Assignment 4 Thinking

download Assignment 4 Thinking

of 43

Transcript of Assignment 4 Thinking

  • 8/10/2019 Assignment 4 Thinking

    1/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    1

    Introduction

    Refurbishment of Department of Civil Engineering building (Block G)

    To meet the growing demands of increased number of students and to enable better

    customer service, the Department of Civil Engineering is embarking on a project to

    refurbish its current office block (Block G). The refurbishment should enhance the

    current layout and aesthetic outlook, but should preserve the existing structural

    specification. Once completed, the building should consist of main administrative office,

    rooms for all lectures, rooms for visiting lectures, work-station for tutors and

    postgraduates, a resource room/library, computer laboratories, seminar rooms, design

    offices, study area for students, other rooms for administrative purposes, at least two

    research laboratories, utility shop and a gymnasium. The new layout proposed should

    enable to achieve the objectives of better customer service and meet enhanced demand in

    higher education. The report should also provide conceptual designs of the proposals.

    Through years, there are growing demands of increased number of students. To

    enable better customer service, the Department of Civil Engineering is intent to

    refurbish its current office block (Block G).

    The refurbishment will enhance the current layout and aesthetic outlook.

    The brand new layout will enable to achieve the objectives of better customer

    service, meet enhanced demand in higher education, making use the space

    effectively.

  • 8/10/2019 Assignment 4 Thinking

    2/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    2

    Objective

    Aesthetic the current outlook.

    Better customer service. Update the existing facilities.

    Improve students performance by providing good services, resource and facilities.

    The brand new Block G will consists of

    Main administrative office

    Rooms for all lectures

    Rooms for visiting lecturers

    work-station for tutors and postgraduates

    Resource room/library

    Computer laboratories

    Seminar rooms

    Design office

    Study area for students

    Other rooms for administrative purposes

    At least two research laboratories

    Utility shop

    Gymnasium

  • 8/10/2019 Assignment 4 Thinking

    3/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    3

    Concept

    This is four concept that we use

    1.

    Aesthetic

    - Something or about appreciation combination of qualities giving

    pleasure to the sight or other senses or to be mind.

    2. Comfortable

    - Circumstance; occurrence of fact connected with an event or person

    that feel good or better.

    3. Systematic

    - Follow the system and something meditate; plan that going fluent.

    4. Spacious

    - Something that away from crowded and commodious; having plenty of

    leisure.

  • 8/10/2019 Assignment 4 Thinking

    4/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    4

    Methodology

    Our group comprised of three member, which are Wong Mei Wah, Faiz Najmi

    Bin Abdullah and Nur Liyana Binti Hassan. We have discussed properly before we sub-

    divided the job to complete the findings on our topic. After fairly discussion, Wong MeiWah has been appointed as the head of the team.

    We started plan our work by discussion at first. During the session of discussion,

    it required lots communication skills to end up with compromise among group members.

    Anyway, we did it successfully in discussion and concede a point to do our project.

    Next, we distributed evenly our tasks according to everyone own ability. Then,

    we had meeting at few places in the Faculty of Engineering, which are engineering

    library, Infineon corner at Engineering Tower, student corner at Block U and student

    gathering corner at Civil Engineering Department which situated at Block G of the

    Faculty of Engineering. This is to ensure every group members will not lag behind the

    process.

    We discussed it during meeting when we were facing the hesitation in making

    decision. In this project is about refurbishment of department of Civil Engineering

    building (Block G), we would like to ask the response from civil departments students.

    Thus, we had decided to distribute questionnaire and conduct interview session with

    students in Civil Department of Faculty of Engineering to ask for their opinion. After that,

    we gathered all feedback and analysis on it.

    At last, we compiling identified problems and constrains with all data include

    suggestions and considered solutions. Then, we could conclude it with recommendations

    for this case.

  • 8/10/2019 Assignment 4 Thinking

    5/43

  • 8/10/2019 Assignment 4 Thinking

    6/43

  • 8/10/2019 Assignment 4 Thinking

    7/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    7

    4. Planning the study

    i. Suggestion to have indoor structure of the

    student gathering corner in block G

    ii. Suggestion to have welfare facilities inside

    the department

    iii. Suggestion to have stronger and wider Wifi

    zone in block G

    iv. Suggestion to concentrate all lecturersroom

    in one floor

    v. Suggestion to make full use of every space

    of block G

    vi.

