ASHRAE IRELAND HVAC FOR DATA...

48
Michael Geraghty Building Services Engineer (DipEng) Company owner and managing director [email protected] ASHRAE IRELAND HVAC FOR DATA CENTRES

Transcript of ASHRAE IRELAND HVAC FOR DATA...

Page 1: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Michael GeraghtyBuilding Services Engineer (DipEng)

Company owner and managing director

[email protected]

ASHRAE IRELANDHVAC FOR DATA CENTRES

Page 2: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

OVERVIEW OF THE MARKET SITUATION IN IRELAND

Page 3: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Relative Data Centre Scale

Forty-six operational data centres in Ireland in Q1 2018

Ireland Hosts Commercial Data Centres of all Sizes

1 MW to 10 MW<1 MW 10 MW to 20 MW

812161020 MW to 40 MW

Source: www.bitpower.ie

Page 4: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Source: www.bitpower.ie

Page 5: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Source: www.bitpower.ie

Page 6: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Source: www.bitpower.ie

Page 7: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Sustainability Measures

Source: www.bitpower.ie

Page 8: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Source: www.bitpower.ie

Page 9: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Source: MMCD

Page 10: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Source: MMCD

Page 11: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Source: MMCD

Page 12: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

HYPERSCALEFacebook, Google, Amazon, Microsoft, Apple

These companies build to their own specification

Page 13: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

MULTI-TENANT COLOCATIONEdgeConnex, K2, Keppel.

These companies use private investor funds.

The data centres are built to suit the clients needs.

The hyperscale data companies lease “white space”.

Page 14: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

COLOCATION WHOLESALE

Digital Realty, Equinix, InterXion.

These facilities are designed for partial use by clients that lease ‘white space’.

Page 15: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

PRIVATE

BT, Eir, OPW.

These are mostly for Financial companies, banks, telecom and I.T. companies

Page 16: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

EDGE DATA CENTRES

Not yet in Ireland.Edge DC’s will range from 500kW to 1 MW.They will be located closer to where the end user is, to help improve speed and latency

Page 17: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

DATA CENTRES ARE NOT BUILT IN IRELAND BECAUSE OF THE

WEATHER

Page 18: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Companies come to Ireland because:The others are hereThere is a critical mass here – designers, contractors, i.T. companiesWe have suitable infrastructure (ecosystem)Because they are US companies

Chance of interruption is lowSeismic activityWarExtreme weather

Tax is more or less the same everywhere for large companies

Page 19: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

TERMINOLOGY

Power Usage Effectiveness

Page 20: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

A lot of air is required

Q=mcΔt

1000kW = m x 1.2 x 1.02 x 10K

1000kW/ 12.24 = m

81.69m3/s = m

DESIGN ISSUES

https://www.iesve.com/case_studies/images/cbo-data-centre/hall.jpg

Page 21: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

FRESH AIR DAMPERSCONDENSATION RISK

21

There is a risk of condensation on the internal surface of fresh air intake dampers when they are closed.

This is a function of the indoor air condition, the outdoor temperature and the conductivity of the damper material

Page 22: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

FRESH AIR DAMPERSCONDENSATION RISK

22

Frame Entropic Halton UTT Alternate solution

Material Stainless steel, AISI 304 Aluminium

Density (kg/m3) 8000 2700

Heat capacity (J/kg*K) 500 897

Heat conductivity(W/m*K)

16.2 205

Outdoor temp (K) 263.15 263.15

Surface area (mm2) 890 506

Indoor temp 283.15 283.15

Heat flux* (W/m2) 0.1 10

Total heat loss (W) 0.089*10-3 5.06*10-3

Page 23: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

FRESH AIR DAMPERSICE RISK

23

In cold conditions, there is a risk of ice forming on the internal surface of fresh air intake dampers when they are closed. This is a function of the indoor air condition, the outdoor temperature and the conductivity of the damper material

https://www.iesve.com/case_studies/images/cbo-data-centre/hall.jpg

Page 24: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

FRESH AIR DAMPERSCORROSION RISK

24

In costal regions, there is a risk of corrosion of the metals in the dampers.

This is mainly caused by corrosive salty outdoor air coming in contact with the metal surfaces of the fresh intake dampers

http://www.iesve.com/case_studies/images/cbo-data-centre/hall-y-03.jpg

Page 25: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

FRESH AIR INLETSFree cooling

CFD Analysis of mixing box

Characteristics of inlet dampers and filters on full recirc.Air tightnessRisk of condensationPressure dropRisk of corrosion

stainless steel vs AluReliability

delivery phasein usemaintenance

Mechanisms, linkages, actuators, bearings.

Full scale mock-ups of HVAC systems

25

CFD Analysis for a hyperscale Data Centre

Page 26: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

HOT AIR RISES

26

CFD Analysis a large Data Centre

Page 27: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

GOOGLE SHIFTS TO LIQUID COOLING FOR AI DATA CRUNCHING

27

An eight-rack pod of Google's liquid-cooled TPU version 3 servers for artificial intelligence workloads. (Image: Google)

Page 28: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

VOLUME AND PRESSURE DROP

28

2.4m

2.4m

Page 29: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

VOLUME AND PRESSURE DROP

29

Panel filters• Cheap• Effective• Widely available• Pressure drop 50Pa

Electrostatic filters

• Removes pollen, bacteria and dust• Reliable and simple• Very low energy use• Extremely low maintenance costs, it

never needs replacing• It can be washed and sanitised using

ordinary detergents, without any decline in efficiency or product life

• No ongoing costs, no replacement filters required

• Integrated ‘Change filter’ alarm• Pressure drop 10Pa

• 1000kW = 86m3/s

Page 30: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

AHU DESIGN FOR CRAC SYSTEMSWith CRAC units in the space, the fresh air needs to be conditioned.

