ASSET 11 FOUL NETWORK Jan '15 REV B

21
Rev Description Prep Chkd Appd Date Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0601 A JAN '15 PH W.F N.C NTS 10001 SHEET 1 OF 8 INDEX PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 12A ASSET 25 ASSET 12B ASSET 22B ASSET 22A ASSET 13A ASSET 13B ASSET 24B ASSET 26 ASSET 15 ASSET 16C ASSET 14B ASSET 14A 10001-JB-11-PRE-0610 10001-JB-11-PRE-0612 10001-JB-11-PRE-0608 10001-JB-11-PRE-0609 10001-JB-11-PRE-0611 10001-JB-11-PRE-0602 10001-JB-11-PRE-0603 LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ 10001-JB-11-PRE-0604 10001-JB-11-PRE-0605 10001-JB-11-PRE-0607 10001-JB-11-PRE-0606 SARAT ASSET 23A ASSET 23B ASSET 27 ASSET 16A ASSET 16B

Transcript of ASSET 11 FOUL NETWORK Jan '15 REV B

  • Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0601 A

    JAN '15PHW.FN.C

    NTS 10001

    SHEET 1 OF 8INDEX PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 12A

    ASSET 25

    ASSET 12BASSET 22B

    ASSET 22A

    ASSET 13A

    ASSET 13B

    ASSET 24B

    ASSET 26 ASSET 15

    ASSET 16C

    ASSET 14B

    ASSET 14A

    10001-JB-11-PRE-0610 10001-JB-11-PRE-0612

    10001-JB-11-PRE-0608 10001-JB-11-PRE-0609

    10001-JB-11-PRE-0611

    10001-JB-11-PRE-0602 10001-JB-11-PRE-0603

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    10001-JB-11-PRE-0604 10001-JB-11-PRE-0605

    10001-JB-11-PRE-060710001-JB-11-PRE-0606

    SARAT

    ASSET 23A

    ASSET 23B

    ASSET 27

    ASSET 16A

    ASSET 16B

  • BRID

    GE

    Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0602 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 1 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 27

    ASSET 17

    ASSET 23B

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No. 2 - ASSET 11DEEP GRAVITYSEWER

    No. 1 - ASSET 11 & ASSET 27 DEEP GRAVITY SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 27 I.L= -5.781m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 27 I.L = =I.L -4.885

    No. 3 - DEEP GRAVITY SEWER

  • Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0603 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 2 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 15

    ASSET 18

    ASSET 17

    ASSET 16B

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.2 - ASSET 11, ASSET 18 & ASSET 17 DEEP GRAVITY SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 17 I.L = =I.L -4.660

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 17 I.L = -2.398m

    No.12 - ASSET 11 DEEP GRAVITY SEWER

    ASSET 16AASSET 15

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 18 = -2.398m

  • BRID

    GE

    Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0604 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 3 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 25

    ASSET 15

    ASSET 26

    ASSET 27

    ASSET 23B

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.5- ASSET 11 DEEP GRAVITY SEWER

    No.5- ASSET 11DEEP GRAVITY SEWER

    No.3- ASSET 11DEEP GRAVITY SEWER

    No.1 - ASSET 11DEEP GRAVITY SEWER

    No.2 - ASSET 11 DEEP GRAVITY SEWER

    No.12 - ASSET 11DEEP GRAVITY SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 15 I.L = =I.L -2.131

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 25 I.L = 0.125m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 15 I.L = -1.600m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 25 I.L = -5.152m

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 26I.L = =I.L -4.271m

    No.28 - ASSET 11

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 25 I.L = =I.L -0.119

  • Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0605 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 4 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 15 ASSET 16A

    ASSET 16B

    ASSET 13B

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.6- ASSET 11 DEEP GRAVITY SEWER

    No.13 - ASSET 11 DEEP GRAVITY SEWER

    No. 2 - ASSET 11 DEEP GRAVITY SEWER

    No.23 - ASSET 11 FOUL SEWER

    No. 3 - ASSET 11 DEEP GRAVITY SEWER

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 16C I.L =-4.782m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 15 = -2.131m