    Suggestion to use autoCAD to draw the new

    plan of block G

    Wong Mei Wah

    All members

    All members

    All members

    5. Distribution of duties

    i. Conduct the survey

    ii. Designer of the plan of block G

    iii. Arranging meeting and write minutes

    iv. Photographer

    v. Cost estimation

    Wong Mei Wah

    Faiz Najmi Bin Abdullah

    Nur Liyana Binti Hassan

    Wong Mei Wah

    Faiz Najmi Bin Abdullah

    Faiz Najmi Bin Abdullah

    6. Decide on work schedule

    i. Having next meeting after 2 weeks

    ii. Data collection

    All members

  • 8/10/2019 Assignment 4 Thinking

    8/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    8

    Second Minutes of Meeting

    Date :19 November 2013

    Time : 3.30pm

    Venue : Infineon Corner, Engineering Tower

    Topics :

    Discuss information

    Data collection

    Analyses data

    Attendance :

    1. Wong Mei Wah

    2. Faiz Najmi Bin Abdullah

    3. Nur Liyana Binti Hassan

    No. Topics Action

    1. Discuss information required

    i.

    Design of the new design of plan of block G All members

    2. Data collection

    i. Problems faced

    ii. Solution considered

    All members

    3. Analyses data

    i. Result of the survey All members

  • 8/10/2019 Assignment 4 Thinking

    9/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    9

    Third Minutes of Meeting

    Date : 3 December 2013

    Time :3.00pm

    Venue :Engineering library, Faculty of Engineering

    Topics :

    Discuss the findings

    Finalize the report

    Prepare for presentation

    Attendance :

    1. Wong Mei Wah

    2. Faiz Najmi Bin Abdullah

    3. Nur Liyana Binti Hassan

    No. Topics Action

    1. Discuss the findings

    i.

    Cost estimation of project Faiz Najmi Bin Abdullah

    2. Finalize the report

    i. Make arrangements for the report

    ii. Individual summary

    All members

    3. Prepare for presentation

    i. Divide the topics among member

    ii. Gather information to prepare a PowerPoint

    presentation

    All members

  • 8/10/2019 Assignment 4 Thinking

    10/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    10

    Problems Encountered

    A) Lacking of facilities

    We found out that existing facilities in block G of Civil Engineering Department is

    insufficient and not well maintained.

    Problem 1: Study area

    There are lacking of study area for students in our department. This is due to the

    growing demand of increased number of undergraduate and postgraduate students. The

    study area of block G is limited and the surrounding is not suitable to study as it is near to

    the laboratory and exposed to weather change, such as rain. Even though the study area is

    covered, but when heavy rain in University of Malaya students cannot stay at the study

    area due to the environment condition of the place. Besides, the study area of block G is

    not equipped well with suitable tables and chairs.

    Cur rent studentsstudy corner

  • 8/10/2019 Assignment 4 Thinking

    11/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    11

    Problem 2: Block G do not have computer lab.

    In Block G, computer lab is unavailable. Although there is an existing computer

    lab at block G, the lab are not equipped with computers. Students usually face a big

    problem when doing assignments or reports which need to be completed using computer.

    Students have to bring their own laptop or go to the computer lab of block N. As an

    example, students who taking course Drawing for Civil Engineering, KAEA1102, have to

    go to computer lab of block N when doing AutoCad design.

    Computer lab without Computer facili tiesProblem 3:

    Current teaching equipment of block G is too old and not well-upgraded. The

    tables and T-rulers in the drawing room are too old and some are malfunctioning

    compared to those in the Faculty of Build Environment. Besides, the sound system and

    projector of design office often spoiled or not function well during lecture time.

  • 8/10/2019 Assignment 4 Thinking

    12/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    12

    Table and ru ler in block G Table and ru ler of Facul ty of Architecture

    Problem 4: Lack of welfare facilities

    Current Department of Civil Engineering do not equipped with any welfare

    facilities such as utility shop and gymnasium or leisure area. Students, lecturers and staffs

    do not have any place for them to do sport and exercise. For post-graduate students who

    often spend their time at department do not have any place for them to enjoy exercise for

    a better performance on academic. For final year students, they are suffering in looking

    for printing service in purpose of printing thesis paper. Besides, students often face with

    the problem on printing lecture note or assignment paper as there is not photocopy shop

    at block G. For staffs at department do not have any grocery shop for them to buy some

    snacks or drinks.

    B) Wi-Fi problem.

    There are free Wi-Fi access for students around University of Malaya, which are UM-

    WiFi-studentand UM-Wifi-staff. However, we cannot detect Wi-Fi access at block G.

    This is very inconvenient to students as students cannot access internet to carry out

    academic stuff, such as to find information and images to complete the assignment.

    Besides, lecturers also face with the same problem during the lecture as sometime

    they need to access on internet for some teaching resources.

    Free Wi-F i access at Department of Civil Engineeri ng

  • 8/10/2019 Assignment 4 Thinking

    13/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    13

    C) The structural design of block G is too complicated.

