Ashik.S and Roopesh. R. Nair seminar 2016

20
POWER AUGMENTATION IN KERALA-ISSUES, CHALLENGES AND SOLUTION 0 8 / 2 8 / 2 0 2 2 1

Transcript of Ashik.S and Roopesh. R. Nair seminar 2016

Page 1: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

1

POWER AUGMENTATION IN KERALA-ISSUES,

CHALLENGES AND SOLUTION

Page 2: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

2

BY:-

ASHIK.SROOPESH.R.NAIR

ELECTRICAL AND ELECTRONICS ENGINEERING

AMMINI COLLEGE OF ENGINEERING

Page 3: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

3

INTRODUCTION:- As Electricity has become one of the most essential

requirement for human existence and development.

The Availability of electricity to all is essential for the sustainable development of a society.

So for the sustainable development of our state Kerala the augmentation of power is necessary.

Here we discuss about the issues and challenges faced by power sector of the state and solutions for it.

Page 4: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

4

POWER SCENARIO OF KERALA :- The electricity scenario in Kerala is at a turning point, as the state is making a shift from hydro sources to non-hydro sources of power generation.

Power scenario in the state is becoming complex day by day because of scarcity of power especially during peak hours.

The total installed capacity of the state is 2846.001 MW (11941.9 MU).

Page 5: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

5

Page 6: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

6

2194.135 MW is generated by KSEB owned station and the remaining of independent power producers.

Average peak hour demand of Kerala is about 3400 MW with a daily demand of around 60 MU.

Around 15 MU of this demand is met from the state generation.

The rest of the demand is catered by central share and purchases from power trade exchanges and via independent power producers.

Page 7: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

7

Issues & Challenge

s

Transmission and

distribution

Environment

implementing project

Non payment of

Tariff

Power theft

Increase in domestic

consumption

Cost escalation and

delay

Page 8: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

8

ISSUES AND CHALLENGES:

Increasing Domestic Consumption:-• A key issue faced by the state is ever increasing domestic

(household). As most of the households are electrified.

Transmission and Distribution:-• For the past many years, Kerala has been consistently

maintaining a very poor T & D system, which led to a very high T & D losses.

• Non availability of Transmission corridor has made the power from central share and purchase exchange outside the state

very difficult.

Page 9: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

9

Cost Escalation and Delay in Implementing Projects:-

• Most of the power projects in the state get delayed due to many factors increase the cost of the project.

• The delay in the projects incur opportunity cost on the state.

Environmental Concerns :-

• As Kerala is located at the western Ghats the implementation of the hydroelectric projects have ecological concerns.

Page 10: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

10

Power theft:-

• Power theft refers to taking connections from overhead or underground supply lines before getting recorded by meter.

• Power theft also increases the transmission losses.

Page 11: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

11

Non Payment of Tariff:-

• Other big challenge for power sector in Kerala is the non payment of the tariff charges by big consumers.

• The non payment by big consumers have caused KSEB deficient in funds.

Page 12: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

12

Solutions

Roof top solar panel

Floating solar panel

Small or mini

hydroelectric project

Construction of

transmission corridor

Improved transmissio

n & distribution

Use of energy efficient

equipment's

Avoiding power theft

Improved tariff

collection

Page 13: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

13

SOLUTIONS :

The solutions for the different issues and challenges are:-

Rooftop solar panels:

• The introduction of solar panels on the rooftop of both domestic and commercial consumers will not only make the consumer independent of grid.

• This will also give KSEB additional power in the grid for supply.

Page 14: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

14

Floating solar panels:

• As the state have many ponds and dams the solar panels can be kept floating on it for solar power.

• This will also decrease the rate of evaporation of water in the hydroelectric projects.

Page 15: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

15

Small or Mini hydroelectric projects:

• To avoid the ecological damages the implementation of small hydroelectric projects in place of large projects.

• This will also help to overcome time delay and cost escalation caused in large scale projects.

Page 16: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

16

Construction of transmission corridor:

• This is necessary for transmission of power purchased from power exchanges.

• For this we have to speed up land acquisition process.

Page 17: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

17

Improving Transmission and distribution network:-

• We should improve our transmission and distribution system for reducing the transmission and distribution losses.

Promote the use of energy efficient equipments:-

• We should promote the usage of energy efficient equipments to decrease the household consumption.

Page 18: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

18

Avoiding power Theft:-

• We should check regularly to avoid power theft .

• We should also make the public the problems that cause to the state.

Improving Tariff collection:-

• Tariff collection should be made more efficient to avoid large dues.

• Strict action should be taken against defaulters.

Page 19: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

19

REFERENCE:-

WWW.GOOGLE.COM

WWW.WIKIPEDIA.COM

www.kseb.in

Page 20: Ashik.S and Roopesh. R. Nair seminar 2016

05/02/2023

20

THANK YOU