ASSEMBLY INSTRUCTIONSS DOME SYSTEM
USAUL 2703 Listed System
2 | 11Table of contents
2
3
4
6
7
11
TABLE OF CONTENTS
GENERAL INSTRUCTIONS
MATERIALS REQUIRED
FIRE RATING
ASSEMBLY
TERMS AND CONDITIONS
TABLE OF CONTENTS
ENGINEERING STRENGTH IS AT OUR CORE
With sophisticated product innovations and a deep customer focus, Everest Solar is the engineering leader for all your mounting system needs. We are the US division of K2 Systems, one of Europe’s market leaders with more than 3 GW installed.
We offer proven product solutions and innovative designs. Wind tunnel testing along with advanced structural and electrical validation that should facilitate permitting, design and installation. Our designs result in cost competitive racking systems with dedicated support that will position you to win more projects.
We partner with our customers and suppliers for the long-term. High quality materials and cutting edge designs provide a durable, yet functional system. Our product line is comprised of a few, coordinated components that lower the cost of materials, and simplify installation, saving you time and money. All backed by German engineering, a long track record of quality, and a company that is here to stay.
Thank you for choosing Everest Solar mountings systems for your Solar PV Project.
INTRODUCTION TO THE S DOME SYSTEM
The S Dome is a traditional South-facing system that maximizes output on your roof.
S Dome has been wind tunnel tested in a boundary layer wind tunnel, and has peer-reviewed to SEAOC PV-2 requirements.
Low component count reduces labor costs.
3 | 11Safety Regulations
GENERAL INSTRUCTIONS
Everest Solar Systems’ Assembly Instructions must be followed to maintain the exclusive, limited product warranty. Contractor shall verify that it is using the most current instructions by downloading the latest version from our website http://www.everest-solarsystems.com/us/downloads/technical-information.html or by contacting us directly at [email protected].
In general, the following applies:
¬ Systems should be installed by experienced contractors licensed and qualified to perform the work with professional workmanship and quality.
¬ Before installation, Contractor must verify that the system meets all applicable laws, regulations, ordinances, and codes. Contractor shall verify that the roof or other structures to which the system is being attached are capable of carrying the system loads.
¬ Contractor is solely responsible for work safety and accident prevention regulations and corresponding standards and regulations of the applicable occupational safety and health agency are followed.
¬ Module manufacturer installation guides must be followed. Use approved electrical bonding and grounding components as required by the local or national codes and AHJ.
¬ A copy of these instructions must be on site, and read and understood by all workers during installation.
¬ In the event our general installation and assembly instructions are not followed, or that not all system components and assemblies are used according to these instructions, or that components are used which were not obtained from us, Everest Solar Systems is not liable for any resulting defects and damages, and the exclusive, limited warranty will be void.
¬ The exclusive, limited product warranty shall apply only if all instructions are strictly adhered to and the system is correctly installed. Everest Solar Systems disclaims any and all warranties, express or implied, including without limitation any warranties of merchantability and fitness for a particular purpose other than as set forth in the exclusive, limited warranty in the terms and conditions of sale, which can be viewed under on our website: http://www.everest-solarsystems.com/us/downloads/technical-information.html
¬ The dismantling of the system should be in reverse order of these assembly instructions.
¬ This system can be installed for all standard flat roofs with pressure-resistant substrates and a roof pitch of up to 5 degrees. The elevation angle is 10 degrees.
¬ It is recommended to verify compatibility of the Building Mat with the particular roofing on the project.
¬ Minimum distance to roof edge: 20 in.
¬ A thermal break is required at no more than 50 ft in both directions, North/South and East/West. A minimum separation of 1.5 in is required between separate array.
¬ The S Dome is designed to be used with standard 60 cell modules with a frame height of 1.18-1.97in (30-50mm). All modules used with the S Dome system must be approved by the module manufacturer prior to installation. For a complete list of approved modules, please visit www.everest-solarsystems.com/us/downloads.
4 | 11Materials Required
| 1005843Windbreaker Dome S1000Length: 66.93 inch (1700 mm)Material: Aluminum
| 2001441
| 4000417
S Dome Windbreaker HardwareMaterial: stainless steel
| 1005840
Dome S1000Width: 3.54 inch (90 mm) Material: Aluminum
Optional: Universal Hardware SetMaterial: stainless steel
| 2000813
| 1005842
Dome SDWidth: 3.54 inch (90 mm) Material: Aluminum
XPressRail 22Material: Aluminum
| item number system-specific
EZ Universal Hardware SetMaterial: stainless steel
All components evaluated under UL 2703 and encompassed within Everest Solar System’s UL 2703 listing noted with
UL 2703 LISTED COMPONENTS
Bonding End Clamp SetMaterial: stainless steelHardware: stainless steel
Bonding Middle Clamp SetMaterial: stainless steelHardware: stainless steel
| item number system-specific
| item number system-specific
| 2001442Ilsco Lug SGB-4Material: tin plated aluminumHardware: stainless steel
| item number system-specific
| 2001472
Optional: Porter for ballasting Material: Aluminum
| 1006039Optional: XPressRail Connector SetMaterial: Aluminum
Optional: Micro Inverter Mounting Kit*Material: stainless steel
*The inverter hardware kit is not intended to replace the micro inverter ground and has only been evaluated to attach to the rail.