    Even though the building of block G is not large, students, especially first year

    students are failed to reach their destination in block G. The current design of lecturer

    room are too complicated and confusing, which make problems to students who

    wanted to meet lecturer at their office as they hardly to find the room. For the new

    design of the rooms for lecturer should be clear and simple which concentrate in one

    floor.

  • 8/10/2019 Assignment 4 Thinking

    14/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    14

    The F loor Plan of Block G

    D) The building of civil department (block G) dilapidated and not well-maintained.

    University of Malaya has an old historic background. Department of Civil

    Engineering is the first department of Faculty of Engineering in University of Malaya.

    The building of Department of Civil Engineering has a six-decades of history.

    Therefore, the building of block G is very old and need to be maintained-well to make

    sure the building is under good condition. Refurbishment and renovation on the

    building is needed to ensure a better and more comfortable study environment for

    students.

    Cur rent appearance of block G

  • 8/10/2019 Assignment 4 Thinking

    15/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    15

    Considered Solutions

    (a)

    Floor plan of ground floor of block G

    F loor plan of ground floor of block G

    Study

    area

    Utility

    shop

  • 8/10/2019 Assignment 4 Thinking

    16/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    16

    For the new design of the floor plan, a new study area for students and a utility shop will

    be added for the ground floor. The main adminstrative office and two research

    labotatories will remain the same as current building. Besides, the new study area should

    be a closed area equiped with adequade and suitable study tables and chairs. On the other

    hand, a new utility shop should be built beside the new study area to ease the needs of

    students. The utility shop will provide priting and photocopy service for students and

    grocery for all the students, lecturers and staff at Block G.

    Study area of block G.

    Uti li ty shop of block G

  • 8/10/2019 Assignment 4 Thinking

    17/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    17

    (b)Floor plan of first floor of block G

    F loor plan of fi rst fl oor of block G

    The current floor of the building will be demonished and refurbish with two seminar

    rooms, one discussion room, work station for tutor and postgraduates, and rooms for

    lecturer in the new design of Block G. The two seminar rooms will be equipped with

    tables, chairs and latest teaching equipment such as white board, projector, computer and

    LCD screen. A small discussion will be built for the purpose of students visiting lecterurs.

  • 8/10/2019 Assignment 4 Thinking

    18/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    18

    Seminar r ooms of block G

    Discussion room of block G

  • 8/10/2019 Assignment 4 Thinking

    19/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    19

    (c)Floor plan of second floor of block G

    F loor plan of second f loor of block G

    Same as the first floor of block G, the second floor will be demonized and the two design

    offices will be remain. For the new design for second floor, there are two new computer

    labs, a mini library, a small gymnasium, a small study area, a small work station for tutor

  • 8/10/2019 Assignment 4 Thinking

    20/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    20

    and lecturer, and rooms for lecturer. The two new computer lab with equipped with

    desktop and latest software, suitable computer tables and chairs, and teaching equipment.

    The new mini library will provide reference books, journals, thesis that related with civil

    engineering field. A small gymnasium is built for the purpose of provided a leisure area

    for students, lecturers, and staffs of civil department. Besides, the design office will equip

    with new drawing tables and chairs.

    Computer lab of block G Gymnasium of block G

    M ini li brary of block G Study area of Block G

  • 8/10/2019 Assignment 4 Thinking

    21/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    21

    Constrains & Limitations

    Based on the problems encountered, we analyze the building of block G and design a newplan of block G for the refurbishment of block G. However, in the process of design and

    proposing this project, we were facing some obstacles and limitations.

    1)Budget/ Cost

    The refurbishment of block G is a huge project as it requires a large amount of money.

    The reconstruction of the internal structural design and facilities such as gym, mini

    library and computer lab require a huge budget such as the equipment and the

    construction fee. Most of these equipment are very expensive and need to have

    maintenance regularly. Hence, it is quite hard for this project to obtain approval and carry

    out practically.

    2) I nconvenience for lectur ers and students dur ing the refu rbi shment process

    As the refurbishment work involved most lecturers in the department, they may face

    inconveniences during that time as they have no place to do their own works.

    Furthermore, it is not so comfortable for them to do their works at temporary offices as

    they are not familiar with the surrounding and it is difficult to manage the work in

    temporary places. Besides that, for those students who are usually having classes in the

    department need to find alternative places for their class. This eventually brought

    inconvenience for the lecturers and students too.

  • 8/10/2019 Assignment 4 Thinking

    22/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    22

    Analysis of Data

    Part A: Opinions on Current Building of Department of Civil Engineering, Block G

    Question 1: Do you satisfied with the appearance and layout of Block G?

