Page 1: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

Gewog Connectivity Roads for Enhanced Climate Resilience

Report

OCTOBER 2016

Assessment of Gewog Connectivity Roads for

Enhanced Climate Resilience

Report

Enhancing Sustainability and Climate Resilience of Forest

and Agriculture Landscape and Community Livelihoods in

Bhutan

OCTOBER 2016 UNDP, BHUTAN

Page 2: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

2

Table of Contents

List of Tables .................................................................................................................... 4

MAPS ...............................................................................................................................

............................................................................................................................... 4

ABBREVIATIONS .............................................................................................................. 5

GLOSSARY ....................................................................................................................... 7

EXECUTIVE SUMMARY .................................................................................................... 8

1. BACKGROUND..................................................................................................... 12

1.1 POTENTIAL IMPACTS OF CLIMATE CHANGE ON ROADS ................................................ 12

2. OBJECTIVES AND SCOPE OF THE STUDY ....................................................... 15

2.1 SCOPE OF THE ASSIGNMENT ...................................................................................... 17

3. METHODOLOGY AND APPROACH .................................................................... 18

4. ENHANCING RESILIENCE OF ROADS TO CLIMATE CHANGE........................ 22

4.1 DEVELOPMENT OF CLIMATE RESILIENT ROAD ............................................................ 23

4.2 CURRENT STATUS OF CLIMATE RESILIENCE OF GC ROADS IN THE TARGET PROJECT AREA24

4.3 RECOMMENDATIONS AND ESTIMATES FOR ENHANCING THE CLIMATE RESILIENCE OF THE

PRIORITIZED GC ROADS........................................................................................... 26

4.4 MAKING PRIORITIZED GC ROADS CLIMATE RESILIENT. .............................................. 29

4.5 ECONOMIC JUSTIFICATION FOR INCORPORATION OF CLIMATE RESILIENT MEASURES..... 36

I. Nature of economic benefits: 36

II. Nature of social benefits: 36

III. Nature of environmental benefits 37

IV. Cost-benefit analysis 37

5. GEWOG CONNECTIVITY ROADS ....................................................................... 39

5.1 GENERAL INFORMATION ON ROAD NETWORK IN THE COUNTRY ..................................... 39

5.2 GENERAL INFORMATION OF ALL GC ROADS IN THE COUNTRY ...................................... 40

5.3 IDENTIFICATION AND PRIORITIZATION OF GC ROADS .................................................. 41

5.4 PRIORITIZED GC ROADS FOR PROJECT SUPPORT ..................................................... 42

5.5 GC ROADS SELECTED FOR CLIMATE PROOFING ......................................................... 51

6. CONCLUSIONS AND RECOMMENDATIONS ..................................................... 53

7 Annexure .............................................................................................................. 55

7.1 ANNEX – I _ TERMS OF REFERENCE ........................................................................ 55

7.2 ANNEX – II _ LIST OF STAKEHOLDER/PERSONS CONSULTED ....................................... 60

7.3 ANNEX – III _ FIELD ASSESSMENT DATA OF IDENTIFIED GC ROADS .......................... 61

Page 3: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

3

7.4 ANNEX - IV _ ITINERARY.................................................................................. 121

7.5 ANNEX – V _ REFERENCES ............................................................................ 123

7.6 ANNEX – VI _ ENVIRONMENTAL FRIENDLY ROAD CONSTRUCTION (EFRC)............... 124

7.7 ANNEX - VII _ LIST OF PARTICIPANTS DURING PRESENTATION ON 20-JULY 2016 ...... 129

7.8 ANNEX - VIII _ PHOTOGRAPHS OF DUNGMITHANG – MESITHANG GC ROAD, ............ 130

TANG, BUMTHANG ....................................................................... 130

Page 4: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

4

List of Tables

TABLE 1: IDENTIFICATION OF GC ROADS FOR ASSESSMENT BY NUMBER AND PERCENTAGE ........... 20

TABLE 2: DETAILS OF GEWOG CONNECTIVITY ROADS ASSESSED AND ANALYSED ......................... 21

TABLE 3: CLIMATE RISKS .......................................................................................................... 26

TABLE 4: POTENTIAL ADAPTATION AND MITIGATION MEASURES AGAINST CLIMATE INDUCED HAZARDS26

TABLE 5: GC ROADS PRIORITIZED AND ACTIVITIES RECOMMENDED FOR CLIMATE PROOFING .......... 28

TABLE 6: COSTS FOR CLIMATE PROOFING OF PRIORITIZED GC ROADS ....................................... 29

TABLE 7: SUMMARY _ CURRENT STATUS OF CLIMATE RESILIENCE OF GC ROADS...................... 31

TABLE 8: UNIT COST OF ITEMS FOR COMPLETE CLIMATE PROOFING ........................................... 40

TABLE 9: DETAILS OF GEWOG CONNECTIVITY ROADS TAKEN OVER BY DOR IN 2014 ................... 41

TABLE 10: RANKING OF THE GC ROAD PROJECTS BASED ON WEIGHTED NET PRESENT VALUE ..... 50

TABLE 11: TOTAL COST OF GC ROAD PROJECT...................................................................... 50

TABLE 12: ROADS SELECTED FOR CLIMATE PROOFING ............................................................ 51

TABLE 13: FINAL RANKING OF GC ROADS SELECTED FOR CLIMATE PROOFING ............................ 52

List of Boxes

Box 1: Definition of Gewog Connectivity Roads….………………………………………………..14

Box 2 : Definition of climate-induced hazards …………………………………………….………..15

Box 3: Climate Resilience Adaptive Measures………………………….…………………………..18

MAPS

MAP 1: PROJECT TARGET AREAS (LANDSCAPE 1, LANDSCAPE 2 AND LANDSCAPE 3). ................ 16

MAP 2: ROAD ALIGNMENT OF CHHUDZOM (DOVAN) GC ROAD (48.5 KM) .................................... 42

MAP 3: ROAD ALIGNMENT OF NIMSHONG-SHINGKHAR GC ROAD (31.96 KM) ............................... 43

Page 5: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

5

ABBREVIATIONS

AE Assistant Engineer

AMC Agriculture Machinery Center

ASL Above Sea Level

BC Biological Corridor

BHU Basic Health Unit

CMU Central Machinery Unit

DoFPS Department of Forest & Park Services

DoL Department of Livestock

DoR Department of Roads

DR Dzongkhag Road

ECRP Eastern Central Regional Project

EE Executive Engineer

EFRC Environmental Friendly Road Construction

FC Formation Cutting

FR Farm Road

FW Formation Width

GC Gewog Connectivity

GEF Global Environment Facility

GNHC Gross National Happiness Commission

JE Junior Engineer

Km Kilometer

LDCF Least Developed Countries Fund

LG Local Government

m meter

MoAF Ministry of Agriculture and Forests

MoEA Ministry of Economic Affairs

MoWHS Ministry of Works & Human Settlement

NLC National Land Commission

NRDCL Natural Resources Development Corporation Limited

Nu Ngultrum

PA Protected Area

PE Project Engineer

Page 6: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

6

PPD Policy and Planning Division

RGoB Royal Government of Bhutan

RLP Rural Livelihood Project

RNR Renewal Natural Resources

ROW Right of Way

RSPN Royal Society for Protection of Nature

RSTA Road Safety and Transport Authority

RUG Road Users’ Group

SNV Netherlands Development Organization

ToR Terms of Reference

UNDP United Nations Development Programme

UNICEF United Nations Children’s Fund

WMM Wet Mix Macadam

Page 7: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

7

GLOSSARY

Dasho : Conferred title equivalent to ‘Sir’

Dzongdag : District Administrator

Dzongkhag Tshogdu : District Development Committee

Dzongkhag : District

Gewog : Administrative Block

Gup : Elected head of a gewog

Lhakhang : Temple

Mangmi : Deputy Head of the Block Administration

Ngultrum : National currency

Nye : Religious site

Thromde : Municipality

Tshogpa : Elected link man between the Gup and the public

Page 8: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

8

EXECUTIVE SUMMARY

The Royal Government of Bhutan (RGoB) accords the highest priority for the sustainable conservation of its environment. It is enshrined in the constitution of the kingdom of Bhutan that every Bhutanese is a trustee of the Kingdom’s natural resources and environment for the benefit of the present and future generations and that the government shall protect, conserve and improve the pristine environment and safeguard the biodiversity of the country. Despite such a colossal commitment, Bhutan is still considered highly vulnerable to the impacts of climate change. The vulnerability to the impacts of climate change largely emanates from its rugged mountainous ecosystem, steep geo-physical setting due to its location in the Himalayas with altitudes ranging from 150 to 7,500 meters (m) above sea level (asl), and its weak economic structure as a least developed country. Over 69% of the population dwell in rural areas and are largely dependent on agriculture for their livelihood. It is a landlocked country and surface transport is the most reliable form of connectivity in the country. In the recent years Bhutan has been confronted with varying magnitudes of the impacts of climate change on the sources of rural livelihoods and biodiversity. The country has been struggling to reduce and adapt to these impacts in order to sustainably improve the resilience of the rural communities and conservation of the biodiversity.

The future climate change projections for Bhutan indicate that as compared to the 1980-2009 periods the mean annual temperature is projected to increase by 0.8°C to 1.0°C by 2010-2039 and further by 2.0°C -2.4°Cfor the period 2040-2069. The summer temperatures are projected to increase by 0.8°C in 2010-2039 and further increase by 2.1 °C by 2040-2069. The winter temperature is projected to increase by much higher range of 1.2°C rise for 2010-2039 time slice and by 2.8°C for the period 2040-2069.With regard to the precipitation, the mean annual precipitation is expected to increase by 10% for the period 2010 to 2039 and, further by 20% for the period 2040-2069.The most prominent and increasing climate change induced hazards relevant to the road and transport sector are landslides, flash floods, different types and magnitude of soil erosion which are most induced by unprecedented monsoon rain. The climate change induced hazards will severely impact the livelihood sources of the rural communities and disrupt key infrastructures like roads that will immensely affect the access to food and other basic necessities. The physical topography dominated by rugged mountainous terrain is by far the most significant factor that predisposes the Bhutanese roads to climate change induced disasters. For the long term sustainability, durability and to reduce the impacts on the environment it is essential to undertake climate proofing of roads to make it climate resilient.

The project on “Enhancing sustainability and resilience of forest and agriculture landscape and community livelihoods in Bhutan” aims to reduce the impacts of climate change on the most vulnerable section of the Bhutanese society which are the rural communities. The project has broad objectives to enhance the sustainability of the different sources of livelihoods and biodiversity of the country. To achieve its objectives, the project has adopted an integrated landscape-based approach which has the key strategy for adaptation to the impacts of climate change. The integrated landscape strategy of the project includes the improvement of the institutional capacity at national, sub-national and local levels to sustainably manage the forests and agricultural landscapes for enhanced resilience to climate change; emplacement of a governance system for biological corridors and operationalization of conservation managements system in the pilot corridors; and the development of climate resilient livelihood options for the local communities.

Page 9: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

9

The primary focus of the project is to support the development of climate resilient livelihood options in the country to reduce the vulnerabilities of the communities to the impact of climate change. Among others, one of the potential areas of intervention envisaged by the project is the development of climate resilient Gewog Connectivity (GC) roads. This study is expected to provide relevant inputs for the formulation and design of project. The underlying objectives of this assignment is to examine the existing status of GC roads in the project areas, assess their vulnerability to various climate-induced hazards, identify and prioritize the GC roads that requires to be strengthened for enhancing the resilience of the rural communities, and analyze the costs and benefits for enhancing the climate resilience of these roads. This study on GC roads forms one of the sub-consulting assignments whose findings will provide inputs for the formulation and design of project.

The different methodologies adopted for this assignment included the use of primary and secondary information. The secondary information was obtained through the desktop reviews and focused group discussion with the relevant stakeholders. The primary data was obtained through a predesigned structured questionnaire survey of the stakeholders and by undertaking the field visits to assess the status of the target GC roads. The key informants covered by the survey in the eleven Dzongkhags included the local government officials like Gups, Gewog Administrative Officers, Mangmi, Tshogpas and selected representatives of the beneficiaries. Furthermore, additional information was also collected from the engineers from the Department of Roads (DoR) at departmental head office Thimphu and field offices. Site engineers from DoR accompanied during the field visits for all the targeted roads. The engineers provided with an in-depth information on about the road and also enabled during discussions and consultations with the local government officials and other public at the survey sites. The data collected were then analyzed to prepare the final report.

During the review of literature on road construction techniques, existing standards and specification for different categories of roads were reviewed. The literature gave a particular emphasis on the Environmental Friendly Road Construction (EFRC) techniques and its utilization in developing climate resilient roads. The most basic information on the GC roads was obtained from which is the national focal agency responsible for all aspects of the road sector in Bhutan.

Of the total 31 GC roads considered under project area, 14 GC roads that constitute 48% of GC roads in the project area were sampled for assessment. The key criteria used for selecting the samples for this study were the percentage of landscape falling inside a Gewog, GC roads with a length of over three Kilometers (Km) and identification of at least one GC road from each Dzongkhag.

The findings from this study further confirms that because of the country’s fragile and rugged mountainous terrain the impacts of climate change on GC roads will be highly severe and will affect the road and transport sector in different ways. As a result of the increased monsoon discharges from streams and rivers which will increase the frequency and magnitude of land slips, landslide, flash flood and erosion likely to impact on essential infrastructures like roads with severe damages. Some of the damages could be even irreversible. About 73% GC roads assessed in this study are highly vulnerable to climate change induced hazards because of the poor design and sub-standard quality of construction. Out of 14 GC roads assessed, only four seem to have some degrees of climate resilience. Although the use of EFRC techniques was to be followed, it has been apparently ignored or not adopted rigorously making the roads highly vulnerable to the different types of climate change induced hazards. The drains are poorly designed and water from the drains overflows on the road surface damaging the road. It is highly likely that insufficient construction budget resulted in comprising the quality of

Page 10: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

10

construction. Two of the 14 sampled GC roads fall in heavy rainfall zone and are highly prone to damage all the year rounds if it is not adequately climate proofed. The shortage of local labour is one of the main constraints that affect the regular and timely maintenance of GC roads especially during the peak monsoon season when the roads are highly exposed to the climate induced hazards. Any small damages during the monsoon season neglected tend to serve as the entry point for major damage of much higher magnitude. Since the construction of climate resilient roads is a fairly new area, the DoR is severely affected by the lack of skilled and technical expertise. The present technical expertise on the construction of climate resilient roads in DoR is highly inadequate. At present, the manuals and guidelines on EFRC designs are absent.

Based on the findings and observations from this GC road study a number of recommendations are made for the improvement of the present status of the GC roads for making it climate proof and resilient. Some of the most fundamental recommendations are:

Five GC roads namely 48.5 Km Chhokorling (Toribari) – Pankhay (Gewog office) GC Road (Dovan) in Sarpang; 31.96 Km Nimshong-Shingkhar GC road, Shingkhar Gewog, Zhemgang Dzongkhag; 19.5 Km Wangdigang-Zhalingbi GC Road, Korphu Gewog, Trongsa Dzongkhag; 21.2 Km Yongkola-Banjar GC road, Tsamang Gewog, Mongar Dzongkhag and 16.3 Km Autsho - Gewog Centre (Jarey) GC road in Lhuentse have been prioritized for support by the project. There is an urgent need to develop and strengthen the technical capacity of engineers of the DoR on the design and construction of climate resilient roads as DoR is the nodal agency responsible for the development of the road sector. This could be accomplished through the provision of short and long term trainings, study visits to relevant institutions in the region and by developing guidelines on EFRC and climate resilient roads. The use of EFRC techniques such as bioengineering works has to be strengthened and enforced during the construction of the GC roads. This study has estimated a total budget of Nu.1269.00 million for the development of climate resilient roads under the project. From this total allocation a sum of Nu. 634.50 million should be allocated for the development of climate resilient roads; Nu. 610.00 million towards making the GC roads climate resilient, Nu. 4.50 million for the development of EFRC and climate resilient guidelines, and Nu. 20.00 million should be for strengthening the institutional capacity of DoR. There is a need to implement a holistic climate resilient package for the entire length of the Chhudzom-Dovan and the Nimshong – Shingkhar GC roads while for the Korphu GC road there is a need to execute the bioengineering works and construction of gabion walls in two critical sections. This study has identified and prioritized three GC roads namely Chhudzom-Dovan, Nimshong –Shingkhar and Korphu GC road for immediate climate proofing under the project. The lessons learned from these pilot roads should then be used for developing the guidelines and specifications for the preparation of climate resilient standards for construction of climate resilient roads in Bhutan. Making GC roads climate resilient requires a much higher capacity of drains, blacktopping,

and construction of additional cross drains or culverts. This entails additional budget

Page 11: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

11

compared to the construction of normal roads. The DoR has estimated a budget of Nu.6.78

million for the construction of one kilometer of climate resilient roads and hence it is essential

to use this estimate while preparing the budget estimates for the development of climate

resilient roads.

There is little doubt that road is the most effective, inexpensive, sustainable and reliable form

of transport in Bhutan. Topography and geo-physical setting of the country is by far the most

significant factor that predisposes the Bhutanese roads to climate change induced disasters.

It is apparent from this study that the different climate change induced hazards such as the

landslides, flash floods and different forms of soil erosions make the roads highly vulnerable

to damages especially during the monsoon. The financial resources, technical expertise and

institutional capacity with the DoR for the development of climate resilient roads need to be

strengthened for the development of climate resilient GC roads in the country. Roads are one

of the most important sectors and are also the most potential drivers of change for the socio-

economic development of the country. Notwithstanding its role in the socio-economic

development of the country the climate proofing of GC roads remains the priority area of

investment for the government for adaptation to climate change.

Page 12: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

12

1. BACKGROUND

Bhutan is a mountainous landlocked country located on the eastern slope of the Himalayas with a geographical area of 38, 394 square Km. The country is characterized by fragile mountainous ecosystem with elevations ranging from about 100 meters in the foothills to over 7500 meters towards the north. High, rugged mountains, glaciers and moraines, deep valleys and ravines and depressions earmarking watercourses, drainage basins and waterfalls characterize Bhutan’s physical features1. The landscape which is dominated by rugged mountainous terrain and steep slopes makes the country highly vulnerable to the different types of climate induced natural hazards and climate related disasters. Over 69% of the population dwell in rural areas and are largely dependent on subsistence agriculture for their livelihood2. Agriculture sector is highly dependent on monsoon. Being is a landlocked country surface transport is the most reliable form of connectivity in the country.

In the recent years Bhutan has been confronted with varying magnitudes of the impacts of climate change on the sources of rural livelihoods and biodiversity. Considering its fragile ecosystem, the country has adopted the conservation of environment as one of the four pillars of Gross National Happiness (GNH) which embodies the main development philosophy of the country. The Royal Government of Bhutan (RGOB) accords the highest priority for the sustainable conservation of its environment. It is enshrined in the constitution of the kingdom of Bhutan that every Bhutanese is a trustee of the Kingdom’s natural resources and environment for the benefit of the present and future generations and that the government shall protect, conserve and improve the pristine environment and safeguard the biodiversity of the country.

Notwithstanding, the colossal commitments towards the conservation of the environment Bhutan is increasingly facing the impacts of climate change and climate induced disasters. In the recent times the frequency and magnitude of climate induces extreme events is increasing causing substantial damages to the source of livelihoods. The climate in Bhutan varies substantially from one Dzongkhag to another due to the sudden changes in the topography, elevation and altitude over short distance and small season variation cause impacts of substantial magnitudes across the different sectors such as agriculture, infrastructures like roads and bridges bringing immense hardships to the communities.

A well developed and reliable transport system is a critical infrastructure for the socio-economic development of the country, In Bhutan the river systems and waterways are mostly unfit for transport due to the mountainous terrain that makes the rivers system narrow which meander through steep gorges, and generally do not run very deep3. Air transport is still developing, not very feasible and expensive. Thus surface transport is the most inexpensive, reliable and sustainable transport system for Bhutan.