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 15

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 15 = I.L -1.600m

    FUTURE 200mmTRUNK FOUL SEWERFROM ASSET 16A = I.L -0.996m

    FUTURE 200mmTRUNK FOUL SEWERFROM ASSET 16A = I.L -1.909m

  • 15.00

    Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0606 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 5 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 23A

    ASSET 24A

    ASSET 22B

    ASSET 23B

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.5- ASSET 11 DEEP GRAVITY SEWER

    No.11- ASSET 11 DEEP GRAVITY SEWER

    No.6- ASSET 11 DEEP GRAVITY SEWER

    No.6 - ASSET 11 DEEPGRAVITY SEWER

    ASSET 24B No.21 - ASSET 11 FOUL SEWER

    No.22-- ASSET 11 FOUL SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 23A I.L = -2.405

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 23A I.L = -1.909m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 24A I.L = --1.829m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 23B I.L = -1.568m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 23A I.L = -1.402m

    FUTURE 200mmTRUNK FOULSEWER FROMASSET 23B I.L = -2.826m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 24B I.L = -2.915m

  • Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0607 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 6 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 13A

    ASSET 14A

    ASSET 13B

    ASSET 23A

    ASSET 23B

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.5- ASSET 11 DEEP GRAVITY SEWER

    No.5- ASSET 11 DEEP GRAVITY SEWER

    No.24 - ASSET 11 FOUL SEWER

    No.26-- ASSET 11 FOUL SEWER

    No.25 - ASSET 11 FOUL SEWER

    No.4 ASSET 11 DEEP GRAVITY SEWER

    No.6- ASSET 11 DEEP GRAVITY SEWER

    No.11- ASSET 11 DEEP GRAVITY SEWER

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 13A I.L = -1.318

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 13A I.L = -2.546

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 23B I.L = -0.4088

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 13B I.L = -0.332

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET13B I.L = -0.555

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 13B I.L = -1.788

    FUTURE 200mmTRUNK FOUL SEWERFROM ASSET 14A I.L = -0.729

  • Sub Station

    Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0608 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 8 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    No.21 - ASSET 11 FOUL SEWER

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.6- ASSET 11 DEEP GRAVITY SEWER

    No.8- ASSET 11 DEEP GRAVITY SEWER

    No.12- ASSET 11 DEEP GRAVITY SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 22B I.L = -2.282m

    No.20 - ASSET 11 FOUL SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 23A I.L = -2.05

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 23A I.L = -i.909m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 23A I.L = -1.402m

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 22B I.L = -3.021

    No.11- ASSET 11 DEEP GRAVITY SEWER

  • Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0609 -

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 8 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    No.25 - ASSET 11 FOUL SEWER

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.6- ASSET 11 DEEP GRAVITY SEWER

    No.8- ASSET 11 DEEP GRAVITY SEWER

    No.6- ASSET 11 DEEP GRAVITY SEWER

    No.26 - ASSET 11 FOUL SEWER

    No.8- ASSET 11 DEEP GRAVITY SEWER

    No.11- ASSET 11 DEEP GRAVITY SEWER

    No.12- ASSET 11 DEEP GRAVITY SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 13A I.L = -2.546

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 13A I.L = -1.318

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 22B

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 14A I.L = -0.729

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 12B I.L = -1.953

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 12B I.L = -2.212

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 12B I.L = -1.680

  • Sub Station

    Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0610 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 10 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    No.20 - ASSET 11 FOUL SEWER

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 22A

    ASSET 22BLEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.12- ASSET 11 DEEP GRAVITY SEWER

    No.11- ASSET 11 DEEP GRAVITY SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 22B

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 22A I.L = -2.283

    FUTURE 200mm TRUNKFOUL SEWERFROM ASSET 22BI.L = -3.021

  • Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0611 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 11 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    ASSET 12A

