Ashley's Portfolio of Professional Works
-
Upload
ashley-simpson -
Category
Documents
-
view
229 -
download
1
description
Transcript of Ashley's Portfolio of Professional Works
ashl
eysi
mps
on31
48 W
oodv
iew
Ridg
e Dr
, Apt
. 204
Kans
as C
ity, K
ansa
s 66
103
913.
963.
1170
ashl
ey.s
imps
on20
13@
gmai
l.com
Project Overview
1 | Trauma Center 2 | Aviation
Trau
ma
Cent
erRo
atan,
Hon
dura
s Apartment
Medical
Community/PublicSupport Space
Apartment
Medical
Community/PublicSupport Space
apartment
medical
community/public
support space
diagram | process sketches
My graduate thesis project was geared toward humanitarian design. It was a collaboration between students to design a Trauma Center on the island of Roatan in Honduras. The locals currently have few medical clinics and one hospital that can't manage very many patients, making this center pertinent to their well being. We had the opportunity to travel to the island and visit with locals and government officials who wanted us to design and help build the facility. The goal was to create this trauma center while staying within a very strict budget because the island has very little funding. To do this we looked into efficient building methods while also using local materials, natural means of ventilation and daylighting, and collecting rainwater. Phase one of this project was completed in collaboration with Logan Carlyle, Nathan Geier, Wenjing Li, Ashley Simpson, and Danielle Smith. Upon programming the trauma center, we thought about the function and circulation heavily. We kept the building long and thin to help promote cross and stack ventilation, and then we started breaking down the functions. Having the most public portion (waiting and community) at the entry, changing to semi-public where medical functions take place, to private where back of house services and visiting doctors' apartments are located. This helped us keep everything clear and concise throughout the project.
diagram | evolution of function
At the halfway point of the project, teams merged. The team now consisted of six fifth-year students: Naihao Fan, Nathan Geier, Kelsie Kremer, Ashley Simpson, Danielle Smith, and Andrew Stith. Having similar schemes, we were able to combine the two projects into one. The opportunity was provided at the beginning of the spring semester to take a second trip to the island of Roatan in order to present our designs to the government officials and get feedback regarding what needs to be changed, added, etc. Some feedback received included materiality change from wood to CMU to mitigate the cost of upkeep, placing the building on the ground instead of elevating to rid the risk of mosquitoes, adding some programmatic features and zoning, and considering the possibility of expansion in the future. In addition to these changes, we developed the design to further maximize water collection by changing the sectional quality of the roof to a true butterfly roof. The sequence of spaces was also rearranged to assure that the private portion of the medical facility remains as such while also giving the entry/waiting area more of an experiential quality.
diagram | function
Apartment
Medical
Community/Public
Apartment
Medical
Community/Public
apartments
medical
community
site model
site plan + originally proposed hospital footprint
public (residence/waiting)
public (medical)
semi-private
private
diagram | privacy gradient model | overhead view
diagram | grid
diagram | construction
exterior view from hill
CC BBI H G F E D C B A
6
12
13
5
4
3
2
11
10
9
M L K JP O N
8
QRT
U
S
7
AA
1
14
consultationadministration ER ward
family waitingreception +pharmacy
recovery suitedoctor
locker room laboratory X-ray
X-ray dark roomjanitor (medical)
outpatient surgery
operating room
Prep/Sterilizationwhite zone lobby
maintainence +storage
bathroom
Delivery +ER suite
utensil wash room
clinic:internal medicine
clinic:internal medicine
clinic:pediatrics
clinic:pediatrics
pharmacy storage
break room
laundry +janitor
records
waiting area
community room
upup
down
private classroomkitchen
laundrydining + commons
storage dorm 1dorm 2dorm 3
public bathroom
public bathroom
ambulance entrancepatient entrance
visiting doctor residencenurse station
generator
incinerator
floor plan
bamboo trusses.
A final portion of the Roatan Trauma Center project was an exploration of innovative construction methods that could be used with local materials and remain affordable. This research included building and testing bamboo trusses with fiberglass connections. The ease of construction, use of a natural material, lightweight nature of the structure, and strength were many of the positive outcomes. The trusses that were constructed were 1'-6" deep and spanned 16'. Shorter spans were initially tested in the engineering department, and we found that this means of construction would be very suitable for the island. It was calculated that each joint in the truss would need to support 300 pounds; after testing, we found that each joint was able to hold around 1100 pounds before the member failed. It was also seen that the material is what failed first, not the fiberglass connections. The test continued on the 16' span. It was constructed by connecting several smaller spans together that could be assembled on site. The test proved this size is also successful as it was been able to hold 2000 pounds (125 psf), more than double the weight it needed to hold.
1- bamboo
6- engineered testing 7- material failure
2- chopped web members
8- testing 16’ trusses 9- deflection after 2000 pounds added
3- start of assembly 4- fiberglass connections 5- complete trusses
+ 0’ EXISTING APRON LEVEL
+ 13’ RENOVATED DEPARTURE LEVEL
RENOVATED CONCOURSE C OPTIONS1"=16'
N
DRAFT - For Discussion Purposes Only-Proposed Terminal B & C North Locations Approximate
+ 26’ ROOF
+ 32’ STERILE CORRIDOR
EXISTING PIPES (LOCATION APPROXIMATE)
+ 42’ ROOF
OPTION A
RENOVATED DEPARTURE LEVEL
EXISTING APRON LEVEL
+ 0’ EXISTING APRON LEVEL
+ 13’ RENOVATED DEPARTURE LEVEL
RENOVATED CONCOURSE C OPTIONS1"=16'
N
DRAFT - For Discussion Purposes Only-Proposed Terminal B & C North Locations Approximate
+ 26’ ROOF
+ 32’ STERILE CORRIDOR
+ 42’ ROOF
+ 48’EXISTING PIPES (LOCATION APPROXIMATE)
OPTION B
RENOVATED DEPARTURE LEVEL
EXISTING APRON LEVEL
Airp
ort P
lann
ing
The Houston Airport System project consisted of a short planning effort to demonstrate various studies for an exiting terminal. My primary responsibility consisted of producing graphics for weekly presentations.
sectional study | option b
sectional study | option a
The Kansas City International Airport Planning effort consisted of various studies for renovations of existing facilities as well as the demolition and rebuilding of new facilities. My responsibilities were to help model the various design options and produce graphics and take offs for design presentations.
Section 1 | Concept 61”=120’
Section 2 | Concept 41” = 80’
Section 1 | Concept 41” = 80’
----
----
LegendBAG CLAIM
CIRCULATION
EXISTING ROAD TO REMAIN
GATES
MISC TENANTS
PARKING
PUBLIC RESTROOM
RETAIL
ROAD
TERMINAL FUNCTION
1" = 160'-0"1 _Arrivals & Gates Level
Areas by room - Arrivals & Gates Level - Overall
Name Level Area
BAG CLAIM Arrivals & Gates Level 163,098 SFCIRCULATION Arrivals & Gates Level 372,987 SFGATES Arrivals & Gates Level 100,961 SFMISC TENANTS Arrivals & Gates Level 3,940 SFPUBLIC RESTROOM Arrivals & Gates Level 35,170 SFRETAIL Arrivals & Gates Level 82,782 SFTERMINAL FUNCTION Arrivals & Gates Level 7,877 SF
766,815 SF
sectional study | renovation
arrivals & gates space planning study | renovation
----
----
LegendBAG CLAIM
CIRCULATION
EXISTING ROAD TO REMAIN
GATES
MISC TENANTS
PARKING
PUBLIC RESTROOM
RETAIL
ROAD
TERMINAL FUNCTION
1" = 160'-0"1 _Arrivals & Gates Level
Areas by room - Arrivals & Gates Level - Overall
Name Level Area
BAG CLAIM Arrivals & Gates Level 163,098 SFCIRCULATION Arrivals & Gates Level 372,987 SFGATES Arrivals & Gates Level 100,961 SFMISC TENANTS Arrivals & Gates Level 3,940 SFPUBLIC RESTROOM Arrivals & Gates Level 35,170 SFRETAIL Arrivals & Gates Level 82,782 SFTERMINAL FUNCTION Arrivals & Gates Level 7,877 SF
766,815 SF
bag claimcirculationexisting road to remaingatesmisc tenantsparkingpublic restroomretailroadterminal function
legend
LegendAIRLINE OPERATIONS
BAGGAGE HANDLING
CIRCULATION
CONCESSION SUPPORT
DOMESTIC BAGGAGE CLAIM
EXISTING ROAD TO REMAIN
MISC TENANTS
OTHER SPACE
PARKING
PUBLIC RESTROOM
RETAIL
ROAD
TERMINAL FUNCTION
US CUSTOMS
----
Areas by room - Arrivals
Name Level Area
AIRLINE OPERATIONS Arrivals Level 164514 SFBAGGAGE HANDLING Arrivals Level 105532 SFCIRCULATION Arrivals Level 38235 SFCONCESSION SUPPORT Arrivals Level 13633 SFDOMESTIC BAGGAGECLAIM
Arrivals Level 24181 SF
MISC TENANTS Arrivals Level 1368 SFOTHER SPACE Arrivals Level 46923 SFPUBLIC RESTROOM Arrivals Level 2029 SFRETAIL Arrivals Level 2926 SFTERMINAL FUNCTION Arrivals Level 76013 SFUS CUSTOMS Arrivals Level 11353 SF
486708 SF
1" = 160'-0"1 _Arrivals
Section 1 | Concept 61”=120’
Section 2 | Concept 41” = 80’
Section 1 | Concept 41” = 80’
sectional study | new construction
arrivals space planning study | new construction
LegendAIRLINE OPERATIONS
BAGGAGE HANDLING
CIRCULATION
CONCESSION SUPPORT
DOMESTIC BAGGAGE CLAIM
EXISTING ROAD TO REMAIN
MISC TENANTS
OTHER SPACE
PARKING
PUBLIC RESTROOM
RETAIL
ROAD
TERMINAL FUNCTION
US CUSTOMS
----
Areas by room - Arrivals
Name Level Area
AIRLINE OPERATIONS Arrivals Level 164514 SFBAGGAGE HANDLING Arrivals Level 105532 SFCIRCULATION Arrivals Level 38235 SFCONCESSION SUPPORT Arrivals Level 13633 SFDOMESTIC BAGGAGECLAIM
Arrivals Level 24181 SF
MISC TENANTS Arrivals Level 1368 SFOTHER SPACE Arrivals Level 46923 SFPUBLIC RESTROOM Arrivals Level 2029 SFRETAIL Arrivals Level 2926 SFTERMINAL FUNCTION Arrivals Level 76013 SFUS CUSTOMS Arrivals Level 11353 SF
486708 SF
1" = 160'-0"1 _Arrivals
airline operationsbaggage handlingciculationconcession supportdomestic baggage claimexisting road to remainmisc tenantsother spaceparkingpublic restroomretailroadterminal functionus customs
legend
aerial rendering | expansion
The Tampa International Airport project was a master plan study consisting of new development and renovations in the southwest corner of the airport grounds including a new rental car facility and tram line connecting to the terminals. Additionally, studies were done for the potential addition of a new terminal as well as the expansion of airport management functions in the northeast corner of the grounds. My responsibilities were to model the various additions and renovations and produce the large master plan rendering seen below.
Denv
er In
tern
atio
nal A
irpor
tDe
nver
, Col
orad
o
Denver International Airport South Terminal Redevelopment Project: ¢ 519 room Westin Hotel ¢ 26,000sf conference center ¢ Public Plaza Venue | entertainment, art, restaurants ¢ Public transit center | East Rail Line to downtown in 35 min ¢ Hotel and Plaza opening late 2015 ¢ Rail service first half of 2016
plaza level | rendering by Gensler
Responsibilities: ¢ Managed Deliverables for 35 design teams ¢ Revit Model Reviews ¢ Assisted with BIM Coordination Meetings ¢ RFI Model Compliance Reviews ¢ Construction Administration
plaza level | rendering by Gensler
Utilizing BIM in the form of Revit and Navisworks, I was able to fulfill my role to ensure success throughout the project. My role included reviewing the design team's models throughout design and construction for compliance with the BIM standards we helped create for the airport. During the design phase, I helped ensure each trade’s model was following the strict guidelines that we had laid out, and during construction, I reviewed RFIs alongside the Navisworks model to confirm changes in the field were being implemented in the design team’s models. By enforcing these standards and ensuring they are being met throughout the project, we will be able to incorporate the BIM models into the airport’s facilities management software. With the success we have created during this process, the project has set the groundwork to implement BIM for facility management throughout the airport from this point forward.
Awards/Honors: ¢ Autodesk Excellence in Infrastructure 2013 - first prize by unanimous vote
for creation/use of models for spatial coordination, clash detection, design review, collaboration, cost analysis ¢ Featured at Autodesk University 2013 and 2014 ¢ Highlighted at opening keynote of AU 2013 by Carl Bass, CEO of Autodesk
model capture | equipment room
model capture | platform and hotel
model capture | bus drop-off
Citru
s Bo
wl
Orlan
do, F
lorid
a
Citrus Bowl: ¢ Completion 2015 ¢ Accommodates 65,000 ¢ New restrooms, concessions, club and
loge seating, clubs, concourses, lower- and mid- bowl seating
demolition key notes
A existing lower bowl and associated members to be demolished in their entirety
B existing mid bowl and associated members to be demolished in their entirety
C existing upper bowl to remain
D existing ramp enclosure, ramps and their associated members to be demolished in their entirety - typ at all four corners
E existing scoreboard to be removed and turned over to owner
F existing elevator and stair to be demolished in their entirety including foundations, typical at southeast and southwest sides
G remove existing area drains & associated piping
H remove existing expansion joint & adjacent ramp structure
I remove section of concrete
J extent of parapet wall to be removed. reclaim precast for in fill where existing elevator shafts were removed
bowl section | demolition
Responsibilities: ¢ Worked on initial packages in a multi-
package CD set ¢ Documentation and detailing for
demolition and shell design phases
demolition key notes
A existing lower bowl and associated members to be demolished in their entirety
B existing mid bowl and associated members to be demolished in their entirety
C existing upper bowl to remain
D existing ramp enclosure, ramps and their associated members to be demolished in their entirety - typ at all four corners
E existing scoreboard to be removed and turned over to owner
F existing elevator and stair to be demolished in their entirety including foundations, typical at southeast and southwest sides
existing ramp enclosure, ramps, and associated members demolished in its entirety.
existing mid bowl and associated members to be demolished in its entirety.
demolition plan legend
existing lower bowl and associated members to be demolished in its entirety.
existing parapet to be demolished.
axon | demolition
aerial photo | demolition
east elevation quad a | demolition
floor plan quad a | demolition
existing lower bowl and associated members to be demolished in their entirety
existing mid bowl and associated members to be demolished in their entirety
existing upper bowl to remain
existing ramp enclosure, ramps and their associated members to be demolished in their entirety - typ at all four corners
existing scoreboard to be removed and turned over to owner
existing elevator and stair to be demolished in their entirety including foundations, typical at southeast and southwest sides
demolish existing fence and gates in their entirety, including footings
existing structure to be demolished in its entirety, including foundations
existing field to remain, protect from damage during construction
existing building to remain, protect from damage during construction
existing equipment to be demolished in their entirety, including footings
demolition key notes
A
B
C
D
E
F
G
H
J
K
L
existing to remain, protect from damage during construction
existing to be demolished
existing to remain, protect from damage during construction
demolition plan legend
Alba
ny C
apita
l Cen
ter
Alba
ny, N
ew Yo
rk
Albany Capital Center: ¢ 9500sf of Meeting Room Space ¢ 22,500sf of Multi-Purpose Space ¢ Link between walkway and existing hotel ¢ 3 Levels of Parking Garage
COLUM
N
COLUM
N
COLUM
N
WAY
14.0
WALKW
AY
EL:114
.1
WALKW
AY
EL:115
.8
WALKW
AY
EL:116
.4
WALKW
AY
EL:115
.9
TOP ST
EP
EL:113
.9
BOTTO
M
STEP
92.3
SLOPE
EL:92.