1.1 Potential Impacts of Climate Change on roads

Climate change has the potential to cause significant disruptions and damage to transport systems particularly to the roads. The climate change projections for Bhutan indicate that as compared to the 1980-2009 periods the mean annual temperature is projected to increase by 0.8°C to 1.0°C by 2010-2039 and further by 2.0°C -2.4°Cfor the period 2040-2069. The summer temperatures are projected to increase by 0.8°C in 2010-2039 and further increase

1 Second National Communication to UNFCCC, NEC, 2011 2 RNR Sector 11th Five Year Plan,2013-2018, MoAF 3Second National Communication to UNFCCC, NEC, 2011

Page 13: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

13

by 2.1 °C by 2040-2069. The winter temperature is projected to increase by much higher range of 1.2°C rise for 2010-2039 time slice and by 2.8°C for the period 2040-2069.With regard to the precipitation, the mean annual precipitation is expected to increase by 10% for the period 2010 to 2039 and, further by 20% for the period 2040-20694. The National Adaptation Programme of Action (NAPA), 2006 has identified natural disasters mainly landslides, floods and other forms of physical disruptions as the main cause of concern that could cause irreversible damages to important infrastructures like roads, bridges and hydropower that will impact the delivery of services to the rural communities. According to NAPA (2006) the incidence of natural disaster and its impacts are likely to be heightened by climate change5. The most common climate induced hazards that could directly impact the road and associated infrastructures are landslide, floods, and landslips, deposition of boulders and debris, deformation of topography and destabilization of the delicate steep slopes. Topography is by far the most significant factor that predisposes the Bhutanese roads to climate change induced disasters. Generally, the topography of all of the project areas is highly mountainous with deeply incised river valleys and road alignments often have to pass through the unavoidable unstable slopes. Given the above scenario the impacts of climate change on all types of roads are highly likely and that making the roads climate proof and resilient will be very fundamental for its long term sustainability. The primary focus of the project is to support the development of climate resilient livelihood options in the country to reduce the vulnerabilities of the communities to the impact of climate change. One of the potential areas of intervention envisaged by the project is the development Gewog Connectivity (GC) roads. This study is thus expected to provide relevant inputs for the formulation and design of project. The underlying objectives of this assignment is to examine the existing status of GC roads in the project areas, assess their vulnerability to various climate-induced hazards, identify and prioritize the GC roads that requires to be strengthened for enhancing the resilience of the rural communities, and analyze the costs and benefits of enhancing the climate resilience of these roads. This Gewog Connectivity (GC) roads study forms one of the eight sub-consulting assignments whose findings will provide inputs for the formulation and design of Project. The project has three following three fundamental objectives which include:

The improvement of the institutional capacity at national, sub-national and local levels to sustainably manage forest and agricultural landscapes for enhanced climate resilience.

To establish a system of governance for biological corridors and operationalization of the conservation management system in the pilot corridors.

To support the development of climate-resilient livelihood options for the local communities.

4 Second National Communication to UNFCCC, NEC, 2011 5 Bhutan National Adaptation Programme of Action, 2006, National Environment Commission,

Thimphu.

Page 14: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

14

The timeframe for this study was 35 days including fieldwork as reflected in the Terms of Reference (ToR) in Annexure I.

Box 1: Definition of Gewog Connectivity Roads

Gewog Connectivity (GC) Roads are part of the Dzongkhag Roads (DR) that connects the Gewog Centers. The goals are to increase and improve access to health and educational facilities, markets, financial institutions and other development benefits.

The Road Act 2013 has defined “Dzongkhag Road (DR) as all internal Dzongkhag roads, including road that connects a Dzongkhag Centre and an Integrated Gewog Centre or connects two Dzongkhag Centers not otherwise designated as National Highway or connects an Integrated Gewog Centre with an existing road of equal or higher classification.”

All GC roads connect Gewog offices from highways. These provide access to Integrated Gewog Centres, schools and Basic Health Unit (BHU). The road alignment normally passes through the Gewog connecting villages and farmlands along the way. Sometimes these roads also touch or pass through important historical and cultural sites/monasteries etc.

The construction of all internal DRs started during the 9th Five Year Plan as Farm Road (FR). The FR has the following specifications: carriageway of 3.5 m, Formation width of 5.10m, L-shaped drain of 0.60m and .0.5 m shoulder on either side.

The specifications of DR and FR are given below:

Road Type Pavement Standards

Remarks Right of Way

(ROW) Formation Width

(FW) Carriageway Drains Shoulder

Farm Road 12.20 m 5.10 m 3.50 m 0.60m 0.50 m

Shoulder on both sides of Carriageway

Dzongkhag Road or Gewog Connectivity Road

20 m 6.50 m 3.50 m 1.00 m

1.00 m

1 m of width (after drain) left for debris collection

The GC roads are part of the DR. These have been named as GC roads* to differentiate from other DR while taking up blacktopping works. The government has prioritized to blacktop all roads connecting to Gewog Centres. * Consultation with DoR officials.

Page 15: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

15

2. OBJECTIVES AND SCOPE OF THE STUDY

The objective of the assignment is to examine the existing status of GC roads in the target project areas and their vulnerability to various climate-induced hazards. The assignments also include the identification and prioritization of GC roads that require to be strengthened enhancing its resilience to climate induced disaster by undertaking a detail analysis of climate related risks and costs and benefits analysis of the roads. The target project areas include Landscape 1, Landscape 2 and Landscape 3 which defined below.

Landscape I: constitutes the Jigme Khesar Strict Nature Reserve (JKSNR) and Biological Corridor 1 covering 758 square kilometers that is administratively under in Bjee, Sombay, Gakiling and Sama Gewogs of Haa Dzongkhagand Tsento Gewog under Paro Dzongkhag. The total population living inside Landscape I is estimated at 1,500 people.

Landscape II: constitutes the Jigme Singye Wangchuck National Park (JSWNP), Biological Corridor 2 and Biological Corridor 8 covering 2,844 square kilometers which cuts across seven different Dzongkhags of Punakha, Sarpang, Thimphu, Trongsa, Tsirang, Wangduephodrang and Zhemgang. It includes a total of 23 Gewogs of which 11 are under Wangduephodrang, four Gewogs under Trongsa, two Gewogs each under Punakha, Sarpang and Tsirang and one Gewog each in Thimphu and Zhemgang Dzongkhags. The total population living inside the protected landscape II is estimated at 10,000 people.

Landscape III: constitutes Phrumsengla National Park (PNP) and Biological Corridor 4 covering 1,406 square kilometers. This area covers 11 Gewogs under Bumthang, Lhuentse, Mongar, Zhemgang, and TrongsaDzongkhags. Of the 11 Gewogs three Gewogs each fall under Bumthang and Lhuentse, two Gewogs each fall under Mongar and Zhemgang Dzongkhags while one Gewog falls under Trongsa Dzongkhag.

Box 2 : Climate-induced hazards

Climate-induced hazards may be defined as processes or phenomena that may cause loss of life, injury or other health impacts, property damage, loss of livelihoods and services, social and economic disruption or environmental damage.

Climate Change is a result of overall global warming, leading to ice/glacier melting, increased rainfalls, erratic weather conditions/patterns and extreme weather events. This has an overall impact on agriculture, forest/bio-diversity, health, water resources and roads/infrastructures.

High intensity and localized rainfall causes an increased saturation of slopes and increases surface run-off with risks of erosion, landslides, flash floods and infrastructure damages.

Road assets likely to be affected are pavement and road base, bridges, culverts, slopes (stability) and surface drainage. Road blocks/damages from flash floods on the highways are becoming quite common.

The two most notable instances of floods caused by high discharges recorded in Bhutan are the Landslide Dam Outburst Floods (LDOF) at Kurizampa in Kurichu in Mongar that occurred on 10 th of July 2004 which was caused by the outburst of “Tshatichu landslide dam” and the Glacial Lake Outburst Flood (GLOF) in Punatsangchu that occurred on the 7 th of October,1994 which was caused by the outburst of glacial lake “Luggye-Tsho”. Both these floods inflicted severe damages to the existing highways at several places.

Page 16: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

16

MAP 1: Project Target Areas (Landscape 1, Landscape 2 and Landscape 3).

Landscape 1: Jigme Khesar SNR + BC 1 Landscape 2: JSW National Park + BC 2 + BC 3

Landscape 2: JSW National Park + BC 2 + BC 8

Page 17: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

17

2.1 Scope of the Assignment

This study was undertaken under the supervision of Gross National Happiness Commission (GNHC) and the United Nations Development Program (UNDP). The Project Preparation Grant (PPG) team worked in close collaboration with the consultants. The assignment included the following different tasks.

To undertake a detail review of all GC roads with respect to their length, number of beneficiaries, functional and financing status.

To undertake the physical assessment of the different GC roads under project area to establish the current status of climate proofing and resilience using the nationally acceptable standards for climate-resilient and EFRC especially in relation to drainage and slope stability.

To develop suitable selection criteria based on the socio-economic, climate change and environmental factors for assessing the climate resilience status of the GC roads. These criteria were then used to identify and prioritize the GC roads for project support for enhancing their sustainability and resilience to climate change.

To undertake the cost-benefit analysis considering the economic, social and environmental factors including the benefits of the GC road over short, medium, and long-term for enhancing the climate resilience of the prioritized GC roads for project support.

To identify strategic activities for enhancing the sustainability and climate resilience of the prioritized GC roads, and prepare detailed costing for these activities based on nationally acceptable standards and norms for making the roads climate-resilient or environment friendly.

Page 18: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

18

3. METHODOLOGY AND APPROACH

Different approaches and methodologies were adopted for undertaking this assignment through the use of primary and secondary information. The secondary information was obtained through the desktop reviews and focused group discussion with the relevant stakeholders. The primary data was obtained through a structured questionnaire survey of the stakeholders and by undertaking the field visits to assess the status of the target GC roads. The key informants covered by the survey in the eleven Dzongkhags included the local government officials like Gups, Gewog Administrative Officers, Mangmi and Tshogpas. Furthermore, additional information was also collected from the engineers met at the survey sites. The data collected were then analyzed to prepare the final report. The detail approaches are discussed below.

i. Review of Related Literature

Review of relevant literature related to road construction techniques, existing standards and specification for various types of roads were reviewed. Particular attention was given to the Environmental Friendly Road Construction (EFRC)6 techniques used in the road construction sector. This is because the road designs and specifications are of paramount importance to address the climate change impacts. A variety of literature on climate resilience of roads was scanned and reviewed7 during the course of this work. It was apparent that the information on climate resilience or climate proofing of roads in the country is very scanty. The proposed Nganglam-Deothang Highway was the first road where some climate resilience initiatives were initiated. The three reports on this road reviewed and relevant for this study were the Environmental Impact Assessment (EIA) Report for Nganglam-Deothang Highway8, where some climate resilience adaptive measures are proposed, followed by the Draft Final Environment Report 9 where further studies were carried out to identify vulnerable areas and the recommended climate change adaptive measures.

6 See Annex VII_EFRC

7 See Annexure V_ References/ Literatures reviewed

8 EIA_ Nganglam - Deothang Road, ADB Project No. 39225-06, Bhutan: Road Network Project (RNP) II Additional Financing, DoR May 2012 by Karma Chogyel

9 Environment Report _ ADB TA-7608 Road Network Project (RNP) II Additional Financing, REG: Enabling Climate Change Responses in Asia and the Pacific – Building Resilience to Disaster and Climate Change Impacts (Subproject 2) Nganglam - Deothang Road, DoR January 2013, by KD Chamling

Page 19: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

19

Box 3: Climate Resilience Adaptive Measures

Climate Resilience Adaptive Measures or climate change adaptation refers to the measures adopted for reducing the vulnerability to new climate patterns by appropriately altering behaviour and reviewing asset usage and resource allocation that is based on previous climate patterns.

Some of the examples of climate resilience adaptive measures are:

Application of safety factors to design assumptions (due to rapid contraction/expansion, bitumen bleeding).

Avoiding the hazardous areas that are prone to landslides and flood.

Reduce slope gradients wherever possible.

Increasing drainage capacity.

Increasing protective works through retaining and breast walls.

Increasing the bridge openings and scouring protection.

River training and river bank protection.

Increased use of bioengineering for slope protection.

Improving the construction quality through higher specifications and stricter compliance.

Provision of sufficient maintenance resources such as the budget, maintenance programmes.

Enforcing truck axle loading.

Introduction of supportive reforestation, agricultural and irrigation management programmes in project road corridors.

Undertaking bioengineering works on slopes to enhance slope stability.

.

The most basic information on the GC roads was obtained from the Department of Roads (DOR) which is the nodal agency responsible for the road sector in Bhutan.

ii. Field Visits to Target Project Areas

During the course of this study a total of 14 GC roads (Table 1) were selected for assessment and during the field visits a structured questionnaire survey prepared by the consultants was used to collect the required information. The key informants covered by the survey in the eleven Dzongkhags included the local government officials like Gups, Gewog Administrative Officers, Mangmi and Tshogpas. Furthermore, additional information was also collected from the engineers from the Department of Roads (DoR) at departmental head office Thimphu and field offices. Engineers from respective sites also accompanied during the field visits of the targeted roads. They provided valuable information on about the road and also enabled during discussions and consultations with the local government officials and other public at the survey sites10.Three selection criteria used for the sampling the GC roads for this study were:

Percentage of landscape study area falling inside a Gewog.

Length of GC road above 3 km and command area covered were considered

10Refer Annexure II_ Lists of Stakeholder/Persons consulted

Page 20: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

20

Inclusion of at least one GC road per Dzongkhag.

This study assessed 48% of GC roads falling in the project area (Table 1 and 2).

Table 1: Identification of GC roads for assessment by number and percentage

Sl. No. Dzongkhag

Number of GC roads

Gewogs inside Project

study area (Nos.)

GC roads in project Gewogs

(Nos)

GC road selected for study

(Nos.)

Gewog coverage inside the project

study area

(%)

Remarks

1 Lhuentse 8 3 2 1 Jarey – 55-60% inside PNP

2 Mongar 15 2 2 1 Tsamang – 55% inside PNP

3 Bumthang 4 3 3 1 Tang – 5% inside PNP

4 Trongsa 3 4 3 1 Korphu – 100% inside JSWNP

5 Zhemgang 6 3 2 1 Shingkhar – 65% 30% inside PNP + 35% inside BC

6 Sarpang 10 2 2 1 Chhudzom/Doban – 5%

inside JSWNP

7 Tsirang 12 2 2 1 Phuentenchhu – 10%

inside JSWNP

8 Wangdue Phodrang

15 11 10 4 Athang – 75%

Gasetshowom -25%

Nahi – 50%

Phobji – 50-55%

- 60% inJSWNP +15% inside BC8

- inside BC2

- inside BC2

- 35% inside JSWNP + 20% inside BC8

9 Punakha 7 2 1 1 Kabjisa - 5% inside BC2

10 Paro 10 1 1 0 Tsento –

15-20%

inside the BC

11 Haa 3 3 3 2 Sombaykha –

40-45%

inside JKSNR

Total 11 93 36 31 14 48% of GC roads assessed

iii. Analysis and Report Writing

The final part of the methodology was the analysis of all the information collected through field visits and other consultations meetings. Based on the final analysis the findings from this study has been reported and relevant recommendations made for enhancing the climate proofing and resilience of the GC roads for better adaption to the impacts of climate change.

Page 21: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

21

Table 2: Details of Gewog Connectivity roads assessed and analysed

Landscape Dzongkhag Gewog

(% coverage inside the project study area)

GC roads considered for assessment Length (km)

Remarks

Landscape 1: JKSNR + BC 1

Haa

Bjee -70-75% inside the landscape Jenkana - Khamina 65.5 Not assessed. (Road upgraded to SNH.)

Sombaykha -40-45% inside JKSNR Khamina-Sombaykha 14* Not assessed. (Made Field visit only as the road is under construction.)

Gakiling Gakiling-Rangtse 7* Not assessed. (Made Field visit only as the road is under construction.)

Paro Tsento – 15-20% inside the BC Drugyel – Gewog office 0.6 Not assessed. (Field visit not made).

Landscape 2: JSWNP+BC2+BC8

Punakha Kabjisa - about 5% inside BC2 Jalephu - Kabjisa Gewog office 3.06 Assessed.

Sarpang Chhudzom/Doban – 5% inside JSWNP Chokorling (Toribari) – Gewog office 48.5 Assessed.

Trongsa Korphu – entirely inside JSWNP Wangdigang-Zhalingbi 20 Assessed.

Tsirang Phuentenchhu – 10% inside JSWNP Tsirangtoe Gup office – Gewog office 5.25 Assessed.

Wangdue Phodrang

Athang – 75% (60% inside JSWNP + 15% inside BC8)

Jarogang zam – Dogayphu (Gewog office) 7 Assessed.

Gasetsho wom -25% inside BC2 Gaselo Feeder Road (end point) - Wasina (Gewog Office)

5.7 Assessed.

Nahi – 50% inside BC2 Agoloo – Gup office 3.4 Assessed.

Phobji – 50-55% (35% inside JSWNP + 20% inside BC8)

Tabading -Gup Office (RNR Office) 14 Assessed.

Landscape 3: PNP + BC4

Bumthang Tang – 5% inside PNP Dungmithang - Mesithang 27 Assessed.

Lhuentse Jarey – 55-60% inside PNP Autsho-Jarey 16.3 Assessed.

Mongar Tsamang – 55% inside PNP Yongkola - Tsamang 21.3 Assessed.

Zhemgang Shingkhar – 65% (30% inside PNP + 35% inside BC)

Nimshong - Shingkhar 31.96 Assessed.

Total 11 16 14 237.21

* Road under construction (Refer Annex – IV _ Itinerary)

Page 22: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

22

4. ENHANCING RESILIENCE OF ROADS TO CLIMATE CHANGE

The importance of roads cannot be undermined as it is the country’s most feasible, reliable and inexpensive mode of transport. It is also seen as the single most drivers of change for the rapid socio-economic development of the country. The RGoB has prioritized to provide good road connectivity to all the Gewogs primarily to reduce poverty and promote balanced and equitable rural development. As discussed in section 1.1 above that the topography of the country is the most significant factor that predisposes the Bhutanese roads to climate change induced disasters. The mountainous topography, steep slopes and unavoidable unstable slopes makes the roads highly vulnerable to the different forms of weather induced disasters. The future climate change projections for Bhutan indicate that the temperature and precipitations are likely to increase significantly which will lead to the increasing frequency and magnitudes of extreme climatic events and natural disasters. In a mountainous country like Bhutan no roads are totally safe from frequent blocks be it in summer or winter11. Roads built must be climate resilient to meet the extreme temperature changes and to carry the traffic volume12. One of the formidable challenges faced by the DoR is to keep the roads open for traffic during the monsoon. Furthermore, the geologically fragile mountainous terrain makes the roads highly vulnerable to the impacts of climate changes such as flash floods and landslides caused by heavy rains. Considering this scenario, there is urgency and need to identify suitable technologies for developing a more climate resilient roads in the country to ensure the smooth flow of essential goods and services during the time of natural disaster. There is also a need for suitable adaptation and mitigations measures in the road sector.

Resilience has been defined as “The ability of a system, community or society exposed to hazards. Climate resilient roads require a set of technological measures rather than a single technology; to resist, absorb, accommodate and recover from the effects of hazards in a timely and efficient manner, including through the reservation and restoration of its essential basic structures and functions13.” Climate resilience, in the road sector means that our roads should be able to resist, absorb and accommodate any adverse impacts induced by from climate change. Climate proofing, is a term used generally for identifying risks in a project from climate variability and change, and ensuring that those risks are reduced to acceptable levels through long-lasting and environmentally sound, economically viable and socially acceptable changes implemented at one or more of the following stages in the project cycle: planning, design, construction, operation and decommissioning14.

The resilience of the roads to climate change impacts could be enhanced though better climate proofing and building climate resilient roads. From an engineering perspective,

11 National Food Security Paper, Bhutan Climate Summit 2011, MoAF. 12 Climate change Risk Assessment Report, Asian Development Bank, Country Partnership Strategy: Bhutan,

2014-2018 13-14 Paving the Way for Climate - Resilient Infrastructure: Guidance for Practitioners and Planners, UNDP

September 2011.

Page 23: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

23

climate proofing is the capacity of a system to continue to function well as the climate changes. It is a measure of the range within which the system, such as an ecosystem, a socio-economic system or a technological system continues to function ‘normally’15. The road networks in Bhutan are highly vulnerable to climate change impacts due to poor quality of construction, a high proportion of unpaved roads and limited resources for maintenance and lack of suitable construction technologies. The GC roads in particular are most vulnerable to impacts of climate change due to the poor quality of design and construction. Although the DoR places a high emphasis on the construction of environmentally friendly roads through the use of EFRC technologies, the resilience of the roads to climate change is still inadequate. Surface drainages, culverts and bridges and hillside slopes become vulnerable to increased rainfall intensity resulting in the increased surface runoff, soil erosion and sediment load transport. Scouring and damages to wing walls, aprons and drainage systems are imminent. Therefore, to make our roads climate resilient or climate proof higher drainage capacity of drains, culverts and bridges must be designed. Proper and adequate retaining structures combined with bio-engineering measures must be in place to prevent slope failures. The road surface has to be protected with bituminous sealing to prevent water getting into the base course and damaging the road and thereby reducing the lifespan of the road.

