Asphalt Quality Task Force Update Regional Asphalt Seminar David P. Shiells, P.E. District Materials Engineer

description

Asphalt Quality Task Force Update Regional Asphalt Seminar. David P. Shiells, P.E. District Materials Engineer. Asphalt Quality Task Force. Background – Authorized by Chief Engineer. - PowerPoint PPT Presentation

Transcript of Asphalt Quality Task Force Update Regional Asphalt Seminar

Page 1: Asphalt Quality Task Force Update Regional Asphalt Seminar

Asphalt Quality Task Force UpdateRegional Asphalt Seminar

David P. Shiells, P.E.

District Materials Engineer

Page 2: Asphalt Quality Task Force Update Regional Asphalt Seminar

“The purpose of the Task Force is to discuss and suggest possible improvements to enhance asphalt quality by reviewing the VDOT rideability program and proposing other simple measures and positive contract language that would increase the quality of our projects and provide for a level playing field for our contractors. In other words, a simple workable contracting mechanism that would help encourage quality.”

2

Asphalt Quality Task Force

Background – Authorized by Chief Engineer

Page 3: Asphalt Quality Task Force Update Regional Asphalt Seminar

3

Task Force Team

Industry VDOT/VCTIR

*David Helmick, Superior Paving *David Shiells, NoVa District Materials

Company Engineer

David Branscome, Branscome Ron Crandol, Asphalt Program Manager

Paving Company

Trenton Clark, Virginia Asphalt Jon Dowell, Maintenance Contract

Association Manager

Ed Dalrymple, Chemung Contracting Rick Kibler, Construction Manager

Company David Lee, Salem District Materials

David Horton, Virginia Paving Engineer

Company Kevin McGhee, Associate Principal

Richard Schreck, Virginia Asphalt Research Scientist

Association

*Co-Chairman

Page 4: Asphalt Quality Task Force Update Regional Asphalt Seminar

4

How Do We Define Asphalt Quality ?

Road and Bridge Specifications

Special Provisions

Road and Bridge Standards

Consistency !

Page 5: Asphalt Quality Task Force Update Regional Asphalt Seminar

5

Measures of Asphalt Quality

Laboratory Test Results (Mix) Meet job mix formula Consistent

Page 6: Asphalt Quality Task Force Update Regional Asphalt Seminar

6

Measures of Asphalt Quality

Field Density Meets minimum specification Uniform and consistent

Page 7: Asphalt Quality Task Force Update Regional Asphalt Seminar

7

Measures of Asphalt Quality

Smoothness/Rideability No bumps, IRI less than 70 ins/mile

Page 8: Asphalt Quality Task Force Update Regional Asphalt Seminar

8

Measures of Asphalt Quality

Longitudinal Joints Straight, good density

Page 9: Asphalt Quality Task Force Update Regional Asphalt Seminar

9

Measures of Asphalt Quality

Transverse Joints Smooth, straight, barely visible Length of transition

Page 10: Asphalt Quality Task Force Update Regional Asphalt Seminar

10

Measures of Asphalt Quality

Uniformity of Texture No texture variation, no segregation

Page 11: Asphalt Quality Task Force Update Regional Asphalt Seminar

11

Good Quality Paving Practices

Use of MTV Reduces mix segregation Reduces thermal segregation Minimizes trucks bumping into paver

Page 12: Asphalt Quality Task Force Update Regional Asphalt Seminar

12

Good Quality Paving Practices

Use of Automation/Skis Pavers Milling Machines

Page 13: Asphalt Quality Task Force Update Regional Asphalt Seminar

13

Good Quality Paving Practices

Performance Milling Smoother pavement surface More teeth on milling drums Safer for motorists

Page 14: Asphalt Quality Task Force Update Regional Asphalt Seminar

14

Good Quality Paving Practices

Uniform and Sufficient Tack All exposed surfaces Longitudinal joints Transverse joints

Page 15: Asphalt Quality Task Force Update Regional Asphalt Seminar

15

Good Quality Inspection Practices

Straight Edge Transverse joints Frequent checks

Page 16: Asphalt Quality Task Force Update Regional Asphalt Seminar

16

How Do We Achieve Quality ?Incentives/Disincentives• Appropriate incentives for high quality work• Appropriate disincentives for poor quality workEnforcement of Specifications• Ensures minimum level of quality• Discourages poor performanceEducation• Inspectors, foremen, managers, roller operatorsGood Specifications• Encourage quality work• Measurable and acheivableAccurate Testing• Incentives/disincentives based on test results