    Graph 1: Satisfaction Level towards the Appearance and Layout of Block G

    Based on the data collected, 90% of the respondents show their dissatisfactory towards

    the appearance of Block G. This results clearly shows that the building is already

    obsolete and a new refurbishment is needed to implement. Furthermore, there is alwaysseeping of water into the building once raining. The respondents also claimed that the

    spaces in Block G are not fully utilized. Thus, it causes the layout of Block G is less

    satisfactory.

    0

    5

    10

    15

    20

    25

    30

    35

    40

    Very Satisfy Satisfy Dissatisfy Very Dissastisfy

    NUMBEROFRESPONDENTS

    Satisfaction towards The Appearance and Layout of Block G

  • 8/10/2019 Assignment 4 Thinking

    23/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    23

    Question 2: Do you satisfied with the study area for students in Department of Civil and

    Environmental Engineering?

    Chart 1 Satisfaction Level towards the Study Area in Block G

    The pie chart above shows that majority of the respondents are not satisfy towards the

    study area in Block G. 88% of the respondents are dissatisfied towards the condition of

    the current study area in Block G. Only 12% of the respondents are satisfied with thestudy area. This mainly due to the environmental condition and the facilities in the study

    area in Block G. The study area is an open area; thus it does not provide a quite

    environment for the students to do revisions. Furthermore, most of the respondents showtheir dissatisfactory towards the study area because it does not provide a conductive study

    environment for the students as the study area is without air-conditioners. Another reason

    is the weak Wi-Fi strength in the study area causes most of students do not like the study

    area in Block G.

    Very Satisfy

    0%Satisfy

    12%

    Dissatisfy

    42%

    Very Dissastisfy

    46%

    SATISFACTION TOWARDS THE STUDY AREA IN BLOCK G

  • 8/10/2019 Assignment 4 Thinking

    24/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    24

    Question 3: The design offices in Block G are in good condition?

    Graph 2: Condition of Design Offices in Block G.

    According to the analysis above, there is a neutral voting from the respondents. Thenumber of respondents agree and disagree that the design offices are in good condition

    are both 22 out of the 50. However, there are a slightly difference for the very disagree

    and very agree. Only 1 out of 50 of the respondents very agrees that the design offices

    are in good condition. Hence, we can conclude that total of 46% of the respondents saythat the design offices are in good condition but 54% of them are not agree with that.

    0

    5

    10

    15

    20

    25

    Very Agree Agree Diasgree Very Disagree

    1

    22 22

    5

    NumberofRespondents

    Condition of Design Offices in Block G

  • 8/10/2019 Assignment 4 Thinking

    25/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    25

    Question 4: The laboratories in Block G are well equipped and suitable to carry out

    experiments related to the courses?

    Chart 2: Condition of the Laboratories in Block G

    According to the pie chart above, the proportion of respondents who are disagree with the

    statement is higher that than of those who are agree. 23 out of 50 of the respondents

    disagree while 18 out of 50 of the respondents agree with the statement. The reason for

    the respondents claim that the lab is not in good condition because the equipment andapparatus in the laboratories are old and outdated, some of them are even malfunctioning.

    5, 10%

    18, 36%23, 46%

    4, 8%

    Condition of The Laboratories in Block G

    Very Agree

    Agree

    Disagree

    Very Disagree

  • 8/10/2019 Assignment 4 Thinking

    26/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    26

    Question 5: The work-stations for tutors and postgraduates are sufficient and well

    equipped?

    Graph 3: Work-stations for Tutors and Postgraduates

    Based on the graph above, most of the respondents say that the number of current work-

    stations for tutors and postgraduates are not sufficient and not well equipped. 28 out of 50

    of the respondents, which is 56% of the respondents disagree with the statement while 22out of 50 of the respondents, which is 44% agree with the statement. Most of the

    postgraduates wish to have a more comfortable work place.

    3

    19

    25

    3

    0

    5

    10

    15

    20

    25

    30

    Very Agree Agree Disagree Very Disagree

    Numbero

    fRespondents

    Work Stations for Tutors and Postgraduates

  • 8/10/2019 Assignment 4 Thinking

    27/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    27

    Question 6: Rooms for lecturer are in good condition.

    Graph 4: Condition of Lecturers Room

    31 out of 50 of the respondents say that the conditions of the lecturers rooms are

    dissatisfactory. On the contrary, only 19 out of 50 of the respondents say that the

    conditions in the lecturers rooms are well enough and in a good condition.From theanalysis, most of the respondents do not satisfied with the condition of the lecturers

    room. It is because the lecturer room is quite small and the space is very limited. Then,

    when the lecturers place their teaching materials in their rooms, it cause the room to seemmessy. Besides that, the furniture in the rooms for lecturers is old. Thus, the rooms for

    lecturers should be renovated and embellished.