4.1 Development of Climate Resilient Road

The measures adopted to make roads climate proof and enhance its resilience to climate change are generally classified in two categories16 :

I. Engineering and structural measures- Under these measures the technologies

typically includes the following:

The use of slope stabilization structures such as (dry stone wall, gabion wall, Random Rubble Masonry (RRM), and jute bag wall. The choice of the structure is dependent on the gradient of the road, terrain and site conditions and the availability of construction materials.

Paving of roads with durable materials

Development of improved drainage systems to avoid erosion of road materials. The drainage system includes drainage and cross drainage structures such as cascades, small check walls, culverts and causeway, and French drains in marshy areas.

For the construction of new roads construction proper alignment of roads to avoid unstable and fragile areas and improved planning of roads with proper cross section and higher standard dimensions is essential.

II. Bio-engineering measures Bio-engineering is the use of vegetation, either alone or in conjunction with civil engineering structures such as wall and drains to manage water and debris thereby reducing instability and erosion on slopes. The plants or plant materials used in bioengineering works are selected local plants that have the properties to root out and establish at sites, thus enhancing slope stabilization process by the plants’ root networks

15 Paving the Way for Climate - Resilient Infrastructure: Guidance for Practitioners and Planners, UNDP September 2011.

16 https://www.ctc-n.org/sites/www.ctc-n.org/files/UNFCCC_docs/ref20x08_35.pdf

Page 24: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

24

system. Bio-engineering measures prevent soil erosion and provide slope stability through soil anchoring, reinforcing, armouring the slopes. Through the use of bioengineering measures exposed areas and dumpsites are covered and exposed less which strengthens the soil stability, reduces environmental impacts and improves the aesthetic value. Some of the popular bio-engineering methods are: Grass Planting: Grass seed is spread or alternatively grass seed is hand-planted in lines across the slope. This results in slope stabilization by armouring and reinforcing of slopes. Shrub and Tree Planting: Shrubs or trees are planted at regular intervals on the slope which later create a dense network of roots in the soil supporting the slope. Brush Layering, Palisades and Fascines: Woody cuttings are laid in lines across the slope usually following the contour which forms a strong barrier, preventing the development of rill, and trap material moving down the slope. The system catches debris, armours and reinforces the slope. Composite Systems: A range of composite systems used to include live check dams, vegetated stone pitching and planted geo-textiles later supplemented by the vegetation. The composite systems reinforce the soil thereby stabilizing the slopes.

4.2 Current status of climate resilience of GC roads in the target project area

The assessment of 14 GC roads17 revealed that the overall road quality and condition of the GC roads poor considering the lack of drainage system, surface flows and evident landslides and soil erosion. The construction of the GC roads has not received adequate attention, in terms of planning, road alignment surveys and supervision during construction period. The lack of basic maintenance was very obvious in almost all the GC roads.

The most challenging part is the lack of or non-existence of essential road structures such as the side drains and cross drainages. Traces of earthen drains are seen in some sections but most of these were non-functional. In many sections the drains are higher than the pavement, due to compaction of the carriage-way over time due to traffic and also due to surface runoffs. Further, it was difficult to ascertain whether any maintenance was ever carried out after the completion of the construction. After the GC roads were taken over by the DoR in 2014, the maintenance has improved as the DoR carries out the maintenance on a routine basis and when immediate attention is needed. The field engineers expressed difficulties in recruiting local labourers. DoR’s regular maintenance crews are busy with their own allocated maintenance sites along the highways.

The slopes need protection with the construction of retaining and breast walls, reinforced earth together with geotextiles materials in many areas. The construction of Gabion walls would be adequate and suitable in many cases. Some of the valley side slope failures are

17 See Annex- II_ Field Assessment Data of identified GC Road.

Page 25: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

25

due to the poor construction activities such as the tipping of construction spoils slide clearings. EFRC techniques demand safe disposal of spoils in pre-identified disposal sites. Such provisions are often excluded from construction contract package due to budget constraints.

No bioengineering measures had been carried out for slope stabilization in most of the GC roads. Many of the barren slopes would have stabilized by now had some bio-engineering works been carried out. Such measures, if carried out properly and timely, would not only enhance slope stability but also improve the aesthetic value of the site. Bioengineering measures serve the same purposes of engineering structures. It is cheaper than engineering structures, easy to implement and over time replaces the engineering structures while providing the same engineering functions to the site.

The steep gradient, insufficient road width and lack vehicle passing zones, narrow and blind curves are other issues that need to be rectified and improved. General improvement of road through widening and gradient corrections is required immediately. However, no major realignment of the road is envisaged.

During the field visits, it was observed that DoR has already contracted out six GC roads from the 14 GC roads assessed in this study. The scope of the works primarily included blacktopping. Repair and maintenance of drainages, widening and gradient improvements in critical areas and other required permanent structures are marginalized due to insufficient budget allocation. For blacktopping of one kilometers of GC road a total budget of Nu. 2.90 million is allocated which is not sufficient to address climate resilient issues.

The present status of the assessed GC roads indicates that they are not climate resilient. Although the ongoing works of blacktopping with some minor repair and maintenance will contribute to the improvement of road conditions to some degrees much remains to be done to make these roads climate resilient. Some of the GC roads assessed were found to be ‘climate resilient to a certain degree and this can be attributed to the ongoing blacktopping, construction of drains and other repairs works. Therefore, upgrading the present GC roads to a complete climate resilient or climate proof GC roads would require a much higher investment both technically and financially. The DoR has estimated an amount of Nu. 6.78 million to complete and climate proof for one kilometer of GC road. Most of the GC roads are like fair weather roads and their status can be generally summarized as:

The quality of construction of the GC roads assessed was very poor in terms of their thickness of blacktopping, drainage and other essential structures.

Out of 14 GC roads (73%) assessed, only four roads have some degree of climate resilience.

Although EFRC techniques seem to have been adopted for the construction of GC roads many important adaptive measures of EFRC have been either ignored or not followed during construction.

Bioengineering measures have not been carried out and this needs to be emphasized and strengthened.

The budget allocated for one kilometer of GC road construction is apparently low and as a result the quality of construction is compromised and other essential structures like drainages and retaining structures on the road are minimized.

Absence of adequate numbers of cross drainages has led to the accumulation rain water which has damaged the road pavement. On the five GC roads namely Tsamang, Korphu, Nimshong-Shingkhar, Chhudzom (Dovan), Zenkana-Khamina only four-wheel

Page 26: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

26

drive vehicles could ply. The most popular vehicle fit for these roads are the Indian made Boleros.

To make our GC roads climate resilient blacktopping, improvements of drains, construction of additional cross drains and culverts, providing retaining structures and the improvement of gradient are very essential.

In general, the formation width is less and narrower than the required length of 6.5 m. Some locations have only 4-5 m of width. This makes passing of two vehicles extremely difficult and one has to reverse till a suitable and safe location is found to give way for the approaching vehicle.

4.3 Recommendations and Estimates for enhancing the climate resilience of the prioritized GC roads

Bhutanese roads are highly vulnerable to the different impacts climate change. There are two main climate parameters which will impact and make our roads vulnerable. These two parameters are the increase in the temperature and precipitation. It is expected that there will be an increase in the rainfall intensity, duration and frequency including freak weathers. This will lead to higher discharges that will directly impact and increase the risks from surface runoffs, flooding; landslides and scouring. Higher level of discharges will weaken and even wash away the bridges, culverts, drainages and retaining structures. The high variation in temperature is likely to have impacts on the road pavement through bitumen bleeding, PCC curing and cracking. Some of the risks associated with climate change and its consequences are summarized in Table 3. Some of the potential adaptation and mitigation measures are presented in Table 4.

Table 3: Climate risks

No Types of Climate Induced Hazards Potential Impacts on Roads

1 Increased intensity and frequency of precipitation

Saturation of soil, Landslides, Mudslides, deposition of debris on the roads, contamination of water sources, High runoff rates, erosion, Flooding,

2 Increased temperature Poor curing of PCC, PCC slab curl and cracking, Flushing/bleeding of Asphalt concrete (bitumen).

3 Windstorms Deposition of debris, erosion and slides

4 Decrease or fluctuation in temperature Change in frequency of Freeze-thaw cycles

5 Snowfall and ice Damage of asphalt concrete

Table 4: Potential adaptation and mitigation measures against climate induced hazards

Impacts Possible Solutions for New Roads and Existing Roads Construction of New roads Existing roads

Saturation of soil Implement and rigorously follow EFRC technology

Widening drains, construct line drains

Page 27: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

27

Landslide Retaining walls and combine with bioengineering works

Retaining walls supplemented by bioengineering works

High runoff rates, erosion

Provision 3-4 numbers of cross drains for each kilometer as per DoR standards Design drainage structures of higher capacity Design culverts of higher discharge capacity using 1200 mm diameter Hume pipe Provide scour protection works

Provision of 3-4 numbers of cross drains for each kilometer as per DoR standards Increase size and number of cross drainages. Decrease the interval distance of cross drainages to reduce large volume of discharges at one place Design drainage structures of higher capacity Design culverts of higher discharge capacity using 1200 mm diameter Hume pipe. Provide scour protection works

Contamination of water sources

Avoid discharge of drain water in water sources

Avoid discharge of drain water in water sources

Flooding Design and build bridge/culvert to accommodate higher discharges. Increase culverts/bridges openings and scour protection works. Provide adequate wing walls or aprons both upstream and downstream Provide scour protection works.

Design and build bridge/culvert to accommodate higher discharges. Increase culverts/bridges openings and scour protection works. Provide adequate wing walls or aprons both upstream and downstream Provide scour protection works.

(Marshy area)

Unstable slope and slope failure due to excess water

Construct lined catch drain above. Construction of French drains to drain off water. Construction of gabion walls (breast wall). Bioengineering -live staking

Construct lined catch drain above. French drains + gabion walls with geo-textile. Use perforated pipes for subsurface drainage Brush layering and live staking

(Sandy soil) Slope failure.

Construct masonry/gabion wall. Construct light crib wall above. Trim slope if necessary; Carry out bioengineering works

Construct masonry/gabion wall. Construct light crib wall above. Trim slope if necessary; Carry out bioengineering works

(Blasting) Damaged slope & vegetation with stone debris.

Follow control blasting techniques. (Widening and improvement works in rocky areas.)

Drilling pattern has to be designed and amount of explosives calculated to be used according to rock type.

Continue use of Cordex. Use of delay detonators and Acconex (silent blasting) is highly recommended as per site conditions.

Weak pavements Design pavements as per existing standards to prevent failures from extreme impacts of temperatures, precipitation and flooding.

Design pavements as per existing standards to prevent failures from extreme impacts of temperatures, precipitation and flooding.

Potential threat of undercutting of roads by rivers/streams

Provide adequate embankment, protection walls. Increase flood protective and river training works.

Provide adequate embankment, protection walls. Increase flood protective and river training works.

Disruptions of movements due road damages by existing streams/river crossing

Design and build bridge/culvert to accommodate higher discharges. Increase culverts/bridges openings and scour protection works.

Design and build bridge/culvert to accommodate higher discharges. Increase culverts/bridges openings and scour protection works.

Page 28: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

28

During the increased discharge of water caused by high intensity of rainfall, the management of excess flow is the biggest challenge. The existing road and road infrastructures become vulnerable to the high increased discharges. To avoid the damages caused by increased discharge of water, the most vulnerable sites have to be identified and adequate corrections made to ensure that the roads are not subject to irreversible damages. The immediate interventions would be to assess the existing road construction technology, provide adequate resources and strengthen the technical capacity. Once the vulnerabilities are identified there several measures that could be deployed to make the roads more climate resilient. The potential corrective measures that could be deployed are:

Modifications to infrastructure by changing road surfacing materials, increasing the capacity of culverts and bridges, side and cross drainages

Changes in maintenance procedures such as checking drains in vulnerable areas after heavy rainfall and increased monitoring of embankments.

To make the prioritized GC roads more climate resilient, all GC roads will have the following parameters in place.

Road gradient corrected and improved.

Drainages, culverts & bridges designed to take higher discharge capacity from the existing standards. Trapezoidal drains with increased discharge capacity used in marshy or high discharge locations.

Higher discharge capacity Hume-pipes (900 – 1200) mm diameter used for Cross drainages (3-4 cross-drains/km or as per site conditions provided).

Improved slope stability through;

- Slope batter maintained - Increased with adequate numbers of retaining structures (retaining/breast walls) - Bio-engineering works implemented on slopes, slide areas, dumping sites.

Safe and adequate numbers of vehicle passing zones.

Adequate wing-walls and aprons provided both upstream and downstream including scour protection works.

Regular and timely repairs and maintenance works undertaken.

Milestones, relevant road signs and crash-barriers erected for information and safety of road users.

Based on field observations, assessment and data analysis, the following GC roads are prioritized and recommended for enhancing climate resilience.

Table 5: GC roads prioritized and activities recommended for climate proofing

Sl. No Recommendations Name of the Prioritized GC Road

1 Carry out a complete climate proofing (blacktopping, culverts & drains, walls, bioengineering works) for entire length of the road

a) Chokorling-Pangkhey (48.5 km) GC road, Chhudzom (Dovan) Gewog, Sarpang Dzongkhag

b) Nimshong-Shingkhar (31.96 km) GC road, Shingkhar Gewog, Zhemgang Dzongkhag

Page 29: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

29

2 Bioengineering and slope protection measures at chainages 0.200–0.300 km

a) Bioengineering works - 85m x 25m b) Gabion wall constructions - 85m x 5 m

(Length x Height) c) L-drains constructions - 85 m

Wangdigang - Zhilangbi (19.5 km) GC road, Korphu Gewog, Trongsa Dzongkhag

3 Construction of drains and additional permanent works for entire length

a) Yongkola-Banjar (21.2 km) GC road, Tsamang Gewog, Mongar Dzongkhag

b) Autsho-Jarey (16.00 km), GC road, Jarey Gewog, Lhuentse Dzongkhag.

Table 6: Costs for climate proofing of prioritized GC roads

Sl. No Activities Costs

1 Carry out a complete climate proofing for entire lengths: a) Chokorling - Pangkhey (48.5 km) GC road,

Sarpang Dzongkhag b) Nimshong - Shingkhar (31.96 km) GC

road, Zhemgang Dzongkhag

(48.5 x 6.78) = Nu: 328.83 million

(31.96 x 6.78) = Nu: 216.69 million

Sub-total = Nu: 545.52 million-------(1)

2 Bioengineering and slope protection measures at chainages 0.200–0.300 km of Wangdigang - Zhilangbi (19.5 km) GC road, Korphu Gewog, Trongsa Dzongkhag i. Bioengineering works - 85m x 25m

ii. Gabion wall constructions - 85m x 5 m

(Length x Height)

iii. L-drains constructions - 85 m

(2125 m2) x 705 = Nu: 0. 15 million

(85 x 27437.55) = Nu: 2. 332,200 mill

(85x1100) = Nu: 0.093,500 mill Subtotal = Nu: 2.576 million -----------(2)

3 Construction of drains and additional permanent works only for entire lengths for:

a) Tsamang (21.2 km) GC road i. L-drains ii. Permanent works (25%)

b) Jarey (16.00 km) GC road i. L-drains ii. Permanent works (25%)

21.20 km x 1100.00 = Nu: 23.32 million

(25%) of (Nu: 23.32 million) = Nu: 11.13 million

Sub-total = Nu: 34.45 million------------(3)

16.00 km x 1100.00 = Nu: 17.60 million (25%) of (Nu: 17.60 million) = Nu: 4.40 million

Sub-total = Nu: 22.00 million------------(4)

Grand Total {(1) +(2) +(3) +(4)} = Nu: 604.546 million or say Nu: 605.00 million

4.4 Making Prioritized GC Roads Climate Resilient.

The existing GC roads were constructed to provide access to Gewogs. The EFRC concepts and technologies were to be part of the construction methods. Despite the efforts to stringently follow the EFRC techniques the roads did not meet the required standards. Five GC roads namely Chhokorling-Pangkhey, Nimshong-Shingkhar, Wangdigang-Zhilangbi, Yongkola-Banjar and Autsho-Jarey are in poor conditions and hence require additional inputs and interventions to make it climate resilient. The DoR has already started blacktopping of many existing GC roads including minor repairs and maintenance with the limited budget of

Page 30: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

30

Nu: 2.9 million/km. These interventions will no doubt improve the road conditions but will not be adequate enough to make it fully climate resilient. These roads will thus require construction of more cross-drainages, increased side drains, slope stability and the overall formation width. The current GC roads were construction with Farm Road specifications and need to be upgraded with increased specifications as GC or Dzongkhag road to take increased discharges in the event of high precipitation. These roads were prioritized based on general observations, field assessment and cost–benefit analysis. The roads identified under this category are already given under

Page 31: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

31

Table 7: Summary _ Current status of Climate Resilience of GC Roads

Sl. No.

Name of the GC Road Year Built

Vulnerability to various climate hazards

Remarks

Climate resilience measures

Changes to environment due to road construction

Current Status of climate resilience / EFRC standards

Prone to slides / geological instabilities

1 Tabading - Phobji

(5.6 km) 2004

No impacts on land, water & forest resources.

Slight increase of dry waste

Side/cross drains, culverts adequate for increased rainfall resulting from climate change

Slope stabilization is not required

No sign of slope instabilities.

Road is climate resilient to a certain degree.

No additional input required immediately.

Need to increase the drain size (extra wide drains) after 15 yrs.

2 Autsho - Jarey

(16.3 km) 2012

No impacts on land, water & forest resources.

Waste may increase once blacktopped as per Gup.

Side/cross drains, culverts required.

1 slide area (30x15) m.

1 breast wall (30x3) m required.

Scree area; requires 1.5 -2 m high Gabion wall.

Road is not climate resilient.

.

Additional inputs required for climate resilience like;

- Construction of 3 walls - 14 km of side drains to be

constructed - 3 causeways required - 20 cross-drains needed

3 Yongkola–Tsamang

(21.3 km) 2005

No impacts on land, water & forest resources.

Side/cross drains, culverts required.

1 slide area (20x9) m.

1 breast wall (20x3) m required.

Road is not climate resilient.

Additional inputs required for climate resilience like;

- 2 breast wall - 15 km of wider side drains - 35 nos. of 90 mm dia

Hume pipe cross drains - Bioengineering at 3 sites

Page 32: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

32

Sl. No.

Name of the GC Road Year Built

Vulnerability to various climate hazards

Remarks

Climate resilience measures

Changes to environment due to road construction

Current Status of climate resilience / EFRC standards

Prone to slides / geological instabilities

4

Dungmithang -Mesithang (Tang)

(17 km)

1980s

No impacts on land, water & forest resources.

Side/cross drains, culverts adequate

Slope stability is required and in contract.

1 slide area (15x15) m.

1 breast wall (20x3) m required.

Road is climate resilient.

- One additional breast wall required (Bioengineering area).

5

Korphu

(Wangdigang -Zhalingbi) (19.5 km)

2004

No impacts on land, water & forest resources.

Side/cross drains, culverts required. Slope stability is required and in contract.

1 slide area (15x10) m. 1 breast wall (15x3) m required.

Road is not climate resilient.

Additional inputs required for climate resilience. - 10 km of line drain - 40 cross-drains - 1000 m3 Gabion wall - 1 box culvert at

Nagpokhoshar (3Lx4.5Wx1.5h) m

- 4 places gradient improvement

- 4 nos. cause ways

6

Nimshong - Shingkhar

(31.96 km)

2013

No impacts on land, water & forest resources.

Slight increase of plastics and beer bottles.

Side/cross drains, culverts required.

Slope stability is required.

2 slide areas (15x10) m and 25x 20 m

Road is not climate resilient.

Additional inputs of all road structures required for climate resilience.

- 2 nos. breast walls - 40 nos. Cross drains - 30 km 0f line drains - Bioengineering at 4 sites

Page 33: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

33

Sl. No.

Name of the GC Road Year Built

Vulnerability to various climate hazards

Remarks

Climate resilience measures

Changes to environment due to road construction

Current Status of climate resilience / EFRC standards

Prone to slides / geological instabilities

7

Chhudzom/Dovan

(Choekorling/Toribari – Pangkhey Gup office)

(48.5 km)

2014

No impacts on land, water & forest resources.

Slight increase

Side/cross drains, culverts required.