    ASSET 12B

    No.4

    No.18No.27 - ASSET 11 FOUL SEWER

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

    No.8- ASSET 11 DEEP GRAVITY SEWER

    No.9- ASSET 11 DEEP GRAVITY SEWER

    No.6- ASSET 11 DEEP GRAVITY SEWER

    No.25 - ASSET 11 FOUL SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 12B I.L = -1.953

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 12B I.L = -2.212

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 12B I.L = -1.680

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 12A I.L = -6.853

    FUTURE 200mmTRUNK FOUL SEWERFROM ASSET 12A I.L = -4.689

  • IN

    OUT

    Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0612 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    SHEET 12 OF 12LAYOUT PLAN OF ASSET 11

    FOUL SEWER

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15ASSET 12A

    ASSET 12B

    ASSET 14A

    SARAT

    No.26 - ASSET 11 FOUL SEWER

    No.8- ASSET 11 DEEP GRAVITY SEWER

    No.9- ASSET 11 DEEP GRAVITY SEWER No.10- ASSET 11 DEEP GRAVITY SEWER

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 12B I.L = -2.912

    TRUNK FOUL SEWERFROM ASSET SARAT I.L = -3.881

    TRUNK FOUL SEWERFROM ASSET SARAT I.L = -4.689

    FUTURE 200mm TRUNK FOUL SEWERFROM ASSET 14A I.L = -2.925

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED DEEP GRAVITY SEWER(ASSET 11)shown thus

    SECTION No. & DIRECTION shown thus

    FUTURE CONNECTIONS constructedunder seperate contract's

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    No.1

    ??mm@

    ??mm@

  • Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0613 A

    JAN '15PHW.FN.C

    As Shown@A1 10001

    SHEET 1 OF 6SECTIONS

    FOUL SEWER ASSET 11

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    Rev Description Prep ChkdAppdDate

    SCALE = 1:2000 HORIZONTAL1:200 VERTICAL

    A Draft Issue for Review N.C W.F W.F JAN '15

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED GROUND LEVEL shown thus

    EXISTING GROUND LEVEL Shown thus

    22A-F-No.

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

  • Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0613 A

    JAN '15PHW.FN.C

    As Shown@A1 10001

    SHEET 2 OF 6SECTIONS

    FOUL SEWER ASSET 11

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    Rev Description Prep ChkdAppdDate

    SCALE = 1:2000 HORIZONTAL1:200 VERTICAL

    A Draft Issue for Review N.C W.F W.F JAN '15

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED GROUND LEVEL shown thus

    EXISTING GROUND LEVEL Shown thus

    22A-F-No.

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. All materials to be approved by EWA/SEPPD prior to installation.6. Installation to be in accordance with SEPPD standards and best

    practices and in accordance with the utility cross sections.7. All works to be carried out by a SEPPD approved contractor.8. Pipe diameters up to 450mm, shall be of uPVC.9. Pipe diameters above 450mm, shall be of GRP material.10. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

  • Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0615 A

    JAN '15PHW.FN.C

    As Shown@A1 10001

    SHEET 3 OF 6SECTIONS

    FOUL SEWER ASSET 11

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    Rev Description Prep ChkdAppdDate

    SCALE = 1:2000 HORIZONTAL1:200 VERTICAL

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED GROUND LEVEL shown thus

    EXISTING GROUND LEVEL Shown thus

    11-F-No.

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. Pipe diameters up to 450mm, shall be of uPVC.6. Pipe diameters above 450mm, shall be of GRP material.7. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    A Draft Issue for Review N.C W.F W.F JAN '15

  • Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0616 A

    JAN '15PHW.FN.C

    As Shown@A1 10001

    SHEET 4 OF 6SECTIONS

    FOUL SEWER ASSET 11

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    Rev Description Prep ChkdAppdDate

    SCALE = 1:2000 HORIZONTAL1:200 VERTICAL

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED GROUND LEVEL shown thus

    EXISTING GROUND LEVEL Shown thus

    11-F-No.