4
WALKW
AY
EL:92.
3
GARAGE
ENTRA
NCE
-GARAGE
FLOOR
EL:92.
4
EL:92.
3
TOP
STEP
EL:92.
3
GARAGE
EL:72.
2
GARAGE
ENTRA
NCE
EL:72.
3
BOTTO
M
STEP
EL:72.
4
WALKW
AY
EL:72.
3
WALKW
AY
EL:72.
4
EL:92.
3
SLOPE
EL:94.
2SLO
PE
EL:96.
0
CHAN
GE
SLOPE
EL:114
.1
WALKW
AY
EL:95.
9
107
102
92
93
100100
105105
100
95 90
85
80
75
70
65
60
55
55
95
90 90
90
85
80
75
100
PARKING GARAGE LEASE PARCEL L.2860 P.578
CONCRETE SIDEWALK
NCASTER STREET
EAGLE S
TREET
(66' P
UBLIC R
.O.W.)
HOWARD STREET(PUBLIC R.O.W. VARIES)
WEN
DELL STREET
(30' PUBLIC
R.O.W.)
PARKING GARAGE
PARKING GARAGE
GRANITE CURB
GRAN
ITE CURB
BOULEVA
RD A
REA
CONC RETAINING WALL
RETAINING WALL
TAINING W
ALL
CE
RETAINING WALLS
EXISTING B
UILDING
EXISTING BUILDING
PEDESTRIAN WALKWAY
ELEVATED PEDESTRIAN WALKWAY
EXISTING B
UILDING
EXISTING B
UILD
ING
EXISTING B
UILD
ING
6" C
HAI NLINK
7.5 ' C
HAIN LINK FEN
CE
19372 SF
MULTI-PURPOSE ROOMMP-1
8690 SF
PRE-FUNCTIONMP-2
400 SF
MULTI-PURPOSECOUNTER/WORKROOM
MP-5
587 SF
WOMEN'S RESTROOMMP-10
397 SF
MEN'S RESTROOMMP-9
971 SF
WOMEN'S RESTROOMMP-10
401 SF
MEN'S RESTROOMMP-9
137 SF
JANITOR'S CLOSETMP-11
300 SF
STAIR-
305 SF
STAIR-
4157 SF
SERVICE CORRIDORMP-6
330 SF
MULTI-PURPOSE SUITEMP-12
150 SF
EVENT UTILITY ROOMMP-4
100 SF
ELEVATOR-
100 SF
ELEVATOR-
114 SF
MEDIUM ELECTRICALCLOSETMEP-15
2307 SF
SERVICE ZONE-
308 SF
STAIR-
252 SF
EXHIBITOR STORAGEMP-7
215 SF
FREIGHT ELEVATORL-9
200 SF
SERVICE ELEVATORL-10
252 SF
EXHIBITOR STORAGEMP-7
83 SF
IDF ROOMMEP-1488 SF
SMALL ELECTRICALCLOSETMEP-16
88 SF
SMALL ELECTRICALCLOSETMEP-16
309 SF
STAIR-
100 SF
ELEVATOR-
59 SF
WALL PANEL STORAGEMP-8
Space Planning
Leasable
Public
Service
1" = 20'-0"1 LEVEL 2
SCHEDULE BY LEVEL
Number Name Area
LEVEL 1MEP-13 MDF ROOM 102 SFMEP-14 IDF ROOM 90 SFMEP-15 MEDIUM ELECTRICAL CLOSET 102 SFMEP-16 SMALL ELECTRICAL CLOSET 86 SFMEP-16 SMALL ELECTRICAL CLOSET 81 SF
- SERVICE ZONE 1315 SFMR-1 JUNIOR BALLROOM 10001 SFMR-2 FLEX MEETING ROOMS 9028 SFMR-3 PRE-FUNCTION 11036 SFMR-4 MULTI-PURPOSE
COUNTER/WORKROOM400 SF
MR-5 SERVICE CORRIDOR 3973 SFMR-6 MEN'S RESTROOM 397 SFMR-6 MEN'S RESTROOM 401 SFMR-7 WOMEN'S RESTROOM 971 SFMR-7 WOMEN'S RESTROOM 587 SFMR-8 JANITOR'S CLOSET 204 SFMR-9 WALL PANEL STORAGE 168 SFMR-10 MULTI-PURPOSE SUITE 327 SF
FS-1 KITCHEN 2650 SF
- STAIR 305 SF- STAIR 309 SF- STAIR 300 SF- ELEVATOR 100 SF- ELEVATOR 100 SF- ELEVATOR 100 SF- STAIR 308 SF
43440 SF
DOCKMEP-5 FIRE PUMP 151 SFMEP-7 EMERGENCY GENERATOR 176 SFMEP-18 FIRE COMMAND CENTER 105 SF
MS-2 EMPLOYEE LOCKERS 354 SFMS-3 EXHIBITOR SERVICES CENTER 300 SFMS-4 SHOPS 293 SFMS-5 GENERAL BUILDING STORAGE 1538 SFMS-6 SECURITY SUITE 350 SF
L-4 LOADING DOCK/CRATE STORAGE 2238 SFL-6 RECEIVING 498 SFL-9 FREIGHT ELEVATOR 215 SFL-10 SERVICE ELEVATOR 200 SF
- STAIR 308 SF6725 SF
Grand total: 76 98690 SF
SCHEDULE BY LEVEL
Number Name Area
MEZZANINEMP-13 AUDIO-VISUAL CONTROL/STORAGE 803 SF
MEP-4 LV SWITCHGEAR ROOM 405 SFMEP-11 MAIN TELEPHONE SWITCH ROOM 165 SFMEP-12 MAIN TECHNOLOGY ROOM 203 SFMEP-17 BUILDING ENGINEER OFFICE SUITE 203 SF
MS-1 MANAGEMENT OFFICE SUITE 1005 SF
- STAIR 308 SF- ELEVATOR 100 SF- STAIR 305 SF- SERVICE CORRIDOR 2567 SFCO-1 MEZZANINE CONNECTOR 2109 SF
8170 SF
LEVEL 2- SERVICE ZONE 2307 SFMP-1 MULTI-PURPOSE ROOM 19372 SFMP-2 PRE-FUNCTION 8690 SFMP-4 EVENT UTILITY ROOM 150 SFMP-5 MULTI-PURPOSE
COUNTER/WORKROOM400 SF
MP-6 SERVICE CORRIDOR 4157 SFMP-7 EXHIBITOR STORAGE 252 SFMP-7 EXHIBITOR STORAGE 252 SFMP-8 WALL PANEL STORAGE 59 SFMP-9 MEN'S RESTROOM 397 SFMP-9 MEN'S RESTROOM 401 SFMP-10 WOMEN'S RESTROOM 971 SFMP-10 WOMEN'S RESTROOM 587 SFMP-11 JANITOR'S CLOSET 137 SFMP-12 MULTI-PURPOSE SUITE 330 SF
MEP-14 IDF ROOM 83 SFMEP-15 MEDIUM ELECTRICAL CLOSET 114 SFMEP-16 SMALL ELECTRICAL CLOSET 88 SFMEP-16 SMALL ELECTRICAL CLOSET 88 SF
- ELEVATOR 100 SF- STAIR 300 SF- STAIR 305 SF- ELEVATOR 100 SF- STAIR 308 SF- STAIR 309 SF- ELEVATOR 100 SF
40355 SF
COLUM
N
COLUM
N
COLUM
N
COLUM
N
ALKWA
Y
EL:114
.0
WALKW
AY
EL:114
.1
WALKW
AY
EL:115
.8
WALKW
AY
EL:116
.4WA
LKWAY
EL:115
.9
TOP ST
EP
EL:113
.9
BOTTO
M
STEP
92.3
SLOPE
EL:92.
4
WALKW
AY
EL:92.
3
GARAGE
ENTRA
NCE
-GARAGE
FLOOR
EL:92.
4
EL:92.
3
TOP
STEP
EL:92.
3
GARAGE
EL:72.
2
GARAGE
ENTRA
NCE
EL:72.
3
BOTTO
M
STEP
EL:72.
4
WALKW
AY
EL:72.
3
WALKW
AY
EL:72.
4
EL:92.
3
SLOPE
EL:94.
2SLO
PE
EL:96.
0
CHAN
GE
SLOPE
EL:114
.1
WALKW
AY
EL:95.
9
107
102
92
93
02
100100
105105
100
95 90
85
80
75
70
65
60
55
55
95
90 90
90
85
80
75
70
100
PARKING GARAGE LEASE PARCEL L.2860 P.578
CONCRETE SIDEWALK
ANCASTER STREET
EAGLE S
TREET
(66' P
UBLIC R
.O.W.)
HOWARD STREET(PUBLIC R.O.W. VARIES)
WEN
DELL STREET
(30' PUBLIC
R.O.W.)
PARKING GARAGE
PARKING GARAGE
PARKING GARAGE
GRANITE CURB
GRAN
ITE CURB
BOULEVA
RD A
REA
CONC RETAINING WALL
RETAINING WALL
RETAINING W
ALL
CHAIN LINK FEN
CE
RETAINING WALLS
EXISTING B
UILDING
EXISTING BUILDING
PEDESTRIAN WALKWAY
ELEVATED PEDESTRIAN WALKWAY
EXISTING B
UILDING
EXISTING B
UILD
ING
EXISTING B
UILD
ING
6" C
HAI NLINK
7.5 ' C
HAIN LINK FEN
CE
Space Planning
Leasable
Public
Service
400 SF
MULTI-PURPOSECOUNTER/WORKROOM
MR-4
587 SF
WOMEN'S RESTROOMMR-7
9028 SF
FLEX MEETING ROOMSMR-2
10001 SF
JUNIOR BALLROOMMR-1
971 SF
WOMEN'S RESTROOMMR-7
401 SF
MEN'S RESTROOMMR-6
2650 SF
KITCHENFS-1
11036 SF
PRE-FUNCTIONMR-3
3973 SF
SERVICE CORRIDORMR-5
309 SF
STAIR-
300 SF
STAIR-
305 SF
STAIR-
397 SF
MEN'S RESTROOMMR-6
327 SF
MULTI-PURPOSE SUITEMR-10
168 SF
WALL PANEL STORAGEMR-9
204 SF
JANITOR'S CLOSETMR-8
100 SF
ELEVATOR-
100 SF
ELEVATOR-
100 SF
ELEVATOR-
102 SF
MDF ROOMMEP-13
1315 SF
SERVICE ZONE-
308 SF
STAIR-
215 SF
FREIGHT ELEVATORL-9
200 SF
SERVICE ELEVATORL-10
102 SF
MEDIUM ELECTRICALCLOSETMEP-15
90 SF
IDF ROOMMEP-14
86 SF
SMALL ELECTRICALCLOSETMEP-16
81 SF
SMALL ELECTRICALCLOSETMEP-16
1" = 20'-0"1 LEVEL 1
SCHEDULE BY LEVEL
Number Name Area
LEVEL 1MEP-13 MDF ROOM 102 SFMEP-14 IDF ROOM 90 SFMEP-15 MEDIUM ELECTRICAL CLOSET 102 SFMEP-16 SMALL ELECTRICAL CLOSET 86 SFMEP-16 SMALL ELECTRICAL CLOSET 81 SF
- SERVICE ZONE 1315 SFMR-1 JUNIOR BALLROOM 10001 SFMR-2 FLEX MEETING ROOMS 9028 SFMR-3 PRE-FUNCTION 11036 SFMR-4 MULTI-PURPOSE
COUNTER/WORKROOM400 SF
MR-5 SERVICE CORRIDOR 3973 SFMR-6 MEN'S RESTROOM 397 SFMR-6 MEN'S RESTROOM 401 SFMR-7 WOMEN'S RESTROOM 971 SFMR-7 WOMEN'S RESTROOM 587 SFMR-8 JANITOR'S CLOSET 204 SFMR-9 WALL PANEL STORAGE 168 SFMR-10 MULTI-PURPOSE SUITE 327 SF
FS-1 KITCHEN 2650 SF
- STAIR 305 SF- STAIR 309 SF- STAIR 300 SF- ELEVATOR 100 SF- ELEVATOR 100 SF- ELEVATOR 100 SF- STAIR 308 SF
43440 SF
DOCKMEP-5 FIRE PUMP 151 SFMEP-7 EMERGENCY GENERATOR 176 SFMEP-18 FIRE COMMAND CENTER 105 SF
MS-2 EMPLOYEE LOCKERS 354 SFMS-3 EXHIBITOR SERVICES CENTER 300 SFMS-4 SHOPS 293 SFMS-5 GENERAL BUILDING STORAGE 1538 SFMS-6 SECURITY SUITE 350 SF
L-4 LOADING DOCK/CRATE STORAGE 2238 SFL-6 RECEIVING 498 SFL-9 FREIGHT ELEVATOR 215 SFL-10 SERVICE ELEVATOR 200 SF
- STAIR 308 SF6725 SF
Grand total: 76 98690 SF
SCHEDULE BY LEVEL
Number Name Area
MEZZANINEMP-13 AUDIO-VISUAL CONTROL/STORAGE 803 SF
MEP-4 LV SWITCHGEAR ROOM 405 SFMEP-11 MAIN TELEPHONE SWITCH ROOM 165 SFMEP-12 MAIN TECHNOLOGY ROOM 203 SFMEP-17 BUILDING ENGINEER OFFICE SUITE 203 SF
MS-1 MANAGEMENT OFFICE SUITE 1005 SF
- STAIR 308 SF- ELEVATOR 100 SF- STAIR 305 SF- SERVICE CORRIDOR 2567 SFCO-1 MEZZANINE CONNECTOR 2109 SF
8170 SF
LEVEL 2- SERVICE ZONE 2307 SFMP-1 MULTI-PURPOSE ROOM 19372 SFMP-2 PRE-FUNCTION 8690 SFMP-4 EVENT UTILITY ROOM 150 SFMP-5 MULTI-PURPOSE
COUNTER/WORKROOM400 SF
MP-6 SERVICE CORRIDOR 4157 SFMP-7 EXHIBITOR STORAGE 252 SFMP-7 EXHIBITOR STORAGE 252 SFMP-8 WALL PANEL STORAGE 59 SFMP-9 MEN'S RESTROOM 397 SFMP-9 MEN'S RESTROOM 401 SFMP-10 WOMEN'S RESTROOM 971 SFMP-10 WOMEN'S RESTROOM 587 SFMP-11 JANITOR'S CLOSET 137 SFMP-12 MULTI-PURPOSE SUITE 330 SF
MEP-14 IDF ROOM 83 SFMEP-15 MEDIUM ELECTRICAL CLOSET 114 SFMEP-16 SMALL ELECTRICAL CLOSET 88 SFMEP-16 SMALL ELECTRICAL CLOSET 88 SF
- ELEVATOR 100 SF- STAIR 300 SF- STAIR 305 SF- ELEVATOR 100 SF- STAIR 308 SF- STAIR 309 SF- ELEVATOR 100 SF
40355 SF
COLUM
N
COLUM
N
COLUM
N
WALKW
AY
EL:114
.1
WALKW
AY
EL:115
.8
WALKW
AY
EL:116
.4
WALKW
AY
EL:115
.9
TOP S
TEP
EL:113
.9
BOTTO
M
STEP
92.3
CHANGE
SLOPE
EL:92.4
WALKW
AY
EL:92.3
GARAGE
ENTRA
NCE
-GARAGE
FLOOR
EL:92.4
WALKW
AY
EL:92.3
WALKW
AY
EL:92.3
TOP
STEP
EL:92.3
GARAGE
EL:72.2
GARAGE
ENTRA
NCE
EL:72.3
BOTTO
M
STEP
EL:72.4
WALKW
AY
EL:72.3
WALKW
AY
EL:72.4
WALKW
AY
EL:92.3
CHANGE
SLOPE
EL:94.2
CHANGE
SLOPE
EL:96.0
CHANGE
SLOPE
EL:114
.1
WALKW
AY
EL:95.9
107
102
79
92
93
100100
105105
100
95 90
85
80
75
70
65
60
55
55
50
65
70
90
95
95
90
85
PARKING GARAGE LEASE PARCEL L.2860 P.578
CONCRETE SIDEWALK
ASTER STREET
EAGLE S
TREET
(66' P
UBLIC R
.O.W.)