1 Bailey bridge over Thotne khola at 35 km (120’ L x 4.5 W x 4 m H)

4 slides areas

50x10m

30x15m

30x8m

45x12m

Road is not climate resilient.

Additional inputs of all road structures required for climate resilience. It falls in very heavy rainfall area.

- 4 nos. Breast walls (slide areas)

- 100 nos. cross drains - 8 nos, cause ways - Line drain entire length

8

Phuentenchu

(Tsirangtoe Gup Office – Phuentenchu Gup Office)

(5.25 km)

2006

No impacts on land, water & forest resources.

Slight increase

L-drains required. 2 nos. causeways and 14 nos Hume pipe culverts in contracts

Slope stability is not required.

No sign of slope instabilities.

Road is climate resilient to some degree.

L-drain required to make it more climate resilient.

Not required.

Page 34: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

34

Sl. No.

Name of the GC Road Year Built

Vulnerability to various climate hazards

Remarks

Climate resilience measures

Changes to environment due to road construction

Current Status of climate resilience / EFRC standards

Prone to slides / geological instabilities

9

Athang

(Jarogang zam – Dogayphu G office)

(7 km)

2013

No impacts on land, water & forest resources.

No change.

L-drains required on entire length.

4 nos causeways required

7 nos Humepipe culverts reqd.

1 Box culvert required over Phangrichu stream

None. Road is not climate resilient.

Additional inputs required for climate resilience.

- L-drains required on entire length.

- 4 nos causeways required

- 7 nos Humepipe culverts reqd.

- 1 Box culvert reqd over Phangrichu stream

- 4 nos irrigation channel crossings require proper cross-drainage works. Signs of erosion seen due to irrigation cross channel.

10

Kabjisa

(Jalephu – Kabjisa Gewog Office)

(3.1 km)

2010

No impacts on land, water & forest resources.

No change.

L-drains requiredd.

2 additional Humepipe culverts reqd.

None

Road widening of 100 m required.

100m Retaining walls required.

Road is not climate resilient.

Additional inputs required for climate resilience.

- 100 m road widening - 100 m retaining wall reqd. - L drain reqd. (3 km) - 2 nos. Hume pipe reqd.

11 Gasetshowom -

(5.5 km) 2001

No impacts on land, water & forest resources.

Slight garbage increase

L-drains needs repairs

Cross drains not required.

No sign of slope instabilities.

Road is climate resilient to certain degree.

No additional input required immediately.

Not required.

Page 35: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

35

Sl. No.

Name of the GC Road Year Built

Vulnerability to various climate hazards

Remarks

Climate resilience measures

Changes to environment due to road construction

Current Status of climate resilience / EFRC standards

Prone to slides / geological instabilities

12 Nahi -- 3.7 km 2006

No impacts on land, water & forest resources.

No garbage

L-drains needs repairs.

1 breast wall reqd.

1 slip (3x3 m)

Road is not climate resilient.

Additional inputs required including black topping.

- 1 breast wall (3x3) m - L drains repairs (2.5 km)

13 Sombeykha -- 14 km

Road under construction. FC is over and final widening of 4km completed. Work contracted to M/s Lhendup Norbu Construction, in April 2015 and the contract period is 18 months.

Start date- April 2015

All EFRC methods need to be complied with.

- Supervise and monitor works closely for quality.

- Ensure control blasting works.

- Carry out bioengineering works.

14 Gakiling-Rangtse –

(7 km)

Road under construction. 3 km of FC completed. Construction is carried out departmentally by DoR.

Start date- April 2015

All EFRC methods need to be complied with.

- Ensure control blasting works.

- Carry out bioengineering works.

- Drains/cross drains must be of higher quality and higher specifications to withstand higher discharges (high rainfall area)

Page 36: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

36

4.5 Economic Justification for Incorporation of Climate Resilient Measures

Rural roads tend to generate large amount of benefits to the local economy, social and environment. In this study following parameters are used to identify the benefits of the rural road projects.

I. Nature of economic benefits: Economic benefits are easy to quantify through following parameters:

a. Improved access to social infrastructure (schools and health centers): Roads help to improve access to social infrastructure and lead to large economic benefits from increased productivity.

b. Increased production: Roads provide better access to existing markets for the farmer

by reducing transport costs which encourages farmers to produce more. Roads also facilitate the transportation of goods such as construction materials and heavy machines which reduces the cost of development. This results into higher profit for the producers.

c. Increased consumer surplus: Consumers have better access to diverse range of commodities and also with reduced cost leading to increase in consumer surplus.

d. Enhance agriculture growth: Roads help to improve marketability of perishable goods through timely and cheaper transport, and this provides a direct incentive for more market-oriented agriculture production with more profitable cash crops, and also raise rural income and employment.

e. Greater investment: Reduced transportation cost and increased expected rate of returns creates opportunities for greater investment in buildings and other fixed assets.

f. Creation of a more competitive local market: Greater resource use efficiency will be generated by promoting competitive market structure through encouraging more local business and more intense competition from outside.

g. Greater Savings: Better roads help to improve fuel efficiency of the vehicles and help

to cut down consumption of fossil fuels and also expand personal savings through reduced maintenance cost of vehicles.

h. Higher value of land: With the improved access created by the road project, the value of the rural land increase making land a highly valuable asset.

II. Nature of social benefits: Social and economic benefits cannot be entirely segregated as they are closely linked and thus many of the social benefits can be indirectly quantified through following economic parameters.

a. Increased labour mobility: Incentivize labour movement through higher expected

wages and larger employment opportunities; b. Improved access to health: More work days available due to reduced morbidity and

sick days per person; c. Better access to schools: Higher percentage of people with basic education and

literacy, which has been associated with better productivity and quality of life. d. Women empowerment: Larger numbers of female have opportunity for better

education and health services and productive employment. e. Greater personal transport and increased social mobility with transfer of knowledge,

more opportunity for new businesses and entrepreneurship. f. Higher productivity and income.

Page 37: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

37

g. Reduced rural urban migration: If the benefit created by the project is large enough, the local areas tend to become more attractive and the rural-urban migration rate tends to decline. Rural roads tend to suppress the push effect.

III. Nature of environmental benefits: The environmental benefits of the rural road projects can be captured through following parameters:

a. Reduced carbon emission: with better roads, the fuel efficiency of the vehicles improves and it leads to reduced emission of carbon.

b. Reduction in firewood use: with better roads more people will have easier access to alternative source of cooking fuels like use of liquid petroleum gas (LPG) or kerosene. This will reduce the felling of trees for firewood.

c. Slope stability and aesthetic value improved: bioengineering works will provide

slope stability and the plants once established helps to further support regeneration of plants in the area. The plants help in the absorption of CO2 and release oxygen to the atmosphere.

It is usually very difficult to accurately quantify the benefits of the infrastructural projects such as roads. Such quantification requires very expensive inter-temporal surveys. Many a times it is preferred to use relevant studies as benchmark for deriving appropriate parameters for undertaking social cost and benefit analysis. A study ‘Framework for quantifying social and economic benefits from rural road development; some thoughts and practical insights’ by Thampil Pankaj (Retired Principal Transport Specialist, World Bank) provides estimates that such projects can lead to income gain (that includes imputed values of all the economic, social and environment gains) equivalent of 80-100%. In this study we have taken the lower bound of 80%, for estimating total benefits of the projects.

IV. Cost-benefit analysis: The financial analysis was carried out in order to assess consolidated profit from the project and to outline the cash flows that underpin calculation of socio economic benefits and costs. The main objective of financial and economic analysis is to calculate monetary value on cost and benefits. Infrastructural projects tend to generate large amount of positive externalities that far exceed the private benefits. Some of these projects may appear non-profitable from the private perspective but tend to become socially desirable. In such cases social profitability (welfare) should become primary criteria for the project appraisal. In this study, only those social benefits are included which can be monetized.

The financial evaluation indicates that the GC road is relatively expensive. Yet, the long term benefit far exceeds cost of GC Road because such infrastructural projects tend to generate far greater benefits than its costs in longer period. Long term return on this investment goes beyond the current rural livelihood than without road connectivity. GC road will have long term benefit for both rural and agricultural development in Bhutan, natural resources management and biodiversity conservation and as well as it would help to reduce rural-urban migration.

Given that there are no cases on the use of roads, only the social benefits should be taken into account for the cost and benefit analysis.

Major methodological approaches followed for the financial analysis are:

Page 38: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

38

In this study, it is based on simple social cost and benefit analysis. The social cost and benefit analysis is based on Net Present Value (NPV)18 approach. To calculate NPV, 10% rate of discount is applied. The choice of rate of discount is based on average rate of inflation over the last 6 years. NPV is calculated as

𝑁𝑃𝑉 =∑{𝑅𝑡

(1 + 𝑟𝑡)} − 𝐶

𝑡

𝑖=1

Where, Rt= net private benefits in each period of time r = Rate of discount C= Cost of project Given the large size of positive externalities created by infrastructural public sector projects, SCBA is more justified and widely applied. In this analysis, NPV is defined as the sum of future streams of net social benefits from an investment project. This analysis takes into account potential increase in the income for the households after the project comes into operation. For this analysis, Gewog wise data on household income from the BLSS 201219 is used as benchmark information. This income was converted to possible Gewog level household income in 2015 using the average annual growth rate (AAGR) figure of GDP growth rate (2.5%) for three years starting from 2012-2015. AAGR was calculated from the information obtained from national accounts reports, NSB, for the relevant years. For the rest of the information, data generated by this study though field survey is used. ADB 2010 report on infrastructure in Bhutan states that infrastructural projects cause the non-farm income to increase by 50-72%, while the farm income increases by 21-29%. This study uses this information for the potential gain in the income of the households after GC roads. Using the proportion of farm and non- farm households as weight, average increase in income can be taken as 31.4%. Based on these calculations, this study assumes that on average household income would rise by 31.4% after making the GC roads climate resilient. Cost of blacktopping of one km of GC road is taken as Nu. 6.78 million. To arrive at possible gains in income from time saved from travelling because of roads (reflecting an increase in total factor productivity), the income gain from GC road are disaggregated for per hour income. This figure is used for arriving at income gain for every hour of labour saved. This can also be treated as opportunity cost of time saved. Overall NFB is used to calculate net present value (NPV) of sum of streams of financial flows over thirty years’ time. To calculate NPV, 10% rate of discount is applied. The choice of rate of discount is based on average rate of inflation over the last 6 years.

18 NPV is defined as discounted sum of future streams of income from a project.

19 Bhutan Labour Survey, NSB, 2012

Page 39: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

39

5. GEWOG CONNECTIVITY ROADS

5.1 General information on road network in the country

Bhutan started the construction first road in 1961 with the construction of the Thimphu-Phuentsholing national highway. Today, most part of the country is connected with a network of roads. There are 11,052.48220 km of various categories of roads, 337 numbers of bridges and 380 pedestrian bridges nationwide. (Refer Annex- VI- Type and Length of Roads by Dzongkhags).

The road transportation network is classified as follows:

a) Asian Highway (AH) - Phuentsholing–Thimphu Highway, b) Primary National Highway (PNH) - existing East-West & North-South Highway, c) Secondary National Highway (SNH) -existing District roads, d) Dzongkhag Roads (currently Feeder roads) / GC roads e) Thromde roads (currently Urban Roads) f) Farm roads (currently Farm Roads), and g) Access Roads (AR)

The DoR is the national focal agency with the overall responsibility for all types of roads in the country. The Thromde Administration is responsible for all roads in the Thromde. Similarly, the Dzongkhags Administration is responsible for the administration and management of all roads constructed or maintained by it, including access roads. For Farm Roads technical specification, guidelines and manuals are provided by the Ministry of Agriculture and Forests.

In order to facilitate and improve accessibility in rural areas, a network of roads was constructed to Farm Road standards by Dzongkhags. The Farm Roads that connect to Gewog Centers are categorized as GC roads. These roads are unpaved and lack adequate road assets including the drainage systems. These GC roads need to be upgraded to the new GC road specifications. The blacktopping of these roads have been initiated by the Government projects and expected to complete Blacktopping of 98 GC roads by beginning of 2018.

20 (15 -16 Source: July 2016, DoR, MoWHS, Thimphu)

Page 40: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

40

The unit rate for complete climate proofing GC roads is as follows:

Table 8: Unit cost of items for complete climate proofing

Sl. No Specifications Unit Cost (Nu. Million/Kilometer)

1 Base Course 2.043

2 Bitumen Sealing 1.281

3 Permanent works (drains, walls, culverts etc.)

2.10

4 Total 5.424

5 25% contingency for making roads climate resilient

1.356

Therefore, the total cost for complete climate proofing of GC road is Nu: 6.780 million/km21.

Source: DoR, 2016

The maintenance costs22 for various categories of roads per annum are:

Primary National Highway - Nu: 88,000.00/km Secondary National Highway` - Nu: 80,000.00/km Dzongkhag Roads/GC roads - Nu: 44,000.00/km

.

5.2 General information of all GC roads in the country

To improve accessibility in rural areas, a network of GC roads measuring 1702.89 km covering 68 Gewogs have been constructed since the beginning of 9th Five Year Plan. Initially, the Dzongkhags Administration was responsible for the construction and maintenance of these roads in their respective Dzongkhags. All of these roads are unpaved due to the lack of financial resources. Many of the road assets, like culverts, drains, cross drainage and walls in the GC roads are either absent or inadequate.

In 2014 the GC roads were handed over to DoR for their maintenance and management. The government has prioritized and mandated DoR to carryout blacktopping of GC roads. Apart from blacktopping, other activities important activities like slope protection, repair and maintenance of drains, culverts including the improvements of gradient, zigs and curves improvement, and road widening at the critical certain stretches are some of the common issues observed in most of the GC roads which that needs immediate attention. The DoR has contracted out the blacktopping works of many GC roads with some provisions of L-shaped drains, cross-drainages and some retaining structures. The estimated budget of Nu: 2.9 million for blacktopping one kilometer of road appears to be insufficient to provide required

21 Unit rate provided by dor, 2016.

22 Maintenance cost provided by DoR, 2016.

Page 41: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

41

permanent structures. The DoR has estimated a budget of Nu.6.780 million to upgrade one Kilometer of existing road to a more climate resilient GC road.

Table 9: Details of Gewog Connectivity Roads taken over by DoR in 2014

Sl. No. Regional Office Number Existing (km)

Under construction in 2016

1 S/Jongkhar 22 262.30 12 km

2 Trashigang 19 218.81 -

3 Lingmethang 21 272.13 17 km

4 Trongsa 9 58.28 -

5 Zhemgang 8 117.54 35.58 km

6 Sarpang 24 248.14 -

7 Lobeysa 26 67.14 -

8 Thimphu 15 146.13 48 km

9 Phuentsholing 21 190.85 10 km

Total 165 1,581.32 122.58 km

Source: DoR_2016

All GC roads are upgraded from Farm Road requiring changes in the dimensions and specifications as the Road Classification. See Fig: 1 below for the road designs and specification.

5.3 Identification and Prioritization of GC Roads

Climate change induced disaster can severely affect the road infrastructures causing significant disruption and damage to transport systems. The damages inflicted by such disasters and extreme climate events have a direct bearing on the road users, communication and maintenance budgets. Timely and informed adaptation actions can significantly reduce climate change impacts and associated costs. By making roads more climate resilient the sustainability and life of the roads can be greatly enhanced.

All GC roads connect Gewog office to the national highways. These provide access to RNR Centres, Schools, Basic Health Unit (BHU) and markets. The road alignment normally passes through the Gewog centers connecting villages and farmlands along the way. In some cases, these roads also touch or pass through important historical and cultural sites and monasteries. Since these roads provide access to goods and services, their usability is very important and hence should be accessible throughout the year.

All GC roads are of paramount importance for a particular Gewog as it is the only means of motorable linkage between the Gewog and other parts of the country. The government has also given a high priority to blacktop all GC roads. Blacktopping is only one aspect of making a road climate resilient. Although, making all GC roads climate resilience would be desirable, the cost involved will be invariably very high. To cope with the limited financial resources, prioritization of GC roads was done using a set of selection criteria. There are a total of 31 GC roads covering 37 Gewogs under 11 Dzongkhags in the project study area. Many of these

Page 42: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

42

roads were found to be very short or outside the landscapes and thus not selected. The selection of GC roads for this was done using the following three criteria:

Percentage of landscape study area falling inside a Gewog

Length of the GC road above 3 km and command area covered by road

Minimum of one GC road per Dzongkhag

5.4 Prioritized GC Roads for Project Support

From the above exercise 14 GC roads (48%) were identified and selected for further assessment. These 14 GC roads covered 14 Gewogs of 11 Dzongkhags within the project study area. Based on the three selection criteria and detailed cost-benefit analysis (CBA) five GC roads have been prioritized for climate proofing with support from the project. The ranking of all the GC roads assessed and cost benefits analysis is presented in Table 10 and 11 respectively.

The five prioritized roads are:

1. Chhokorling (Toribari) – Pankhay (Gewog office) GC Road (Dovan) - 48.5 km The entire road length is considered for upgrading to complete climate resilient road due to:

It scores the highest ranking. (Refer Table 10: Final ranking of GC roads selected for climate proofing).

Oranges and cardamom are the main cash crops and people need good and reliable road for marketing.

Other beneficiaries are two Lower Secondary Schools, 2 BHUs, RNRs.

The road serves/benefits 11 villages including three villages of other Gewog, (Jigmecholing Gewog).

The area is subjected to a very heavy rainfall during monsoon and hence a good climate resilient road is essential.

Map 2: Road alignment of Chhudzom (Dovan) GC road (48.5 km)

Page 43: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

43

2. Nimshong-Shingkhar (31.96 km) GC road, Shingkhar Gewog, Zhemgang Dzongkhag

The entire road length is considered for upgrading to complete climate resilient road due to:

This road will connect the remotest village.

This road will greatly facilitate the inception work of the upcoming Chamkharchhu Hydropower project.

This road provides connectivity to another important village of Bardo from Therang junction from where the road bifurcates to Shingkhar and Bardo. Bardo has one of the oldest schools established during 1965 and thus makes the place a historic and important village.

Benefits existing institutions like, one Early Child Care Development Centre (ECCD), one RNR centre, one Basic Health Unit and Shingkhar Primary School. It is a boarding school with 140 students, 10 day scholars with seven teachers and two cooks.

The area is subjected to a very heavy rainfall during monsoon and hence a good climate resilient road is essential.

There is a high potential of increased agricultural production especially potato and the proposed road will ensure better accessibility to market.

Development of Eco/cultural Trek from Khandopang (Bumthang) till Shingkhar. Potential revenue increase from tourism in future.

Proposal of connecting Khomsar-Wama under Shilambi Gewog of Mongar Dzongkhag in the 12th Five Year Plan period.

Shingkhar Gewog has five ‘Nyes” or religious sites which people visit. With good road the Gup said that more people will visit the sites.

Map 3: Road alignment of Nimshong-Shingkhar GC road (31.96 km)

Page 44: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

44

3. Wangdigang-Zhalingbi (19.5 km) GC Road, Korphu Gewog, Trongsa Dzongkhag

This road connects three villages of Nimshong with 67 households (H/H), Nabji with 61 H/H and Korphu with 80 H/H which are entirely inside the buffer zone of Jigme Singye Wangchuck National Park. The Park Office is at Nabji and at the end of the road. The road is important due to:

A good quality road is essential for safe and reliable mobility for efficient management of the Park.

Eco-tourism has been started since five-six years back and better road will attract more tourists in the area in future.

Photo 1: Eco-Tourism-Resting place at Nabji constructed five years ago.

The Gewog has a historic and important Nabji lhakhang. Annual tshechu is conducted on the 15th day of 11 month of Bhutanese calendar. Many people visit the Lhakhang and attend the tshechu. The tshechu celebration goes on for one week and the highlight being the ‘naked’ mask dance (chham) which attracts large number of visitors. There may be increased number of visitors once the road is improved.

Photo 2: Nabji Lhakhang

Cardamom is one of the cash crops cultivated more and more by the villagers and there is a need for improve access to market.

Other crops grown and marketed are oranges, ginger, vegetables including “cane shoots” (patsha) and ‘dumroo’ (wild leaves) considered a local delicacy.

Dairy products like butter and cheese are also marketed to Zhemgang and Tintibi towns, both are about 40 km away.

The road was initially constructed as Power Tiller Track (PTT), meant for farm power tillers. This was upgraded to Farm Road later and therefore the road alignment and specifications are not up to the standards. Generally, the road width is narrow, has sharp narrow zigs/blind

Page 45: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

45

curves, steep alignment gradient (in many stretches) and lacks proper drainage systems. At three to four places only 4-wheeled drive vehicles can play due to bad road, worsened by water ponding on the road surface. Over all the road needs widening of roads, improving gradient and blind curves and water management structures.

