Asset Healthcare Assessment
description
Transcript of Asset Healthcare Assessment
International Other Assets Social Networking
Maintenance Assessment Questionnaire
Please answer the following questions by entering a number in the “Score” columns usingthe following rating system as a guide.
Rating System0 The topic unknows, never think about, nerver think it's important1 Please use rate description for each topic2 You are unsure between rating 1 or 33 Please use rate description for each topic4 You are unsure between rating 3 or 55 Please use rate description for each topic
Item Topic Score Evidence1 Routine Preventive Maintenance / Predictive Maintenance 32 CMMS Matrics / Work Executiion / Review 33 Equipment Criticality and Work Identification / Prioritization 24 Planning & Scheduling 35 Turnaround Management / Shutdown 46 Spare Parts Selection and Optimization 47 Contract Out Management 48 Asset Integrity 49 Asset Strategies (SRCM) 5
10 Failure Analysis /RCA/FMEA 511 Condition Based Maintenance 312 Craft Skills Enhancement 413 Equipment History 414 Maintenance / Operations Integration 115 OPM (First Line Maintenance by operators) 416 External Benchmarking 417 RAM/ RCM / RBI / SIL 218 Equipment Standardization /Spare Parts Optimization 119 Life Cycle Analysis 220 Vendor Reliability / Maintenance 021 Strategic Asset Management 0
Assessment Person DetailsName: Pruk N.
Field: PTTEP1ition: EngineerDate: January 14, 2012
Rate Description for Each Topic1. Routine Preventive Maintenance / Predictive Maintenance
1=Breakdown frequent3=PM implemented, defects identified & corrected5=PM hours and W.O.s exceed repairs about 1.5 times
2. CMMS Matrics / Work Executiion / Review1=Ineffective work orders, plans and controls3=Computerized work system implemented5=CMMS is fully utilized
3. Equipment Criticality and Work Identification / Prioritization 1=No priortity system / WR by operator only3=Work priority is implemented / operators have scheduled walk but no effective5=All works priority with production team / operators have scheduled walk round with check lists / Anyone can create WR / WR feedback
4. Planning & Scheduling 1=Maintenance is repair (run to fail for most equipment) / No schedule PM3=Most work planned & Scheduled5=Long-range schedule implemented (>1year plan)
5. Turnaround Management / Shutdown1=No equipment part life management (no equipments shutdown for maintenance)3=Part life management implemented for equipments5=Turnaround well planned and executed
6. Spare Parts Selection and Optimization1= Store service level lows3=Store service levels support operation5=Spare part keep for 2 times of life cycle
7. Contract Out Management1=No contractor management3=Contractor management inplemented5=Contrator well evaluate and feedback / Contractor comparation
8. Asset Integrity1=No comprehensive asset care program3=Asset Healthcare Program inplemented but not cover to all equipment5=Asset healthcare program for all equipment
9. Asset Strategies (SRCM)1=Condition monitoring sporadic, ignored / No RCA / No improvement3=Condition monitoring and RCA implemented but have ineffective improvement from RCA5=Condition monitoring based on cost & risk / Results of RCFA’s implemented routinely
10. Failure Analysis /RCA/FMEA1=Failure analysis infrequent, ineffective3=Failure analysis system established, effective (Root cause found)5=Failure analysis done for 80% of failures
11. Condition Based Maintenance 1=Inspections don’t get done3=Condition monitoring widely used, trusted5=Use Predictive techniques to minimize downtime
12. Craft Skills Enhancement 1=No training provided for staffs
3=Completency development program implemented / Training scheduled but almost not relate to job and business need / Training is only for key person5=Completency development program response to business need
13. Equipment History 1=No equipment history3=Equipment history is accurate and used5=Equipment history leads to improvement program
14. Maintenance / Operations Integration 1=“Team” implementation creates confusion / disorder
5=Work teams flexible, self-directed15. OPM (First Line Maintenance by operators)
1=Anarchy replaces hierarchy3=Operators perform TPM activities5=Continuous improvement process embraced, understood, working