    0

    5

    10

    15

    20

    25

    Very Agree Agree Disagree Very Disagree

    9

    22

    19

    0NUMBEROFRESPONDENTS

    Rooms for Lecturers

  • 8/10/2019 Assignment 4 Thinking

    28/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    28

    Question 7: Is seminar room necessary in Block G?

    Chart 3: Necessity of seminar rooms in Block G

    Based on the data obtained on the opinion of having a seminar room in Block G, morethan half of the respondents think that is a necessary. 66% of the respondents agree to

    have a seminar room because it provides a suitable place for the outside speakers orlecturers to give talks to students. Besides that, students also can carry out discussions or

    meeting in the seminar rooms.

    Yes66%

    No

    34%

    Necessity of Seminar Rooms

  • 8/10/2019 Assignment 4 Thinking

    29/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    29

    Part B: Suggestion for Refurbishment of Block G

    Question 8: Do you support the idea of refurbishment of Block G?

    Chart 4: Agreement of the Idea of Refurbishment of Block G

    According to the pie chart above, mostly of the respondents agree with the refurbishment

    of Block G with only 7.14% of the respondents disagree with that. One situation that weneed to observe that is none of the respondent is very disagree with the idea as most of

    the student claim that the departments building is already old and obsolete either in the

    outlook or the interior part. Hence, we can say that the respondents are agree with the

    idea of refurbishment of Block G. Thus, a refurbishment is necessary to make thebuilding looks new.

    23, 46%

    20, 40%

    7, 14%0, 0%

    Refurbishment of Block G

    Very Agree

    Agree

    Disagree

    Very Disagree

  • 8/10/2019 Assignment 4 Thinking

    30/43

  • 8/10/2019 Assignment 4 Thinking

    31/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    31

    Questions 10: What facility will you suggest to be included in the newly renovated studyarea?

    Graph 6: Facilities should be included in the Newly Renovated Study Area

    The data obtained shows that most of the respondents suggested that installing airconditioners and providing better Wi-Fi in the study area will make them more

    comfortable to stay and study there. 21 out of 50 of the respondents are choosing to

    install air conditioners in the study area while 20 of them are selecting a better Wi-Fi. Wecan see that air conditioner is the most essential facility in the new study area. In addition,

    availability of Wi-Fi becomes very important to the students because we use internet for

    information, submitting assignments, and also downloading the lecture notes. In addition,we also notice that some respondents requested for comfortable chairs and stools to be

    included in the new study area. Besides that, students also wish that the study area does

    provide vending machines which sell drinks and also food and snacks. As a result, we

    propose that the new study area should be equipped with air-conditioners, comfortablechairs and stools and food and drinks vending machines.

    21

    6

    20

    2 1

    Facilities in Study Area

    Install Air Conditioners

    Provide Comfortable Chairs

    and Tables

    Provide Better Wi-fi

    Vending Machines Selling

    Drinks

    Vending Machines Selling

    Food

  • 8/10/2019 Assignment 4 Thinking

    32/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    32

    Questions 11 and 12: Do you agree to enhance the facilities of laboratories and designoffices in Block G?

    Graph 7: Enhancement of Facilities of Laboratories and Design Offices in Block G

    According to the graph above, most of the respondents agree with enhancing the facilities

    of laboratories and design offices in the Block G. There is a same trend for respondents

    very agree, agree, disagree and very disagree in the laboratories and design office. 86%

    and 94% of the respondents agree to enhance the laboratories and design officerespectively. Majority of them agree because they found that some of the apparatus and

    the equipment in the laboratories are already not functioning well and are outdated which

    always provide an inaccurate experimental result. Furthermore, some of the tables and

    chairs in the design offices are also spoiled. As a result, this might become an obstacle forstudents to learn and study there. Hence, we propose to enhance the facilities of

    laboratories and design offices in Block G

    0

    10

    20

    30

    40

    50

    60

    Very Agree Agree Disagree Very Disagree

    NumberofResp

    ondents

    Enchancement of Facilities

    Laboratories Design Offices

  • 8/10/2019 Assignment 4 Thinking

    33/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    33

    Questions 13, 14, 15 and 16: Do you support the idea of proposing new area in Block G?

    Graph 8: Agreement of Idea of Proposing New Area in Block G.

    The graph above shows that more than half of the respondents agree with the idea of

    proposing the new areas as stated. The students wish to have seminar rooms for them to

    carry out discussions and listen to talks, computer labs for them to learn advancedsoftware, utility shop such as a photocopy shop and also a library which provides them

    sufficient reading materials. Thus, we propose to introduce these new areas in Block G.