The road is currently taken up for blacktopping with limited inputs on drains/walls. There are still critical slide prone areas that need stabilization. The budget allocated for blacktopping and repairs/maintenance works is insufficient to carry out slope stabilization measures. It requires additional budget to make sections of the road climate resilient. Further, there are two critical sites about chainage 0.200 – 0.300 km from the Take-Off point where slope stabilization works are needed.

Photo 3: Slide areas near Take-Off. Photo 4: Lower road alignment is Korphu GC road.

Need for climate proofing sections of the road:

During field survey two critical sites were identified that threatened with potential landslides. These sites must be stabilized and make it safe and trafficable to vehicles round the year through. Therefore, the area has been identified, assessed and recommended to be taken up under the Project Support. Specific interventions with costs have been worked out in the report. The following interventions recommended are;

a) Slope stabilization through;

Carrying out Bio-engineering works.

Construction of gabion walls.

Construction of L-drains in the are

Page 46: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

46

Photo 5: Site for Bio-engineering works. Photo 6: Site for L-Drain construction.

Photo 7: Narrow road width in slide area. Photo 8: Very narrow road width.

b) Capacity building through Bio-engineering training

Bio-engineering training can be conducted to get hands-on experience at the site. The training will benefit the participants while the area also gets bio-engineering works. This will also help in the capacity building of engineers at the local level.

If scheduled properly even the laying and construction of gabion walls would provide hands-on training to the participants.

The training would also enable to understand and implement Occupational Health and Safety measures at work sites.

4. Yongkola-Banjar (21.2 km) GC road, Tsamang Gewog, Mongar Dzongkhag

About 55% of Gewog falls within the Phrumshingla National Park. The DoR is currently carrying out blacktopping works. But due to insufficient budget, repairs/maintenance of drains is restricted to some road sections. Therefore, to make the road more climate resilient, drainage system and permanent works will be taken up in the entire length of the road. A good road will provide better access and enable better management of Phrumshingla National Park in future.

Page 47: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

47

Photo 9: Scoured drain. Photo 10: Slope failure & debris covered drain.

Photo 11: Poor drains and damaged slope. Photo 12: Slope erosion on valley side.

Photo 13: Damaged culvert embankment. Photo 14: Water ‘ponding’ on the road.

Page 48: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

48

Photo 15: Conservation awareness message left on the rock by Tsamang School.

5. Autsho- Jarey GC road (16.3 km), Autsho gewog, Lhuentse Dzongkhag.

About 55-60% of Gewog falls within the Phrumshingla National Park. The GC road passes through chir pine area. The road width is narrow, has poor drainage system, with no cross-drains and passes through two scree areas. The DoR is currently carrying out blacktopping works. But due to insufficient budget, repairs/maintenance of drains are restricted to some road sections. Therefore, to make the road more climate resilient, drainage system and permanent works will be taken up in the entire length of the road. A good road will provide better access and enable better management of Phrumshingla National Park in future. It also connects Ganglapong and Khuling villages under Tsamang Gewog.

Photo 16 & 17: Unstable slopes in scree areas.

Page 49: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

49

Photo 18: Scoured drain. Photo 15: Very narrow road width.

Photo 15: Interaction with locals. Photo 15: Consultation (Gup and Engineer)

Page 50: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

50

Table 10: Ranking of the GC Road Projects based on Weighted Net Present Value

Dzongkhag Gewog Road WNPV

(in Nu. million)

Rank

Wangdue Phodrang Phobji Tabading-Ngelungdracholing lhakhang

4,6531.82 1

Sarpang Dovan Chokorling-Pankhay 4,145.199 2

Lhuentse Jarey Autsho-Gup Office 3,093.531 3

Trongsa Korphu Wangdigang-Zhalingbi 2,298.265 4

Mongar Tsamang Yongkola-Banjar 1,701.631 5

Tsirang Phuentenchu- Tsirangtoe- Phuentenchu 1,001.218 6

Haa Sombaykha Khamina-Sombaykha 775.0415 7

Punakha Kabjisa Jelephu-Kabjisa 652.1758 8

Zhemgang Shingkhar Nimshong - Shingkhar 607.9944 9

Haa Gakeling Gakiling-Rangtse 498.6683 10

Wangdue Phodrang Gasetshowom Gaselo Feeder Road (end point)-Wasina (Gewog office)

232.9367 11

Wangdue Phodrang Nahi Agoloo-Pengang 201.13 12

Bumthang Tang Dungmithang-Mesithang 127.7856 13

Wangdue Phodrang Athang Zarigang - Athang -0.83766 14

Table 11: Total cost of GC road project

Dzongkhag Gewogs Total cost Length of road

Number of Beneficiary Households

Weight

Bumthang Tang 66300000 17 96 5.6

Haa Sombaykha 54600000 14 61 4.4

Haa Gakeling 27300000 7 63 9.0

Lhuentse Autsho 63570000 16.3 145 8.9

Mongar Tsamang 83070000 21.3 128 6.0

Punakha Kabjisa 12090000 3.1 61 19.7

Sarpang Dovan 189150000 48.5 400 8.2

Trongsa Korphu 76050000 19.5 208 10.7

Tsirang Phuntenchu 20280000 5.2 69 13.3

Wangdue Phodrang Athang 27300000 7 3 0.4

Wangdue Phodrang Gasetshowom 21450000 5.5 60 10.9

Wangdue Phodrang Nahi 14430000 3.7 22 5.9

Wangdue Phodrang Phobji 21840000 5.6 229 40.9

Zhemgang Shingkhar 1246440000 31.96 201 6.3

Page 51: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

51

5.5 GC Roads Selected for Climate Proofing

From the above two exercises carried out the following GC roads have been selected and prioritized for climate proofing under this project.

Table 12: Roads selected for climate proofing

(1) Dzongkhag

(2) Gewog

(3) Road

(4) WNPV

(Nu. million)

(5) Rank (CBA)

(6) Current Climate

Resilience (From Table 7)

(7) Final Ranking

Wangdue Phodrang Phobji Tabading-Ngelungdracholing

lhakhang 4,6531.82 1

Climate resilient to certain degree.

14

Sarpang Dovan Chokorling-Pankhay 4,145.199 2 Not climate resilient. 1

Lhuentse Jarey Autsho-Gup Office 3,093.531 3 Not climate resilient. 2

Trongsa Korphu Wangdigang-Zhalingbi 2,298.265 4 Not climate resilient. 3

Mongar Tsamang Yongkola-Banjar 1,701.631 5 Not climate resilient. 4

Tsirang Phuentenchu- Tsirangtoe- Phuentenchu 1,001.218 6 Climate resilient to certain degree.

12

Haa Sombaykha Khamina-Sombaykha 775.0415 7 Road under construction. 7

Punakha Kabjisa Jelephu-Kabjisa 652.1758 8 Not climate resilient. 5

Zhemgang Shingkhar Nimshong-Shingkhar 607.9944 9 Not climate resilient. 6

Haa Gakeling Gakiling-Rangtse 498.6683 10 Road under construction. 8

Wangdue Phodrang Gasetshowom Gaselo Feeder Road (end point)-Wasina (Gewog office)

232.9367 11 Climate resilient to certain degree.

10

Wangdue Phodrang Nahi Agoloo-Pengang 201.13 12 Not climate resilient. 9

Bumthang Tang Dungmithang-Mesithang 127.7856 13 Climate resilient. 13

Wangdue Phodrang Athang Zarigang -Athang -0.83766 15 Not climate resilient. 11

Page 52: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

52

Computing columns (5) and (6) provides with a new ranking of the road which can be taken as prioritized road for climate proofing.

Table 13: Final ranking of GC Roads selected for climate proofing

(1) Dzongkhag

(2) Gewog

(3) Road

(4) WNPV

(Nu. million)

(5) Rank (CBA)

(6) Current Climate

Resilience (From Table 6)

(7) Final

Ranking

Sarpang Chhudzom/Dovan Chokorling-Pankhay 4,145.199 2 Not climate resilient. 1

Lhuentse Jarey Autsho-Gup Office (Jarey) 3,093.531 3 Not climate resilient. 2

Trongsa Korphu Wangdigang-Zhalingbi 2,298.265 4 Not climate resilient. 3

Mongar Tsamang Yongkola-Banjar 1,701.631 5 Not climate resilient. 4

Punakha Kabjisa Jelephu-Kabjisa 652.1758 8 Not climate resilient. 5

Zhemgang Shingkhar Nimshong-Shingkhar 607.9944 9 Not climate resilient. 6

Haa Sombaykha Khamina-Sombaykha 775.0415 7 Road under construction. 7

Haa Gakiling Gakiling-Rangtse 498.6683 10 Road under construction. 8

Wangdue Phodrang Nahi Agoloo-Pengang 201.13 12 Not climate resilient. 9

Wangdue Phodrang Gasetshowom Gaselo Feeder Road (end point) -Wasina (Gewog office)

232.9367 11 Climate resilient to certain degree.

10

Wangdue Phodrang Athang Zarigang -Athang -0.83766 14 Not climate resilient. 11

Tsirang Phuentenchu- Tsirangtoe- Phuentenchu 1,001.218 6 Climate resilient to certain degree.

12

Bumthang Tang Dungmithang-Mesithang 127.7856 13 Climate resilient. 13

Wangdue Phodrang Phobji Tabading-Ngelungdracholing

lhakhang 4,6531.82 1

Climate resilient to certain degree.

14

Page 53: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

53

6. CONCLUSIONS AND RECOMMENDATIONS

Based on the field visit and analysis of the information collected the following recommendations and conclusion is made for the project intervention.

Some of the most fundamental recommendations are:

1) Five GC roads namely 48.5 Km Chhokorling (Toribari) – Pankhay (Gewog office) GC Road (Dovan) in Sarpang; 31.96 Km Nimshong-Shingkhar GC road, Shingkhar Gewog, Zhemgang Dzongkhag; 19.5 Km Wangdigang-Zhalingbi GC Road, Korphu Gewog, Trongsa Dzongkhag; 21.2 Km Yongkola-Banjar GC road, Tsamang Gewog, Mongar Dzongkhag and 16.3 Km Autsho- Gewog Centre (Jarey) GC road in Lhuentse have been prioritized for support by the project.

2) There is an urgent need to develop and strengthen the technical capacity of engineers of the DoR on the design and construction of climate resilient roads as DoR is the nodal agency responsible for the development of the road sector. This could be accomplished through the provision of short and long term trainings, study visits to relevant institutions in the region and by developing guidelines on EFRC and climate resilient roads.

3) The use of EFRC techniques such as bioengineering works has to be strengthened and enforced during the construction of the GC roads.

4) This study has estimated a total budget of Nu.1269.00 million for the development of climate resilient roads under the project. From this total allocation a sum of Nu. 634.50 million should be allocated for the development of climate resilient roads; Nu. 610.00 million towards making the GC roads climate resilient, Nu. 4.50 million for the development of EFRC and climate resilient guidelines, and Nu. 20.00 million should be for strengthening the institutional capacity of DoR.

5) There is a need to implement a holistic climate resilient package for the entire length of the Chhudzom-Dovan and the Nimshong–Shingkhar GC roads while for the Korphu GC road there is a need to execute the bioengineering works and construction of gabion walls in two critical sections.

6) This study has identified and prioritized three GC roads namely Chhudzom-Dovan, Nimshong –Shingkhar and Korphu GC road for immediate climate proofing under the project. The lessons learned from these pilot roads should then be used for developing the guidelines and specifications for the preparation of climate resilient standards for construction of climate resilient roads in Bhutan.

7) Making GC roads climate resilient requires a much higher capacity of drains, blacktopping, and construction of additional cross drains or culverts. This entails additional budget compared to the construction of normal roads. The DoR has estimated a budget of Nu.6.78 million for the construction of one kilometer of climate resilient roads and hence it is essential to use this estimate while preparing the budget estimates for the development of climate resilient roads.

Page 54: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

54

There is little doubt that road remains the most effective, inexpensive, sustainable and reliable form of transport in Bhutan. Topography and geo-physical setting of the country is by far the most significant factor that predisposes the Bhutanese roads to climate change induced disasters, it is apparent from this study that the Climate change induced hazards such as the landslides, flash floods and different forms soil erosions makes the roads highly vulnerable to damages especially during the monsoon. The financial resources, technical expertise and institutional capacity with the DoR for the development of climate resilient roads need to be strengthened for the development of climate resilient GC roads in the country. Based on this study the following key conclusions can be drawn with regard to the climate proofing and the improvement of the GC roads for enhancing the resilience to climate change.

The most prominent and increasing climate change induced hazards relevant to the road and transport sector are landslides, flash floods, different types and magnitude of soil erosion which are most induced by unprecedented monsoon rain. The climate change induced hazards will severely impact the livelihood sources of the rural communities and disrupt key infrastructures like roads that will immensely affect the access to food and other basic necessities.

As a result of the increased monsoon discharges from streams and rivers which will increase the frequency and magnitude of land slips, landslide, flash flood and erosion essential infrastructures like roads will suffer severe damages.

About 73% GC roads assessed in this study are highly vulnerable to the climate change induced hazards because of the poor design and quality of construction. Out of 14 GC roads assessed, only four seem to have some degrees of climate resilience.

The EFRC techniques have been apparently ignored or not adopted rigorously making the roads highly vulnerable to the different types of climate change induced hazards.

The drains are poorly designed and water from the drains overflows on the road surface damaging the road. It is highly likely that insufficient construction budget resulted in comprising the quality of construction.

Two of the 14 sampled GC roads fall in heavy rainfall zone and are highly prone to damage all the year rounds if it is not adequately climate proofed.

The shortage of local labour is one of the main constraints that affect the regular and timely maintenance of GC roads especially during the peak monsoon season when the roads are highly exposed to the climate induced hazards. Any small damages during the monsoon season neglected tend to serve as the entry point for major damage of much higher magnitude.

Since the construction of climate resilient roads is a fairly new area, the DoR is severely affected by the lack of skills and technical expertise. At present, the manuals and guidelines on EFRC designs are absent. The present technical expertise on the construction of climate resilient roads in DoR is highly inadequate.

Page 55: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

55

7 Annexure

7.1 Annex – I: Terms of Reference

TERMS OF REFERENCE

FOR INDIVIDUAL CONSULTANTS/CONTRACTORS

POST TITLE:

National Consultant for Assessment of Gewog Connectivity

Roads for Enhanced Climate Resilience.

AGENCY/PROJECT NAME: UNDP/GEF/LDCF Project on Enhancing Sustainability and

Climate Resilience of Forest and Agricultural Landscapes

and Community Livelihoods in Bhutan.

COUNTRY OF ASSIGNMENT: Bhutan

1) GENERAL BACKGROUND

In order to reduce climate change vulnerabilities and improve the sustainability of local

livelihoods and biodiversity of the country, the Royal Government of Bhutan has requested

support from the Global Environment Facility through UNDP for a full-sized project titled

“Enhancing Sustainability and Climate Resilience of Forest and Agricultural Landscapes and

Community Livelihoods in Bhutan.” The project aims to operationalize an integrated

landscape-based approach to climate change adaptation and biodiversity conservation. It

seeks to do so through: (a) improvement of institutional capacity at national, sub-national

and local levels to manage forest and agricultural landscapes sustainably for enhanced

climate resilience; (b) emplacement of governance system for biological corridors and

operationalization of conservation management system in the pilot corridors; and (c)

development of climate-resilient livelihood options for the local communities.

Based on the project identification form (PIF) document, which articulates the project

concept and key components, the GEF has approved project preparation grant (PPG) to

Page 56: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

56

develop the Project Document and GEF CEO Endorsement Document. The PPG phase

commenced in January 2016 and is scheduled to end in December 2016. In order to aid the

project design and formulation of the Project Document, a series of sub-consulting

assignments has been anticipated.

2) OBJECTIVES OF THE ASSIGNMENT

The objective of the assignment is to examine the existing status of gewog connectivity (GC)

roads in the target project areas and their vulnerability to various climate-induced hazards,

identify and prioritize the GC roads that require to be strengthened for higher climate-

resilience, and analyze the costs and benefits of enhancing the climate resilience of these

roads. The findings of this consulting assignment will be vital to the formulation and design

of the UNDP/GEF/LDCF project, particularly with regards to the development of climate-

resilient livelihood options for the local communities.

3) SCOPE OF WORK AND KEY TASKS

Under the supervision of GNHC and UNDP, and in close consultation with the PPG team, the consultant will carry out the following tasks:

(1) Develop and present a detailed methodology and work plan for the assignment;

(2) Carry out desk review of all GC roads with respect to their length, number of beneficiaries,

functional and financing status, etc.;

(3) Carry out field work to examine the current status of climate resilience of all the GC roads in

the target project areas using nationally acceptable standards for climate-resilient/

environment-friendly roads especially in relation to drainage and slope stability, develop

selection criteria, and based on these criteria identify and prioritize GC roads for project

support to enhance their sustainability and climate resilience. The criteria will need to

constitute a good balance between socio-economic, climate change and environmental factors;

(4) Identify and analyze anticipated costs and benefits of enhancing the prioritized GC roads for

project support. The cost-benefit analysis will need to look at economic, social and

environmental costs and benefits over short-, medium-, and long-term;

(5) Identify activities for enhancing the sustainability and climate resilience of the prioritized GC

roads and prepare detailed costing for these activities based on nationally acceptable standards

and norms for climate-resilient/ environment-friendly roads.

4) DURATION OF ASSIGNMENT, DUTY STATION AND EXPECTED PLACES OF TRAVEL

Page 57: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

57

The consultant will be employed for 35 working days spread over the period from 3rd week

of March to 30th May, 2016. He/ she will be expected to travel to the field covering gewogs

that fall (entirely or partially) inside Jigme Singye Wangchuck National Park and

Phrumshengla National Park and the biological corridors that link them to other protected

areas.

5) FINAL PRODUCTS

(1) An inception report detailing the methodology and work plan for the consulting assignment,

and outlining the table of contents of the consulting report;

(2) A field mission completion report outlining the process and itineraries;

(3) A detailed report which: (a) provides general information of all GC roads in the country; (b)

describing the current status of climate resilience of GC roads in the target project areas; (c)

identifying and prioritizing GC roads for project support and their rationale; (d) detailing

specific activities and costs to enhance the climate resilience of the prioritized GC roads; and

(e) analyzing the anticipated economic, social and environment costs and benefits of

enhancing the climate resilience of the prioritized GC roads.

6) PROVISION OF MONITORING AND PROGRESS CONTROLS

The consultant will receive technical guidance and support from the PPG team comprising

of two international and a national consultant. The PPG team will ensure that the

methodology of the assessment is in alignment with the intended objectives of the project,

and monitor quality of the final products. UNDP will provide technical advice and liaise with

GNHC and project partners to conduct field assessment in the target landscapes.

7) DEGREE OF EXPERTISE AND QUALIFICATIONS

Master’s degree or higher in road engineering, environmental engineering, climate change

adaptation or related field;

At least seven years of relevant progressive work experience;

Knowledge and skills for cost-benefit analysis;

Extensive experience of working on development of rural infrastructure especially rural

roads;

High level of proficiency in Dzongkha and local Bhutanese dialects;

Very good analytical and report writing skills in English.

8) CRITERIA FOR SELECTION OF THE BEST OFFER

Page 58: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

58

The criteria which shall serve as basis for evaluating offers will be:

Combined Scoring method – where the qualifications and relevant work experience will be

weighted a max. of 70%, and combined with the price offer which will be weighted a max of

30%

Criteria Weight Max. Point

Technical

Academic background

Relevant work experience

Sound knowledge and skills in cost-benefit analysis

Experience of working on development of rural infrastructure especially rural roads as demonstrated through past assignments, publications and reports.

Appraisal and feedback from past clients on related assignments

70

10

10

15

25

10

Sub-total A. (Technical) 70

Financial 30 30

Sub-Total B.(Financial) 30

Total (A+B) 100

9) PAYMENT TERMS

The applicant is required to submit a lump-sum financial proposal for the period of 35 working

days. The selected consultant will be paid upon payment certification from the hiring

manager, in the following manner:

25% upon submission and acceptance of the inception note detailing the methodology

and work plan for the assignment;

25% upon completion of the field work and assessment;

50% upon submission and acceptance of the final report by the PPG team, GNHC and

UNDP.

10) AWARD OF CONTRACT

The consultant who fulfill the requirements will be assessed based on a combined scoring

of:

Technical evaluation comprising of 70%, and

Financial evaluation of 30%.