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. Pipe diameters up to 450mm, shall be of uPVC.6. Pipe diameters above 450mm, shall be of GRP material.7. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    A Draft Issue for Review N.C W.F W.F JAN '15

  • Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0617 A

    JAN '15PHW.FN.C

    As Shown@A1 10001

    SHEET 5 OF 6SECTIONS

    FOUL SEWER ASSET 11

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    Rev Description Prep ChkdAppdDate

    SCALE = 1:2000 HORIZONTAL1:200 VERTICAL

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED GROUND LEVEL shown thus

    EXISTING GROUND LEVEL Shown thus

    11-F-No.

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. Pipe diameters up to 450mm, shall be of uPVC.6. Pipe diameters above 450mm, shall be of GRP material.7. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    A Draft Issue for Review N.C W.F W.F JAN '15

  • Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0618 A

    JAN '15PHW.FN.C

    As Shown@A1 10001

    SHEET 6 OF 7SECTIONS

    FOUL SEWER ASSET 11

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    Rev Description Prep ChkdAppdDate

    SCALE = 1:2000 HORIZONTAL1:200 VERTICAL

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED GROUND LEVEL shown thus

    EXISTING GROUND LEVEL Shown thus

    11-F-No.

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. Pipe diameters up to 450mm, shall be of uPVC.6. Pipe diameters above 450mm, shall be of GRP material.7. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    A Draft Issue for Review N.C W.F W.F JAN '15

  • Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0619 A

    JAN '15PHW.FN.C

    As Shown@A1 10001

    SHEET 7 OF 7SECTIONS

    FOUL SEWER ASSET 11

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    Rev Description Prep ChkdAppdDate

    SCALE = 1:2000 HORIZONTAL1:200 VERTICAL

    LEGEND:

    PROPOSED MANHOLE shown thus

    PROPOSED PIPELINE shown thus

    PROPOSED GROUND LEVEL shown thus

    EXISTING GROUND LEVEL Shown thus

    11-F-No.

    Notes1. This Drawing is to be read in conjunction with all other relevant

    documentation.2. Do not scale from this drawing, use only printed dimensions.3. All dimensions in millimetres, all chainages, levels and coordinates

    are in metres unless defined otherwise.4. This drawing is to be read in conjunction with the project Health and

    Safety File for any identified potential risks.5. Pipe diameters up to 450mm, shall be of uPVC.6. Pipe diameters above 450mm, shall be of GRP material.7. Minimum clear cover from finish grade level to the top of pipe shall

    be minimum 1200mm.

    A Draft Issue for Review N.C W.F W.F JAN '15

  • 1:30 CROSSFALL

    1200

    100 100

    10mm THICKEPOXY MORTAR

    200mm THICKCONCRETE WALL (C45/20)

    HALF ROUND CHANNEL

    1000 G POLYTHENE SHEET

    CONCRETE BLINDING 50mm THICK

    PAINT PROTECTION INACCORDANCE WITH SECTION GOF THESPECIFICATION (TABLE G1)

    200 800 200

    250

    BENCHING TO BE C45/20CONCRETE FINISHED WITH10mm THICK EPOXY MORTAR

    MASTIC SEALANT 50x25 THICK WITHBOND BREAKER MEMBRANE TOUNDERSIDE ONLY

    RTR LINER IN ACCORDANCE WITHSECTION 'F' OF THE SPECIFICATION

    200

    MEDIUM OR HEAVY DUTY CAST IRONCOVER AND FRAME WITH RTR SEALING PLATE

    ROAD LEVEL (PAVED AREAS)COVER LEVEL -5

    ROAD LEVEL (UNPAVED AREAS)COVER LEVEL -50

    GROUND LEVEL (OPEN AREAS)COVER LEVEL -150

    CONCRETE HAUNCHGRADE C 45/20

    PRECAST COVER SUPPORT PAINTEDINTERNALLY WITH EPOXY MORTAR

    2000

    Max

    .