    9

    23

    16

    2

    3

    23

    21

    3

    11

    19

    12

    8

    13

    21

    9

    7

    0 5 10 15 20 25

    Very Agree

    Agree

    Disagree

    Very Disagree

    Proposing New Area in Block G

    Seminar Room Computer Lab Utility Shop Library

  • 8/10/2019 Assignment 4 Thinking

    34/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    34

    Cost Estimation

    A) Mini Gymnasium

    1. Boxing bags RM 180x3 RM 540

    2.

    Elliptical Bike RM 668x2 RM 13363. Sit up Equipment RM 710x2 RM 1420

    4. Dumbbell Weightlifting Bench RM 420x2 RM 840

    B) Mini Library

    1. Bookshelves RM 169x8 RM 1352

    2. Air Conditioner

    (Mitsubishi 1HP SRK09CMP) RM 769x2 RM 1538

    C) Computer Lab

    1.

    Tables RM 159x70 RM 11130

    2. Printers

    (HP LASERJET 2200) RM 250x2 RM 500

    3. Air Conditioner

    (Mitsubishi 1HP SRK09CMP) RM 769x4 RM3076

    4. Computers

    (Dell 3010M-i3224G50-W87

    OptiPlex 3010) RM 2048x70 RM143360

    D) Study Corner

    1. Writing Tables

    (1500x700x750mm) RM 160x4 RM 640

    2. Chairs RM 45x15 RM 675

    3. Air Conditioner

    (Mitsubishi 1HP SRK09CMP) RM 769x1 RM 769

    E) Construction Fee

    RM 10000

    TOTAL RM 177176

  • 8/10/2019 Assignment 4 Thinking

    35/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    35

    Recommendations

    In this topic, we analysis and conclude all of our data. At first, we had identified

    four problems previously. We noticed these problems were based on a point that relatedto the facilities and maintenance of the Department of Civil Engineering. Hence, the most

    feasible solution must be able to solve these four problems together.

    At the same time, refurbishment of the department with a series of assumed that

    the most effective way to fix the four problems. This is because if the facilities are

    upgraded and well-maintained, the students can be motivated to strive for their best as

    they can have extra privilege in pursuing their studies. With those solutions mentioned,

    the department can build a good image with such facilities and systematic arrangement of

    every single room.

    In addition, we had conducted a survey among students of the department. This

    survey purposely collected various opinions from students towards the situation in their

    department. According to the statistic chart, it shows that majority of students agree that

    it is necessary to upgrade the department with various facilities.

    Although there were several constrains that we were facing, but the refurbishment

    planning could provide more convenience to all students in the future. Anyhow, it is

    necessary to carry on this plan. According to the questionnaire that we had distributed,

    we also found that majority of students agree to have this refurbishment work as it does

    really benefit everyone. The limits and constrains that will be facing can actually solve if

    we plan well. The overall cost for the work is estimated to be RM167176 that mainly

    involved the equipment to be installed. The work can be completed in short period which

    around 2 months.

  • 8/10/2019 Assignment 4 Thinking

    36/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    36

    References

    1. "Part 2 CAD/CAM/CAE",25 Year retrospective, Computer Graphics World,

    2011, retrieved 29 March 2012

    2. Autodesk, Inc".FundingUniverse. Lendio. 2012. Retrieved 29 March 2012.

    3. Brief History of Interior Design (2007) Retrieved December 7, 2012, from

    www.interior-design-school.net

    4. Piotrowski, C, 2004, Becoming an Interior Designer, John Wiley & Sons, New

    Jersey, USA

    5. Grahame, James. (2007-05-17)Mike Riddle's Prehistoric AutoCAD.Retro Thing.

    Retrieved on 2013-07-21.

    6. Pile, J, 2003, Interior Design, 3rd edn, Pearson, New Jersey, USA

    7.

    Site Plans, Elevations and Floor PlansA Community Guide San Jose. Accessed 11February 2009.

    http://www.cgw.com/Publications/CGW/2002/Volume-25-Issue-2-Feb-2002-/25-YEAR-RETROSPECTIVE-br-Part-2-CAD-CAM-CAE.aspxhttp://www.fundinguniverse.com/company-histories/Autodesk-Inc-company-History.htmlhttp://www.interior-design-school.net/http://www.retrothing.com/2007/05/mike_riddles_pr.htmlhttp://www.sanjoseca.gov/planning/counter/planning_sanjose/Planning_in_San_Jose_pt3.pdfhttp://www.sanjoseca.gov/planning/counter/planning_sanjose/Planning_in_San_Jose_pt3.pdfhttp://www.retrothing.com/2007/05/mike_riddles_pr.htmlhttp://www.interior-design-school.net/http://www.fundinguniverse.com/company-histories/Autodesk-Inc-company-History.htmlhttp://www.cgw.com/Publications/CGW/2002/Volume-25-Issue-2-Feb-2002-/25-YEAR-RETROSPECTIVE-br-Part-2-CAD-CAM-CAE.aspx
  • 8/10/2019 Assignment 4 Thinking

    37/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    37

    Individual Summary

    Name : Wong Mei Wah

    Matric Number : KEA120053

    We are divided into three group in the first interactive class of Thinking and

    Communication Skills for Civil Engineers. There are three members in our group who are

    Faiz Najmi Bin Abdullah, Nur Liyana Binti Hassan and me. We were assigned to the

    project which is titled Refurbishment of Department of Civil Engineering building

    (Block G). We decided to have our first meeting on 12 November 2013 after the class

    ended.

