ASX ANNOUNCEMENT For personal use only · 10/4/2013 · PSC’s located over prospective Penyu and...
Transcript of ASX ANNOUNCEMENT For personal use only · 10/4/2013 · PSC’s located over prospective Penyu and...
ABN 65 086 630 373
Perth Office Registered Office | Aquila Centre Level 3, 1 Preston Street Como WA 6152 | P: +61 8 9474 0000 F: +61 8 9474 0099 | www.nido.com.au Manila Office Unit 38B, 38th Floor, Philamlife Tower, 8767 Paseo de Roxas, Makati City 1226, Philippines | P: +63 2 856 5910 F: + 63 2 856 5494
4 October 2013
ASX ANNOUNCEMENT
Updated Investor Presentation
Nido Petroleum Limited (ASX: NDO) (“Nido” or the “Company”) wishes to advise that it has updated its investor presentation. A copy of the updated investor presentation is attached to this announcement. For further information please contact: Phil Byrne Managing Director +61 8 9474 0000 [email protected]
Michael Vaughan Cannings Purple +61 422 602 720 [email protected]
Join our electronic mailing list and find more information about Nido Petroleum at: www.nido.com.au
For
per
sona
l use
onl
y
October 2013
Nido Petroleum Limited
Investor Update
Phil Byrne, Managing Director
For
per
sona
l use
onl
y
2
Disclaimer and Competent Person Consent
This presentation contains forward looking statements concerning the financial condition, results of operations and business of Nido Petroleum Limited (‘the Company’). All statements other than statements of historical fact are, or may be deemed to be, forward looking statements. Forward looking statements are statements of future expectations that are based on management’s current expectations and assumptions and involve known and unknown risks and uncertainties that could cause the actual results, performance or events to differ materially from those expressed or implied in these statements. These risks and uncertainties include, but are not limited to: price fluctuations, actual demand, currency fluctuations, drilling and production results, commercialisation, development progress, operating results, reserve estimates, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals and cost estimates, political risks including the risk of expropriation and renegotiation of the terms of contracts with government entities, delays or advancements in the approval of projects and delays in the reimbursement of shared costs. All references to dollars, cents or $ in this presentation are to Australian currency, unless otherwise stated.
Peer Group Comparisons Any reference to ASX peer group includes the following companies: Tap Oil, MEO Ltd, Carnarvon Petroleum Ltd, Otto Energy Ltd, Rialto Ltd, Pan Pacific Petroleum Ltd, Cue Energy Resources Ltd, Pancontinental Oil & Gas Ltd, Neon Energy Ltd and Nexus Energy Ltd.
Reserves Information and Competent Person Consent The reserves information contained in this presentation concerning the West Linapacan A field is a summary of the report filed by the Company on the ASX on 4 September 2013. Mr Stephen Lane, B.Sc. (Hons.) Geology, Technical Director, Gaffney Cline & Associates who is a member of the Society of Petroleum Engineers and has at least five years’ experience in the sector consented in writing to the inclusion of this information in the form and context in which it appears in this presentation.
The reserves information concerning the Galoc oil field contained in this presentation has been reviewed by Mr David Lim, BSc. (Hons), MSc. Director, Odin Reservoir Consultants Pty Ltd. Mr Lim is a Petroleum Reservoir Engineer and a member of the Society of Petroleum Engineers and has over five years’ experience in the sector. Mr Lim consented in writing to the inclusion of the information concerning the Galoc oil field in the form and context in which it appears in this presentation.
For
per
sona
l use
onl
y
3
Corporate Snapshot
Snapshot – Key Corporate Data Market Data
Share Price (as at 23 Sep ‘13) 4.5c
Shares on Issue 2.046Bn
Market Capitalisation (at 4.5c) $92M
Financial Data – HY’13 ($M)
Cash at Bank 29.9
Debt (9.0)
Undrawn Debt ~(19.0)
Revenue 19.7
Net Profit 15.6
Production & 2P Reserves (Nido Share) as at 30 June 2013
Average net bopd (HY’13) 1,118
Galoc (MMstb) ~3.1
West Linapacan (MMstb) 3.2
ASX listed upstream oil and gas Company, headquartered in Perth, Australia
Diversified growth portfolio of producing, developing & exploring assets in SE Asia
Sound financial position & funded work program
Experienced Board and Management
For
per
sona
l use
onl
y
4
Board & Management
Bill Bloking FAICD - Non Executive Chairman • Over 39 years’ experience in the global energy industry with
senior executive roles with overall strategic, commercial and corporate accountability.
