeptember 30, 2010

Enable enterprise-wide conformance to informationtechnology enterprise architecture.

Strategic Initiative: EnterpriseArchitecture Conformance

Strategic Activity: Support forIntegrating Standards and ConfigurationManagement.

Activity Target 1:Co-lead with AIO a cross-agency team to draft CMprocesses and procedures for non-NAS IT. DueSeptember 30, 2010

ATO-W will continue to co-lead a cross-LOB team indeveloping CM processes and procedures for non-NAS Information Technology.

Strategic Activity: ATO-F Support forIntegrating Standards in SoftwareDevelopment.

Activity Target 1:Complete EA reference models. Due September30, 2010

Leverage Federal Segment ArchitectureMethodology (FSAM) to complete EA referencemodels.

Protect FAA-sensitive and individual privacyinformation from unauthorized disclosure.

Strategic Initiative: UnauthorizedDisclosure

Strategic Activity: Stabilize InformationAssurance/Privacy Operations.

Activity Target 1:Complete PTAs and PIAs as required by the C&Aanniversary date. All systems are required tosubmit PTAs, and where applicable, PIAs,annually in conjunction with their SCAP/AnnualSecurity Assessment submissions. DueSeptember 30, 2010

Protect FAA-sensitive and individual privacyinformation from unauthorized disclosure.

Activity Target 2:Participate in the Privacy Compliance activitiesand implement compliance review checklists asrequested by the FAA's Privacy Officer. Due June30, 2010Activity Target 3:Coordinate and implement agency privacyguidance. Due September 30, 2010Activity Target 4:Identify key personnel with significant privacyresponsibilities (e.g. anyone that must ensure thatprivacy documents are completed in accordancewith FISMA requirements) by November 30, 2009,and ensure privacy training is taken and

documented for FISMA compliance. Due June 30,2010Activity Target 5:Report privacy breaches to the CSMC as theyoccur. Due September 30, 2010Activity Target 6:with Records Officer to schedule all electronicrecords in accordance with the EGOV Act Section207. Due September 30, 2010 Due September 30,2010

Strategic Activity: Build EnablingPrivacy Infrastructure.

Activity Target 1:Ensure FIPS 200 requirements have beenintegrated into the Enterprise Architecture. DueSeptember 30, 2010

Encryption activity.

Activity Target 2:Encrypt all PII systems. Due September 30, 2010

Strategic Activity: Privacy InformationGovernance.

Activity Target 1:Establish and Maintain physical security standardscommensurate with privacy information risks. DueSeptember 30, 2010

Implement Converged Physical Security & PrivacyInformation Governance.

Activity Target 2:Ensure planned policy and guidance documentsare implemented for the FAA HSPD-12 program.Due September 30, 2010

Flight Plan Target: CustomerSatisfactionMaintain the annual average of FAA surveys on theAmerican Customer Satisfaction Index at or above theaverage Federal Regulatory Agency score. FY 2010Target: Government Regulatory Average

Review customer requirements annually and measurecustomer satisfaction more broadly for FAA services.

Strategic Initiative: CustomerRequirements Review

Strategic Activity: ATO ACSI Survey ofCustomer Satisfaction with ATOServices

Activity Target 1:Survey ATO customers' opinions of the productsand services provided by the Air TrafficOrganization and provide final survey results toATO management. Due September 30, 2010

ACSI Survey conducted by AJC to gauge thesatisfaction of customers with ATO services.

Page 103 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 105: ATO Business Plan 2010

Strategic Activity: ATO ACSI Survey ofCustomer Satisfaction Action Plan

Activity Target 1:Develop action plan based on FY2009 surveyresults to resolve customer issues that negativelyimpact satisfaction with ATO services and presentto AJC management. Due November 30, 2009

Action Plan based on ACSI Survey conducted byAJG to gauge the satisfaction of customers withATO services.

Standardize FAA websites making them more usefulfor exchanging information and conducting business.

Strategic Initiative: Standardize FAAWebsites

Strategic Activity: Standardize ATOWebsites

Activity Target 1:Update the ATO web strategies and action plansin writing to the FAA Web Manager and brief FAAWeb Council on the ATO plans on or beforeJanuary 30, 2010. Due January 30, 2010

Ensure all ATO websites comply with the Agency'sweb and branding standards and policies.

Activity Target 2:Submit ATO web progress reports to the FAA WebManagers on or before March 31, 2010. DueMarch 31, 2010Activity Target 3:Submit ATO web progress reports to the FAA WebManagers on or before June 30, 2010. Due June30, 2010Activity Target 4:Certify to the Administrator on or beforeSeptember 30, 2010 that 95 percent or more ofATO web pages comply with FAA web standards,policies and requirements including those outlinedin the FY-2010 Web Strategy and Action Plan. DueSeptember 30, 2010

Flight Plan Target: OPM HiringStandardBy FY 2010, 80 percent of FAA external hires will befilled within OPM's 45-day standard for government-widehiring. FY 2010 Target 80%

In external recruitment efforts, implement corporatestrategies that expand the applicant pool to ensureequal opportunity to all applicants and result inattracting high quality candidates to the FAA.

Strategic Initiative: ExternalRecruiting

Strategic Activity: ATO Mission-CriticalHiring

Activity Target 1:

Identify mission-critical external hires.

Update and submit FY10 and FY11 hiringprojections for mission-critical occupations. DueFebruary 28, 2010

Flight Plan Target: ReduceWorkplace InjuriesReduce the total workplace injury and illness case rate tono more than 2.44 per 100 employees by the end of FY2011, and maintain through FY 2013. FY 2010 Target:2.52 per 100 employees

Reduce workplace injuries through employee safetyprogram evaluations and OSHA Voluntary ProtectionProgram measures.

Strategic Initiative: ReduceWorkplace Injuries

Strategic Activity: ATO-W EmployeeSafety

Activity Target 1:EOSH Services will produce a strategiccommunications package for ATO managers toutilize in order to inform employees on how toreport mishaps in SMIS, awareness of OSHpolicies, and specific safe work practices based onhazards that exist in the workplace. Due July 27,2010

ATO is committed to supporting initiatives, programsand policies that improve agency-wide performancein employee safety and health in the workplaceenvironment.

Activity Target 2:ATO will conduct EOSH program managementevaluations in each service area using suchmeasures as safety mishap investigation andrecordkeeping, safety training, and safetyinspections. Due July 27, 2010Activity Target 3:Conduct and document workplace inspections andabate identified hazards in ATO facilities in eachservice area. Due August 15, 2010Activity Target 4:ATO will require all Air Traffic Managers andSupervisors to complete training awareness on theSafety Management Information System (SMIS)for injury and illness reporting. Due August 15,2010

Flight Plan Target: Clean AuditObtain an unqualified opinion on the agency's financialstatements (Clean Audit with no material weaknesses)each fiscal year. FY 2010 Target: Clean Audit with nomaterial weaknesses

Improve timeliness and accuracy of financialtransactions by capitalizing assets in a timely manner.

Strategic Initiative: Capitalization ofAssets

Page 104 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 106: ATO Business Plan 2010

Strategic Activity: Support onCapitalization of Assets

Activity Target 1:Provide data and analysis to support the accrualof FAA assets placed in service but not yet postedin Delphi on a quarterly basis with an accuracyrate of 10% of actual activity when compared bythe look back analysis 60 days after the end of thefiscal year. Due November 30, 2009

Improve timeliness and accuracy of financialtransactions by capitalizing assets in a timelymanner.

Activity Target 2:85% of assets will be capitalized within 65 days ofdate placed in service. Due September 30, 2010

Strategic Activity: Support Capitalizationof Assets

Activity Target 1:One third of the total value of capitalized personalproperty from Delphi will be reviewed andvalidated in FY 2010. Due September 30, 2010

Support timely and accurate capitalization of assets.

Activity Target 2:80% of the assets identified in the monthly FSEPdecommission report will be reviewed for thestatus of capital assets and the activity report toAFM on a monthly basis. Due September 30, 2010

Strategic Activity: Support onCapitalization of Assets

Activity Target 1:Provide data and support on a monthly basis toARC and ABA to prepare the 90 day forecast ofasset deployment by the 5th day of each month.Due September 30, 2010

Support timely and accurate capitalization of assets.

Activity Target 2:At the end of the year, 80% of assets arecapitalized within 60 business days of the dateplaced in service. Due September 30, 2010

Improve the overall management of cost-reimbursablecontracts through oversight controls and the DefenseContract Audit Agency (DCAA) audit process.

Strategic Initiative: CostReimbursable Contracts

Strategic Activity: DCAA Audits of CostReimbursable Contracts

Activity Target 1:Order audits on cost reimbursable contracts over$100 million and report on audit status quarterly,in January 2010, April 2010, July 2010 andSeptember 2010. Due September 30, 2010

Determine number of cost reimbursable contracts$100 million or more in estimated value, thenrequest DCAA audits on those over $100 million.

Strategic Activity: Cost ReimbursableContract Close-outs

Activity Target 1:Close 88% of the number of Cost Reimbursablecontracts that become eligible for close-out andreport quarterly by January 30, 2010, April 30,2010, July 30, 2010, September 30, 2010. DueSeptember 30, 2010

Close a percentage of Cost Reimbursable contractsthat become eligible for close-out. The number ofeligible contracts is defined as all Cost Reimbursablecontracts that ended performance in the precedingfiscal year.

Closeout prior year information technology AuditFindings not later than the second quarter of eachfiscal year, and receive no significant deficienciesrelated to new IT Notices of Findings andRecommendations (NFR).

Strategic Initiative: IT Audit Findings

Strategic Activity: IT Audit Findings.

Activity Target 1:Conduct internal audit/sampling of contractors thathave left the agency to determine the timeliness ofclose-out of their system access. Due December31, 2009

Correct High and Medium Vulnerabilities and receiveno Significant Deficiencies related to new IT NFRs.

Activity Target 2:Implement corrective actions if required to ensuresystem access is turned off for those contractorsleaving agency. Due February 28, 2010

Flight Plan Target: ATCPositions Workforce PlanMaintain the air traffic controller workforce at, or up to 2percent above, the projected annual totals in the AirTraffic Controller Workforce Plan. FY 2010 Target: at orup to 2% above annual target

Implement the hiring, training, staffing analysis, andmanagement recommendations of the Air TrafficController Workforce Plan to support FAA's safetymission and meet external stakeholder requirements.Update and report annually on agency progress.

Strategic Initiative: ATC WorkforcePlan

Strategic Activity: ATO-T Hire and TrainTerminal Air Traffic Controllers

Activity Target 1:Establish a final facility specific hiring plan. DueOctober 1, 2009

Terminal Services Execution of the ATC WorkforceHiring Plan - Establish Facility Hiring Planrequirements and Select potential candidates forplacement into Terminal Facilities.

Page 105 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 107: ATO Business Plan 2010

Activity Target 2:Select the required number of potential candidatesto meet Terminal's hiring goal. Due August 1, 2010

Strategic Activity: ATO-E Support for AirTraffic Controller (ATC) Hiring

Activity Target 1:Establish a final facility specific hiring plan. DueOctober 1, 2009

En Route Services Execution of the ATC WorkforceHiring Plan - Establish Facility Hiring Planrequirements and select potential candidates forplacement into En Route Facilities.

Activity Target 2:Select the required number of potential candidatesto meet En Route's hiring goal. Due August 1,2010

Strategic Activity: ATO-F ATC WorkforceReport

Activity Target 1:Update to the Air Traffic Control Workforce Planwritten and ready for FAA Administrator review.Due March 31, 2010

Update the Air Traffic Control Workforce Report toCongress.

Activity Target 2:Update attrition forecasts monthly. Monitor hiring,losses, overtime, Time On Position, TraineeRatios, etc by facility. Due September 30, 2010

Strategic Activity: ATC ControllerTraining

Activity Target 1:Achieve at least 200 new hire training completionseach in 1st and 2nd Quarters of FY 2010 (at least67 per month). Due March 30, 2010

Track the number of new hire training completionsper quarter from developmental to certifiedprofessional controller (CPC), for a total of 1000 newhire completions by September 30, 2010.

Activity Target 2:Achieve at least 300 new hire training completionseach in 3rd and 4th Quarters of FY 2010 (at least100 per month). Due September 30, 2010

Strategic Activity: Air Traffic ControllersWorkforce Plan Coordination - Hiring

Activity Target 1:Report progress on meeting ATC Actual on Board(AOB) monthly targets as indicated in the FederalPersonnel Payroll System (FPPS). DueSeptember 30, 2010

Coordinate and report on the initiative efforts tomaintain the ATC Workforce Plan Annual Hiringwithin 2% of the Air Traffic Controller WorkforceHiring Plan Targets.

Flight Plan Target: Continuity ofOperationsExceed Federal Emergency Management Agencycontinuity readiness levels by 5 percent. FY 2010Target: exceed FEMA targets by 5%

Develop web-based emergency operation information-sharing tools that create a common operational pictureand support effective decision making.

The 9/11 attacks, recent natural disasters (e.g.,Hurricane Katrina in 2005), and security events inNational Airspace System (NAS) have providedlessons-learned that continue to drive the FAA's effortsto further strengthen its crisis managementcapabilities. Core areas of focus include:

- The need to develop and implement improvedautomation tools, which support enhanced real-timeoperational coordination; real-time, integrated use ofsensor and flight data, as well as other pertinent datasources; and establishment of a common operationalpicture useful for crisis management.

- The need to develop and implement improvedautomation tools, which leverage web portal andenterprise caliber database technologies, to enableimproved sharing and analysis of data needed tomaintain situational awareness and support effective,rapid decision-making.

Strategic Initiative: Web-BasedEmergency Operations Tools

Strategic Activity: Develop EmergencyOperation Information Sharing

Activity Target 1:Assist in the design and integration of real timereporting of NAS equipment status in collaborationwith ASH and AJR-2. Due September 30, 2010

Assist in the design and integration of the capabilityto have real time reporting of NAS equipment status.

Strategic Activity: ATO CR/EO StatusReporting

Activity Target 1:In collaboration with ASH, develop a plan toestablish a unified ATO CR/EO Status Reportingcapability, including the status of employees, NASservices, equipment and other infrastructure. DueNovember 30, 2009

Develop a plan to establish a unified ATO CR/EOStatus Reporting capability, including the status ofemployees, NAS services, equipment and otherinfrastructure.

Strategic Initiative: ImproveOperational and Corporate CrisisResponse Structures

Page 106 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 108: ATO Business Plan 2010

Improve the use and functionality of operational andcorporate crises response structures such asspecialized hurricane coordination cells and continuityof operations programs.

Strategic Activity: Improved integrationwith NRF related interagency responsemechanisms.

Activity Target 1:Develop a plan to enhance crisis managementinteroperability and integration for systems suchas surveillance tools needed to supportinteragency COP. Due February 1, 2010

ATO will, in cooperation with FEMA and otherpartners, further strengthen air navigation services(e.g., ATM and airspace management) relatedprovisions in the National Response Framework(NRF) related interagency response mechanismssuch as the Hurricane Contingency Plan(CONPLAN) generated annually by FEMA, as wellas the NRF itself.

Deliver future schedule demand forecasts to assureconsistent NAS modeling for investment analysis andworkload planning by providing 2 future schedules perquarter by September 30, 2010.

Core Business Target: FutureSchedules and SeasonalProjections

Generate quarterly seasonally-adjusted network trafficforecasts (future schedules) to support NAS Modelingfor investment analysis and workload planning by ATOservice units. Utilize future schedules to produceconsistent projections for the service delivery points.

Core Business Initiative: Forecastand Operations Analysis

Core Activity: Traffic Forecast

Activity Target 1:Produce 2 Future Schedules based on FY2009Q4 operations. Due October 30, 2009

Make schedules and projections available for ATOplanning on a quarterly basis. For each set ofFuture Schedules listed in the targets below, AJGwill update the seasonal projections for the servicedelivery points consistent with the future schedules.

Activity Target 2:Produce 2 Future Schedules based on FY2010 Q1operations. Due February 28, 2010Activity Target 3:Produce 2 Future Schedules based on FY2010 Q2operations. Due April 30, 2010Activity Target 4:Produce 2 Future Schedules based on FY2010 Q3operations. Due July 30, 2010

Ensure that ATO employees, customers, andstakeholders are provided timely, accurate, clear, andconsistent information about ATO initiatives according toestablished schedules.

Core Business Target:Communications

Provide information to ATO employees throughelectronic and print media. Products include, but arenot limited to, a Web-based newsletter, a daily FAAoperations report, biweekly management publication,and a wide variety of specialty publications to increaseemployee understanding and support of ATOprograms and activities.

Core Business Initiative: AJGInternal Communications

Core Activity: ATO News

Activity Target 1:Establish an annual baseline target. DueSeptember 30, 2010

Increase visits to ATO News.

Core Activity: Narrow Casting

Activity Target 1:Establish plan to build a prototype. DueSeptember 30, 2010

Complete Deep Dive research and evaluation.

The External program is a major point of informationfor the FAA/ATO public Audiences (industry, militarypartners, travelers, trade association etc.) on topics ofmajor interest. These topics include FAA/ATO Safetyinitiatives, modernization efforts and system operationand performance. Through various communicationsefforts the External Program provides relevantinformation to these audiences and solicit input fromthem to improve where possible FAA/ATO's provisionof services. All efforts and activities reflect the Agencymission and policy as well as the programmatic goalsand objectives of the FAA and ATO.

Core Business Initiative: ExternalCommunications

Core Activity: Weekly Newsletter

Activity Target 1:Expand distribution by 10% during the fiscal year.Due September 30, 2010

Publish a weekly newsletter to inform publicaudiences of the major FAA/ATO safety andmodernization initiatives.

Core Activity: Public Outreach Events

Activity Target 1:Conduct at least 3 public outreach events onselected dates throughout the fiscal year by9/30/10. Due September 30, 2010

Conduct public outreach activities to inform publicaudiences of the major FAA/ATO safety andmodernization initiatives and air traffic operations.

Page 107 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 109: ATO Business Plan 2010

Serve as the ATO liaison and focal point to the FAAAdministrator, ATO Chief Operating Officer (COO),ATO Executive Council and FAA's Office ofGovernment and Industry Affairs for internal andexternal controlled correspondence. This includesinquiries from Congress, private industry, and theExecutive Branch, regarding ATO programs andpolicies.

Core Business Initiative: ATOControlled Correspondence

Core Activity: ControlledCorrespondence

Activity Target 1:Respond to 85 percent of Executive andCongressional inquiries within the timeframesestablished by the Administrator (AOA). DueSeptember 30, 2010

Respond to Congressional letters within timeframeestablished by the Administrator (AOA).

Achieve the Terminal Services direct/indirect staffingratio of 8.19 by September 2012 (FY10 Target = Achievethe Terminal Services direct/indirect staffing ratio of 8.50)and the Terminal Services facility labor cost peroperation of $22.42 by September 2012 (FY10 Target =Achieve the Terminal Services facility labor cost peroperation target of $20.49) by ensuring the efficient andeffective provision of terminal services by providing corebusiness support functions for Administration, Finance,and Mission Support.

Core Business Target: AchieveTerminal Services StaffingRatios and Unit Costs

Provide the Administration, Finance, and MissionSupport functions necessary to enable safe, efficientand cost-effective delivery of terminal Air TrafficControl (ATC) services at annual target levels.

Core Business Initiative: ProvideSupport to Enable Achievement ofTerminal Services Unit Cost andStaffing Ratio Targets

Core Activity: Terminal ServicesAdministration

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy the Terminal Servicesdirect/indirect staffing ratio of 8.50. Due March 31,2010

Provide the administrative support functionsnecessary to deliver safe, efficient and cost effectiveTerminal Air Traffic Control (ATC) services includingBusiness Support and Employee Support.

Activity Target 2:Achieve the Terminal Services direct/indirectstaffing ratio of 8.50. Due September 30, 2010

Core Activity: Terminal ServicesFinance

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy the ATO TerminalServices facility labor cost per operation target of$20.49. Due March 31, 2010

Provide the financial support functions necessary todeliver safe, efficient and cost effective terminal AirTraffic Control (ATC) services including FundAccount Management, Investment Analysis Support,Cost Management Initiatives Support, Cost &Performance Auditing and Terminal ServicesFinancial Systems & Reporting.

Activity Target 2:Achieve the ATO Terminal Services facility laborcost per operation target of $20.49. DueSeptember 30, 2010

Core Activity: Terminal ServicesMission Support

Activity Target 1:Complete assessment for achieving year-endperformance goal to satisfy the ATO-Terminaldirect/indirect staffing ratio of 8.50. Due March 31,2010

Provide management direction and guidanceconcerning interfaces and tactical requirements forterminal services. Present and defend theDepartment of Transportation/FAA positions withrespect to terminal air traffic issues in formal andinformal meetings with key officials. Provide directionfor executing the terminal portion of the ControllerWorkforce Plan including staffing, hiring, terminaltraffic analysis and training as it relates to allterminal facilities. Provide guidance and oversightfor new hire technical training.