HOWARD STREET(PUBLIC R.O.W. VARIES)
WEN
DELL STREET
(30' PUBLIC
R.O.W.)
PARKING GARAGE
PARKING GARAGE
GRANITE CURB
GRANITE CURB
BOULEVA
RD A
REA
C RETAINING WALL
RETAINING WALL
RETAINING WALLS
EXISTING B
UILDING
EXISTING BUILDING
PEDESTRIAN WALKWAY
ELEVATED PEDESTRIAN WALKWAY
EXISTING B
UILDING
EXISTIN
G B
UILD
ING
EXISTING B
UILD
ING
6" CHAI NLINK
7.5' CHAIN LINK FEN
CE
Space Planning
LEASABLE
SERVICE
25010 SF
MULTI-PURPOSEMP-1
963 SF
WOMEN'SRESTROOM
MP-10
4955 SF
SERVICECORRIDOR &
STORAGEALCOVES
MP-6
945 SF
WOMEN'SRESTROOM
MP-10
495 SF
MEN'SRESTROOM
MP-9
492 SF
MEN'SRESTROOM
MP-9
600 SF
WALL PANELSTORAGE
MP-8
360 SF
MULTI-PURPOSESUITEMP-12
72 SF
JAN CLOSETMP-11
72 SF
JAN CLOSETMP-11
150 SF
PASS ELEV-
300 SF
STAIR-
345 SF
STAIR-
270 SF
FREIGHTELEVATOR
L-9
180 SF
SERVICEELEVATOR
L-10
300 SF
STAIR-
150 SF
PASS ELEV-
300 SF
STAIR-
306 SF
SERVICECORRIDOR &
STORAGEALCOVES
MP-6
306 SF
SERVICECORRIDOR &
STORAGEALCOVES
MP-6
1" = 20'-0"1 LEVEL 2
LEVEL_SCHEDULE
Number Name Area
LEVEL 2- PASS ELEV 150 SF- STAIR 300 SF- STAIR 345 SF- PASS ELEV 150 SF- STAIR 300 SF- STAIR 300 SF
MP-1 MULTI-PURPOSE 25010 SFMP-6 SERVICE CORRIDOR &
STORAGE ALCOVES4955 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
306 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
306 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
156 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
156 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
156 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
156 SF
MP-8 WALL PANEL STORAGE 600 SFMP-9 MEN'S RESTROOM 495 SFMP-9 MEN'S RESTROOM 492 SFMP-10 WOMEN'S RESTROOM 963 SFMP-10 WOMEN'S RESTROOM 945 SFMP-11 JAN CLOSET 72 SFMP-11 JAN CLOSET 72 SFMP-12 MULTI-PURPOSE SUITE 360 SFLEVEL 2 36745 SF
MEZZANINE LEVELRoom 1208 SF
- STAIR 345 SF- CORRIDOR 1880 SF- PASS ELEV 150 SF- STAIR 300 SF- STAIR 300 SFCO-1 MEZZANINE CONNECTOR 1680 SF
MEP-4 L.V. SWITCHGEAR ROOM 403 SFMEP-6 ELEVATOR MACHINE ROOM 150 SFMEP-6 ELEVATOR MACHINE ROOM 150 SFMEP-11 MAIN TELEPHONE SWITCH
ROOM212 SF
MEP-12 MAIN TECHNOLOGY ROOM 233 SFMEP-13 MDF ROOM 105 SFMEP-14 IDF 90 SFMEP-14 IDF 83 SFMEP-15 MEDIUM ELEC CLOSET 105 SFMEP-15 MEDIUM ELEC CLOSET 105 SFMEP-16 SMALL ELEC CLOSET 83 SFMEP-16 SMALL ELEC CLOSET 83 SFMEP-16 SMALL ELEC CLOSET 90 SFMEP-16 SMALL ELEC CLOSET 90 SFMEP-17 BUILDING ENGINEER OFFICE
SUITE210 SF
MS-1 MANAGEMENT OFFICE SUITE 1012 SFMS-3 EXHIBITOR SERVICE CENTER 386 SF
MP-7 EXHIBITOR STORAGE 500 SFMP-8 WALL PANEL STORAGE 600 SFMP-13 AV CONTROL & STORAGE 810 SFMEZZANINE LEVEL 11360 SFGrand total 99952 SF
LEVEL_SCHEDULE
Number Name Area
LOADING DOCK LEVEL- STAIR 300 SF
L-4 LOADING DOCK/CRATESTORAGE
1813 SF
L-6 RECEIVING 512 SFL-9 FREIGHT ELEVATOR 270 SFL-10 SERVICE ELEVATOR 180 SF
MEP-5 FIRE PUMP 153 SFMEP-7 EMERGENCY GENERATOR 201 SFMEP-18 FIRE COMMAND CENTER 114 SF
MS-2 EMPLOYEE LOCKERS 375 SFMS-4 SHOPS 300 SFMS-5 GENERAL BUILDING STORAGE
- MAINT.1548 SF
MS-6 SECURITY SUITE 351 SFLOADING DOCK LEVEL 6116 SF
LEVEL 1- STAIR 345 SF- PASS ELEV 150 SF- STAIR 300 SF- PASS ELEV 150 SF- STAIR 300 SF- STAIR 300 SF
FS-1 KITCHEN 3497 SF
- 192 SF- 816 SF- 192 SFMR-1 JR. BALLROOM 10080 SFMR-2 FLEX MEETING ROOMS 9052 SFMR-3 LOBBY/PRE-FUNCTION 11389 SFMR-3 LOBBY/PRE-FUNCTION 284 SFMR-4 MULTI-PURPOSE
COUNTER/WORKROOM418 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
3718 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
292 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
110 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
110 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
308 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
292 SF
MR-6 MEN'S RESTROOM 384 SFMR-6 MEN'S RESTROOM 415 SFMR-7 WOMEN'S RESTROOM 800 SFMR-7 WOMEN'S RESTROOM 726 SFMR-8 JAN CLOSET 90 SFMR-8 JAN CLOSET 90 SFMR-9 WALL PANEL STORAGE 220 SFMR-9 WALL PANEL STORAGE 64 SFMR-9 WALL PANEL STORAGE 64 SFMR-10 MULTI-PURPOSE SUITE 308 SF
MEP-9 KITCHEN H.W. HEATER 100 SF
MP-4 EVENT UTILITY ROOM 176 SFLEVEL 1 45730 SF
COLUM
N
COLUM
N
WALKW
AY
EL:114
.1
WALKW
AY
EL:115
.8
WALKW
AY
EL:116
.4
WALKW
AY
EL:115
.9
TOP S
TEP
EL:113
.9
BOTTO
M
STEP
92.3
CHANGE
SLOPE
EL:92.4
WALKW
AY
EL:92.3
GARAGE
ENTRA
NCE
-GARAGE
FLOOR
EL:92.4
WALKW
AY
EL:92.3
WALKW
AY
EL:92.3
TOP
STEP
EL:92.3
GARAGE
EL:72.2
GARAGE
ENTRA
NCE
EL:72.3
BOTTO
M
STEP
EL:72.4
WALKW
AY
EL:72.3
WALKW
AY
EL:72.4
WALKW
AY
EL:92.3
CHANGE
SLOPE
EL:94.2
SLOPE
EL:96.0
CHANGE
SLOPE
EL:114
.1
WALKW
AY
EL:95.9
107
102
79
92
93
100100
105105
100
95 90
85
80
75
70
65
60
55
55
95
90
PARKING GARAGE LEASE PARCEL L.2860 P.578
STREET
EAGLE S
TREET
(66' P
UBLIC R
.O.W.)
HOWARD STREET(PUBLIC R.O.W. VARIES)
WEN
DELL STREET
(30' PUBLIC
R.O.W.)
PARKING GARAGE
GRANITE CURB BOULEVA
RD A
REA
RETAINING WALL
RETAINING WALLS
EXISTING B
UILDING
EXISTING BUILDING
PEDESTRIAN WALKWAY
ELEVATED PEDESTRIAN WALKWAY
EXISTING B
UILDING
EXISTIN
G B
UILD
ING
EXISTING B
UILD
ING
AIN LINK FEN
CE
Space Planning
LEASABLE
PUBLIC
SERVICE
9052 SF
FLEX MEETINGROOMS
MR-2
10080 SF
JR. BALLROOMMR-1
3497 SF
KITCHENFS-1
3718 SF
SERVICECORRIDOR &
STORAGEALCOVES
MR-5
11389 SF
LOBBY/PRE-FUNCTIONMR-3
726 SF
WOMEN'SRESTROOM
MR-7
384 SF
MEN'SRESTROOM
MR-6
415 SF
MEN'SRESTROOM
MR-6
800 SF
WOMEN'SRESTROOM
MR-7
418 SF
MULTI-PURPOSECOUNTER/WORKROOM
MR-4
90 SF
JAN CLOSETMR-8
220 SF
WALL PANELSTORAGE
MR-9292 SF
SERVICECORRIDOR &
STORAGEALCOVES
MR-5
90 SF
JAN CLOSETMR-8
308 SF
MULTI-PURPOSESUITEMR-10292 SF
SERVICECORRIDOR &
STORAGEALCOVES
MR-5
308 SF
SERVICECORRIDOR &
STORAGEALCOVES
MR-5
176 SF
EVENT UTILITYROOMMP-4
100 SF
KITCHEN H.W.HEATERMEP-9
150 SF
PASS ELEV-
284 SF
LOBBY/PRE-FUNCTIONMR-3
300 SF
STAIR-
345 SF
STAIR-
300 SF
STAIR-
270 SF
FREIGHTELEVATOR
L-9
180 SF
SERVICEELEVATOR
L-10
300 SF
STAIR-
150 SF
PASS ELEV-
1" = 20'-0"1 LEVEL 1
LEVEL_SCHEDULE
Number Name Area
LEVEL 2- PASS ELEV 150 SF- STAIR 300 SF- STAIR 345 SF- PASS ELEV 150 SF- STAIR 300 SF- STAIR 300 SF
MP-1 MULTI-PURPOSE 25010 SFMP-6 SERVICE CORRIDOR &
STORAGE ALCOVES4955 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
306 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
306 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
156 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
156 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
156 SF
MP-6 SERVICE CORRIDOR &STORAGE ALCOVES
156 SF
MP-8 WALL PANEL STORAGE 600 SFMP-9 MEN'S RESTROOM 495 SFMP-9 MEN'S RESTROOM 492 SFMP-10 WOMEN'S RESTROOM 963 SFMP-10 WOMEN'S RESTROOM 945 SFMP-11 JAN CLOSET 72 SFMP-11 JAN CLOSET 72 SFMP-12 MULTI-PURPOSE SUITE 360 SFLEVEL 2 36745 SF
MEZZANINE LEVELRoom 1208 SF
- STAIR 345 SF- CORRIDOR 1880 SF- PASS ELEV 150 SF- STAIR 300 SF- STAIR 300 SFCO-1 MEZZANINE CONNECTOR 1680 SF
MEP-4 L.V. SWITCHGEAR ROOM 403 SFMEP-6 ELEVATOR MACHINE ROOM 150 SFMEP-6 ELEVATOR MACHINE ROOM 150 SFMEP-11 MAIN TELEPHONE SWITCH
ROOM212 SF
MEP-12 MAIN TECHNOLOGY ROOM 233 SFMEP-13 MDF ROOM 105 SFMEP-14 IDF 90 SFMEP-14 IDF 83 SFMEP-15 MEDIUM ELEC CLOSET 105 SFMEP-15 MEDIUM ELEC CLOSET 105 SFMEP-16 SMALL ELEC CLOSET 83 SFMEP-16 SMALL ELEC CLOSET 83 SFMEP-16 SMALL ELEC CLOSET 90 SFMEP-16 SMALL ELEC CLOSET 90 SFMEP-17 BUILDING ENGINEER OFFICE
SUITE210 SF
MS-1 MANAGEMENT OFFICE SUITE 1012 SFMS-3 EXHIBITOR SERVICE CENTER 386 SF
MP-7 EXHIBITOR STORAGE 500 SFMP-8 WALL PANEL STORAGE 600 SFMP-13 AV CONTROL & STORAGE 810 SFMEZZANINE LEVEL 11360 SFGrand total 99952 SF
LEVEL_SCHEDULE
Number Name Area
LOADING DOCK LEVEL- STAIR 300 SF
L-4 LOADING DOCK/CRATESTORAGE
1813 SF
L-6 RECEIVING 512 SFL-9 FREIGHT ELEVATOR 270 SFL-10 SERVICE ELEVATOR 180 SF
MEP-5 FIRE PUMP 153 SFMEP-7 EMERGENCY GENERATOR 201 SFMEP-18 FIRE COMMAND CENTER 114 SF
MS-2 EMPLOYEE LOCKERS 375 SFMS-4 SHOPS 300 SFMS-5 GENERAL BUILDING STORAGE
- MAINT.1548 SF
MS-6 SECURITY SUITE 351 SFLOADING DOCK LEVEL 6116 SF
LEVEL 1- STAIR 345 SF- PASS ELEV 150 SF- STAIR 300 SF- PASS ELEV 150 SF- STAIR 300 SF- STAIR 300 SF
FS-1 KITCHEN 3497 SF
- 192 SF- 816 SF- 192 SFMR-1 JR. BALLROOM 10080 SFMR-2 FLEX MEETING ROOMS 9052 SFMR-3 LOBBY/PRE-FUNCTION 11389 SFMR-3 LOBBY/PRE-FUNCTION 284 SFMR-4 MULTI-PURPOSE
COUNTER/WORKROOM418 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
3718 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
292 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
110 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
110 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
308 SF
MR-5 SERVICE CORRIDOR &STORAGE ALCOVES
292 SF
MR-6 MEN'S RESTROOM 384 SFMR-6 MEN'S RESTROOM 415 SFMR-7 WOMEN'S RESTROOM 800 SFMR-7 WOMEN'S RESTROOM 726 SFMR-8 JAN CLOSET 90 SFMR-8 JAN CLOSET 90 SFMR-9 WALL PANEL STORAGE 220 SFMR-9 WALL PANEL STORAGE 64 SFMR-9 WALL PANEL STORAGE 64 SFMR-10 MULTI-PURPOSE SUITE 308 SF
MEP-9 KITCHEN H.W. HEATER 100 SF
MP-4 EVENT UTILITY ROOM 176 SFLEVEL 1 45730 SF
space planning studies
COLUM
N
COLUM
N
COLUM
N
107
102
79
92
93
100100
105105
100
95 90
85
80
75
70
65
60
55
55
65
7095
90
85
CRETE SIDEWALK
ER STREET
EAGLE S
TREET
(66' P
UBLIC R
.O.W.)