• 33 years of the 38 spent with ExxonMobil and the BHP Billiton Group, holding senior executive positions in Australia, Asia, South America and the United States.
Phil Byrne MAICD - Managing Director & CEO • Petroleum geologist with over 30 years’ global experience
in senior exploration, business development, commercial, and leadership roles in the oil & gas industry.
• Strong background in production and operational activities with BG Group and BHP Billiton Petroleum.
Andrew Edwards FAICD - Non Executive Director • Former Managing Partner of PWC (Perth Office) • Chartered accountant with over 30 years’ experience • Former State Chairman and national vice president of the
Financial Services Institute of Australiasia • Significant experience as a non executive director of listed
companies.
Jon Pattillo MAICD – Head of Exploration & Production
• Senior petroleum executive with over 26 years’ experience in the oil & gas industry managing international exploration and development projects, strategic planning and commercial areas.
• Proven track record of delivering and creating value through organic growth and new business development.
Eduardo Mañalac MAICD - Non Executive Director • 35-year career in international petroleum exploration and
production management, acreage acquisition, production sharing contracts and Joint Venture negotiations.
• Started the first geological mapping of the Palawan Basin in the Philippines and encouraged Phillips Petroleum’s (now ConocoPhillips) initial entry into the Palawan Basin and similar areas in Indonesia.
Ashley Gilbert MAICD - Chief Financial Officer • Chartered accountant with over 18 years’ experience in
commerce and public practice. • Significant expertise in financial control and accounting,
statutory and joint venture accounting, tax planning and compliance, treasury management, capital raising, negotiation of debt facilities, risk management and insurance matters.
Michael Ollis GAICD – Non Executive Director
• PhD in fluids with over 30 years’ experience in the global oil & gas industry in senior operation engineering, drilling and completion roles.
• Senior management experience at BHP Billiton Petroleum in exploration, appraisal and development of oil fields.
John Newman MAICD - General Counsel & Company Secretary • Company secretary and lawyer with more than 20 years’
legal experience • Significant expertise in negotiating project agreements,
divestments and acquisitions, corporate governance and advice, capital raisings and insurance.
For
per
sona
l use
onl
y
5
Company Strategy
To build a high quality balanced portfolio of producing, development and exploration assets in Asia
To focus on reserves and production growth in the near term
To provide a high quality exploration drilling program which is fundable from cash resources and has the potential to have a material impact
To forge partnerships with value adding partners For
per
sona
l use
onl
y
6
Portfolio Snapshot F
or p
erso
nal u
se o
nly
7
Acreage Maps F
or p
erso
nal u
se o
nly
8
Galoc Development (22.88% W.I.)
Phase II Production – Commencing Nov ‘13
Currently producing ~4,500 bopd gross
Phase II expected to deliver ~8 MMbls of additional
Resources (gross)
Expected to lift gross production ~12,000 bopd (net Nido
~2,700 bopd)
Key Milestones:
Subsea installation October / November 2013
Increased Oil Production ~ end November 2013
Galoc Field SC 14C1
Reserves (MMstb) as at 1 January 2013
1P 2P 3P
Gross 9.43 14.92 21.19
Nido Net Working Interest* 2.16 3.41 4.85
*Net Working Interest is different to Net Entitlement Interest as it does not include the subtraction of the Government’s entitlement
For
per
sona
l use
onl
y
9
West Linapacan ‘A’ Redevelopment (22.28% W.I.)
Nido 2P Reserves – 3.2 MMstb
Reserves recently assessed by Gaffney Cline & Associates
Field produced 8.5MMbbls of oil prior to being shut-in in 1996
Re-development concept of two horizontal subsea wells
tied-back to an FPSO being planned
Key Milestones:
FID expected in 2014
First oil production anticipated in 2015
Upside from West Linapacan ‘B’ and exploration leads
Reserves (MMstb)* as at 30 June 2013
1P 2P 3P
Gross 9.60 16.51 21.03
Nido Net Entitlement 1.94 3.20 3.93
* Based on a 2 well development, Linapacan limestone only For
per
sona
l use
onl
y
10
Forward Drilling Program - Philippines
High Impact Baragatan-1 Exploration Well – Mean OIIP 676 MMbbls
50% W.I. – Nido is Technical Operator
Large, 3D seismic defined rotated fault block
Targeting Pagasa Formation sandstones producing at the
Galoc Oil field (SC14C1)
Well cost ~US$24 million (gross); Nido share ~ US$12
million
Nido seeking to farm-out to balance equity position
Drilling timing subject to securing an appropriate rig
* Resource volumes estimated by Nido and tabulated on a Gross volume basis
Baragatan-1 Resource Potential (MMbbls, gross)* Low Best High Mean
OIIP 86 504 1498 676
Prospective Resource 26 151 449 203
Baragatan Prospect
For
per
sona
l use
onl
y
11
Forward Drilling Program - Indonesia
3 Exploration Well Program – Offshore Indonesia
Recent Farm-in deal into the Gurita, Cakalang and Baronang PSCs with Operator, Lundin Petroleum B.V.