5 | 11Materials Required
Module End Clamp SetMaterial: Aluminum
Module Middle Clamp SetMaterial: Aluminum
| 2000960
| item number system-specific
| item number system-specific
Optional: OMG PowerGrip PlusAllows welding to the roof membrane
Optional: Eco Fastener 65Material: stainless steel
| item number system-specific
Optional: Burndy KMC WEEB Clip
Material: stainless steelPre-assembled with Mid Clamp
Optional: Fire Guard S1000 West*,**
Fire Guard S1000 East*,**
Material: Aluminum
| item number system-specific
| 2001433| 2001424
NON-UL LISTED COMPONENTSComponents in this section were not evaluated by UL for bonding
| 2001410
| 2001411
Building Protection Mat IIMaterial: recycled tire rubber
Building Protection Mat SDMaterial: recycled tire rubber
| 4000336
Building Protection Mat Spacer PadMaterial: recycled tire rubber
* Use of Fire Guards required on East and West edge of arrays to be compliant with UL 1703 for Type 1 modules.** The use of the Fire Guard on a UL 2703 system will not affect the UL 2703 system listing.
Figure 1
6 | 11Fire Rating
UL1703 - S Dome Fire Rating:
The S Dome system has undergone fire performance testing per UL 1703 Section 15, Fire Performance.
A System Class A fire rating is achieved when using CrossRail under the following conditions:¬ Used in combination with a UL 1703 Listed module with a fire performance of Type 1 or Type 2. Consult the module manufacturer
for specific fire performance rating information.¬ Type 1 modules tested with UL
- Use of Fire Guards required on East and West edge of arrays to be compliant with UL 1703 for Type 1 modules.- The use of the Fire Guard on a UL 2703 system will not affect the UL 2703 system listing.
¬ Type 2 modules tested with Western Fire Center¬ Roof slope of 2/12 inch rise per linear foot or lower.¬ The assembly is to be mounted over a fire resistant roof covering rated for the application.¬ The results of the racking system do not improve a roof covering Class rating.
UL2703 - S Dome Bonding:
The S Dome system has obtained a UL 2703 system listing from Underwriter's Laboratories (UL).
A sample bonding path diagram is shown in Figure 1, below. Specific installations may vary based on site conditions and AHJ requirements.
Each electrical connection has been evaluated to a maximum fuse rating of 30A. When installed per these installation instructions, all connections meet the requirements of NEC 690.43.
Installation should be periodically reinspected for loose components or fasteners and any corrosion.
Everest S Dome system was tested with the SolarWorld, Sunmodule family of modules.¬ PlusSW200-300Mono (including black)¬ PlusSW200-280Poly (including black)
This racking system may be used to ground and/or mount a PV module complying with UL 1703 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instructions.
7 | 11Installation of S-Dome System
1of 12
a. Building mats are installed by sliding them onto the end of the rail or can be installed from the bottom by pushing one side of the mat onto the rail and snapping the other side around the rail flange.
b. Install one Building Protection Mat II per S Dome.
c. Install one Building Protection Mat SD per single SD Dome.
d. To account for fluctuation in roof surface, the Building Protection Mat Spacer Pad can be placed under the Mat II and Mat SD to support the rail. Up to 4 Spacer Pads can be used in one location.
BUILDING PROTECTION MATS
2of 12
a. Butt up rails end to end.
b. Insert one EZ Universal Hardware Set in each rail and turn clockwise 90 degrees until they lock.
c. Position each EZ Hardware Set such that when the XPressRail Connector is installed, the Connector is centered over the splice.
d. Fasten with the Serrated Flange Nut. Torque to 11.8 ft-lbs.
Option: Dome S1000 can be used to splice the rail if the joint is +/- 1 inch from the center of the Dome S1000 location.
INSTALL RAIL CONNECTORS
INSTALLATION OF S-DOME SYSTEM: STEP BY STEP
8 | 11Installation of S-Dome System
FIT DOME S1000
FIT DOME SD
a. Insert two EZ Universal Hardware Sets in rail and turn 90 deg clockwise until they lock.
b. Position the S Dome over the EZ Universal Hardware Sets and slide down over the bolts.
c. Fasten with the Serrated Flange Nut. Torque to 11.8 ft-lbs.
3of 12
a. Insert one EZ Universal Hardware Set in rail and turn 90 deg clockwise until locked.
b. Position SD Dome over the EZ Universal Hardware Set and slide down over bolts.
c. Using the Serrated Flange Nut, loosely fasten SD domes. SD Dome should still be able to slide along the rail.
d. Repeat steps a thru c until the rail is complete with Dome SD‘s.