Page 17: Asphalt Quality Task Force Update Regional Asphalt Seminar

17

Task Force Recommendations

Goals for Recommendations• Immediate impact• End result wherever possible• Cost effective• Easy to implement• Simple/easy to understand

Page 18: Asphalt Quality Task Force Update Regional Asphalt Seminar

18

Task Force Recommendations

#1 - Make the “incentive only” specification a default on all maintenance and construction projects with speed limits ≥45 mph not subject to the incentive/disincentive specification; complete a pilot project with “before” and “after” ride testing to evaluate effectiveness of the “incentive only” specification

• Pilot projects completed on the Fairfax County Parkway in 2012 and on the Prince William Parkway in NoVa in 2013

• Incentive >$530,000 on FCP • PM-7A-13, PM-7C-13 and PM-7E-13 (various routes) completed in

Culpeper district in 2013• Control sites completed in Fredericksburg, Staunton, Hampton

Roads and Richmond• VCTIR evaluating results• Target completion date: February 28, 2015

Page 19: Asphalt Quality Task Force Update Regional Asphalt Seminar

19

Task Force Recommendations

#2 - Evaluate the cost effectiveness of making the “incentive only” ride spec. a default spec. and evaluate the effect on ride quality; review the rideability test data to determine if there is a benefit to making the incentive only spec. a default and make adjustments if bonuses are being paid for rough pavements

• Research Project “An assessment of Incentive-Only Ride Specification for Asphalt Pavements” has been initiated

• Criteria for application of rideability specification (minimum traffic volume, speed, etc.)

• Target completion date: February 28, 2015

0

100

200

300

400

500

600

700

00.04

0.08

0.12

0.16

0.20

0.24

0.28

0.32

0.36

0.40

0.44

0.48

0.52

0.56

0.60

0.64

0.68

0.72

0.76

0.80

0.84

0.88

0.92

0.96

1.00

1.04

1.08

1.12

1.16

1.20

1.24

1.28

1.32

1.36

1.40

1.44

1.48

1.52

1.56

1.60

1.64

1.68

1.72

1.76

IRI (

in/m

i)

Distance (miles)

EB_S1_L2

Before IRI

After IRI

Average Before IRI

Average After IRI

BEFORE AVERAGEIRI = 166 in/miAFTER AVERAGE IRI = 57 in/mi% IMPROVEMENT = 66

Page 20: Asphalt Quality Task Force Update Regional Asphalt Seminar

20

Task Force Recommendations

#3 - Review the rideability test data and incentive/disincentive payments to determine if incentives/disincentives are set at appropriate levels to encourage quality asphalt construction

• Archive data has been assembled and is under review• VDOT has some of the highest incentives of all state DOTs• Target completion date: February 28, 2015

Page 21: Asphalt Quality Task Force Update Regional Asphalt Seminar

21

Task Force Recommendations

#4 - Make joint density measurement, recording and reporting mandatory for all maintenance work in 2013 and review the data at the end of the year to determine if incentives/disincentives are appropriate Plant Mix Schedules, 2013, Vol. 2 of 2, Section 315.05 (e)1.b “At each test site in the sublot, the longitudinal joints shall also be tested for density using a nuclear density gauge. For surface and intermediate mixes, the gauge shall be placed within 4 inches of the joint. For base mixes, the gauge shall be placed within 6 inches of the joint. The gauge shall not be placed over top of the joint. The joint density shall be recorded. If a single longitudinal joint density reading is less than 95 percent of the target control strip density, the Contractor shall institute corrective action. The values obtained from the joint readings will not be used in payment calculation. By the end of the day’s operations, the Contractor shall furnish the test data developed during the day’s paving to the Engineer.”

Page 22: Asphalt Quality Task Force Update Regional Asphalt Seminar

22

Task Force Recommendations

#4 - Make joint density measurement, recording and reporting mandatory for all maintenance work in 2013 and review the data at the end of the year to determine if incentives/disincentives are appropriate

95%

Page 23: Asphalt Quality Task Force Update Regional Asphalt Seminar

23

Task Force Recommendations

#5 - Revise the current specifications to clarify that performance milled surfaces can be left open to traffic over weekends and up to 14 days total

Plant Mix Schedules, 2013, Vol. 2 of 2, Special Provision for Cold Planing (Milling) Aspalt Concrete Operations, October 1, 2012, Section III.A:

“Performance planed surfaces must be paved back within 14 calendar days from the start of the performance planing operation….The Contractor is required to perform pavement surface testing in accordance with Section 515.04 of the specifications to verify he has achieved the acceptable surface texture prior to opening the performance planed surface to traffic.”