Activity Target 2:Achieve the ATO-Terminal direct/indirect staffingratio of 8.50. Due September 30, 2010

Core Activity: Install simulationequipment to support Tower Air TrafficController training

Activity Target 1:Assess the Progress for Managing satellitedatabase development at three (3) TowerSimulation hub sites. Due March 31, 2010

The Tower Simulation System (TSS) will providerealistic training for Tower Air Traffic Controllers in anon-operational environment. The TSS is a selfcontained system and requires only commercialpower outlets to operate. Once delivered andinstalled, the expected benefits of the TSS are: (1)An increase in the capacity to train tower air trafficcontroller students and (2) Enhancement insimulation training effectiveness through the creationof multiple scenarios.

Page 108 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 110: ATO Business Plan 2010

Activity Target 2:Manage satellite database development at three(3) Tower Simulation hub sites. Due September30, 2010

Ensure and deliver daily System Operations coordinationand planning activities associated with airspace.

Core Business Target: SystemOperations - Core Business

Provides 100% leadership, direction, and guidance toSystem Operations, and other Air Traffic Organization(ATO) Vice Presidents by leading the organization andcoordinating efforts to ensure efficient use of theNational Airspace System (NAS), develop ATOpolicies, manage airspace issues, and provide trafficflow management for the NAS.

Core Business Initiative: ATOSystem Operations Service Unit -Core Business - Capacity

Core Activity: Vice President for SystemOperations

Activity Target 1:Establish Organization to provide 100% supportfor direct day-to-day activities associated with allSystem Operations Due October 30, 2009

The Air Traffic System Operations Service Unitprovides overall national guidance for air trafficprocedures and airspace issues, traffic flowmanagement for the National Airspace System(NAS), requirements for weather observation andreporting standards, and the serves as the focalpoint for daily Air Traffic Organization interface withDepartment of Defense and Department ofHomeland Security regarding air transportationsecurity issues.

Core Activity: Director of SystemOperations Security

Activity Target 1:Provide 100% support by managing ATO's dailyoperational security activities. Due September 30,

Leads ATO's national defense, homeland security,law enforcement, and national response relatedefforts. Specifically ensures that ATO effectivelypartners with DHS, DoD and other key agencies inthe Government's shared effort to protect the U.S.and its interests from security and other majorthreats (e.g., biothreats such as pandemic influenzaand natural disasters such as Hurricane Katrina).Also advocates the safety and efficiency needs ofthe NAS and its customers by mitigating the impactof the aforementioned threats and associatedresponse measures. Conducts these missionsthrough policy development, strategic plans,operational plans, operational procedures,operational programs, and tactical operationsactivities.

2010

Activity Target 2:Maintain 24/7 participation in interagency AirDomain tactical operations through AJR-2 ATSCs,using tools such as the DEN. Intervene on 100%of Air Domain related security incidents, whichwould substantially affect NAS operations, tocontribute to response efforts and to mitigatesafety and efficiency impacts. Due September 30,2010Activity Target 3:Enable ATO operational interfaces with NRFrelated, interagency response mechanisms (e.g.,the NRCC and JFOs stood up in crisis areas) usedfor real world and exercise events. Due September30, 2010

Core Activity: Director of Airspace andAeronautical Information Management

Activity Target 1:Provide 100% support by managing dailyoperations of Airspace and AeronauticalInformation Management Due September 30,2010

The Director of is responsible for managing airspaceand regulatory policy formulation and analysis of day-to-day operational programs related to aeronauticalinformation services; airspace design, modeling,simulation, and capacity; environmental mattersapplying to ATC operations in the NAS; and airtraffic rules for the operation of aircraft in the NAS.

Core Activity: Director of Litigations

Activity Target 1:Provide 100% support by managing dailyoperations for System Operations Litigation DueSeptember 30, 2010

Exclusive point of contact for the Air TrafficOrganization by the Office of the Chief Counsel andthe United States Department of Justice for litigationinvolving personal injury and/or wrongful deathresulting from aircraft accidents or incidents, or airtraffic incidents, where allegations or negligence aremade, in whole or part, involving employees of theAir Traffic Organization. The office provides logisticalsupport as well as subject matter consultants andexperts.

Core Activity: Director of SystemOperations Planning and ProceduresProvides leadership, direction, and guidance for thePlanning, Procedures and Engineering ServicesGroup.Business Services - Provides leadership, directionand guidance for ensuring System OperationsServices plans and measures are properly reflectedin DOT/FAA/ATO planning processesProcedures - Provides leadership, direction,guidance, and single focal point for assessing,

Page 109 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 111: ATO Business Plan 2010

Activity Target 1:Provide 100% support by managing dailyoperations for System Operations Planning andProcedures Due September 30, 2010

developing, coordinating, and maintaining Air TrafficProcedures for the Air Traffic Organization.Engineering Services - Ensures plans andprocedures are aligned with the NAS EnterpriseArchitecture, advocates and coordinates proposedchanges to the EA, serves in the role as ChiefSystem Engineer for System Operations, andcoordinates EA decision points for which ATO-R isresponsible.-Provide management of the SMP process,Business Plan and Flight Plan for all of SystemOperations

Core Activity: Director of Administration

Activity Target 1:Manage and support 100% of System OperationsAdministration. Due September 30, 2010

Provides leadership, direction, and guidance to staffspecialists involved in a wide range of administrativeand support services.

Core Activity: Director of FlightServices

Activity Target 1:Provide 100% support by managing daily FlightServices for System Operations. Due September30, 2010

The Director of Flight Services leads the agency'seffort to provide aeronautical information andcustomized preflight and inflight service to domesticand international general aviation communitiesincluding military operations and federal local lawenforcement throughout the United States andPuerto Rico.

Core Activity: System OperationsDirector of Finance

Activity Target 1:Manage organization budgets and certifyexpenditure of funds to prevent anti-deficiencyspending. Due September 30, 2010

The Director of Finance performs budgetformulations, execution and reconciliation for theservice unit. Formulations functions include thedevelopment and submission of budgets toCongress to obtain funds for the service unit.Execution functions include allocation and thecertification of procurement requests. Reconciliationis the tracking and account of obligated funds. Typesof Funds managed by the directorate include Facilityand Equipment (F&E), Operation (Ops), andResearch Engineering and Development (RE&D).

Core Activity: Director of SystemOperations Air Traffic Control SystemCommand Center (ATCSCC)

Activity Target 1:Provide 100% support by managing dailyoperations of System Operations ATCSCC. DueSeptember 30, 2010

Collaborates with domestic and foreign air trafficservice providers and aviation representatives on atactical and strategic basis to evaluate systemcapacity and demand, and implements appropriateresponses to ensure a safe orderly and expeditiousflow of air traffic.

Core Activity: Director, SystemOperations Safety Management

Activity Target 1:Provide safety management support to the systemoperations organization. Due September 30, 2010

The System Operations Safety Management(SOSM) will develop, guide, and oversee safetymanagement activities within System Operations.The SOSM Office staff is committed to facilitatingcollaborative and comprehensive review,determination, mitigation, and documentation of risksand hazards created through NAS changes.

Employee Services is responsible for theadministration of all internal personnel actionsincluding, but not limited to, employee benefits, exitclearances, medical and security clearances, bids,payroll issues, promotions, transfers, retirements, andany other actions that are needed. They are the Lineof Business (LOB) Point of Contact (POC) for alltraining issues. They oversee the PerformanceManagement System (PMS) and Labor DistributionReporting (LDR) system. The PMS includes theadministration of the Superior Contribution Increase(SCI) program, and the Short Term Incentive (STI)programs within the organization. Managers andemployees use this to ensure that LDR data for theorganization is accurate and complete. They alsoactively promote and gather needed trainingrequirements and ensure that mandatory training isresponded to in a timely manner. They work with theNational Training Office to ensure employees aregiven the same opportunity to attend needed trainingas the other LOBs.

Core Business Initiative: SystemOperations AdministrationEmployee Services

Core Activity: Accountability Board

Activity Target 1:30% of System Operations employees (includingmanagers) will attend Accountability Board

Ensure System Operations management'scommitment for FAA Accountability Board goals byfacilitating targeted Accountability Board training formanagers and supervisors.

Page 110 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 112: ATO Business Plan 2010

Process Briefing developed by the FAA Office ofAccountability Board, AHA-1 Due September 30,2010

Core Activity: Group Surveys

Activity Target 1:Develop and conduct survey Due November 1,2009

Conduct survey to assess quality of BusinessServices Group (AJR-61) and Employee ServicesGroup (AJR-62)products/deliverables. Ensure arepresentative of each of the System OperationsDirectors (and each of the their tactical operationsstaff) complete the surveys. The Director ofAdministration will conduct the survey in November2009 and put an action plan in place to address thetop five opportunities for improvement for the group.

Activity Target 2:Develop action plan with input from AJR directorsto address top 5 improvement opportunities. DueJanuary 15, 2010Activity Target 3:Carry out action plan items identified. DueSeptember 30, 2010

Review System Operations resources/functions todetermine whether we have the rightskill/grade/function mix to provide System Operationsservices in the most effective and efficient manner.

Core Business Initiative: ResourceAssessment

Core Activity: Develop SystemOperations Services WorkforceReview/Plan

Activity Target 1:Complete resource assessment of Traffic Flowand ATCSCC, Security, Administration, andComptroller directorates. Due November 30, 2009

Review System Operations resources/functions todetermine whether we have the rightskill/grade/function mix to provide SystemOperations services in the most effective andefficient manner.

Activity Target 2:Complete resource assessments of SafetyManagement, Flight Services, Airspace and AIM,Programs, Planning and Procedures. Due January31, 2010Activity Target 3:Develop recommendations for Vice President toadjust resources based on results of assessmentDue March 31, 2010

Core Business Target: Achievethe En Route and OceanicServices Target for Unit Cost ofIndirect Labor

Reduce unit cost of En Route operations by managingindirect labor costs at Service Delivery Points (SDP)within plus / minus 5 percent variance of the establishedcost target. FY 2010 Target: To be set by October 31,2009.

Effectively manage SDP indirect labor costs.

Core Business Initiative: EffectivelyManage Service Delivery Point(SDP) Indirect Labor Costs

Core Activity: Effectively Manage SDPIndirect Labor Costs

Activity Target 1:Achieve a plus / minus 5 percent variance ofestablished targets. Due September 30, 2010

Effectively manage SDP indirect labor costs.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

The Comptroller and Planning Office strives to ensurefiscal responsibility within Technical Operations Services.

Core Business Target: TechnicalOperations - Comptroller andPlanning

Initiate budget performance integration.

Core Business Initiative: Initiatebudget performance integration.

Core Activity: Initiate budgetperformance integration.

Activity Target 1:Finalized FY 2011 performance plan. DueSeptember 30, 2010

Initiate budget performance integration.

Activity Target 2:Provide performance plan to budget personnel forFY2011budget formulation. Due January 15, 2010

Conduct quarterly reviews

Core Business Initiative: Conductquarterly reviews

Core Activity: Financial Planning

Activity Target 1:Conduct financial and performances review witheach Directorate for 1st quarter. Due March 1,2010

Conduct quarterly reviews.

Activity Target 2:Conduct quarterly review with ATO Finance for 1stquarter. Due March 1, 2010

Page 111 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 113: ATO Business Plan 2010

Activity Target 3:Conduct financial review with each Directorate for2nd quarter Due May 1, 2010Activity Target 4:Conduct quarterly review with ATO Finance for2nd quarter. Due May 1, 2010Activity Target 5:Conduct financial planning review with eachDirectorate for 3rd quarter. Due August 1, 2010Activity Target 6:Conduct quarterly review with ATO Finance for 3rdquarter. Due August 1, 2010

Make the NAS more cost effective by reducing thevariance between the initial budget and the allowancesissued in the fourth quarter (as a result of third quarterreview). FY 2010 Target: plus / minus 5.0 percent.

Core Business Target: ImproveEn Route and Oceanic ServicesBudget Planning

Reduce the variance between the initial budget andthe allowances issued in the fourth quarter (as a resultof third quarter review).

Core Business Initiative: ImproveBudget Planning

Core Activity: Reduce Variance betweenInitial Budget and Allowances Issued inthe Fourth Quarter

Activity Target 1:Limit variance between initial budget andallowances issued in the fourth quarter of FY 2010by plus / minus 5.0 percent. Due September 30,2010

Reduce variance between initial budget andallowances issued in the fourth quarter of FY 2010.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Acquire and develop necessary skills by achieving thetarget for months to certification of Developmentals toCertified Professional Controllers (CPC). FY 2010Target: 36 months.

Core Business Target: Acquireand Develop Necessary Skills forNew En Route Controllers

Reduce OJT for certification of Developmentals.

Core Business Initiative: Reduce Onthe Job Training (OJT) Time forCertification

Core Activity: Manage On The JobTraining (OJT) Time Budgeted forDevelopmental Certification

Activity Target 1:90 percent of new controllers meet or come inunder their budgeted time for certification. DueSeptember 30, 2010

Meet or come in under the established timebudgeted for Stage II, III and IV certification ofDevelopmentals.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

The Planning and Finance Team within the Air TrafficOrganization Office of Safety will ensure the activitydollars in the Business Plan and the Build-Up/Build-Downtables are in balance as we begin the fiscal year.

Core Business Target: Air TrafficOrganization Office of SafetyFinance and Planning

Provides guidance, expertise, and analysis of financialoperations and performance planning includingoperations financial plan and analysis, capital financialplans and analysis, strategic planning, performancemetrics, and transfer pricing.

Core Business Initiative: AJSFinance

Core Activity: Office of Safety CoreFinance

Activity Target 1:Prepare and provide financial quarterly reviewsand end of year closeout to Vice President forOffice of Safety and Senior Vice President AirTraffic Organization Finance on funding andobligation status. Due September 30, 2010

Provides guidance, expertise and analysis offinancial operations and strategic and performanceplanning of both Operational and Facilities andEquipment funding. Assist in all phases of thebudget cycle; coordinate with Planning in thealignment of fiscal year budgets with the FederalAviation Administration Flight Plan, StrategicMapping Process and Federal AviationAdministration Business Plans. Utilize variousFederal Aviation Administration financialmanagement tools to enter, track and reconcile allfinancial transactions to ensure timely obligation offunds.

Activity Target 2:Provide monthly Balanced Scorecard update to AirTraffic Organization-Finance throughout FY 2010.Due September 30, 2010Activity Target 3:Provide description of general finance work suchas entering, monitoring and reconciling transaction

Page 112 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 114: ATO Business Plan 2010

using Federal Aviation Administration financialsystems (Delphi, REGIS, Advance ReportingSystem and the Budget Execution Tool)throughout FY 2010. Due September 30, 2010Activity Target 4:Achieve minimum of 95% obligation of funds byend of FY 2010. Due September 30, 2010Activity Target 5:Maintain, track and reconcile Business PlanInitiatives in Air Traffic Organization Financial toolto track obligations and expenditures of fundsthroughout the execution phase of the annualoperating budget. Enter Business Plan trackinginformation in the Financial tool no later thanDecember 31, 2009. Due September 30, 2010

Provides guidance, expertise, and analysis onperformance planning including operations financialplans, strategic management process planning andperformance metrics such as building and monitoringthe Vice President and other Safety Executives ShortTerm Incentive progress. Also working in coordinationwith the Office of Safety Finance team to ensureoperations financial plan and analysis and capitalfinancial plans and analysis are in sync with Office ofSafety Plans

Core Business Initiative: AJSPlanning

Core Activity: Strategic Planning withinthe Office of Safety

Activity Target 1:Prepare highlights from the Flight Plan Books forthe Vice President and accountable directors inprepping for the monthly Flight Plan meetings.Interim highlights will be sent monthly. DueSeptember 30, 2010

Provides guidance, expertise, and analysis onperformance planning including operations financialplans, strategic management process planning andperformance metrics such as building andmonitoring the Vice President and other SafetyExecutives Short Term Incentive progress. Alsoworking in coordination with the Office of SafetyFinance team to ensure operations financial planand analysis, capital financial plans and analysis arein sync with Office of Safety Plans.

Activity Target 2:Coordinate building the Office of Safety ExecutivesShort Term Incentive Plans, and provide at leastquarterly updates to the Office of SafetyExecutives on progress of their Short TermIncentive, notifying them immediately ifnotice/aware of any Short Term Incentive elementsgoing Yellow or Red. Due September 30, 2010Activity Target 3:Perform monthly statusing on business plantargets, rolling up activities and initiatives toproduce reports for the Vice President. Thesereports will be presented to the Vice President at

least quarterly. Due September 30, 2010

Provide safe, secure, and optimal information technologyservices for the Air Traffic Organization (ATO).

Core Business Target:Information TechnologyServices for the ATO

ATO Information Technology programs, processesand services are guided by strategies, decisioncriteria, and historical metrics.

Core Business Initiative: ATOInformation Technology programsare guided by strategies, decisioncriteria, and historical metrics

Core Activity: Develop new strategiesfor optimizing information technologyservices

Activity Target 1:IT Strategies Schedule: Develop FY 2010Information Technology Strategies publicationschedule for such plans as IT Strategic Roadmapsand Modernization Plans, ATO non-NAS EA andreference models, Web 2.0 Strategy, MobileComputing Strategy (includes Blackberrys),Windows Operating System evaluation strategy,etc. Due January 31, 2010

Strategies guide the programs, processes andservices of the ATO Information Technology office.They may also provide criteria and metrics to guidemanagement decision making. The neededstrategies are reviewed each year and tailored tomeet managerial priorities.

Activity Target 2:IT Strategies Products: Develop scheduled FY2010 Information Technology Strategies DueSeptember 30, 2010

Core Activity: Improve informationtechnology processes and tools fordelivering services

Activity Target 1:IT Process Schedule: Develop FY 2010information technology process improvementschedule for Software Development Life Cycle,Technical Reference Model, EnterpriseArchitecture, Strategic Planning, and DataManagement processes and tools. Due January31, 2010

Information technology improvements may beimplemented with a variety of specialized bestpractice models and tools which guide processimprovement efforts.

Activity Target 2:IT Process Improvements: Develop scheduled FY2010 information technology process

Page 113 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 115: ATO Business Plan 2010

improvements. Due September 30, 2010

Core Activity: Improve IT OperationsMeasures

Activity Target 1:IT OPS Satisfaction: Achieve greater than 90%satisfaction on customer satisfaction surveys forfirst six months of FY2010. Due March 31, 2010

Continue collecting the existing customersatisfaction measure and prototype new metrics toeffectively monitor AJF-A operations of non-NASinformation technology infrastructure and usersupport processes.

Activity Target 2:IT OPS Satisfaction: Achieve greater than 90%satisfaction on customer satisfaction surveys forFY2010. Due September 30, 2010Activity Target 3:IT OPS Metrics Approach: Develop a metricsapproach for non-NAS information technologyincluding metrics and dashboard requirements.Due January 31, 2010Activity Target 4:IT OPS Metrics Ready: Develop data repository,metric collection process, dashboards, and reportsready to begin data collection. Due March 31,2010Activity Target 5:IT OPS Metrics Collection: Collect the first twomonths of data. Due June 30, 2010Activity Target 6:IT OPS Metrics Follow on: Develop approach tofurther improving IT Operations measures inFY2011 using lessons learned. Due September30, 2010

Invest in IT Infrastructure projects which optimize itsscope and capacity to meet FAA's business needs.

Core Business Initiative: Optimizethe IT Infrastructure

Core Activity: Improve Enterprise DataCenter capability and capacity

Activity Target 1:Interim EDC: Implement interim Enterprise DataCenter (EDC) improvements until transition to newEDCs occurs. Due September 30, 2010

Develop two linked Enterprise Data Centers (EDCs)operations that improve security, availability, disasterrecovery, and continuity of operations services.

Activity Target 2:EDC CM: Implement Change Management (CM)for tracking Enterprise Data Center (EDC)changes. Due September 30, 2010Activity Target 3:EDC DR: Enhance Enterprise Data Center (EDC)disaster recovery (DR) planning. Due September30, 2010

Activity Target 4:EDC PM: All Enterprise Data Center (EDC)projects are managed in accordance with AJF-A1'sdocumented Project Management (PM) Process.Due September 30, 2010

Promote use of the installed IT infrastructure to deliverintended FAA business and cost outcomes.Consolidate operations into infrastructure targetlocations. Optimize to achieve the intended use ofexisting assets that meet business needs at lowercosts.

Core Business Initiative: BusinessGain Maximization from the existingIT Infrastructure

Core Activity: Improve ConsolidatedHosting of ATO Applications

Activity Target 1:EDC Application Schedule: Obtain concurrencefrom application custodians on the FY2010schedule for migration into the EDC and therequired resources. Publish the FY2010application migration schedule. Due January 30,2010

The Enterprise Data Center (EDC) infrastructureinvestment is intended to achieve economies ofscale in hosting a large number of ATO applicationsby eliminating the costs of previous multiple ATOdata centers. To achieve this benefit, AJF-A1 willfacilitate the migration of ATO applications into theEDCs. Annual schedules list applications to bemoved into the EDCs.

Activity Target 2:EDC Application Migration: Complete thescheduled FY2010 application migrations into theATO Enterprise Data Centers (EDCs). DueSeptember 30, 2010

Provide services and investments to cost effectivelymaintain existing infrastructure, operating applications,and information access.