11) FINANCIAL PROPOSAL

Please indicate fee structure:

Page 59: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

59

i. If Lump-sum (provide breakdown of this lump sum i.e travel, per diem and fee for

anticipated number of working days); and

ii. Daily fee (inclusive of fees, including any other relevant expenses related to this assignment).

12) RECOMMENDED PRESENTATION OF OFFER

Please submit the below preferred documents with you Presentation of Offer:

a) Duly accomplished Letter of Confirmation of Interest and Availability;

b) Personal CV or P11, indicating all past experience from similar projects, as well as

the contact details (email and telephone number) of the Candidate and at least three

(3) professional references;

c) Brief description of why the individual considers him/herself as the most suitable for

the assignment, and a methodology on how they will approach and complete the

assignment.

The proposal should be submitted in electronic format by Monday 14th March 2016 to [email protected].

Page 60: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

60

7.2 Annex – II: List of Stakeholder/Persons consulted

Sl. No

Name Designation Contact Number

Dzongkhag / Gewog

1. Mr. G. M. Rai Chief, Lobeysa, DoR 17706636 Wangdue, Punakha

2. Mr. Balaram Acharya A. E., Nobding, DoR 17759740 Wangdue Phodrang

3. Mr. Nima Wangchu J. E., Nobding, DoR 17799466 Wangdue / Phobji GC Road

4. Mrs. Ugyen Tshomo J. E., Pinsa, DoR 17993794 Wangdue / Athang, Gasetshowom, Nahi and Kabjisa (Punakha) GC Road

5. Mr. Tsheten Tshering A.E., Pinsa, DoR 17721448 Wangdue

6. Mr. Prem Rai Supervisor, Pinsa, DoR 77412172 Wangdue

7. Mr. Ugyen (ata) Mason, DoR 17604716 Punakha / Zomlingthang,

8. Mr. Tougay Chief, Trongsa, DoR 17607620 Trongsa, Bumthang

9. Mr. Sangay Dorji AE, Jakar, DoR 17699270 Bumthang Sub-division Office

10. Mr. Sonam Dorji AE, Pangjor, DoR 17669903 Korphu GC Road

11. Mr. Jambay Tenzin P. O, Lingmethang, DoR 17685175 Mongar

12. Mr. Wangdi AE, Shengor, DoR 17661789 Sengor Sub-Division Office

13. Ms. Sangay Wangmo JE, Yongkola, DoR 17451700 Yongkola-Tshamang GC Road

14. Mr. Tsheten Dema JE, Autsho, DoR 17368795 Autsho-Jarey GC Road.

15. Mr. Karma Dorji Chief, Tingtibi, DoR 77347499 Zhemgang

16. Mr. H.R. Ghalley EE, Tingtibi, DoR 17512037 Zhemgang

17. Mr. Sangay Dhuba PE,Therang, DoR 17120698 Nimshong Office

18. Mr. Nawang Kinga Supervisor, DoR 17560089 Nimshong-Shingkhar GC Road

19. Mr. C.B. Mongar Chief, Sarpang, DoR 17606832 Sarpang, Tsirang, Dagana

20. Mr. Ugyen Dorji EE, Sarpang, DoR 17695244 Construction

21. Mr. Leki Dorji AE, Sarpang, DoR 17673459 GC roads.

22. Mr. Dakpa P.O., Thimphu, DoR 17524563 Thimphu, Paro, Haa 23. Mr. Sangay Tenzin EE, Haa, DoR 17334752 Haa

24. Mr. Phuntsho Dhendup JE, Khamina, DoR 17120059 Khamina-Sombeykha GC Road

25. Mr. LungtenZamtsho JE, Khamina, DoR 17892881 Khamina-Gakiling GC Road.

26. Mr. Dorji Gyeltshen Chief, Maintenance Division 17708120 DoR, Thimphu

27. Mr. Karma Tenzin EE, Design Section 17609331 DoR Thimphu

28. Mr. Ngawang Choeda Gewog Adm. Officer 17812966 Wangdue / Phobji

29. Mr. Ugyen Dorji Mangmi 77639178 Wangdue/Athang

30. Mr. Sangay Gup 17618563 Wangdue/Gasetshowom

31. Ms. Deki Lhamo Gedung 77374373 Wangdue/Nahi

32. Mr. Karma Gyeltshen Gewog Adm. Officer 17907035 Punakha/Kabjisa

33. Mr. Kinzang Minjur Gup 17727006 Lhuentse/Jarey

34. Mr. Sonam Dhendup Gewog Adm. Officer 17855578 Bumthang/ Tang

35. Mr. Tashi Penjore Gedung 17611459 Trongsa/ Korphu

36. Mr. Phuntsho Range Officer 17747897 Zhilangi Range Office, DoFPS

37. Mr. Nidup Gup 17866591 Zhemgang/Shingkhar

38. Mr. Sherab Jamtsho Range Officer 17559931 Range Office, Nimshong

39. Mr. Shivalal Kararia Gup 17921342 Tsirang / Phuentenchu

40. Mr. Shanti Ram Chamlengai

Tshogpa 17317651 Tsirang / Phuentenchu

41. Mr. Chimmi Dorji Range Officer 17788071 Park Office, Lingmethang

42. Mr. Karma Tshethar Chief Engineer Engineering Division, DoA,

43. Lungten Jamtsho Chief Engineer DD, DoR

44. Karma Wangdi Chief Engineer 17162377 Construction, DoR

45. Sonam Desel Dy. Chief Env. Officer 17758958 PPD/MoWHS

Page 61: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

61

7.3 ANNEX – III _ Field Assessment Data of identified GC Roads

The following 14 GC Roads were identified and subjected to field assessments. Assessments were carried out for each road and information obtained is being furnished in the Format developed under “Questionnaire” for this specific assignment. A total of 15 GC roads were visited, covering 14 Gewogs under 11 Dzongkhags.

① Phobji

Questionnaire Date: 11-May ‘16

A: Current Status of GC Roads

Landscape: 2

Dzongkhag: Wangdue Phodrang Gewog: Phobji

Name of GC Road: Phobji

Length: 5.6 Km From: Tabading - Ngelungdracholing Feeder road ch.2.95 km

To: Ngelungdracholing lhakhang

(Gup office/RNR office, Phobji falls on the way)

Year of Construction: 2004

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The road condition is very good after Black topping. L-drains /cross drains are in place. Numerous streams also act as natural cross drains. The road passes through a very gentle terrain and slope height is also very less, thereby reducing the threats of slope failures/slips etc. Maintenance works (Wet Mix Macadam (WMM), drains etc) were carried out by DOR in 2015.,

Note: Contract for Blacktopping works (11.5 km, Gangte Gewog – Phobji Gewog) is awarded to M/s Tobden Construction and the work is under progress.

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required23.

23The site has been handed over to the contractor and now it’s his responsibility to maintain the road till he hands back road to the DoR.

Page 62: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

62

Who maintains? DoR

Labour contribution? Local labourers are recruited as and when required.

Funding? RGoB under Maintenance budget

Are there Road Users’ Group? Yes/No - NO

How effective is the current management practice of the roads?

Seems effective as there are no signs of any maintenance required on this road. Also the volume of traffic seems to be less on this road.

What are the challenges? The JE expressed that labourers are not easily available. Farmers are busy with their works and also the existing daily wage is not attractive to them.

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The current condition of the road is good and nothing needs to be done. During 2015 the DoR had carried out WMM/drains repairs/maintenance and this year (2016) blacktopping is being done.

Beneficiaries

Name of village Distance from the road

No. of

H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Khemdro Road passes through it.

99

Medium & light Tippers (contractor)

20

Transportation of goods and services, Offices Contract works

During peak season, 2-3 buses (tourists) ply every day. 5 shopkeepers own vehicles. The JE has observed a slight increase of traffic after road maintenance (road improvement).

Tawa 5 km 130

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses)

Remarks

Protected Area:

The GC road does not fall inside any PA/BC/FMU.

Page 63: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

63

Biological Corridor:

FMU:

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - Slight increase of dry wastes. Cleanup days are organized by primary schools on Saturdays.

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc)

- Side drains Entire length √ √ Concrete L drains are/were repaired/constructed in 2015.

- Cross drains √ √ As a thumb-rule 2-3 nos, per km of cross drains need to be provided.

- Culverts/bridges - Not required.

ii) Slope stability (Types and dimensions)

- Retaining Walls - Not required.

- Breast walls - Not required.

- Bio-engineering works (Techniques used)

-

Not required.

Page 64: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

64

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/

area Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road.

- No

Is it due to road cut?

- - - Carriage way

- - No sign of slope instability as the slopes are gentle and the height of cut is less than 3 m in average.

Below road.

- No

Undercutting by rivers, irrigation canals, land use, others??

- - Road Alignment

- -

Category Size/area Frequency Observations / Remarks

Geological instability - -

Not seen/observed.

Others - - (Due to quarries, logs/firewood extraction etc.)

Page 65: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

65

② Jarey

Questionnaire Date: 13-May ‘16

A: Current Status of GC Roads

Landscape: 3

Dzongkhag: Lhuentse Gewog: Jarey

Name of GC Road: Autsho - Jarey

Length: 16.3 Km From: Autsho To: Gup office/RNR office

Year of Construction: 2011 - 2012

Financing source: RGoB/GoI/WB/ADB/Others - SDP

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The road condition is not goods as it passes through chirpine forests with lots of fragmented and rocky stretches. The JE informed that there are rock slides/debris fall during rains at several places. But there is one critical area (at Sangchhenla, around 6-7 km from Autsho) where slips occur very often. The road width is very narrow (averaged 4.5 – 5.5 m) and to give way to the oncoming vehicle is difficult and risky. Either of the vehicle has to go back to find a suitable place before giving way the oncoming vehicle. There are no cross drains and the earthen drain is all covered with debris and non-functional. Both retaining walls and breast walls are required. The entire length of the road needs widening to obtain the formation width (FC) of 6.5 m for GC road.

Note: Blacktopping and base course works already awarded and the contractor is just mobilizing machinery and manpower.

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required24.

Who maintains? DoR

Labour contribution? Local labourers are recruited as and when required.

Funding? RGoB under Maintenance budget

24The site has been handed over to the contractor and now it’s his responsibility to maintain the road till he hands back road to the DoR.

Page 66: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

66

Are there Road Users’ Group? Yes/No - NO

How effective is the current management practice of the roads?

Seems effective as there are no signs of any maintenance required on this road.

What are the challenges? The JE expressed that labourers are not easily available. Farmers are busy with their works and also the existing daily wage is not attractive to them.

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The current condition of the road is not good.

About 30% of the road length is very narrow and needs widening.

About 3 km of road length passes through scree area and needs to be provided with breast walls.

Improvement of gradient required.

Widening of curves/zigs.

Cross drains and line drains required.

A breast wall required at Sanchhenla (30x15 M).

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Jarey Road passes through it.

Medium & light Tippers (contractor)

2-3

Domestic In total there are about 6 nos. of small vehicles and 3 nos. of two-wheelers plying in the GC road.

Ngangney Road passes through it.

Contract works

Ladong 3 km There is one BHU and a school in Ladong.

Pam 6 km

Yumche 9 km

Total 145

Page 67: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

67

Name of PAs/BCs

Distance from the road

Length (km) Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

Protected Area:

The GC road does not fall inside any PA/BC/FMU.

Biological Corridor:

FMU:

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - The gup informed that currently not so much of waste generation, but the waste will increase when more vehicles/people use the road after being blacktopped.

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required

Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc)

Page 68: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

68

- Side drains √ √ Concrete L drains are being constructed under the current contract.

- Cross drains √ √ As per site conditions. (As a thumb-rule 2-3 nos, per km of cross drains need to

be provided).

- Culverts/bridges √ √ Not required. But one existing cause-way needs to be improved.

ii) Slope stability (Types and dimensions)

- Retaining Walls √ √ Required.

- Breast walls √ √ Required.

- Bio-engineering works

(Techniques used)

√ √

Not implemented. Requires to be implemented for slope stability and improvement of aesthetic value.

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area

Frequency Damages Signs of erosion /

deposition (on & along)

Remarks To Type

Landslide (slope instabilities)

Above road

Is it due to road cut?

- Yes 30X 15 m-

3-4 times- Carriage way

- road blocks due to debris fall.

Land slips and erosion increasing annually.

Lots of slopes increasingly becoming vulnerable. One breast walls of 30x3 m. required at Songchhenla

Below road

Undercutting by rivers, irrigation canals, land use, others??

- None

- - Road Alignment

Valley side slope getting eroded during slip clearing

Category Size/area Frequency Observations / Remarks

Page 69: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

69

Geological instability

- - Around 3 km of road length runs through fragmented rocky area/ “scree” and this area is prone to scree slips if disturbed. Potentially scree debris slip threats. Construction of a 1.5-2 m high gabion wall would prevent rock slips. Needs further detailed assessment incase interventions are proposed.

Others - - (Due to quarries, logs/firewood extraction etc) - None.

③ Tsamang Questionnaire Date: 14-May ‘16

A: Current Status of GC Roads

Landscape: 3

Dzongkhag: Mongar Gewog: Tsamang

Name of GC Road: Tsamang

Length: 21.3 Km From: Yonkola To: Banjar

Year of Construction: 2005

Financing source: RGoB/GoI/WB/ADB/Others - GOI

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The road condition is not good as it gets very wet and slippery during rains. Only 4-wheel drive vehicles can make it with great difficulties, even these vehicles cannot make it at 2-3 places when the rains are heavy. About 40% of the road length is narrow. The drains are almost non-functional. Lots of land slips. Cross drains have been provided but not adequate.

Note: DoR has contracted out widening works, including blacktopping with base course. The works are ongoing.

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required25.

Who maintains? DoR

Labour contribution? Local labourers are recruited as and when required. (need based)

Funding? RGoB under Maintenance budget

25The site has been handed over to the contractor and now it’s his responsibility to maintain the road till he hands back road to the DoR.

Page 70: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

70

Are there Road Users’ Group? Yes/No - NO

How effective is the current management practice of the roads?

Due to insufficient labors/manpower the road is maintained on need basis.It is not the ideal management practice but perhaps the next best alternative solution.

What are the challenges? The JE expressed that due to acute shortage of labours, timely maintenance is compromised.

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The road needs improvement of base course immediately and drainage system as driving during / after rains is slippery and risky. Due to shortage of labors, proper maintenance of drains has not been carried out and water runs over the carriageway. Maintenance is reduced to slips clearance only.

The DoR has contracted widening works, blacktopping and base course. Due to limited funds the scope of works has been reduced to carry out limited activities only. L-drains, cross drains proposed are limited in quantity. Cross drains need to be provided as per site conditions but under the present contract this has been limited due to want of fund.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Drangmaling

Road passes through it. 8

Medium & light Tippers (contractor)

2-3

Carrying construction materials. Carrying farm produce to markets.

Used mainly for construction purposes.

Tsamang

Road passes through it. 75

Banjar 3 km 45 There is one BHU and a school in Ladong.

Page 71: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

71

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

Protected Area:

- -

- - - The GC road does not fall inside any PA/BC/FMU.

Biological Corridor:

- - - - - -

FMU:

- -

- - - -

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - No

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required

Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc)

- Side drains √ √ Concrete L drains are being constructed under the current contract (quantity/length reduced).

- Cross drains √ √ As per site conditions. (As a thumb-rule 2-3 nos, per km of cross drains need to be

provided).

Page 72: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

72

- Causeways (about 10 nos in all)

- Culverts/bridges √ √

ii) Slope stability (Types and dimensions)

- Retaining Walls √ √ Proposed under the contract.

- Breast walls √ √ Proposed under the contract

- Bio-engineering works

(Techniques used)

√ √

Not implemented. Requires to be implemented for slope stability and improvement of aesthetic value.

(Generally all the roads constructed by Dzongkhags do not implement bioengineering works including many of the EFRC items, due to very low budget.)

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size / area

Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road

Is it due to road cut?

- No 20X 9m- seasonal

Carriage way

- road blocks due to debris fall.

Yes.

During rainy season.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- - -

Category Size/area Frequency Observations / Remarks

Page 73: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

73

Geological instability

15x10 m - seasonal Although well vegetated area, the scouring of toe during rainy season, area tends to become slide prone.

Others - - (Due to quarries, logs/firewood extraction etc)- None.

Page 74: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

74

④ Tang Questionnaire Date: 16-May ‘16

A: Current Status of GC Roads

Landscape: 3

Dzongkhag: Bumthang Gewog: Tang

Name of GC Road: Wabthang

Length: 17 Km From: Dungmithang To: Mesithang

Year of Construction: Early 1980s (about 35 years ago)

Financing source: RGoB/GoI/WB/ADB/Others - Sheep/Yak Farming Project, DoL

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The road is one of the best roads in terms of quality, gradient and road width. The DoR had been maintaining this road for over a decade.

Note: DoR has contracted out the blacktopping works to M/S KD Builders Pvt. Ltd. with the following scope of works: - blacktopping - Drains (stone pitched (RRM)drains and L-drain (4 km).

The works are ongoing.

Current management of roads: DoR (for the past 12-13 years)

Type of maintenance:

Annual/periodic/daily? Daily26.

Who maintains? DoR through its regular maintenance crews.

Labour contribution? DoR, waged

Funding? RGoB under Maintenance budget

Are there Road Users’ Group? Yes/No - NO. Road Users’ Group exists only for farm roads.

26The site has been handed over to the contractor and now it’s his responsibility to maintain the road till he hands back road to the DoR.

Page 75: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

75

How effective is the current management practice of the roads?

Effective since the maintenance is carried out on a daily basis.

What are the challenges? Maintenance during winter and during snows can be a little challenging.

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The road is in good shape and with the current contract for black topping, drain works, no additional itmes need to be added to further improve the road. Adequate numbers of cross drains exist.

But there is one old slide at Zhunshen (at 14-15 km) where a gabion breast wall of 15x3 m needs to be provided. However, this wall must be constructed during non-rainy season to reduce the risk of the slide failure. Construct French drains in marshy areas of Pangshing and Zhunshen. In all three locations of approx. area of 20x10m each must be taken up.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Babzur

Road passes through the village. 22

Trucks Medium &light vehicles Tippers (contractor 2-wheelers Tractors Tourist bus Sturdy tour vehicles

5 20

5 6 2 6 3

Carrying construction materials. Carrying farm produce to markets. Official duties

Tourist buses Study tours

Benefits 27 villages

Kunzangdra

Road passes through the village. 20

Pangshing

Road passes through the village. 14

Zhemshong

Road passes through the village. 9

Misithang Road passes

4

Page 76: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

76

through the village.

Phromang 5 km 19

Dazur 2 km 8

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses)

Remarks

Protected Area: - -

- - - The GC road does not fall inside PNP.

Biological Corridor:

-

- - - - GC road falls under BC of PNP.

FMU:

- -

- - - NRDCL plans to extract logs from Rodengla FMU (end of Feeder Road).

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - Generally there is an increase of waste due to increased travelers, picnickers etc.

Page 77: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

77

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc)

- Side drains Throughout. √ √ Stone pitched and L drains are being constructed under the current contract.

- Cross drains 3-4 / km √ √ As per site conditions. (As a thumb-rule 2-3 nos, per km of cross drains need

to be provided).

- Culverts/bridges 4-5 H/pipe culverts

1 bailey bridge

√ √

ii) Slope stability (Types and dimensions)

- Retaining Walls √ √ Proposed under the contract.

- Breast walls √ √ Proposed under the contract

- Bio-engineering

works

(Techniques used)

√ √

Not implemented. Requires to be implemented for slope stability and improvement of aesthetic value. (Zhungshen slide area).

Page 78: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

78

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area Frequency Damages Signs of erosion /

deposition (on & along)

Remarks To Type

Landslide (slope instabilities)

Above road

Is it due to road cut?

- Yes

15x15 m - Carriage way - reduction

in road width

Water runs over the road.

Drain covered and blocked.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road alignment

- - -

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc)- None.

Page 79: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

79

⑤ Korphu Questionnaire Date: 17-May ‘16

A: Current Status of GC Roads

Landscape: 2

Dzongkhag: Trongsa Gewog: Korphu

Name of GC Road: Wangdigang - Zhalingbi

Length: 19.5 Km From: Wangdigang To: Zhalingbi

Year of Construction: 2004

Financing source: RGoB/GoI/WB/ADB/Others - Others (many agencies were involved in the construction of this road. UNICEF-Food, and Tool & Plants; ECRP, RLP, CMU - machinery and RGoB - Blasting)

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

Overall the road quality is ok and can qualify as a fair weather road. At 5 locations the road is marshy and even 4-wheel drive vehicles have difficulties to drive over in heavy rains. Remnants of drains can be seen in some stretches and non-functional in most cases. This has resulted in water running on the road creating water channels and “ponding” effects. A few cross drains are found near villages only. But for the rest of the road, the natural or depressions serve as cross drains. About 4-5 culverts are required over gullies where some perennial water is found. There are two larger rivers over which bridges need to be constructed. At several places the gradient is very steep and at 4 places this needs to be corrected/improved. About 60% of the road is very narrow and needs to be widened. These are generally in rocky stretches.