16. External Benchmarking1=No External Benchmarking3=External Benchmarking implemented but no full function5=External Benchmarking fully developed leads to continuous improvement and look back
17. RAM/ RCM / RBI / SIL
3=High-value production processes assessed via RCM / Failure analysis routine activity techniques5=Reporting systems tie reliability to financial results through OUE / Complete equipment histories are used to trend and predict failures
18. Equipment Standardization /Spare Parts Optimization1=No equipment standardization / spare part optimization3=equipment standardization / spare part optimization implemented ineffectively5=equipment standardization / spare part optimization fully implemented for all equipment / stock value reduced by 30%
19. Life Cycle Analysis1=Nobody knows how long of equipments' life cycle in their plant2=Life cycle analysis implemented / Reliability becomes focus — not maintenance
20. Vendor Reliability / Maintenance1=Vendor reduction — lower service levels3=Everyone knows that Vendor Reliability is important and has program to control vendor reliability5=Vendors fully participate in reliability / Evaluate and feedback vendor
21. Strategic Asset Management 1=Executive and plant management fail to align and implement goals / Market pressures make short-term decisions predominate / Union recalcitrance makes high performance organization impossible3=Operational reliability is cross-functional responsibility. Reliability built into purchasing, production, engineering / Activity-based management implemented / Market impact of reliability valued / Clear organizational alignment5=Monitoring, process control, and information systems integrated./ Life expectancy analysis, lifecycle extension reengineering done / Automated, demand-driven
3=Natural Work Teams perform most dailymaintenance effectively
1=RCM implementation creates confusion,increased downtime
5=Concurrent engineering employed to ensurelifecycle, maintainability
plant production balancing implemented
International Other Assets Social Networking PTTEP
Asset Healthcare Assessment ResultsField: PTTEP1Asset Healthcare Maturity Level: Competent Planned MaintenanceAssessment Date: January 14, 2012
4.9 0 0 1 0 00 0 1 0 00 1 0 0 00 0 1 0 00 0 0 1 00 check1 0 check2 0 check3 1 check4 0 check50 0 0 1 0 3 1 3 0 00 0 0 1 0 Com Fail Compet.0 0 0 0 1 Com Fail Compet.0 0 0 0 1 Low Fail Low Pe.0 0 1 0 0 Low Fail Low Pe.0 check1 0 check2 0 check3 1 check4 0 check5 Low Fail Low Pe.0 0 0 0 0 1 1 3 0 21 0 0 0 00 check1 0 check2 0 check3 1 check4 0 check50 1 0 0 0 0 1 2 0 00 1 0 0 01 0 0 0 00 check1 1 check2 0 check3 0 check4 0 check50 1 0 2 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0
Routine Preventive Maintenance / Predictive MaintenanceCMMS Matrics / Work Executiion / Review
Equipment Criticality and Work Identification / Prioritization
Planning & Scheduling
Turnaround Management / Shutdown
Spare Parts Selection and Optimization
Contract Out Management
Asset Integrity
Asset Strategies (SRCM)
Failure Analysis /RCA/FMEA
Condition Based Maintenance Craft Skills Enhancement
Equipment History
Maintenance / Operations Integration
OPM (First Line Maintenance by operators)
External Benchmarking
RAM/ RCM / RBI / SIL
Equipment Standardization /Spare Parts Optimization
Life Cycle Analysis
Vendor Reliability / Maintenance
Strategic Asset Management
0
1
2
3
4
5
International Other Assets Social Networking PTTEP
Routine Preventive Maintenance / Predictive MaintenanceCMMS Matrics / Work Executiion / Review
Equipment Criticality and Work Identification / Prioritization
Planning & Scheduling
Turnaround Management / Shutdown
Spare Parts Selection and Optimization
Contract Out Management
Asset Integrity
Asset Strategies (SRCM)
Failure Analysis /RCA/FMEA
Condition Based Maintenance Craft Skills Enhancement
Equipment History
Maintenance / Operations Integration
OPM (First Line Maintenance by operators)
External Benchmarking
RAM/ RCM / RBI / SIL
Equipment Standardization /Spare Parts Optimization
Life Cycle Analysis
Vendor Reliability / Maintenance
Strategic Asset Management
0
1
2
3
4
5
International Other Assets Social Networking PTTEP