Core Business Initiative: Refreshand maintain the Installed IT non-NAS Infrastructure

Core Activity: Refresh the InformationTechnology Operations Infrastructure toSustain MaintainabilityBest practices for Information TechnologyOperations requires a hardware and softwarerefreshment cycle to reduce maintenance team sizeby reducing the number and complexity ofmaintenance calls. Annual life cycle management(LCM) targets are computed based on historicalrefreshments to achieve these targets:

90% of desktops refreshed every 4 years90% of laptops refreshed every 3 years90% of servers & switches refreshed every 5 years

Page 114 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 116: ATO Business Plan 2010

Activity Target 1:ATO OPS LCM: Achieve the life cyclemanagement (LCM) targets to sustain ATOOperations (OPS) maintainability during the firstsix months of the year. Due March 31, 2010

70% of printers refreshed every 5 years

Activity Target 2:ATO OPS LCM: Achieve the life cyclemanagement (LCM) targets to sustain ATOOperations (OPS) maintainability during the year.Due September 30, 2010

Meet the FY 2010 small business procurement goalsestablished by the Congress, the Office of the Secretaryof Transportation (DOT), and the FAA, to promote SmallBusiness development and good Corporate Citizenship.Target for FY10 - Award at least 25% of the total directprocurement dollars to Small Businesses.

Core Business Target: SmallBusiness Goals and CorporateCitizenship

Support the Department of Transportation (DOT) FY2010 Small Business Goals.

Core Business Initiative: DOT SmallBusiness Goals

Core Activity: FAA Small BusinessGoals and Corporate Citizenship - AJASMP A2.11

Activity Target 1:Deliver and participate in two outreach events orprograms by July 30, 2010, with a total of 4 by theend of FY 2010. Due September 30, 2010

Award contracts in accordance with Congress, theOffice of the Secretary of Transportation, and theFAA's set goals, and provide outreach and trainingto small businesses with special emphasis on small,disadvantaged and women-owned businesses andservice-disabled veteran-owned businesses.

Activity Target 2:Award at least 25% of the total direct procurementdollars to Small Businesses. Due September 30,2010

Improve Personnel, Compensation, and Benefits (PC&B)data integrity for the ATO Strategy and Performanceorganization (AJG) to increase the effectiveness ofestablished processes and decision-making.

Core Business Target: AJGPC&B Financial Management

Provide management oversight to monitor and assessfinancial and strategic planning accountability withATO Strategy and Performance Business

Core Business Initiative: PC&BAnalysis and Assessment

organization.

Core Activity: AJG PC&B DecisionProcess

Activity Target 1:Decrease the number of data entry nodes from 9to 1 single point of contact. Due January 30, 2010

Manage AJG PC&B data analysis and assessmentsto allow commonality of reporting and expedite thefunding process

Activity Target 2:Provide quarterly consolidated AJG PC&B reports.Due September 30, 2010

Increase facility-level participation in Air TrafficLeadership Development programs in at least (5) airtraffic facilities by the end of FY 2010.

Core Business Target:Leadership Effectiveness

Provide Facilities and other ATO employees withtraining opportunities to progress and succeed intomanagement positions.

Core Business Initiative: EmployeeTraining and Development

Core Activity: Build Facility-LevelLeadership Capability

Activity Target 1:Deploy ATLDP with the second group of facilities.Conduct workshops and start in-facility activities.Due February 28, 2010

Continue implementation and evaluation of the pilotoffering of the Air Traffic Leadership DevelopmentProgram (ATLDP-1) for Certified ProfessionalControllers (CPCs) aspiring to the Frontline Manager(FLM) role. Design and pilot the Air TrafficLeadership Development Program (ATLDP-2) forFrontline Managers (FLMs) aspiring to theOperations Manager (OM) role.

Activity Target 2:Design ATLDP-2 for FLMs aspiring to OM roles.Due May 30, 2010

Core Activity: Leadership ResponseCenter

Activity Target 1:Complete the test and evaluation of operationsprocesses and procedures. Due October 30, 2009

Fully deploy the ATO Leadership Response Center

Activity Target 2:Complete the evaluation of the pilot projects anddevelop. Due December 31, 2009Activity Target 3:Implement the communication plan, and quarterlyprocess and outcome evaluation. Due March 31,2010

Page 115 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 117: ATO Business Plan 2010

Core Activity: New EmployeeOrientation

Activity Target 1:Establish a reliable delivery and support networkfor the non-controller version of on-boardingprogram. Due March 30, 2010

Establish a consistent ATO On-board program fornewly-hired ATO managers and employees thatcommunicate important information andexpectations.

Activity Target 2:Establish consistency and appropriatecommonalities between air traffic controller andnon-controller versions of the program. Due June30, 2010Activity Target 3:Deliver sessions to new employees with anaverage participant rating of at least 3.5 (5-ptscale) on helpfulness of the orientation session toperform job duties. Due September 30, 2010

Develop, procure, deliver, and manage acquisition,business management, and professional skills training toincrease skills and certification of professionals in theareas of business management and other specializedprofessions, and meet Acquisition Workforce Planrequirements and schedules.

Core Business Target:Professional Training andDevelopment

Implement effective training programs that meetrequirements identified for certifications andprofessional competencies.

Core Business Initiative:Professional Training andCertification

Core Activity: Implement TrainingPrograms

Activity Target 1:Implement the FY2010 funded training plan for theacquisition and business communities, andsupport staff Due September 30, 2010

Implement training programs to meet requirementsoutlined in the Acquisition Workforce Plan.

Activity Target 2:Achieve and average of at least 3.5 (on a 5-pointscale) on evaluation measures related to the valueof information learned. Due September 30, 2010

Core Activity: Manage PersonnelActivities

Activity Target 1:Standardize 10% of position classification seriesATO-wide. Due December 31, 2009

Improve consistency and management of personnelactivities across the air traffic organization.

Activity Target 2:Standardize 30% of position classification seriesATO-wide. Due September 30, 2010Activity Target 3:Develop and implement a comprehensive trackingsystem to track personnel actions across the ATO.Due June 30, 2010

Ensure 60 percent of ATO management workforceattends at least one training session of ConflictManagement, Respecting Differences, EEO orAccountability Board.

Core Business Target: PromoteConstructive WorkplaceRelationships

Promote constructive workplace relationships byproviding support to ATO management in preventing,resolving, and reducing conflicts within the ATOworkforce.

Core Business Initiative: ReduceConflicts Within the ATO Workforce

Core Activity: Training Schedule andTargeted Training

Activity Target 1:Develop a training schedule for ATO distribution.Due February 28, 2010

Develop a training schedule for ATO distribution andensure ATO management workforce attendstargeted training sessions.

Activity Target 2:Ensure 60 percent of ATO management workforceattends at least one targeted training session. DueAugust 31, 2010

Implement process improvements and best practices tooptimize and ensure ATO contracts are on-schedule andon-budget for major investment programs in FY 2010.

Core Business Target: ATOContracts and QualityAssurance Services

Improve processes for contracting services to ensureacquisitions are on-schedule and on-budget in FY2010.

Core Business Initiative: ProcessImprovements for ContractingServices

Core Activity: Contracts and QualityAssurance Services - AJA SMP A1.61

Activity Target 1:

Optimize process improvements for contracting andquality assurance services to ensure on-scheduleand on-budget goals are met for major investmentprograms in FY 2010.

Page 116 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 118: ATO Business Plan 2010

Identify at least two process improvements or bestpractices to improve time or cost of contracting formajor investment programs. Due July 31, 2010

Meet all FAA deadlines to develop, report, evaluate, andalign ATO business plans to FAA agency-wide plan.

Core Business Target: StrategicPlanning

Lead the integration of the ATO Business Plan with theFAA Flight Plan by facilitating the identification of goalsand performance measures by ATO service units.

Core Business Initiative: BusinessPlanning

Core Activity: ATO Business Plan

Activity Target 1:Prepare a draft of the FY 2011 ATO BusinessPlan. Due July 31, 2010

Document the activities within ATO to support FAAstrategies and core business.

Activity Target 2:Publish the FY 2011 ATO Business Plan based onupdates to the Flight Plan. Due September 30,2010

Core Activity: Flight Plan Update andReview Process

Activity Target 1:Coordinate inputs and complete the Flight Planprocess with all Service Units. Due April 17, 2010

Represent the ATO in the Flight Plan Update andReview Process.

Activity Target 2:Complete the review process. Due September 1,2010

Core Activity: Submit CapitalInvestment Plan to Congress

Activity Target 1:Develop FAA wide coordination draft of the FiveYear Capital Investment Plan. Due November 30,2009

The CIP shows how we would spend futureauthorizations and links them to FAA strategic andperformance goals. The CIPprovides full visibility into the scope and plannedschedule for capital expenditures.

Activity Target 2:Deliver draft Five Year Capital Investment Plan toOMB. Due January 29, 2010Activity Target 3:Deliver Five Year Capital Investment Plan toCongress. Due March 31, 2010

Construct a new ATCSCC facility in 2011 on the FAA'sowned property to overcome the constraints of the

Core Business Target: ATCSCCRelocation to New Facility

existing building.

Relocate to new facility to realize significant costavoidance over 21 years once occupied.

Core Business Initiative: ATCSCCRelocation to Vint Hill Campus inWarrenton, Virginia

Core Activity: Begin Construction ofNew ATCSCC Facility

Activity Target 1:Begin installation and testing of equipment in June2010. No cost will be avoided until the facility iscommissioned. Due June 30, 2010

ATCSCC Modernization supports this goal byreducing expenses through constructing a facility onFAA owned property instead of leasing office space.Under ATCSCC Modernization, the FAA will achievecost avoidance benefits projected at $121.4M (riskadjusted then-year) from FY2011-2031

Activity Target 2:Complete facility construction in July 2010. No costwill be avoided until the facility is commissioned.Due July 30, 2010

Provide best-in-class laboratories for research,engineering, development, test, evaluation, andmaintenance of air navigation, air traffic management,and future air transportation system-related activitiesensuring the NextGen laboratory (NIEC) is 100%operational by FY2010.

Core Business Target:Laboratory Services

Provide world class laboratories for research,engineering, development, test, evaluation, andmaintenance for air navigation, air traffic management,and future air transportation system related activities.

Core Business Initiative: LaboratoryServices

Core Activity: NAS Laboratories

Activity Target 1:Aircraft support for ADS-B Flight Test in the Gulfof Mexico.Validation of completion from program sponsor.Due January 30, 2010

Provide National Airspace System Laboratories forair navigation and air traffic management programs.Provide aircraft support for Automatic DependentSurveillance-Broadcast (ADS-B) Flight Test in theGulf of Mexico. Strategic Link (10S1W)Provide laboratory support for Safety ManagementSystem (SMS)evaluations in the Tower/TRACONModeling and Simulation Laboratory (AirwayFacilities Tower Integration Laboratory (AFTIL)Strategic Link (10S59)

Page 117 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 119: ATO Business Plan 2010

Activity Target 2:Laboratory support for SMS evaluations in theTower/TRACON Modeling and SimulationLaboratory (AFTIL). Validation of completion fromsafety study sponsor. Due August 30, 2010

Core Activity: NextGen LaboratorySupport

Activity Target 1:New Aircraft:All preliminary required Exhibit 300 documentation(Attachment I) for the acquisition of a new aircraftdeveloped and approved. Due December 31,2009

Provide laboratory support for future airtransportation system programs. Complete allrequired Exhibit 300 documentation for theacquisition of a new aircraft. Complete the systemconsolidation of the NextGen Integration andEvaluation Capability.

Activity Target 2:NextGen Integration and Evaluation Capability(NIEC)NIEC Initial Capability by March 2010 and NIECFully Operational by June 2010. Due June 30,2010

Core Activity: ISO 9001 - 2008

Activity Target 1:ISO 9001-2008 Audit ReportAudit Reports Due June 30, 2010

Maintain world class status by maintaining ISO 9001-2008 Registration through surveillance audits.

Provide best in class Test and Evaluation (T&E) servicesby receiving ISO Certification by May 2010.

Core Business Target: Test andEvaluation

Provide best in class T&E services to ensure thatcurrent NAS and future air transportation systems areefficiently and comprehensively verified using bestpractices and quality standards. Provide technicallyand operationally sound verification and validationtechniques; such as; evaluations, analyses, data &services from comprehensive air transportationsystem, local airport, airspace, and user perspectives.Characterize performance of current system andeffects of proposed NextGen changes on pilots,controllers, aircraft, and related system components.

Core Business Initiative: Test andEvaluation

Core Activity: NAS Test and EvaluationProvide test & evaluation services to ensure currentautomation, communications, surveillance, andnavigation programs and future air transportationsystems are efficiently and comprehensively verified,validated, and integrated as indicated by approvedcorporate work plan/project scope

Activity Target 1:NextGen Data Communications Segment 1 Testand Evaluation Master Plan. Due June 30, 2010

agreement/program directive schedules. StrategicLinks include ADS-B (10S2A), WAAS (10S3A),Runway Status Lights (10S4J), and ASDE-X ADS-B(10S105).

Activity Target 2:Test and Evaluation Program Status QuarterlyT&E Program Status Reports. Due September 30,2010

Core Activity: Air TransportationEvaluations, Analyses, Data andServices

Activity Target 1:Wide Area Augmentation System (WAAS)Rotorcraft Localizer Performance with VerticalGuidance approaches (LPV) Flight EvaluationReport. Due April 30, 2010

Provide technically and operationally soundevaluations, analyses, data & services from airtransportation system, local airport, airspace, anduser perspectives. Characterize performance ofproposed NextGen changes.

Activity Target 2:Navigation Signal Analysis of Existing andProposed Instrument Landing System (ILS) andVery High Frequency Omnidirectional Range(VOR)Locations. Navigation Signal AnalysisReport. Due September 30, 2010

Core Activity: Separation Standards

Activity Target 1:Safety Assessment supporting the implementationof 30 Nautical Mile (NM) Lateral and 30 NMLongitudinal separation standard in WesternAtlantic Route System (WATRS)+ Airspace.Safety Assessment Report due 10/09. DueOctober 31, 2009

Provide analytical studies and related safetymonitoring services in support of separationreductions in U.S. Sovereign Airspace, internationalairspace where FAA has delegated authority toprovide air traffic services, and international airspacewhere the U.S. and its citizens have a safety-relatedinterest.(10C5I-Reduce Oceanic Separation)

Activity Target 2:Conduct Biannual Review of the Performance ofReduced Vertical Separation Minima (RVSM) inNorth America (U.S., Canada and Mexico) CastAgainst International Civil Aviation Organization(ICAO)-Recommended Requirements. FAA--Hosted Meetings and Assembly of PerformanceData due 11/09, 5/10. Due May 30, 2010Activity Target 3:Periodic Examination of Performance MeasuresSupporting 30 NM Lateral and 30 NM LongitudinalSeparation Minima in ZOA, ZAN and ZNY FIR's

Page 118 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 120: ATO Business Plan 2010

with emphasis on Satellite Datalink ServiceProvision -- Preparation for Wider Implementation.Quarterly Program Status Report due 12/09, 3/10,6/10, 9/10. Due September 30, 2010Activity Target 4:ICAO Separation Standards related meetingsreview of progressICAO Separation Standards Reports/TechnicalWorking Papers due 12/09, 3/10, 6/10, 9/10. DueSeptember 30, 2010

This effort involves the leadership oversight, andstrategic planning efforts for the AJF organization andcovers Financial Performance Metrics, Civil AirNavigation Services Organization (CANSO) globalbenchmarking, and performance analysis

Core Business Target: FinancialLeadership and StrategicPlanning

Provides guidance, expertise, and analysis on coreand strategic activities and performancemeasurement, including reporting on Senior VicePresident and other Finance Executives Short TermIncentive (STI) progress. Also working in coordinationwith the AJF Comptroller to ensure operations fundingplan (Ops $), Facilities and Equipment (F&E) financialplans are tied in with AJF Business Plan.

Core Business Initiative: StrategicBusiness Planning

Core Activity: Strategic BusinessPlanning

Activity Target 1:Provide monthly reports to update the AJF SeniorVice President on the status of AJF core andstrategic activities. Due September 30, 2010

Financial leadership and oversight for ATOorganization and AJF Service Unit to trackperformance on core and strategic activities on amonthly and quarterly basis.

Activity Target 2:Provide quarterly updates to the AJF Senior VicePresident and other Executives in AJF to reviewthe status of Short Term Incentive (STI) activities.The purpose of these updates is to monitordiscuss progress on their Short Term Incentiveduring the fiscal year. Due October 31, 2009Activity Target 3:Provide quarterly updatesto the AJF Senior VicePresident and other Executives in AJF to reviewthe status of Short Term Incentive (STI) activities.The purpose of these updates is to monitordiscuss progress on their Short Term Incentiveduring the fiscal year. Due January 31, 2010Activity Target 4:Provide quarterly updatesto the AJF Senior VicePresident and other Executives in AJF to reviewthe status of Short Term Incentive (STI) activities.

The purpose of these updates is to monitordiscuss progress on their Short Term Incentiveduring the fiscal year. Due April 30, 2010Activity Target 5:Provide quarterly updates to the AJF Senior VicePresident and other Executives in AJF to reviewthe status of Short Term Incentive (STI) activities.The purpose of these updates is to monitordiscuss progress on their Short Term Incentiveduring the fiscal year. Due July 31, 2010

System Operations invests wisely in facilities andequipment that improve ATO operations, SystemOperations will work to increase the operating efficiencyof the NAS. That should contribute to reduced operatingcosts for customers by reducing delays and fuelconsumption by ensuring the efficient and effectiveprovision of core System Operations mission services(Traffic Management, Security, Fight Services, Airspace& Aeronautical Information Management) and providingcore business support functions for Planning,Administration, Finance, Litigation, and Programsmission support.

Core Business Target: ImproveSystem Operations Efficiencyand Productivity

Maintain and reassess the resources required toconduct Continuing Government Activities using theLockheed Martin AFSS contract. Analyze benefits andidentify efficiencies and cost effective improvementsfor the services we offer our customers.

Core Business Initiative: FlightServices Business Operations

Core Activity: Manage Flight ServicesBudget

Activity Target 1:Monitor spending and identify and reportvariances against budgets not to exceed 3%. DueAugust 31, 2010

Examine and report expected savings and costavoidances resulting from the AFSS A-76 andrealignment of overall Flight Services organization.

Core Activity: Direct User AccessTerminal Services (DUATS)

Activity Target 1:Sustain and monitor DUAT service. Produce fourreports describing operational performance alongwith any contractual modifications of operationalcapabilities. Due September 30, 2010

DUATS gives the aviation community access toweather and aeronautical information and flightplanning tool via computer. The DUATS program willbe sustained until all agree that the Service Provideris supplying equal or better service via their FlightServices solution.

Page 119 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 121: ATO Business Plan 2010

Conduct competitive acquisition of Alaska FlightService Modernization (AFSM) automation system inorder to provide operational efficiencies and improvedelivery of flight services.

Core Business Initiative: FlightServices Project Management

Core Activity: Flight Services AlaskaAudit

Activity Target 1:Conduct an audit assessment at four Alaska FlightServices facilities and produce a report for eachfacility identifying what is required to maintain andsustain. Reports due December 31, 2009; March31, 2010; June 30, 2010; September 24, 2010.Due September 30, 2010

Conduct an audit of each Alaskan Flight Servicesfacility to identify and prioritize what is required tomaintain and sustain the facilities. In coordinationwith Technical Operations and Western ServiceCenter, develop a plan to maintain and sustainAlaskan Flight Services facilities.

Oversee the development of Flight Services strategicvision for the future that includes requirementdocuments and needs of Flight Services and GeneralAviation that can be incorporated in NextGen.

Core Business Initiative: FlightServices Strategic Planning

Core Activity: NextGen Requirementsfor Flight Services/General AviationIntegration

Activity Target 1:Develop Concept of Use for Enhanced Searchand Rescue Validation and Verification exercise.Due August 31, 2010

Continue development of Strategic Plan that includeneeds and requirements of Flight Services/GeneralAviation that can be incorporated into the NextGenarchitecture.

Activity Target 2:Conduct user forms and outreach programs withindustry to ensure a common focus for the future.Due August 31, 2010Activity Target 3:Identify and complete activities to exercise optionperiod 1 of the CONUS AFSS contract Due July31, 2010

Improve reconciliation processes for the ATO Strategyand Performance organization (AJG) for better decision-making.

Core Business Target: AJGReconciliation ProcessImprovement

Assess the effectiveness and efficiency of AJGreconciliation processes for better managementdecision-making.

Core Business Initiative: AJGReconciliation Process Assessment

Core Activity: Reconciliation ProcessSurvey

Activity Target 1:Provide financial training opportunities to AJGpersonnel to understand best practices andimprove established reconciliation processes. DueSeptember 30, 2010

Identify areas to improve the effectiveness andefficiency of AJG reconciliation processes for betterdecision-making

Activity Target 2:Develop a survey to measure the effectiveness ofreconciliation data used by AJG management fordecision-making, and determine additionalservices which can be provided. Due September30, 2010

Increase corporate efficiency by conducting andcompleting safety audits and developing andimplementing new business processes and anautomated tool.

Core Business Target: Increasecorporate efficiency.

Provide technical quality standards in support of thesafety management plan & the SOS Directorate.

Core Business Initiative: ProvideTechnical Quality Standards.

Core Activity: Provide corporatebusiness processes and technicalquality standards.

Activity Target 1:Support the Technical Operations SafetyManagement Program by conducting 9 auditsannually. Due September 30, 2010

Provide corporate business processes and technicalquality standards.