4of 12
5of 12
CONTINUE RAIL INSTALLATION
a. Lay first outer rail assembly.
b. Lay second rail assembly parallel to first assembly. The center to center dimension should be calculated as the module length, plus 3/4“.
c. Continue laying rail assemblies until a thermal break is needed.
9 | 11Installation of S-Dome System
5a of 8
OPTIONAL: PORTERS AND BALLASTa. Insert one EZ Universal Hardware Set in each rail and turn 90 deg
clockwise until locked.
b. Position Porter on EZ Universal Hardware Set on both rails.
c. Fasten with the Serrated Flange Nut. Torque to 11.8 ft-lbs.
d. Repeat steps a thru c until the rail is complete with Porters. Distance between Porters should be no greater than the paver length plus 1/2“.
6 of 12
INSTALLING GROUNDING LUG
OPTIONAL: INSTALL FIRE GUARDS (UL 1703 - TYPE 1 MODULES ONLY)
a. Secure ground lug to horizontal flange or vertical walls of Dome S1000.
b. Torque to 35 in-lbs on Dome and ground wire.
*For UL 2703 compliance, use 4-14 AWG Solid/Stranded Copper ground wire.
a. Only required on East and West edge of arrays.
b. Insert two EZ Universal Hardware Sets in the rail and turn 90 deg clockwise until locked.
c. Position Fire Guard on EZ Universal Hardware and lower top flange of Fire Guard over the top of the Dome S1000.
d. Fasten with the Serrated Flange Nut.
e. Torque to 11.8 ft-lbs.
7of 12
OPTIONAL: INSTALLING ANCHORSa. Install one porter as described in Step 5 if not already installed.
b. Determine desired anchor location. Must be located within 12” of XPressRail 22.
c. Drill hole in Porter to match the anchor bolt pattern.
a. Eco65 – Drill in back of Porter.
b. OMG PowerGrip Plus – Drill in bottom of Porter.
d. Install anchor to roof following manufacturer instructions.
e. Bolt anchor to Porter using anchor supplied hardware.
8
9
of 12
of 12
10 | 11Installation of S-Dome System
INSTALL PV
a. Insert appropriate clamps into the clamp channel of both the D andSD Domes.
b. Position PV module across two S Domes against the module stop.
c. Push SD Dome under the module until the module rests against themodule stop. Torque hardware to 11.8 ft-lbs.
d. Secure clamp to module. Torque to 10.3 ft-lbs.
Important: Verify module manufacturers recommended torque specification to ensure clamps are compatible.
10of 12
INSTALL THE WINDBREAKER
a. Position the upper fold of the windbreaker on the flange on thenorth edge of the Dome.
b. At the edge of the array, align the windbreaker edge with the edgeof the module.
c. Install the windbreaker hardware. Torque to 11.8 ft-lbs.
d. In the middle of the array, overlap adjacent windbreakers, align theslots, and install the windbreaker hardware. Torque to 11.8 ft-lbs.
e. Ensure the last windbreaker does not extend beyond the DomeS1000 and install the windbreaker hardware. Torque to 11.8 ft-lbs.
11of 12
OPTIONAL: ATTACH MICRO INVERTERS OR POWER OPTIMIZERS
a. Insert the Micro Inverter Mounting Kit Hardware into the rail.
b. Slide the micro inverter or power optimizer onto the bolt, betweenthe lock washer and flat washer.
c. Tighten bolt to secure micro inverter or power optimizer. Torque to10.3 ft-lbs.
* The inverter hardware kit is not intended to replace the micro inverterground and is only evaluated to attachment to the rail.
12of 12
Assembly Instructions S Dome | US5 | 0715Product images are for illustrative purposes only. Specifications are subject to change without notice. All sales of our products shall be subject to Everest Solar Systems terms and conditions, including the exclusive limited warranty set forth therein.
Mounting systems for solar technology
K2 Systems International:World headquarters K2 Systems GmbH, GermanyK2 Systems SARL, FranceK2 Systems SRL, ItalyK2 Solar Mounting Solutions Ltd., UK
Everest Solar Systems, LLC 3809 Ocean Ranch Blvd.Suite 111Oceanside, CA 92056Tel. +1.760.301.5300info@everest-solarsystems.comwww.everest-solarsystems.com
THANK YOU FOR CHOOSING A EVEREST MOUNTING SYSTEM.
Systems from Everest Solar Systems are fast and simple to install. We hope these instructions have helped you in this. Please contact us if you have any questions or suggestions for improvements. We are looking forward to receive your call on our
Service-Hotline +1.760.301.5300
Ready!
TERMS AND CONDITIONS
Product images are for illustrative purposes only. Specifications are subject to change without notice. All sales of our products shall be subject to Everest Solar Systems terms and conditions, including the exclusive limited warranty set forth therein. The terms and conditions can be found at http://www.everest-solarsystems.com/us/downloads/technical-information.html