    1:30 CROSSFALL

    1001000100 250250

    50

    POSITION OFACCESS HOLE

    10mm THICKEPOXY MORTAR

    250mm THICKCONCRETE WALL (C45/20)

    HALF ROUND CHANNEL

    1000 G POLYTHENE SHEET

    CONCRETE BLINDING 50mm THICK

    PAINT PROTECTION INACCORDANCE WITH SECTION GOF THE SPECIFICATION (TABLE G1)

    250 1200 250

    3000

    Max

    .30

    0

    BENCHING TO BE C45/20CONCRETE FINISHED WITH10mm THICK EPOXY MORTAR

    MASTIC SEALANT 50x25 THICK WITHBOND BREAKER MEMBRANE TOUNDRESIDE ONLY

    RTR LINER IN ACCORDANCE WITHSECTION 'F' OF THE SPECIFICATION

    200

    REINFORCEMENT BAR

    MEDIUM OR HEAVY DUTY CAST IRONCOVER AND FRAME WITH RTR SEALING PLATE

    ROAD LEVEL (PAVED AREAS)COVER LEVEL -5

    ROAD LEVEL (UNPAVED AREAS)COVER LEVEL -50

    GROUND LEVEL (OPEN AREAS)COVER LEVEL -150

    CONCRETE HAUNCHGRADE C 45/20

    PRECAST COVER SUPPORTPAINTED INTERNALLY WITHEPOXY MORTAR

    800

    3-3 T20-100 B

    4 T20-200 B

    4 T20-200 B

    4 T20-200 B

    1+5 T20-100 B

    4 T20 TRIMMER BARS

    300

    800

    600

    450 450

    1700

    CHAMBER TYPE - E

    ????(SCALE 1:20)

    ???????????(SCALE 1:20)

    ????(SCALE-1:20)

    ???????????(SCALE-1:20)

    ?????????????????????(SCALE-1:20)

    CHAMBER TYPE - F

    Xref P:\10001-Diyar al Muharraq Primary Infrastructure\10001-106 Drawings\000 XREF Files\10001-JB-000-M2-0001_DRBD_WA1.dwg

    Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0620 A

    Jan '15PHW.FN.C

    1:2000@A1 10001

    OF ASSET 11TYPE E&F AND COVER TYPES

    MH SCHEDULE & CHAMBER DETAILS

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    Notes1. This Drawing is to be read in conjunction with all

    other relevant documentation.2. Do not scale from this drawing, use only

    printed dimensions.3. All dimensions in millimetres, all chainages,

    levels and coordinates are in metres unlessdefined otherwise.

    4. This drawing is to be read in conjunction with theproject Health and Safety File for any identifiedpotential risks.

    5. All materials to be approved by EWA/SEPPDprior to installation.

    6. Installation to be in accordance with SEPPDstandards and best practices and in accordancewith the utility cross sections.

    7. All works to be carried out by a SEPPDapproved contractor.

  • 1:30 CROSSFALL

    2001000200 250250

    50

    POSITION OFACCESS HOLE

    HALF ROUND CHANNEL

    1000 G POLYTHENE SHEET

    250 1400 250

    3000

    Max

    .30

    0

    MASTIC SEALANT 50x25mm THICKWITH BOND BREAKERMEMBRANE TOUNDRESIDE ONLY

    RTR LINER IN ACCORDANCE WITHSECTION 'F' OF THE SPECIFICATION

    200

    REINFORCEMENT BAR

    MEDIUM OR HEAVY DUTY CAST IRONCOVER AND FRAME WITH RTR SEALING PLATE

    ROAD LEVEL (PAVED AREAS)COVER LEVEL -5

    ROAD LEVEL (UNPAVED AREAS)COVER LEVEL -50

    GROUND LEVEL (OPEN AREAS)COVER LEVEL -150

    CONCRETE HAUNCHGRADE C 45/20

    PRECAST COVER SUPPORT PAINTEDINTERNALLY WITH EPOXY MORTAR

    800

    10mm THICKEPOXY MORTAR

    250mm THICKCONCRETE WALL (C45/20)

    CONCRETE BLINDING 50mm THICK

    PAINT PROTECTION INACCORDANCE WITH SECTION GOF THE SPECIFICATION (TABLE G1)