Activity Target 2:Implement Business Process Engineering ActionPlan. Due September 30, 2010Activity Target 3:Develop and implement one automated tool toincrease corporate efficiency. Due September 30,2010

Spectrum Engineering Services obtains, assigns,certifies, and protects radio frequencies for the FAA'scommunication, navigation, and surveillance programs.

Core Business Target: ProvideSpectrum Engineering Services

Page 120 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 122: ATO Business Plan 2010

To secure, manage, and protect the necessary radiofrequency spectrum resources to support the safe andefficient operation of the National Airspace System.

Core Business Initiative: Achieve95% of Activity Targets to provideSpectrum Services for NAS users.

Core Activity: Develop Civil AviationSpectrum Standards.

Activity Target 1:Prepare US civil aviation positions for the 2011World Radio Communication Conference (WRC).Due September 30, 2010

Develop Civil Aviation Spectrum Standards.

Core Activity: Protect Civil AviationSpectrum

Activity Target 1:Establish EMC protection (criteria, allocations, etc)for all new NAS systems Due September 30, 2010

Protect Civil Aviation Spectrum

Activity Target 2:Complete 100% of requested SpectrumCertifications Due September 30, 2010

Provide Technical Operations financial oversight asneeded.

Core Business Target: ProvideFinancial Oversight

Provide Budget Formulation oversight for all Tech OpsDirectorates

Core Business Initiative: ProvideBudget Formulation & Execution

Core Activity: Provide Capital BudgetFormulation & Execution

Activity Target 1:Facilitate budget formulation activities to meetinternal and external due dates. Due September30, 2010

Provide Capital Budget Formulation oversight for allTech Ops Directorates.

Activity Target 2:Monitor, track, and report obligations andexpenditures for Technical Operations Servicesquarterly. Due September 30, 2010Activity Target 3:Monitor and track issues and provide statusquarterly Due September 30, 2010

Core Activity: Provide Operations andActivity 5 Budget Execution

Activity Target 1:Facilitate budget formulation activities to meet

Provide Operations and Activity 5 Budget Executionoversight for Technical Operations Service Unit

internal and external due dates. Due September30, 2010Activity Target 2:Monitor, Track, and Report obligations andexpenditures for Technical Operations and reportstatus quarterly. Due September 30, 2010Activity Target 3:Monitor and track issues and provide feedbackquarterly. Due September 30, 2010

Core Activity: Perform Finance relatedAdministrative Functions

Activity Target 1:Provide guidance, facilitate development, monitorstatus, QC final product and report status of allitems/issues pertaining to financial inquiries of theTechnical Operations Service unit quarterly. DueSeptember 30, 2010

Perform Finance related Administrative Functions forTechnical Operations Service Unit

Perform integrate Budget and Planning through BPI(Budget Planning Integration).

Core Business Initiative: IntegrateBudget and Planning through BPI(Budget Planning Integration)

Core Activity: Budget PlanningIntegration

Activity Target 1:Formulate and submit FY2011 Plans byNovember 2010. Due September 30, 2010

Work with Directorates to Integrate Budget andPlanning.

Core Activity: Integrated Tech OpsBusiness Plan

Activity Target 1:Develop a business plan that erases functionallines and reflects an integrated approach tosupport of the ATO Strategy and the Flight Plan byApril 2010. Due April 30, 2010

Develop an integrated Tech Ops Business Plan

Activity Target 2:Develop STI candidates by August 2010. DueAugust 31, 2010

Core Activity: Development of BPI

Activity Target 1:Formulate and submit FY2011 Plans byNovember 2010. Due August 30, 2010

Work with Directorates to Integrate Budget andPlanning. Formulate and submit FY2011 Plans byNovember 2010.

Develop Communication Tools

Core Business Initiative:Communications Tools

Page 121 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 123: ATO Business Plan 2010

Core Activity: Planning Guide onWebsite

Activity Target 1:Develop the Business Planning policy, processand templates for Tech Ops community byJanuary 2010. Due January 31, 2010

Develop, update, and publish Planning Guide onWebsite.

Activity Target 2:Describe the procedures for developing and/orsupporting Initiative Profile Forms by January2010. Due January 31, 2010Activity Target 3:Develop CCB type templates, procedures,performance review format and other SPIRErelated documents for the Tech Ops community byJanuary 2010. Due January 31, 2010Activity Target 4:Update STI user's guide for STI profiles andreporting by January 2010. Due January 31, 2010Activity Target 5:Update the Budget and Planning Integration user'sguide and template for Budget Year 2013 byJanuary 2010. Due January 31, 2010

Respond timely to external directives

Core Business Target: Respondto external directives

Respond timely to external directives

Core Business Initiative: DirectivesManagement

Core Activity: Directives Management

Activity Target 1:Prepare responses to directives received fromexternal organizations for TECH OPS HQ review.Due September 30, 2010

Provide responses to directives received fromexternal organizations for TECH OPS HQ review.

Respond timely to customer inquiries

Core Business Target: Customerinquiries

Ensure response to customer inquiries in timelymanner.

Core Business Initiative:Administrative Support

Core Activity: Customer Service

Activity Target 1:Respond to customer inquiries by next businessday. Due September 30, 2010

Respond to customer inquiries.

Respond timely to incoming correspondence

Core Business Target: Incomingcorrespondence

Ensure a response in a timely manner forcorrespondence.

Core Business Initiative:Communications

Core Activity: Correspondence

Activity Target 1:Assign and respond to correspondence inquiriesby next business day. Due September 30, 2010

Respond to correspondence inquiries

Process FPSS actions timely

Core Business Target: ProcessFPSS actions timely

Process FPPS actions in a timely manner.

Core Business Initiative: HumanResource

Core Activity: FPPS Actions

Activity Target 1:Upon receipt, process FPPS actions within 2business days. Due September 30, 2010

Process FPPS actions

Publishing of monthly newsletter and other media andtimely, meaningful website.

Core Business Target: Tech OpsCommunication

Ensure timely distribution of newsletter and timelyupdates of web

Core Business Initiative:Communications

Core Activity: Communications

Activity Target 1:Ensure Technical Operations Newsletters andweb pages reach a wide audience and have timelyinformation. Due September 30, 2010

Publish Technical Operations Newsletters and webpages.

For fiscal year 2010, the Director of Administration Officeis committed to enhancing performance and increaseproductivity through effective and responsive business

Core Business Target: IncreaseProductivity in Administrativeand Business Operations

Page 122 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 124: ATO Business Plan 2010

operations.

Air Traffic Organization's Office of SafetyAdministrative Office is committed to ensuring World-Class Administrative and Business Operations. TheAdministrative Office is continuing efforts to: a)Improve the efficiency and quality of our keyprocesses, including reworking them as needed, tooptimize the Cycle Time; and b) Delivering superiorservices and systems to our Users.

Core Business Initiative: EnsureWorld-Class Administrative andBusiness Operations

Core Activity: Core AJS Administration

Activity Target 1:Provide a monthly status on the movement ofpersonnel actions, including all incomingpersonnel requests from management, awards,permanent change of station processing, etc. DueSeptember 30, 2010

The Director of Administration position serves as theprimary liaison to the Office of Safety Vice Presidentand other organizations within the U.S. Departmentof Transportation/Federal Aviation Administrationand outside entities (e.g., Congress, the GeneralAccounting Office, private industry, and the generalpublic). Provides leadership, direction and guidanceto staff specialists involved with providing a widerange of administrative and support services to theVice President.

Activity Target 2:Update and provide organizational charts as theorganization evolves. Due September 30, 2010

Ensure the executives and managers meet the trainingrequirements of 40 hours rolling on annual basis from theprovided list to choose.

Core Business Target:Mandatory Executive andManager Training

The Director of Administration function is responsiblefor identifying, organizing, and recording the necessarytraining and development needed to enhancemanagerial competence and provide a foundation formanagerial selection, training, and performancemanagement.

Core Business Initiative: Executiveand Management TrainingRequirement

Core Activity: Mandatory Executive andManager Training

Activity Target 1:

Provide notices on the mandatory annual trainingclasses as they become available to the Executivesand Managers.

Monitor and ensure the training requirement for allexecutives and managers to take a minimum ofthe 40 hours (i.e., Model Work Environment, EqualEmployment Opportunity Law, Prevention ofSexual Harassment, Accountability Overview,Conflict Management) by end of the FY 2010 hasbeen met. Interim progress on participation will bereported to the Office of Safety's Vice President atthe end of the second quarter. Due September 30,2010

Achieve average sick leave usage for all employees ofno more than 12 days per year.

Core Business Target: IncreaseATO En Route and OceanicServices Employee Productivity

Manage sick leave usage of all personnel to improveproductivity.

Core Business Initiative: ATO EnRoute and Oceanic ServicesPersonnel Productivity

Core Activity: Effectively Manage SickLeave Usage

Activity Target 1:Achieve an average sick leave usage rate peremployee of 12 days or less a year. DueSeptember 30, 2010

Increase AJE productivity by managing sick leaveusage in accordance with the yearly target for allemployees.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

Establish administrative and business standards, andprocesses, including organizational policy development,structure, roles, and decision rights using an establishedbaseline, training, and an assessment of theeffectiveness of current processes.

Core Business Target: ATOOrganization Change Process

Enhance performance and increase productivitythrough effective and responsive business operations.

Core Business Initiative: BusinessOperations Improvement

Core Activity: Organizational ChangeProcess

Activity Target 1:Develop and provide training to at least 4 ATOorganizations on the organization change process.Due June 30, 2010

Implement an organization change process for theATO. Provide policy and process education andmeasure the effectiveness of current process flow.

Page 123 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 125: ATO Business Plan 2010

Activity Target 2:Establish a baseline and develop measures toassess the baseline for future processimprovements. Due June 30, 2010Activity Target 3:Identify areas for possible improvements to theorganization change process flow. Due September30, 2010

Develop, implement and assess strategies for a results-oriented and performance-based ATO organization bythe end of FY 2010.

Core Business Target: ManageCultural and Behavioral Change

Develop, implement, and assess strategies to increaseemployee engagement and improve employee-management relationships.

Core Business Initiative: CulturalTransformation

Core Activity: Organizational CulturalTransformation Process

Activity Target 1:Develop an employee engagement process. DueNovember 30, 2009

Lead efforts to improve ATO employee engagement.

Activity Target 2:Administer the employee engagement survey DueMarch 31, 2010Activity Target 3:Baseline employee engagement data. Due June 1,2010Activity Target 4:Initiate appropriate employee engagementactivities to improve FAA's ranking in the BestPlaces to Work in the Federal Government SurveyDue September 30, 2010

Analyze, improve and implement standardized ATObusiness processes by the end of FY 2010.

Core Business Target: Lead ATOBusiness Process Improvement(BPI)

Expedite provision of key products and services byATO Headquarters organizations.

Core Business Initiative:Performance Management

Core Activity: ATO Business ProcessImprovement

Activity Target 1:Develop a standardized template for analysis,

Lead efforts to improve ATO business processes,focusing on those performed by Headquartersorganizations.

selection and execution of BPI projects in supportof Strategy 2013, Goal 5. Due February 28, 2010Activity Target 2:Establish an ATO inventory of core and keysupport processes for candidate line of businessprojects to include inputs and outputs. Due June30, 2010Activity Target 3:Develop or recruit BPI staff core competenciesbased upon accepted BPI methodologies andindustry best practices. Due September 30, 2010

Allocate and manage resources to accomplishorganizational objectives.

Core Business Target: ResourceManagement

Perform staffing, budget, and planning integration insupport of efficient management and fiscallyresponsible business operations.

Core Business Initiative: Ensurecost effective business solutionsand services are implementedand/or validated

Core Activity: Maintain an effectiveInternal Controls program as defined byOMB Circular A-123

Activity Target 1:Achieve a no inherent risk assessment throughFMFIA annual reporting. Due September 30, 2010

Assess compliance with laws/policies and evaluatesusceptibility to abuse.

Activity Target 2:Perform travel card assessments and notifications;quarterly minimum. Due September 30, 2010Activity Target 3:Review purchase card activity and compliance;quarterly minimum. Due September 30, 2010

Core Activity: Assess financialperformance against forecasted staffingplans

Activity Target 1:Review Directorate & Svc Area employment plansmonthly. Due September 30, 2010

Manage staffing plans and authorizations.

Activity Target 2:Certify FPPS requests within 2 business days. DueSeptember 30, 2010Activity Target 3:Validate staffing authorizations, requests, plans, &budget; quarterly. Due September 30, 2010

Page 124 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 126: ATO Business Plan 2010

Core Activity: Conduct comparativefinancial analyses

Activity Target 1:Perform financial modeling & forecasting forvarious pay & staffing models; as required. DueSeptember 30, 2010

Perform Financial Modeling & Forecasting

Activity Target 2:Conduct trend analysis, such as attrition,demographic, retirement eligibility, job categoryannually. Due September 30, 2010Activity Target 3:Develop financial cost benefit models as required.Due September 30, 2010

Core Activity: Manage ReimbursableAgreements program

Activity Target 1:Assess agreements for policy adherence andfunding accuracy. Due September 30, 2010

Oversee Reimbursable Agreements program

Activity Target 2:Concur/Nonconcur with Reimbursable Agreementswithin 3 days of submission. Due September 30,2010Activity Target 3:Identify Reimbursable Inactive Obligationsquarterly. Due September 30, 2010

In 2010, provide best-in-class facility maintenance,engineer and support services by completing re-registration of the Environment Management System(EMS) under ISO 14000 and completing the update ofthe Facility Management Plan.

Core Business Target: CenterOperations (WJHTC)

Provide facility maintenance, engineering and supportservices for all properties located at the TechnicalCenter including land, buildings, and infrastructure.

Core Business Initiative: CenterOperations (WJHTC)

Core Activity: Maintain World ClassCenter Operations

Activity Target 1:ISO 14000: Internal Audit Report. Due March 30,2010

Maintain world class center operations bymaintaining the Environment Mgmt System (EMS) toensure operations protect the environment and meetregulatory requirements by re-registering the EMSunder ISO 14000.

Activity Target 2:ISO 14000: Re-Registration Complete. Due April30, 2010

Core Activity: Integrated Facility Plansand Processes

Activity Target 1:Energy Strategy and Plan. Draft 5-Year EnergyStrategy Plan Due March 30, 2010

Establish comprehensive, integrated facility plansand processes by updating the Facility ManagementPlan to include identified costs, benefits, and returnon investment and generating a 5 year energystrategy and plan.

Activity Target 2:Facility Management Plan Update. Due September30, 2010

Support all Technical Center customers by providingcapabilities and services to provide integrated strategiesand solutions that achieve national and internationalgoals.

Core Business Target: FederalLaboratory

Ensure ability to perform FAA William J. HughesTechnical Center mission in the future.

Core Business Initiative: FederalLaboratory

Core Activity: Strategic Leadership

Activity Target 1:Strategic Training Course for managers. DueDecember 31, 2009

Build stronger leadership by developing strategicthinking, planning, and execution skills.

Activity Target 2:Updated Strategic Plan, Draft Strategic Plan due6/10, Final Strategic Plan due 9/10. DueSeptember 30, 2010

Core Activity: FAA Technology TransferProgram

Activity Target 1:Draft Congressional Report. Due November 30,2009

Provide congress with fiscal year achievements forthe FAA Technology Transfer Program Office.

Activity Target 2:Final Congressional Report. Due December 31,2009

Increase coordination of the programs, laboratories andfacilities external partners to help meet the requirementsof FAA's internal and external customers. In FY2010,facilitate and track 90% of Interagency ResearchAgreements between FAA and National Aeronautics andSpace Administration (NASA).

Core Business Target: ResearchPartnerships

Page 125 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 127: ATO Business Plan 2010

In partnership with internal FAA/ATO offices,academia, NASA, JPDO, MITRE, and internationalorganizations, ensure FAAs continued worldleadership in aviation Research and TechnologyDevelopment. Coordinates aviation researchinvestment priorities with other agencies, andinternational organizations to identify research gaps,reduce duplication of efforts, leverage availableresources, and maintain US leadership. Collaborateswith research organizations, industry, and academia toevaluate advanced concepts and proposed solutionsthrough joint research and development projectssupporting NextGen, NAS Enterprise Architecture andother FAA goals.

Core Business Initiative: ResearchPartnerships

Core Activity: Research Collaboration atNASA

Activity Target 1:Provide coordination of the programs, laboratoriesand facilities of the NASA Centers to help meetthe requirements of FAA's internal and externalcustomers through the operation of Field Teamoffices at NASA Langley Research Center and atNASA Ames Research Center. FacilitateInteragency Agreements between FAA and NASAand Track total dollar value and number ofagreements. Due August 31, 2010

Foster research opportunities in meeting FAA goals,including those for air transportation, and facilitatetransfer of NASA technology into the FAA.

Paythrough payment. Reimburse the Department ofLabor for the FY2008 OWCP payouts with the moneyobtained through Congress.

Core Business Target: OWCPPaythrough

Paythrough payment. Reimburse the Department ofLabor for the FY2008 OWCP payouts with the moneyobtained through Congress.

Core Business Initiative: OWCPPaythrough

Core Activity: OWCP Paythrough

Activity Target 1:Reimburse the Department of Labor for theFY2008 OWCP payouts with the money obtainedthrough Congress. Due July 31, 2010

Paythrough payment. Reimburse the Department ofLabor for the FY2008 OWCP payouts with themoney obtained through Congress.

Improve standardization of administrative supportservices across service center locations.

Core Business Target:Administrative Services

Provide staff and support services to ATO-E, ATO-R,ATO-T and ATO-W Directors of Operation

Core Business Initiative: Staff andsupport services to ATO Directorsof Operation

Core Activity: Business ProcessImprovement

Activity Target 1:Identify a minimum of 2 administrative processimprovement candidates Due March 31, 2010

Improve the efficiency of administrative and humanresource management service delivery throughcontinued standardization of processes.

Activity Target 2:Implement 1 administrative business processimprovement Due September 30, 2010

Deliver financial, procurement, and logistical supportservices to ATO Service Areas, ATO Service Center andother FAA organizations.

Core Business Target: BusinessServices

Provide staff and support services to ATO-E, ATO-R,ATO-T and ATO-W Directors of Operation

Core Business Initiative: Staff andsupport services to ATO Directorsof Operation

Core Activity: Financial ManagementOversight

Activity Target 1:Brief Directors of Operation on status of budgetallocations and expenditures Due December 31,2009

Deliver financial management services to meetDirectors of Operation service unit requirements

Activity Target 2:Brief Directors of Operation on status of budgetallocations and expenditures Due March 31, 2010Activity Target 3:Brief Directors of Operation on status of budgetallocations and expenditures Due June 30, 2010Activity Target 4:Brief Directors of Operation on status of budgetallocations and expenditures Due September 30,2010Activity Target 5:Complete annual audit of Service Area compliancewith personal property responsibilities DueSeptember 30, 2010

Core Activity: Business ProcessImprovementImprove the efficiency of financial and logisticsmanagement service delivery through continuedstandardization of processes

Page 126 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 128: ATO Business Plan 2010

Activity Target 1:Identify a minimum of 2 financial and logisticsbusiness process improvement candidates DueMarch 31, 2010Activity Target 2:Implement 1 financial business processimprovement Due September 30, 2010

Enhance integrated planning, requirements, and programimplementation management support to service units andother FAA organizations.

Core Business Target: Planningand Requirements

Provide staff and support services to ATO-E, ATO-R,ATO-T and ATO-W Directors of Operation

Core Business Initiative: Providestaff and support services to ATODirectors of Operation

Core Activity: Corporate WorkplanAdministration

Activity Target 1:Percentage of project accomplishment reportsprovided by the scheduled due dates DueDecember 31, 2009

Improve management, project planning, schedulingand accomplishment of F&E Projects

Activity Target 2:Percentage of project accomplishment reportprovided by the scheduled due dates Due March31, 2010Activity Target 3:Percentage of project accomplishment reportprovided by the scheduled due dates Due June 30,2010Activity Target 4:Percentage of project accomplishment reportprovided by the scheduled due dates DueSeptember 30, 2010Activity Target 5:Perform Quarterly Program Review meetings withDirectors of Operations Due December 31, 2009Activity Target 6:Perform Quarterly Program Review meetings withDirectors of Operations Due March 31, 2010Activity Target 7:Perform Quarterly Program Review meetings withDirectors of Operations Due June 30, 2010Activity Target 8:Perform Quarterly Program Review meetings withDirectors of Operations Due September 30, 2010

Core Activity: Business ProcessImprovementImprove the efficiency of project management,planning, scheduling, and reporting throughcontinued standardization of processes.

Activity Target 1:Identify a minimum of 2 project managementbusiness process improvement candidates DueMarch 31, 2010Activity Target 2:Implement 1 project management businessprocess improvement Due September 30, 2010

Core Activity: Asset Retirement

Activity Target 1:Complete 100% of the Regional CapitalizationTeam (RCT) meetings and complete the requiredRCT checklist Due September 30, 2010

New F&E projects must now include theidentification and disposition responsibilities ofassets to be taken out of service or replaces as aresult of a new project.

Activity Target 2:Ensure 100% of the proper paperwork is submittedin a timely manner for retired or transferred assetsin accordance with the reutilization/disposal planestablished by the SU Due September 30, 2010

Perform oversight and support for National AirspaceSystem (NAS) procedures and changes which affectoperations and special activities within the NAS forservice units and other FAA organizations.