It appears that maintenance was not carried out at all and the drains are chocked and covered with debris. Perhaps only slip clearance and road blocks clearing activities were prioritized as maintenance activities before DoR took over the road.

Note: DoR has contracted out the blacktopping works to Druk Lhayul Construction Co. Pvt. Ltd., Paro, with the following scope of works:

- Widening and improvement of zigs. - GSB, WBM and black topping (25mm thick) works - L drains (0.6 m width) for about 50% of the entire length of the GC road - 40 nos. of Hume pipe Cross drains (90 Hume pipes) already purchased) - Slope stabilities required at 4-5 places- gabion walls (about 1000 m3 of 2-5 m height with varying lengths)

required as per site conditions.

The works are ongoing.

Page 80: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

80

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Daily27.

Who maintains?

Labour contribution?

Funding?

Are there Road Users’ Group? Yes/No - NO.

How effective is the current management practice of the roads?

At present no maintenance works seem to be there.

What are the challenges? DoR engineer had stated shortage of labour.

Current condition of the GC road and critical suggestions to improve the GC roads to maximize the benefit of the road to the beneficiaries.

The road is trafficable during fair weather only. To make it all weather road, improvement works like widening of curves, gradient rectification, base course and black topping must be carried out. Side drains, cross drains are other activities that must be put in place to ensure water management is properly addressed. There are two rivers (Philigangchu stream) at Nagpokhosar and Jiliganchu further ahead where culverts or bridges are required. The Philigangchua is relatively small river and can be crossed easily, except that during monsoon the river can get bigger and crossing might be a problem. A box culvert (3L x 4.5W x 1.5H) m should be ok over this river. A bailey bridge (110 ft) is under construction by M/S D.D. Construction over the Jiligangchu stream. It is referred to in the contract as “Construction of Chulekha Nabji Bailey Bridge (110 ft) on Nabji-Korphu GC road”.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Nimshong

Road passes through the village. 67

Trucks Tippers (contractor LVs (Boleros)

10

Carrying construction materials. Carrying farm produce to markets.

27The site has been handed over to the contractor and now it’s his responsibility to maintain the road till he hands back road to the DoR.

Page 81: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

81

Nobji 3 km 61

25

Official duties -Tourist vehicles during Tshechu

Khorphu

4.7 km 80

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

Protected Area:

- - - - - GC road falls inside the Buffer zone area of JSNP.

Biological Corridor:

- - - - -

FMU:

- -

- - -

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - None.

Page 82: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

82

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required

Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc)

- Side drains About 30% remains in the entire road length.

√ √ Nonfunctional as the drains are choked or covered by debris.

- Cross drains 3-4/km √ √ As per site conditions. (As a thumb-rule 2-3 nos, per km of cross drains need to be provided).

- Culverts/bridges 4-5 H/pipe culverts

1 bailey bridge

√ √

ii) Slope stability (Types and dimensions)

- Retaining Walls √ √ Proposed under the contract.

- Breast walls √ √ Proposed under the contract

- Bio-engineering works

(Techniques used)

√ √

Not implemented. Requires to be implemented for slope stability and improvement of aesthetic value.

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Page 83: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

83

Category Location Causes Size/area Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road Is it due to road cut?

- Yes

15x10 m - Carriage way

- reduction in road width

Water runs over the road.

Drain covered and blocked.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- - -

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc)- None.

Page 84: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

84

⑥ Nimshong-Shingkhar

Questionnaire Date: 19-May ‘16

A: Current Status of GC Roads

Landscape: 3

Dzongkhag: Zhemgang Gewog: Shingkhar

Name of GC Road: Shingkhar

Length: 31.96 Km From: Nimshong To: Shingkhar

Year of Construction: 2013 (additional length of 1.24 km till Gup’s office to be completed by June ’16)

Financing source: RGoB/GoI/WB/ADB/Others - GoI

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The road has no base course as the road is just completed. Side drains/cross drains have not been provided. Due to these the road surface has been damaged by rains and gets slippery and thus making it difficult to drive on it. There are two huge landslides at Shebjigang and Gramkhar (chainage 10 km & 14 km from Nimshong). The slides have covered almost half of the road width for about 15-25 m. A RRC bridge (12.5 L x 4.5 H x 4 W) m is required and proposed over Rejugangchu

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? periodic

Who maintains? DoR but the road is still considered as under construction due to additional 1.24 km till Gup’s office expected to be completed by June 2016)

Labour contribution? Local labours on casual wages.

Funding? RGoB

Are there Road Users’ Group? Yes/No - NO.

Page 85: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

85

How effective is the current management practice of the roads?

no maintenance works carried out

What are the challenges? DoR engineer had stated shortage of labour.

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The road is trafficable during fair weather only. To make it all weather road, drainage system should be in place and maintenance carried out regularly. Breast walls must be constructed on the slide areas. BT works required. Bioengineering works to be carried out.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day Purpose (uses) Remarks

M F

Wamling

Road passes through the village. 77

Trucks Tippers (contractor LVs (Boleros)

10

Carrying construction materials. Carrying farm produce to markets. Official duties

Thrisa 5 km 65

Shingkhar

Trong Mayembi

Changkhar

Radhi

13

16

5

Page 86: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

86

25

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day Purpose (uses) Remarks

Protected Area:

- -

- - - GC road does not fall inside PA, BC or FMU.

Biological Corridor:

- - - -

FMU:

-

-

- - -

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - Yes

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - Slight increase of non-biodegradable plastic wrappers and beer bottles.

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc.)

- Side drains √ √ Sl No i) and ii) proposed in the next 2016-17 budget.

Page 87: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

87

- Cross drains √ √

- Culverts/bridges √ √

ii) Slope stability

- Retaining Walls √ √

- Breast walls √ √

- Bio-engineering works

(Techniques used)

√ √

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks

To Type

Landslide (slope instabilities)

Above road

- 2 locations

Is it due to road cut?

- Yes

15x10 m

25x 20 m

- Carriage way

- reduction in road width

Water runs over the road.

Drain covered and blocked.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- - -

Page 88: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

88

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc) - None.

Page 89: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

89

⑦ Chhudzom/Dovan

Questionnaire Date: 19-May ‘16

A: Current Status of GC Roads

Landscape: 2

Dzongkhag: Sarpang Gewog: Dovan (Chudzom)

Name of GC Road: Dovan

Length: 48.5 Km From: Chokorling (Toribari) To:Pankhay (Gewog office)

Year of Construction: 2014

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

Overall quality of the road is good. The road width is sufficient. Side drains and adequate numbers of cross drains provided.

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required28.

Who maintains? DoR

Labor contribution? Local labours on casual wages.

Funding? RGoB

Are there Road Users’ Group? Yes/No - No.

How effective is the current management practice of the roads?

Satisfactory

28The site has been handed over to the contractor and now it’s his responsibility to maintain the road till he hands back road to the DoR.

Page 90: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

90

What are the challenges? Engineer had stated shortage of labour.

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The road is trafficable during dry weather only. With rains most of the areas get slushy and slippery. Mostly Boleros (or 4-wheel drive vehicles) are able to ply on these roads. Contracts packages have been awarded to carry out black topping works, base course, drains, cross drains and gabion walls. A bailey bridge over Thotne khola (chainage 35 km) has been proposed. Nu:8 million has been approved for the construction of the bridge. Site survey has been completed and design of the bridge is under progress.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Chokorling Road passes through the village.

400 3011 1883

Tippers (contractor) Boleros Hilux

100

Carrying construction materials. Carrying farm produce to markets. Official duties Visit Gewog office

Dalungang Road passes through the village.

Maogang 3Road passes through the village.

Gungring Road passes through the village.

Phankhey Road passes through the village.

Page 91: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

91

Name of PAs/BCs

Distance from the road

Length (km) Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

Protected Area:

- -

- - - GC Road does not fall inside, PA, BC, or FMU.

Biological Corridor: - - - -

FMU:

- -

- - -

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - Slight increase

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc)

- Side drains 7 km √ √ L drains/earthen drains proposed

- Cross drains 50 Nos √ √ Box culverts proposed

- Culverts/bridges √ √

1 Bailey bridge required and proposed over Thotne khola at chainage 35 km (120’ L x 4.5 W x 4 m H)

ii) Slope stability

Page 92: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

92

- Retaining Walls √ √ 8 nos. proposed (R/wall and Gabion walls)

- Breast walls √ √

- Bio-engineering works

(Techniques used)

Broadcasting of seeds

√ √

Good

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area Frequency Damages Signs of erosion /

deposition (on & along)

Remarks To Type

Landslide (slope instabilities)

Above road Is it due to road cut?

- Yes

50x10m 30x15m 30x8m 45x12m

3-4 times during rainy seasons / monsoon

Carriage way

-reduction in road width

- Water runs over the road.

- debris depositing on road

Drain road blocked. Road gets muddy and slippery.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- - -

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc.)- None.

Page 93: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

93

⑧ Phuentenchu

Questionnaire Date: 24 -May ‘16

A: Current Status of GC Roads

Landscape: 2

Dzongkhag: Tsirang Gewog: Phuentenchu

Name of GC Road: Phuentenchu

Length: 5.25 Km From: Tsirangtoe Gup office To: Gewog Office, Phuentenchhu

Year of Construction: 2006

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The road quality was good as it is contracted to M/s Wang’s Private Ltd, Wangdue for Blacktopping works. Base course, laying of Hume pipes for cross drains are complete. Only earthen drain provided as there is no provision in the contract. The drains will be taken up if additional budget is allocated. Widening of road has been completed and the road width improved/increased to more than 5.1 m. Gradient has been improved. Side drains/cross drains have not been provided.

A total of 15 nos. of passing zones created along the road.

Current management of roads:

DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required29.

Who maintains? DoR

Labour contribution? Local labours on casual wages.

Funding? RGoB

Are there Road Users’ Group? Yes/No - NO.

How effective is the current management practice of the roads?

no maintenance works carried out

29The site has been handed over to the contractor and now it’s his responsibility to maintain the road till he hands back road to the DoR.

Page 94: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

94

What are the challenges? DoR engineer had stated shortage of labour.

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The current road condition is very good and soon the road will be blacktopped. There are not threats from landslips or slope failure. Therefore, only L-drains must be provided, as cross drains are already put in place, as water management for this road.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day Purpose (uses) Remarks

M F

Upper Norbuthang

Road passes through the village.

69 180 150

Trucks Tippers Light Vehicle Bolero

10

Carrying construction materials. Carrying farm produce to markets. Official duties commuting

27 Boleros in Phuentenchu Gewog only.

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day Purpose (uses) Remarks

Protected Area:

- -

- - - GC road does not fall inside PA, BC or FMU.

Biological Corridor:

- - - - -

FMU:

- -

- - -

Page 95: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

95

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - Slight increase expected.

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention

required Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc.)

- Side drains Entire length √ √

Earthen drain only, due to low budget provision. L drains must be provided as the area has high rainfall during monsoon.

- Cross drains 2 nos causeway √ √

- Culverts/bridges

14 nos. Hume Pipe culverts

√ √

ii) Slope stability

- Retaining Walls √

- Breast walls √

- Bio-engineering works

(Techniques used)

Page 96: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

96

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area

Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road -

Is it due to road cut?

-- No

- - Carriage way

- - -

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- - -

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc.)- None.

Page 97: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

97

⑨ Athang Questionnaire Date: 25-May ‘16

A: Current Status of GC Roads

Landscape: 2

Dzongkhag: Wangdue Phodrang Gewog: Athang

Name of GC Road: Athang

Length: 7 Km From: Zarigang zam To: Gewog Office, Athang

Year of Construction: 2013

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The road quality is still trafficable. At four places the road has been dug to take water for irrigation purposes and this makes it a little bumpy ride. Sections of the L drain are still seen, although the drains are higher than the road surface. Land slide had occurred 2 years back due to flash flood effect after the whole area was devastated by fire.

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required.

Who maintains? DoR

Labour contribution? Local labours on casual wages.

Funding? RGoB

Are there Road Users’ Group? Yes/No - NO.

How effective is the current management practice of the roads?

Not very effective, but somehow road is made trafficable.

What are the challenges? DoR’s Work Supervisor stated shortage of labour and lack of machineries are hindering proper maintenance works.

Page 98: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

98

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The current road condition is still ok. L drains must be repaired and rectified. DoR must make adequate provisions to continue providing water for irrigation purposes through Hume pipes embedded below the road. There are no immediate threats from landslips or slope failure. Therefore, L-drains, cross drains and a box-culvert over “phangrichu” stream must be provided to improve the road. A 22 m long with of 3.5m carriage way RC-T Girder bridge exists over the Dickchu river. Road widening in few places prior to black topping would improve the road quality and also its stability.

Beneficiaries

Name of village Distance from the

road

No. of

H/H

Population Types of

vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Dolangpche (Hati dunga)

Road passes through the village.

1 1 2

Tippers DCM Light Vehicle Bolero Bikes

2-3

Carrying construction materials. Carrying farm produce to markets. Official duties commuting

27 Boleros in Phuentenchu Gewog only.

Phangri ‘A’ -------“------ 1 1 5

Phangri ‘B’ -------“------ 1 2 4

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

Protected Area: - - - - - GC road does not fall inside PA, BC or FMU.

Biological Corridor: - - - -

FMU:

- -

- - - -

Page 99: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

99

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - No change.

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc)

- Side drains L- drains (constructed earlier) are found in a few stretches.

√ √ L drains must be provided over the entire length.

- Cross drains 4nos causeway √ √ The existing causeways are damaged and needs to be repaired / reconstructed with bigger dimensions as per site conditions. Cross drainage is proposed to be provided through Humepipe culverts.

- Culverts/bridges √ √

7 nos. Hume Pipe culverts proposed by DoR. One box culvert (4L x 3.5 W x 1.5 H) m Required over Phangri chu stream.

ii) Slope stability

- Retaining Walls √

- Breast walls √

Page 100: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

100

- Bio-engineering

works (Techniques used)

Light intervention required on slopes, a per site conditions.

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area

Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road

- Yes

Is it due to road cut?

- No. It was due to flash flood.

- - once Carriage way

Road block

Due to erosion of soil above road after heavy forest fire.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- -

Traces of slope erosion seen from irrigation channel.

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc.)- None.

Page 101: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

101

⑩ Kabjisa Questionnaire Date: 26 -May ‘16

A: Current Status of GC Roads

Landscape: 2

Dzongkhag: Punakha Gewog: Kabjisa

Name of GC Road: Kabjisa (Kabesa)

Length: 3.1 Km From: Jalephu (Jalekha) - ‘0’ Point To: Gewog Office, Kabjisa

Year of Construction: 2009-2010

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The overall quality of road is good. But in general the road width is very narrow. The narrowest stretch/section is of about 100m at Damtekha and at Kabesa village. At Damtekha section the average FC width is about 4.5 m, the carriage way is 2.5-2.9 m. There is no place to give way to the oncoming vehicle. The side drains and cross drains are provided and sufficient. No threat of slides or slips along the road.

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required.

Who maintains? DoR

Labour contribution? Local labours on casual wages.

Funding? RGoB

Are there Road Users’ Group? Yes/No - NO.

How effective is the current management practice of the roads?

Not very effective, but somehow road is made trafficable.

What are the challenges? DoR’s Work Supervisor stated shortage of labour.

Page 102: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

102

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

At Damteckha section the road width must be obtained by constructing a retaining wall. An irrigation channel runs below the road and necessary precautions/measures (or restoration works) must be taken while constructing the wall. One Cross drain must be provided at the Kabjisa GC take-off point to safely drain the water rather than letting all the water on the Highway. Blacktopping of the road would greatly improve the road quality.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses)

Remarks

M F

Damtekha Road passes through the village.

18 58 47

Tippers (7) Shaktiman (1) Light Vehicle -------(60) Bolero (7) Bikes (5)

-School bus (2)

- Taxi

21 1

15 10 1 2 2

Carrying construction materials.

Carrying farm produce to markets. Official duties commuting

Traffic is heavy during Tsechu, Eusakha drupchen and also pilgrimage to Chorten Ningpo Lhakhang (av. 5 vehicles/day)

Eusakha -------“------ 43 152 145

Name of PAs/BCs

Distance from the road

Length (km) Types of vehicle plying /day

Trips per day

Purpose (uses)

Remarks

Protected Area:

- -

- - - GC road does not fall inside PA, BCor FMU.

Biological Corridor: - - - -

FMU: -

-

- - -

Page 103: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

103

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - No change.

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention

required Remarks

Yes No Yes No

i) Drainage (Types of drains, earthen, stones, line etc)

- Side drains L- drains (constructed earlier) are found in a few stretches.

√ √ L drains nonfunctional at many places.

- Cross drains 3 nos Hume Pipe

Culverts required √ √ 2 nos. additional required, one at the GC road Take-off point

- Culverts/bridges -Not provided Not required.

ii) Slope stability

- Retaining Walls - √ Not required.

- Breast walls 1 √ √ Additional not required.

- Bio-engineering works

(Techniques used)

-

Light intervention required on slopes, as per site conditions.

Page 104: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

104

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area

Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road -

- No

Is it due to road cut?

-

- - Carriage way

- -

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- -

-

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc.)- None.

Page 105: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

105

⑪ Gasetshowom Questionnaire Date: 26 -May ‘16

A: Current Status of GC Roads

Landscape: 2

Dzongkhag: Wangdue Phodrang Gewog: Gasetshowom

Name of GC Road: Gasetshowom

Length: 5.7 Km From: Gaselo Feeder road (end point To: Gewog Office, Wasina

Year of Construction: 2000-2001 (about 15-16 years back)

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal - Permanent

Observation on overall quality of road:

The overall quality of road is good. The DoR had already awarded contracts in two packages to 2 contractors and the scope of works included the followings; Blacktopping, drains and WMM.

Construction of L-drain was complete in Package 1 (0.00 -2.68 km).

Black topping completed in Package 2 (2.68 – 5.5 km).

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required30.

Who maintains? DoR

Labour contribution? Local labours on casual wages.

Funding? RGoB

Are there Road Users’ Group?

Yes/No - NO.

30The site has been handed over to the contractor and now it’s his responsibility to maintain the road till he hands back road to the DoR.

Page 106: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

106

How effective is the current management practice of the roads?

Not very effective.

.

What are the challenges? JE stated shortage of labour.

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

With current maintenance contracts the road is fine. No critical issues observed that requires attention.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Singkhey Road passes through the village.

60 110 190

DCM Pvt.Vehicle-6

- Taxi

20 Carrying construction materials. Carrying farm produce to markets. Official duties commuting

After Gewog office there are two chiwogs that also benefit from the GC road.

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

Protected Area:

- -

- - - GC road does not fall inside PA, BC or FMU.

Biological Corridor: - - - -

FMU: - - - - -

Page 107: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

107

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - Maybe slightly increased.

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage (Types of drains, earthen, stones, line etc.)

- Side drains L- drains √ √ L drains nonfunctional at many places.

- Cross drains 4 nos √ √

- Culverts/bridges - 1 culvert Lawalungmachu.

ii) Slope stability

- Retaining Walls - √ Not required.

- Breast walls 1 √ √ Additional not required.

- Bio-engineering works (Techniques used)

- Not required.

Page 108: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

108

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area

Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road

- No

Is it due to road cut?

-

- - Carriage way

-

-

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- -

-

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc) - None.

Page 109: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

109

⑫ Nahi Questionnaire Date: 27 -May ‘16

A: Current Status of GC Roads

Landscape: 2

Dzongkhag: Wangdue Phodrang Gewog: Nahi

Name of GC Road: Nahi

Length: 3.7 Km From: Agoloo (10 km from Highway) To: Gewog Office, Pegang

Year of Construction: 2005-06

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal - Permanent

Observation on overall quality of road:

The overall quality of road is ok. The road width is narrow (4-5m in average) and is only 3m. Stone masonry L- drain was constructed. Due to lack of maintenance most of sections are damaged and non-functional. There were 4 nos. of cross drains and seemed to be adequate. A small slip has occurred that might become worse if a breast wall is not provided.

Current management of roads: DoR

Type of maintenance:

Annual/periodic/daily? Periodic, as and when required.