HOWARD STREET(PUBLIC R.O.W. VARIES)
WEN
DELL STREET
(30' PUBLIC
R.O.W.)
PARKING GARAGE
PARKING GARAGE
GRANITE CURB
GRANITE CURB
BOULEVA
RD A
REA
RETAINING WALL
RETAINING WALLS
EXISTING B
UILDING
EXISTING BUILDING
PEDESTRIAN WALKWAY
ELEVATED PEDESTRIAN WALKWAY
EXISTING B
UILDING
EXISTIN
G B
UILD
ING
EXISTING B
UILD
ING
6" CHAI NLINK
7.5' CHAIN LINK FEN
CE
DN
DN
DN
DN
22800 SF
Multi-PurposeMP-1
450 SF
Men's RestroomMP-9.2
523 SF
Women's RestroomMP-10.2
2356 SF
PreFunctionMP-2.2
450 SF
Connection to WalkwayMS-1
5398 SF
Service Corridor & StorageMP-6.1
300 SF
Freight ElevatorL-9150 SF
Service ElevatorL-10
333 SF
Multipurpose SuiteMP-12
443 SF
Wall Panel StorageMP-8
150 SF
IDFMEP-14.1
105 SF
MDFMEP-13.1313 SF
Main Tech RoomMEP-12
120 SF
ElecMEP-15.2
390 SF
Men's RestroomMP-9.1
520 SF
Women's RestroomMP-10.1
2500 SF
PreFunction/FlexMP-1.1200 SF
MultipurposeCounter/Workroom
MP-5150 SF
Workroom StorageMP-5.1
143 SF
Event Utility RoomMP-4
1580 SF
General Building StorageMS-5
320 SF
ShopsMS-4
300 SF
Security SuiteMS-6
98 SF
ElecMEP-16.1
390 SF
StairST-1-135
260 SF
StairST-2-135
450 SF
StairST-3-135
Legend
Flex
Leasable
Public
Service
1" = 20'-0"1 +135 - Multipurpose
Rooms by Level
Number Name Area
+105 - Meeting RoomsMR-1 Jr Ballroom 9053 SFMR-2 Flex Meeting Rooms 9053 SFMR-2.1 PreFunction/Flex 2130 SFMR-3 PreFunction 7700 SFMR-3.1 Lower Lobby 216 SFMR-4 Multipurpose
Counter/Workroom200 SF
MR-4.1 MP Workroom Storage 150 SFMR-5 Service Corridor & Storage 6206 SFMR-6.1 Men's Restroom 390 SFMR-6.2 Men's Restroom 450 SFMR-7.1 Women's Restroom 520 SFMR-7.2 Women's Restroom 523 SFMR-9.1 Wall Panel Storage 331 SFMR-9.2 Wall Panel Storage 336 SFMR-10 Multi-Purpose Suite 304 SF
FS-0 Kitchen 2745 SFFS-0.1 Kitchen 225 SF
MEP-6 Elev Mach Rm 236 SFMEP-11 Main Telephone Room 270 SFMEP-14.2 IDF 101 SFMEP-15.1 Elec 101 SFMEP-16.2 Elec 95 SFMEP-17 Engineer Suite 243 SFMEP-18 Fire Command Center 128 SF
EL-1-105 Elevator 68 SFEL-2-105 Elevator 61 SFST-1-105 Stair 390 SFST-2-105 Stair 260 SFST-3-105 Stair 450 SF+105 - Meeting Rooms 42933 SF
+92 - Garage Lvl2EL-1-92 Elevator 68 SFEL-2-92 Elevator 62 SFST-1-92 Stair 390 SFST-2-92 Stair 260 SFST-3-92 Stair 450 SF
PK-1.2 Parking Garage 29520 SFPK-2 Garage Corridor 450 SFPK-2.1 Garage Corridor 241 SF+92 - Garage Lvl2 31441 SF
+80 - Garage Lvl1MEP-3 Vault 490 SF
EL-1-80 Elevator 68 SFEL-2-80 Elevator 62 SFST-1-80 Stair 390 SFST-2-80 Stair 260 SFST-3-80 Stair 450 SF
PK-1.1 Parking Garage 29520 SFPK-2.2 Garage Corridor 241 SFPK-2.3 Garage Corridor 450 SF+80 - Garage Lvl1 31931 SF
+60/+64 - Loading DockL-0 Loading Dock 7519 SFL-4 Loading Dock / Crate
Storage1800 SF
L-6 Receiving 450 SFL-9 Freight Elevator 300 SFL-10 Service Elevator 150 SF
EL-2-136 Emergency Generator 247 SFEL-2-137 Fire Pump 203 SFMEP-1 Plant 750 SFMEP-1.1 Cooling Tower 668 SFMEP-4 Switchgear 375 SF+60/+64 - Loading Dock 12462 SFGrand total 170092 SF
Rooms by Level
Number Name Area
+150 - MezzanineMP-7 Exhibitor Storage 341 SFMP-13 AV Control & Storage 980 SF
MS-0.1 Service Corridor 2778 SFMS-0.2 Service Corridor 819 SFMS-1 Mgmt Office Suite 890 SFMS-2 Employee Lockers 450 SFMS-3 Exhibitor Services Center 349 SF
CO-1 Mezzanine Connector 2624 SFST-1-150 Stair 390 SFST-2-150 Stair 260 SFST-3-87 Elevator 68 SFST-3-88 Elevator 61 SFST-3-150 Stair 450 SF+150 - Mezzanine 10459 SF
+135 - MultipurposeMP-1 Multi-Purpose 22800 SFMP-1.1 PreFunction/Flex 2500 SFMP-2.2 PreFunction 2356 SFMP-4 Event Utility Room 143 SFMP-5 Multipurpose
Counter/Workroom200 SF
MP-5.1 Workroom Storage 150 SFMP-6.1 Service Corridor & Storage 5398 SFMP-8 Wall Panel Storage 443 SFMP-9.1 Men's Restroom 390 SFMP-9.2 Men's Restroom 450 SFMP-10.1 Women's Restroom 520 SFMP-10.2 Women's Restroom 523 SFMP-12 Multipurpose Suite 333 SF
MS-4 Shops 320 SFMS-5 General Building Storage 1580 SFMS-6 Security Suite 300 SF
MEP-12 Main Tech Room 313 SFMEP-13.1 MDF 105 SFMEP-14.1 IDF 150 SFMEP-15.2 Elec 120 SFMEP-16.1 Elec 98 SF
EL-1-135 Elevator 68 SFEL-2-135 Elevator 61 SFMS-1 Connection to Walkway 450 SFST-1-135 Stair 390 SFST-2-135 Stair 260 SFST-3-135 Stair 450 SF+135 - Multipurpose 40867 SF
COLUM
N
COLUM
N
WALKW
AY
EL:114
.1
WALKW
AY
EL:115
.8
WALKW
AY
EL:116
.4WA
LKWAY
EL:115
.9
TOP S
TEP
EL:113
.9
BOTTO
M
STEP
92.3
CHANGE
SLOPE
EL:92.4
WALKW
AY
EL:92.3
GARAGE
ENTRA
NCE
-GARAGE
FLOOR
EL:92.4
WALKW
AY
EL:92.3
WALKW
AY
EL:92.3
TOP
STEP
EL:92.3
GARAGE
EL:72.2
GARAGE
ENTRA
NCE
EL:72.3
BOTTO
M
STEP
EL:72.4
WALKW
AY
EL:72.3
WALKW
AY
EL:92.3
CHANGE
SLOPE
EL:94.2
CHANGE
SLOPE
EL:96.0
CHANGE
SLOPE
EL:114
.1
WALKW
AY
EL:95.9
107
102
79
92
93
100100
105105
100
95 90
85
80
75
70
65
7095
PARKING GARAGE LEASE PARCEL L.2860 P.578
LANCASTER STREET
EAGLE S
TREET
(66' P
UBLIC R
.O.W.)
HOWARD STREET(PUBLIC R.O.W. VARIES)
WEN
DELL STR
EET
(30' PUBLIC
R.O.W.)
PARKING GARAGE
GRANITE CURB BOULEVARD A
REA
RETAINING WALL
RETAINING WALLS
EXISTING B
UILDING
PEDESTRIAN WALKWAY
ELEVATED PEDESTRIAN WALKWAY
EXISTING B
UILDING
EXISTIN
G B
UILD
ING
6" C
HAINL INK
SPACE PLANNING
LEASABLE
SERVICE
31520 SF
MULTI-PURPOSEMP-1
378 SF
STAIR?
190 SF
WALL PANEL STORAGEMP-8
215 SF
WALL PANEL STORAGEMP-8
361 SF
EXHIBITOR SERVICESCENTER
MS-3
658 SF
WOMEN'SMP-10
420 SF
STAIR?
420 SF
STAIR?
525 SF
MEN'SMP-9
739 SF
WOMEN'SMP-10 490 SF
MEN'SMP-9
125 SF
ELEVATOR?695 SF
WOMEN'SMP-10
611 SF
EXHIBITOR STORAGEMP-7
99 SF
ELEVATOR?
99 SF
IDFMEP-14
134 SF
IDFMEP-14
403 SF
MEN'SMP-9
124 SF
SM ELECT CLOSETMEP-16
280 SF
FREIGHTL-9
420 SF
STAIR?
4644 SF
SERVICE CORRIDORMP-6
134 SF
SERVICEL-10
94 SF
JANITORMP-11
185 SF
JANITORMP-11
140 SF
ELEVATOR?
1" = 20'-0"1 LEVEL 2
Program Space Matrix by Level
Number Name Area
MR-9 WP STORAGE 70 SFMR-9 WP STORAGE 70 SFMR-9 WP STORAGE 70 SFMR-9 WP STORAGE 70 SFMR-9 WP STORAGE 51 SFMR-10 MULTI-PURPOSE SUITE 432 SF
39969 SF
MULTI-PURPOSE LEVELSTAIR 378 SFSTAIR 420 SFSTAIR 420 SFELEVATOR 125 SFELEVATOR 99 SFSTAIR 420 SFELEVATOR 140 SF
MEP-14 IDF 99 SFMEP-14 IDF 134 SFMEP-16 SM ELECT CLOSET 124 SFMP-1 MULTI-PURPOSE 31520 SFMP-6 SERVICE CORRIDOR 4644 SFMP-7 EXHIBITOR STORAGE 611 SFMP-8 WALL PANEL STORAGE 190 SFMP-8 WALL PANEL STORAGE 215 SFMP-9 MEN'S 403 SFMP-9 MEN'S 525 SFMP-9 MEN'S 490 SFMP-10 WOMEN'S 658 SFMP-10 WOMEN'S 739 SFMP-10 WOMEN'S 695 SFMP-11 JANITOR 94 SFMP-11 JANITOR 185 SFMS-3 EXHIBITOR SERVICES CENTER 361 SF
43686 SF
MECH MEZZANINESTAIR 378 SFSTAIR 420 SFSTAIR 158 SFHOTEL CONNECTOR 2476 SFCONNECTOR LOBBY 556 SF
GARAGE ELEVATOR 99 SFMEP SERVICE CORRIDOR 1110 SFMEP-6 EL. MACHINE ROM 101 SFMEP-15 MED ELECT CLOSET 100 SFMEP-16 SM ELECT CLOSET 81 SFMEP-17 BUILDING ENGINEER 476 SFMP-13 AUDIO VISUAL SUITE 703 SFMS-1 MANAGEMENT OFFICE SUITE 1294 SFMS-5 STORAGE 1550 SF
9501 SFGrand total 101307 SF
Program Space Matrix by Level
Number Name Area
LOADING DOCKCORRIDOR 1256 SF
L-4 LOADING DOCK/ CRATESTORAGE
1832 SF
L-6 RECEIVING 502 SFL-9 FREIGHT 280 SFMEP-3 TRANSFORMER VAULT 501 SFMEP-4 LV SWITCHGEAR 504 SFMEP-5 FIRE PUMP 205 SFMEP-7 EMERGENCY GENERATOR 202 SFMEP-16 SM ELECT CLOSET 89 SFMS-2 EMPLOYEE LOCKERS 334 SFMS-4 SHOPS 297 SFMS-5 GENERAL BUILDING STORAGE 1813 SFMS-6 SECURITY SUITE 333 SF
8151 SF
CONFERENCE LEVEL 1ELEVATOR 125 SFELEVATOR 129 SFSTAIR 420 SFSTAIR 420 SFSTAIR 373 SFELEVATOR 97 SFSTAIR 420 SF
FS-1 FOOD SERVICE 3283 SFL-10 SERVICE 134 SFMEP-6 EL. MACHINE RM 94 SFMEP-9 KIT HW 98 SFMEP-11 MAIN TELEPHONE 239 SFMEP-12 MAIN TECH ROOM 237 SFMEP-13 MDF 97 SFMEP-15 MED ELECT CLOSET 98 SFMEP-16 SM ELECT RM 71 SFMEP-18 FIRE COMMAND 99 SFMP-4 EVENT UTILITY 532 SFMR CAPITAL ROOM 1250 SFMR VESTIBULE 600 SFMR STORAGE 924 SFMR-2 MEETING ROOMS 4507 SFMR-2 MEETING ROOMS 4507 SFMR-2 MEETING ROOMS 2808 SFMR-3/MP-2 PREFUNCTION 11306 SFMR-4 MULIT-PURPOSE WORKROOM 396 SFMR-4 MULTI-PUROPOSE COUNTER 158 SFMR-5 SERVICE CORRIDOR 2964 SFMR-6 MEN'S 866 SFMR-6 MEN'S 332 SFMR-7 WOMEN'S 943 SFMR-7 WOMEN'S 507 SFMR-8 JANITOR 75 SFMR-8 JANITOR 95 SF
COLUM
N
WALKW
AY
EL:114
.1
WALKW
AY
EL:115
.8
WALKW
AY
EL:116
.4WA
LKWAY
EL:115
.9
TOP S
TEP
EL:113
.9
BOTTO
M
STEP
92.3
SLOPE
EL:92.4
WALKW
AY
EL:92.3
GARAGE
ENTRA
NCE
-GARAGE
FLOOR
EL:92.4
WALKW
AY
EL:92.3
WALKW
AY
EL:92.3
TOP
STEP
EL:92.3
GARAGE
EL:72.2
GARAGE
ENTRA
NCE
EL:72.3
BOTTO
M
STEP
EL:72.4
WALKW
AY
EL:72.3
WALKW
AY
EL:72.4
SLOPE
EL:94.2
SLOPE
EL:96.0
CHANGE
SLOPE
EL:114
.1
WALKW
AY
EL:95.9
107
102
92
93
100100
105105
100
95 90
85
80
75
70
65
60
55
95
95
PARKING GARAGE LEASE PARCEL L.2860 P.578
LANCASTER STREET
EAGLE S
TREET
(66' P
UBLIC R
.O.W.)