Page 24: Asphalt Quality Task Force Update Regional Asphalt Seminar

24

Task Force Recommendations

#6 (Revised 10/14/13) – Review available methods to evaluate pavements and determine depth of milling and other repairs necessary to produce a long lasting pavement

• Very difficult to evaluate depth of milling during planning stages• What is the best way to evaluate patching type and quantity ?• Draft research needs statement (RNS) to evaluate potential use

of falling weight deflectometer (FWD) and ground penetrating radar (GPR) under review

Page 25: Asphalt Quality Task Force Update Regional Asphalt Seminar

25

Task Force Recommendations

#7 - Review available technologies to measure surface uniformity and develop a specification for surface uniformity

• Transportation Research Board SHRP 2, Project R06C, published December 31, 2013

• High speed ground penetrating radar (GPR) and infra-red (IR) technologies to measure surface uniformity

• IR system can measure thermal segregation• GPR system can measure density and density variability across

full mat width and length

Page 26: Asphalt Quality Task Force Update Regional Asphalt Seminar

26

Task Force Recommendations

#8 - Perform an independent QA review of all paving schedules by experienced personnel to include field reviews prior to advertisement

• Schedule for contract submissions provides limited time for making adjustments/corrections

• Good process to ensure that changes after award of contract are minimized

• Target completion date: August 1, 2014

Page 27: Asphalt Quality Task Force Update Regional Asphalt Seminar

27

Task Force Recommendations

#9 - Develop corridor/subdivision strategy to encourage repaving of corridors and subdivisions at one time

• Informally being applied in some districts• Maintenance Division will provide further guidance• Target completion date: August 1, 2014•

Page 28: Asphalt Quality Task Force Update Regional Asphalt Seminar

28

Task Force Recommendations

#10 - Develop policies/guidelines for use/application of high performance asphalt mixes and guidelines for pavement markings consistent with those mixes

• Guidelines are currently in place for most mixes• SMA mixes and special mixes for intersections• Work needed to align life cycles of pavement markings with life

cycles for mixes• Target completion date: July 1, 2014

Page 29: Asphalt Quality Task Force Update Regional Asphalt Seminar

29

Task Force Recommendations

#11 - Review alternative non-intrusive technologies for vehicle detection

• Loop detectors are problematic in new pavement surfaces• Accuracy of loop detectors is excellent with low initial cost• Alternative non-intrusive technologies include video, radar,

microwave and infrared• Accuracy of video detection is an issue at night and in adverse

weather conditions

Page 30: Asphalt Quality Task Force Update Regional Asphalt Seminar

30

Task Force Recommendations

#12 - Re-establish the Regional Asphalt Field Engineer positions to provide advice, training and quality assurance to field personnel (VDOT, contractor and consultant)

• Two positions have been approved and assigned to the Central Office Materials Division

• Each position will cover 3 districts on a regional basis• Goal is to provide field support to all field personnel (VDOT,

consultant, county, etc.) on all types of projects (design-bid-build, design-build, PPTA, locally administered, county, permit and land development)

Page 31: Asphalt Quality Task Force Update Regional Asphalt Seminar

31

Task Force Recommendations

#13 - Continue the Asphalt Quality Task Force to promote asphalt quality and review new technologies as well as application of existing technologies related to asphalt quality

• Group of experienced and knowledgeable professionals from VDOT, industry and research that is dedicated to improving the quality of asphalt concrete in Virginia

• Implement quality initiatives and champion quality

Page 32: Asphalt Quality Task Force Update Regional Asphalt Seminar

32

Who is Responsible for Asphalt Quality ?

Page 33: Asphalt Quality Task Force Update Regional Asphalt Seminar

33

Who is Responsible for Asphalt Quality ?

Not Me !

Page 34: Asphalt Quality Task Force Update Regional Asphalt Seminar

34

Everybody !

Page 35: Asphalt Quality Task Force Update Regional Asphalt Seminar

35

Questions ?