Who maintains? DoR

Labour contribution? Local labours on daily wages.

Funding? RGoB

Are there Road Users’ Group? Yes/No - NO.

How effective is the current management practice of the roads? Not very effective.

What are the challenges? JE stated shortage of labour and difficult to access during rainy season.

Page 110: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

110

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

The drains need to be rectified/improved. A Gabion breast wall of 3x2m is to be provided to prevent further slope failure. Blacktopping essential to improve the road.

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses)

Remarks

M F

Hebesa chiwog Road passes through the village.

22 40 60

Tripper Tractor Pvt.Vehicle

Less than 1

Carrying construction materials.

RNR office/residents under construction beside the Gewog Office.

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses)

Remarks

Protected Area:

- - - - - GC road does not fall inside PA, BC or FMU.

Biological Corridor: - - - -

FMU: - - - - -

Page 111: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

111

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation - No

Water sources (drinking/irrigation) - No

Forest resources - No

Increase/decrease of wastes and type? - Not there.

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage (Types of drains, earthen, stones, line etc.)

- Side drains L- drains √ √ L drains nonfunctional at many places and needs to be repaired

and maintained.

- Cross drains 4 nos √ √

- Culverts/bridges - Not required.

ii) Slope stability

- Retaining Walls - √ Not required.

- Breast walls - √ √ 1 no. required.

- Bio-engineering

works (Techniques used)

-

Not required.

Page 112: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

112

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size / area

Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road -

- Yes

Is it due to road cut?

- Yes

3x3 m - Carriage way

- Initiation of further erosion.

- Blocked drain.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- No

- - Road Alignment

- - -

Category Size/area Frequency Observations / Remarks

Geological instability

- - None.

Others - - (Due to quarries, logs/firewood extraction etc.)- None.

Page 113: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

113

⑬ Sombeykha

Questionnaire Date: 5-June- ‘16

A: Current Status of GC Roads

Landscape: 1

Dzongkhag: Haa Gewog: Sombaykha

Name of GC Road: Khamina -Sombaykha

Length: 14 Km From: Khamina To: Gewog Office, Sombaykha

Year of Construction: Ongoing (Started – April 2015)

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The construction of the road has been awarded to M/s Lhendup Norbu Construction. The contract period is for 18 months.

The initial formation cutting (FC) is complete and the contractor has started and completed about 4 km of final road widening, base course and drains. This road requires two Bailey bridges at She chu and Shu chu rivers.

Current management of roads: Under construction.

Type of maintenance: -

Annual/periodic/daily? -

Who maintains? -

Labour contribution? -

Funding? -

Are there Road Users’ Group? Yes/No

How effective is the current management practice of the roads?

-

What are the challenges? -

Page 114: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

114

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

-

Beneficiaries

Name of village Distance from the road

No. of H/H

Population Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

M F

Tshonglingna Road passes through the village.

7 43

Tripper Tractor

20 Carrying construction materials.

Vehicles belonging to the contractor are plying at site.

Gadaykha ------“------ 13 69

Sombeykha ------“------ 22 723

Mochu Across Amochu 21 7-8 km

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses) Remarks

Protected Area:

- - - - - GC road does not fall inside PA, BC or FMU.

Biological Corridor: - - - -

FMU: - - - - -

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Page 115: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

115

Land degradation -

Water sources (drinking/irrigation) -

Forest resources -

Increase/decrease of wastes and type? -

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage

(Types of drains, earthen, stones, line etc.)

- Side drains L- drains

Road under construction.

- Cross drains -

- Culverts/bridges -

ii) Slope stability

- Retaining Walls -

- Breast walls -

-Bio-engineering works (Techniques used)

Not carried out. The contractor should carry out bioengineering works immediately as this is the season.

Page 116: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

116

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area

Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road -

- Yes

Is it due to road cut?

- Yes

- Carriage way

There will be a few landslides, the slopes need to time to stabilize.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- Maybe

- - Road Alignment

- - -

Category Size/area Frequency Observations / Remarks

Geological instability

- - Not foreseen

Others - - (Due to quarries, logs/firewood extraction etc.)- Can’t say.

Page 117: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

117

⑭ Gakiling Questionnaire Date: 5 – June- ‘16

A: Current Status of GC Roads

Landscape: 1

Dzongkhag: Haa Gewog: Gakiling

Name of GC Road: Gakiling - Rangtse

Length: 7 Km From: Gakiling To: Rangtse

Year of Construction: Ongoing (Started – April 2015)

Financing source: RGoB/GoI/WB/ADB/Others - RGoB

Type of Road: Permanent/Seasonal- Permanent

Observation on overall quality of road:

The construction of the road is being carried out departmentally.

About 3 km of formation cutting (FC) is complete. The work is ongoing.

Current management of roads: Under construction.

Type of maintenance:

Annual/periodic/daily? -

Who maintains? -

Labour contribution? -

Funding? -

Are there Road Users’ Group? Yes/No - No

How effective is the current management practice of the roads?

-

What are the challenges? -

Page 118: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

118

Current condition of the GC road and critical suggestions to improve the Farm roads to maximize the benefit of the road to the beneficiaries.

-

Beneficiaries

Name of village Distance from the road

No. of H/H

Population

Types of vehicle plying /day

Trips per day

Purpose (uses)

Remarks

M F

Rangtse Road passes through the village. 40

Mochu Across Amochu 21

Name of PAs/BCs

Distance from the road

Length (km)

Types of vehicle plying /day

Trips per day

Purpose (uses)

Remarks

Protected Area:

- - - - - GC road does not fall inside PA, BC or FMU.

Biological Corridor: - - - -

FMU:

- - - - -

Page 119: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

119

B: Vulnerability to various climate hazards

Have there been any changes to the environment as a result of road construction:

Land degradation -

Water sources (drinking/irrigation) -

Forest resources -

Increase/decrease of wastes and type? -

Examination of current status of climate resilience/EFRC standards

Items

Quantity provided per km (Nos,)

Adequacy Intervention required Remarks

Yes No Yes No

i) Drainage (Types of drains, earthen, stones, line etc)

- Side drains L- drains

Road under construction.

- Cross drains -

- Culverts/bridges -

ii) Slope stability

- Retaining Walls -

- Breast walls -

- Bio-engineering works

(Techniques used)

-

Not carried out. DoR should carry out bioengineering works immediately as this is the season.

Page 120: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

120

3. Are selected GC road prone to incidences of slides/geological instabilities? Size and frequency?

Category Location Causes Size/area

Frequency

Damages Signs of erosion /

deposition

(on & along)

Remarks To Type

Landslide (slope instabilities)

Above road -

- Yes

Is it due to road cut?

- Yes

- Carriage way

There will be a few landslides, the slopes need to time to stabilize.

Below road

Undercutting by rivers, irrigation canals, land use, others??

- Maybe

- - Road Alignment

- - -

Category Size/area Frequency Observations / Remarks

Geological instability

- - Not foreseen

Others - - (Due to quarries, logs/firewood extraction etc)- Can’t say.

Page 121: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

121

7.4 ANNEX - IV _ ITINERARY

Day Date Place Activities Gewog

Wed

11-May- ‘16 Bumthang - Travel & Halt. - Met Chief, DoR, Lobeysa

- Visit Tabading-Ngelungdraling GC road with JE

- Met Gewog Administration Officer

Phobji

Thu 12-May- ‘16 Lingmethang - Met Asst. Engineer DoR, Lingmethang

Fri 13-May- ‘16 Lhuentse - Visit Autso _ Jarey road GC Roadwith JE -16.3 km

- Met Gup, Jarey

Jarey

Sat 14-May-‘16 Yongkola - Visit Yongkola -Tsamang GC road with JE -21.3 km

Tsamang

Sun 15-May- ‘16 Yongkola Rest

Mon 16-May- ‘16 Bumthang - Visit Dungmithang - Mesithang GC road with Asst. Engineer - 27 km

- Met Gewog Adm. Officer

Tang

Tue 17-May- ‘16 Zhemgang - Visit Wangdigang- Zhalingbi road - 20 km

(Nobji - Korphu GC Road)

- Met Gedung

Korphu

Wed 18-May- ‘16 Zhemgang - Called on Chief, DoR Tingtibito discuss on the field visit.

Shingkhar

Thu 19-May- ‘16 Nimshong - Visit Buli- Nimshong-Shingkhar GC road with Asst. Engineer - 38.66 km

- Met Gup

- Range Officer, DoFPS

Shingkhar

Fri 20-May- ‘16 Tingtibi Travel back to Tingtibi

Sat & Sun

21-22 May- ‘16 Gelephu Travel and Halt

Mon 23-May- ‘16 Sarang - Visit Doban Road GC Road with EE and JE - 48.5 km - Called on Chief DoR

Chudzom/Doban

Tue 24-May- ‘16 Tsirang - Visit Tsirangtoe Gup Office- Gewog office

- 5.25 km (Phuentenchu GC Road with JE)

- Met Gup and Tshogpa

Phuentenchuu

Wed 25-May- ‘16 Wangdue - Visit Athang GC road with Supervisor, DoR

(Jarogang zam - Gewog office road - 7 km)

- Met Mangmi

Athang

Page 122: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

122

Thu 26-May- ‘16 Punakha / Wangdue

- Called on Chief, DoR to finalise the field visits

- Visit to Kabjisa GC road with Mason, DoR (3.06 km)

- Met Gewog Adm. Officer

- End point of Gaselo Feeder Road (DoR) - Wasina (Gewog Office) with JE

- Met Gup

Kabisa

Gasetshowom

Fri 27-May- ‘16 Wangdue - Visit Nahi GC Road (Agoloo – Gup office) with JE

- Met gedung Nahi

Sat 4-June- ‘16 Haa - Travel to Gakiling and halt (Visit Jenkana - Khamina road - 65.5 km)

Bjee

Sun 5-June- ‘16 Haa - Visit Khamina– Sombeykha GC road with JE.

- Visit Khamina – Gakiling GC road with JE

Bjee

Page 123: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

123

7.5 ANNEX – V _ REFERENCES

DoR, June 2004: Road Sector Development and Environmental Friendly Roads in Bhutan_ Providing access to rural communities whilst protecting the environment. DoR, March 2004: Field Hand Book for Construction of Gravel Roads in Bhutan. DoR, June 2005: “Towards Quality Infrastructure” Reference Manual, Bridges DoR, August 2010: Guidelines on use of Standard Work Items for Common Road Works DoR, 2016: Road Pavement Standards, Road classification, Right of Way (ROW) DoR, January 2013: Environment Report_ ADB TA-7608 REG: Enabling Climate Change

Responses in Asia and the Pacific -Building Resilience to Disaster and Climate Change Impacts (Subproject 2)

DoR, May 2012: Environmental Impact Assessment Report, PPTA, ADB Project No.

39225 – 06, Bhutan: Road Network Project (RNP) II Additional Financing, Subproject: Nganglam – Deothang Road

DoR, 2013 Detailed Project Design & Procurement Assessment for SASEC Road

Connectivity Project (Nganglam-Dewathang Highway & Pasakha Access Road

NEC, 2011 Second National Communication to UNFCCC. NEC, 2006 Bhutan National Adaptation Programme of Action, 2006, National

Environment Commission, Thimphu MoAF RNR Sector 11th Five Year Plan, 2013-2018 MoAF National Food Security Paper, Bhutan Climate Summit 2011. ADB Climate Change Risk Assessment Report, Asian Development Bank,

Country Partnership Strategy: Bhutan, 2014-2018 RGoB, July 2010 Bhutan scoping mission report: Local Climate Adaptive

(LoCAL) Facility

UNDP, Sept. 2011 Paving the Way for Climate-Resilient Infrastructure: Guidance for Practitioners and Planners, UNDP September 2011 Web sites http://www.resilientmobility.com/taking_action/assessing_risk

http://www.resilientmobility.com/taking_action/climate_resilient_roads

https://www.ctc-n.org/sites/www.ctc-n.org/files/UNFCCC_docs/ref20x08_35.pdf

http://www.adb.org/projects/documents/improvement-road-safety-and-climate-resilience-national-pptar

Page 124: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

124

7.6 Annex – VI _ Environmental Friendly Road Construction (EFRC)

Background: In May 1990 virtually every senior government official in the country participated in the Workshop on Environment and Sustainable Development to create a nation-wide understanding for and acceptance of the necessity of sustainable development in Bhutan. The workshop discussed problems in working groups covering three main categories:

Agriculture, forestry, nature conservation and animal husbandry. Industrial development, urban growth, energy, roads and population. Human resources development, education, health, population, sanitation and clean water supply.

The meeting then adopted the very strong Paro Resolution on Environment and Sustainable Development and a need was felt to have a governmental body to look after the environmental sector of the country. Soon after the National Environment Commission (NEC) was formed and mandated with the responsibility of drawing up a national strategy to ensure that ‘environmental concerns became an integral part of the development agenda’, the ultimate goal being to minimize or

mitigate the impacts likely to result from the development process. The National Environment Strategy (NES) for Bhutan named “The Middle Path” was thus formulated and released in 1998 by the NEC. As all development activities will have some environmental costs, perhaps a higher degree of environmental concerns fall in the road construction sector in the country. The challenges of road construction are many, given the steep terrains and young Himalayan Mountains with very fragile mountain slopes and eco-system. Therefore, to address these challenges the DoR started with the concept of EFRC techniques under the World Bank project, the Rural Access Project (RAP) with TA support from SNV-Bhutan (Netherlands Development Organisation) from May 2000. The first ever Environmental Codes of Practice (ECoP) in Bhutan was developed for the road sector by DoR with technical assistance from SNV Bhutan known as the Environmental Codes of Practice for Highways & Road, September 1999.

From 2003 with TA support from SNV, the DoR implemented EFRC-Support Project to further develop and consolidate the EFRC concepts. The project had eight components viz.

1. Rural Access Project Implementation Support, 2. Further development of EFRC concept, 3. Adoption of EFRC for all road works by DoR, 4. Development of EFRC Policy Framework, 5. Introduction of EFRC to other Road Agencies 6. Capacity Development of Dzongkhag and Communities 7. Capacity Building within Private Construction Sector, and 8. Dissemination of EFRC to Technical Training and Educational Institutions.

Since 9th Five Year Plan (2002-2007) environmental concerns had received a top priority in the infrastructure development activities. The following paragraphs (in italics) are extracted from the 9 th FYP document.

Chapter 18: Roads and Bridges: In a landlocked country like Bhutan, the socio-economic

development of the country depends largely on an efficient and reliable road network.

Objectives:

Improving accessibility to social and economic activities by building more roads; and

Enhancing the existing network with a view to reduce travel time, road user costs and transportation cost for goods and services.

Adoption of Environment Friendly Road Construction (EFRC) Techniques: Road is one of the largest land users in the country. Inadequate or lack of proper road construction techniques has significant impact on environment and sustainability. Therefore, all road construction activities will be

Page 125: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

125

required to adopt environmentally sound techniques and conform to the Environmental Codes of Practice (ECoP) from now on.

With such a high commitment from the government all road constructions in the country are now in line with EFRC techniques. As a follow up from RAP-I, the WB supported the RAP-II. The Asian Development Bank (ADB) supported Road Network Project-I (RNP-I) is nearing completion and RNP-II also supported by ADB all have the EFRC techniques inbuilt in the project.

Figure 1: Inclusion of environmental safeguards into the road project cycle.

Some salient EFRC Features are;

Planning on basis of accessibility plans Design on small scale maps Avoiding geological weak areas Thorough environmental and social assessments Detailed surveys in the field Design with balanced cut and fill Use of dump sites, log and boulder barriers Use of excavators instead of bull dozers Proper planned side, cross and French drains Use of bio-engineering techniques for slope stabilization Controlled blasting instead of random blasting Use of crib walls and gabion walls Environment Management and Quality Assurance Plans compulsory Use of community based maintenance Considering the life cycle cost cheaper than traditional methods Adoption of Occupational Health and Safety (OHS) measures

Planning

Desk Based Study

Environmental Assessment

Survey

Design

Tender

Construction

Maintenance

Road network planning and road selection

Qualified contractor, clear contract and specifications

Good quality new road

Minimal slope destabilization, EFRC design

Well mapped road corridor

Best alignment; technical, social and environmental feasible

Accurate maps and alternative alignments

Good quality road and durable life-span

Road Project Cycle Analysis

Page 126: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

126

Fig 1: Balanced cut and fill. Fig 2: The importance of the location of the road centreline and its consequences with regard to EFRC.

Fig 3: Excavation quantities in relation to the position of the road’s centreline.

Location of Centreline

• Balanced cut and fill- creates little or no slope stability problems

- for slope angles of not more than 30º

(to avoid retaining walls)

• Full fill- for areas with rock joints

- when bedding or foliation planes dip out of the slope

- in highly erodible soils

- in shallow loose scree or similar deposits

- in slopes with high water table

• Full cut- for slopes without stability problems

- for steep slope angle

- for areas where the dipping of surplus

material is no problem

Source: Drawings reproduced (Fig 1, 2, 3) from original report of Mr. Urs Schaffner on EFRC.

Conclusion on EFRC concept and technology

During September-October 2007, a study31 on EFRC was carried out after eight years of implementation. The study confirmed that the higher initial investment was justified and the cost recovery was just after 3 years as initially projected of 8-9 years! The slide reproduced below is self-explicit.

31The RAP/DoR carried out a study “Review of Whole Life Costs and Benefits of Total EFRC for Road Construction within DoR” . The study funded by SNV-Netherlands Development Organisation, Thimphu was carried out by a team comprising of Mr. Urs Schaffner (Road engineer), Mrs. (Dr.) Ruth Schaffner (Bioengineering Expert) and Mr. K. D. Chamling (Environmental Specialist) as local counterpart during Sept-Oct. 2007.

cut volume

up to 400% cut volume

100%

Cross Section - Box Cut Cross Section - Full Cut

1 m

2 m

cut volume cut volume

65% 35%

Cross Section - 1 m Shift Cross Section - 2 m Shift

Page 127: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

127

Conclusions

Initial cost of Total EFRC and cost recovery period

• EFRC not more than 15% costlier than non/partial EFRC roads

• Transportation costs in average 10% of the total

construction cost

• Log and boulder barriers amount to 0.8% of the

total cost• bioengineering measures amount to 0.8% of the

total cost

> Cost recovery after 3 years!

Figure 4: Graph on economic feasibility of EFRC compared to traditional road construction.

Graphs showing the EFRC roads have a higher initial investment costs but lower repair and maintenance cost which is just the opposite of Traditional Road Construction (TRC). EFRC roads become economically feasible based on cumulative expenditures and benefits after about 8-9 years. (The above analysis was made during the initial stages of EFRC concept development in 2000.)

EFRC vs TRC Costs Comparison [X 1,000 Nu.]

0

2000

4000

6000

8000

10000

12000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39

Year

Co

sts

EFRC Traditional

Page 128: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

128

Fig. 5: Quality level of DoR after 7 years of development

Years10 20

Good engineering practice ~ EFRC concept

DoR 2007

0

Graph showing the level of capacity and capability of DoR in EFRC technology, at the time of study in 2007.

Page 129: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

129

7.7 Annex - VII _ List of Participants during Presentation on 20-July 2016

List of participants during the Presentation on Gewog Connectivity Roads by PPG

Sub-Consultant, GEF/LDCF/UNDP on 20th July 2016, Meeting Hall, DoR Thimphu.

Sl. No. Name Designation Organisation

1 Mr. Karma Galay Director DoR

2 Mr. Karma Wangdi Chief Engineer, Construction

DoR

3 Mr. M.N. Lamichaney Specialist DoR

4 Mr. Dorji Gyeltshen P Chief Engineer DoR

5 Mr. Dorji Wangmo CPO PPD, MoWHS

6 Mr. Namgay Tshering Engineer DoR

7 Mr. Tshewang Dorji Chief Engineer, BD DoR

8 Mr. Lungten Jamtsho Chief Engineer, DD DoR

9 Ms. Sonam Desel Dy. Chief Environment Officer

PPD, MoWHS

10 Mr. K. D. Chamling Consultant, GC Road UNDP

Page 130: Assessment of Gewog Connectivity Roads for Enhanced ......Bhutan Gewog Connectivity Roads for Enhanced Climate Resilience Report OCTOBER 2016 Assessment of Gewog Connectivity Roads

130

7.8 ANNEX - VIII _ Photographs of Dungmithang – Mesithang GC road, Tang, Bumthang

Take-off point. Stone pitched drain.

Blacktopped road with stone pitched drain. Landslide damaged road and drains.

Ongoing black topping works. Line drain under construction.