Core Business Target:Operations Support

Provide staff and support services to ATO-E, ATO-R,ATO-T and ATO-W Directors of Operation

Core Business Initiative: Staff andsupport services to ATO Directorsof Operation

Core Activity: National Airspace System(NAS) Procedures

Activity Target 1:Number of flight procedures published by FAA anddistributed to the public (charted) Due March 31,2010

Perform oversight and support for NAS proceduresand changes which affect operations and specialactivities within the NAS

Activity Target 2:Number of flight procedures published by FAA anddistributed to the public (charted) Due September30, 2010Activity Target 3:Number of Air Traffic procedures published byFAA and not distributed to the public (non-charted)Due March 31, 2010Activity Target 4:Number of Air Traffic procedures published byFAA and not distributed to the public (non-charted)Due September 30, 2010

Page 127 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 129: ATO Business Plan 2010

Core Activity: Business ProcessImprovement

Activity Target 1:Identify a minimum of 1 service business processimprovement candidate Due March 31, 2010

Improve the efficiency of operations support servicedelivery through continued standardization ofprocesses and procedures

Activity Target 2:Implement 1 service business processimprovement candidate Due September 30, 2010

Perform inspections, evaluations, safety riskmanagement, accident and incident information services,and safety initiatives to ATO service units and other FAAorganizations.

Core Business Target: SafetyAssurance

Provide staff and support services to ATO-E, ATO-R,ATO-T and ATO-W Directors of Operation

Core Business Initiative: Staff andsupport services to ATO Directorsof Operation

Core Activity: Accident and IncidentPackages

Activity Target 1:Percentage of Director notifications within allottedtime parameters. Due March 31, 2010

Perform event notification, review, and validationwithin allocated time parameters.

Activity Target 2:Percentage of Director notifications within allottedtime parameters Due September 30, 2010Activity Target 3:Percentage of event packages completed timelyDue March 31, 2010Activity Target 4:Percentage of event packages completed timelyDue September 30, 2010

Core Activity: Business ProcessImprovement

Activity Target 1:Identify a minimum of 2 service business processimprovement candidates Due March 31, 2010

Improve the effliciency services through contininuedstandarization

Activity Target 2:Implement 1 service business processimprovement candidate Due March 30, 2010

Core Business Target:Communication Security(COMSEC)

Provide and maintain adequate resources and personnelto allow ATO to conduct secure voice and datacommunications when and where needed to supportATO's mission of safe and efficient National AirspaceSystem (NAS) operations.

Provide program management to insure the adequacyand reliability of all ATO COMSEC accounts inproviding secure voice and data communicationsfacilitated by the correct application of CommunicationSecurity (COMSEC) products and procedures.

In order to maintain the safe and efficient operation ofthe NAS, and as a matter of national security, theprotection of classified and sensitive information isnecessary. The COMSEC program provides ATO theability to communicate classified and sensitiveinformation in real time and in a secure environment.AJR-2 program management and oversight of ATOsecure voice and data transmissions will support theATO's missions and assure that there are no securityincidents.

Core Business Initiative:Communication Security (COMSEC)

Core Activity: Manage COMSECProgram

Activity Target 1:Staff a draft ATO COMSEC order for ATO ChiefOperationg Office Officer's signature Due August30, 2010

Manage the ATO's COMSEC program as identifiedin FAAO 1600.8. Establish an ATO COMSECprogram management mechanism to enhanceCOMSEC standards and enforce compliance withFAA, Department of Airforce, and national levelguidance in order to protect national securityinformation.

Activity Target 2:Issue guidance to ATO COMSEC programmanagers. Due September 30, 2010Activity Target 3:Complete all review and reports as required for thecommunications security program IAW FAA Order1600.8, including semi-annual inventory of allCOMSEC equipment. Due September 30, 2010Activity Target 4:Issue guidance to INFOSEC program mangers.Due September 30, 2010

Manage the implementation of National AviationSecurity Policy.

Core Business Initiative: NationalAviation Security Policy

Core Activity: Manage InternationalFlight Information Manual (IFIM)webpage for US Prohibitions,Restrictions, and Notices.Manage content for International Flight Information

Page 128 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 130: ATO Business Plan 2010

Activity Target 1:Complete a weekly review of all web links andFDC NOTAMS, post new/remove old information,and answer questions sent to 9-ATOR-HQ-IFOSgroup email address. Provide a monthly briefing tointernal FAA representatives on actions taken.Due September 30, 2010

Manual (IFIM) webpage for US Prohibitions,Restrictions, and Notices.

Core Activity: Support National Strategyfor Aviation Security

Activity Target 1:Participate in NSAS meetings and brief FAAexecutives (as appropriate) on at least a quarterlybasis. Due September 30, 2010

Support and represent DOT/FAA in development ofplans that support National Strategy for AviationSecurity.

Continue to support the FAA activities around theADAPT program.

Core Business Initiative: SystemOperations Security StrategicOperations - Core Business

Core Activity: ADAPT

Activity Target 1:Continue support for the existing ADAPT programin support of FAA activities. Due September 30,2010

Support ADAPT

Core Activity: Security IntegratedToolset

Activity Target 1:Conduct studies, engineering assessments, or anyother design/development activity in support of theNextGen security program, SITS. Due September30, 2010

SITS

AJL will develop requirements for 100% of approved andvalidated technical training requirements. DueSeptember 30, 2010

Core Business Target:Competency

Develop and improve methods of providing technicaltraining to ensure individual and organizationalcompetency.

Core Business Initiative: ImprovingCompetency

Core Activity: Improving IndividualCompetency

Activity Target 1:

Identify activities to improve testing and evaluationmethods for ATC and ATSS students.

Develop a post academy test using CDRL011, forATC students to evaluate the effectiveness ofacademy training. Due March 31, 2010Activity Target 2:Record and periodically analyze post academy testassessment scores from ATC academy students.(Periodical analysis will be performed minimallyonce per quarter beginning April 2010.) DueSeptember 30, 2010Activity Target 3:Develop a Pre-OJT test using CDRL011, for ATCstudents to evaluate the effectiveness of fieldtraining. Due September 30, 2010

Core Activity: Improving OrganizationalCompetency

Activity Target 1:Establish the average time to completion in eachATC developmental stage. (Periodical analysis willbe performed minimally once per quarter.) DueDecember 31, 2009

Identify activities to improve organizationcompetencies for ATC and ATSS students.

Activity Target 2:Establish a baseline by determining the averagepercentage of ATC students on board versus thenumber of CPC's. (Periodical analysis will beperformed minimally once per quarter.) DueSeptember 30, 2010Activity Target 3:Establish a baseline of the number of ATSScertifications. (Periodical analysis will beperformed minimally once per quarter.) DueDecember 31, 2009Activity Target 4:Identify and analyze the average time to CPC forATC students from the first day of academytraining to last position certification. (Periodicalanalysis will be performed minimally once perquarter.) Due September 30, 2010Activity Target 5:Establish a baseline of the average time tocertification for ATSS students, from the first day ofacademy training to first equipment certification.(Periodical analysis will be performed minimallyonce per quarter.) Due September 30, 2010Activity Target 6:Establish a baseline to begin reporting on theaverage percentage of ATC students who fail ineach of the developmental stages. (Periodicalanalysis will be performed minimally once perquarter.) Due December 31, 2009Activity Target 7:Analyze the average number of ATC students oncourse to make CPC within the required timeperiod. (Periodical analysis will be performedminimally once per quarter.) Due September 30,2010

Page 129 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 131: ATO Business Plan 2010

Implement cost initiatives to reduce overall training costsby 5%. Due September 30, 2010

Core Business Target: Cost

Implement cost efficiency initiatives to reduce overalltraining cost and improve productivity.

Core Business Initiative: CostEfficiency

Core Activity: Improving Cost Reportingand Containment

Activity Target 1:Identify and analyze the unit cost per hour foreach ATC student for training. (Periodicalanalysis will be performed minimally once perquarter.) Due November 30, 2009

Identify activities to improve the identification andcontainment of cost within AJL.

Activity Target 2:Identify and analyze the unit cost per hour for eachATSS student for training. (Periodical analysis willbe performed minimally once per quarter.) DueSeptember 30, 2010Activity Target 3:Establish a baseline and analyze the actualteaching time of ATC instructors at the academyand in the field, broken out by type to includeclassroom and lab time. (Periodical analysis will beperformed minimally once per quarter.) Due March31, 2010Activity Target 4:Establish a baseline and analyze the actualteaching time of ATSS instructors at the academy.(Periodical analysis will be performed minimallyonce per quarter.) Due March 31, 2010

By FY2010, produce a revised NAS EnterpriseArchitecture requirements document by interviewing atleast 25 requirements subject matter experts (SME's)throughout the ATO, 2 academic references, and at least5 external requirements management practitioners; inorder to establish updated enterprise level requirementsthat will reduce the number of technical problems as wellas costs and schedule overruns during NextGenimplementation.

Core Business Target: SystemsEngineering and Safety: NASRequirements and InterfaceManagement

The Systems Engineering and Safety NASRequirements and Interface Management Group is

Core Business Initiative: SystemsEngineering and Safety: NASRequirements and InterfaceManagement

dedicated to provide leadership in the area ofrequirements development for new and/or improvedcapabilities within the NAS. These requirements mustalign with current NAS Architecture while enabling apathway into the future. Successful implementation ofthe Next Generation NAS depends on the ATO's abilityto apply industry/government best practices forrequirements and interface management.

Core Activity: Revise NAS-SR-1000(NAS level Requirements document) tosupport NextGen OperationalImprovements

Activity Target 1:Stakeholders vet draft within respectiveorganization. Due June 30, 2010

NAS Requirements and Interface Management willlead a NAS-SR-1000 revision to align NAS levelrequirements with the Enterprise ArchitectureFramework in support of NextGen. The documentmust be restructured and revised as appropriate tomeet the requirements development needs of theATO going forward into the NextGen NAS.

Activity Target 2:Final Draft presented to NAS authorizing board forsignature. Due September 30, 2010

Market Business Services to meet Service Units' needs

Core Business Target: MarketBusiness Services

Market Finance Services to meet Service Units' needs.This initiative will address "I'm treated as a valuedcustomer" question on the ATO-F customer survey formanagers and supervisors.

Core Business Initiative: MarketFinancial Services

Core Activity: Customer SatisfactionSurvey

Activity Target 1:Implement Customer Satisfaction Survey,distributing to managers and supervisors. DueJune 30, 2010

Deploy ATO Finance Annual Customer SatisfactionSurvey to managers and supervisors

Activity Target 2:Close survey and provide analysis to the "I amtreated as a valued customer" question on thesurvey for the ATO Finance management team.Due August 31, 2010Activity Target 3:Provide survey totals, annual comparisons,comment analysis, action plans and otheranalyses as required to the ATO Financemanagement team Due August 31, 2010

Page 130 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 132: ATO Business Plan 2010

Core Activity: Periodic Surveys

Activity Target 1:Develop list of potential questions formanagement review Due November 30, 2009

Deploy periodic single-question surveys on ATOFinance website to reach a broader audience andgather information periodically throughout the year.

Activity Target 2:Post at least 10 questions throughout the yearand analyze responses. Due September 30, 2010

By September 2010, complete eight enterprise viewsdescribing the evolution of the NAS EnterpriseArchitecture to support the successful evolution of theNAS and NextGen implementation including strategicactivities.

Core Business Target: NASEnterprise Architecture

The National System (NAS) Architecture lays out thestrategic activities (service delivery and infrastructure)to improve NAS operations and move towards theNext Generation Air Transportation System (NextGen)vision. These executive views show the evolution ofmajor FAA investments/programs in today's NAS(services and infrastructures) to meet the futuredemand.

Core Business Initiative: NASEnterprise Architecture

Core Activity: NAS EnterpriseArchitecture (EA) Products

Activity Target 1:Develop and build out of EA DODAF "views" tosupport NextGen Implementation and enterpriselevel architecture decisions. Due June 30, 2010

Develop the EA products necessary to describe theevolution of the National Airspace mission over timeand include the results in the Air Traffic Organization(ATO) National Airspace System (NAS) EnterpriseArchitecture repository to ensure effective use of theNAS EA across the agency.

Activity Target 2:Work to align EA and Infrastructure Roadmapswith JPDO artifacts, Operational Improvements &capabilities. Due September 30, 2010Activity Target 3:Conduct outreach activities to enhancecommunications, awareness, and knowledge ofthe NAS EA. Due September 30, 2010

Complete for FY2010 NAS Enterprise Architecture(NASEA) product views to support system engineeringprocesses and customer products to guide acquisitiondecision making for NextGen end-state.

Core Business Target: SystemEngineering & Safety: SupportServices

Provide system engineering services in support ofplanning, acquisitions and development of the NextGeneration Air Transportation capabilities andinfrastructure.

Core Business Initiative: SystemEngineering Support Services

Core Activity: Systems EngineeringSupport Services - NAS EnterpriseArchitecture

Activity Target 1:Deliver final end-state views to NAS ChiefArchitect. Due October 31, 2009

Provide system engineering and technical support todevelop enterprise-level NAS Enterprise Architecturemid-term (2018) and end state (2025) views toprovide the framework to guide acquisition decisionsfor programs leading to the NextGen end-state.

Activity Target 2:Deliver draft interim views to NAS Chief Architect.Due January 31, 2010Activity Target 3:Deliver final interim views to NAS Chief Architect.Due September 30, 2010

Core Activity: Systems EngineeringSupport Services for Next GenerationAir Transportation.

Activity Target 1:Ensure support laboratory is in full scale use,including the use of CPDLC applications. DueJanuary 30, 2010

Provide systems engineering services -- developrequirements, functional architecture, and alternativeanalysis -- in support of the development of NextGencommunications infrastructure.

Activity Target 2:Complete functional architecture (segment 1 withsegment 2 extensibility). Due July 30, 2010Activity Target 3:Support validation of RTCA SC-214 Work Package1 standards - phase 1. Due August 30, 2010

Develop and execute an ATO Finance hiring plan thatidentifies levels.

Core Business Target: ATOFinance Hiring Plan

Develop and execute an ATO Finance hiring plan thatidentifies levels.

Core Business Initiative: Developand Execute Hiring Plan

Core Activity: Federal employeestrength

Activity Target 1:

Build AJF core Federal employee strength.

Page 131 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 133: ATO Business Plan 2010

Develop a hiring plan for all directorates. DueJanuary 31, 2010Activity Target 2:Implement approved hiring plan according toschedule. Due September 30, 2010Activity Target 3:Maintain hiring plan implementation database,reporting metrics monthly. Due September 30,2010

ATO-1 and CORP

Core Business Target: ATO-1and CORP

ATO-1 and CORP

Core Business Initiative: ATO-1 andCORP

Core Activity: ATO-1 and CORP

Activity Target 1:ATO-1 and CORP Due September 30, 2010

ATO-1 and CORP

In collaboration with ABA, AIO, and AJF-A3, review andupdate the agency's Non-NAS Enterprise Architecture forAJF business and financial systems.

Core Business Target: Reviewand Update the FinancialSegment of Non-NAS EnterpriseArchitecture

Review the Financial Segment of the non-NASEnterprise Architecture and update for any systemchanges that have occurred since the last review.

Core Business Initiative: Maintainthe Financial Segment of non-NASEnterprise Architecture

Core Activity: ATO EnterpriseArchitecture

Activity Target 1:Revalidate semiannually the AJF financialsystems and tools included in the financialsegment of the non-NAS Enterprise Architecture.Update the AIO instance of System Architect byMarch 31, 2010 to reflect any ATO systemchanges. Due March 31, 2010

In collaboration with ABA and AIO, review, reviseand update the AJF financial segment of the non-NAS Enterprise Architecture for financial systems.

Activity Target 2:Revalidate semiannually the AJF financial systemsand tools included in the financial segment of thenon-NAS Enterprise Architecture. Update the AIO

instance of System Architect by September 30,2010 to reflect any ATO system changes. DueSeptember 30, 2010

Support the performance management of the ATOthrough metrics reporting

Core Business Target: SupportPerformance Management

Support the performance management of the ATOthrough metrics reporting for ATO operational serviceunits.

Core Business Initiative: SoundPerformance Metrics

Core Activity: Monthly and QuarterlyReports

Activity Target 1:Monthly financial performance metrics reportsupdated on the AJF website on the 5th businessday of each month. Due September 30, 2010

Produce monthly and quarterly reports throughoutthe year in support of performance management.

Activity Target 2:Complete assessment of stakeholder reportingneeds and requirements to ensure AJF reports areof value to recipients. Due December 31, 2009

Support global leadership of the ATO through CANSO

Core Business Target: SupportGlobal Leadership

Support global leadership of the ATO through CANSOcompleting the annual global benchmarking report fordistribution worldwide to Air Navigation ServiceProviders.

Core Business Initiative: AdvanceATOs Global Leadership

Core Activity: Provide AnalyticalSupport to CANSO

Activity Target 1:Final report produced in December 2009. DueDecember 31, 2009

Provide analytical support to CANSO throughout theyear in preparation for producing the AnnualBenchmarking Report

Activity Target 2:Create summary briefing for ATO ExecutiveCouncil of Annual Benchmarking Report. DueJanuary 30, 2010

Lead business process reengineering or otherimprovement efforts with impact to financial systems orprocesses in the ATO to support the goal of ensuringeffective AJF processes and tools.

Core Business Target: BusinessProcess Reengineering Efforts

Page 132 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 134: ATO Business Plan 2010

Lead business process reengineering or otherimprovement efforts with impact to financial systems orprocesses across the ATO

Core Business Initiative: ImproveATO Process and System Efficiency

Core Activity: New BPR Projects

Activity Target 1:Have 4 active business process reengineering orother improvement projects each quarter. DueDecember 31, 2009

Improve financial related business processes acrossthe ATO.

Activity Target 2:Have 4 active business process reengineering orother improvement projects each quarter. DueMarch 31, 2010Activity Target 3:Have 4 active business process reengineering orother improvement projects each quarter. DueJune 30, 2010Activity Target 4:Have 4 active business process reengineering orother improvement projects each quarter. DueSeptember 30, 2010

Implement and facilitate FAA organization excellencegoals within the Central Service Areas.

Core Business Target:Implement and facilitate FAAorganization excellence goalswithin the Central Service Area.

Identify and develop qualified candidates that reflectthe desired diversity and culture of the organization.

Core Business Initiative: SupportFAA Wide Employee DevelopmentPrograms

Core Activity: Conduct Front LineManager's Operational Workshop

Activity Target 1:Conduct a minimum of one class. Due September30, 2010

Front Line Manager's Operational Workshop

Core Activity: Support Tech OpsSuccession Planning (TOSPP)

Activity Target 1:Select a minimum of three Front Line Managerparticipants for the FY2010 TOSPP Program. DueSeptember 30, 2010

Identify qualified candidates that reflect the desireddiversity and culture of the organization.

Core Activity: Timely PersonnelCertification

Activity Target 1:80% of current FY required personnel certificationwill be issued within 180 days of the completion oftechnical training. Due September 30, 2010

Issue Personnel Certification in a timely mannerafter required technical training.

AJP Contract Management Services has theresponsibility of providing resource vehicles and servicesto ensure that NextGen and Operations Planning (AJP)and its customers have the resource support needed tomeet their Flight Plan Goals and initiatives in support ofthe Next Generation Air Transportation System.Implement process improvements and best practices tooptimize and ensure AJP contracts are on-schedule andon-budget in FY2010.

Core Business Target: AJPContracts Management Services

AJP Contracts Management Services are dedicated toproviding NextGen and Operations Planning (AJP) andother FAA organizations, with several technical andresearch support services contracts essential to thecompletion of their mission goals and flight planresponsibilities. AJP Contracts Management Serviceshas the responsibility of providing resource vehiclesand services to ensure that NextGen and OperationsPlanning (AJP) and its customers have the resourcesupport needed to meet their Flight Plan Goals andinitiatives in support of the Next Generation AirTransportation System.

Core Business Initiative: NextGenand Operations Planning (AJP):Contracts Management Services

Core Activity: Systems Enginnering &Architecture- SETA

Activity Target 1:Develop and implement a quarterly reportingtracking system to provide management withquarterly status reports that track support servicescontract financial status. Due June 30, 2010

AJP Contracts Management Services support willensure the availability of a variety of technicalsupport and research contract vehicles to supportAJP and other FAA organizations in support of FAAFlight Plan goals and the Next Generation AirTransportation System.

Activity Target 2:Ensure that activities and issues impacting thedevelopment and award of the SystemsEngineering Contract (SE2020) are on track andcontract is awarded by the end of FY2010. DueSeptember 30, 2010

Page 133 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 135: ATO Business Plan 2010

Core Activity: Systems Engieeting andArchiteicture - MITRE/CAASD

Activity Target 1:Complete Product Based Work Plan DueSeptember 30, 2010

Need to formulate Product Based Work Plan and2014 Long Range plan.

Activity Target 2:Complete 2014 Lang Range Plan Due September30, 2010

Distribute at least 90% of scheduled ISS publications

Core Business Target: DistributeISS Publications

Distribute information security systems (ISS)publications.

Core Business Initiative: DistributePublications.

Core Activity: Publish policies,handbooks and directives.

