At the beginning there were two canals: 1. The Forth and Clyde Canal was built in 1777 between harbors Grangemouth and Falkirk, connecting Glasgow with the west coast of Scotland; 2. Union Canal, between Falkirk and Edinburgh, was finished in 1822. Because of geographical difficulties, which created a difference of 79ft. in elevation, the two canals were connected by 11 locks by a huge water carousel - started in 1963 and finished in 2002. Scottish Canal Engineering

description

Scottish Canal Engineering. At the beginning there were two canals: 1. The Forth and Clyde Canal was built in 1777 between harbors Grangemouth and Falkirk, connecting Glasgow with the west coast of Scotland; 2. Union Canal, between Falkirk and Edinburgh, was finished in 1822. - PowerPoint PPT Presentation

Transcript of At the beginning there were two canals:

Page 1: At the beginning there were two canals:

At the beginning there were two canals:1. The Forth and Clyde Canal was built in 1777 between harbors Grangemouth and Falkirk, connecting Glasgow with the west coast of Scotland; 2. Union Canal, between Falkirk and Edinburgh, was finished in 1822.

Because of geographical difficulties, which created a difference of 79ft. in elevation, the two canals were connected by 11 locks by a huge water carousel - started in 1963 and finished in 2002.

Scottish Canal Engineering

Page 2: At the beginning there were two canals:
Page 3: At the beginning there were two canals:
Page 4: At the beginning there were two canals:
Page 5: At the beginning there were two canals:

This is the only rotational boat transporter in the world. It has two arms, and each arm forms a kind of huge tub filled with water.

Boats enter the tub, then the tub locks up and the huge arm starts rotating…

Page 6: At the beginning there were two canals:

Lower canal…Lower canal…

Page 7: At the beginning there were two canals:

Entrance to lower canal…Entrance to lower canal…

Page 8: At the beginning there were two canals:

A Boat is approaching the A Boat is approaching the “tub”…“tub”…

Page 9: At the beginning there were two canals:

At top of the “tub”…At top of the “tub”…

Page 10: At the beginning there were two canals:

There are boats in bothThere are boats in bothupper and lower “tubs”…upper and lower “tubs”…

35 m35 m

Page 11: At the beginning there were two canals:

Rotation is starting…Rotation is starting…

Page 12: At the beginning there were two canals:

Boats in both rotating arms…Boats in both rotating arms…

Page 13: At the beginning there were two canals:

Rotation…Rotation…

Page 14: At the beginning there were two canals:
Page 15: At the beginning there were two canals:

Just before “landing”…Just before “landing”…

Page 16: At the beginning there were two canals:
Page 17: At the beginning there were two canals:
Page 18: At the beginning there were two canals:
Page 19: At the beginning there were two canals:

One 78ft. long “tub”, with water and boat, weights about 300 tons.One 78ft. long “tub”, with water and boat, weights about 300 tons.

Page 20: At the beginning there were two canals:

Closing of the gate, regulation of level of water, and “tubs” rotation takes only 15 minutes.

The “tubs” are filled according the Archimedes’ Law, so the weight of the “tubs” are balanced.

An engine of 22.5 kW is required to open the upper and lower lock and turn the whole system by 180º, which uses only 1.5 kWh.