PSC’s located over prospective Penyu and West Natuna grabens
PSC’s lie in close proximity to numerous oil and gas fields and discoveries (Belida Field 350mmbbls)
10% W.I. in each PSC with option to increase up to 20% W.I. prior to drilling
3 well program to commence in November 2013
* Gross Prospective Resources provided by Lundin; Nido’s Net Entitlement volumes will be lower than the volumes in the table ** Summation of all primary reservoir objectives
Prospective Resources (MMbbls, gross)* Low Best High
Baronang PSC
Balqis-1** 20.2 46.6 100
Boni-1 (sidetrack) 9 55 159
Gurita PSC
Gobi-1 12.7 23.8 41.2
For
per
sona
l use
onl
y
12
Net Reserves Position 1P, 2P & 3P
0.0
1.0
2.0
3.0
4.0
5.0
1P 2P 3P
West Linapacan 'A' Reserves (mmstb) at Net Entitlement Interest
as at 30 June 2013*
* as estimated by Gaffney Cline & Associates
0.0
1.0
2.0
3.0
4.0
5.0
1P 2P 3P
Galoc Field Total Reserves (mmstb) at Net Working Interest
as at 1 Jan 2013 *
Represents production from 1 Jan 2013 to 30 June 2013
*as estimated by David Lim of Odin Reservoir Consultants P/L as at 1 January 2013 (refer to Appendix for complete table) ** to be re-estimated at year-end 2013
For
per
sona
l use
onl
y
13
Active Forward Program to Year End 2014
REGION ASSET PLANNED ACTIVITY 4Q 2013
1Q 2014
2Q 2014
3Q 2014
4Q 2014
Philippines
SC 14C1 - Galoc Oil Field • Phase II Production
SC 14C2 - West Linapacan ‘A’ Oil Field Schedule based on operators best estimate
• FEED
• FID (estimate)
• Project Execution * Wells
SC 63 • Drill Baragatan-1**
Indonesia
Baronang PSC • Drill Balqis-1** Well
• Drill Boni-1** Well
Gurita PSC • Drill Gobi-1** Well
SE Asia
New Business • Build Asset Portfolio
*First Oil in anticipated in 2015 **Drilling timing based on securing relevant approvals and suitable rig
Well
For
per
sona
l use
onl
y
14
Fully Funded for Planned Forward Program**
* Forecast revenue based on oil price remaining at or around US$100/bbl with actual lifting's subject to production performance, timing and success of Phase II. ** Cash flow expenditure / revenues based on current budget estimates. *** West Linapacan CAPEX estimates are not incorporated in the above chart.
A$ M
M
Funding details
Galoc Phase II oil field development
Two exploration wells and exploration side-track in the Baronang and Gurita PSC’s, Indonesia
Baragatan-1 exploration well in SC 63, Philippines
West Linapacan Re-development FEED and pre-FID costs
For
per
sona
l use
onl
y
15
Fully funded work program for approved activity in 2013 and 2014 Base production set to almost triple by end of November 2013 (~1000 bopd to ~2700 bopd) Recent significant reserves upgrade (2P reserves from ~3MMstb to ~6 MMstb bbls net) Active exploration program with 4 wells over the next 12 months targeting a combined prospective resource of ~88 MMbbls net to Nido West Linapacan A reserves base paves the way for a second field development with expected cash flow stream in 2015
Investment Proposition
Current share price underpinned by Galoc production, with little recognition for West Linapacan A
development or near term exploration drilling potential
For
per
sona
l use
onl
y
16
Appendix – Balquis Prospect Indonesian PSC
Balquis Prospect
For
per
sona
l use
onl
y