Activity Target 1:Distribute 90% scheduled ISS implementation andguidance documents within the fiscal year DueSeptember 30, 2010

Publish policies, handbooks and directives.

Implement and facilitate FAA organization excellencegoals within the Western Service Area.

Core Business Target:Implement and facilitate FAAorganization excellence goalswithin the Western Service Area.

Identify and develop qualified candidates that reflectthe desired diversity and culture of the organization.

Core Business Initiative: SupportFAA Wide Employee DevelopmentPrograms

Core Activity: Conduct Front LineManager's Operational Workshop

Activity Target 1:Conduct a minimum of one class. Due September30, 2010

Front Line Manager's Operational Workshop

Core Activity: Support Tech OpsSuccession Planning (TOSPP)

Activity Target 1:Select a minimum of three Front Line Managerparticipants for the FY2010 TOSPP Program. Due

Identify qualified candidates that reflect the desireddiversity and culture of the organization.

September 30, 2010

Core Activity: Encourage Participationin the Agency's Mentoring Program

Activity Target 1:Provide mentors annually in support of theHR/TWO/PWC Mentoring Program. DueSeptember 30, 2010

Encourage Participation in the Agency's MentoringProgram

Implement and facilitate FAA organization excellencegoals within the Eastern Service Area.

Core Business Target:Implement and facilitate FAAorganization excellence goalswithin the Eastern Service Area.

Identify and develop qualified candidates that reflectthe desired diversity and culture of the organization.

Core Business Initiative: SupportFAA Wide Employee DevelopmentPrograms

Core Activity: Conduct Front LineManager's Operational Workshop

Activity Target 1:Conduct a minimum of one class. Due September30, 2010

Front Line Manager's Operational Workshop

Core Activity: Support Tech OpsSuccession Planning (TOSPP)

Activity Target 1:Select a minimum of three Front Line Managerparticipants for the FY2010 TOSPP Program. DueSeptember 30, 2010

Identify qualified candidates that reflect the desireddiversity and culture of the organization.

Core Activity: Timely PersonnelCertification

Activity Target 1:80% of current FY required personnel certificationwill be issued within 180 days of the completion oftechnical training. Due September 30, 2010

Issue Personnel Certification in a timely mannerafter required technical training.

Core Activity: Encourage Participationin the Agency's Mentoring Program

Activity Target 1:Provide mentors annually in support of the HumanResources Mentoring Program. Due September30, 2010

Encourage Participation in the Agency's MentoringProgram

Page 134 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 136: ATO Business Plan 2010

Analyze business operations in order to provide afoundation and infrastructure for the BusinessDevelopment Office. Identify operational costs anddevelop standard processes and documentation.

Core Business Target: BusinessAnalysis

Document operations in order to identify the cost ofdoing business.

Core Business Initiative: BaselineActivities

Core Activity: Baseline BusinessDevelopment

Activity Target 1:Baseline the cost of the Business DevelopmentOffice for use in future cost comparisons forreview by the Director of Business Developmentand the Senior Vice President of Finance DueSeptember 30, 2010

Baseline Business Development activities.

Activity Target 2:Baseline the cost of new opportunities in a pricingmodel for review by the Director of BusinessDevelopment. Due March 31, 2010

Standardize business processes for evaluation andimplementation of opportunities, integrating existingpolicies and procedures where necessary.

Core Business Initiative: Processesand Infrastructure

Core Activity: Implement Infrastructure

Activity Target 1:Develop standard terms for inclusion inagreements for use in national and internationalbusiness opportunities. Provide to the TacticalBoard and Executive Council for review. Due July31, 2010

Implement infrastructure to include methods andmodels for cost recovery.

Manage day-to-day operations and developmeasurement tools to ensure efficient and effectivebusiness activities.

Core Business Target: AccountManagement

Coordinate activities to ensure seamless operation ofthe Business Development Group. Integrate andmaximize marketable ATO opportunities to provide AirTraffic products and services.

Core Business Initiative: ManageBusiness Activities

Core Activity: Business Management

Activity Target 1:

Utilize business management techniques to operateefficiently and effectively.

Evaluate and define requirements for a billingprocess within existing policy and guidance. DueJune 30, 2010Activity Target 2:Implement a billing process based on thepreviously development requirements for review bythe Director of Business Development and theSenior Vice President of Finance. Due September30, 2010Activity Target 3:Evaluate the Business Plan for relevance andimplementation, and provide revision to theDirector of Business Development and Senior VicePresident of Finance for review. Due June 30,2010Activity Target 4:Develop recommendations for policy changes andappropriations language to expediteimplementation of opportunities for review by theTactical Board. Due March 31, 2010

Core Activity: Operations Measurement

Activity Target 1:Document cycle times for Business Developmentopportunities and provide to the Director ofBusiness Development for review. Due March 31,2010

Identify and establish goals for the BusinessDevelopment organization.

Identify potential business relationships and promoteFAA products and services globally.

Core Business Target: CustomerRelations

Promote FAA core competencies worldwide byestablishing business relationships with air navigationservice providers and other potential customers, andidentifying potential Business Developmentopportunities through those relationship channels.The Business Development organization will integrateacross the ATO Lines of Business (LOBs) to provide afocal point for coordinating the delivery of products andservices. Having a single focal point will allowseamless service to the customer, which is referred toas "Portfolio Management."

Core Business Initiative: PromoteBusiness Development

Core Activity: Identify Partners

Activity Target 1:Identify aviation-related networking events,establish a calendar of those events for use bystaff for review by the Director of BusinessDevelopment. Due November 30, 2009

Create and further develop relationships with airnavigation service providers and industry.

Activity Target 2:Update aviation-related networking events

Page 135 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 137: ATO Business Plan 2010

calendar every 90 days for review by the Directorof Business Development. Due September 30,2010

Core Activity: Identify Opportunities

Activity Target 1:Identify potential opportunities for review by theTactical Board every 90 days. Due September 30,2010

Identify potential opportunities through variouschannels (business relationships, networking events,personal introductions, etc.).

Staffing Ranges: Workforce Alignment, including theupdate of Staffing Ranges for FAA Facilities.

Core Business Target: StaffingRanges

Staffing Ranges: Workforce Alignment, including theupdate of Staffing Ranges for FAA Facilities.

Core Business Initiative: StaffingRanges

Core Activity: Develop and UpdateStaffing Ranges

Activity Target 1:Staffing Ranges for FAA Facilities updated andready for approval. Due March 31, 2010

Develop and update Staffing Ranges: Develop andupdate Staffing Ranges for FAA Facilities.

TOWER Standards: Workforce alignment, includingdevelopment of daily staffing standard models for FAATower Facilities

Core Business Target: TOWERStandards

TOWER Standards: Workforce alignment, includingdevelopment of daily staffing standard models for FAATower Facilities

Core Business Initiative: TOWERStandards

Core Activity: Standards for FAA TowerFacilities

Activity Target 1:Tower standards updated with daily on positionstaffing models (OPSM) and ready for Senior VPFinance approval. Due December 31, 2009

Standards for FAA Tower facilities: Revise Towerstandards.

Ensure adequate AJF-4 staffing to support group

Core Business Target: AJF-4Staffing

Ensure adequate AJF-4 staffing to support group

Core Business Initiative: Staffingand Recruiting

Core Activity: Analytical Strength

Activity Target 1:Hire 3 analysts for AJF-4. Due July 31, 2010

Build AJF-4 core Federal employee analyticalstrength.

Improve efficiency of ATO projects, services, andprocesses.

Core Business Target: ImproveEfficiency

Improve efficiency of ATO projects, services, andprocesses.

Core Business Initiative: ImproveEfficiency

Core Activity: Improve Efficiency

Activity Target 1:Identify minimum of three new ATO initiatives toimprove cost effectiveness and operationalefficiency and propose them to the EC. DueSeptember 30, 2010

OES will work with all ATO organizations to identifypossible new initiatives to improve the efficiency ofATO projects, services, and processes.

Activity Target 2:For Scheduling Tool project, select vendor. DueNovember 30, 2009Activity Target 3:Award the follow on Office of Enterprise Solutions(OES) Support Contract. Due June 30, 2010

Develop TRACON Standards for FAA Facilities.

Core Business Target: FinancialAnalysis and Process Re-engineering-TRACON Standards

Complete the update of the daily TRACON staffingstandards to be used in the 2010 Controller WorkforcePlan.

Core Business Initiative: TRACONStandards

Core Activity: Standards for FAATRACON facilities

Activity Target 1:TRACON standards updated with daily on positionstaffing models (OPSM) and ready for Senior VPFinance approval. Due March 30, 2010

Workforce alignment, including development ofstandards for FAA TRACON facilities

Page 136 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 138: ATO Business Plan 2010

Implement new processes and procedures that allowATO personnel to conduct their work both efficiently andeffectively.

Core Business Target: InspireHigh Performance ThroughDeveloping Leadership at AllLevels

Develop and implement financial managementprocesses, procedures, and training to ensure theATO workforce is performing at an optimal level.

Core Business Initiative:Institutionalize FinancialManagement Processes andProcedures

Core Activity: Standardize FundsCertification Across the ATO

Activity Target 1:Draft Funds Certification policy to include rolesand responsibilities, training requirements, andsystem access and utilization requirements. DueSeptember 30, 2010

Institute processes and procedures to ensure fundscertification is conducted consistently across theATO.

Activity Target 2:Identify ATO Fund Certifiers and develop a gapanalysis and action plan based on the FundsCertification training policy requirements. DueSeptember 30, 2010

Core Activity: Develop Training andFinancial Management Path

Activity Target 1:Develop Fund Certification Semi-AnnualRefresher Training: Beta Version Due September30, 2010

Ensure training for financial management path is up-to-date and provides the competencies necessaryfor the intended audience.

Activity Target 2:Update existing financial management coursesincluding: Fund Certification Training Course,Using the Purchase Card in the FAA, andManaging Financial Transactions in the ATO. DueDecember 31, 2009

Core Activity: Deliver Training forFinancial Management Path

Activity Target 1:Deliver Fund Certification Training Courses to aminimum of 150 persons, deliver Using thePurchase Card in the FAA Courses to a minimumof 750 persons, and deliver Managing Financial

Ensure personnel in financial management pathreceive current training on skills used in their work.

Transactions in the ATO Courses to a minimum of750 persons. Due September 30, 2010

Provide State-of-the-Art Administrative & BusinessProcesses by developing Cost Analysis Reports and KeyMetrics on expense items such as Travel, WirelessDevices, Purchase Card Usage. Issue FY11 ServiceUnit Allowances for 1-year appropriations prior to start ofyear. Conduct 3 Performance Reviews of projects with 1-year funding obligations of at least $5M. DevelopDashboard requirements for Staffing/Hiring reports.

Core Business Target: ProvideState-of-the-Art Administrativeand Business Processes

Establish practices and reporting procedures toimprove operations budget management and control.

Core Business Initiative: ImproveOperations Budget Managementand Control

Core Activity: Manage 1-YearAppropriations During Fiscal Year toEnsure Prudent Financial Management

Activity Target 1:Issue FY11 service unit allowances for 1-yearappropriations prior to start of year. DueSeptember 30, 2010

Establish practices to improve management ofappropriations.

Core Activity: Improve CostManagement Within the ATO

Activity Target 1:Develop cost analysis reports on ATO expenses,and establish performance metrics including:travel, wireless devices, purchase card usage, andadministrative supplies. Due September 30, 2010

Establish cost management practices and reporting.

Core Activity: Establish OperatingBudgets Project Performance ReviewProtocol for Projects Funded byOperating Budgets Office

Activity Target 1:Conduct three project performance reviews ofprojects with 1-year funding obligations of at least$5M. Due September 30, 2010

Establish auditing and accounting practices andreporting.

Core Activity: Deploy IntegratedBusiness Processes and SoftwareApplications to Meet Our Needs

Activity Target 1:

Enhance staffing and hiring reporting.

Page 137 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 139: ATO Business Plan 2010

Develop Staffing/Hiring Dashboard requirements.Due March 30, 2010

Establish practices and procedures to improve themanagement and efficiency of ATO financialoperations.

Core Business Initiative:Institutionalize FinancialManagement Processes andProcedures

Core Activity: Establish StandardOperating Procedures for the ATO

Activity Target 1:Review/revise 4 Standard Operating Procedures.Due September 30, 2010

Develop and implement Standard OperatingProcedures to improve efficiencies and ensureconsistency of processes across the ATO.

Realize savings of the annual real property lease andpurchase costs through improved business processes.

Core Business Initiative: ImproveBusiness Processes Related to RealProperty

Core Activity: Improve ATOManagement of Real Property-CIPM08.06-00

Activity Target 1:Produce an internal ROI for the ATO Real EstateOffice of 100 percent. Due September 30, 2010

Provide guidance to improve the management ofreal property.

Activity Target 2:Perform a minimum of 4 space utilization surveysof ATO space. Due September 30, 2010Activity Target 3:Write guidance that helps ATO to selectnew/replacement ATCT locations that are bothcost-effective and technically acceptable. DueSeptember 30, 2010

ARRA Implementation - Achieve 34.93% Facilities andEquipment ARRA (American Recovery andReinvestment Act) Disbursement Rate.

Core Business Target: AmericanRecovery and Reinvestment Act(ARRA) Implementation

Appropriately and effectively obligate F&E ARRAfunds to reach substantial program completion withinestablished timelines.

Core Business Initiative:Management of F&E ARRA Funds

Core Activity: Complete F&E ARRAProjects

Activity Target 1:Complete installation and construction activitiesfor a minimum of 90% of planned FY2010 projectsas baselined on October 1, 2009. Due September30, 2010

Complete planned installation and constructionactivities on ARRA F&E projects, within cost and onschedule.

Activity Target 2:A minimum of 90% of planned ARRA FY2010projects will be completed within 10% of plannedcost as baselined on October 1, 2009. DueSeptember 30, 2010Activity Target 3:Achieve 99% of designated ARRA obligationmilestones for FY2010 as reflected in thebaselined plan on October 1, 2009. DueSeptember 30, 2010

Provide benefits analysis standards and guidance as wellas robust tools to ensure agency decisions are based onsound data analysis.

Core Business Target: BenefitsAnalysis

Continuously improve benefits analysis tools, data,and techniques to support agency decision makingprocess.

Core Business Initiative: ImproveBenefit Analysis Models

Core Activity: Benefit Analysis ToolsUpdate

Activity Target 1:To improve collaboration within AJF-3 and accessto tools, move the operations research analystsand lab to FOB 10A. Due March 31, 2010

Provide tools, data and techniques to improve theability to perform and evaluate benefit analysis.

Activity Target 2:Develop a plan for strengthening AJF-3'ssimulation and optimization tools. Due February28, 2010

Provide financial and business case evaluation of FAACFO Packages.

Core Business Target: ImproveCFO Review Process

In support of the AEB effort to strengthen and buildefficiencies into the CFO review process, work with theCFO, contracting, and legal organizations to rebuildthe process.

Core Business Initiative: AJF CFOPackage Review

Page 138 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 140: ATO Business Plan 2010

Core Activity: Acquisition PackageReview Process

Activity Target 1:As applicable, integrate CFO review andinvestment analysis activities. Map IndependentGovernment Cost Estimates (IGCE) to InvestmentAnalysis Life Cycle Cost Estimates (LCCE);reconcile and document any differences. DueMarch 31, 2010

In support of the AEB effort to strengthen and buildefficiencies into the CFO review process, work withthe CFO, contracting, and legal organizations torebuild the process..

Provide cost estimating standards and guidance as wellas robust tools to ensure agency decisions are based onsound data analysis.

Core Business Target: AdvanceCost Estimating Discipline

Continuously improve cost estimating analysis tools,data, and techniques to support agency decisionmaking process.

Core Business Initiative: ImproveCost Estimating Capability

Core Activity: Advance Cost EstimatingDiscipline

Activity Target 1:Provide FAA-specific Rough Order of Magnitude(ROM) Software factors for use in developingagency Software Cost Estimates. Due September30, 2010

Continue to advance the cost estimating disciplineand process to include addressing human capitalplanning issues to ensure core capability to performcost estimating is enhanced.

System Operations make confident business decisions toimprove leadership perspective of business managementby implementing a server based software package with aweb based user interface. We achieve breakthroughperformance by developing procedures for aircraftaccident and incident notification, investigation, andreporting; documenting emergency guidance,establishing employee orientation packages; andproviding strategic input into the FAA's Flight Plan. Ourbreakthrough for overall success is a baseline responsetime to Freedom of Information Acts; challenge eachemployee to promote sharepoint V3 KSN tool; andintegrate SMS in our daily operations and/or programs.

Core Business Target: SystemOperations BusinessManagement

Core Business Initiative: CoreBusiness Initiative: SystemOperations Litigation FIOA &

The System Operations Office of Litigation FOIA andanalysis group is responsible for 1) responding to ATOFreedom of Information Act (FOIA) requests 2)Maintaining 9/11 and ATO investigatory archives, and3) Maintenance of the National Accident/LitigationDatabase. It coordinates with air traffic facilities foraccess to air traffic witnesses; collection of evidence,including transcription of ATC tapes necessary forhearings, radar plots, etc.; and any expert consultationinvolving the ATO, while keeping the costs anddisruption associated with enforcement actions,litigation activities, and Freedom of Information Act(FOIA) requests and replies to a minimum.

Analysis Group

Core Activity: Revise FAA 8020.16 A/CAccident & Incident Notification,Investigation and Reporting

Activity Target 1:The final version of FAA Order 8020.16B will beavailable. Due June 30, 2010

The System Operations Office of Litigation willupdate FAA Order 8020.16 Air Traffic OrganizationAircraft Accident and Incident Notification,Investigation, and Reporting' This order prescribesFAA Air Traffic Organization (ATO) procedures andresponsibilities for aircraft accident and incidentnotification, investigation, and reporting. It providesdirection and guidance to ATO service units, serviceareas, service centers, offices, and facilities whenthey are called upon to perform accidentinvestigations.

Core Activity: Freedom of InformationAct

Activity Target 1:Improve on-time FOIAS by 10% Due September30, 2010

Baseline the response time on FOIA''s.

The System Operations Office of Litigation DataServices area is responsible for data managementactivities including: data mining, archives, policy andStandard Operating Practices (SOPS) for data in theATO as it relates to the Freedom of Information Act(FOIA), Federal Rules of Civil Procedure (FRCP), andgeneral legal and administrative electronic discoveryrules and practices. It works in conjunction with AGCand the CIO's office to develop standardized datamanagement policy and operational procedures tosupport data discovery for litigation activities.

Core Business Initiative: SystemOperations Litigation Data Services

Core Activity: Develop EnforcementAction Tracking Software CapabilityDevelop and implement a server based softwarepackage with a web based user interface, to trackand manage all requests made by AGC andDepartment of Justice attorneys for information to

Page 139 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 141: ATO Business Plan 2010

Activity Target 1:Create method to track pilot deviations. DueMarch 30, 2010

support pilot enforcement actions.

Activity Target 2:Increase electronic filing of cases by 50%. DueSeptember 30, 2010

In FY2010, complete 5 CRD (Concepts & RequirementsDefinition) Initiative reviews by their established duedates designated by the FAA Investment DecisionAuthority (IDA). Each CRD Initiative Review requires thecreation of 9 to 11 sets of analytical documents byvarious FAA offices in which the CRD Group serves asas the focal point to ensure timely completion andassessment of the reviews.

Core Business Target: SystemsEngineering and Safety:Concepts & RequirementsDefinition

Supports the design and maintenance of the NASEnterprise Architecture through performance qualityassurance function and ensures that deliverables meetAcquisition Management Systems (AMS)requirements.

Core Business Initiative: ConceptsRequirements Definition

Core Activity: NAS Investment Analysisand Readiness Decision

Activity Target 1:Make outreach contacts with program managersscheduled to complete Investment AnalysisReadiness Decision (IARD). Due February 28,2010

The Concepts and Requirements Definition phase ofInvestment Analysis provides essential informationto decision makers to assure them that proposedinvestment initiatives have completed the requiredlevel and depths of analyses to warrant furtherconsideration for potential investment.

Activity Target 2:Make recommendations based on systemengineering and economic measures for oneInvestment Analysis Readiness Decision tosupport the business case analysis process. DueJune 30, 2010

Meet 100% of all AJP FY10 targets set in theFAA/Government Accountability Office (GAO) High RiskList.

Core Business Target: GAO HighRisk List

Our goal is to implement improved processes withinAJP that will make us efficient and effectively run ourorganization, and, in the process of doing that, alsoeliminate all the factors causing the FAA'sModernization Program to be assigned to the GAOHigh-Risk List (HRL). Our goal is to continue the gainsmade to get off the GAO HRL and remain off the HRL.

Core Business Initiative: GAO HighRisk List

Core Activity: FAA/GAO NAS EnterpriseArchitecture Activity Target(s)Mitigation

Activity Target 1:Analyze AMS policy changes to determine ifmodification are required to the NASEA frameworkin order to maintain consistency. Due September30, 2010

Meet all targets set in the FAA/GAO plan to get offand stay off the High Risk List (HRL).

