ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air...

20
1 32 nd International Nuclear Air Cleaning Conference ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development Thomas J. Vogan, Chair - CONAGT June 18, 2012

Transcript of ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air...

Page 1: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

1 32nd International Nuclear Air Cleaning Conference

ASME Committee on Nuclear Air & Gas Treatment (CONAGT)

AG-1 Development

Thomas J. Vogan, Chair - CONAGT June 18, 2012

Page 2: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

2 32nd International Nuclear Air Cleaning Conference

History of CONAGT The Committee Organization ASME AG-1 Future Activities

Topical Agenda

Page 3: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

3 32nd International Nuclear Air Cleaning Conference

History of CONAGT

Page 4: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

4 32nd International Nuclear Air Cleaning Conference

History of CONAGT

• May 1971 – ANSI N45.8 Committee formed to address air cleaning systems – Initiated work on the development of ANSI N509 and N510

• Jan 15, 1976 – CONAGT was accredited and chartered under the ASME Board on Nuclear Codes & Standards – Replaced ANSI N45.8 Committee

• May 6, 1976 – First CONAGT business meeting held at ASME headquarters in New York

Page 5: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

5 32nd International Nuclear Air Cleaning Conference

History of CONAGT

• June 1951 – Air Cleaning Seminar for the AEC Held at Harvard University, Cambridge, MA

• Evolved into the AEC Air Cleaning Conferences • ANSI N45.8 formed between 11th & 12th ACC

with participants from the ACC.

Page 6: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

6 32nd International Nuclear Air Cleaning Conference

Original Publications

• ANSI N510-1975 published June 19, 1975 • ANSI N509-1976 published December 7, 1976 • ORNL NISC-65, Air Cleaning Handbook

published May 1976

Page 7: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

7 32nd International Nuclear Air Cleaning Conference

The Committee Organization

Page 8: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

8 32nd International Nuclear Air Cleaning Conference

CONAGT Standards Committee

CONAGT ORGANIZATION Board on

Nuclear Codes & Standards

Executive Committee

Subcommittee on General

Support Services

Subcommittee on Filtration

Subcommittee on Inspection &

Testing

Subcommittee on Adsorption

Subcommittee on Technology

Subcommittee on Gas Process

Treatment

Subcommittee on Ventilation

Air Conditioning

Subcommittee on Common Equipment

Project Teams Project Teams Project Teams Project Teams Project Teams

Presenter
Presentation Notes
make the point that this is a very experienced team that will accomplish the bulk of the work very cost effectively a lot of people means a lot of input, not necessarily a lot of cost since we have design criteria's, specs to start with, ...
Page 9: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

9 32nd International Nuclear Air Cleaning Conference

ASME AG-1 Code

Page 10: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

10 32nd International Nuclear Air Cleaning Conference

Organization of AG-1

• Division 1 – General Requirements • Division 2 – Air Cleaning Equipment • Division 3 – Gas Process Treatment Equipment • Division 4 – Testing

Page 11: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

11 32nd International Nuclear Air Cleaning Conference

Division 1 – General Requirements • Definitions, References and Materials • Structural Design Rules Loading Criteria Loading Combinations & Service Limits Stress Criteria Deflection Criteria Component & Support Design Rules Seismic Design Verification

• Inspection & Testing • Fabrication & Coatings • Packaging, Quality Assurance & Documentation • Repairs, Replacements & Modifications

Page 12: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

12 32nd International Nuclear Air Cleaning Conference

Division 2 – Air Cleaning Equipment • Fans & Blowers • Dampers & Louvers • Ductwork • AHU Housings • Refrigeration Equipment • Conditioning Equipment (Heaters & Coolers) • Moisture Separators • Filters • Adsorbers & Adsorbent Media • Mounting Frames • Instrumentation

Page 13: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

13 32nd International Nuclear Air Cleaning Conference

Division 3 – Gas Process Equipment • Vessels • Noble Gas Holdup • High Pressure Blowers • Hydrogen Recombiners • Gas Sampling • Scrubbers • Cyclones • Membranes • Filters • Precipitators • Adsorbents • Mist Eliminators

Page 14: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

14 32nd International Nuclear Air Cleaning Conference

Division 4 – Air Cleaning Equipment

• Testing Air Treatment Systems • Testing Gas Process Treatment Systems

Page 15: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

15 32nd International Nuclear Air Cleaning Conference

CONAGT Challenges

& Future Plans

Page 16: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

16 32nd International Nuclear Air Cleaning Conference

AG-1 Code 2012 Edition • New Code Section: Section FL - Sand Filters

• Maintenance Revisions Maintenance revision of Section FJ, Low Efficiency

Filters Maintenance revision of Section FC, HEPA Filters Upgrade Mandatory Appendix FC-I, HEPA Filter

Media Incorporate design and gaskets for HEPA Filter

double turned flanges Clarify the reference to “Nuclear Safety Related”

Page 17: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

17 32nd International Nuclear Air Cleaning Conference

AG-1 Code 2012 Edition • Maintenance Revisions – con’t Consolidate and update the ASTM Material

Specifications reference Maintenance revision of Section RA, Refrigeration

Equipment Maintenance revision of Section CA, Conditioning

Equipment Clarify the refrigeration equipment components

quality requirements Incorporate rotating equipment vibration

requirements into Section AA, General Requirements Expand and clarify the AWS welding standards for

ductwork in Section AA, General Requirements

Page 18: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

18 32nd International Nuclear Air Cleaning Conference

AG-1 Code 2012 Edition

• Maintenance Revisions – con’t Correct the fire water spray requirements for Section

FE, Type III Adsorbers Clarify the application of the Fluid Momentum Loads

(FML) for load combinations in Section AA, General Requirements, Section DA, Ductowork and Section HA, Housings

Page 19: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

19 32nd International Nuclear Air Cleaning Conference

AG-1 Code 2014 Edition

• ASME Publications - Elimination of Addenda • 2 Year AG-1 Code Publication Cycle • Planned New Code Sections & Appendices: Section FI – Metal Media Filters Section FM - High Strength HEPA Filters Division 3 Code Sections Portable ATS Vacuum Systems Other Adsorbent Media

• Maintenance Revisions

Page 20: ASME Committee on Nuclear Air & Gas Treatment ... ACC - AG-1...32nd International Nuclear Air Cleaning Conference 1 ASME Committee on Nuclear Air & Gas Treatment (CONAGT) AG-1 Development

20 32nd International Nuclear Air Cleaning Conference

Discussion