POWER AUGMENTATION IN KERALA-ISSUES,
CHALLENGES AND SOLUTION
![Page 2: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/2.jpg)
05/02/2023
2
BY:-
ASHIK.SROOPESH.R.NAIR
ELECTRICAL AND ELECTRONICS ENGINEERING
AMMINI COLLEGE OF ENGINEERING
![Page 3: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/3.jpg)
05/02/2023
3
INTRODUCTION:- As Electricity has become one of the most essential
requirement for human existence and development.
The Availability of electricity to all is essential for the sustainable development of a society.
So for the sustainable development of our state Kerala the augmentation of power is necessary.
Here we discuss about the issues and challenges faced by power sector of the state and solutions for it.
![Page 4: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/4.jpg)
05/02/2023
4
POWER SCENARIO OF KERALA :- The electricity scenario in Kerala is at a turning point, as the state is making a shift from hydro sources to non-hydro sources of power generation.
Power scenario in the state is becoming complex day by day because of scarcity of power especially during peak hours.
The total installed capacity of the state is 2846.001 MW (11941.9 MU).
![Page 5: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/5.jpg)
05/02/2023
5
![Page 6: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/6.jpg)
05/02/2023
6
2194.135 MW is generated by KSEB owned station and the remaining of independent power producers.
Average peak hour demand of Kerala is about 3400 MW with a daily demand of around 60 MU.
Around 15 MU of this demand is met from the state generation.
The rest of the demand is catered by central share and purchases from power trade exchanges and via independent power producers.
![Page 7: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/7.jpg)
05/02/2023
7
Issues & Challenge
s
Transmission and
distribution
Environment
implementing project
Non payment of
Tariff
Power theft
Increase in domestic
consumption
Cost escalation and
delay
![Page 8: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/8.jpg)
05/02/2023
8
ISSUES AND CHALLENGES:
Increasing Domestic Consumption:-• A key issue faced by the state is ever increasing domestic
(household). As most of the households are electrified.
Transmission and Distribution:-• For the past many years, Kerala has been consistently
maintaining a very poor T & D system, which led to a very high T & D losses.
• Non availability of Transmission corridor has made the power from central share and purchase exchange outside the state
very difficult.
![Page 9: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/9.jpg)
05/02/2023
9
Cost Escalation and Delay in Implementing Projects:-
• Most of the power projects in the state get delayed due to many factors increase the cost of the project.
• The delay in the projects incur opportunity cost on the state.
Environmental Concerns :-
• As Kerala is located at the western Ghats the implementation of the hydroelectric projects have ecological concerns.
![Page 10: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/10.jpg)
05/02/2023
10
Power theft:-
• Power theft refers to taking connections from overhead or underground supply lines before getting recorded by meter.
• Power theft also increases the transmission losses.
![Page 11: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/11.jpg)
05/02/2023
11
Non Payment of Tariff:-
• Other big challenge for power sector in Kerala is the non payment of the tariff charges by big consumers.
• The non payment by big consumers have caused KSEB deficient in funds.
![Page 12: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/12.jpg)
05/02/2023
12
Solutions
Roof top solar panel
Floating solar panel
Small or mini
hydroelectric project
Construction of
transmission corridor
Improved transmissio
n & distribution
Use of energy efficient
equipment's
Avoiding power theft
Improved tariff
collection
![Page 13: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/13.jpg)
05/02/2023
13
SOLUTIONS :
The solutions for the different issues and challenges are:-
Rooftop solar panels:
• The introduction of solar panels on the rooftop of both domestic and commercial consumers will not only make the consumer independent of grid.
• This will also give KSEB additional power in the grid for supply.
![Page 14: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/14.jpg)
05/02/2023
14
Floating solar panels:
• As the state have many ponds and dams the solar panels can be kept floating on it for solar power.
• This will also decrease the rate of evaporation of water in the hydroelectric projects.
![Page 15: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/15.jpg)
05/02/2023
15
Small or Mini hydroelectric projects:
• To avoid the ecological damages the implementation of small hydroelectric projects in place of large projects.
• This will also help to overcome time delay and cost escalation caused in large scale projects.
![Page 16: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/16.jpg)
05/02/2023
16
Construction of transmission corridor:
• This is necessary for transmission of power purchased from power exchanges.
• For this we have to speed up land acquisition process.
![Page 17: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/17.jpg)
05/02/2023
17
Improving Transmission and distribution network:-
• We should improve our transmission and distribution system for reducing the transmission and distribution losses.
Promote the use of energy efficient equipments:-
• We should promote the usage of energy efficient equipments to decrease the household consumption.
![Page 18: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/18.jpg)
05/02/2023
18
Avoiding power Theft:-
• We should check regularly to avoid power theft .
• We should also make the public the problems that cause to the state.
Improving Tariff collection:-
• Tariff collection should be made more efficient to avoid large dues.
• Strict action should be taken against defaulters.
![Page 19: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/19.jpg)
05/02/2023
19
REFERENCE:-
WWW.GOOGLE.COM
WWW.WIKIPEDIA.COM
www.kseb.in
![Page 20: Ashik.S and Roopesh. R. Nair seminar 2016](https://reader036.fdocuments.in/reader036/viewer/2022082906/58f0eaf71a28ab1e198b4593/html5/thumbnails/20.jpg)
05/02/2023
20
THANK YOU