HOWARD STREET(PUBLIC R.O.W. VARIES)
WEN
DELL STREET
(30' PUBLIC
R.O.W.)
PARKING GARAGE
GRA
NITE CURB BOULEVA
RD A
REA
RETAINING WALL
RETAINING WALLS
EXISTING B
UILDING
PEDESTRIAN WALKWAY
ELEVATED PEDESTRIAN WALKWAY
EXISTING B
UILDING
EXISTING B
UILD
ING
7.5' C
HAIN LINK FEN
CE
SPACE PLANNING
LEASABLE
PUBLIC
SERVICE
4507 SF
MEETING ROOMSMR-2
11306 SF
PREFUNCTIONMR-3/MP-2
4507 SF
MEETING ROOMSMR-2
2808 SF
MEETING ROOMSMR-2
3283 SF
FOOD SERVICEFS-1
396 SF
MULIT-PURPOSEWORKROOM
MR-4
2964 SF
SERVICE CORRIDORMR-5
373 SF
STAIR?
97 SF
ELEVATOR?
420 SF
STAIR?
134 SF
SERVICEL-10
239 SF
MAIN TELEPHONEMEP-11237 SF
MAIN TECH ROOMMEP-12
98 SF
MED ELECT CLOSETMEP-15
98 SF
KIT HWMEP-9
420 SF
STAIR?
420 SF
STAIR?
97 SF
MDFMEP-13
70 SF
WP STORAGEMR-9
70 SF
WP STORAGEMR-9
70 SF
WP STORAGEMR-9
70 SF
WP STORAGEMR-9
51 SF
WP STORAGEMR-9
95 SF
JANITORMR-8
280 SF
FREIGHTL-9
532 SF
EVENT UTILITYMP-4
600 SF
VESTIBULEMR
71 SF
SM ELECT RMMEP-16
866 SF
MEN'SMR-6
432 SF
MULTI-PURPOSE SUITEMR-10
943 SF
WOMEN'SMR-7
125 SF
ELEVATOR?
94 SF
EL. MACHINE RMMEP-6
924 SF
STORAGEMR
1250 SF
CAPITAL ROOMMR
332 SF
MEN'SMR-6
507 SF
WOMEN'SMR-7
75 SF
JANITORMR-8
99 SF
FIRE COMMANDMEP-18
1" = 20'-0"1 LEVEL 1
Program Space Matrix by Level
Number Name Area
MR-9 WP STORAGE 70 SFMR-9 WP STORAGE 70 SFMR-9 WP STORAGE 70 SFMR-9 WP STORAGE 70 SFMR-9 WP STORAGE 51 SFMR-10 MULTI-PURPOSE SUITE 432 SF
39969 SF
MULTI-PURPOSE LEVELSTAIR 378 SFSTAIR 420 SFSTAIR 420 SFELEVATOR 125 SFELEVATOR 99 SFSTAIR 420 SFELEVATOR 140 SF
MEP-14 IDF 99 SFMEP-14 IDF 134 SFMEP-16 SM ELECT CLOSET 124 SFMP-1 MULTI-PURPOSE 31520 SFMP-6 SERVICE CORRIDOR 4644 SFMP-7 EXHIBITOR STORAGE 611 SFMP-8 WALL PANEL STORAGE 190 SFMP-8 WALL PANEL STORAGE 215 SFMP-9 MEN'S 403 SFMP-9 MEN'S 525 SFMP-9 MEN'S 490 SFMP-10 WOMEN'S 658 SFMP-10 WOMEN'S 739 SFMP-10 WOMEN'S 695 SFMP-11 JANITOR 94 SFMP-11 JANITOR 185 SFMS-3 EXHIBITOR SERVICES CENTER 361 SF
43686 SF
MECH MEZZANINESTAIR 378 SFSTAIR 420 SFSTAIR 158 SFHOTEL CONNECTOR 2476 SFCONNECTOR LOBBY 556 SF
GARAGE ELEVATOR 99 SFMEP SERVICE CORRIDOR 1110 SFMEP-6 EL. MACHINE ROM 101 SFMEP-15 MED ELECT CLOSET 100 SFMEP-16 SM ELECT CLOSET 81 SFMEP-17 BUILDING ENGINEER 476 SFMP-13 AUDIO VISUAL SUITE 703 SFMS-1 MANAGEMENT OFFICE SUITE 1294 SFMS-5 STORAGE 1550 SF
9501 SFGrand total 101307 SF
Program Space Matrix by Level
Number Name Area
LOADING DOCKCORRIDOR 1256 SF
L-4 LOADING DOCK/ CRATESTORAGE
1832 SF
L-6 RECEIVING 502 SFL-9 FREIGHT 280 SFMEP-3 TRANSFORMER VAULT 501 SFMEP-4 LV SWITCHGEAR 504 SFMEP-5 FIRE PUMP 205 SFMEP-7 EMERGENCY GENERATOR 202 SFMEP-16 SM ELECT CLOSET 89 SFMS-2 EMPLOYEE LOCKERS 334 SFMS-4 SHOPS 297 SFMS-5 GENERAL BUILDING STORAGE 1813 SFMS-6 SECURITY SUITE 333 SF
8151 SF
CONFERENCE LEVEL 1ELEVATOR 125 SFELEVATOR 129 SFSTAIR 420 SFSTAIR 420 SFSTAIR 373 SFELEVATOR 97 SFSTAIR 420 SF
FS-1 FOOD SERVICE 3283 SFL-10 SERVICE 134 SFMEP-6 EL. MACHINE RM 94 SFMEP-9 KIT HW 98 SFMEP-11 MAIN TELEPHONE 239 SFMEP-12 MAIN TECH ROOM 237 SFMEP-13 MDF 97 SFMEP-15 MED ELECT CLOSET 98 SFMEP-16 SM ELECT RM 71 SFMEP-18 FIRE COMMAND 99 SFMP-4 EVENT UTILITY 532 SFMR CAPITAL ROOM 1250 SFMR VESTIBULE 600 SFMR STORAGE 924 SFMR-2 MEETING ROOMS 4507 SFMR-2 MEETING ROOMS 4507 SFMR-2 MEETING ROOMS 2808 SFMR-3/MP-2 PREFUNCTION 11306 SFMR-4 MULIT-PURPOSE WORKROOM 396 SFMR-4 MULTI-PUROPOSE COUNTER 158 SFMR-5 SERVICE CORRIDOR 2964 SFMR-6 MEN'S 866 SFMR-6 MEN'S 332 SFMR-7 WOMEN'S 943 SFMR-7 WOMEN'S 507 SFMR-8 JANITOR 75 SFMR-8 JANITOR 95 SF
floor plan| level 2
floor plan| level 1
Responsibilities: ¢ Programming through Construction Documents ¢ Assisted with BIM Management ¢ Assisted in creation of the cartoon set ¢ Revit Modeling and Detailing ¢ Civil Coordination ¢ Door Hardware/Security Coordination
Leasable space is the key to Convention Centers, being the revenue maker of the facility. Therefore, this factor was a primary focus for the Albany Capital Center, which consists of six meeting rooms and a large multi-purpose space, totaling 32,000sf of leasable space. Being constrained for space on the small site, which also slopes 55’ from the northwest to the southeast corner, provided a challenge for which we had to quickly come to a solution. Within our design solution, we also had to be aware of our surroundings needing to provide a secure connection through our building from the existing walkway on the south to the existing hotel on the north.
section | entry
GARAGE LEVEL 170' - 0"
GARAGE LEVEL 281' - 2"
LEVEL 1107' - 0"
TRUCK PARKING86' - 0"
LEVEL 2131' - 0"
ROOF169' - 11"
EQUIPMENTPLATFORM
143' - 0"
4 3 2 1
GARAGE LEVEL 391' - 2"
WALKWAY119' - 0"
T.O. PARAPET175' - 2"
2.4
A5A-402
LOBBYVESTIBULE
L1.01
MULTI-PURPOSEL2.03
PREFUNCTIONL1.02
LOW ROOF156' - 11"
GARAGELEVEL 3
P-3
GARAGELEVEL 1
P-1
EXTERIOR DOCK65' - 0"
110'
- 2"
RE: CIVIL
TO PARAPET161' - 11 1/2"
MEETINGROOMS
L1.06
WALKWAYWW.01
5' - 0
"11
' - 2"
4' - 1
0"5'
- 2"
15' -
10"
12' -
0"12
' - 0"
12' -
0"13
' - 11
"
5' - 0
1/2
"
7' - 1
1 1/
2"5'
- 3"
25' - 0"12' - 3"17' - 9"30' - 0"
GARAGE LEVEL 170' - 0"
GARAGE LEVEL 281' - 2"
LEVEL 1107' - 0"
TRUCK PARKING86' - 0"
LEVEL 2131' - 0"
ROOF169' - 11"
EQUIPMENTPLATFORM
143' - 0"
AC
GARAGE LEVEL 391' - 2"
WALKWAY119' - 0"
J1A-400
T.O. PARAPET175' - 2"
BC.3A9
A-402
LOW ROOF156' - 11"
STAIRST4
CAPITALROOML1.05
FIRECOMMAND
L1.29
FIRE PUMPG3.02
STAIRST4
EXTERIOR DOCK65' - 0"
A.2C.4
A-410A12
110'
- 2"
TO PARAPET161' - 11 1/2"
5' - 3
"7'
- 11
1/2"
5' - 0
1/2
"
13' -
11"
12' -
0"12
' - 0"
12' -
0"15
' - 10
"5'
- 2"
4' - 1
0"11
' - 2"
5' - 0
"
1' - 11" 8' - 0" 35' - 2" 23' - 1 1/2" 7' - 8 1/2"
GARAGE LEVEL 170' - 0"
GARAGE LEVEL 281' - 2"
LEVEL 1107' - 0"
TRUCK PARKING86' - 0"
LEVEL 2131' - 0"
ROOF169' - 11"
EQUIPMENTPLATFORM
143' - 0"
9 8
GARAGE LEVEL 391' - 2"
WALKWAY119' - 0"
10
T.O. PARAPET175' - 2"
J1A-401
LOW ROOF156' - 11"
GARAGELEVEL 1
P-1
SERVICECORRIDOR
L1.15
SERVICECORRIDOR
L2.12
EXTERIOR DOCK65' - 0"
A-414A12
110'
- 2"
TO PARAPET161' - 11 1/2"
RE: CIVIL
5' - 0
"11
' - 2"
4' - 1
0"5'
- 2"
15' -
10"
12' -
0"12
' - 0"
12' -
0"13
' - 11
"
5' - 0
1/2
"
7' - 1
1 1/
2"5'
- 3"
40' - 0"36' - 3"
HNTB New York Engineering &Architecture, P.C.The HNTB Companies
715 Kirk DriveKansas City, Missouri 64105Ph: (816) 472 - 1201Fax: (816) 471 - 1934
Save
d:
Drawing Copyright © 2014
III Winners Circle. PO Box 5269 . Albany, NY 12205-0269Main: (518) 453-4500 . www.chacompanies.com
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY AREACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THESTAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THEDATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION
OF THE ALTERATION.
Submittal / RevisionNo. App'd. By Date
Designed By: Drawn By: Checked By:
Issue Date: Project No: Scale:
Drawing No:
AS SHOWN
ALBANY CAPITAL CENTER
1
A
234567891011121314
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
OGS Project Number: SA601
2/5/
2015
3:5
2:20
PM
A-402
02/06/15 36674
AO AO SMP
OVERALL BUILDINGSECTIONS
1/16" = 1'-0"
A1PARTIAL SECTION0 16'4' 8'0 16' 32'8'4' 1/16" = 1'-0"
A5PARTIAL SECTION0 16'4' 8'0 16' 32'8'4' 1/16" = 1'-0"
A9PARTIAL SECTION0 16'4' 8'0 16' 32'8'4'
BID PACKAGE #3 -PHASE #3
MD MM 02/06/15
Detailing/Documentation Responsibilities: ¢ Exterior EIFS wall details ¢ Roof details ¢ Vertical transportation (scissor stairs, ramps, etc) ¢ Rails, protection components ¢ All garage/loading dock components ¢ Door head, jamb, sill ¢ Louver head, jamb, sill ¢ Door schedule, louver schedule ¢ UL Assemblies, Partitions
GARAGE LEVEL 170' - 0"
GARAGE LEVEL 281' - 2"
LEVEL 1107' - 0"
TRUCK PARKING86' - 0"
LEVEL 2131' - 0"
EQUIPMENTPLATFORM
143' - 0"
GARAGE LEVEL 391' - 2"
WALKWAY119' - 0"
C.3
LOW ROOF156' - 11"
EXTERIOR DOCK65' - 0"
C.4
A-626M6
A-625M6
SIM
A-625A10
SIM
2' - 0"
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
FIXED ALUMINUM LOUVER08 91 19.A1
CAST-IN-PLACE FOUNDATIONWALL
03 30 00.A3
CAST-IN-PLACE FOUNDATIONWALL W/ ARCHITECTURALFINISH
03 30 00.A6
TO PARAPET161' - 11 1/2"
A-625A6
SIMOPP
OPP
GARAGE LEVEL 170' - 0"
GARAGE LEVEL 281' - 2"
LEVEL 1107' - 0"
TRUCK PARKING86' - 0"
LEVEL 2131' - 0"
EQUIPMENTPLATFORM
143' - 0"
GARAGE LEVEL 391' - 2"
WALKWAY119' - 0"
10
LOW ROOF156' - 11"
EXTERIOR DOCK65' - 0"
A-626A10
A-626F10
A-625G1
SIM 2' - 0"
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
CAST-IN-PLACE FOUNDATIONWALL
03 30 00.A3
TO PARAPET161' - 11 1/2"
GARAGE LEVEL 170' - 0"
GARAGE LEVEL 281' - 2"
LEVEL 1107' - 0"
TRUCK PARKING86' - 0"
LEVEL 2131' - 0"
ROOF169' - 11"
EQUIPMENTPLATFORM
143' - 0"
9
GARAGE LEVEL 391' - 2"
WALKWAY119' - 0"
T.O. PARAPET175' - 2"
LOW ROOF156' - 11"
A-625A6
A-625M6
A-625G6
A-625G10
A-625A10
2' - 0"
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
CURT
AIN
WAL
L R.
O.
16' -
10"
1' - 6
"8'
- 6 1
/4"
8' - 3
3/4
"
GLAZED ALUMINUM CURTAINWALL SYSTEM
08 44 13.A0
FIXED ALUMINUM LOUVER08 91 19.A1
LOUV
ER R
.O.