Activity Target 2:Refine information products for incorporatingInformation Systems Security in EA. DueSeptember 30, 2010Activity Target 3:Coordinate technical standards for NAS and non-NAS hardware and software where there arecommon requirements. Due June 30, 2010

Core Activity: FAA/GAO Verification andValidation (V&V) Activity Target(s)

Activity Target 1:Hold V&V Stakeholders Meeting to finalize V&Vguidance for Acquisition Management System(AMS). Due December 30, 2009

Meet all targets set in the FAA/GAO plan to get offand stay off the High Risk List (HRL). Continue toinstitutionalize quality Test and Evaluation (T&E)standards by achieving ISO 9001-2008 Registrationfor the William J. Hughes Technical Center''s T&EServices and lead FAA Verification and Validation(V&V) improvements for NextGen by implementinglifecycle V&V philosophy elements into theAcquisition Management System (AMS) asapproved by the Acquisition Executive Board (AEB).

Activity Target 2:Lifecycle V&V Modification to the FAA AcquisitionManagement System (AMS) Draft AMS Changes.Due February 28, 2010

Administer, assess and analyze at least one customersatisfaction survey. Due September 30, 2010.

Core Business Target: People

Develop and use customer satisfaction surveys toimprove key processes and deliver superior services.

Core Business Initiative: Survey

Page 140 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 142: ATO Business Plan 2010

Core Activity: Delivery of Surveys

Activity Target 1:Design, distribute, and analyze survey data (level3) to ATC managers whose employees have usedthe training system with the current fiscal year.(Periodical analysis will be performed minimallyonce per quarter.) Due June 30, 2010

Design, distribute, and analyze survey results fromcustomers and stakeholders to gain their perceptionand ideas for improvement of the national trainingprogram.

Activity Target 2:Design, distribute, and analyze survey data (level3) to ATSS managers whose employees haveused the training system with the current fiscalyear. (Periodical analysis will be performedminimally once per quarter.) Due June 30, 2010Activity Target 3:Analyze survey results from ATC students at theacademy and in the field. Use analysis to designimprovement methods to enhance academytraining. (Periodical analysis will be performedminimally once per quarter.) Due March 31, 2010Activity Target 4:Analyze survey results from ATSS students at theacademy and in the field. Use analysis to designimprovement methods to enhance academytraining. (Periodical analysis will be performedminimally once per quarter.) Due September 30,2010Activity Target 5:Develop and distribute an informal survey for AJLstaff, Labor Organizations and SUPCOM toanalyze perceptions of the AJL training program.(Periodically analyze at a minimum, once perquarter.) Due March 31, 2010

Provide forum for ATO Finance to communicate withprogram managers, on NAS program managementperformance.

Core Business Target: NASProgram Performance

F&E Requirements development Group

Core Business Initiative: F&ERequirements Development Group

Core Activity: 2010 ManagementSummit

Activity Target 1:Status issues from 2010 Program ManagementSummit before commencement of 2010 Summit.Due February 28, 2010

Deliver 2010 Summit on NAS ProgramManagement, that includes assessment of 2009commitments by February 2010.

In FY2010, establish quality policy and guidance for allfour phases of the AMS.

Core Business Target: QualityV&V Practices: Verfication andValidation

Implement quality V&V and T&E processes andcontinuously improve them. Ensure organizationalcompliance to the quality processes at the TechnicalCenter.

Core Business Initiative:Institutionalize Quality Verification &Validation (V&V) and Test &Evaluation (T&E) Standards

Core Activity: Institutionalize qualityV&V and T&E standards throughout theTechnical Center

Activity Target 1:Achieve ISO-9001-2008 Certification fordesignated T&E programs (associated deliverable:ISO Pre-Assessment Report, ISO CorrectiveAction Review, and ISO Certification Report). DueApril 30, 2010

Institutionalize quality V&V and T&E standardsthroughout the Technical Center.

Activity Target 2:Update T&E Handbook. Due August 15, 2010

Activity Target 3:Conduct study to provide T&E process and testcapability improvement recommendations andinput needed to address challenges and issuesfacing the implementation and deployment of theNextGen air transportation system. DueSeptember 15, 2010

Core Activity: Provide Quality Input toAMS V&V Policy and Guidance

Activity Target 1:Hold 5th V&V Summit. Due November 30, 2009

Continue to work with Agency to provide qualityinput to AMS V&V policy and guidance.

Activity Target 2:Deliver enhanced V&V Policy and Guidance to theAcquisition System Advisory Group (ASAG). DueMarch 30, 2010

Align 100% of business planning activities to ATO,Strategy and Performance (AJG), and FAA agency-wideplanning strategies.

Core Business Target: AJGStrategic and Business Planning

Page 141 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 143: ATO Business Plan 2010

Lead the integration of the AJG Business Plan withATO and FAA agency-wide planning strategies byfacilitating the identification of goals and performancemeasures by AJG organizations.

Core Business Initiative: BusinessPlanning

Core Activity: AJG Business Plans

Activity Target 1:Prepare a draft of the FY 2011 ATO AJG BusinessPlan. Due July 31, 2010

Develop, submit, and report on business plandocuments for the Strategy and PerformanceBusiness Unit (AJG), in accordance with ATO andFAA agency-wide timelines. Document the activitieswithin AJG to support FAA strategies and corebusiness targets.

Activity Target 2:Monitor and report, monthly, on the progress ofAJG business plan targets and activities. DueSeptember 30, 2010

Increase participation in Intern, Co-Operative Education(Co-op), and Summer Hire programs within the Air TrafficOrganization (ATO) by promoting their benefits and valueadded.

Core Business Target: ATOIntern, Co-Op and Summer HirePrograms

Promote the benefits of effective Intern, Co-operativeEducation (Co-Op) and summer Hires programs withinthe Air Traffic Organization (ATO).

Core Business Initiative: PromoteEffective Intern, Co-Op and SummerHire Programs

Core Activity: ATO Intern, Co-Op, andSummer Hire Programs

Activity Target 1:Ensure ATO employs 150 interns, co-ops, andsummer hires. Due August 31, 2010

Increase participation in Intern, Co-OperativeEducation (Co-Op), and summer Hires programswithin the Air Traffic Organization.

Complete tracked ATO Accountability Board (AB) casesby their resolution dates.

Core Business Target: ATOAccountability Board (AB) Cases

Distribute quarterly reports on the completion of ABcases to ATO Management.

Core Business Initiative: ATOAccountability Board Case Reports

Core Activity: ATO AB Case QuarterlyReports

Activity Target 1:Complete 80% of tracked ATO AccountabilityBoard cases by their resolution dates. DueSeptember 30, 2010

Analyze and generate quarterly reports on thecompletion of Accountability Board (AB) cases forATO management distribution.

Activity Target 2:Provide quarterly reports to ATO Service Units.Due September 30, 2010

Improve process and development of business plancomponents.

Core Business Target: AJVBusiness Planning

Provide staff and support services to ATO-E, ATO-R,ATO-T and ATO-W Directors of Operation

Core Business Initiative: Staff andsupport services to ATO Directorsof Operation

Core Activity: Business Planning

Activity Target 1:Create internal ATO-V process and procedure forbusiness plan development Due December 31,2009

.Develop, formulate and improve ATO-V businessplan.

Activity Target 2:Publish an internal AT0-V calendar for futureplanning cycles Due January 15, 2010

Develop and implement a Recruitment and OutreachProgram to attract a diverse applicant pool for ATOmission-critical occupations in FY2010.

Core Business Target: Build andRetain a Diverse, Highly Skilled,Motivated and ProductiveWorkforce.

Promote a workplace that is diverse, and creates,nurtures, and utilizes diversity of thought, viewpoints,and experience.

Core Business Initiative: OutreachInitiatives

Core Activity: Recruitment andOutreach Plan

Activity Target 1:Identify mission critical occupations, and thecompetencies needed, within the ATO. DueNovember 30, 2009

Build a diverse, highly skilled, workforce.

Page 142 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 144: ATO Business Plan 2010

Activity Target 2:Develop an outreach and recruitment plan, usinghiring projections, demographics to attract a broadaudience of applicants for mission-criticaloccupations. Due January 29, 2010Activity Target 3:Implement actions outlined in the AviationOutreach Plan for Air Traffic Controllers, and theRecruitment and Outreach Plan. Due September30, 2010

Increase NAS Maintenance Supply Support fundingEfficiency

Core Business Target: NASMaintenance Supply support

Manage/Oversight NAS Maintenance Supply Supportfunding.

Core Business Initiative: CorporateFiscal Efficiency

Core Activity: Manage/Oversee Purges

Activity Target 1:Reduce FY-10 total purge against NASMaintenance Supply Support (store credit) by15%. Due September 30, 2010

Manage/Oversee Purges.

Activity Target 2:Develop and institute an awareness plan toemphasize all requisitions must be accompaniedby an RMLS maintenance Log I.D. Due September30, 2010

Ensure all deadlines as set by NSG are met within 48hours of the deadline.

Core Business Target: Operateand maintain the daily operationof the NSG Group

Manage the daily operations of the NSG Group,ensuring deadlines are met as requested.

Core Business Initiative:Management of the NSG Group

Core Activity: Manage the NSG Group

Activity Target 1:Obligate within +.25% of allocations; ensureperformance measurements goals are reported bythe 5th of the month Due September 30, 2010

Manage the NSG Group

NAS Asset Traceability

Core Business Target: CorporateEffectiveness

Enhance NAS Efficiency and Effectiveness.

Core Business Initiative: CorporateImprovements

Core Activity: 2 Dimensional BarCoding (2DBC)and automated TechnicalPerformance Records (TPRs).

Activity Target 1:Develop a Business Case for 2DBC. DueDecember 31, 2009

2 Dimensional Bar Coding (2DBC)and automatedTechnical Performance Records (TPRs).

Activity Target 2:Secure corporate funding for 2DBC marking effortin the field. Due July 31, 2010Activity Target 3:Develop 2DBC field marking plan and scheduleand successfully mark an OEP locationPrepareDue August 31, 2010Activity Target 4:Prepare final requirements document forautomated TPRs Due September 30, 2010

Complete 100% of scheduled ATO system annualassessments.

Core Business Target: Completeannual assessments in supportof aviation security

Authorize 100% of scheduled ATO systemcertifications by September 30, 2010.

Core Business Initiative: Secure theNAS

Core Activity: Ensure a safe and secureNAS

Activity Target 1:Complete 100% of scheduled ATO system annualassessments. Due September 30, 2010

Ensure a safe and secure NAS

Provide ISS Research & Development engineeringsupport to enhance information systems security of theNAS.

Core Business Target: EnhanceSystems Security

To enhance the NAS

Core Business Initiative: Secure theNAS

Core Activity: Ensure a safe and secureNAS

Activity Target 1:

Ensure a safe and secure NAS

Page 143 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 145: ATO Business Plan 2010

Develop and test 2 NAS Enterprise Solutions forISS security. Due September 30, 2010

Authorize 100% of scheduled ATO 3 year systemsrecertification's by the target system's C&A anniversarydate.

Core Business Target: Supportnational aviation security needsthrough recertifications.

Ensure all ATO systems requiring a SCAP or annualassessment are complete by certification date.

Core Business Initiative: Secure theNAS

Core Activity: Ensure a safe and secureNAS.

Activity Target 1:Authorize 100% of scheduled ATO 3 yearsystems recertifications by the target system'sC&A anniversary date. Due September 30, 2010

Promote a safe and secure NAS by enhancinginformation security systems and identifying safetyrisk management processes.

Authorize 100% of scheduled ATO system certificationsby September 30, 2010.

Core Business Target: Supportnational aviation security needsthrough certifications.

Ensure all ATO systems requiring a SCAP or annualassessment are complete by certification date.

Core Business Initiative: Secure theNAS.

Core Activity: Ensure a safe and secureNAS

Activity Target 1:Authorize 100% of scheduled ATO systemcertifications. Due September 30, 2010

Promote a safe and secure NAS by enhancinginformation security systems and identifying safetyrisk management processes

Provide SIG support for ISS issues.

Core Business Target: SecurityInformation Group (SIG) Support

As issues come into the SIG, provide support asneeded.

Core Business Initiative:Restoration and Field SupportTechnical Assistance.

Core Activity: Provide technicalassistance for restoration.

Activity Target 1:Provide SIG support for ISS issues within thefiscal year. Due September 30, 2010

Provide technical assistance as restoration/on-sitesupport requests come in.

Develop and implement core communications strategiesexternally and internally for the purposes of education,training, outreach and marketing of ATO Financeproducts, services, policies, guidance andaccomplishments.

Core Business Target: ATOFinance Communications

Develop and implement core communicationsstrategies externally and internally for the purpose ofeducation, training, outreach and marketing of ATOFinance products, services, policies, guidance andaccomplishments.

Core Business Initiative: Developand Deploy ATO FinanceCommunications

Core Activity: Develop an ATO FinanceCommunications Strategy

Activity Target 1:Develop a Core Communications Strategy forFY2010. Due November 30, 2009

Develop an ATO Finance core communicationsstrategy focusing on both external and internalaudiences for the purpose of education, training,outreach and marketing of ATO Finance products,services, policies, guidance and accomplishments

Activity Target 2:Highlight priorities for core communications andoutline schedule. Due December 31, 2009

Core Activity: Implement ATO FinanceCommunications Strategy

Activity Target 1:Develop specific communications venues for corecommunications priorities. Draft due December31, 2009. Due December 31, 2009

Implement ATO Finance core communicationsstrategy focusing on both external and internalaudiences for the purpose of education, training,outreach and marketing of ATO Finance products,services, policies, guidance and accomplishments.

Activity Target 2:Outline detailed milestones for implementation.Due December 31, 2009Activity Target 3:Implement Core Communications Plan for FY2010. Due September 30, 2010

Page 144 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 146: ATO Business Plan 2010

Develop a Capital Investment Plan per congressionalrequirements and have available for publication by May30, 2010 in support of the goal to institute a robust 5-yearcapital plan and minimize risk associated with ATOinvestments.

Core Business Target: AJFStrategic Goal 1: Institute aRobust 5-year Capital Plan

Submit a 5-year Capital Plan to support the FY12budget by developing criteria to determine riskiestareas of the Capital Portfolio, Create new CapitalInvestment Team and determine roles, membershipand employ the reconstituted CIT to validateobjectives, requirements and value of the riskiestelements in the Capital Portfolio. Refine FY12 CapitalBudget based on results of reviews and validate aportfolio of capital investments that are balanced tosupport the following objectives:

1) Sustain adequate investment in aginginfrastructure, ensuring current services are maintained; 2) Support the strategic goals of NextGen; 3) Base investment decisions on the best value to thepublic; and 4) Achieve buy-in and consensus among majorstakeholders in the plan

Core Business Initiative: Create aRobust Capital Plan

Core Activity: Analytical Work

Activity Target 1:Develop criteria to determine the riskiest areas ofthe capital portfolio, and apply the criteria todevelop a list of areas for comprehensive review.Due November 1, 2009

Perform analytical work that will provide context forthe new capital plan and frame a risk-basedapproach to managing it.

Core Activity: Oversight Processes

Activity Target 1:Determine role and membership of the newCapital Investment Team. Due November 1, 2009

Reconstitute oversight processes, with a focus onrisk management

Core Activity: Comprehensive Reviews

Activity Target 1:Employ the reconstituted CIT to validateobjectives, requirements, and value of the riskiestelements of the capital portfolio. Due February 28,2010

Conduct comprehensive reviews of the riskiestprograms, projects, and/or portfolios.

Activity Target 2:Use the results of the reviews to refine the FY12capital budget request. Due June 30, 2010

Reduce reimbursable agreement processing time to 100days or less and document 100% of priority ATOfinancial processes and tools in support of the goal toensure effective and efficient ATO financial processesand tools and to increase the satisfaction of users of ATOfinancial processes and tools FAA wide.

Core Business Target: AJFStrategic Goal 2: Ensureeffective and efficient ATOfinancial processes and tools

With the support of AJF directors, AJF 9 will leadefforts to ensureeffective and efficient ATO financial processes andtools by developing a Current Inventory of MainstreamProcesses, Prioritization of Current MainstreamProcesses for Assessment, 3-year Project Plan withhigh-level Milestones and Documentation of "As-Is"state for high-priority Processes/Tools. Ongoingefforts across AJF in support of this strategic goalinclude the following:

· Optimize Reimbursables standard operatingprocedures · Improve the Corporate Work Plan · Modernize Air Traffic Organization (ATO) FinancialManagement Systems · Improve ATO Financial Management andAccounting Systems · Standardize and Integrate Data and Toolsets insupport of the AJF Strategic Goal to ensure ATO financialprocesses and tools are effective and efficient.

Core Business Initiative: Document,evaluate and improve ATO financialprocesses and tools

Core Activity: Inventory, Prioritize andDocument

Activity Target 1:Develop inventory of processes and tools. DueMarch 31, 2010

Inventory, prioritize and document as-is ATOfinancial processes and tools

Activity Target 2:Develop 3-year project plan with high-level projectmilestones. Refine metrics and strategies Due:March Due March 31, 2010Activity Target 3:Prioritize processes and accompanying tools forassessment. Due June 30, 2010 Due June 30,2010Activity Target 4:Document priority as-is processes and tools. DueSeptember 30, 2010 Due September 30, 2010

Page 145 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 147: ATO Business Plan 2010

Optimize Reimbursables standard operatingprocedures, leveraging to AJF core competencies.

Core Business Initiative: OptimizeReimbursables

Core Activity: Reimbursables StandardOperating Procedure (SOP)

Activity Target 1:Finalize standardized labor rates and associatedimplementation strategy for integrating with theFAA financial systems and processes. DueJanuary 31, 2010 Due January 31, 2010

Streamline reimbursable process and procedures toimprove ATO management of reimbursableagreements.

Activity Target 2:Publish annual reimbursable report. Due January31, 2010 Due January 31, 2010Activity Target 3:Establish baseline processing times and reportmonthly. Due January 31, 2010 Due January 31,2010Activity Target 4:Finalize and begin implementation of to-beprocess (guidance, tool, training). ) DueSeptember 30, 2010 Due September 30, 2010Activity Target 5:Automate accounting processes within RA Toolset(closeout, Rollover, Carryforward). Due September30, 2010. Due September 30, 2010

Improve requirements planning and execution of F&EProjects by developing a disciplined governanceprocess that includes Control Board, policies andprocedures, and a plan to improve prioritization andprovide training.

Core Business Initiative: CorporateWork Plan

Core Activity: Corporate Work Plan-CIPM08.14-00

Activity Target 1:Develop and deliver CWP training to 45engineering personnel. Due September 30, 2010Due September 30, 2010

Develop disciplined governance process thatincludes Control Board, policies and procedures,and a plan to improve prioritization and providetraining.

Activity Target 2:Prioritize CWP business process reengineeringrecommendations and begin development ofimplementation plan. Due June 30, 2010 Due June30, 2010Activity Target 3:Establish Corporate Work Plan Metrics. DueDecember 31, 2009 Due December 31, 2009

Activity Target 4:Upgrade the Corporate Work Plan (CWP) fromPrimavera 5 to Primavera 6.2 This will be fullyimplemented at the end of FY10. Due September30, 2010 Due September 30, 2010

AJF-5 will improve budget planning and execution forall ATO managed appropriations including Operations(OPS), Facilities and Equipment (F&E), and Research,Engineering, and Development (R,E&D). Incollaboration with stakeholder organizations, we willcollect, validate, and prioritize financial systemsrequirements to improve, procure, and/or develop newfinancial management systems to meet approvedbudget planning, formulation, allocation, funds control,execution, and reporting for ATO.

Core Business Initiative: ATOFinancial Management SystemsModernization

Core Activity: ATO FinancialManagement Systems Requirements

Activity Target 1:In collaboration with AJF-1, AJF-2, and AFO,identify and evaluate AJF system shortfalls in viewof collected ATO budget requirements andexpected future DOT accounting system capability(e.g. 12i). Due December 31, 2009

Deliver budget planning, formulation, execution andreporting systems for the Operations (OPS),Facilities and Equipment (F&E), and Research,Engineering, and Development (R,E&D)appropriations to meet near-term and future ATOfinancial management requirements for systemusers and stakeholder organizations.

Activity Target 2:In collaboration with AJF-1, AJF-2, and AFO,identify and evaluate alternative system solutionsto the gaps identified under target 1 and develop ajoint recommendation on the preferred systemsolution for senior management review andapproval. Due March 31, 2010Activity Target 3:Based on approval obtained under target 2,develop an acquisition strategy, SIR, ICGE, andplan of action and milestones (POA&M) to designand implement the proposed solution. Briefmanagement, obtain necessary approvals andfunding, and begin the acquisition process. DueJune 30, 2010

Core Activity: ATO FinancialManagement Systems ConsolidationPlan

Activity Target 1:Review AJF systems capabilities against user

Evaluate AJF financial systems and tools forcommon functionality to determine if consolidation ofsystems is feasible and economically viable.

Page 146 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 148: ATO Business Plan 2010

requirements and develop a plan to consolidatesimilar functions and "sunset" redundant orunneeded capabilities. The plan is to include atimeline and cost estimate for completion. DueMay 31, 2010Activity Target 2:Transition systems currently hosted on VMware inFOB-10B (BET & SPIRE) to the EDC in OKC. DueJune 30, 2010

Core Activity: Baseline UserSatisfaction with Current SystemsPerformance

Activity Target 1:Develop and conduct system specific usersatisfaction surveys for AJF-5 managed systemsand tools. Due July 31, 2010

Survey system users to establish a customersatisfaction baseline regarding functionality, ease-of-use, and support for AJF systems and tools.

