Assuring Compliance with Waste Acceptance Requirements

11
1 Federal Office for Radiation Protection Department SE Safety of Nuclear Waste Management Section SE 3.1 Waste Package Quality Control Stefan Steyer Waste Acceptance Criteria for Disposal of Very Low, Low and Intermediate Level Waste 30 September 2010, Peine, Germany Assuring Compliance with Waste Acceptance Requirements

description

Assuring Compliance with Waste Acceptance Requirements. Federal Office for Radiation Protection Department SE Safety of Nuclear Waste Management Section SE 3.1 Waste Package Quality Control Stefan Steyer Waste Acceptance Criteria for Disposal of Very Low, Low and Intermediate Level Waste - PowerPoint PPT Presentation

Transcript of Assuring Compliance with Waste Acceptance Requirements

Page 1: Assuring Compliance with Waste Acceptance Requirements

1

Federal Office for Radiation Protection

Department SE

Safety of Nuclear Waste Management

Section SE 3.1

Waste Package Quality Control

Stefan Steyer

Waste Acceptance Criteria for Disposal of

Very Low, Low and Intermediate Level Waste

30 September 2010, Peine, Germany

Assuring Compliance with Waste Acceptance Requirements

Page 2: Assuring Compliance with Waste Acceptance Requirements

2

Waste Acceptance Requirements and Quality Control

Quality Control

SafetyAnalyses

Model Data

Waste Acceptance Requirements

Page 3: Assuring Compliance with Waste Acceptance Requirements

3

– Process Qualification with Accompanying Inspections

– Spot Checking of Legacy Waste

– Type Checking of Containers

Quality Control Measures for Radioactive Waste Packages

Page 4: Assuring Compliance with Waste Acceptance Requirements

4

Process QualificationM

anua

l

Page 5: Assuring Compliance with Waste Acceptance Requirements

5

Spot Checking of Legacy Waste

0.5 to 12 %

Page 6: Assuring Compliance with Waste Acceptance Requirements

7

Process Qualification versus Spot Checking

Process Qualification:

– Handbook or

Process Control Quality Plan– Statement on the Suitability of

the Process – Accompanying Inspections

Mandatory according to §74

Radiation Protection Ordinance

Spot Checking:

– Applicable to Legacy Waste

– Checking of 0.5 to 12 % of the

Waste Products

Page 7: Assuring Compliance with Waste Acceptance Requirements

8

Type Testing of Containers

– Production of Containers including QA Measures

– Prototype Test

– Assessment of the Application Documents (Construction Drawings,

Parts Lists), Results of the Prototype Test and the QA Measures

– Supervision of the Container Production

Page 8: Assuring Compliance with Waste Acceptance Requirements

9

Prototype Test

• Stacking Test (6 m) -> Stackability• Lifting Test -> Handling• Drop Test 0.8 m (4 m/s)• Drop Test 5 m• Thermal Test (1 h at 800 °C)

Page 9: Assuring Compliance with Waste Acceptance Requirements

10

Drop Test 5 m

Page 10: Assuring Compliance with Waste Acceptance Requirements

11

Thermal Test (1 h at 800 °C)

Page 11: Assuring Compliance with Waste Acceptance Requirements

12

Thank You for Your Attention