    We managed to briefly discuss and get further understanding the ideas of the topic

    in our first meeting. Then, we listed out our group organization as well as responsibility

    of each member. I have been selected as the group leader. In this meeting, I was

    responsible for the floor plan design of block G and the preparation on presentation slides.

    I suggested to increase the facilities of block G to have a utility shop that provide

    photocopy and printing services. After the discussion, we distributed all the duties to each

    of us and we decided to have the next meeting on 3 weeks time from now. After the

    meeting, I browse through some books and references regarding the floor plan design of

    block G and redesign it out by using AutoCad software. To get more information about

    the design of Block G, I also research through Internet and ask the opinions of seniors of

    my department.

    For our second meeting, we continue our discussion on the collected data about

    the design on refurbishment of Department of Civil Engineering building (Block G). In

    the process of designing, I found that there are some standard guidelines to be followed

    when designing floor plan of the block G. Through this process, I really learnt a lot of

    useful things which is related to the building and construction. Besides that, we also able

    to identify the existing problems, problems will exist during construction as well as the

    solution to all these problems. It is a very great challenge to us as we can apply all the

  • 8/10/2019 Assignment 4 Thinking

    38/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    38

    things we learnt before. At the end of the meeting, we decided to finalize and discuss all

    the remaining details by 2 weeks time.

    During the last meeting, the issue about the cost of estimation for refurbishment

    of block G is brought out. I have faced some problem while designing the floor plan of

    the block G. It is the first time for me to do the designing of building. In fact, it is a quite

    tough job for us as we never learnt the cost of estimation for a refurbishment on a

    building before. However, with the help of lecturers, we manage to finish it at last. After

    that, we combine all the data and details in our report. I also prepare some slides for the

    presentation as well.

    After all the hard works, I would like to highlight that the cooperation and

    collaboration among group members are essentially and paramount importance in the

    way to produce a efficiency as well as a significance group discussion so as to find out

    the best and critical solutions to solve all the constraints in various aspects such as in term

    of budget, manpower and time. All group members should take up their responsibility

    and play their crucial roles in different ways in order to complete this task. Through this

    project, I had gain knowledge and experience. Besides that, I also experiences as the

    leader of the group which improves my leadership skills, how to organize my work andcommunicates with my group members.

    Lastly, I want to show my appreciation to our lecturers, Prof. Dr. Hashim Bin

    Abdul Razak and Dr. Min Jang as well as my group members as they really help and

    guide me a lot in the way to complete this challenging task. Without their help, this

    project would not run smoothly as it does now.

  • 8/10/2019 Assignment 4 Thinking

    39/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    39

    Name : Faiz Najmi Bin Abdullah

    Matric Number : KEA120016

    The last few days have been seriously stressful for me. I'm not good at being the center of

    attention, and this whole thing has brought me to tears on more than one occasion since I

    hit publish on Monday night. But in all of that, the commenter of GT have been amazing

    about rallying around me and supporting me, and I'm incredibly grateful, so I wanted to

    take some time to specifically mention the people who went above and beyond for me.

    First of all, I want to congratulate to our group for making our final assignment

    critical thinking and communication successful and finish before the due date. Thanks to

    our lecturer that work hard to make the course interesting and easier to learn. The lecturerI meant is Professor Dr. Hashim Bin Abdul Razak. He patiently teaches us the theoretical

    part by spending around 2 hour and gives us enough exercise to make sure we understand

    the course outcome. Also, our co-instructor Professor Dr. Min Jang that handle the hand

    on and tutorial class. Sincerely, Prof. Dr. Min Jang gave a very energetic lecture and

    inspires us to become a better speaker and gave us tips about speaking in front of people.

    Furthermore, I want to thank you to my group for working very hard to make the project

    successful. My group mate Wong Mei Wah and Yana. For Wong Mei Wah, I want to

    thanks you because as the main contributor to our final project. She is very efficient and

    very tidy in her work. As we distributed the works, her majority does the research and

    rearranges the final works. As for Yana, she basically does the assist work for Wong Mei

    Wah, by doing the survey, analysis and meeting report. As for me, I do the theoretical

    part, spending the time to do research and the facts.