Page 31: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Normal Summer processReturn 5080m3/h34C & 27.18% (9g/kg)

Fresh air m3/h40C & 30% R.H (13.88g/kg)

Dump 496-0m3/h

5730m3/hCooling 50kWOff coil =13C & 97% (9g/kg)

Mixed air with 20% FA 5730m3/h35.21C & 28.13%(9.98g/kg)

5730m3/hHeating 17kWOff coil = 22C & 9g/kg

Project: Subject: Summer mode - Analysis of air as it flows through the AHUDate: 20-02-2017Author: Mark Mc Dougall, Entropic

20-100% Fresh Air 1146-5730m3/hr

80-0% Recirc 4584-0m3/h

Humidifier offSupply Air 5730m3/h22C & 54.7% (9g/kg)

Fresh air 5730m3/h40C & 30%(13.88g/kg)

5730m3/hCooling 74kWOff coil =13C & 97% (9g/kg)

5730m3/hHeating 17kWOff coil = 22C & 9g/kg

Page 32: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Reliable, energy efficient and low environmental impact systems

Free cooling

DescriptionAmbient Air is used to directly cool the data hall. Return Air is drawn from the Hot Aisle with a fan wall. Desired supply air temperature is controlled with a mixing box between the ambient and return air. Mix air is filtered and supplied to the Data Hall with a fan wall. Non-recirculated air is dumpedIf additional cooling is required this can be a adiabatic cooler, DX or CHW coilAdvantagesNo Additional cooling is required provided the ambient air is lower than the cold aisle (Eg 27C cold aisle in Ireland). So no water usage or water treatment is required.No additional fresh air for pressurisation / ventilation

ConsiderationsAmbient air needs to be of suitable quality for supply to the Data Hall eg maritime climate or very polluted city or industrial areaSupply and return fan wall will run the same airflow in parallel which may (depending onArchitecturally challenging

Page 33: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Reliable, energy efficient and low environmental impact systems

Free cooling

Indirect air cooled – plate heat exchanger methodFull recirculation air handling unit(s) with an air to air plate heat exchanger. Cooling is achieved by passing fresh air over the plate in a cross flow pattern to dump.

AdvantagesLeast expensive of air side heat recovery Only one circulation fan on room side

ConsiderationsConnections are difficult requiring cross over of flows and returnsWill need additional cooling from approx 20CHX will need to come in short sections to come out from the side of the unit

Page 34: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Reliable, energy efficient and low environmental impact systems

Free cooling

Double plate heat exchanger.

Full recirculation air handling units with 2no air to air plate heat exchangers in series. Cooling is achieved by passing fresh air over the 2no plate HXs in a cross flow pattern to dump.

AdvantagesMore efficient heat exchange than a single HXLower hours of supplementary cooling required

Supply & return connections on same side

ConsiderationsHigher cost than a single exchangerHigher pressure drop than a single HX unitHXs will need to come in short sections to come out from the side of the unitWill need additional cooling from approx 23COnly one circulation fan on room side

Page 35: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Reliable, energy efficient and low environmental impact systems

Free cooling

Vertical Rotary Wheel Heat ExchangerSeries of full recirculation air handling units with a rotary heat recovery wheel mounted in the AHU. Cooling is achieved by passing fresh air through the rotating wheel cooling the recirculated air as passes to dump

Full recirculation air handling units with 2no air to air plate heat exchangers in series. Cooling is achieved by passing fresh air over the 2no plate HXs in a cross flow pattern to dump.

AdvantagesMore efficient heat exchange than a single HXLower hours of supplementary cooling required

Supply & return connections on same side

ConsiderationsHigher cost than a single exchangerHigher pressure drop than a single HX unitHXs will need to come in short sections to come out from the side of the unitWill need additional cooling from approx 23COnly one circulation fan on room side

Page 36: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Build healthier buildingsReduce pollutants and chemicalsReduce green house gas emissionsReduce the use of HFCs in buildings.

ENVIRONMENTAL MISSION

Page 37: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Article 9(1) of the Directive requires Member States to ensurethat:-- by 31 December 2020, all new buildings are nearly zeroenergy buildings; and- after 31 December 2018, new buildings occupied andowned by public authorities1 are nearly zero-energybuildings.

Page 38: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

http://www.greenpeace.org/international/Global/international/planet-2/report/2009/5/HFCs-Fgases.pdf

Page 39: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

CIBSE Guide B (2005)

Page 40: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1
Page 41: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Half Airflow

>80% Reduction

on electricity use

ENERGY EFFICIENCY

Page 42: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1
Page 43: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

HFC GWP

At least 3000times worse than CO2

Page 44: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

ACCIDENTS HAPPEN, REFRIGERANTS LEAK

Page 45: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

High efficiency air intake external weather louvres with corrosion protection

Main featuresWater separation

Corrosion resistance

Reference project

Page 46: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

PRESENTATION ON USB

Page 47: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1
Page 48: ASHRAE IRELAND HVAC FOR DATA CENTRESashrae-ireland.org/wp-content/uploads/2018/05/ASHRAE...2018/04/12  · Fo r ty -s i x o p er ati o n al d ata c en tr es i n Ir el an d i n Q 1

Thank you

[email protected]