11' -
0 1/
2"
CAST-IN-PLACE FOUNDATIONWALL W/ ARCHITECTURAL
FINISH
03 30 00.A6
CAST-IN-PLACE FOUNDATIONWALL
03 30 00.A3
TO PARAPET161' - 11 1/2"
GARAGE LEVEL 170' - 0"
GARAGE LEVEL 281' - 2"
LEVEL 1107' - 0"
TRUCK PARKING86' - 0"
LEVEL 2131' - 0"
ROOF169' - 11"
EQUIPMENTPLATFORM
143' - 0"
9
GARAGE LEVEL 391' - 2"
WALKWAY119' - 0"
T.O. PARAPET175' - 2"
LOW ROOF156' - 11"
A-625M10
A-626F1
A-626P1
A-626A6
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
A-626F6
CAST-IN-PLACE FOUNDATIONWALL W/ ARCHITECTURALFINISH
03 30 00.A6
CAST-IN-PLACE FOUNDATIONWALL
03 30 00.A3
TO PARAPET161' - 11 1/2"
HNTB New York Engineering &Architecture, P.C.The HNTB Companies
715 Kirk DriveKansas City, Missouri 64105Ph: (816) 472 - 1201Fax: (816) 471 - 1934
Save
d:
Drawing Copyright © 2014
III Winners Circle. PO Box 5269 . Albany, NY 12205-0269Main: (518) 453-4500 . www.chacompanies.com
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY AREACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THESTAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THEDATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION
OF THE ALTERATION.
Submittal / RevisionNo. App'd. By Date
Designed By: Drawn By: Checked By:
Issue Date: Project No: Scale:
Drawing No:
AS SHOWN
ALBANY CAPITAL CENTER
1
A
234567891011121314
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
OGS Project Number: SA601
2/5/
2015
3:5
3:07
PM
A-414
02/06/15 36674
AO AO SMP
WALL SECTIONS
KEYNOTE LEGENDKey Value Keynote Text
03 30 00.A3 CAST-IN-PLACEFOUNDATION WALL
03 30 00.A6 CAST-IN-PLACEFOUNDATION WALL W/ARCHITECTURAL FINISH
07 24 19.A0 WATER-DRAINAGE EIFSSYSTEM
08 44 13.A0 GLAZED ALUMINUMCURTAIN WALL SYSTEM
08 91 19.A1 FIXED ALUMINUM LOUVER
1/4" = 1'-0"
A9WALL SECTION0 4' 8'
1/4" = 1'-0"
A12WALL SECTION0 4' 8' 0 4' 8' 0 4' 8'
BID PACKAGE #3 -PHASE #3
MD MM 02/06/15
1/4" = 1'-0"
A1WALL SECTION 1/4" = 1'-0"
A5WALL SECTION
G
LOW ROOF156' - 11"
AIR BARRIER TRANSITIONFLASHING
07 27 26.B1
PREFINISHED ALUMINUMCOPING
07 62 00.B2
CONTINUOUS CLEAT07 62 00.K1
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
TPO ROOF MEMBRANE07 54 23.A1
FASTENERS W/ STRESS PLATES07 54 23.D4
HEAT WELD07 54 23.D2
TPO ROOF MEMBRANE ONTAPERED INSULATION
07 54 23.A2
1/2" COVER BOARD07 54 23.C1
1-1/2" METAL ROOF DECK REF:STRUCTURAL
05 31 00.C1
2' - 1"
8" METAL STUD05 40 00.A6
R-13 BATT INSULATION07 21 00.A2
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
4"
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
TO PARAPET161' - 11 1/2"
SPRAY-APPLIED FIREPROOFING07 81 00.A0
TO ROOF CAP FLASHING
EXTEND MIN. 8" ABOVEROOF DECK
TPO WALL CAP FLASHINGCONTINUOUS UNDER COPING
07 54 23.B2
9
CAST-IN-PLACE FOUNDATIONWALL W/ ARCHITECTURAL
FINISH
03 30 00.A6
FIXED ALUMINUM LOUVER08 91 19.A1
SILL FLASHING W/ END DAMS08 91 19.F1
ON BED OF MASTIC
1' - 9"
SLOTTED CLIP ANGLE05 50 00.A13
9
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
R-13 BATT INSULATION07 21 00.A2
BLOCKING06 10 00.A1
SHEET METAL FLASHING07 62 00.A0
JOINT SEALANT07 92 00.A0
SEALANT W/ BACKER ROD07 92 00.A1
W/ WEEPS @ 24" OC MIN
FIXED ALUMINUM LOUVER08 91 19.A1
2' - 0"
1' - 10 1/2"
3/4"
SUSPENSION WIRE09 51 13.D1
15/16" TEE09 51 13.B2
15/16" WALL ANGLE09 51 13.C2
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
8" METAL STUD05 40 00.A6
STEEL BEAM REF: STRUCTURAL05 12 00.B0
SLOTTED CLIP ANGLE05 50 00.A13
ACOUSTICAL PANEL CEILINGREF: SCHEDULE
09 51 13.A1
SPRAY-APPLIED FIREPROOFING07 81 00.A0
DRIP EDGE07 24 19.H1
LEVEL 2131' - 0"
9
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
GLAZED ALUMINUM CURTAINWALL SYSTEM
08 44 13.A0
BLOCKING06 10 00.A1
JOINT SEALANT07 92 00.A0
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
2' - 0"
1' - 6
"
R-13 BATT INSULATION07 21 00.A2
1 5/8"
W/ END DAMS
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
8" METAL STUD05 40 00.A6
4" 4"
1"
2"4"
11"
STAINLESS STEEL FIN-TUBEENCLOSURE
05 75 00.A1
BLOCKING06 10 00.A1
SHEET METAL FLASHING07 62 00.A0
BENT STEEL PLATE POUR STOP05 12 00.P1
5/8" MOISTURE RESISTANTGYPSUM BOARD
09 29 00.D1
ALIGN
1/2" GYPSUM BOARD09 29 00.A5
STEEL BEAM REF: STRUCTURAL05 12 00.B0
CAST-IN-PLACE CONCRETE SLABW/ METAL DECKING
03 30 00.F1
A-621G1
OPP
1-HR CONCEALEDSPRAY-APPLIED FIREPROOFING
07 81 00.A1
9
BLOCKING06 10 00.A1
JOINT SEALANT07 92 00.A0
SEALANT W/ BACKER ROD07 92 00.A1
W/ WEEPS @ 24" O.C. MIN
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1 2' - 0"
1 5/8" GLAZED ALUMINUM CURTAINWALL SYSTEM
08 44 13.A0
15/16" TEE09 29 00.P1
SUSPENSION WIRE09 29 00.P3
15/16" WALL ANGLE09 29 00.P2
5/8" TYPE "X" GYPSUM BOARD09 29 00.B1
R-13 BATT INSULATION07 21 00.A2
8" METAL STUD05 40 00.A6
3/4"
SHEET METAL FLASHING07 62 00.A0
W/ END DAMS
DRIP EDGE07 24 19.H1
9
LOW ROOF156' - 11"
PREFINISHED ALUMINUMCOPING
07 62 00.B2
AIR BARRIER TRANSITIONFLASHING
07 27 26.B1
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
TPO ROOF MEMBRANE07 54 23.A1
FASTENERS W/ STRESS PLATES07 54 23.D4
HEAT WELD07 54 23.D2
TPO ROOF MEMBRANE07 54 23.A1
1/2" COVER BOARD07 54 23.C1
CONTINUOUS CLEAT07 62 00.K1
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
8" METAL STUD05 40 00.A6
R-13 BATT INSULATION07 21 00.A2
STEEL BEAM REF: STRUCTURAL05 12 00.B0
TO PARAPET161' - 11 1/2"
TO ROOF CAP FLASHING
4"
TPO WALL CAP FLASHINGCONTINUOUS UNDER COPING
07 54 23.B2
EXTEND MIN. 8" ABOVEROOF DECK
SPRAY-APPLIED FIREPROOFING07 81 00.A0
92' - 0"CAST-IN-PLACE SLAB ON GRADE
03 30 00.A5
CAST-IN-PLACE FOUNDATIONWALL
03 30 00.A3
COMPRESSIBLE JOINT FILLER03 30 00.L6
SELF-ADHERING SHEETWATERPROOFING
07 13 26.A1
DRAINAGE PROTECTION BOARD07 13 26.B1
CONCRETE DRIVEREF: CIVIL DWGS.
URETHANE POURABLE SEALANT07 92 00.C3
VAPOR BARRIER - 15 MIL03 30 00.P1
LEVEL 1107' - 0"
G
R-13 BATT INSULATION07 21 00.A2
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
DRAINAGE STRIP
8" METAL STUD05 40 00.A6
WRAP MESH TO BACK SIDEOF EIFS MIN. 2"
3-5/8" METAL STUD05 40 00.A4
R-13 BATT INSULATION07 21 00.A2
R-20 MINERAL BATT INSULATIONPINNED TO STRUCTURE
07 21 00.E1
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
1/2"
2' - 1"
BENT STEEL PLATE POUR STOP05 12 00.P1
STEEL BEAM REF: STRUCTURAL05 12 00.B0
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
3-5/8" METAL STUD05 40 00.A4
1' - 5"
COILING DOOR HOUSING08 33 23.E1
INSULATED COILING SERVICEDOOR W/ MOTOR
08 33 23.C1
SPRAY-APPLIED FIREPROOFING07 81 00.A0
METAL DECK FLUTE INSULATION07 21 00.D1
EQUIPMENTPLATFORM
143' - 0"
81' - 10 5/8"
8" METAL STUD05 40 00.A6
R-13 BATT INSULATION07 21 00.A2
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
2" POLYISOCYANURATEINSULATION
07 21 00.B4
6" METAL STUD FRAMING09 22 16.F1
5/8" TYPE "X" GYPSUM BOARD09 29 00.B1
5/8" TYPE "X" GYPSUM BOARD09 29 00.B1
SUSPENSION WIRE09 29 00.P3
15/16" WALL ANGLE09 29 00.P2
15/16" TEE09 29 00.P1
RUNNING BOND FACE BRICKVENEER - BRICK TYPE 1
04 26 13.A2
AIR BARRIER SYSTEM TO BE CONTINUOUSFULLY ADHERED AND TERMINATED PERMANUFACTURE'S STANDARDS AT ALL OPENINGS,PENETRATIONS AND INTERFACES WITH OTHERAIR BARRIER SYSTEMS.
GENERAL NOTE:
1.
HNTB New York Engineering &Architecture, P.C.The HNTB Companies
715 Kirk DriveKansas City, Missouri 64105Ph: (816) 472 - 1201Fax: (816) 471 - 1934
Save
d:
Drawing Copyright © 2014
III Winners Circle. PO Box 5269 . Albany, NY 12205-0269Main: (518) 453-4500 . www.chacompanies.com
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY AREACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THESTAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THEDATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION
OF THE ALTERATION.
Submittal / RevisionNo. App'd. By Date
Designed By: Drawn By: Checked By:
Issue Date: Project No: Scale:
Drawing No:
AS SHOWN
ALBANY CAPITAL CENTER
1
A
234567891011121314
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
OGS Project Number: SA601
2/5/
2015
3:57
:48
PM
A-625
02/06/15 36674
MEP MEP SMP
EXTERIOR WALL DETAILS
KEYNOTE LEGENDKey Value Keynote Text
03 30 00.A3 CAST-IN-PLACE FOUNDATIONWALL
03 30 00.A5 CAST-IN-PLACE SLAB ONGRADE
03 30 00.A6 CAST-IN-PLACE FOUNDATIONWALL W/ ARCHITECTURALFINISH
03 30 00.F1 CAST-IN-PLACE CONCRETESLAB W/ METAL DECKING
03 30 00.L6 COMPRESSIBLE JOINTFILLER
03 30 00.P1 VAPOR BARRIER - 15 MIL04 26 13.A2 RUNNING BOND FACE BRICK
VENEER - BRICK TYPE 105 12 00.B0 STEEL BEAM REF:
STRUCTURAL05 12 00.P1 BENT STEEL PLATE POUR
STOP05 31 00.C1 1-1/2" METAL ROOF DECK
REF: STRUCTURAL05 40 00.A4 3-5/8" METAL STUD05 40 00.A6 8" METAL STUD05 50 00.A13 SLOTTED CLIP ANGLE05 75 00.A1 STAINLESS STEEL FIN-TUBE
ENCLOSURE06 10 00.A1 BLOCKING06 16 00.A1 5/8" GLASS-MAT GYPSUM
SHEATHING07 13 26.A1 SELF-ADHERING SHEET
WATERPROOFING07 13 26.B1 DRAINAGE PROTECTION
BOARD07 21 00.A2 R-13 BATT INSULATION07 21 00.B4 2" POLYISOCYANURATE
INSULATION07 21 00.D1 METAL DECK FLUTE
INSULATION07 21 00.E1 R-20 MINERAL BATT
INSULATION PINNED TOSTRUCTURE
07 24 19.A0 WATER-DRAINAGE EIFSSYSTEM
07 24 19.H1 DRIP EDGE07 27 26.A0 FLUID-APPLIED MEMBRANE
AIR BARRIER07 27 26.B1 AIR BARRIER TRANSITION
FLASHING07 54 23.A1 TPO ROOF MEMBRANE07 54 23.A2 TPO ROOF MEMBRANE ON
TAPERED INSULATION07 54 23.B2 TPO WALL CAP FLASHING
CONTINUOUS UNDERCOPING
07 54 23.C1 1/2" COVER BOARD07 54 23.D2 HEAT WELD07 54 23.D4 FASTENERS W/ STRESS
PLATES07 62 00.A0 SHEET METAL FLASHING07 62 00.B2 PREFINISHED ALUMINUM
COPING07 62 00.K1 CONTINUOUS CLEAT07 81 00.A0 SPRAY-APPLIED
FIREPROOFING07 81 00.A1 1-HR CONCEALED
SPRAY-APPLIEDFIREPROOFING
07 92 00.A0 JOINT SEALANT07 92 00.A1 SEALANT W/ BACKER ROD07 92 00.C3 URETHANE POURABLE
SEALANT08 33 23.C1 INSULATED COILING SERVICE
DOOR W/ MOTOR08 33 23.E1 COILING DOOR HOUSING08 44 13.A0 GLAZED ALUMINUM CURTAIN
WALL SYSTEM08 91 19.A1 FIXED ALUMINUM LOUVER08 91 19.F1 SILL FLASHING W/ END DAMS09 22 16.F1 6" METAL STUD FRAMING09 29 00.A5 1/2" GYPSUM BOARD09 29 00.B1 5/8" TYPE "X" GYPSUM
BOARD09 29 00.D1 5/8" MOISTURE RESISTANT
GYPSUM BOARD09 29 00.P1 15/16" TEE09 29 00.P2 15/16" WALL ANGLE09 29 00.P3 SUSPENSION WIRE09 51 13.A1 ACOUSTICAL PANEL CEILING