  • 8/10/2019 Assignment 4 Thinking

    40/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    40

    As for intro for this summary for this report, I will explain about the report

    generally. We picked this topic because the topic is very near to as civil engineering

    undergraduate. The topic about the renovation of the department of civil engineering is

    embarking on the project to reconstruct and design the current office block (block G).

    The improvement included the arrangement, current layout, and aesthetic layout.

    However, the structure of the existing building must be preserved.

    As for the solution for this problem, we manage to collect many respondents from

    undergraduate to make sure our research approved and the suggestion. The questionnaire

    asked about the satisfactory towards the outlook of Block G and the refurbishment of

    Block G. Most of them agree that the block G should be improved and the design should

    be more captive and bright.

    As for theoretical part and factual part, we did the research by referring the

    internet and articles. From there, we manage to identify the problem and found the great

    example of good department building. Majorly, we identify problem came from lack of

    facilities, poor teaching equipment, problem with internet connection, poor and not well-

    maintained building. Furthermore, the plan of the building is very complicated and not

    well arrange.

    We also manage to get a few solutions to solve the following problems. First of

    all, we must simplify the plan of the block G. We must make the lecturer room smallerand we also manage to build the utility shop and study area for student services.

    Moreover, we must make sure our department facilities up to date.

    However, we found that there are some Constrains and limitations. The limitation

    is the budget. The refurbishment of block G is a huge project as it consumes a large

    amount of money. Moreover, the improvement is very Inconvenience for lecturers and

    students. Refurbishment work involved most lecturers in the department, they may face

    inconveniences as they have no place to do their own works Students who are usually

    having class in the department need to find other places for their class.

    Although there were several constrains that we were facing, but the refurbishment

    planning could provide more convenience to all students in the future. Anyhow, it is

    necessary to carry on this plan. According to the questionnaire that we had distributed,

  • 8/10/2019 Assignment 4 Thinking

    41/43

  • 8/10/2019 Assignment 4 Thinking

    42/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    42

    the research and findings on facts. He also did the theoretical part. They had given a good

    cooperation along the making of the assignment. For me, I did the survey work and

    analysis part. I also did the meeting report.

    So, here are some introductions on our topic. Our topic is Refurbishment of

    Department of Civil Engineering Building (Block G). We had chosen this topic as we

    are civil engineering students and we are the closes to this building. We wish to express

    our opinion on our department building and give suggestions on how we can improve and

    maximize the usage of that building. We had come out with the idea on renovating the

    building and improve the current layouts of the building.

    We find out that we had a few problems faced on the department. One of them is

    lack of facilities. Facilities that we are stressing on are convenient study area which is

    very necessary for us, computer lab as we cant bring our laptop everyday to class to do

    our assignment, good teaching equipment and welfare facilities such as utility shop as we

    faced the difficulties on printing and photocopy lecture notes or assignments. Another

    main problem is the current layout of Block G is too complicated. To prove these

    problems do exist, we had conducted a survey on 50 respondents. We had asked them on

    their satisfaction towards the outlook of the Block G. As we have expected, most of them

    are dissatisfy with the current outlook of Block G. They do agree if we do some

    improvements towards the block.For the theoretical and factual part, we had did some research on the internet.

    From that, we managed to find some good examples of building concept and good

    facilities. This helps us in providing the suggestions on how we can improve the outlook

    of the building and improve the facilities provided at the block in the future. So basically,

    we are suggesting that we should make the layout of each floor at the block are more

    simple. We suggest that we move the current lecturer room and turn it into a discussion

    room. We also suggest some spot where we can establish it as a new study area for civil

    engineering student and utility shop. We insist that the future utility shop should be

    provided with printing and photocopy services. Furthermore, we suggest on how we can

    improve the computer lab and facilities provided at the computer lab along with the

    teaching equipment as well.

  • 8/10/2019 Assignment 4 Thinking

    43/43

    KXEX 2167- Thinking And Communication Skills For Civil EngineersRefurbishment of Department of Civil Engineering building (Block G)

    However, there are some constrains and limitation that we face if we want to

    proceed this project. This project will require construction works and purchasing some

    equipment. Therefore, we can expect a large amount of money is required. So, we have

    the limitations on budget. Furthermore, since there will be a construction work in

    progress, obviously the lecturer cannot use their room for the meantime. This will be

    inconvenient to them as they have to find new place to do their jobs. Besides, there are

    some classes been held at the block G. It will also causes some difficulties to find new

    replacement class as our tutorial classes and lecture halls in Faculty of Engineering are so

    limited.

    Even there are a few limitations exist, if this project is carried out, it will give a

    huge benefit to the students of Civil Engineering in the future. This had been agreed by

    most of the respondents from our survey. So, we can say that it is necessary to proceed

    with this project.