    BENCHING TO BE C45/20CONCRETE FINISHED WITH10mm THICK EPOXY MORTAR

    3-3 T16-180 B

    5 T16 145 B

    5 T16 145 B

    5 T16-145 B

    1+4 T16-145 B

    4 T16 TRIMMER BARS

    310

    800

    790

    550

    1900

    550 800

    1:30 CROSSFALL

    2001000200

    250250

    50

    POSITION OFACCESS HOLE

    1400

    10mm THICKEPOXY MORTAR

    250mm THICKCONCRETE WALL (C45/20)

    HALF ROUND CHANNEL

    1000 G POLYTHENE SHEET

    CONCRETE BLINDING 50mm THICK

    PAINT PROTECTION IN ACCORDANCEWITH SECTION G OF THESPECIFICATION (TABLE G1)

    250 1400 250

    2000

    Max

    .35

    0

    BENCHING TO BE C45/20CONCRETE FINISHED WITH10mm THICK EPOXY MORTAR

    MASTIC SEALANT 50x25mm THICKWITH BOND BREAKERMEMBRANE TO UNDRESIDE ONLY

    RTR LINER IN ACCORDANCE WITHSECTION 'F' OF THE SPECIFICATION

    200

    REINFORCEMENT BAR

    MEDIUM OR HEAVY DUTY CAST IRONCOVER AND FRAME WITH RTR SEALING PLATE

    ROAD LEVEL (PAVED AREAS)COVER LEVEL -5

    ROAD LEVEL (UNPAVED AREAS)COVER LEVEL -50

    GROUND LEVEL (OPEN AREAS)COVER LEVEL -150

    CONCRETE HAUNCHGRADE C 45/20

    PRECAST COVER SUPPORT PAINTEDINTERNALLY WITH EPOXY MORTAR

    250

    800 200200

    3-3 T16-180 B

    5 T16 145 B

    5 T16 145 B

    5 T16-145 B

    1+4 T16-145 B

    4 T16 TRIMMER BARS

    310

    800

    790

    550

    1900

    550 800

    FOULSEW

    ER

    ?

    FOUL SE

    WER

    ?

    FOUL SE

    WER

    ?

    FOULSEW

    ER

    ?

    FOULSEWER

    ?

    CHAMBER TYPE - G

    ????(SCALE 1:20)

    ???????????(SCALE 1:20)

    CHAMBER TYPE - H

    ?????????????????????(SCALE-1:20)

    ????(SCALE 1:20)

    ???????????(SCALE 1:20)

    ?????????????????????(SCALE-1:20)

    Rev Description Prep ChkdAppdDate

    Client

    Design Consultant

    Project

    Stage

    Title

    Scale

    Checked Approved Date

    Drawing No. Rev

    Prepared

    Job No.

    10001-JB-11-PRE-0621 A

    JAN '15PHW.FN.C

    1:2000@A1 10001

    OF ASSET 11TYPE G&H

    CHAMBER DETAILS

    PRELIMINARY DESIGN

    DIYAR AL MUHARRAQ

    PRIORITY WORKSPRIMARY INFRASTRUCTURE

    A Draft Issue for Review N.C W.F W.F JAN '15

    Notes1. This Drawing is to be read in conjunction with all

    other relevant documentation.2. Do not scale from this drawing, use only

    printed dimensions.3. All dimensions in millimetres, all chainages,

    levels and coordinates are in metres unlessdefined otherwise.

    4. This drawing is to be read in conjunction with theproject Health and Safety File for any identifiedpotential risks.

    5. All materials to be approved by EWA/SEPPDprior to installation.

    6. Installation to be in accordance with SEPPDstandards and best practices and in accordancewith the utility cross sections.

    7. All works to be carried out by a SEPPDapproved contractor.

    ????????????????????????????????????????????????????????

    ????????????????????????????????????????????????????????

    ?????????????????????????????????????????????????????

    CHAMBER COVER TYPE