Evaluate the feasibility and potential benefits ofexpanding the use of ATO "cuff" systems to the FAAenterprise "core" system level.

Core Business Initiative:Standardize and Integrate Data andToolsets

Core Activity: Identify Standard CoreSystems

Activity Target 1:In collaboration with AFO/ABA, review AJFfinancial applications, systems, and tools todetermine what capabilities should berecommended for agency-wide implementation as"core" systems and brief AJF and AFO/ABAmanagement. Due April 30, 2010 Due April 30,2010

Assess the viability and cost of standardizing ATOsystems (e.g. REGIS, CWP) to function as "core"systems for the agency.

Activity Target 2:Develop a plan of action and milestones for eachsystem identified under target 1 for enterprise-wideimplementation. Due July 31, 2010 Due July 31,2010

Determine strategy and plan of action for ATOfinancial management and accounting systemsconsistent with ABA and DOT guidance.

Core Business Initiative: FutureATO Systems Requirements

Core Activity: ATO StakeholderRequirementsCollect, document, and prioritize ATO stakeholderrequirements for accounting, financial management,and reporting for incorporation into the DOT, FAA,and ATO future systems requirements includingOracle 12i.

Activity Target 1:Determine ATO's requirements for the next DOTaccounting system (Oracle 12i) to be fielded inFY2012 or later. Due October 31, 2009 DueOctober 31, 2009Activity Target 2:Review current business rules in the CostAccounting System and develop recommendationsfor strengthening justification for agency overflightand user fees. Due July 31, 2010 Due July 31,2010Activity Target 3:Brief senior management on the recommendedimprovements for the Cost Accounting Systemdeveloped under target 2 and obtain approval toproceed. Due September 30, 2010 DueSeptember 30, 2010

Core Activity: ATO Financial Reporting

Activity Target 1:Specify what agency level changes are needed, ifany, to existing WBS and LDR structure anddevelop a plan of action and timeline to reviseagency orders and implement the changes. DueDecember 31, 2009 Due December 31, 2009

Work Breakdown Structure and Labor DistributionReporting Structure for ATO Financial Reporting.

Activity Target 2:Identify underutilized system functions andreporting capabilities from "core" systems (e.g.PRISM, DELPHI, & ARS) and provide training tothe user community. Due September 30, 2010 DueSeptember 30, 2010Activity Target 3:Complete design and implementation of Phase 2F&E Reporting. Provide Training to UserCommunity. Due June 30, 2010 Due June 30,2010

Standardize and Integrate Data and Toolsets.

Core Business Initiative: DataManagement

Core Activity: Improving CAS

Activity Target 1:Identify feasible CAS upgrades within existinginfrastructure and develop business case with costand schedule estimates. Due December 31, 2009

Explore options for improving the Cost AccountingSystem (CAS).

Activity Target 2:Conduct a detailed review of the current businessrules in CAS to determine if the cost allocationprocess should be revised. Ensure that anychanges maintain consistency with reporting forprior periods. Due December 31, 2009Activity Target 3:Conduct training sessions for AJF-3 on how to

Page 147 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 149: ATO Business Plan 2010

access and use CAS data to baseline operatingcosts for legacy systems. Due January 31, 2010Activity Target 4:Conduct LDR outreach training to achieveconsistency to project charging. Due September30, 2010Activity Target 5:Provide the Quarterly CAS Cost Efficiency Reportto AFO consisting of the Cost per IFR Flight Ratiowith management discussion and analysiscomparison with prior quarter; the LDR complianceratio, and the Staff Support Ratio, a new CASbased metric. The reports are due Feb 28 for1stQTR, May 31 for 2nd QTR and August 31 for3rd QTR. Due August 31, 2010

Core Activity: Help Desk Support

Activity Target 1:Review current help desk process to identify areasfor improvement to better support system usersand obtain management approval to proceed. DueJune 30, 2010

Improve Help Desk support.

Activity Target 2:Implement approved recommendations identifiedunder target 1 and communicate changes to usercommunity. Due September 30, 2010

Core Activity: Contract Accruals

Activity Target 1:Evaluate contracts for major OPS and F&Eprograms to capture a greater percentage ofaccrued contract costs in the monthly report. DueDecember 31, 2009

Expand use of contract accruals to improveaccuracy of monthly cost reporting.

Activity Target 2:Develop a standardized, repeatable, and verifiablereporting process for contract accruals andevaluate the feasibility of transferring the monthlyreporting responsibility to ATO COTRs and providetraining. Due June 30, 2010

Core Activity: Improve Corporate WorkPlan (CWP)

Activity Target 1:Assist AJF-9, with evaluation of CWP modules toidentify opportunities for modules consolidation orother system technology changes to improveCWP operation. Due December 31, 2009

Improve Corporate Work Plan (CWP)

Activity Target 2:Develop system change requests forrecommendations developed under target 1 andobtain approval from the ConfigurationManagement Board to proceed. Due March 31,2010

Activity Target 3:Implement approved CWP system changes andcollaborate with AJF-2 to provide training to theuser community. Due June 30, 2010

Core Activity: Alternatives for AJFSystems and Tools Support

Activity Target 1:Complete transition of technical support for AJFprojects currently under Volpe/CSC to a newsupport contractor by January 31, 2010. DueJanuary 31, 2010

Identify alternatives for future technical anddevelopment support for AJF financial systems andtools and reduce the total cost of the systemstransitioned.

Activity Target 2:Review alternatives and develop a transition planfor long-term technical support for other AJFsystems currently supported under other contracts(e.g. SETA II, NISC). Due June 30, 2010Activity Target 3:Eliminate failure risk to AJF managed systems dueto the departure of key personnel providingtechnical support. Ensure that adequate systemdocumentation exists for continuity of operation inthe event any key personnel become unavailable.Due September 30, 2010

Core Activity: Review andConsolidation of Data Warehouses

Activity Target 1:Lead a review of the data warehouses used byATO to determine if all are needed. Developrecommendations for consolidation andelimination of unneeded warehouses. Due June30, 2010

In collaboration with AJF-A3, assess the continuingneed for all legacy ATO data warehouses anddevelop recommendations for consolidation orelimination of unneeded capability.

Establish World Class IT Capability for ATO bydeveloping a multi-year Strategy and Road Map forachieving long term goals; achieving recognition of AJF-A as the single office responsible for managing allaspects of non-NAS IT; completing an inventory of all ITsystems (current and under development) within ATO;developing IT staffing Plans, developing ATO policy andgovernance for all non-NAS IT capability and developingperformance measurement plans for ATO IT.Where appropriate, possible and feasible, activities

Core Business Target: AJFStrategic Goal 3: EstablishWorld Class InformationTechnology Capability for the AirTraffic Organization

Page 148 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 150: ATO Business Plan 2010

under this goal will be coordinated with other AJF andATO organizational units/directors, with the FAA Office ofthe CIO, and with other FAA Lines of Business to effectsynergy and collaboration to achieve shared goals andobjectives.

This AJF goal will be accomplished by centralizingmanagement of ATO IT functions under the Office ofthe ATO CIO to include: IT Governance; ITPerformance Measurement; IT Application Deliveryand Management; IT Infrastructure Delivery,Operation, and Management; IT Talent Management;Information Security and Business Continuity; andVendor Management. Metrics will be established andbest practice benchmarks will be used to determine abaseline maturity level.

Core Business Initiative: CentralizeATO IT management functions

Core Activity: Planning, Inventory andPerformance Measurement

Activity Target 1:Complete development of a multi-year strategyand road map for achieving the long-term goal.This will establish a baseline level of maturity forthe existing IT functions; major milestones,initiatives, and outcomes; identification of majorservices provided; and identification of major risksand obstacles to achieving this strategic goal. DueJanuary 31, 2010

Complete multi-year strategy and road map,establish AJF-A as single manager of non-NASsystems, inventory ATO IT systems, develop staffingplan, implement governance and performancemeasurement plan.

Activity Target 2:Achieve recognition of AJF-A as the single officeresponsible for managing all aspects of non-NASinformation technology in the ATO (formallyestablish the Office of the CIO). Due March 31,2010Activity Target 3:Conduct and complete an inventory of all ITsystems, applications, and capability currentlyoperating or under development within the ATO.Where appropriate, this activity will be coordinatedwith the FAA Office of the CIO, and with other FAALines of Business. Due June 30, 2010Activity Target 4:Develop and document an IT staffing plan,including initial identification of 'missing' skill areasand resource estimates to address these areas.Due June 30, 2010Activity Target 5:Develop and implement ATO policy andgovernance for the submission, review, validationand budget request for all non-NAS IT capability.This activity will be coordinated with the AJFdirectors/organizational units, ATO Lines ofBusiness, and the FAA Office of the CIO as

appropriate. Due July 31, 2010

Activity Target 6:Develop and implement an organizational andfunctional performance measurement plan for ATOIT. Due September 30, 2010

In support of our customers and AEB objectives, produceuser-friendly, up-to-date guidance materials.

Core Business Target: ImproveInvestment Analysis Guidance

Using appropriate media, update and improvebusiness case guidance.

Core Business Initiative: DevelopUser-Friendly Business CaseGuidance

Core Activity: Business Case Guide

Activity Target 1:Create a Business Case Analysis Guide thatincludes processes, best practices, and agencyexamples. Due September 30, 2010

Using appropriate media, update and improvebusiness case guidance.

Ensure adequate staffing and skill mix to support the fullrange of AJF-3 responsibilities.

Core Business Target:Strengthen Core Skills WithinAJF-3

Ensure adequate staffing and skill mix to support thefull range of AJF-3 responsibilities.

Core Business Initiative: Staffingand Recruiting

Core Activity: Analytical and LeadershipStrength

Activity Target 1:Hire 10 analysts for AJF-3. Due July 31, 2010

Continue to strengthen the ability of our organizationto provide leadership in planning, business processreengineering and performance metrics reporting

Implement the High Performing Organization (HPO)initiative to reduce waste associated with FAA's internal,annual requirement for aeronautical chart and mapproducts. Reduce the ATO's consumption ofaeronautical charts by 50% in FY 2010, for a total costavoidance of $1.0M.

Core Business Target: CostControl - Chart and Mapproducts

Page 149 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 151: ATO Business Plan 2010

High Performing Organization (HPO) related to theInstrument Flight Procedures and Charting activities.

Core Business Initiative: HPO -Instrument Flight Procedures andCharting

Core Activity: Aeronautical NavigationServices

Activity Target 1:Reduce the ATO's consumption of aeronauticalcharts by 50% in FY 2010, for a total costavoidance of $1.0M. Due September 30, 2010

The ATO is implementing an OMB-approved HighPerforming Organization within TechnicalOperations, Aviation System Standardsorganization.

Be better stewards of public funds by managing total AirTraffic Organization, En Route and Oceanic Serviceslabor obligations. FY 2010 Target: not to exceed $TBDper one forecasted Instrument Flight Rule (IFR) flight inthe National Airspace System (NAS), as measuredmonthly and year to date. FY 2010 Target will be set byOctober 31, 2009.

Core Business Target: Achievethe En Route and OceanicServices Target for Total LaborObligations

Effectively manage total Service Unit labor obligations.

Core Business Initiative: EffectivelyManage Total Service Unit LaborObligations to Prevent Fraud, Wasteand Abuse

Core Activity: Effectively Manage TotalService Unit Labor Obligations

Activity Target 1:Conduct ten organizational assessments. DueSeptember 30, 2010

Conduct vulnerability assessments in En Routeorganizational units.

Activity Target 2:Assess progress towards achieving year-endperformance goal. Due March 31, 2010

AJG will track and report quarterly on actions taken insupport of the Secretary of Transportation's fiscal yeargoal that 3 percent of all new hires are individuals withtargeted (severe) disabilities.

Core Business Target: NewHires with Targeted Disabilities

Core Business Initiative: Supportthe Agency's New Hires with

AJG will provide support of the Secretary ofTransportation's fiscal year goal that 3 percent of allnew hires are individuals with targeted (severe)disabilities.

Targeted Disabilities Goals

Core Activity: ATO actions in support ofDOT FY goal that 3% of all new hires areindividuals with targeted disabilities

Activity Target 1:ATO will sponsor a hiring fair for people withtargeted disabilities. Due September 30, 2010

ATO will take actions that are intended to result inthehiring of people with targeted disabilities.

Activity Target 2:ATO will sponsor a national ATN training formanagers and supervisors on the People withDisabilities Program. Due September 30, 2010Activity Target 3:ATO will report quarterly to ACR on actions takento hire qualified people with targeted disabilities.Due September 30, 2010

In FY 2010, the Air Traffic Organization Office of Safetywill begin to attain International Organization forStandardization Registration.

Core Business Target:International Organization forStandardization 9001

The Office of Safety is on the path to InternationalOrganization for Standardization certification. TheInternational Organization for Standardization requiresthat we: - Plan our services and products - Perform ourservices and produce our products - Measure thequality of our services and products - Improve ourservices and products based on the results of thosemeasurements - International Organization forStandardization requires us to integrate six processesinto our day-to-day activities. These processes areDocument Control, Control of Records, CorrectiveAction, Preventive Action, Action to Correct Non-Conforming Products and Services, and InternalAudits.

Core Business Initiative:International Organization forStandardization 9001 EmployeeTraining

Core Activity: Realize Benefits ofInternational Organization forStandardization 9001 through EmployeeTrainingBegin implementation of International Organizationfor Standardization 9001 process required forInternational Organization for StandardizationRegistration.

Page 150 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 152: ATO Business Plan 2010

Activity Target 1:Establish training criteria for all Office of Safetyemployees to achieve International Organizationfor Standardization 9001. Due September 30,2010

Improve cross ATO processes and procedures and ATCinternational harmonization efforts.

Core Business Target: Processand Procedures

The Procedures Development Group (PDG) isresponsible for the stewardship of air traffic controlprocedures. It provides the guidelines and standardoperating practices (SOPs) for Document ChangeProposals(DCPs), Notices, General Notices(GENOTs), interpretations, waivers, or other requeststhat would establish or change an air traffic controlprocedure, policy, or guidance contained in a directiveor publication. The stewardship of these processesensures the timely development, tracking,coordination, publication, and distribution of qualityprocedures and associated documents supporting thedelivery of air traffic services. The PDG operatescollaboratively with change initiators which generatethe change requests, and across operating elements(Terminal, Enroute, Flight Service, TrafficManagement, Operations Security, DOD, etc) whichare responsible for their execution.

Core Business Initiative: SystemOperations ProceduresDevelopment Group

Core Activity: Joint ProceduresAutomation And Management System(JPAMS)

Activity Target 1:Establish internal PDG working capability ofJPAMS. Due April 30, 2010

Implement working capability Joint ProceduresAutomation and Management System (JPAMS), aweb based system that automates many of the AJR-53 business processes, including: the air trafficprocedures publication reference library, trackingand coordination of document change requests, andresulting distribution of air traffic proceduredocuments. The automation of these processes willdecrease the processing time and improve trackingand accuracy of change requests, and enablestakeholders to research the etymology of wordsand paragraphs in these documents.

Core Activity: Integrate ICAO into AirTraffic Procedures Action ProcessIntegrate ICAO into the procedures developmentgroup (PDG) by establishing tasks within the PDG toadminister ICAO document review functions for airtraffic procedure changes requests, and a plan towork with operational elements to identify and filedifferences for publication in the AIP. PDG will

Activity Target 1:Establish PDG ICAO tasks. Due March 30, 2010

provide review and comment to proposed ICAO ATdirectives changes from a procedures perspective;review proposed FAA directives procedures actionsfor differences with ICAO pubs; baseline differencesbetween ICAO/FAA AT documents; work with theoperational elements to collect differences lists;colate, and format differences and send topublications group for AIP publication.

Develop a method to add PC&B across all Activities inthe Business Plan.

Core Business Target: AllocatePC&B

Develop a method to Allocate PC&B to all activities inthe Business Plan.

Core Business Initiative: AllocatePC&B

Core Activity: Allocate PC&B

Activity Target 1:Allocate PC&B to activities in the Business Plan.Due September 30, 2010

Develop a method to allocate PC&B to Activities inthe Business Plan.

Ensure that at least three articles, news stories or videoson separate issues appear in major publications,websites or public forums that positively highlight ATOsafety initiatives and when appropriate, incorporate theATO safety messages..

Core Business Target: Positivecommunication for safetyinitiatives

Ensure that at least three articles, news stories orvideos on separate issues appear in majorpublications, websites or public forums that positivelyhighlight ATO safety initiatives and when appropriate,incorporate the ATO safety messages.

Core Business Initiative: NewsCoverage of ATO Activities

Core Activity: Messaging Alignment andQuality Control

Activity Target 1:Complete and approve a business case outliningthe structure, process, benefits, andimplementation plan within the Fiscal Year. DueSeptember 30, 2010

Establish a formal structure to embedcommunication professionals within the majorfunctional areas of ATO.

Page 151 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 153: ATO Business Plan 2010

Ensure that at least three articles, news stories or videoson separate issues appear in major publications,websites or public forums that positively highlight ATOtechnology or procedural advances that increasecapacity and/or efficiency and when appropriate,incorporate the FAA's capacity and efficiency messages.

Core Business Target: Positiveoutreach for efficiency andcapacity enhancements

Ensure that major efficiency and capacityenhancements accomplished by the ATO arepublicized.

Core Business Initiative: NewsCoverage of ATO Activities

Core Activity: Messaging Alignment andQuality Control

Activity Target 1:Facilitate publication of at least three separate,positive articles, news stories or videos onefficiency and capacity enhancements during theFiscal Year. Due September 30, 2010

Establish a formal structure to embedcommunication professionals within the majorfunctional areas of ATO.

Reduce the amount of time it takes to complete phase 1of the Flight Services Modernization Investment AnalysisLifecycle by 12.5%. Achieve phase 1 by September 30,2010

Core Business Target:Consolidate Flight Services fromfour platforms to one

Completion of the 3 phases of the Investment AnalysisSystem Lifecycle is essential to the Flight Servicesplatform transition. This platform transition will lead tofuture cost savings, increase efficiency, and have thepotential to save lives with the implementation ofenhanced services.

Core Business Initiative: FlightServices Modernization InvestmentAnalysis System Lifecycle

Core Activity: Complete phase 1 ofFlight Services Modernization

Activity Target 1:Attain Service Unit approval for CRD by March 31,2010. This action will aid in the transition fromfour Flight Services Platforms to one. Due March31, 2010

Achieve the necessary activities needed to enterphase 1 of the Flight Services platform transition,which include the Concept and RequirementsDefinition (CRD) and the Initial AcquisitionReadiness Decision (IARD) for a modernizedautomation system.

Activity Target 2:Complete 100% of the documents required forIARD. These documents include Shortfall Analysisdocument, Functional Analysis document,Preliminary Requirements document, andAlternatives Descriptions document. DueSeptember 30, 2010

Ensure adequate staffing and skill mix to support the fullrange of AJF-9 responsibilities.

Core Business Target:Strengthen Core Skills WithinAJF-9

Ensure adequate staffing and skill mix to support thefull range of AJF-9 responsibilities.

Core Business Initiative: Staffingand Recruiting

Core Activity: Analytical and LeadershipStrength

Activity Target 1:Hire 5 analysts for AJF-9. Due September 30,2010

Continue to strengthen the ability of our organizationto provide leadership in planning, business processreengineering and performance metrics reporting

Ensure FAA has the staffing and skill mix to successfullymanage NextGen and other major acquisitions byachieving an Actual on Board count for acquisitionpositions at or above 95% of FY10 projectedrequirements (as published in 2009 AcquisitionWorkforce Plan) by September 30, 2010. Expand andupdate FAA's Acquisition Workforce Plan to include pre-Concept & Requirements Definition research anddevelopment, and acquisition workforce requirements forATO service centers, ARC, and AVS; publish by 30 June2010.

Core Business Target: FAAAcquisition Workforce Plan

Ensure FAA has the staffing and skill mix tosuccessfully manage major acquisitions throughimplementing, expanding, and updating FAA'sAcquisition Workforce Plan. The Plan identifies, byorganization, current and projected staffingrequirements in core acquisition disciplines andassociated strategies to address workforce staffingand competency requirements. Core disciplinesinclude engineering and research, programmanagement, business/financial management,contracting, COTR, test and evaluation, and integratedlifecycle logistics.

Core Business Initiative: Implementand Update FAA's AcquisitionWorkforce Plan

Page 152 of 15311/17/09 Fiscal Year 2010 ATO Business Plan

Page 154: ATO Business Plan 2010

Core Activity: Implement 2009Acquisition Workforce Plan

Activity Target 1:Meet 90% of the activity targets identified in theFY10 project plan to implement the acquisitionworkforce plan strategies. Due September 30,2010

Implement strategies identified in 2009 AcquisitionWorkforce Plan.

Core Activity: Expand and UpdateAcquisition Workforce Plan

Activity Target 1:Publish annual update to plan by June 30, 2010.Due June 30, 2010

Expand and update FAA's Acquisition WorkforcePlan to include pre-Concept & RequirementsDefinition research and development, andacquisition workforce requirements for ATO servicecenters, ARC, and AVS; publish by 30 June 2010.

Page 153 of 15311/17/09 Fiscal Year 2010 ATO Business Plan