REF: SCHEDULE09 51 13.B2 15/16" TEE09 51 13.C2 15/16" WALL ANGLE09 51 13.D1 SUSPENSION WIRE
1 1/2" = 1'-0"
G1EXTERIOR WALL DETAIL
0 1'6" 1 1/2" = 1'-0"
A6EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
M6EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
G6EXTERIOR WALL DETAIL 1 1/2" = 1'-0"
G10EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
A10EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
M10EXTERIOR WALL DETAIL
0 1'6"
0 1'6"
0 1'6"
0 1'6"
0 1'6"
0 1'6"
0 1'6"
0 1'6"
1 1/2" = 1'-0"
A1EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
M1EXTERIOR WALL DETAIL
BID PACKAGE #3 -PHASE #3
MD MM 02/06/15
G
LOW ROOF156' - 11"
AIR BARRIER TRANSITIONFLASHING
07 27 26.B1
PREFINISHED ALUMINUMCOPING
07 62 00.B2
CONTINUOUS CLEAT07 62 00.K1
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
TPO ROOF MEMBRANE07 54 23.A1
FASTENERS W/ STRESS PLATES07 54 23.D4
HEAT WELD07 54 23.D2
TPO ROOF MEMBRANE ONTAPERED INSULATION
07 54 23.A2
1/2" COVER BOARD07 54 23.C1
1-1/2" METAL ROOF DECK REF:STRUCTURAL
05 31 00.C1
2' - 1"
8" METAL STUD05 40 00.A6
R-13 BATT INSULATION07 21 00.A2
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
4"
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
TO PARAPET161' - 11 1/2"
SPRAY-APPLIED FIREPROOFING07 81 00.A0
TO ROOF CAP FLASHING
EXTEND MIN. 8" ABOVEROOF DECK
TPO WALL CAP FLASHINGCONTINUOUS UNDER COPING
07 54 23.B2
9
CAST-IN-PLACE FOUNDATIONWALL W/ ARCHITECTURAL
FINISH
03 30 00.A6
FIXED ALUMINUM LOUVER08 91 19.A1
SILL FLASHING W/ END DAMS08 91 19.F1
ON BED OF MASTIC
1' - 9"
SLOTTED CLIP ANGLE05 50 00.A13
9
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
R-13 BATT INSULATION07 21 00.A2
BLOCKING06 10 00.A1
SHEET METAL FLASHING07 62 00.A0
JOINT SEALANT07 92 00.A0
SEALANT W/ BACKER ROD07 92 00.A1
W/ WEEPS @ 24" OC MIN
FIXED ALUMINUM LOUVER08 91 19.A1
2' - 0"
1' - 10 1/2"
3/4"
SUSPENSION WIRE09 51 13.D1
15/16" TEE09 51 13.B2
15/16" WALL ANGLE09 51 13.C2
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
8" METAL STUD05 40 00.A6
STEEL BEAM REF: STRUCTURAL05 12 00.B0
SLOTTED CLIP ANGLE05 50 00.A13
ACOUSTICAL PANEL CEILINGREF: SCHEDULE
09 51 13.A1
SPRAY-APPLIED FIREPROOFING07 81 00.A0
DRIP EDGE07 24 19.H1
LEVEL 2131' - 0"
9
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
GLAZED ALUMINUM CURTAINWALL SYSTEM
08 44 13.A0
BLOCKING06 10 00.A1
JOINT SEALANT07 92 00.A0
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
2' - 0"
1' - 6
"
R-13 BATT INSULATION07 21 00.A2
1 5/8"
W/ END DAMS
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
8" METAL STUD05 40 00.A6
4" 4"
1"
2"4"
11"
STAINLESS STEEL FIN-TUBEENCLOSURE
05 75 00.A1
BLOCKING06 10 00.A1
SHEET METAL FLASHING07 62 00.A0
BENT STEEL PLATE POUR STOP05 12 00.P1
5/8" MOISTURE RESISTANTGYPSUM BOARD
09 29 00.D1
ALIGN
1/2" GYPSUM BOARD09 29 00.A5
STEEL BEAM REF: STRUCTURAL05 12 00.B0
CAST-IN-PLACE CONCRETE SLABW/ METAL DECKING
03 30 00.F1
A-621G1
OPP
1-HR CONCEALEDSPRAY-APPLIED FIREPROOFING
07 81 00.A1
9
BLOCKING06 10 00.A1
JOINT SEALANT07 92 00.A0
SEALANT W/ BACKER ROD07 92 00.A1
W/ WEEPS @ 24" O.C. MIN
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1 2' - 0"
1 5/8" GLAZED ALUMINUM CURTAINWALL SYSTEM
08 44 13.A0
15/16" TEE09 29 00.P1
SUSPENSION WIRE09 29 00.P3
15/16" WALL ANGLE09 29 00.P2
5/8" TYPE "X" GYPSUM BOARD09 29 00.B1
R-13 BATT INSULATION07 21 00.A2
8" METAL STUD05 40 00.A6
3/4"
SHEET METAL FLASHING07 62 00.A0
W/ END DAMS
DRIP EDGE07 24 19.H1
9
LOW ROOF156' - 11"
PREFINISHED ALUMINUMCOPING
07 62 00.B2
AIR BARRIER TRANSITIONFLASHING
07 27 26.B1
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
TPO ROOF MEMBRANE07 54 23.A1
FASTENERS W/ STRESS PLATES07 54 23.D4
HEAT WELD07 54 23.D2
TPO ROOF MEMBRANE07 54 23.A1
1/2" COVER BOARD07 54 23.C1
CONTINUOUS CLEAT07 62 00.K1
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
8" METAL STUD05 40 00.A6
R-13 BATT INSULATION07 21 00.A2
STEEL BEAM REF: STRUCTURAL05 12 00.B0
TO PARAPET161' - 11 1/2"
TO ROOF CAP FLASHING
4"
TPO WALL CAP FLASHINGCONTINUOUS UNDER COPING
07 54 23.B2
EXTEND MIN. 8" ABOVEROOF DECK
SPRAY-APPLIED FIREPROOFING07 81 00.A0
92' - 0"CAST-IN-PLACE SLAB ON GRADE
03 30 00.A5
CAST-IN-PLACE FOUNDATIONWALL
03 30 00.A3
COMPRESSIBLE JOINT FILLER03 30 00.L6
SELF-ADHERING SHEETWATERPROOFING
07 13 26.A1
DRAINAGE PROTECTION BOARD07 13 26.B1
CONCRETE DRIVEREF: CIVIL DWGS.
URETHANE POURABLE SEALANT07 92 00.C3
VAPOR BARRIER - 15 MIL03 30 00.P1
LEVEL 1107' - 0"
G
R-13 BATT INSULATION07 21 00.A2
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
DRAINAGE STRIP
8" METAL STUD05 40 00.A6
WRAP MESH TO BACK SIDEOF EIFS MIN. 2"
3-5/8" METAL STUD05 40 00.A4
R-13 BATT INSULATION07 21 00.A2
R-20 MINERAL BATT INSULATIONPINNED TO STRUCTURE
07 21 00.E1
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
1/2"
2' - 1"
BENT STEEL PLATE POUR STOP05 12 00.P1
STEEL BEAM REF: STRUCTURAL05 12 00.B0
WATER-DRAINAGE EIFS SYSTEM07 24 19.A0
3-5/8" METAL STUD05 40 00.A4
1' - 5"
COILING DOOR HOUSING08 33 23.E1
INSULATED COILING SERVICEDOOR W/ MOTOR
08 33 23.C1
SPRAY-APPLIED FIREPROOFING07 81 00.A0
METAL DECK FLUTE INSULATION07 21 00.D1
EQUIPMENTPLATFORM
143' - 0"
81' - 10 5/8"
8" METAL STUD05 40 00.A6
R-13 BATT INSULATION07 21 00.A2
5/8" GLASS-MAT GYPSUMSHEATHING
06 16 00.A1
FLUID-APPLIED MEMBRANE AIRBARRIER
07 27 26.A0
2" POLYISOCYANURATEINSULATION
07 21 00.B4
6" METAL STUD FRAMING09 22 16.F1
5/8" TYPE "X" GYPSUM BOARD09 29 00.B1
5/8" TYPE "X" GYPSUM BOARD09 29 00.B1
SUSPENSION WIRE09 29 00.P3
15/16" WALL ANGLE09 29 00.P2
15/16" TEE09 29 00.P1
RUNNING BOND FACE BRICKVENEER - BRICK TYPE 1
04 26 13.A2
AIR BARRIER SYSTEM TO BE CONTINUOUSFULLY ADHERED AND TERMINATED PERMANUFACTURE'S STANDARDS AT ALL OPENINGS,PENETRATIONS AND INTERFACES WITH OTHERAIR BARRIER SYSTEMS.
GENERAL NOTE:
1.
HNTB New York Engineering &Architecture, P.C.The HNTB Companies
715 Kirk DriveKansas City, Missouri 64105Ph: (816) 472 - 1201Fax: (816) 471 - 1934
Save
d:
Drawing Copyright © 2014
III Winners Circle. PO Box 5269 . Albany, NY 12205-0269Main: (518) 453-4500 . www.chacompanies.com
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY AREACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THESTAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THEDATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION
OF THE ALTERATION.
Submittal / RevisionNo. App'd. By Date
Designed By: Drawn By: Checked By:
Issue Date: Project No: Scale:
Drawing No:
AS SHOWN
ALBANY CAPITAL CENTER
1
A
234567891011121314
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
OGS Project Number: SA601
2/5/
2015
3:57
:48
PM
A-625
02/06/15 36674
MEP MEP SMP
EXTERIOR WALL DETAILS
KEYNOTE LEGENDKey Value Keynote Text
03 30 00.A3 CAST-IN-PLACE FOUNDATIONWALL
03 30 00.A5 CAST-IN-PLACE SLAB ONGRADE
03 30 00.A6 CAST-IN-PLACE FOUNDATIONWALL W/ ARCHITECTURALFINISH
03 30 00.F1 CAST-IN-PLACE CONCRETESLAB W/ METAL DECKING
03 30 00.L6 COMPRESSIBLE JOINTFILLER
03 30 00.P1 VAPOR BARRIER - 15 MIL04 26 13.A2 RUNNING BOND FACE BRICK
VENEER - BRICK TYPE 105 12 00.B0 STEEL BEAM REF:
STRUCTURAL05 12 00.P1 BENT STEEL PLATE POUR
STOP05 31 00.C1 1-1/2" METAL ROOF DECK
REF: STRUCTURAL05 40 00.A4 3-5/8" METAL STUD05 40 00.A6 8" METAL STUD05 50 00.A13 SLOTTED CLIP ANGLE05 75 00.A1 STAINLESS STEEL FIN-TUBE
ENCLOSURE06 10 00.A1 BLOCKING06 16 00.A1 5/8" GLASS-MAT GYPSUM
SHEATHING07 13 26.A1 SELF-ADHERING SHEET
WATERPROOFING07 13 26.B1 DRAINAGE PROTECTION
BOARD07 21 00.A2 R-13 BATT INSULATION07 21 00.B4 2" POLYISOCYANURATE
INSULATION07 21 00.D1 METAL DECK FLUTE
INSULATION07 21 00.E1 R-20 MINERAL BATT
INSULATION PINNED TOSTRUCTURE
07 24 19.A0 WATER-DRAINAGE EIFSSYSTEM
07 24 19.H1 DRIP EDGE07 27 26.A0 FLUID-APPLIED MEMBRANE
AIR BARRIER07 27 26.B1 AIR BARRIER TRANSITION
FLASHING07 54 23.A1 TPO ROOF MEMBRANE07 54 23.A2 TPO ROOF MEMBRANE ON
TAPERED INSULATION07 54 23.B2 TPO WALL CAP FLASHING
CONTINUOUS UNDERCOPING
07 54 23.C1 1/2" COVER BOARD07 54 23.D2 HEAT WELD07 54 23.D4 FASTENERS W/ STRESS
PLATES07 62 00.A0 SHEET METAL FLASHING07 62 00.B2 PREFINISHED ALUMINUM
COPING07 62 00.K1 CONTINUOUS CLEAT07 81 00.A0 SPRAY-APPLIED
FIREPROOFING07 81 00.A1 1-HR CONCEALED
SPRAY-APPLIEDFIREPROOFING
07 92 00.A0 JOINT SEALANT07 92 00.A1 SEALANT W/ BACKER ROD07 92 00.C3 URETHANE POURABLE
SEALANT08 33 23.C1 INSULATED COILING SERVICE
DOOR W/ MOTOR08 33 23.E1 COILING DOOR HOUSING08 44 13.A0 GLAZED ALUMINUM CURTAIN
WALL SYSTEM08 91 19.A1 FIXED ALUMINUM LOUVER08 91 19.F1 SILL FLASHING W/ END DAMS09 22 16.F1 6" METAL STUD FRAMING09 29 00.A5 1/2" GYPSUM BOARD09 29 00.B1 5/8" TYPE "X" GYPSUM
BOARD09 29 00.D1 5/8" MOISTURE RESISTANT
GYPSUM BOARD09 29 00.P1 15/16" TEE09 29 00.P2 15/16" WALL ANGLE09 29 00.P3 SUSPENSION WIRE09 51 13.A1 ACOUSTICAL PANEL CEILING
REF: SCHEDULE09 51 13.B2 15/16" TEE09 51 13.C2 15/16" WALL ANGLE09 51 13.D1 SUSPENSION WIRE
1 1/2" = 1'-0"
G1EXTERIOR WALL DETAIL
0 1'6" 1 1/2" = 1'-0"
A6EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
M6EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
G6EXTERIOR WALL DETAIL 1 1/2" = 1'-0"
G10EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
A10EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
M10EXTERIOR WALL DETAIL
0 1'6"
0 1'6"
0 1'6"
0 1'6"
0 1'6"
0 1'6"
0 1'6"
0 1'6"
1 1/2" = 1'-0"
A1EXTERIOR WALL DETAIL
1 1/2" = 1'-0"
M1EXTERIOR WALL DETAIL
BID PACKAGE #3 -PHASE #3
MD MM 02/06/15
exterior detail| window sill
exterior detail| parapet
stair detail| self-supporting terrazzo
stair detail| self-supporting terrazzo
wall section | EIFS
WALKWAY119' - 0"
STAINLESS STEEL IMBEDS- STOP 3" FROM EACH END
PRECAST TERRAZZO STAIRTREAD
09 66 23.B1
SELF SUPPORTING
1/2" LAMINATED GLASS08 80 00.F3
STAINLESS STEEL GUARDRAILSHOE
05 73 00.B5
COMPRESSIBLE FILLERFOR TREAD DEFLECTION
STAINLESS STEEL GUARDRAILCAP
05 73 00.B6
1/2" CLEAR TEMPERED GLASS05 73 00.B1
STEEL TUBE STRINGER PAINTED05 51 00.C6
POURED TERRAZZOLANDING ON METAL PAN
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
HANDRAIL BRACKET05 52 13.A2
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
1"1/8" 7/8"
2 1/
4" T
YP.
1' - 4 3/4"3'-6" TO NEXT JOINT
6"3'
- 0"
DECORATIVE STAINLESS STEELHANDRAILS & POSTS
05 73 00.A2
PRECAST TERRAZZO STAIRTREAD
09 66 23.B1
SELF SUPPORTING
STAINLESS STEEL GUARDRAILSHOE
05 73 00.B5
1/2" LAMINATED GLASS08 80 00.F3
COMPRESSIBLE FILLER FORTREAD DEFLECTION
STAINLESS STEEL IMBEDS -STOP 3" FROM EACH END
POURED TERRAZZO LANDINGON METAL PAN
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
1/8" JOINT BETWEENTREAD AND POUREDLANDING
1/8"
STAINLESS STEEL GUARDRAILCAP
05 73 00.B6
1/2" CLEAR TEMPERED GLASS05 73 00.B1
HANDRAIL BRACKET05 52 13.A2
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
1' - 4 3/4"3' - 6" TO NEXT JOINT
6"3'
- 0"
DECORATIVE STAINLESS STEELHANDRAILS & POSTS
05 73 00.A2
LEVEL 1107' - 0"
3
PRECAST TERRAZZO STAIRTREAD
09 66 23.B1
1/2" LAMINATED GLASS08 80 00.F3
COMPRESSIBLE FILLERFOR TREAD DEFLECTION
STAINLESS STEEL GUARDRAILCAP
05 73 00.B6
1/2" CLEAR TEMPERED GLASS05 73 00.B1
STEEL TUBE STRINGER PAINTED05 51 00.C6
STAINLESS STEELIMBEDS - STOP 3"FROM EACH END
SELF SUPPORTING
STAINLESS STEEL GUARDRAILSHOE
05 73 00.B5
1"
1/8" 7/8"
HANDRAIL BRACKET05 52 13.A2
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
2 1/
4" T
YP.
6"3'
- 0"
1' - 1 1/2"
11" TYP.
1/2"
3/4"
3/8"
1/4"
DECORATIVE STAINLESS STEELHANDRAILS & POSTS
05 73 00.A2
ONE TREAD
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
CONC-FILLED PAN TREAD05 51 00.C1
STRINGER ANCHOREDTO SLAB; CONNECTIONDETAIL BY STAIRCONTRACTOR
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
1' - 6
"
@ ST2, ST3, ST4, ST5
3' - 0
"
LEVEL 1107' - 0"
1' - 6
"
ONE TREAD
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
CONC-FILLED PAN TREAD05 51 00.C1
CONTINUOUS STEELSTRINGER ANCHORED TOSTRUCTURAL STEELBEAM; CONNECTION BYSTAIR CONTRACTOR
STEEL BEAM REF: STRUCTURAL05 12 00.B0
BENT STEEL PLATE POUR STOP05 12 00.P1
ABRASIVE METAL NOSING05 50 00.F1
@ ST2, ST3, ST4, ST5
3' - 0
"
3' - 6
"
7
WALKWAY119' - 0"
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
CONC-FILLED PAN TREAD05 51 00.C1
CONC-FILLED PAN LANDING05 51 00.C2
ABRASIVE METAL NOSING05 50 00.F1
1' - 6
"
1' - 0"
3' - 0
"
STAIR CONTRACTOR TOSUPPORT STAIR TOADJACENT STRUCTURE
@ ST2, ST3, ST4, ST5
WALKWAY119' - 0"
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
CONC-FILLED PAN LANDING05 51 00.C2
CONC-FILLED PAN TREAD05 51 00.C1
ABRASIVE METAL NOSING05 50 00.F1
1' - 6
"
ONE TREAD
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
STAIR CONTRACTOR TOSUPPORT STAIR TO ADJACENTSTRUCTURE
@ ST2, ST3, ST4, ST5
3' - 0
"
LEVEL 2131' - 0"
7
1' - 6
"
1' - 0"
CONC-FILLED PAN TREAD05 51 00.C1
ABRASIVE METAL NOSING05 50 00.F1
CONTINUOUS STEELSTRINGER ANCHOREDTO STRUCTURAL STEELBEAM; CONNECTIONBY STAIR CONTRACTOR
BENT STEEL PLATE POUR STOP05 12 00.P1
ANCHORED TO SLAB
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
@ ST2, ST3, ST4, ST5
6"3'
- 0"
HNTB New York Engineering &Architecture, P.C.The HNTB Companies
715 Kirk DriveKansas City, Missouri 64105Ph: (816) 472 - 1201Fax: (816) 471 - 1934
Save
d:
Drawing Copyright © 2014
III Winners Circle. PO Box 5269 . Albany, NY 12205-0269Main: (518) 453-4500 . www.chacompanies.com
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY AREACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THESTAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THEDATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION
OF THE ALTERATION.
Submittal / RevisionNo. App'd. By Date
Designed By: Drawn By: Checked By:
Issue Date: Project No: Scale:
Drawing No:
AS SHOWN
ALBANY CAPITAL CENTER
1
A
234567891011121314
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
OGS Project Number: SA601
2/5/
2015
3:5
4:59
PM
A-511
02/06/15 36674
ANS ANS SMP
STAIR DETAILS
BID PACKAGE #3 -PHASE #3
MD MM 02/06/15
KEYNOTE LEGENDKey Value Keynote Text
05 12 00.B0 STEEL BEAM REF:STRUCTURAL
05 12 00.P1 BENT STEEL PLATE POURSTOP
05 50 00.F1 ABRASIVE METAL NOSING05 51 00.C1 CONC-FILLED PAN TREAD05 51 00.C2 CONC-FILLED PAN LANDING05 51 00.C5 STEEL CHANNEL STRINGER
PAINTED05 51 00.C6 STEEL TUBE STRINGER
PAINTED05 51 00.D1 STEEL TUBE HANDRAIL 1-1/2"
O.D.05 51 00.D2 STEEL TUBE GUARDRAIL
PAINTED05 52 13.A2 HANDRAIL BRACKET05 73 00.A2 DECORATIVE STAINLESS
STEEL HANDRAILS & POSTS05 73 00.B1 1/2" CLEAR TEMPERED GLASS05 73 00.B5 STAINLESS STEEL GUARDRAIL
SHOE05 73 00.B6 STAINLESS STEEL GUARDRAIL
CAP08 80 00.F3 1/2" LAMINATED GLASS09 66 23.B1 PRECAST TERRAZZO STAIR
TREAD09 96 00.C1 HIGH-PERFORMANCE
COATING HPC-1
1 1/2" = 1'-0"
G1DETAIL @ ST1 INT. LANDING
1 1/2" = 1'-0"
A4DETAIL @ ST1 TOP LANDING 1 1/2" = 1'-0"
A1DETAIL @ ST1 BOTTOM0 1'6"
0 1'6"
0 1'6" 1 1/2" = 1'-0"
A7TYP. DETAIL @ EGRESS STAIR ON SLAB
1 1/2" = 1'-0"
G4TYP. DETAIL @ EGRESS STAIR INT. SLAB 1 1/2" = 1'-0"
G11TYP. DETAIL @ EGRESS STAIR INT. LANDING
1 1/2" = 1'-0"
A11TYP. DETAIL @ EGRESS STAIR INT. LANDING
1 1/2" = 1'-0"
G7TYP. DETAIL @ EGRESS STAIR INT. SLAB
0 1'6"0 1'6"
0 1'6" 0 1'6" 0 1'6"
WALKWAY119' - 0"
STAINLESS STEEL IMBEDS- STOP 3" FROM EACH END
PRECAST TERRAZZO STAIRTREAD
09 66 23.B1
SELF SUPPORTING
1/2" LAMINATED GLASS08 80 00.F3
STAINLESS STEEL GUARDRAILSHOE
05 73 00.B5
COMPRESSIBLE FILLERFOR TREAD DEFLECTION
STAINLESS STEEL GUARDRAILCAP
05 73 00.B6
1/2" CLEAR TEMPERED GLASS05 73 00.B1
STEEL TUBE STRINGER PAINTED05 51 00.C6
POURED TERRAZZOLANDING ON METAL PAN
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
HANDRAIL BRACKET05 52 13.A2
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
1"1/8" 7/8"
2 1/
4" T
YP.
1' - 4 3/4"3'-6" TO NEXT JOINT
6"3'
- 0"
DECORATIVE STAINLESS STEELHANDRAILS & POSTS
05 73 00.A2
PRECAST TERRAZZO STAIRTREAD
09 66 23.B1
SELF SUPPORTING
STAINLESS STEEL GUARDRAILSHOE
05 73 00.B5
1/2" LAMINATED GLASS08 80 00.F3
COMPRESSIBLE FILLER FORTREAD DEFLECTION
STAINLESS STEEL IMBEDS -STOP 3" FROM EACH END
POURED TERRAZZO LANDINGON METAL PAN
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
1/8" JOINT BETWEENTREAD AND POUREDLANDING
1/8"
STAINLESS STEEL GUARDRAILCAP
05 73 00.B6
1/2" CLEAR TEMPERED GLASS05 73 00.B1
HANDRAIL BRACKET05 52 13.A2
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
1' - 4 3/4"3' - 6" TO NEXT JOINT
6"3'
- 0"
DECORATIVE STAINLESS STEELHANDRAILS & POSTS
05 73 00.A2
LEVEL 1107' - 0"
3
PRECAST TERRAZZO STAIRTREAD
09 66 23.B1
1/2" LAMINATED GLASS08 80 00.F3
COMPRESSIBLE FILLERFOR TREAD DEFLECTION
STAINLESS STEEL GUARDRAILCAP
05 73 00.B6
1/2" CLEAR TEMPERED GLASS05 73 00.B1
STEEL TUBE STRINGER PAINTED05 51 00.C6
STAINLESS STEELIMBEDS - STOP 3"FROM EACH END
SELF SUPPORTING
STAINLESS STEEL GUARDRAILSHOE
05 73 00.B5
1"
1/8" 7/8"
HANDRAIL BRACKET05 52 13.A2
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
HIGH-PERFORMANCE COATINGHPC-1
09 96 00.C1
2 1/
4" T
YP.
6"3'
- 0"
1' - 1 1/2"
11" TYP.
1/2"
3/4"
3/8"
1/4"
DECORATIVE STAINLESS STEELHANDRAILS & POSTS
05 73 00.A2
ONE TREAD
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
CONC-FILLED PAN TREAD05 51 00.C1
STRINGER ANCHOREDTO SLAB; CONNECTIONDETAIL BY STAIRCONTRACTOR
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
1' - 6
"
@ ST2, ST3, ST4, ST5
3' - 0
"
LEVEL 1107' - 0"
1' - 6
"
ONE TREAD
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
CONC-FILLED PAN TREAD05 51 00.C1
CONTINUOUS STEELSTRINGER ANCHORED TOSTRUCTURAL STEELBEAM; CONNECTION BYSTAIR CONTRACTOR
STEEL BEAM REF: STRUCTURAL05 12 00.B0
BENT STEEL PLATE POUR STOP05 12 00.P1
ABRASIVE METAL NOSING05 50 00.F1
@ ST2, ST3, ST4, ST5
3' - 0
"
3' - 6
"
7
WALKWAY119' - 0"
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
CONC-FILLED PAN TREAD05 51 00.C1
CONC-FILLED PAN LANDING05 51 00.C2
ABRASIVE METAL NOSING05 50 00.F1
1' - 6
"
1' - 0"
3' - 0
"
STAIR CONTRACTOR TOSUPPORT STAIR TOADJACENT STRUCTURE
@ ST2, ST3, ST4, ST5
WALKWAY119' - 0"
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
CONC-FILLED PAN LANDING05 51 00.C2
CONC-FILLED PAN TREAD05 51 00.C1
ABRASIVE METAL NOSING05 50 00.F1
1' - 6
"
ONE TREAD
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
STAIR CONTRACTOR TOSUPPORT STAIR TO ADJACENTSTRUCTURE
@ ST2, ST3, ST4, ST5
3' - 0
"
LEVEL 2131' - 0"
7
1' - 6
"
1' - 0"
CONC-FILLED PAN TREAD05 51 00.C1
ABRASIVE METAL NOSING05 50 00.F1
CONTINUOUS STEELSTRINGER ANCHOREDTO STRUCTURAL STEELBEAM; CONNECTIONBY STAIR CONTRACTOR
BENT STEEL PLATE POUR STOP05 12 00.P1
ANCHORED TO SLAB
STEEL TUBE GUARDRAILPAINTED
05 51 00.D2
STEEL TUBE HANDRAIL 1-1/2"O.D.
05 51 00.D1
STEEL CHANNEL STRINGERPAINTED
05 51 00.C5
@ ST2, ST3, ST4, ST5
6"3'
- 0"
HNTB New York Engineering &Architecture, P.C.The HNTB Companies
715 Kirk DriveKansas City, Missouri 64105Ph: (816) 472 - 1201Fax: (816) 471 - 1934
Save
d:
Drawing Copyright © 2014
III Winners Circle. PO Box 5269 . Albany, NY 12205-0269Main: (518) 453-4500 . www.chacompanies.com
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY AREACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THESTAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LANDSURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THEDATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION
OF THE ALTERATION.
Submittal / RevisionNo. App'd. By Date
Designed By: Drawn By: Checked By:
Issue Date: Project No: Scale:
Drawing No:
AS SHOWN
ALBANY CAPITAL CENTER
1
A
234567891011121314
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
OGS Project Number: SA601
2/5/
2015
3:5
4:59
PM
A-511
02/06/15 36674
ANS ANS SMP
STAIR DETAILS
BID PACKAGE #3 -PHASE #3
MD MM 02/06/15
KEYNOTE LEGENDKey Value Keynote Text
05 12 00.B0 STEEL BEAM REF:STRUCTURAL
05 12 00.P1 BENT STEEL PLATE POURSTOP
05 50 00.F1 ABRASIVE METAL NOSING05 51 00.C1 CONC-FILLED PAN TREAD05 51 00.C2 CONC-FILLED PAN LANDING05 51 00.C5 STEEL CHANNEL STRINGER
PAINTED05 51 00.C6 STEEL TUBE STRINGER
PAINTED05 51 00.D1 STEEL TUBE HANDRAIL 1-1/2"
O.D.05 51 00.D2 STEEL TUBE GUARDRAIL
PAINTED05 52 13.A2 HANDRAIL BRACKET05 73 00.A2 DECORATIVE STAINLESS
STEEL HANDRAILS & POSTS05 73 00.B1 1/2" CLEAR TEMPERED GLASS05 73 00.B5 STAINLESS STEEL GUARDRAIL
SHOE05 73 00.B6 STAINLESS STEEL GUARDRAIL
CAP08 80 00.F3 1/2" LAMINATED GLASS09 66 23.B1 PRECAST TERRAZZO STAIR
TREAD09 96 00.C1 HIGH-PERFORMANCE
COATING HPC-1
1 1/2" = 1'-0"
G1DETAIL @ ST1 INT. LANDING
1 1/2" = 1'-0"
A4DETAIL @ ST1 TOP LANDING 1 1/2" = 1'-0"
A1DETAIL @ ST1 BOTTOM0 1'6"
0 1'6"
0 1'6" 1 1/2" = 1'-0"
A7TYP. DETAIL @ EGRESS STAIR ON SLAB
1 1/2" = 1'-0"
G4TYP. DETAIL @ EGRESS STAIR INT. SLAB 1 1/2" = 1'-0"
G11TYP. DETAIL @ EGRESS STAIR INT. LANDING
1 1/2" = 1'-0"
A11TYP. DETAIL @ EGRESS STAIR INT. LANDING
1 1/2" = 1'-0"
G7TYP. DETAIL @ EGRESS STAIR INT. SLAB
0 1'6"0 1'6"
0 1'6" 0 1'6" 0 1'6"
Trav
el P
hoto
grap
hy
tower bridge | London, England
single rose on a cold morning | Orvieto, Italy
stranded boat on shore | Roatan, Honduras
duomo | Orvieto, Italy
guggenheim museum | New York, New York
sunset | Castiglion del Lago, Italy
coliseum | Rome, Italy
park guell | Barcelona, Spain
simpson